PDF Energy Analyst 27[1].04.10-Presentation Final

Embed Size (px)

Citation preview

  • 8/8/2019 PDF Energy Analyst 27[1].04.10-Presentation Final

    1/30

    nergy

    Powering a Brighter TomorrowPowering a Brighter Tomorrow

    1

    Q4 FY 2010

    Q4FY2010

  • 8/8/2019 PDF Energy Analyst 27[1].04.10-Presentation Final

    2/30

    AGENDA

    OperationalPerformanceOperationalPerformance

    FinancialPerformanceFinancialPerformance

    StatusofProjectsStatusofProjects

    WayForwardWayForward

    2

  • 8/8/2019 PDF Energy Analyst 27[1].04.10-Presentation Final

    3/30

    OPERATIONALPERFORMANCE

    3

  • 8/8/2019 PDF Energy Analyst 27[1].04.10-Presentation Final

    4/30

    OperationalPerformance

    Net

    Generation

    (

    Million

    Units)Net

    Generation

    (

    Million

    Units) 5,171

    152 %

    2,0561,791

    71 %

    246 %

    Q4FY09 Q4FY10 FY 2009 FY 2010

    518

    39 %

    29 %

    58 %32 %42 %

    ong erm a es or erm a es

    RealizationRs.PerUnitRealizationRs.PerUnit

    Q4FY2009 Q4FY2010 FY 2009 FY 2010

    Short Term Realisation 6.63 4.59 7.08 4.86

    Average Realisation 5.25 4.26 6.03 4.52

    4

  • 8/8/2019 PDF Energy Analyst 27[1].04.10-Presentation Final

    5/30

    OperationalPerformance

    NETGENERATION(Mu)NETGENERATION(Mu) FY10FY10FY09FY09Q4FY09Q4FY09 Q4FY10Q4FY10

    Vijayanagar(SBU

    II)

    -1159

    -2905

    Barmer(RWPLI) - 106 - 155

    o a e enera on

    Vijayanagar (SBUI) 100.2 100.9 97.9 100.0

    Vijayanagar(SBUII) - 96.7 - 93.8

    Barmer(RWPL

    I)

    -43.9

    -45.9

    5

  • 8/8/2019 PDF Energy Analyst 27[1].04.10-Presentation Final

    6/30

    FINANCIALPERFORMANCE

    6

  • 8/8/2019 PDF Energy Analyst 27[1].04.10-Presentation Final

    7/30

    FinancialHighlights- Standalone

    1,3562,441

    TotalIncome*(Rs.Crores)TotalIncome*(Rs.Crores) EBITDA (Rs.Crores)EBITDA (Rs.Crores)

    53 %60 %

    847

    184

    409

    373

    1,594

    802

    115 %

    122 %

    Q4 Annual

    FY 09 FY 10

    Q4 Annual

    FY 09 FY 10

    *IncludesOtherIncome

    847

    969

    PBT (Rs.Crores)PBT (Rs.Crores) PAT(Rs.Crores)PAT(Rs.Crores)

    45 % 46 %

    578

    315

    667

    298

    127 %180 %

    Q4 Annual

    FY 09 FY 10

    131

    Q4 Annual

    FY 09 FY 107

  • 8/8/2019 PDF Energy Analyst 27[1].04.10-Presentation Final

    8/30

    StandaloneResults

    TotalIncome (Rs.Crores) 372.92 802.35 1593.98 2441.03

    Q4FY2009Q4FY2009 Q4FY2010Q4FY2010 FY 2009FY2009 FY 2010FY2010

    EBITDA

    (Rs.

    Crores) 184.38 409.01 847.09 1356.03

    EBITDA(%) 49.44 50.98 53.14 55.55

    Interest(Rs.Crores) 38.43 71.73 120.28 262.30

    Depreciation

    (Rs.

    Crores) 15.05 38.92 59.63 124.32

    PBT(Rs.Crores) 130.90 298.36 667.18 969.41

    PAT(Rs.Crores) 112.36 315.03 578.08 846.67

    . . . . .

    8

  • 8/8/2019 PDF Energy Analyst 27[1].04.10-Presentation Final

    9/30

    FinancialHighlights- Consolidated

    1,2882,429

    TotalIncome* (Rs.Crores)TotalIncome* (Rs.Crores) EBITDA (Rs.Crores)EBITDA (Rs.Crores)

    31 %

    135 %

    549

    389

    484

    1,852

    843

    74 % 302 %

    97

    Q4 Annual

    FY 09 FY 10

    Q4 Annual

    FY 09 FY 10

    745868

    PBT (Rs.Crores)PBT (Rs.Crores) ..

    169 %136 %

    * ncu es er ncome

    277273368

    256

    1047 %495 %

    24

    Q4 Annual

    FY 09 FY 10

    43

    Q4 Annual

    FY 09 FY 109

  • 8/8/2019 PDF Energy Analyst 27[1].04.10-Presentation Final

    10/30

    ConsolidatedResults

    TotalIncome (Rs.Crores) 483.65 842.91 1852.16 2429.26

    Q4FY2009Q4FY2009 Q4FY2010Q4FY2010 FY 2009FY2009 FY 2010FY2010

    EBITDA

    (Rs.

    Crores) 96.68 389.10 548.99 1287.65

    EBITDA(%) 19.99 46.16 29.64 53.01

    Interest(Rs.Crores) 38.45 86.49 120.94 283.70

    Depreciation

    (Rs.

    Crores) 15.29 47.03 60.21 136.10

    PBT(Rs.Crores) 42.94 255.57 367.84 867.85

    PAT(Rs.Crores) 23.80 273.03 276.69 745.49

    . . . . .

    10

  • 8/8/2019 PDF Energy Analyst 27[1].04.10-Presentation Final

    11/30

    FinancialHighlights

    ConsolidatedasatMarch31,2010ConsolidatedasatMarch31,2010

    Rs.Crores

    Net Worth 4780.20

    Debt 7870.14

    Net Fixed Assets * 11597.94

    .

    Weighted Average Cost of Debt (%) 11.51

    11

    *Including CWIP

  • 8/8/2019 PDF Energy Analyst 27[1].04.10-Presentation Final

    12/30

    MAJORDEVELOPMENTS

    12

  • 8/8/2019 PDF Energy Analyst 27[1].04.10-Presentation Final

    13/30

    MajorDevelopments

    PERFORMANCEPERFORMANCE PROJECTSPROJECTS VERTICALINTEGRATIONVERTICALINTEGRATION

    260MWgeneratingstationconferredNationalAwardformeritorious

    AcquisitionofmajoritystakeinSouthAfricanCoalMiningHoldingLimited

    in

    April

    2010

    400KVDoubleCircuitQuadMooseConductorTransmissionlinefromJaigad

    to

    New

    Koyna

    performancefor2009 DomesticCoallinkage

    approvedforRWPLfortwoyears

    c arge nApr 2010

    13

  • 8/8/2019 PDF Energy Analyst 27[1].04.10-Presentation Final

    14/30

    AcquisitionofMajorityStakeinSACMH

    KeyFeaturesKeyFeatures

    LocationUmlabu

    &

    Ilanga

    (Wit

    Bank

    Region),

    South

    Africa

    JSWEnergyacquired49.8%stakeinRoyalBafokengCapitalbyprovidingavalueofZAR30centspershareof

    Resources*m a u: xp ore , nexp ore

    Ilanga:1MT

    Reserves* Umlabu:

    Explored

    14

    MT,

    Unexplored

    6

    MTIlan a:1MT

    SACMH

    Totalpayoutforacquiring100%

    stakein

    SACMH

    ZAR

    160.69

    DistancetoPort

    RBCT:402Km

    Maputo:405Km

    Durban:520Km

    .

    RichardsBayCoalTerminalEntitlementformilliontonsperannum

    CoalSpecifications

    GCV(NAR) 6000Kcal - 6200Kcal

    Railwaysidingwithintheminewithacapacitytohandleupto5milliontonsperannum

    Investment

    time)

    *As per SRK Report 14

  • 8/8/2019 PDF Energy Analyst 27[1].04.10-Presentation Final

    15/30

    STATUSOFPROJECTS

    15

  • 8/8/2019 PDF Energy Analyst 27[1].04.10-Presentation Final

    16/30

    Jaigad

    Power

    Transco

    Ltd.-

    JV

    with

    MSETCL

    StatusUpdateStatusUpdateProjectDetailsProjectDetails

    GrossCapacity 1200MW,400KVTransmission

    Jaigad to New Koyna charged

    Technology

    ou e rcu t ua ooseConductorLine

    Procurement Ordersplaced

    Tower Foundations: 71%Tower Erection: 39%

    ProjectCost

    Rs.580CroresincludingIDC

    Debt:Equity:75:25

    ActualspenttillMar31,2010:

    Land:Rightofwayachieved

    . .

    ExpectedCommissioning

    November2010

    16

  • 8/8/2019 PDF Energy Analyst 27[1].04.10-Presentation Final

    17/30

    JointVentures

    BLMCL MinedevelopmentprocesscommencedatKapurdi

    tatus

    p atetatus

    p ate

    Expectedto

    extract

    lignite

    by

    first

    quarter

    of

    calendar

    2011

    MJSJCoal Publichearingprocesscompleted

    Landacquisitioninprocess

    Targettocommenceproductionin2011

    Leveling&soilfillingwork&100%pilingworkcompleted

    JSWToshiba Ground

    broken

    for

    turbine

    manufacturing

    facility

    Contractsforcivilworksfinalised

    Totalprojectcompletion16%

    BlademanufacturingbyYear2011

    17

  • 8/8/2019 PDF Energy Analyst 27[1].04.10-Presentation Final

    18/30

    GENERATIONPROJECTS

    18

  • 8/8/2019 PDF Energy Analyst 27[1].04.10-Presentation Final

    19/30

    RajWestPowerLtd.Barmer - I

    StatusU dateStatusU date

    GrossCapacity 1,080MW(8x135)

    Technology Sub-criticalCaptiveLignitebasedTPP

    Full load operation achieved for unit 1

    Unit 2 Boiler H dro test is com leted

    FuelLinkageFSA

    with

    BLMCL

    (49%

    JV)

    for

    supply

    of

    lignitefromcaptiveligniteminesofBLMCL Target Synchronization

    89%

    erection

    of

    Unit

    2

    BTG

    completed

    WaterAllocation

    AllocationfromIGNP Unit 2 May10

    Unit 3 August10

    PowerOfftakeLongTerm:PPAforentirecapacitywithstateGovernmentdistributionutilities

    Unit 4 October10

    Unit 5 December10

    ProjectCost

    Total

    Cost:

    Rs.

    5000

    CrsDebt/Equity:75:25

    AmtspenttillMar31,2010:

    Rs.4,781.0Crs

    Unit 6 January 11

    Unit 7 March11

    Unit 8 February11

    19

  • 8/8/2019 PDF Energy Analyst 27[1].04.10-Presentation Final

    20/30

    JSWEnergy(Ratnagiri)Ltd.- 4x300MW

    bi

    GrossCapacity 1200MW(4x300)

    Boiler-1 light up and chemical cleaningcompleted

    StatusUpdateStatusUpdateProjectDetailsProjectDetails

    ec no ogy u -cr ca mpor e oa ase

    FuelLinkage LongtermsupplyarrangementforIndonesiancoal

    -

    Start up power commenced on April 16th

    and three bays of switchyard chargedFinancialclosureachieved

    a erAllocation

    MIDC+SeaWater

    300

    MW

    to

    MSEDCL

    for

    25

    years

    with

    pass

    throu hParticulars % of total

    Turbine -1barringgearoperationisinprogress

    PowerO ta eAbilitytoavailshorttermratesforbalance900MW

    TotalCost:Rs.4500Crs

    PCC & RCC 89

    TG Structural Fabrication 89

    TG Structural Erection 65

    ProjectCost Debt

    /Equity:

    75:25

    AmtspenttillMar31,2010:

    Rs.3,526.6Crs

    Boiler1 Erection 94

    Boiler2 Erection 90

    64

    ExpectedCommissioning

    Un tI nMay2010

    EntireprojectbyNovember/December

    2010

    Boiler4 erection 54

    20

  • 8/8/2019 PDF Energy Analyst 27[1].04.10-Presentation Final

    21/30

    RajWestPowerLtd.BarmerII - 2x135MW

    StatusUpdateStatusUpdateProjectDetailsProjectDetails

    GrossCapacity 270MW(2x135)

    Technology SubcriticalCaptivelignitebasedTPP

    FuelLinka e A liedtoMinistr ofCoal

    Land in possession

    Appliedforcoallinkage

    WaterAllocation

    AllocationfromIGNP

    PowerOfftake

    arrangements

    ProjectCost TotalCost:Rs.1350Crs

    ExpectedCommissioning

    January2013

    21

  • 8/8/2019 PDF Energy Analyst 27[1].04.10-Presentation Final

    22/30

    KutehrHydroProject- 3x80MW

    Public hearing for Environment clearance

    StatusUpdateStatusUpdateProjectDetailsProjectDetails

    GrossCapacity 240MW(3x80)

    Technology Run-of-the-riverHydropower

    e success u y on pr

    Prequalification

    tenders

    floated

    for

    Main

    CivilWorks

    HPSEBapprovedconstructionpowerof3

    WaterAllocation

    RaviRiver

    Freepower

    to

    GoHP

    12%

    to

    30%

    LandAcquisitioninProcess

    Techno

    Economic

    Clearance

    from

    CEA

    awaitedPowerOfftake

    .Balancethroughshorttermarrangements

    TotalCost:Rs.1915.2Crs.

    ProjectCost Debt

    /

    Equity:

    56:44AmtspenttillMar31,2010:Rs.89.0Crs

    CommissioningSeptember2015

    22

  • 8/8/2019 PDF Energy Analyst 27[1].04.10-Presentation Final

    23/30

    ChhattisgarhPowerProject- 2x660MW

    Project site clearance received from StateGovernment in July09

    GrossCapacity 1,320MW(2x660)

    StatusUpdateStatusUpdateProjectDetailsProjectDetails

    TOR received from MoEF

    Rail Transport Clearance received

    TechnologySuper-criticaldomesticcoalbased

    TPP

    MoUsignedwithGoCGforsettingupa

    DPR finalised

    Landacquisition

    in

    progress

    TPPalongwithintegratedcoalmine

    FuelLinkage

    11%interestincoalblockjointly

    allocated;applied

    for

    additional

    coal

    BTG bid evaluation process commencedWaterAllocation

    35mncmpawaterallocatedfromMahanadiRiver

    PowerOfftake Combination

    of

    LTPPA

    and

    short

    term

    agreementswithJSWPTC;35%toStateGovt.

    Rs.6,500CrsProjectCost Amt spenttillMar31,2010:

    Rs.19.5Crs

    Expected

    CommissioningUnit

    I-

    July2014

    UnitII November2014 23

  • 8/8/2019 PDF Energy Analyst 27[1].04.10-Presentation Final

    24/30

    WestBengalPowerProject- 2x800MW

    GrossCapacity 1,600MW(2x800)

    Su er-criticalDomesticcoalbased

    Water availability study conducted

    StatusUpdateStatusUpdateProjectDetailsProjectDetails

    ec no ogyTPP

    ShareHolding74% - JSWEL26% - JSWBengalSteelLimited

    Bengal State Power Distribution Co. Ltd. for

    entering into a long term Power PurchaseAgreement for surplus power.

    FuelLinkage

    IchhapurMines- WBMDTCtosupply

    fuel

    procurement on March 31, 2010

    DPR finalised

    PowerOfftake

    Captivesaletothesteelplantontwo

    parttariffframeworkandbalancefor

    BTG bid evaluation by June 2010

    outsidesale

    ProjectCost

    Rs.7680CrsforPowerplantRs.2000CrsforMinesDevelopment

    AmtspenttillMar31,2010:Rs.8.6Crs

    Expected

    Commissioning

    UnitI:2014

    UnitII

    :2015

    24

  • 8/8/2019 PDF Energy Analyst 27[1].04.10-Presentation Final

    25/30

    JSWEnergy(RatnagiriII)Ltd. 3200MW

    StatusUpdateStatusUpdateProjectDetailsProjectDetails

    ,

    Technology Super-critical

    imported

    coal

    based

    TPP

    Authority

    Maharashtra

    Fuel

    Linkage

    ImportedCoalfromIndonesiaand

    Mozambique-Agreements

    in

    place

    WaterAllocation SeaWater

    PowerOfftake Participatedinbidsforpowertie-up

    ProjectCost Rs.150Bn.

    ExpectedCommissioning

    April2015

    25

  • 8/8/2019 PDF Energy Analyst 27[1].04.10-Presentation Final

    26/30

    JharkhandPowerProject 1620MW

    StatusUpdateStatusUpdateProjectDetailsProjectDetails

    ,

    Technology1,320MW - Super-criticalDomesticcoalbasedTPP;300MWSub-critical

    an en e

    Appliedfor

    coal

    linkage

    Authority MoUwithGoJ

    WaterAllocation Water

    is

    proposed

    to

    be

    sourced

    from

    PowerOfftake25%toStateGovernment;restthroughLTPPAandSTPPAwithJSWPTC

    ProjectCost Rs.79Bn.

    ExpectedAugust2015

    26

  • 8/8/2019 PDF Energy Analyst 27[1].04.10-Presentation Final

    27/30

    Strategy&WayForward

    Ensurefuel

    security

    Creating worldclasspowerutilitycompany

    Balancedoff-takearrangements

    u generat onassetsw tdiversifiedfuel

    Captureopportunityprovidedbypowersector

    2727

  • 8/8/2019 PDF Energy Analyst 27[1].04.10-Presentation Final

    28/30

    SitePhotographs:RajWestPowerLimited

    PlantOverviewPlantOverview

    PlantOverviewPlantOverview

    2828

  • 8/8/2019 PDF Energy Analyst 27[1].04.10-Presentation Final

    29/30

    PlantOverviewPlantOverview

    Line1ErectionCompletedLine1ErectionCompleted

    2929

  • 8/8/2019 PDF Energy Analyst 27[1].04.10-Presentation Final

    30/30

    Certain statements in this report concerning our future growth prospects are forward looking statements,which involve a number of risks, and uncertainties that could cause actual results to differ materially from

    those in such forward looking statements. The risk and uncertainties relating to these statements include,but are not limited to risks and uncertainties regarding fluctuations in earnings, our ability to manage growth, intense competition within Power industry including those factors which may affect our cost

    , , ,cost overruns on fixed- price, fixed-time frame contracts, our ability to commission mines withincontemplated time and costs, our ability to raise the finance within time and cost client concentration,restrictions on immigration, our ability to manage our internal operations, reduced demand for power, ourabilit to success ull com lete and inte rate otential ac uisitions, liabilit or dama es on our servicecontracts, the success of the companies in which the Company has made strategic investments, withdrawalof fiscal/governmental incentives, impact of regulatory measures, political instability, legal restrictions onraising capital or acquiring companies outside India, unauthorized use of our intellectual property and

    general economic conditions affecting our industry. The company does not undertake to update anyorwar oo ng s a emen s a may e ma e rom me o me y or on e a o e company.

    30