Exhibit J-1. Stakeholder Group Information Packets Tucson Electric Power Rosemont 138kV Transmission Line Project J-13 CEC Application November 2011

PDF 8257 KB - Tucson Electric Power

  • Upload
    others

  • View
    7

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PDF 8257 KB - Tucson Electric Power

Exhibit J-1. Stakeholder Group Information Packets

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-13 CEC Application November 2011

Page 2: PDF 8257 KB - Tucson Electric Power

THIS PAGE INTENTIONALLY LEFT BLANK

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-14 CEC Application November 2011

Page 3: PDF 8257 KB - Tucson Electric Power

Rosemont 138-kV Transmission Line Project

Stakeholder Group Handbook

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-15 CEC Application November 2011

Page 4: PDF 8257 KB - Tucson Electric Power

THIS PAGE INTENTIONALLY LEFT BLANK

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-16 CEC Application November 2011

Page 5: PDF 8257 KB - Tucson Electric Power

1

�Stakeholder�Group�Roster�� � EPG�Rosemont�138�kV�Transmission�Line�Project� � February�12,�2009�Tucson�Electric�Power�

ROSEMONT 138-KV TRANSMISSION LINE PROJECT STAKEHOLDER GROUP

MEMBERSHIP

The purpose of the Stakeholder Group is to establish a group representing a range of opinions in a forum small enough to allow for thorough education of the participants, detailed discussion of issues, and informal dialogue. EPG, Inc. (EPG) contacted various individuals/organizations for selection of the members that would assist Tucson Electric Power (TEP) and EPG in identifying issues and concerns relevant to the proposed project. Representation of a cross-section of the region includes federal, state, county, and municipal agencies that have administrative jurisdiction within the project area; industry/business; and citizens on behalf of their neighborhoods. Members were selected based on their knowledge of the project area, capability to commit the time required to participate in the Stakeholder Group throughout the planning process, and willingness to participate in an impartial manner.

ROSTER OF STAKEHOLDER GROUP MEMBERS

Federal�� Bev Everson ([email protected])/Teresa Ann�Ciapusci ([email protected]),

Coronado National Forest �� Cindy Alvarez ([email protected])/Dan Moore ([email protected]),

Bureau of Land Management, Tucson

State�� Tim Bolton ([email protected]), Arizona State Land Department �� Steve Husman ([email protected]), Santa Rita Experimental Range

City/Town�� Chris Kaselemis ([email protected]), City of Tucson �� Orlanthia Henderson ([email protected])/John Neuneubel

([email protected]), Town of Sahuarita �� Eddie Peabody ([email protected]), Planning and Zoning Committee, Green Valley

Coordinating Council

Industry/Business�� Bob Iannarino ([email protected])/Mark Weinberg

([email protected])/Ken Abrahams ([email protected]), Diamond Ventures

�� Nan Walden ([email protected]), Farmers Investment Company

Citizens at Large �� Marshall Magruder ([email protected])

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-17 CEC Application November 2011

Page 6: PDF 8257 KB - Tucson Electric Power

2

�Stakeholder�Group�Roster�� � EPG�Rosemont�138�kV�Transmission�Line�Project� � February�12,�2009�Tucson�Electric�Power�

PROJECT TEAM

Tucson Electric Power�� Ed Beck ([email protected]) �� Shannon Breslin ([email protected]) �� Lee Aitken ([email protected]) �� Larry Lucero ([email protected])

EPG, Inc. – Phone (602) 956-4370 �� Lauren Weinstein ([email protected]) �� Jaime Wood ([email protected]) �� Chelsa Johnson ([email protected]) �� Emily Belts ([email protected])

Rosemont Copper �� Kathy Arnold ([email protected]) �� Laurie Woodall, KR Saline (law@krsaline)

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-18 CEC Application November 2011

Page 7: PDF 8257 KB - Tucson Electric Power

1Stakeholder Group Roles & Responsibilities EPGRosemont 138-kV Transmission Line Project February 12, 2009 Tucson Electric Power

ROSEMONT 138-KV TRANSMISSION LINE PROJECT ROLES AND RESPONSIBILITIES

STAKEHOLDER GROUP

Role

The Rosemont 138-kV Project Stakeholder Group (SG) has been established to participate with the study team in the planning process for the proposed project. The SG is an important link to the community; therefore, the SG members should consider the views of the individual group members as well as the views of their representative organizations/communities.

Responsibilities

�� Specifically, input will be sought from the SG members on the following: �� Issues, ideas, and concerns held by the SG members and/or members of the

community/organization in which they are involved �� Resource information and studies �� Criteria by which alternative(s) are identified �� Alternative routes identified �� Impact assessment and mitigation �� Route selection process �� Review and comment on study results at key points

�� Consistency is very important. We ask that you attend all of the SG meetings planned (four) throughout the process.

Meetings will be organized to maximize the time available (approximately 2 hours). If a SG member would like a particular topic addressed, contact Chelsa Johnson or Lauren Weinstein at EPG (602-956-4370) prior to the meeting.

�� Regular communication by SG members with their organizations, agencies, or communities is encouraged. Members of the SG accept the responsibility to keep their associates and constituency groups informed of the progress of the discussions and to seek advice and comments.

�� Attendance at public open house meetings is encouraged.

�� Information disseminated by SG members can be attributed only to an individual and not the entire group.

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-19 CEC Application November 2011

Page 8: PDF 8257 KB - Tucson Electric Power

2Stakeholder Group Roles & Responsibilities EPGRosemont 138-kV Transmission Line Project February 12, 2009 Tucson Electric Power

EPG

Role

EPG is conducting the environmental and public planning process to site a proposed 138-kV transmission line required to meet future electrical demand for the proposed Rosemont operations. Facilitating the public involvement portion of the planning process includes working with the SG and conducting other activities to inform and involve the community.

Responsibilities

�� Notify members of SG of meeting dates and times. �� Host and facilitate all meetings. �� Identify and track all issues discussed at SG meetings. Provide information on any

decisions made by the project study team in response to issues raised by SG. �� Provide relevant technical information to SG in conjunction with the planning process. �� Consider and incorporate the SG’s views in the planning process.

TUCSON ELECTRIC POWER

Role

During the public planning process, Tucson Electric Power (TEP) will be the technical advisor to the SG. TEP will also serve as the lead contact with the media.

Responsibilities

�� Provide a description of the project.

�� Provide an explanation of the purpose of and need for the project.

�� Provide information, TEP policy, and/or relevant data sufficient to address issues and concerns raised by the SG and public.

�� Provide technical information (e.g., engineering, system planning) sufficient to enhance the SG’s understanding of the project.

�� Select alternative(s) to be carried forward for detailed environmental impact analysis.

Select preferred route(s) to be carried forward in the CEC application and before the Arizona Power Plant and Transmission Line Siting Committee based on the various

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-20 CEC Application November 2011

Page 9: PDF 8257 KB - Tucson Electric Power

3Stakeholder Group Roles & Responsibilities EPGRosemont 138-kV Transmission Line Project February 12, 2009 Tucson Electric Power

decision elements: environmental, public acceptability, permits, engineering, right-of-way acquisition, cost, purpose and need

ROSEMONT COPPER COMPANY

Role

During the public planning process, Rosemont Copper Company (RCC) will work with TEP to provide technical data as necessary, ensure power requirements are well defined and that all options for receiving power are identified. RCC will also provide assistance for TEP’s identification and selection of route options to be carried forward for detailed environmental impact analyses.

Responsibilities

�� Provide resource information and studies.

�� Monitor meetings and participate, as necessary or as requested.

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-21 CEC Application November 2011

Page 10: PDF 8257 KB - Tucson Electric Power

THIS PAGE INTENTIONALLY LEFT BLANK

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-22 CEC Application November 2011

Page 11: PDF 8257 KB - Tucson Electric Power

S:\EPG\projects\Rosemont Copper\TEP Rosemont Line\Public Participation\Stakeholder group\Meeting #1\Agenda meeting #1a.doc

Rosemont 138-kV Transmission Line Project

Agenda – Stakeholder Group Meeting #1February 12, 2009, 11:00am – 1:30pm

Unisource building, 2nd Floor Conference Room One South Church Street Tucson, Arizona 85702

�� Welcome and introductions

�� Agenda �� Roles and responsibilities of stakeholder group

�� Electric systems - basics �� Planned facilities and study area

�� Purpose and need for the project - TEP’s system planning process

�� Planning process and public participation activities

�� Environmental studies - Inventory - Siting criteria - Opportunities and constraints

�� Comments and questions

�� Next meeting

�� Action Items

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-23 CEC Application November 2011

Page 12: PDF 8257 KB - Tucson Electric Power

THIS PAGE INTENTIONALLY LEFT BLANK

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-24 CEC Application November 2011

Page 13: PDF 8257 KB - Tucson Electric Power

ROSEMONT 138-KV TRANSMISSION LINE PROJECT

ROSEMONT 138-KV TRANSMISSION LINE PROJECT

Presentation�������� � �� ������� ��

��� �� ����������

�������� �� ���������������� �� ����������

AgendaAgenda

� ���� ��������� ������!� "��! ��� �!��!��������!� "��!����� �!��!��������!� # $����%� %��&'�� $����!������ ������ �!��������������!� �����������!�!�� ����� ����%�!�

� #��������� ��!!�����!�������� (�%� � ������!�����!� )������������������� ��������������%����!

��� �� �����������

� *��!��(���� ���#&� �+*(#,�����!������ ���!� - ���!�����.��!���!� /�0��!���!

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-25 CEC Application November 2011

Page 14: PDF 8257 KB - Tucson Electric Power

Stakeholder Group PurposeStakeholder Group Purpose

" � � � � � � $ � �� ��� "�� �!�����������!���������� ����� ����$� �!������!��� ������ � �� !����!�������!

� )��������������%������ ������������1� �!������� �� ��� ������!������������!����������������� ��!!

��� �� ����������2

Stakeholder Group -Roles and ResponsibilitiesStakeholder Group -Roles and Responsibilities

� � �� �� �� �� ������������ 3�����1�������!!��!�� ������������������ ��!!� - ��������� $������1 ��������� ���!�������!� "�%��&������ ������!����� �!���!������������!� )������������������!�� ������!

��� �� ����������4

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-26 CEC Application November 2011

Page 15: PDF 8257 KB - Tucson Electric Power

2

Project OverviewProject Overview

� *(# �! � �� � 1 ��! �������� � !� %� �! � �!��� �� *(#���!����� ��1���!������������!� %����!�� �!��������!� ���������� ��������&��256�7�� ��! �!!��������1 ����� �!���"!� ���-��� ��� ����!

� # $����� ����!��������!���1�*��!�������������!�����!� ����������-����1�*��!���*&��1����� �����#� ��-����������1��� ����������!�

) � � � � � � � � � � � ��

��� �� ����������8

� )����������� ��!!������������!���%� � ������!�����!������������������&�������������������!!�!�����������1������������ �� �!��1����� ����%��� ��! �!!�������� ���!�������%� � ������� ����!

Project Overview (continued)Project Overview (continued)

� )���0���!�%����������� ����� � � �&�������� ��� ������� � � � �� ������������������ ��!!

� )�������������1 ���-� ��1������1�(�%� � ������- �����������+-(-,�&�������!�� �����������) �9���- � �����- �!!���+)--,

� *��� $���� �.�� �!� �� ��������1 ����) �9���#&� �#���������* ��! �!!���:�����������- ����������1�������� %�� �� )-- � � � ��!� �����

��� �� ����������;

��� %������)--�� � �����!� �����

� # $����� �����!�!�!�1������� �� ��������&�������) �9���������:����<��� � ������ �!���� %��������� !�� !���&���! ��=:������� �%�����6&��������!

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-27 CEC Application November 2011

Page 16: PDF 8257 KB - Tucson Electric Power

4

Purpose and NeedPurpose and Need

� (���� �����������!�� �� �.�� ���������������1�) �9������� � � � � � � � �� %��������� �����!� %��������!� � !����� �.��!�

� "!� ���-��� �- ������!� �.��!����*(#���� %��������� ����&� ������"!� ���-��� ��� ����!

� *��� � � ���� �!�����������1 ����� �!���� ��! �!!�� ���� �! � � %��� ���.���� ��� �������

��� �� ����������>

� ��! �!!���������!���� %�������.��������� ���������&� �1 ����� �!���"!� ���-��� ��� ����!

� -� ��������� ��� �����0�!������ ��! �!!�������!�����!��!�����!���!� %����!�� �!����� ����

Project DescriptionProject Description

� ?������� 0� ������2�� ���!�1��256�7�� ��! �!!��������� )����61�6&���� ���616&��� )�� 0� ���������� ��1������1 ���!� ��������� ���������� �����������1 ����� �!���"!� ������!�����

� ?�� ���!����0�!�����!��!�����!�&������� �.�� ������������� �� ��

��� �� ����������5

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-28 CEC Application November 2011

Page 17: PDF 8257 KB - Tucson Electric Power

8

Proposed Structure Type(s)Proposed Structure Type(s)

>4@�6 ���@ >4@�6 ���@

��� �� ������������

System Option ASystem Option A

� /�&�!�����6�� ������256�7�� ��! �!!�� ���� 1 � ��! �!!��������1 �7�������!��������� �!���"!� ������!�����

� ?������� ���!

��� �� ������������

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-29 CEC Application November 2011

Page 18: PDF 8257 KB - Tucson Electric Power

;

System Option BSystem Option B

� /�&�!�����6�� ������256�7 � ��! �!!�� �����7�� ��! �!!��������1 ��������!��������� �!���"!� ������!�����

� ?�����5� ���!

��� �� ������������

System Option CSystem Option C

� "��������0�!�����4;6�7����� � �����6�� ���������������� �� ������256�7A4;6�7�� ��! �!!��������1 ��������!��������� ���� %��������!������B������2� ���!

� /�&�!�����6�� ������256�7�� ��! �!!��������1 � ���� %����

��� �� ������������

1 �� ���� %��������!��������� �!���"!� ������!������B�����>� ���!

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-30 CEC Application November 2011

Page 19: PDF 8257 KB - Tucson Electric Power

>

System Option DSystem Option D

� /�&�!�����6�� ������256�7 � ��! �!!���25 �7�� ��! �!!��������1 �����&�!��!��������� ���� ��"������ �!���"!� ������!�����

� ?�����8� ���!

��� �� �����������2

Planning ProcessPlanning Process

� - � ���!�%������������ ��!!���!�!�����1�!�0�� � � � �������!�!

� ������!�����������%� � ����������������� ���������!�!�������&���������A�������������

� ��%� ������� ����%�!�&��������������������1���������%���������� ����� $������ �!����������

��� �� �����������4

� *(#�&����������1����� �1� ��� ���+!,�1 ��� �������������!� ��������!�&�����!����� ����%�� ���!

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-31 CEC Application November 2011

Page 20: PDF 8257 KB - Tucson Electric Power

5

Planning Process (continued)Planning Process (continued)

� *(# &��� � ��� � ��� 1��� � -(- ���������� � ��*(#�&����� ��� ������1������-(-����������������� �%��&���������) �9���#&� �#���������* ��! �!!���:�����������- �����

� *��)--�&���� ������1���������!�������� %�� ���������-(-������������+&��������������!,�

��� �� �����������8

Anticipated Project ScheduleAnticipated Project Schedule

��� �� �����������;

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-32 CEC Application November 2011

Page 21: PDF 8257 KB - Tucson Electric Power

Environmental Studies OverviewEnvironmental Studies Overview

� (�%� � ������ �!� ��!B :�����!��+�0�!����A1��� ��������!������$� �!���������������������������!,

B 7�!����+!������.��������!��!���%��%��&� !������!������ ����� �������������!,

B -���� ���+�������� ���!�� �!���!��� ����������!���!���!�&�����!��� ����������!���!,�

��� �� �����������>

B =�����+&�����1���%���������� � ��!�����!������!��!���%��������,

Preliminary Alternatives IdentificationPreliminary Alternatives Identification

� <�%����!������� ��� ���+!��!���%������%��!������� �������!�&�����!������ ��,

� <��� ������ �������!����A �� �����������1� �!� ��!���%��� ����+�C�C������!� ����D��&�!��!���%���A���� �����������%!C��� �!�D����!��!���%���A�&�� ����������,

� # ��� ��!�������� �������!�������!� ����!������!�!� ��

��� �� �����������5

� 3�����1��� ��� ��� ����������� ����%�!�1 �� ��! �!!�������� ���!

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-33 CEC Application November 2011

Page 22: PDF 8257 KB - Tucson Electric Power

��

Sensitivity LevelsSensitivity Levels

� 3�� ��������B �C�C���� � �!

� E���!��!���%����B �C�C�� �!������!

� ��� ����!��!���%����B �C�C�� ������!������� ��!��11���!���%� � ������������!

��� �� ������������

� :&�!��!���%����B �C�C������!� ����� ��!������%������� ��!����������1��������!

Potential OpportunitiesPotential Opportunities

� (0�!���������� �1���� �!�?������B ?�������!� #&� �����!�� #�������!

B * ��!� ������� ��$ � ��!A� �� ���!�� "��� ��!

��� �� ������������

� "��� ��!� 3���!� ����� ��!� 7�����A����%����������!�&�����!����1���1��� ����1����������%��� ��������!

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-34 CEC Application November 2011

Page 23: PDF 8257 KB - Tucson Electric Power

��

Potential ConstraintsPotential Constraints

� (0�!����� �!������!

� ���� ����� %��� �!�����������%��� ���!

� (����������1��������!�+�C�C��!��!,

� #� �!����� �� �����

� ) ����������!���!������!� ���� �� ���!

��� �� ������������

� F�&��!�������!����!�!�����!�������!� �� �������������

Agency and Public Participation ActivitiesAgency and Public Participation Activities

*(#�:���� ���- ������:���� !'- � / �� � � �B - ����/�������� �!�

B =� ����1�:���������� ���B ) �9���������:����<��� � ���B #� ��-������-����1�*��!���*&��1����� ������ ����7������- ���������-�������7���A-�������- �� �7������ �+��� !�������� !��<�%��� ����

��� �� ������������

<� ��� !��#����� !�����C,B #� ��-�����)!!�������1��%� � ���!

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-35 CEC Application November 2011

Page 24: PDF 8257 KB - Tucson Electric Power

��

Agency and Public Participation ActivitiesAgency and Public Participation Activities

+��������,*� G@�� /���� +��� H�%�� <�!� ���,B *��G �� �/�����+����H�%�� �<�!� ���,

B #�!����I�.���* ���B ) �9���- � �����- �!!���!��11B ���� ��) �9���:���!����%��"�� �!������%�!B ?��%� !����1�) �9����������"����(0�� � ������"�����B <�%�!6������)� �� ���=�!�

��� �� �����������2

Agency and Public Participation Activities Agency and Public Participation Activities

�� � �� ��� �������� �� ��� ������!B �� ���������� � �����

� #�����������!�� ������!B �� ���������� � �����

��� �� �����������4

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-36 CEC Application November 2011

Page 25: PDF 8257 KB - Tucson Electric Power

�2

Agency and Public Participation Activities Agency and Public Participation Activities

� *���������1 ����������+5;;,�;2�68�44� + ,� *(#�&��!����+www.tep.com,� ) �9���!������� �������)J!�&��!���'&&&C��C!����C�9C�!A<�%�!��!A?�������!A(���� ��A:���������6�)J!C�!�

� # $������&!����� !� ��������� ����������������� �!�����!������&�� !�������� ����� �!������ ���!

��� �� �����������8

� ������� ��1���!�+*(#,

TEP Decision ElementsTEP Decision Elements

# � �� #� �!����������� (�%� � ������ #������������ #� ��!� (������ ���� )������ � ����� ���616&��

��� �� �����������;

� )��������������� ���616&��� -!�

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-37 CEC Application November 2011

Page 26: PDF 8257 KB - Tucson Electric Power

�4

Comments and QuestionsComments and Questions

� <�������� !��������� $������ �!���������������� � $ � �� �!���1��������!K

� <�������� !������������������ ��!!K

� ) ���� �������������� ���!�����!�������� ��������������������� ��!!K

) � ����� � � � � � �� � �� � � �

��� �� �����������>

� ) ���� ���������������������!���������!��� ���������!�����!K

� G�� K

Next StepsNext Steps

# ��� �� ��� #�����������!�� ���������

� )��� ����%�������������1������

� �������� �� ��� ���������

��� �� �����������5

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-38 CEC Application November 2011

Page 27: PDF 8257 KB - Tucson Electric Power

TIMELINE July - October 2009May - July 2009May - July 2009April - May 2009September 2008 - February 2009 February - April 2009

ENGINEERING

ENVIRONMENTALPLANNING

PUBLIC INVOLVEMENT

DETAILED INVENTORY AND ALTERNATIVES ASSESSMENT

Identify preferred engineering alternative(s)Review visual simulationsSelect preferred route and alternative(s) to be presented in CEC application, in coordination with customer: Rosemont Copper

Prepare CEC applicationPrint and file CEC applicationReview and approve applicationFile and notice application

Prepare hearing notice and post signs in project area (announcing CEC application filing and hearings)Track and respond to comments

CEC HEARINGS

Prepare stakeholder and public involvement summary to support CEC application Track and respond to comments

PREPARATION AND FILING OF CEC APPLICATION

Prepare for and conduct stakeholder group meeting #4Prepare and distribute newsletter #3Prepare for and conduct public open house meeting #3Review alternative assessment and selectionTrack and respond to comments

TASK 2TASK 1 TASK 3 TASK 6TASK 5TASK 4

ALTERNATIVES SELECTION AND RESOURCE SURVEYS

Review impact assessment criteria Review alternatives assessment resultsDevelop and review mitigation measures and plan

Prepare for and conduct stakeholder group meeting #3Track and respond to comments

SITING CRITERIA, DEFINE STUDY AREA, AND SECONDARY DATA

COLLECTION

Review and approve preliminary alternatives siting criteriaReview and approve project study areaFinalize project purpose and need statementFinalize project descriptionProvide typical structure design(s) and substation layout

Conduct community leader briefingsIdentify and contact stakeholders Prepare project fact sheet #1Review project purpose and need and descriptionTrack and respond to comments

OPPORTUNITIES/CONSTRAINTS ANALYSIS AND ALTERNATIVES

IDENTIFICATION

Finalize engineering alternatives (e.g., rebuilding existing structures)Review and approve final alternatives

Prepare and provide testimony for Arizona Power Plant and Transmission Line Siting CommitteePrepare testimony slides for supplemental CEC application filingPrepare virtual route tour (optional)Assist with preparation of draft CEC Form of OrderPrepare for and attend ACC hearing

Prepare environmental portions of CEC applicationAssist with filing and noticing application

Compare and rank alternativesPrepare visual simulationsIdentify preferred environmental alternative(s) Document alternative comparison and selection resultsConduct cultural resource survey of preferred alternativeSHPO consultationPrepare cultural resource survey report

Collect additional data for alternativesConduct field surveys to support resources inventoryDevelop impact assessment criteriaConduct alternatives impact assessment and mitigation planning

Develop preliminary alternatives siting criteriaReview preliminary alternatives Prepare study area base mapCollect and map secondary environmental data

Identify environmental opportunities and constraintsIdentify and finalize alternatives

Prepare for and conduct stakeholder group meeting #1Develop mailing listPrepare and distribute newsletter #1Prepare for and conduct public open house #1Prepare for and conduct stakeholder group meeting #2Prepare and distribute newsletter #2Prepare for and conduct public open house #2Review alternativesTrack and respond to comments

Prepare and provide testimony for Arizona Power Plant and Transmission Line Siting CommitteeReview and approve supplemental CEC application filing (as necessary)Prepare draft CEC Form of OrderPrepare for and attend ACC hearing

Planning Process and ResponsibilitiesCertificate of Environmental Compatibility (CEC) Application

Rosemont 138-kV Transmission Line ProjectFebruary 12, 2009

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-39 CEC Application November 2011

Page 28: PDF 8257 KB - Tucson Electric Power

THIS PAGE INTENTIONALLY LEFT BLANK

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-40 CEC Application November 2011

Page 29: PDF 8257 KB - Tucson Electric Power

Pre-ApplicationConference Applicant/

ACC Staff

Post Project Notification

Signs

SitingCommittee

Review

ACC StaffReview

ApplicantRespondsto Data

Requests

Siting CommitteeField Review

Pre-HearingConference

Public CommentHearing(s)

Intervenors File10 Days Prior to Hearing

Applicant andIntervenors

Prepare and ProvideTestimony

Request Briefs/Oral Arguments

ACC Review(May Add Conditions)

ACC Request forBriefs/Arguments

Review Request

(By Any Party to ProceedingWithin 15 Days)

ReconsiderationRequests

Within 30 DaysAfter Decision

File Construction,Operations,Mitigation/

Monitoring Plans

Post Project ApprovalSigns on Site

Periodic SelfCertification Filings

Required activity by Statue (ARS 40-360)or Rules of Practice and Procedure (R14-3-201-219)

Typical requirement

* Decision within 180 days after receipt of application (R14-3-213), subject to extension

Solicit/DocumentAgency andPublic Input

ACC:CEC:Siting Committee:

Arizona Corporation CommissionCertificate of Environmental CompatibilityArizona Power Plant & Transmission Line Siting Committee

180 days 30 to 60 days

File Applicationfor CEC

Prepare Applicationfor CEC

Applicant FilesTen-Year Plan

With ACC

PublicNotice

(Newspaper)Within 10 Days

After Filing

Siting CommitteeDeliberation &

Decision

CEC Granted *

Siting CommitteeHearing(s)

Begin 30 - 60 DaysAfter Notice

ACC HearingDecision to Affirm, Deny,

or Modify at OpenMeeting Held 30 - 60

Days After Notice

ConstructSiting Committee

Submits CEC to ACC

February 2009

Arizona Power Plant and Transmission Line Siting ProcessCertificate of Environmental Compatibility

Rosemont 138-kV Transmission Line Project

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-41 CEC Application November 2011

Page 30: PDF 8257 KB - Tucson Electric Power

THIS PAGE INTENTIONALLY LEFT BLANK

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-42 CEC Application November 2011

Page 31: PDF 8257 KB - Tucson Electric Power

N:\projects\Rosemont Copper\TEP_Lopez\mxds\RMC_Base_Hillshade_92.mxd

Arizona

R o s e m o n t 1 3 8 - k V R o s e m o n t 1 3 8 - k V

T r a n s m i s s i o n L i n e P r o j e c tT r a n s m i s s i o n L i n e P r o j e c t

February 19, 2009

!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!

!!!!!!!!

!!!!!!!!!!!!!!!!!!!!!!!!!!!!!

!!!!!!

!!!!!!!!!!!!!!!!

!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!

!!!!!!!!

!!!!!!!!!!!!!!!!!!!

!!!!!!!!!!!!!

!!!!!!!!!!!!!!!!!!!! ! ! ! ! ! ! ! ! !

!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!!!

!!

!!!

!

!!

!!

!!

!!

!!

!!

!!!!!!!!!!!!!!!!!!!!!

!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!

!!

!!

!!

!!!

!!

! ! !!!

! !!

!! ! ! ! !!

!! ! ! ! ! !

!!!!!!!!!!

!!!!!!!!!!!!!

!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!

!!

!!

!!

!!!!

! ! !!! !! ! !

!! ! ! ! !!

!! ! ! ! ! !

! ! ! ! ! ! ! ! ! ! ! ! !!!!!!!!

!!!!!!!!

!!!!

!!!

!!!

!!

!!!

!!!

!!!

!!!

!!!

!!!

!!!

!!!

!!!

!!

!!

!!!!!!

! ! !!!

!!!

!!

!!!

!!!

!!!

!!

!!!

!! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !

!!

! ! ! ! ! ! !

! ! ! ! ! ! ! ! ! ! ! ! !!!

!!!

!!

!!!!

!!!

!!

!!!

!!!!

!!!

!!!

!!!

!!!

!!!

!!!

!!!

!!!

!!!

!!!

!!!

!!

!!!!!!

! ! !!

!!

!!!!!!!!!!!

!!!!!!

!!

! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !!

!! ! ! ! ! ! !

#I

#I

#I

#I

#I

#I

#I

#I

#I

#I#I#I

#I

#I

P i m a C o u n t yP i m a C o u n t y

S a n t a C r u z C o u n t yS a n t a C r u z C o u n t y

S a n X a v i e rS a n X a v i e rI n d i a n R e s e r v a t i o nI n d i a n R e s e r v a t i o n

Sahuarita Rd.

Alvernon W

ay

Wilm

ot Rd.

Loma A

lta

SonoitaHw

y

Wentw

orth Rd.

Old Spanish Trl

Kolb R

d.

SonoitaHw

y

Box CanyonR

d.

Empire Ranch Rd.

Santa Rita Rd.

Madera

Canyon

Rd.

Duval Mine Rd.

White House Canyon Rd.

Pantano Rd.

Colossal Cave Rd

C O R O N A D OC O R O N A D ON A T I O N A L F O R E S TN A T I O N A L F O R E S T

Swan R

d.

Craycroft R

d.

Houghton R

d.

Pima Mine Rd.

Missi

onRd.

Sahuarita Rd.

S a n t a R i t aS a n t a R i t a

E x p e r i m e n t a l E x p e r i m e n t a l

R a n g eR a n g e

Southern Pacific Railroad

Sp R

ailro

ad

Sp R

ailro

ad

Southern Pacific

Railroad

Southern Pacific Railro

ad

Southern Pacific Railroad

Southern Pacific Railroad

Sp Railroad

Sout

hern

Pacific Railroad

Sout

hern

Paci

fic R

ailro

ad

§̈¦19

§̈¦10

§̈¦10

§̈¦19

UV83

tu89

TucsonIntl

L A S C I E N E G A S N A T I O N A LL A S C I E N E G A S N A T I O N A LC O N S E R V A T I O N A R E AC O N S E R V A T I O N A R E A

DrexelHeights

Tucson

Amado

Vail

Summit

Sonoita

Sahuarita

GreenValley

EastSahuarita

Coronade Tucson

06 01 010606 0101 06 06

31 36 31 36

36 3131 3136

06 01 06

06 01 06 0601

31 36 31

01

36

31 3136 36 31

01

060601

06

06

0101

06

3631 3136

3131 36 31 36

06 01 0106

06 010601 06

31 3636 31

31 31363631

0601 01 06

06010606

01

31

36

31 313636 31 3136

Rosemont

Vail

AS&RPump South

Loop South

FortHuachucaBreaker

CyprusEsperanzaWells

GreenValley

CyprusInterceptor

CyprusRaw WaterSupply

Greaterville

Canoa

Nogales

Sahuarita

0 1 20.5Miles

I

R . 1 3 E . R . 1 4 E . R . 1 5 E . R . 1 6 E . R . 1 7 E .

T .1 5S .

T .1 6S .

T .1 7S .

T .1 8S .

T .1 9S .

R . 1 2 E .

Sources

General Reference Features

Legend

§̈¦10

§̈¦40

§̈¦15

§̈¦10

PHOENIX

TUCSON

§̈¦8

§̈¦17

§̈¦19

Project Location

Mexico

Arizona

County Boundary

Lake

Interstate

Secondary Road

Existing 46-kV Transmission Line

Existing 115-kV Transmission Line

Existing 138-kV Transmission Line

Existing 230-kV Transmission Line

Existing 345-kV Transmission Line

Railroad

Gas Pipeline (Less than 12")! ! ! !

Gas Pipeline (12" or greater)! ! ! !

National Forest Boundary

Highway

Project Area Boundary

Section Boundary

Township Boundary

River / Wash

Proposed Rosemont Substation#IExisting Substation#I

DRAFT

Working Draft

StreetMap USA 2008; TEP 2008; EPG, 2008,Pima County 2008, Rosemont Copper Company 2008

J u r i s d i c t i o n a n d O w n e r s h i pJ u r i s d i c t i o n a n d O w n e r s h i p

Green Valley Planning Area

Sahuarita Incorporated Boundary

Tucson Incorporated Boundary

Planning Jurisdictions

Land Managing Areas

Patented Claims

Claim Boundary

Private Lands

Rosemont Copper Facilities

Mt. Wrightson Wilderness

Santa Rita Experimental Range

Las Cienegas National Conservation Area

Special Management Areas

Arizona State Land

Indian Reservation

National Park Service

Bureau of Land Management

U.S. Forest Service

Unincorporated Pima County

Local Park (Pima County)

Cienega Creek Natural Preserve

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-43 CEC Application November 2011

Page 32: PDF 8257 KB - Tucson Electric Power

THIS PAGE INTENTIONALLY LEFT BLANK

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-44 CEC Application November 2011

Page 33: PDF 8257 KB - Tucson Electric Power

N:\projects\Rosemont Copper\TEP_Lopez\mxds\RMC_Base_Hillshade_92.mxd

Arizona

R o s e m o n t 1 3 8 - k V R o s e m o n t 1 3 8 - k V

T r a n s m i s s i o n L i n e P r o j e c tT r a n s m i s s i o n L i n e P r o j e c t

February 23, 2009

!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!

!!!!!!!!

!!!!!!!!!!!!!!!!!!!!!!!!!!!!!

!!!!!!

!!!!!!!!!!!!!!!!

!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!

!!!!!!!!

!!!!!!!!!!!!!!!!!!!

!!!!!!!!!!!!!

!!!!!!!!!!!!!!!!!!!! ! ! ! ! ! ! ! ! !

!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!!!

!!

!!!

!

!!

!!

!!

!!

!!

!!

!!!!!!!!!!!!!!!!!!!!!

!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!

!!

!!

!!

!!!

!!

! ! !!!

! !!

!! ! ! ! !!

!! ! ! ! ! !

!!!!!!!!!!

!!!!!!!!!!!!!

!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!

!!

!!

!!

!!!!

! ! !!! !! ! !

!! ! ! ! !!

!! ! ! ! ! !

! ! ! ! ! ! ! ! ! ! ! ! !!!!!!!!

!!!!!!!!

!!!!

!!!

!!!

!!

!!!

!!!

!!!

!!!

!!!

!!!

!!!

!!!

!!!

!!

!!

!!!!!!

! ! !!!

!!!

!!

!!!

!!!

!!!

!!

!!!

!! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !

!!

! ! ! ! ! ! !

! ! ! ! ! ! ! ! ! ! ! ! !!!

!!!

!!

!!!!

!!!

!!

!!!

!!!!

!!!

!!!

!!!

!!!

!!!

!!!

!!!

!!!

!!!

!!!

!!!

!!

!!!!!!

! ! !!

!!

!!!!!!!!!!!

!!!!!!

!!

! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !!

!! ! ! ! ! ! !

#I

#I

#I

#I

#I

#I

#I

#I

#I

#I#I#I

#I

#I

P i m a C o u n t yP i m a C o u n t y

S a n t a C r u z C o u n t yS a n t a C r u z C o u n t y

S a n X a v i e rS a n X a v i e rI n d i a n R e s e r v a t i o nI n d i a n R e s e r v a t i o n

Sahuarita Rd.

Alvernon W

ay

Wilm

ot Rd.

Loma A

lta

SonoitaHw

y

Wentw

orth Rd.

Old Spanish Trl

Kolb R

d.

SonoitaHw

y

Box CanyonR

d.

Empire Ranch Rd.

Santa Rita Rd.

Madera

Canyon

Rd.

Duval Mine Rd.

White House Canyon Rd.

Pantano Rd.

Colossal Cave Rd

C O R O N A D OC O R O N A D ON A T I O N A L F O R E S TN A T I O N A L F O R E S T

Swan R

d.

Craycroft R

d.

Houghton R

d.

Pima Mine Rd.

Missi

onRd.

Sahuarita Rd.

S a n t a R i t aS a n t a R i t a

E x p e r i m e n t a l E x p e r i m e n t a l

R a n g eR a n g e

Southern Pacific Railroad

Sp R

ailro

ad

Sp R

ailro

ad

Southern Pacific

Railroad

Southern Pacific Railro

ad

Southern Pacific Railroad

Southern Pacific Railroad

Sp Railroad

Sout

hern

Pacific Railroad

Sout

hern

Paci

fic R

ailro

ad

§̈¦19

§̈¦10

§̈¦10

§̈¦19

UV83

tu89

TucsonIntl

DrexelHeights

Tucson

Amado

Vail

Summit

Sonoita

Sahuarita

GreenValley

EastSahuarita

Coronade Tucson

L A S C I E N E G A S N A T I O N A LL A S C I E N E G A S N A T I O N A LC O N S E R V A T I O N A R E AC O N S E R V A T I O N A R E A

06 01 010606 0101 06 06

31 36 31 36

36 3131 3136

06 01 06

06 01 06 0601

31 36 31

01

36

31 3136 36 31

01

060601

06

06

0101

06

3631 3136

3131 36 31 36

06 01 0106

06 010601 06

31 3636 31

31 31363631

0601 01 06

06010606

01

31

36

31 313636 31 3136

Rosemont

Vail

AS&RPump South

Loop South

FortHuachucaBreaker

CyprusEsperanzaWells

GreenValley

CyprusInterceptor

CyprusRaw WaterSupply

Greaterville

Canoa

Nogales

Sahuarita

0 1 20.5Miles

I

R . 1 3 E . R . 1 4 E . R . 1 5 E . R . 1 6 E . R . 1 7 E .

T .1 5S .

T .1 6S .

T .1 7S .

T .1 8S .

T .1 9S .

R . 1 2 E .

Sources

General Reference Features

Legend

§̈¦10

§̈¦40

§̈¦15

§̈¦10

PHOENIX

TUCSON

§̈¦8

§̈¦17

§̈¦19

Project Location

Mexico

Arizona

County Boundary

Lake

Interstate

Secondary Road

Existing 46-kV Transmission Line

Existing 115-kV Transmission Line

Existing 138-kV Transmission Line

Existing 230-kV Transmission Line

Existing 345-kV Transmission Line

Railroad

Gas Pipeline (Less than 12")! ! ! !

Gas Pipeline (12" or greater)! ! ! !

National Forest Boundary

Highway

Project Area Boundary

Section Boundary

Township Boundary

River / Wash

Proposed Rosemont Substation#IExisting Substation#I

DRAFT

Working Draft

StreetMap USA 2008; TEP 2008; EPG 2008; City of Tucson 2008

E i s t i n g L a n d U s eE i s t i n g L a n d U s e

Land Use

Agriculture

Commercial

Industrial

Parks/Preservation

Public Lands

Public/Quasi-Public

Recreation

Utilities

Vacant

School/Educational Facilities

Residential

Tucson International Airport Instrument Approach Height Zone

Davis Monthan Air Force Base Compatible Use Zone

k School

San Xavier Indian Reservation

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-45 CEC Application November 2011

Page 34: PDF 8257 KB - Tucson Electric Power

THIS PAGE INTENTIONALLY LEFT BLANK

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-46 CEC Application November 2011

Page 35: PDF 8257 KB - Tucson Electric Power

1�Rosemont�138�kV�Transmission�Project� � EPG�General�Siting�Criteria� � DRAFT�2�10�09�

ROSEMONT 138-KV SITING PROJECT General Siting Criteria – Opportunity and Constraint Analysis

An analysis of the individual resources’ sensitivity to the construction and operation of a transmission line will be conducted. Sensitivity is that measure of the probable adverse response of each resource to direct and indirect impacts associated with the construction, operation, maintenance, and abandonment of the proposed transmission line. Criteria to be used in this determination included the following considerations:

� Resource Value: A measure of rarity, high intrinsic value or worth, singularity or diversity of a resource within the study area or region.

� Protective Status: A measure of the formal concern expressed for a resource either through legal protection or by designation of special status.

� Present or Future Uses: A measure of the level of conflict based on policies of land management agencies and/or use.

The resources will then be mapped according to their respective sensitivity levels (including levels that fall in between the major categories), as follows:

� Incompatible – Areas where either legal status (i.e., designated wilderness or jurisdictional policy [e.g., active airports]) would prohibit, or most likely prohibit, the location of transmission facilities. Location of exclusion (or incompatibility) will be considered to be undesirable for location of transmission lines.

� High Sensitivity Areas – Areas determined to be less suitable because of unique, highly valued, complex, historic or protected resources and significant potential conflict with use, or areas posing substantial hazards to construction and operation of the transmission line. Locations of high sensitivity will be considered least desirable for siting the transmission line.

� Moderate Sensitivity Areas – Areas of potential environmental impact because of important, valued resources; resources assigned special status; some conflict with current or planned use. Locations of moderate sensitivity will be considered less desirable for siting the transmission line.

� Low Sensitivity Areas – Areas where the resource conflicts that have been identified through the regional environmental study process are minimal. These areas of low sensitivity will be considered as minimal sensitivity or opportunities for locating the lines, particularly in existing power line corridors.

�Opportunities: Existing and future linear features such as transmission lines, highways/roads, and canals are typically considered opportunities for siting and constructing future transmission lines. Opportunities are considered within the context of the sensitive resources throughout the study area. For example, an existing transmission line corridor may provide an opportunity to construct a new transmission line while minimizing environmental effects; however, there may also be adjacent or underlying environmental resources (e.g., residences or archaeological sites) that pose constraints which need to be considered during the siting, permitting, and construction of a new transmission line.

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-47 CEC Application November 2011

Page 36: PDF 8257 KB - Tucson Electric Power

THIS PAGE INTENTIONALLY LEFT BLANK

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-48 CEC Application November 2011

Page 37: PDF 8257 KB - Tucson Electric Power

���"!� ����256�7�* ��! �!!���# $���� � (#������������������- ��� ���� ������� � <")�* �A��A���

FACILITY SITING CRITERIA WORK SHEET DRAFT SENSITIVITY LEVELS – ROSEMONT 138-KV TRANSMISSION LINE

Resource Category Proposed

Sensitivity Level

Stakeholder Group Suggested Sensitivity

Level Rationale For Suggested Change Existing Land Use and Visual Resources

"�!��������� E��� � ����!A(�������������������!� E��� � ��������"��!A#� �&��!�+�C�C��������"����52,� ��� ���6E��� � �#� �!A# �!� %����� E��� � �"�� ������) ��!��G�������������1�-� !�!������* ���!A* �������

��� ���6E��� � �

- � �����"�����A- � ����� ��� ���� � �E���A"�! �� ��� ���� � �)� ������ ���:����+������� %�!,� ��� ���� � �7������:���� :&� � �3���!� ���� :&� � ���$ �# �� ���=���� ��!�+!����������!����16!����������!,�

:&6��� ���� � �

#�����AJ��!�6#������6�-� �� E��� � �6�-� ��� �� E��� � �6��%� � ����=�������!� ��� ���� � �6�<�����������������!�+# �!�!,� :&� � �7�!����-��!!�1������!�B�=:��+7"�,��� �!���� %����+7JG,�6�7"��-��!!�3� 3�� �������� � �6�7"��-��!!�33� ��� ���6E��� � �6�7"��-��!!�333� :&6��� ���� � �6�7"��-��!!�37� :&� � �6�7JG�# �!� %����� 3�� �������� � �6�7JG�"�������� E��� � �6�7JG�#� �����"�������L� ��� ���6E��� � �6�7JG����1������� :&6��� ���� � �6�7JG���0� � ����1������� :&� � �"�!� ������#���!�����"����!� ��� ���6E��� � �

Future Land Use and Visual Resources "�!���������#�������B�#����)�� %��� ��� ���6E��� � �"�!���������#�������B�M�����)�� %��� ��� ���� � �"�!���������#�������B�-��������A���� ��A- � ���!�%��#����

:&6��� ���� � �

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-49 CEC Application November 2011

Page 38: PDF 8257 KB - Tucson Electric Power

���"!� ����256�7�* ��! �!!���# $���� � (#������������������- ��� ���� ������� � <")�* �A��A���

FACILITY SITING CRITERIA WORK SHEET DRAFT SENSITIVITY LEVELS – ROSEMONT 138-KV TRANSMISSION LINE

Resource Category Proposed

Sensitivity Level

Stakeholder Group Suggested Sensitivity

Level Rationale For Suggested Change - � �����#�������B�#����)�� %��� ��� ���� � �- � �����#�������B�M�����)�� %��� :&6��� ���� � �- � �����#�������B�-��������A���� ��A- � ���!�%��#����

:&� � �

#� �!�A# �!� %�����B�#����)�� %��� ��� ���6E��� � �#� �!�A# �!� %�����B�M�����)�� %��� ��� ���� � �#� �!A# �!� %������B�-��������A���� ��A- � ���!�%��#����

:&6��� ���� � �

"�� ������) ��!��G�������������1�-� !�!������* ���!A* �������B�#����)�� %���

��� ���� � �

"�� ������) ��!��G�������������1�-� !�!������* ���!A* �������B�M�����)�� %���

:&6��� ���� � �

"�� ������) ��!��G�������������1�-� !�!������* ���!A* �������B��-��������A���� ��A- � ���!�%��#����

:&� � �

?����������������!�#�������B�-������������ :&� � �?����������������!�#�������B�#����)�� %��� :&� � ���0���?!��B�#����)�� %��� ��� ���� � ���0���?!��B�M�����)�� %��� :&6��� ���� � ���0���?!��B�-��������A���� ��A- � ���!�%��#����

:&6��� ���� � �

������ ��B�#����)�� %��� ��� ���� � ������� ��B�M�����)�� %��� :&6��� ���� � ������� ���B�-��������A���� ��A- � ���!�%��#����

:&� � �

Cultural Resources :�!���� �# �!���/������� �������"���!�� �# �� ���!�

��� ���6E��� � �

Biological Resources #� ��-�����������1��- �� !� :&6��� ���� � �������- �9�"�%� � ��� ���� � �-�������- ����/��� ���# �!� %�� E��� � �<�%��!��-����� E��� � �:�!�-������!�/�������-�!� %�����) ��� ��� ���� � �#� ��-�����-�!� %�����:���!���!�� �6�)� ������ ���3������!�&�����-�!� %����� :&� � �

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-50 CEC Application November 2011

Page 39: PDF 8257 KB - Tucson Electric Power

2��"!� ����256�7�* ��! �!!���# $���� � (#������������������- ��� ���� ������� � <")�* �A��A���

FACILITY SITING CRITERIA WORK SHEET DRAFT SENSITIVITY LEVELS – ROSEMONT 138-KV TRANSMISSION LINE

Resource Category Proposed

Sensitivity Level

Stakeholder Group Suggested Sensitivity

Level Rationale For Suggested Change ) ���6�=��������- �������� ����) ��!� :&6��� ���� � �6�3 � �����"��� ����) ��!� :&6��� ���� � �6����������?!�������� ����) ��!� :&� � �6�<�!���������������1���"�!�� ��) ��!� :&6��� ���� � �

Existing Opportunities "��!A��$ �) �� ����"��&��!� /)� � �#�������!� /)� � �"��� ��!� /)� � �?����������������!�+!��!�����!�����C,� /)� � �4;6�7�G%� ����* ��! �!!���:����- �� !�� /)� � ���86�7A�256�7�G%� ����* ��! �!!���:����- �� !�� /)� � �

�2�6�7A2486�7�G%� ����* ��! �!!���:����- �� !� /)� � �

Future (Planned) Opportunities�"��!A��$ �) �� ����"��&��!�6�)�� %��� /)� � �"��!A��$ �) �� ����"��&��!�6�-��������A���� ��A- � ���!�%��#���� /)� � �

L���!���%������%��� ��1������� ������ ��1�� ��%��������1��������������+�C�C�� �!���������� ��!���$�������� �$ �� �� ���� ��!�����4;6�7�������%���&� �����!,C��

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-51 CEC Application November 2011

Page 40: PDF 8257 KB - Tucson Electric Power

THIS PAGE INTENTIONALLY LEFT BLANK

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-52 CEC Application November 2011

Page 41: PDF 8257 KB - Tucson Electric Power

S:\EPG\projects\Rosemont Copper\TEP Rosemont Line\Public Participation\Stakeholder group\Meeting #2\Agenda meeting #2.doc

Rosemont 138kV Transmission Line Project

Agenda – Stakeholder Group Meeting #2July 22, 2009, 11:00am – 2:00pm

Unisource building, 2nd Floor Conference Room One South Church Street Tucson, Arizona 85702

�� Welcome and introductions

�� Agenda �� Planning process review

�� Engineering studies �� Public comments received

�� Environmental studies -� Final siting criteria -� Opportunities and constraints analysis

�� Preliminary link alternative identification

�� Next steps

�� Comments and questions

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-53 CEC Application November 2011

Page 42: PDF 8257 KB - Tucson Electric Power

THIS PAGE INTENTIONALLY LEFT BLANK

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-54 CEC Application November 2011

Page 43: PDF 8257 KB - Tucson Electric Power

1

�Stakeholder�Group�Roster�� � EPG�Rosemont�138kV�Transmission�Line�Project� � July�22,�2009�Tucson�Electric�Power�

ROSEMONT 138KV TRANSMISSION LINE PROJECT STAKEHOLDER GROUP

Revised from February 2009

MEMBERSHIP

The purpose of the Stakeholder Group is to establish a group representing a range of opinions in a forum small enough to allow for thorough education of the participants, detailed discussion of issues, and informal dialogue. EPG, Inc. (EPG) contacted various individuals/organizations for selection of the members that would assist Tucson Electric Power (TEP) and EPG in identifying issues and concerns relevant to the proposed project. Representation of a cross-section of the region includes federal, state, county, and municipal agencies that have administrative jurisdiction within the project area; industry/business; and citizens on behalf of their neighborhoods. Members were selected based on their knowledge of the project area, capability to commit the time required to participate in the Stakeholder Group throughout the planning process, and willingness to participate in an impartial manner.

ROSTER OF STAKEHOLDER GROUP MEMBERS

Federal�� Kent Ellett ([email protected]), representative for the transmission line on behalf of the

Coronado National Forest o� Bev Everson ([email protected]) o� Teresa Ann�Ciapusci ([email protected])

�� Linda Hughes ([email protected]), representative for the transmission line on behalf of the Bureau of Land Management, Tucson

o� Cindy Alvarez ([email protected]) o� Dan Moore ([email protected])

�� Mark Harting ([email protected], [email protected]),representative for Davis Monthan AFB airspace management

State�� Tim Bolton ([email protected]), Arizona State Land Department �� Steve Husman ([email protected]), Santa Rita Experimental Range

City/Town�� Chris Kaselemis ([email protected]), City of Tucson �� Orlanthia Henderson ([email protected]), Town of Sahuarita �� Eddie Peabody ([email protected]), Planning and Zoning Committee, Green Valley

Coordinating Council

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-55 CEC Application November 2011

Page 44: PDF 8257 KB - Tucson Electric Power

2

�Stakeholder�Group�Roster�� � EPG�Rosemont�138kV�Transmission�Line�Project� � July�22,�2009�Tucson�Electric�Power�

Industry/Business�� Bob Iannarino ([email protected])/Mark Weinberg

([email protected])/Ken Abrahams ([email protected]), Diamond Ventures

�� Nan Walden ([email protected])/Larry Robertson ([email protected]), Farmers Investment Company

Citizens �� Marshall Magruder ([email protected]) �� Elizabeth Webb ([email protected])

PROJECT TEAM

Tucson Electric Power�� Ed Beck ([email protected]) �� Shannon Breslin ([email protected]) �� Lee Aitkin ([email protected]) �� Larry Lucero ([email protected]) �� Erik Bakken ([email protected]) �� Cory Pintor ([email protected])

EPG, Inc. – Phone (602) 956-4370 �� Lauren Weinstein ([email protected]) �� Jaime Wood ([email protected]) �� Chelsa Johnson ([email protected]) �� Emily Belts ([email protected])

Rosemont Copper �� Kathy Arnold ([email protected]) �� Laurie Woodall, KR Saline (law@krsaline)

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-56 CEC Application November 2011

Page 45: PDF 8257 KB - Tucson Electric Power

ROSEMONT 138KV TRANSMISSION LINE PROJECT

ROSEMONT 138KV TRANSMISSION LINE PROJECT

Presentation�������� � �� ������� ���������� �� �������������

N������������

AgendaAgenda

� ���� ��������� ������!� #��������� ��!!� �%��&�� (������ ����!�����!� #������� ���!� ����%��� (�%� � ������!�����!� # ��� ��� ����������� ����%��������1������

� /�0��!���!� - ���!�����.��!���!

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-57 CEC Application November 2011

Page 46: PDF 8257 KB - Tucson Electric Power

Planning ProcessPlanning Process

2

Engineering Studies Engineering Studies

� *��������������� ����!�����!�� ����������"!� �������*(#��� �1�������� $������!� ������

� # $������!� ������ �1�������������1������������&������� �!���� ��! �!!��������&������������*(#@!������ �����!�!�� ������� �!���!&����� �C�*�!�� �!���!&����� ��&������������0�!������������!��������� ����7�������25�7�� ��! �!!��������������� ����������1� �����1 ����� �!���� ��! �!!�������

� -� ���������1�!� %������!�������������� ���������������7���� �����!��!�����!��

� ��������������������&�� �����!�� �� �.�� ���1 ����� ��! �!!��������� $���

B �&� �1 ���!� ������1 ���� �!����25�7�� ��! �!!���������0��������1 �� �� � � ��� � � � �� � � " � � � � ��

4

�0�!������ ���� %��������!��������� �!���"!� ������!�����

B �&� �1 ��� ����!�1 ���� �!����25�7�� ��! �!!���������0��������1 �� �!���!&����� ����� �!���"!� ������!������

4

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-58 CEC Application November 2011

Page 47: PDF 8257 KB - Tucson Electric Power

2

Public Comments ReceivedPublic Comments Received

� )�� 0� ������42��� ����1 !������� !����������� � � � � �!!���!�&� �� ����%���������

� �� � ��1������������ �!'B :������1����� ����%�!���� �!������ �����!������ ��!B ����������� ��������!���"!� �������*(#���!� � !B #��������� ����!���� �� ���%����!�������0�!B #��������1����� � ����������� ��! �!!�������

8

B #��������!� ���1��&� ��� �������� ��! �!!��������1 ����"!� ����� ����!

Environmental StudiesEnvironmental Studies

-C lt l

Resource Data CollectedL d B Cultural

� � ������������!� ���!

� /�������"���!�� � �������E�!� ���<�!� ���!� �����!�

B Biological � &�����1������������

B Land use� �0�!���������1��� ��������!�

� $� �!���������������������������!

B Visual and recreation � !������.������� !��!���%� %��&� !

;

� %��������� !�������!����!�!�����!

!��!���%��%��&� !�� !������ ����� �������������!

� "��!A� ���!������ ������!

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-59 CEC Application November 2011

Page 48: PDF 8257 KB - Tucson Electric Power

4

Resource Sensitivity Levels OverviewResource Sensitivity Levels Overview

� Low: ��������� �!� �����!� ����!�� �� ��� ��� ���!���������������� �� � �� �!�������� ��!� !����!� �����1 ����������� ��! �!!�������!�+�C�C������!� �����%�����A����%����������!,

� Low-moderate: ��������� �!� �����!� ����!�� ��� �!�����������1����!� ��!!��!�&�������������� ��� �9���&�����%����������!����������!� ������ ���!�+�C�C���0�!������ � ���������� ����������� �!���������� ��!,

� Moderate: �������� �!� �� ��!� ����! � � � �!��� ��� ��1����!

>

Moderate: ��������� �!� �����!� ����!�� ��� �!�����������1����!� ��!!��!�&�������������� ������� � ��� �9���&�����%��������������6��%����������!����������!� ������ ���!�+�C�C���� ������ ���O������� %�!P���������������������� �!���������� ��!,

Resource Sensitivity Levels Overview (continued)Resource Sensitivity Levels Overview (continued)

� Moderate-high: ��������� �!� �����!� ����!�� ��� �!�����������1����!� ��!!��! &��� ������ �� ������ &�� ��%������� ��� ��6��%��������!!��!�&�������������� �������&�����%�������������� ��%����������!���� � ��������� ��!� �!�+�C�C�� �� ������� ��!������6��� %��� �!���������� ��!,

� High: ��������� �!� �����!� ����!�� ��� �!����&� ���� ��� �����.���������%�������� ���0�� ���������� ������� �!� ��!Q���1����!� ��!!��!�&������� ����11���������%��� � ������&��������%��������������6��%����������!���� � ��������� ��!� �!�+�C�C���0�!����� �!�����������%��� ���,

5

� Incompatible: ��������� �!� �����!� ����!�� ��� �!����&� ���������!��%������������ ����� ��������� � ������ �����������!��&���������1��� ��! �!!�������!��!���� �������� ������1�����&����0�!����� �1��� �� �!� ��!�+�C�C����!��������&���� ��!!�� ��!,

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-60 CEC Application November 2011

Page 49: PDF 8257 KB - Tucson Electric Power

8

Opportunities and ConstraintsOpportunities and Constraints

� =�!������� �!� ��!�&��������� $����!������ ��� ���!���%������%��!��!!��������!��������!�����!���� ��� ���1 ����� �!� ��

� ���!���%������%��!��!!�!�����������1����������������!� ����!�1 ������������� ��! �!!�������

� G�� �������!�� ����!��� ���&������������0��1����� ��!����&����������

�B )���!� ����� ���������� ������ ���$������������� �������� ��

Transmission Line Siting Criteria (page 1 of 2)Transmission Line Siting Criteria (page 1 of 2)

����

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-61 CEC Application November 2011

Page 50: PDF 8257 KB - Tucson Electric Power

;

Transmission Line Siting Criteria (page 2 of 2)

��

/��!'����!���%������%��� ��1������� ������ ��1�� ��%��������1��������������+�C�C�� �!���������� ��!���$�������� �$ � �� ���� ��!�����4;�7�������%���&� �����!,C

L*���������!A�������� %������ ���!�����!����!���!������� � �%�!����� �!� �������� �����A �!��!���%������%��!������� �� �������� ������� �!�������������1������ ��� ��C

OpportunitiesOpportunities

� (0�!����A1��� ������� �1���� �!B * ��!� ������

� 3��� !�������� ��$ ���&��!A� �� ���!�+�C�C��������"����"��,� "��� ��!� ���� ��� ��!� ������� �� !

B ?�������!� 3 ������������!� * ��! �!!�������!

��

� #�������!�+�C�C����!��&��� ��&�!��&��� ,� 3���!� ����� ��!� 7�����A����%����������!�&�����!����1���1��� ����%��� ��������!

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-62 CEC Application November 2011

Page 51: PDF 8257 KB - Tucson Electric Power

>

ConstraintsConstraints

� (0�!����� �!������!� � �!�� ���������� ������!� ���� ����� %��� �!�����������%��� ���!�� ���!� ) ��!�&���������� ����� �������������!� �!� ����������!������1�� ��! �!!��������1��������!

� <�!��������!������ ��!� "������ ��� ���� �� �!

�2

"������������������ �!� F�&��/�������"���!�� � �������E�!� ���<�!� ���!� �����!� F�&��!�������!����!�!�����!�������!� �� �������������

Key Terms DefinedKey Terms Defined

� Right-of-way: �������� �9���������!��� ���������1 ������!� ����� �� ���� ��� ���������� 1 � ����� 1���������!� ��������� ���������� �����������1�������� �1�������

� Corridor: ��� ����1������1�%� �����&�����������&!����1��0��������1 ���� ��! �!!��������������������&���������� �����1������������ ����������%� � ��������!��� ����!

� Preliminary link: ! ��!�� ����1���� ��� ��� ��� ��! �!!�������� �������&������ ����� !�������!�� ���!

� Link node: ���� !������������&� ���&�����!� ���

�4

� �

� Route or routes: !� ��!�1�����!��������������� �!���!&����� ������� �!���"!� ������!������

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-63 CEC Application November 2011

Page 52: PDF 8257 KB - Tucson Electric Power

5

Preliminary Link Alternative IdentificationPreliminary Link Alternative Identification

� <�1����!��!���%����� ��� ���1 � �!� ��!���%��� ����+� � ���� �� ����!� ��� �& !��!���%��� %! �0�!����+�C�C������ �������!� ����B �&�!��!���%����%!C��0�!����� �!���������B ���!��!���%���,

� -�������� �������!�������!� ����!������!�!�1 � �!� ��!���%��� ����+�C�C��� ��! �!!�������!���0�!����������1��� ��������!�,

� # ��� ���� �������!�������!� ����!� ��� 3�����1� � ��� ��� � ���� ���� ����%�!

�8

3�����1��� ��� ��� ����������� ����%�!B )�����A�������� ���B (�%� � �����B (������ ���

Link Alternative Screening and Route IdentificationLink Alternative Screening and Route Identification

� :��� ���� ����%�! &��� �� !� ����� ��!�� � �:�������� ����%�!�&�������!� ��������!����� �������������%� � ����������������� ���������!�!���!�&�����!�������A������������

� :�������� ����%�!�&�������� ��������1 �� ������� ��! �!!�������� ���!����&�������� �!�� !&����� � ��� � �!�� "!� ��

�;

� �!���!&����� ������� �!���"!� ������!�����

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-64 CEC Application November 2011

Page 53: PDF 8257 KB - Tucson Electric Power

TEP Decision ElementsTEP Decision Elements

# � �� #� �!����������� (�%� � ������ #�����A������������� #� ��!� (������ ���� )������ � ����� ���616&��

�>

� )��������������� ���616&��� -!�

Next StepsNext Steps

# ��� � 1 �� �� ��� #��������1 ����������!�� ����������+)���!���>������,

� <����������%��� ������� ������!!�!! ���

� "�������� ����%�!�������1������

�5

� �������� � ��������2�+*=<,

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-65 CEC Application November 2011

Page 54: PDF 8257 KB - Tucson Electric Power

��

Questions and CommentsQuestions and Comments

��

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-66 CEC Application November 2011

Page 55: PDF 8257 KB - Tucson Electric Power

SENSITIVITY OF RESOURCESResource Category Sensitivity Level*

Existing Land Use Resources�"�!��������� E������!A(�������������������!� E���- � �����"������ :&6��� ����E���A"�! �� ��� ����)� ������ ���:����+������� %�!,� ��� ����7�����A?���%������:���� :&�3���!� ���� :&�#�����AJ��!�6#������6�-� �� E���6�-� ��� �� E���6��%� � ����=�������!� :&6��� ����Existing Recreation Resources�#� �!� E�������� ��!!�) ��� 3�� ��������3�%��� ����"����!!�) ��� E���<�%������/������A"�������* ���� E���:����* ���!�+-����� �-������!�������,� ��� ���6E���* ������!��#������� ��!������-� �� ���!� E���Existing Visual Resources�������"��!� E���Visual Classifications – BLM (VRM), Forest Service Concern Level Roads6�7"��-��!!�33� ��� ���6E���6�7"��-��!!�333� :&6��� ����6-��� ��:�%�����+E������� �� ��!������ ���!,�B�3 �������� �� ����+�62���1���,�

E���

6-��� ��:�%�����+E������� �� ��!������ ���!,�B�� �� ����+2���1����6�A�� ���,�

E���

6-��� ��:�%�����+E������� �� ��!������ ���!,�B�������� ����+�A����4� ���!,�

��� ����

6-��� ��:�%�����+��� �������� �� ��!������ ���!,�B�3 �������� �� ����+�62���1���,�

��� ����

6-��� ��:�%�����+��� �������� �� ��!������ ���!,�B�� �� ����+2���1����6�A�� ���,�

��� ����

6-��� ��:�%�����+��� �������� �� ��!������ ���!,�B�������� ����+�A����4� ���!,�

:&6��� ����

Future Land Use Resources�"�!���������#�������B�#����)�� %��� ��� ���6E���"�!���������#�������B�M�����)�� %��� ��� ����"�!���������#�������B�-��������A���� ��A- � ���!�%��#����

:&6��� ����

- � �����#�������B�#����)�� %��� :&6��� ����- � �����#�������B�-��������A���� ��A- � ���!�%��#����

:&�

��0���?!��B�-��������A���� ��A- � ���!�%��#����

:&6��� ����

������ ��B�#����)�� %��� ��� ����3���!� �������������!�B�#����)�� %��� :&�3���!� �������������!�B�-��������A���� ��A- � ���!�%��#����

:&�

Future Recreation Resources#� �!�B�#����)�� %��� ��� ���6E���#� �!�B�-��������A���� ��A- � ���!�%��#���� :&6��� ����/������A"�������* ���!�B�#����)�� %��� ��� ���6E���:����* ���!�+-����� �-������!�������,�B�-��������A���� ��A- � ���!�%��#����

:&�

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-67 CEC Application November 2011

Page 56: PDF 8257 KB - Tucson Electric Power

Existing Cultural Resources�:�!���� �(��������/������� �������"���!�� �# �� ���!��

��� ���6E���

Existing Biological Resources�#� ��-�����������1��- �� !� :&6��� ����������- �9�"�%� � ��� ����=� �7�"����+#� ��-��������4�-�!� %�����=���# � � ,�

��� ���6E���

:�!�-������!�/�������-�!� %�����) ��� ��� ���6E���Pima County Conservation Lands System6�)� ������ ���3������!�&�����-�!� %�����) ��� :&�6�=��������- �������� ����) ��!� :&6��� ����6�3 � �����"��� ����) ��!� :&6��� ����6����������?!�������� ����) ��!� :&�6�<�!���������������1���"�!�� ��) ��!� :&6��� ������

Opportunities�Existing Linear Facilities"��!A��$ �) �� ����"��&��!�"��� ��!�?����������������!�+!��!�����!�����C,������������!����16!����������!�4;�7�G%� ����* ��! �!!���:����- �� !����8�7A�25�7�G%� ����* ��! �!!���:����- �� !���2��7A248�7�G%� ����* ��! �!!���:����- �� !�Future (Planned) Linear Facilities�"��!A��$ �) �� ����"��&��!�6�)�� %���"��!A��$ �) �� ����"��&��!�6�-��������A���� ��A- � ���!�%��#����#�������!�+�C�C��&��� ��&�!��&��� ,�?����������������!�+� ��! �!!�������!��!��!�����!,��

������������!���%������%��� ��1������� ������ ��1�� ��%��������1��������������+�C�C�� �!���������� ��!���$�������� �$ �� �� ���� ��!�����4;�7�������%���&� �����!,C��L*���������!A�������� %������ ���!�����!����!���!������� � �%�!����� �!� �������� �����A �!��!���%������%��!������� �� �������� ������� �!�������������1������ ��� ����

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-68 CEC Application November 2011

Page 57: PDF 8257 KB - Tucson Electric Power

TIMELINE* 2nd Quarter 20101st -2nd Quarter 20104th Quarter 20093rd - 4th Quarter 20092008 - 1st Quarter 2009 1st - 3rd Quarter 2009

ENGINEERING

ENVIRONMENTALPLANNING

PUBLIC INVOLVEMENT

DETAILED INVENTORY AND LINK ALTERNATIVES ASSESSMENT

Identify preferred engineering route alternative(s)Review visual simulationsSelect preferred route and alternative(s) to be presented in CEC application, in coordination with customer: Rosemont Copper

Prepare CEC applicationPrint and file CEC applicationReview and approve applicationFile and notice application

Prepare hearing notice and post signs in project area (announcing CEC application filing and hearings)Track and respond to comments

CEC HEARINGS

Prepare stakeholder and public involvement summary to support CEC application Track and respond to comments

PREPARATION AND FILING OF CEC APPLICATION

Prepare for and conduct stakeholder group meeting #4Prepare and distribute newsletter #3Prepare for and conduct public open house meeting #3Review route alternatives Track and respond to comments

TASK 2TASK 1 TASK 3 TASK 6TASK 5TASK 4

ROUTE ALTERNATIVES SELECTION AND RESOURCE SURVEYS

Review impact assessment criteria Review link alternatives assessment resultsDevelop and review mitigation measures and planReview route alternatives

Prepare for and conduct stakeholder group meeting #3Review link alternative impact assessment and preliminary routesTrack and respond to comments

SITING CRITERIA, DEFINE STUDY AREA, AND SECONDARY DATA

COLLECTION

Review and approve preliminary alternatives siting criteriaReview and approve project study areaFinalize project purpose and need statementFinalize project descriptionProvide typical structure design(s) and substation layout

Conduct community leader briefingsIdentify and contact stakeholders Prepare project fact sheet #1Review project purpose and need and descriptionTrack and respond to comments

OPPORTUNITIES/CONSTRAINTS ANALYSIS AND LINK

ALTERNATIVES IDENTIFICATION

Finalize engineering alternatives (e.g., rebuilding existing structures)Review and approve final link alternatives

Prepare and provide testimony for Arizona Power Plant and Transmission Line Siting CommitteePrepare testimony slides for supplemental CEC application filingPrepare virtual route tour (optional)Assist with preparation of draft CEC Form of OrderPrepare for and attend ACC hearing

Prepare environmental portions of CEC applicationAssist with filing and noticing application

Compare and rank route alternativesPrepare visual simulationsIdentify preferred environmental route alternative(s) Document route alternative comparison and selection resultsConduct cultural resource survey of preferred route alternativeSHPO consultationPrepare cultural resource survey report

Collect additional data for link alternativesConduct field surveys to support resources inventoryDevelop impact assessment criteriaConduct link alternatives impact assessment and mitigation planningDevelop route alternatives

Develop preliminary alternatives siting criteriaReview preliminary alternatives Prepare study area base mapCollect and map secondary environmental data

Identify environmental opportunities and constraintsIdentify and finalize link alternatives

Prepare for and conduct stakeholder group meeting #1Develop mailing listPrepare and distribute newsletter #1Prepare for and conduct public open house #1Prepare for and conduct stakeholder group meeting #2Prepare and distribute newsletter #2Prepare for and conduct public open house #2Review link alternativesTrack and respond to comments

Prepare and provide testimony for Arizona Power Plant and Transmission Line Siting CommitteeReview and approve supplemental CEC application filing (as necessary)Prepare draft CEC Form of OrderPrepare for and attend ACC hearing

Planning Process and ResponsibilitiesRosemont 138kV Transmission Line ProjectJuly 2009

*Timeline is estimated

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-69 CEC Application November 2011

Page 58: PDF 8257 KB - Tucson Electric Power

THIS PAGE INTENTIONALLY LEFT BLANK

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-70 CEC Application November 2011

Page 59: PDF 8257 KB - Tucson Electric Power

N:\p

roje

cts\

Ros

emon

t Cop

per\T

EP

_Lop

ez\m

xds\

RM

C_B

ase_

Hills

hade

.mxd

Ari

zona

Ros

emon

t 13

8kV

R

osem

ont

138k

V

Tran

smis

sion

Lin

e P

roje

ctTr

ansm

issi

on L

ine

Pro

ject

July

20,

200

9

01

20.

5M

iles

I

R.

13

E.

R.

14

E.

R.

15

E.

R.

16

E.

R.

17

E.

T.

16

S.

T.

17

S.

T.

18

S.

T.

19

S.

Sour

ces

Gen

eral

Ref

eren

ce F

eatu

res

§̈ ¦10

§̈ ¦40

§̈ ¦15

§̈ ¦10

PHO

EN

IX

TUC

SO

N

§̈ ¦8

§̈ ¦17

§̈ ¦19

Proj

ect L

ocat

ion

Mex

ico

Ari

zona

DR

AFT

Wor

king

Dra

ft

!!!

!

!

!

!

!

!

! !!

!

150

90

100

30

110

50 60

120

80

130

210

200

70

10

160

2040

190

180

170

140

# I

# I

# I

# I

# I

# I

Ros

emon

t

Pim

a C

ou

nty

Pim

a C

ou

nty

Sa

nta

Cru

z C

ou

nty

Sa

nta

Cru

z C

ou

nty

Sonoita Hwy

Wentworth Rd.

Kolb Rd.

Sonoita HwyEmpi

re R

anch

Rd.

Sant

a Rita

Rd.

Madera Canyon Rd.

Whi

te H

ouse

Can

yon

Rd.

Mar

sh S

tatio

n Rd

.

CO

RO

NA

DO

CO

RO

NA

DO

NA

TIO

NA

LN

AT

ION

AL

FO

RE

ST

FO

RE

ST

Sahu

arita

Rd.

Helveti

a Rd.

Houghton Rd.

Main Ave.

Wilmot Rd.

Country Club Rd.

Pim

a M

ine

Rd. El

Tor

o R

d.

La Villita Rd.

Duval

Mine R

d.

CCoonn tt iinnee nn ttaa ll RR

dd ..

BBoo xx

CCaannyyoonn RRdd..

SA

NT

A R

ITA

SA

NT

A R

ITA

EX

PE

RIM

EN

TA

LE

XP

ER

IME

NT

AL

RA

NG

ER

AN

GE

Va

ilV

ail

SS.. CCooppppeerr ccuutt TTrraaii ll

Harrison Rd.

SS.. VViiaa LLoommaa ddeell VVeennaaddoo

Rd 42

4

Rd

417

Rd

413

Rd

411

LA

S

LA

S

CIE

NE

GA

SC

IEN

EG

AS

NA

TIO

NA

LN

AT

ION

AL

CO

NS

ER

-C

ON

SE

R-

VA

TIO

NV

AT

ION

AR

EA

AR

EA

§̈ ¦10

§̈ ¦19

Gre

en

Valle

y

Gre

ater

ville

Fort

H

uach

uca

Bre

aker

Sahu

arita

Sahu

arita

Gre

en V

alle

y

East

Sah

uarit

a

Sono

ita

Sum

mit

Cor

ona

de T

ucso

n

3106

36

01

§̈ ¦19

£ ¤89

UV83

Sout

hern

Pac

ific R

ailro

ad

Cou

nty

Bou

ndar

y

Exis

ting

46kV

Tra

nsm

issi

on L

ine

Exis

ting

115k

V Tr

ansm

issi

on L

ine

Exis

ting

138k

V T

rans

mis

sion

Lin

e

Exis

ting

230k

V T

rans

mis

sion

Lin

e

Exis

ting

345k

V T

rans

mis

sion

Lin

e

Nat

iona

l For

est B

ound

ary

Prop

osed

Sw

itchy

ard/

Subs

tatio

n# I

Exis

ting

Subs

tatio

n# I

Upd

ated

Pro

ject

Stu

dy A

rea

Boun

dary

Seco

ndar

y R

oad

Rai

lroad

Hig

hway

Inte

rsta

te

Sect

ion

Bou

ndar

y

Tow

nshi

p Bo

unda

ry

Riv

er /

Was

h

Lege

nd

Stre

etM

ap U

SA

2008

; TE

P 20

08; E

PG

, 200

8,Pi

ma

Cou

nty

2008

, Ros

emon

t Cop

per C

ompa

ny 2

008

Pre

lim

inar

y Tr

ansm

issi

on L

ink

Pre

lim

inar

y Tr

ansm

issi

on L

ink

Alt

erna

tive

s w

ith

Alt

erna

tive

s w

ith

Juri

sdic

tion

and

Ow

ners

hip

Juri

sdic

tion

and

Ow

ners

hip

Link

Nod

ePr

elim

inar

y Al

tern

ativ

e Li

nk

Link

Iden

tific

atio

n N

umbe

r10

Not

es: N

ot a

ll of

the

prel

imin

ary

alte

rnat

ive

links

sho

wn

on

the

map

will

be

cons

truc

ted.

Pro

ject

stu

dy a

rea

bou

ndar

y ha

s be

en u

pdat

ed a

s of

Jul

y 20

09

Land

Man

agin

g A

reas

Mt.

Wrig

htso

n W

ilder

ness

Sant

a R

ita E

xper

imen

tal R

ange

Las

Cie

nega

s N

atio

nal C

onse

rvat

ion

Area

Spec

ial M

anag

emen

t Are

as

Ros

emon

t Cop

per F

acili

ties

Priv

ate

Land

s

Cla

im B

ound

ary

Ariz

ona

Sta

te L

and

Indi

an R

eser

vatio

n

Bure

au o

f Lan

d M

anag

emen

t

U.S

. For

est S

ervi

ce

Uni

ncor

pora

ted

Pim

a C

ount

y

Loca

l Par

k (P

ima

Cou

nty)

Gre

en V

alle

y P

lann

ing

Are

a

Sahu

arita

Inco

rpor

ated

Bou

ndar

y

Plan

ning

Jur

isdi

ctio

ns

Tucs

on E

lect

ric P

ower

R

osem

ont 1

38kV

Tra

nsm

issi

on L

ine

Proj

ect

J-71

CEC

App

licat

ion

Nov

embe

r 201

1

Page 60: PDF 8257 KB - Tucson Electric Power

THIS

PA

GE

INTE

NTI

ON

ALL

Y L

EFT

BLA

NK

Tucs

on E

lect

ric P

ower

R

osem

ont 1

38kV

Tra

nsm

issi

on L

ine

Proj

ect

J-72

CEC

App

licat

ion

Nov

embe

r 201

1

Page 61: PDF 8257 KB - Tucson Electric Power

S:\EPG\projects\Rosemont Copper\TEP Rosemont Line\Public Participation\Stakeholder group\Meeting #3\Agenda meeting #3.docx

Rosemont 138kV Transmission Line Project

Agenda – Stakeholder Group Meeting #3December 10, 2009, 11:00am – 2:00pm

Unisource building, 2nd Floor Conference Room One South Church Street Tucson, Arizona 85702

�� Welcome �� Project Status

�� Public and Agency Comments

�� Environmental Impact Assessment Methodology

�� Alternative Routes

�� Next Steps

�� Comments and Questions

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-73 CEC Application November 2011

Page 62: PDF 8257 KB - Tucson Electric Power

THIS PAGE INTENTIONALLY LEFT BLANK

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-74 CEC Application November 2011

Page 63: PDF 8257 KB - Tucson Electric Power

ROSEMONT 138KV TRANSMISSION LINE PROJECT

ROSEMONT 138KV TRANSMISSION LINE PROJECT

Presentation�������� � �� ������� �2

<��� �� ���������

�������� �� ������������2<��� �� ���������

AgendaAgenda

� ���� �

� # $���������!

� #����������)������- ���!

� (�%� � ������3 �����)!!�!! �����������

� )��� ����%��"���!

� /�0������!

<��� �� ���������

� - ���!�����J��!���!

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-75 CEC Application November 2011

Page 64: PDF 8257 KB - Tucson Electric Power

Planning ProcessPlanning Process

<��� �� ���������

2

Public Comments ReceivedPublic Comments Received

� - ���!�1 � �!�����!���� �- ������*��!���J�����- ��������� ��� ��� ����� � ������! � �� �� !���� ���������������� ������!��� ����� !

� )��� ����%������!�������0�!�����4;�7�������� ��!����1����������"����(0�� � ������"����������������"����"���� �1� ������! ���� ��� �9��%�!�������� �!��������������� ����!���� �� ���%����!

� "���������������� ����!������=0�-������ �������������- ����/�������� �!�

� ���� �9��%�!����� ����!�1�����%��&!��&� �����������"�����������!

<��� �� ���������

4

� �

� )��� ����%��!��!�������������������� !������1�E��%�����"��������0�!�����4;�7������!����!�����!����� ����%��1 �� ���������!� �������&� �1 �� ���� %������&����� �A���!�����

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-76 CEC Application November 2011

Page 65: PDF 8257 KB - Tucson Electric Power

2

Agency Comments ReceivedAgency Comments Received

� ������"����(0�� � ������"����A) �9���������:����<��� � ���B # �1� �� ��! �!!������������ ����%��������������� ��!����1�������

"��� "�� � ���� ����%�! ���� � �� � ���� ����� � ���"����"��������� ����%�!������� �� �� ���������� ������4;�7������ ���

B # �1� ����6����������� ���������!�+� �!���&��� ���������������25�7�� ��! �!!�������,������������"����"��

� *&��1����� ���B # �1� !��0�!�����4;�7�� ��! �!!��������� �� ����6������&���

�0�!�������1 �!� ���� �B -��� ����&�������������� ���%���%�!����� ����!��� �!�����!�1 �

� �!���&�!�� ��!&����� �A!��!�����

<��� �� ���������

8

� - ����/�������� �!�B # �1� !��� ��� �9��������1�� ��! �!!�������� ����� !!����

- ����/�������� �!�B �����!�!���������� ��������� ��!� �!��� ��� �9��%�!����� ����!�

������ �!���� %����-��� ��:�%���� �%��&��!

Other CommentsOther Comments

� -�����B ���� ����E����!A(�!������ ���

� #������ �������1 ���B ��������� �!������������JR)�!�!!��

� #���1���!

� - ������� ��1���!

<��� �� ���������

;

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-77 CEC Application November 2011

Page 66: PDF 8257 KB - Tucson Electric Power

4

Detailed Inventory and AssessmentDetailed Inventory and Assessment

� 3�����1��� ���� ���� �������� ���� ����%� 1 ��!� ����� �&� � 3�����1�������� ����� ������������� ����%��1 ���!� �������&�

� -��������������%� � ������ �!� ����!!�!! ����1 ��������� ����%������!

� -������������ ��� ��� ��������� ���������!�!�����!� ��%���������1����� ����%������!��&������!��� ��������� �����!�!�� �������������!� ������������!��1��� !

<��� �� ���������

>

Environmental StudiesEnvironmental Studies

C lt lResource Data Collected

L d Cultural� -��!!�3� �� �!� �%��&� /�������"���!�� � �������E�!� ���<�!� ���!� �!���!�

Biological� ������1������������� 7��������

Land use� (0�!���������1��� �������!�

� N� �!���������������������������!

Visual and Recreation � �������.������� ���!���%� %��&� !

<��� �� ���������

5

7��������� ��������!����!�!�����!

���!���%��%��&� !�� ������� ����� �������������!

� "��!A� ���!������ ������!

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-78 CEC Application November 2011

Page 67: PDF 8257 KB - Tucson Electric Power

8

Resource ImpactsResource Impacts

Cultural resource impacts� F�&� �!� �� � �� ���!

Land use impacts� (0�!���� ���� �!� F�&���!� ���� �� ���!�

��!��� ��B (�������B 3���������B /���%�������

Biological resource impacts� =����������!� %������ ��!7 � ��

(0�!�����������!�� ���� ��������!��

Visual resource impacts� :���!�����!������.������� ���!���%��%��&� !�+ �!������!�� ��!A� ���!��� ������!,

� ������ ����� ���

<��� �� ���������

� 7��������� ������1��

������� ����� �������������!

Access Levels – Definitions Access Levels – Definitions

Access (Construction and Operation) Levels and Ground Disturbance DefinedAccess Level Disturbance Definition Typical Crossing Conditions

� ) ��!�&� ����!�� ���������0�!���������1 ��%����������������%��� ����&��������&�!�C

� <�%����������!��� ���������!�����!�����%��� �����%��� ��!�+�C�C�� �!����������� � ������

:�%����

� /���&���!�� ������� ��!����������0�!���������!!� ��!������ �6��!�� ����������!���������� �.�� ��� � %� ����+%��������� � %��� �� �����,C

� /�&�� � %� ���!��� �������%� ������ �%������� �!�1 ��0�!�������!�� ����������!C��7����������!�� �!����������� �����������!� 1����!����!���!�� ���C

����!� ����� �0����!�,C� * ��! �!!���������������������&����!�����!���

��%��� �����%��� ��!�+� � %� ���!����������,C

� E��&���� ��&���� ��� ���������� ��� ������ �1��������!C

� <�%������ �����%����������!�&����0�!����� ��!C

� <�%������ �����%����������!�&���!���!�����0��������8SC

:�%�� �

� ) ��!�&� ����!�� ���������0�!���������1 ��%����������������%��� ����&������� �� ���C

� /�&�� � %� ���!��� ����������� ����������������1�����%������������ �� ���� %����!������������!!�1 ���!� �������.��� ��������%�����!C�7����������!�

� <�%������ �?���%�����A��!� ������!�&����0�!�������� � %��� ��!�+G116��&�� %������ ���!� �.�� ����� � %� ���,C

� <�%����������!�&������0�!���������� �� �� !�+�C�C�� ��&��!��� ���&��!������������!� ���!,C

<��� �� ���������

��

:�%����� ��������� � %���������!� 1����!����!���!�� ���C � * ��! �!!���������������������&����!�����!���

��%��� �����%��� ��!�+� � %� ���!�������,C� <�%������ �����%����������!�&���!���!����

�0��������8SC

:�%���2

� ) ��!�&� ����!�� ���������0�!���������1 ��%����������������%��� ����&����������!�C

� /�&�� � %� ���!����� �.�� ��%������������������ �����������&��� � %���1�!��� �� ��������!�� �����C�7�������������!���&���������!�� ���C

� ?���%�����A��!� ������!�&������0�!����� ��!�+ ���� ���������������� �!��!!���� ��!,C

� <�%������ �����%����������!�&���!���!��0��������86��SC

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-79 CEC Application November 2011

Page 68: PDF 8257 KB - Tucson Electric Power

;

Impact Assessment CriteriaImpact Assessment Criteria

3 ���� - ��� �� *����� 3 �����- ��� ���*����

<��� �� ���������

��

Study Area PhotosStudy Area Photos

� 7� ��! ��! 1 �� !���� � ��� 7� ��!���!�1����!������ ��

<��� �� ���������

��

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-80 CEC Application November 2011

Page 69: PDF 8257 KB - Tucson Electric Power

>

Alternative Route IdentificationAlternative Route Identification

� )��� ����%������!�� �!���������N���A)���!�������&� ��� ��������1 �� ��! �!!�������� ����1� ����!���!����'

# $ � � �� �B # $������!� �������&� �����!B # $������ ������&� �����!B ���� �9������%� � ������� ����!B #����������������������

� * ��� ����1� ����!�� ���������!� ������������ ������&�

/ � �

<��� �� ���������

�2

B / �� ���!B ������"����"��� ���!B )�$������4;�7������ ���!

Switchyard/Substation Sites AnalyzedSwitchyard/Substation Sites Analyzed

� -�!� �������&� �!� ��!(0���!�� 1 �0�!���� � ���� %���� �&����� �A���!�����B (0���!���1��0�!������ ���� %������&����� �A���!�����

B *� � � ������ ������������� ��������������� !������1�����0�!�����4;�7�� ��! �!!������������E��%�����"���

� G�� ������&� �!&����� �A!��!������!���!B # �!���!&����� �A!��!�����B "!� ������!������

<��� �� ���������

�4

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-81 CEC Application November 2011

Page 70: PDF 8257 KB - Tucson Electric Power

5

Summary of Alternative RoutesSummary of Alternative Routes

� ����!1��!��&� ��������1 ���!� ������������ �����1����"!� ���1��������!B )��� ����%�� ����1� ����!�������1������ ������!� ������������ ���������!

� - ������������ ����%�� ���!B �� %��1��� ����!� � ��� ����1 ������ ������1 "!� ����� ����!� � � � � � � � � � � � � �

<��� �� ���������

�8

B ����!������ �����!�!�� ��������������������� ���� �.�� � ���!

Construction and Operation Alternatives –MapsConstruction and Operation Alternatives –Maps

� -�!� ������������ ��������� ����%�!�B ��!�

<��� �� ���������

�;

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-82 CEC Application November 2011

Page 71: PDF 8257 KB - Tucson Electric Power

Alternative Route Families (combining construction and operation) – Maps Alternative Route Families (combining construction and operation) – Maps

� )��� ����%�� ����1� ����!�6 ��!

<��� �� ���������

�>

Preliminary Environmental Alternative Evaluation Table – ExamplePreliminary Environmental Alternative Evaluation Table – Example

� (0� ����B # ��� ��� ��(�%� � ������)��� ����%��(%��������*����

<��� �� ���������

�5

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-83 CEC Application November 2011

Page 72: PDF 8257 KB - Tucson Electric Power

��

Preliminary Alternative Comparison Summary Table – Example Preliminary Alternative Comparison Summary Table – Example

� (0� ����B # ��� ��� ��)��� ����%��- �� �!���� � ��*����

<��� �� ���������

��

Alternative Route EvaluationAlternative Route Evaluation

� )��� ����%�� ���!�&�������� �� ���1��&���������������������� �%��&� - �� �!� ��� !������� � ��� �� &��� �������'- �� �!������!��������� ��� ���&�����������'

B (�%� � ������� ����������B (���� �����!�!�� ���������� �.�� � ���!������� �1 � �!B (������ ���

� -�!� ����������� -!�� "���616&��

B #�����������������!��� �

<��� �� ���������

��

B "������ ���� ��!

� G��� � ������ ����%��� ��! �!!�������� ���!� �������� ����1 &� �������������������1 ���-� ��1������1�(�%� � ������- �����������+-(-,������!�� �����������) �9���- � �����- �!!��

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-84 CEC Application November 2011

Page 73: PDF 8257 KB - Tucson Electric Power

��

Next StepsNext Steps

� -��������%��������1����� ����%�� ���!

� # $������&!����� ��2

� �������� � ��������4�+�!� .�� �� �����,

� #�����������!�� ��������2�+�!� .�� �� �����,

� - �� ������������1��1������ ��! �!!�������� ���+!,������!� �������&� �!� ��+!,�+�!�6��� .�� �� �����,

<��� �� ���������

��

� �������� � ��������8�+��� .�� �� �����,

� # $������&!����� ��4�+��� .�� �� �����,

� �����-(-������������+��� .�� �� �����,

Comments and QuestionsComments and Questions

- ���!� �.��!���!K

<��� �� ���������

��

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-85 CEC Application November 2011

Page 74: PDF 8257 KB - Tucson Electric Power

THIS PAGE INTENTIONALLY LEFT BLANK

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-86 CEC Application November 2011

Page 75: PDF 8257 KB - Tucson Electric Power

N:\p

roje

cts\

Ros

emon

t Cop

per\T

EP_L

opez

\mxd

s\R

MC

_Bas

e_H

illsh

ade_

inse

ts.m

xd

Ari

zona

Ro

se

mo

nt

13

8k

V

Ro

se

mo

nt

13

8k

V

Tra

ns

mis

sio

n L

ine

Pro

jec

tT

ran

sm

iss

ion

Lin

e P

roje

ct

Dec

embe

r 9, 2

0090

12

0.5

Mile

s

I

R.

13

E.

R.

14

E.

R.

15

E.

R.

16

E.

R.

17

E.

T.

16

S.

T.

17

S.

T.

18

S.

T.

19

S.

§̈¦10

§̈¦40

§̈¦15

§̈¦10

PHO

ENIX

TUC

SON

§̈¦8

§̈¦17

§̈¦19

Proj

ect L

ocat

ion

Mex

i co

Ari

zon

a

DR

AFT

Wor

king

Dra

ft

!!!

!

!

!

!

!

!

! !!

!!

!!

!

!

!

!

150

90

100

30

110

50 60

120

130

210

200

10

160

2040

190

170

105

4515

25

185

14513

5 155

9514

0

5585

# I

# I

# I

# I

# I

# I

Ros

emon

t

Pim

a C

ou

nty

Pim

a C

ou

nty

Sa

nta

Cru

z C

ou

nty

Sa

nta

Cru

z C

ou

nty

rita

Rd.

Sonoita Hwy

Wentworth Rd.

Kolb Rd.

SonoitaHwyEm

pire

Ran

chR

d.

Sant

a RitaRd.

Madera Canyon Rd.

ine

Rd.

Whi

teHou

seCan

yon

Rd.

Mar

shSt

atio

nRd

.

CO

RO

NA

DO

CO

RO

NA

DO

NA

TIO

NA

LN

AT

ION

AL

FO

RE

ST

FO

RE

ST

d.

Sahu

arita

Rd.

Daw

n R

d.

Helvet

iaRd.

Houghton Rd.

Main Ave.

Wilmot Rd.

Country Club Rd.

Pim

a M

ine

Rd. El T

oro

Rd.

La Villita Rd.

Duval

MineRd.

CCoonntt iinneenn ttaa

ll RRdd ..

BBooxx

CCaannyyoonn RRdd..

SA

NT

A R

ITA

SA

NT

A R

ITA

EX

PE

RIM

EN

TA

LE

XP

ER

IME

NT

AL

RA

NG

ER

AN

GE

Va

ilV

ail

SS.. CCooppppee rrccuutt TTrraaiill

Harrison Rd.

SS.. VViiaa LLoommaa ddeell VVeennaa ddoo

Rd42

4

Rd

417

Rd

413

Rd

411

LA

S

LA

S

CIE

NE

GA

SC

IEN

EG

AS

NA

TIO

NA

LN

AT

ION

AL

CO

NS

ER

-C

ON

SE

R-

VA

TIO

NV

AT

ION

AR

EA

AR

EA

§̈ ¦10

§̈ ¦19

Sycamore Leaf Rd.

Gre

en

Valle

y

Gre

ater

ville

Fort

H

uach

uca

Bre

aker

Sout

hern

Paci

fic Ra

ilroa

d

Sout

hern

Paci

fic R

ailro

ad

Sp Railroad

Sout

hern

Paci

fic Ra

ilroa

d

Sout

hern

Paci

fic Ra

ilroa

d

Sout

hern

Paci

fic R

ailro

ad

Sout

hern

Paci

fic Ra

ilroa

d

Southe

rn

Pacific

Railro

ad

Southern Pacific Railroad

Sout

hern

Pacif

ic Rail

road

Southern Pacific Railroad

Southern Pacific Railroad

Southern Pacific

Railroad

Southern Pacific

Company RR

UV83

t u89

Cor

ona

de T

ucso

n

East

Sah

uarit

a

Gre

en V

alle

y

Sahu

arita

Sono

ita

Sum

mit

Am

ado

Tucs

on

Sahu

arita

Lege

nd

Sour

ces

!

!!

!

!

130

105

14513

5 155

9514

0

RD424RD424

Sant

aRita

Rd

Sant

aRita

Rd

!!

!

Sant

aRi

taRd

Sant

aRi

taRd

1545

25

Inse

t AIn

set A

Inse

t BIn

set B

Inse

t BIn

set B

Inse

t AIn

set A

Stre

etM

ap U

SA 2

008;

TE

P 20

08; E

PG, 2

008,

Pim

a C

ount

y 20

08, R

osem

ont C

oppe

r Com

pany

200

8

Prop

osed

Switc

hyar

d/Su

bsta

tion

Pre

lim

ina

r R

ou

te A

lte

rna

tiv

es

Pre

lim

ina

r R

ou

te A

lte

rna

tiv

es

Nor

th R

oute

Fam

ily

Link

Nod

ePr

elim

inar

y A

ltern

ativ

e Li

nk

Link

Iden

tific

atio

n N

umbe

r10

Gen

eral

Ref

eren

ce F

eatu

res

Cou

nty

Boun

dary

Seco

ndar

y R

oad

Rai

lroad

Hig

hway

Inte

rsta

te

Sect

ion

Boun

dary

Tow

nshi

p Bo

unda

ry

Riv

er /

Was

h

Exis

ting

46kV

Tra

nsm

issi

on L

ine

Exis

ting

115k

V Tr

ansm

issi

on L

ine

Exis

ting

138k

V Tr

ansm

issi

on L

ine

Exis

ting

230k

V Tr

ansm

issi

on L

ine

Exis

ting

345k

V Tr

ansm

issi

on L

ine

Nat

iona

l For

est B

ound

ary

Prop

osed

Sw

itchy

ard/

Subs

tatio

n# I

Exis

ting

Sub

stat

ion

# I

Upd

ated

Pro

ject

Stu

dy A

rea

Boun

dary

Tucs

on E

lect

ric P

ower

R

osem

ont 1

38kV

Tra

nsm

issi

on L

ine

Proj

ect

J-87

CEC

App

licat

ion

Nov

embe

r 201

1

Page 76: PDF 8257 KB - Tucson Electric Power

THIS

PA

GE

INTE

NTI

ON

ALL

Y L

EFT

BLA

NK

Tucs

on E

lect

ric P

ower

R

osem

ont 1

38kV

Tra

nsm

issi

on L

ine

Proj

ect

J-88

CEC

App

licat

ion

Nov

embe

r 201

1

Page 77: PDF 8257 KB - Tucson Electric Power

N:\p

roje

cts\

Ros

emon

t Cop

per\T

EP_L

opez

\mxd

s\R

MC

_Bas

e_H

illsh

ade_

inse

ts.m

xd

Ari

zona

Ro

se

mo

nt

13

8k

V

Ro

se

mo

nt

13

8k

V

Tra

ns

mis

sio

n L

ine

Pro

jec

tT

ran

sm

iss

ion

Lin

e P

roje

ct

Dec

embe

r 9, 2

0090

12

0.5

Mile

s

I

R.

13

E.

R.

14

E.

R.

15

E.

R.

16

E.

R.

17

E.

T.

16

S.

T.

17

S.

T.

18

S.

T.

19

S.

§̈¦10

§̈¦40

§̈¦15

§̈¦10

PHO

ENIX

TUC

SON

§̈¦8

§̈¦17

§̈¦19

Proj

ect L

ocat

ion

Mex

i co

Ari

zon

a

DR

AFT

Wor

king

Dra

ft

!!!

!

!

!

!

!

!

! !!

!!

!!

!

!

!

!

150

90

100

30

110

50 60

120

130

210

200

10

160

2040

190

170

105

4515

25

185

14513

5 155

9514

0

5585

# I

# I

# I

# I

# I

# I

Ros

emon

t

Pim

a C

ou

nty

Pim

a C

ou

nty

Sa

nta

Cru

z C

ou

nty

Sa

nta

Cru

z C

ou

nty

rita

Rd.

Sonoita Hwy

Wentworth Rd.

Kolb Rd.

SonoitaHwyEm

pire

Ran

chR

d.

Sant

a RitaRd.

Madera Canyon Rd.

ine

Rd.

Whi

teHou

seCan

yon

Rd.

Mar

shSt

atio

nRd

.

CO

RO

NA

DO

CO

RO

NA

DO

NA

TIO

NA

LN

AT

ION

AL

FO

RE

ST

FO

RE

ST

d.

Sahu

arita

Rd.

Daw

n R

d.

Helvet

iaRd.

Houghton Rd.

Main Ave.

Wilmot Rd.

Country Club Rd.

Pim

a M

ine

Rd. El T

oro

Rd.

La Villita Rd.

Duval

MineRd.

CCoonntt iinneenn ttaa

ll RRdd ..

BBooxx

CCaannyyoonn RRdd..

SA

NT

A R

ITA

SA

NT

A R

ITA

EX

PE

RIM

EN

TA

LE

XP

ER

IME

NT

AL

RA

NG

ER

AN

GE

Va

ilV

ail

SS.. CCooppppee rrccuutt TTrraaiill

Harrison Rd.

SS.. VViiaa LLoommaa ddeell VVeennaa ddoo

Rd42

4

Rd

417

Rd

413

Rd

411

LA

S

LA

S

CIE

NE

GA

SC

IEN

EG

AS

NA

TIO

NA

LN

AT

ION

AL

CO

NS

ER

-C

ON

SE

R-

VA

TIO

NV

AT

ION

AR

EA

AR

EA

§̈ ¦10

§̈ ¦19

Sycamore Leaf Rd.

Gre

en

Valle

y

Gre

ater

ville

Fort

H

uach

uca

Bre

aker

Sout

hern

Paci

fic Ra

ilroa

d

Sout

hern

Paci

fic R

ailro

ad

Sp Railroad

Sout

hern

Paci

fic Ra

ilroa

d

Sout

hern

Paci

fic Ra

ilroa

d

Sout

hern

Paci

fic R

ailro

ad

Sout

hern

Paci

fic Ra

ilroa

d

Southe

rn

Pacific

Railro

ad

Southern Pacific Railroad

Sout

hern

Pacif

ic Rail

road

Southern Pacific Railroad

Southern Pacific Railroad

Southern Pacific

Railroad

Southern Pacific

Company RR

UV83

t u89

Cor

ona

de T

ucso

n

East

Sah

uarit

a

Gre

en V

alle

y

Sahu

arita

Sono

ita

Sum

mit

Am

ado

Tucs

on

Sahu

arita

Lege

nd

Sour

ces

!

!!

!

!

130

105

14513

5 155

9514

0

RD424RD424

Sant

aRita

Rd

Sant

aRita

Rd

!!

!

Sant

aRi

taRd

Sant

aRi

taRd

1545

25

Inse

t AIn

set A

Inse

t BIn

set B

Inse

t BIn

set B

Inse

t AIn

set A

Stre

etM

ap U

SA 2

008;

TE

P 20

08; E

PG, 2

008,

Pim

a C

ount

y 20

08, R

osem

ont C

oppe

r Com

pany

200

8

Prop

osed

Switc

hyar

d/Su

bsta

tion

Pre

lim

ina

r R

ou

te A

lte

rna

tiv

es

Pre

lim

ina

r R

ou

te A

lte

rna

tiv

es

Sant

a R

ita R

oad

Fam

ily

Link

Nod

ePr

elim

inar

y A

ltern

ativ

e Li

nk

Link

Iden

tific

atio

n N

umbe

r10

Gen

eral

Ref

eren

ce F

eatu

res

Cou

nty

Boun

dary

Seco

ndar

y R

oad

Rai

lroad

Hig

hway

Inte

rsta

te

Sect

ion

Boun

dary

Tow

nshi

p Bo

unda

ry

Riv

er /

Was

h

Exis

ting

46kV

Tra

nsm

issi

on L

ine

Exis

ting

115k

V Tr

ansm

issi

on L

ine

Exis

ting

138k

V Tr

ansm

issi

on L

ine

Exis

ting

230k

V Tr

ansm

issi

on L

ine

Exis

ting

345k

V Tr

ansm

issi

on L

ine

Nat

iona

l For

est B

ound

ary

Prop

osed

Sw

itchy

ard/

Subs

tatio

n# I

Exis

ting

Sub

stat

ion

# I

Upd

ated

Pro

ject

Stu

dy A

rea

Boun

dary

Tucs

on E

lect

ric P

ower

R

osem

ont 1

38kV

Tra

nsm

issi

on L

ine

Proj

ect

J-89

CEC

App

licat

ion

Nov

embe

r 201

1

Page 78: PDF 8257 KB - Tucson Electric Power

THIS

PA

GE

INTE

NTI

ON

ALL

Y L

EFT

BLA

NK

Tucs

on E

lect

ric P

ower

R

osem

ont 1

38kV

Tra

nsm

issi

on L

ine

Proj

ect

J-90

CEC

App

licat

ion

Nov

embe

r 201

1

Page 79: PDF 8257 KB - Tucson Electric Power

N:\p

roje

cts\

Ros

emon

t Cop

per\T

EP_L

opez

\mxd

s\R

MC

_Bas

e_H

illsh

ade_

inse

ts.m

xd

Ari

zona

Ro

se

mo

nt

13

8k

V

Ro

se

mo

nt

13

8k

V

Tra

ns

mis

sio

n L

ine

Pro

jec

tT

ran

sm

iss

ion

Lin

e P

roje

ct

Dec

embe

r 9, 2

0090

12

0.5

Mile

s

I

R.

13

E.

R.

14

E.

R.

15

E.

R.

16

E.

R.

17

E.

T.

16

S.

T.

17

S.

T.

18

S.

T.

19

S.

§̈¦10

§̈¦40

§̈¦15

§̈¦10

PHO

ENIX

TUC

SON

§̈¦8

§̈¦17

§̈¦19

Proj

ect L

ocat

ion

Mex

i co

Ari

zon

a

DR

AFT

Wor

king

Dra

ft

!!!

!

!

!

!

!

!

! !!

!!

!!

!

!

!

!

150

90

100

30

110

50 60

120

130

210

200

10

160

2040

190

170

105

4515

25

185

14513

5 155

9514

0

5585

# I

# I

# I

# I

# I

# I

Ros

emon

t

Pim

a C

ou

nty

Pim

a C

ou

nty

Sa

nta

Cru

z C

ou

nty

Sa

nta

Cru

z C

ou

nty

rita

Rd.

Sonoita Hwy

Wentworth Rd.

Kolb Rd.

SonoitaHwyEm

pire

Ran

chR

d.

Sant

a RitaRd.

Madera Canyon Rd.

ine

Rd.

Whi

teHou

seCan

yon

Rd.

Mar

shSt

atio

nRd

.

CO

RO

NA

DO

CO

RO

NA

DO

NA

TIO

NA

LN

AT

ION

AL

FO

RE

ST

FO

RE

ST

d.

Sahu

arita

Rd.

Daw

n R

d.

Helvet

iaRd.

Houghton Rd.

Main Ave.

Wilmot Rd.

Country Club Rd.

Pim

a M

ine

Rd. El T

oro

Rd.

La Villita Rd.

Duval

MineRd.

CCoonntt iinneenn ttaa

ll RRdd ..

BBooxx

CCaannyyoonn RRdd..

SA

NT

A R

ITA

SA

NT

A R

ITA

EX

PE

RIM

EN

TA

LE

XP

ER

IME

NT

AL

RA

NG

ER

AN

GE

Va

ilV

ail

SS.. CCooppppee rrccuutt TTrraaiill

Harrison Rd.

SS.. VViiaa LLoommaa ddeell VVeennaa ddoo

Rd42

4

Rd

417

Rd

413

Rd

411

LA

S

LA

S

CIE

NE

GA

SC

IEN

EG

AS

NA

TIO

NA

LN

AT

ION

AL

CO

NS

ER

-C

ON

SE

R-

VA

TIO

NV

AT

ION

AR

EA

AR

EA

§̈ ¦10

§̈ ¦19

Sycamore Leaf Rd.

Gre

en

Valle

y

Gre

ater

ville

Fort

H

uach

uca

Bre

aker

Sout

hern

Paci

fic Ra

ilroa

d

Sout

hern

Paci

fic R

ailro

ad

Sp Railroad

Sout

hern

Paci

fic Ra

ilroa

d

Sout

hern

Paci

fic Ra

ilroa

d

Sout

hern

Paci

fic R

ailro

ad

Sout

hern

Paci

fic Ra

ilroa

d

Southe

rn

Pacific

Railro

ad

Southern Pacific Railroad

Sout

hern

Pacif

ic Rail

road

Southern Pacific Railroad

Southern Pacific Railroad

Southern Pacific

Railroad

Southern Pacific

Company RR

UV83

t u89

Cor

ona

de T

ucso

n

East

Sah

uarit

a

Gre

en V

alle

y

Sahu

arita

Sono

ita

Sum

mit

Am

ado

Tucs

on

Sahu

arita

Lege

nd

Sour

ces

!

!!

!

!

130

105

14513

5 155

9514

0

RD424RD424

Sant

aRita

Rd

Sant

aRita

Rd

!!

!

Sant

aRi

taRd

Sant

aRi

taRd

1545

25

Inse

t AIn

set A

Inse

t BIn

set B

Inse

t BIn

set B

Inse

t AIn

set A

Stre

etM

ap U

SA 2

008;

TE

P 20

08; E

PG, 2

008,

Pim

a C

ount

y 20

08, R

osem

ont C

oppe

r Com

pany

200

8

Prop

osed

Switc

hyar

d/Su

bsta

tion

Pre

lim

ina

r R

ou

te A

lte

rna

tiv

es

Pre

lim

ina

r R

ou

te A

lte

rna

tiv

es

Adja

cent

46k

V F

amily

Link

Nod

ePr

elim

inar

y A

ltern

ativ

e Li

nk

Link

Iden

tific

atio

n N

umbe

r10

Gen

eral

Ref

eren

ce F

eatu

res

Cou

nty

Boun

dary

Seco

ndar

y R

oad

Rai

lroad

Hig

hway

Inte

rsta

te

Sect

ion

Boun

dary

Tow

nshi

p Bo

unda

ry

Riv

er /

Was

h

Exis

ting

46kV

Tra

nsm

issi

on L

ine

Exis

ting

115k

V Tr

ansm

issi

on L

ine

Exis

ting

138k

V Tr

ansm

issi

on L

ine

Exis

ting

230k

V Tr

ansm

issi

on L

ine

Exis

ting

345k

V Tr

ansm

issi

on L

ine

Nat

iona

l For

est B

ound

ary

Prop

osed

Sw

itchy

ard/

Subs

tatio

n# I

Exis

ting

Sub

stat

ion

# I

Upd

ated

Pro

ject

Stu

dy A

rea

Boun

dary

Tucs

on E

lect

ric P

ower

R

osem

ont 1

38kV

Tra

nsm

issi

on L

ine

Proj

ect

J-91

CEC

App

licat

ion

Nov

embe

r 201

1

Page 80: PDF 8257 KB - Tucson Electric Power

THIS

PA

GE

INTE

NTI

ON

ALL

Y L

EFT

BLA

NK

Tucs

on E

lect

ric P

ower

R

osem

ont 1

38kV

Tra

nsm

issi

on L

ine

Proj

ect

J-92

CEC

App

licat

ion

Nov

embe

r 201

1

Page 81: PDF 8257 KB - Tucson Electric Power

N:\p

roje

cts\

Ros

emon

t Cop

per\T

EP_L

opez

\mxd

s\R

MC

_Bas

e_H

illsh

ade_

inse

ts.m

xd

Ari

zona

Ro

se

mo

nt

13

8k

V

Ro

se

mo

nt

13

8k

V

Tra

ns

mis

sio

n L

ine

Pro

jec

tT

ran

sm

iss

ion

Lin

e P

roje

ct

Febr

uary

1, 2

010

01

20.

5M

iles

I

R.

13

E.

R.

14

E.

R.

15

E.

R.

16

E.

R.

17

E.

T.

16

S.

T.

17

S.

T.

18

S.

T.

19

S.

§̈¦10

§̈¦40

§̈¦15

§̈¦10

PHO

ENIX

TUC

SON

§̈¦8

§̈¦17

§̈¦19

Proj

ect L

ocat

ion

Mex

i co

Ari

zon

a

DR

AFT

Wor

king

Dra

ft

!!!

!

!

!

!

!

!

! !!

!!

!!

!

!

!

!

150

90

100

30

110

50 60

120

130

210

200

10

160

20

40

19017

0

105

4515

25

185

14513

5 155

9514

0

5585

[_

[_

[_

[_ [_

[_

[_[_

[_

[_

[_

[_

# I

# I

# I

# I

# I

# I

Ros

emon

t

Pim

a C

ou

nty

Pim

a C

ou

nty

Sa

nta

Cru

z C

ou

nty

Sa

nta

Cru

z C

ou

nty

Ind

ian

Re

se

rva

tio

nIn

dia

n R

es

erv

ati

on

arita

Rd.

Sonoita Hwy

Wentworth Rd.

Kolb Rd.

SonoitaHwyEm

pire

Ran

chR

d.

Sant

a RitaRd.

Madera Canyon Rd.

Min

e R

d.

Whi

teHou

seCan

yon

Rd.

Mar

shSt

atio

nRd

.

C

CO

RO

NA

DO

CO

RO

NA

DO

NA

TIO

NA

LN

AT

ION

AL

FO

RE

ST

FO

RE

ST

d.

Sahu

arita

Rd.

Daw

n R

d.

Helvet

iaRd.

Houghton Rd.

Main Ave.

Wilmot Rd.

Country Club Rd.

Pim

a M

ine

Rd. El T

oro

Rd.

La Villita Rd.

Duval

MineRd.

CCoonn tt iinneenn ttaa

ll RRdd ..

BBoo xx CCaannyyoonn RRdd..

SA

NT

A R

ITA

SA

NT

A R

ITA

EX

PE

RIM

EN

TA

LE

XP

ER

IME

NT

AL

RA

NG

ER

AN

GE

Va

ilV

ail

SS .. CCooppppee rrccuutt TTrraaiill

Harrison Rd.

SS .. VViiaa LLoommaa ddeell VV eennaa ddoo

Rd42

4

Rd

417

Rd

413

Rd

411

LA

S

LA

S

CIE

NE

GA

SC

IEN

EG

AS

NA

TIO

NA

LN

AT

ION

AL

CO

NS

ER

-C

ON

SE

R-

VA

TIO

NV

AT

ION

AR

EA

AR

EA

§̈ ¦10

§̈ ¦19

Sycamore Leaf Rd.

Gre

en

Valle

y

Gre

ater

ville

Fort

H

uach

uca

Bre

aker

Southern Pacific Railroad

Sout

hern

Paci

fic R

ailro

ad

Sout

hern

Paci

fic R

ailro

ad

Sout

hern

Paci

fic Ra

ilroa

d

Sout

hern

Paci

fic Ra

ilroa

d

Sp Railroad

Sout

hern

Paci

fic R

ailro

ad

Sout

hern

Paci

fic Ra

ilroa

d

Southe

rn

Pacific

Railro

ad

Southern Pacific Railroad

Sout

hern

Pacif

ic Rail

road

Southern Pacific Railroad Southern Pacific

Railroad

Southern Pacific

Company RR

UV83

t u89

Cor

ona

de T

ucso

n

East

Sah

uarit

a

Gre

en V

alle

y

Sahu

arita

Sono

ita

Sum

mit

Am

ado

Tucs

on

Sahu

arita

Lege

nd

Sour

ces

!

!!

!

!

130

105

14513

5 155

9514

0[_

[_ [_

[_

RD424RD424

Sant

aRita

Rd

Sant

aRita

Rd

!!

!

[_

Sant

aRi

taRd

Sant

aRi

taRd

1545

25

Inse

t AIn

set A

Inse

t BIn

set B

Inse

t BIn

set B

Inse

t AIn

set A

Stre

etM

ap U

SA 2

008;

TE

P 20

08; E

PG, 2

008,

Pim

a C

ount

y 20

08, R

osem

ont C

oppe

r Com

pany

200

8

Prop

osed

Switc

hyar

d/Su

bsta

tion

Op

tio

na

l S

tak

eh

old

er

Gro

up

Fie

ldtr

ipO

pti

on

al

Sta

ke

ho

lde

r G

rou

p F

ield

trip

Ja

nu

ar

25

, 2

01

0J

an

ua

r 2

5,

20

10

Gen

eral

Ref

eren

ce F

eatu

res

Cou

nty

Boun

dary

Seco

ndar

y R

oad

Rai

lroad

Hig

hway

Inte

rsta

te

Sect

ion

Boun

dary

Tow

nshi

p Bo

unda

ry

Riv

er /

Was

h

Exis

ting

46kV

Tra

nsm

issi

on L

ine

Exis

ting

115k

V Tr

ansm

issi

on L

ine

Exis

ting

138k

V Tr

ansm

issi

on L

ine

Exis

ting

230k

V Tr

ansm

issi

on L

ine

Exis

ting

345k

V Tr

ansm

issi

on L

ine

Nat

iona

l For

est B

ound

ary

Prop

osed

Sw

itchy

ard/

Subs

tatio

n# I

Exis

ting

Sub

stat

ion

# I

Upd

ated

Pro

ject

Stu

dy A

rea

Boun

dary

Fiel

d Tr

ip S

top

Fiel

d Tr

ip R

oute

[_

Link

Nod

ePr

elim

inar

y A

ltern

ativ

e Li

nk

Link

Iden

tific

atio

n N

umbe

r10

Tucs

on E

lect

ric P

ower

R

osem

ont 1

38kV

Tra

nsm

issi

on L

ine

Proj

ect

J-93

CEC

App

licat

ion

Nov

embe

r 201

1

Page 82: PDF 8257 KB - Tucson Electric Power

THIS

PA

GE

INTE

NTI

ON

ALL

Y L

EFT

BLA

NK

Tucs

on E

lect

ric P

ower

R

osem

ont 1

38kV

Tra

nsm

issi

on L

ine

Proj

ect

J-94

CEC

App

licat

ion

Nov

embe

r 201

1

Page 83: PDF 8257 KB - Tucson Electric Power

S:\EPG\projects\Rosemont Copper\TEP Rosemont Line\Public Participation\Stakeholder group\Meeting #4\Agenda meeting #4.docx

Rosemont 138kV Transmission Line Project

Agenda – Stakeholder Group Meeting #4March 5, 2010 11:00am – 2:00pm Unisource building, board room

One South Church Street Tucson, Arizona 85702

�� Welcome �� Project Status

�� Impact Assessment

�� Alternative Route Evaluation

�� Alternative Routes

�� Next Steps

�� Comments and Questions

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-95 CEC Application November 2011

Page 84: PDF 8257 KB - Tucson Electric Power

THIS PAGE INTENTIONALLY LEFT BLANK

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-96 CEC Application November 2011

Page 85: PDF 8257 KB - Tucson Electric Power

ROSEMONT 138KV TRANSMISSION LINE PROJECT

ROSEMONT 138KV TRANSMISSION LINE PROJECT

Presentation�������� � �� ������� �4

�� ��8������

�������� �� ������������4�� ��8������

AgendaAgenda

� ���� �� ���� �

� # $���������!

� 3 �����)!!�!! ���

� )��� ����%��"����(%�������

� )��� ����%��"���!

� /�0� ����!

�� ��8������

� /�0������!

� - ���!�����J��!���!

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-97 CEC Application November 2011

Page 86: PDF 8257 KB - Tucson Electric Power

Public Comments ReceivedPublic Comments Received

� - ���!�1 � �!�����!���� �- ������*��!���J�����- ��������� ��� ��� ����� � ������! � �� �� !���� ���������������� ������!��� ����� !

� )��� ����%������!�������0�!�����4;�7�������� ��!����1����������"����(0�� � ������"����������������"����"���� �1� ������! ���� ��� �9��%�!�������� �!��������������� ����!���� �� ���%����!

� "���������������� ����!������=0�-������ �������������- ����/�������� �!�

� ���� �9��%�!����� ����!�1�����%��&!��&� �����������"�����������!

�� ��8������

2

� �

� )��� ����%��!��!�������������������� !������1�E��%�����"��������0�!�����4;�7������!����!�����!����� ����%��1 �� ���������!� �������&� �1 �� ���� %������&����� �A���!�����

Agency/Stakeholder Group Comments ReceivedAgency/Stakeholder Group Comments Received

� ������"����(0�� � ������"����A) �9���������:����<��� � ���B # �1� �� ��! �!!������������ ����%��������������� ��!����1�������

"����"��������� ����%�!������� �� �� ���������� �������� �� � � �� �� �! � � � � � �� �� �� � � �4;�7������ ���

B # �1� ����6����������� ���������!�+� �!���&��� ���������������25�7�� ��! �!!�������,������������"����"��

B <�!����!��� ��:�������

� *&��1����� ���B # �1� !��0�!�����4;�7�� ��! �!!��������� �� ����6������&���

�0�!�������1 �!� ���� �B -��� ����&�������������� ���%���%�!����� ����!��� �!�����!�1 �

� �!���&�!�� ��!&����� �A!��!�����

�� ��8������

4

� - ����/�������� �!�B # �1� !��� ��� �9��������1�� ��! �!!�������� ����� !!����

- ����/�������� �!�B �����!�!���������� ��������� ��!� �!��� ��� �9��%�!����� ����!�

������ �!���� %����-��� ��:�%���� �%��&��!

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-98 CEC Application November 2011

Page 87: PDF 8257 KB - Tucson Electric Power

2

Public Involvement SummaryPublic Involvement Summary

� )������� ��1���!� � �

� �������� �� ��� ������!

� ������� ��

� #�����������!�!

� - ������� ��1���!

� /�&!����� !

�� ��8������

8

� *���������1 ���������

� ���!����+*(#,

Field tripField trip

�� ��8������

;

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-99 CEC Application November 2011

Page 88: PDF 8257 KB - Tucson Electric Power

4

Revised Alternative LinksRevised Alternative Links

� -������� ��%� � ����� �!� �� �!!�!! ��� 1 ���-����������%� � ������ �!� ����!!�!! ����1 ��������� ����%������!

� "� %���!�%� ���� ��� ��� ������ ����%������!�1 ����������� ������!!�!! ���A���� ����%�� ������%��� �����

�� ��8������

>

Impact Assessment SummaryImpact Assessment Summary

Cultural resource impacts� F�&� �!� �� � �� ���!

Land use impacts� (0�!���� ���� �!� F�&���!� ���� �� ���!�

��!��� ��B (�������B 3���������B /���%�������

Biological resource impacts� =����������!� %������ ��!7 � ��

(0�!�����������!�� ���� ��������!��

Visual resource impacts� :���!�����!������.������� ���!���%��%��&� !�+ �!������!�� ��!A� ���!��� ������!,

� ������ ����� ���

�� ��8������

5

� 7��������� ������1��

������� ����� �������������!B Santa Rita Road was

designated scenic by

Pima County February

2010

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-100 CEC Application November 2011

Page 89: PDF 8257 KB - Tucson Electric Power

8

SimulationsSimulations

�� ��8������

Alternative Route Family ComparisonAlternative Route Family Comparison

� 3�!� ��� �� �!�������

�� ��8������

��

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-101 CEC Application November 2011

Page 90: PDF 8257 KB - Tucson Electric Power

;

Key Considerations for Alternative RoutesKey Considerations for Alternative Routes

� # $������!� ������������ ������&� �����!B * ��� ����1� ����!�� ���������&� �����!� �

� ���� �9������%� � ������� ����!� (���� �����!�!�� ���������� �.�� � ���!������� �1 � �!� (������ ����

B -�!� ����������B -!�B "���616&��

� #����������������������

�� ��8������

��

� "������ ���� ��!� G��� � ������ ����%��� ��! �!!�������� ���!� �������� ����1 &� �������������������1 ���-� ��1������1�(�%� � ������- �����������+-(-,������!�� �����������) �9���- � �����- �!!��

Next StepsNext Steps

#����! ��&!����� �2 �� �� #����!���&!����� ��2�B �� �

� #�����������!���4�B )� ��

� ������9�� ���������!�!�1 �-(-�����������

� �����-(-������������B �� ���������������

�� ��8������

��

����<(3������������

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-102 CEC Application November 2011

Page 91: PDF 8257 KB - Tucson Electric Power

N:\p

roje

cts\

Ros

emon

t Cop

per\T

EP_L

opez

\mxd

s\R

MC

_Bas

e_H

illsh

ade_

inse

ts.m

xd

Ari

zona

Ro

se

mo

nt

13

8k

V

Ro

se

mo

nt

13

8k

V

Tra

ns

mis

sio

n L

ine

Pro

jec

tT

ran

sm

iss

ion

Lin

e P

roje

ct

Febr

uary

5, 2

010

01

20.

5M

iles

I

R.

13

E.

R.

14

E.

R.

15

E.

R.

16

E.

R.

17

E.

T.

16

S.

T.

17

S.

T.

18

S.

T.

19

S.

§̈¦10

§̈¦40

§̈¦15

§̈¦10

PHO

ENIX

TUC

SON

§̈¦8

§̈¦17

§̈¦19

Proj

ect L

ocat

ion

Mex

i co

Ari

zon

a

DR

AFT

Wor

king

Dra

ft

!!

!

!

!

!

!

!

! !!

!!

!

!

!

!

!

150

90

100

30

110

60

120

130

210

160

20

19017

0

105

25

185

135 15

5

9514

0

5585

# I

# I

# I

# I

# I

# I

Ros

emon

t

Pim

a C

ou

nty

Pim

a C

ou

nty

Sa

nta

Cru

z C

ou

nty

Sa

nta

Cru

z C

ou

nty

Ind

ian

Re

se

rva

tio

nIn

dia

n R

es

erv

ati

on

arita

Rd.

Sonoita Hwy

Wentworth Rd.

Kolb Rd.

SonoitaHwyEm

pire

Ran

chR

d.

Sant

a RitaRd.

Madera Canyon Rd.

Min

e R

d.

Whi

teHou

seCan

yon

Rd.

Mar

shSt

atio

nRd

.

C

CO

RO

NA

DO

CO

RO

NA

DO

NA

TIO

NA

LN

AT

ION

AL

FO

RE

ST

FO

RE

ST

d.

Sahu

arita

Rd.

Daw

n R

d.

Helvet

iaRd.

Houghton Rd.

Main Ave.

Wilmot Rd.

Country Club Rd.

Pim

a M

ine

Rd. El T

oro

Rd.

La Villita Rd.

Duval

MineRd.

CCoonn tt iinneenn ttaa

ll RRdd ..

BBoo xx CCaannyyoonn RRdd..

SA

NT

A R

ITA

SA

NT

A R

ITA

EX

PE

RIM

EN

TA

LE

XP

ER

IME

NT

AL

RA

NG

ER

AN

GE

Va

ilV

ail

SS .. CCooppppee rrccuutt TTrraaiill

Harrison Rd.

SS .. VViiaa LLoommaa ddeell VV eennaa ddoo

Rd42

4

Rd

417

Rd

413

Rd

411

LA

S

LA

S

CIE

NE

GA

SC

IEN

EG

AS

NA

TIO

NA

LN

AT

ION

AL

CO

NS

ER

-C

ON

SE

R-

VA

TIO

NV

AT

ION

AR

EA

AR

EA

§̈ ¦10

§̈ ¦19

Sycamore Leaf Rd.

Gre

en

Valle

y

Gre

ater

ville

Fort

H

uach

uca

Bre

aker

Southern Pacific Railroad

Sout

hern

Paci

fic R

ailro

ad

Sout

hern

Paci

fic R

ailro

ad

Sout

hern

Paci

fic Ra

ilroa

d

Sout

hern

Paci

fic Ra

ilroa

d

Sp Railroad

Sout

hern

Paci

fic R

ailro

ad

Sout

hern

Paci

fic Ra

ilroa

d

Southe

rn

Pacific

Railro

ad

Southern Pacific Railroad

Sout

hern

Pacif

ic Rail

road

Southern Pacific Railroad Southern Pacific

Railroad

Southern Pacific

Company RR

UV83

t u89

Cor

ona

de T

ucso

n

East

Sah

uarit

a

Gre

en V

alle

y

Sahu

arita

Sono

ita

Sum

mit

Am

ado

Tucs

on

Sahu

arita

Lege

nd

Sour

ces

!

!!

!

!

130

105

135 15

5

9514

0

RD424RD424

Sant

aRita

Rd

Sant

aRita

Rd

!!

Sant

aRi

taRd

Sant

aRi

taRd

25

Inse

t AIn

set A

Inse

t BIn

set B

Inse

t BIn

set B

Inse

t AIn

set A

Prop

osed

Switc

hyar

d/Su

bsta

tion

Gen

eral

Ref

eren

ce F

eatu

res

Cou

nty

Boun

dary

Seco

ndar

y R

oad

Rai

lroad

Hig

hway

Inte

rsta

te

Sect

ion

Boun

dary

Tow

nshi

p Bo

unda

ry

Riv

er /

Was

h

Exis

ting

46kV

Tra

nsm

issi

on L

ine

Exis

ting

115k

V Tr

ansm

issi

on L

ine

Exis

ting

138k

V Tr

ansm

issi

on L

ine

Exis

ting

230k

V Tr

ansm

issi

on L

ine

Exis

ting

345k

V Tr

ansm

issi

on L

ine

Nat

iona

l For

est B

ound

ary

Prop

osed

Sw

itchy

ard/

Subs

tatio

n# I

Exis

ting

Sub

stat

ion

# I

Upd

ated

Pro

ject

Stu

dy A

rea

Boun

dary

Stre

etM

ap U

SA 2

008;

TE

P 20

08; E

PG, 2

008,

Pim

a C

ount

y 20

08, R

osem

ont C

oppe

r Com

pany

200

8

Not

es: N

ot a

ll of

the

prel

imin

ary

alte

rnat

ive

links

sho

wn

on th

e

m

ap w

ill b

e co

nstr

ucte

d. P

roje

ct s

tudy

are

a bo

unda

ry h

as

been

upd

ated

as

of J

uly

2009

All

links

are

pre

limin

ary

and

may

be

mod

ified

bas

ed o

n ag

ency

and

pub

lic in

put.

Pre

lim

ina

r T

ran

sm

iss

ion

Lin

e

Pre

lim

ina

r T

ran

sm

iss

ion

Lin

e

Lin

k A

lte

rna

tiv

es

wit

hL

ink

Alt

ern

ati

ve

s w

ith

Ju

ris

dic

tio

n a

nd

Ow

ne

rsh

ipJ

uri

sd

icti

on

an

d O

wn

ers

hip

Link

Nod

ePr

elim

inar

y A

ltern

ativ

e Li

nk

Link

Iden

tific

atio

n N

umbe

r10

Mt.

Wrig

htso

n W

ilder

ness

Sant

a R

ita E

xper

imen

tal R

ange

Las

Cie

nega

s N

atio

nal C

onse

rvat

ion

Area

Spec

ial M

anag

emen

t Are

as

Gre

en V

alle

y P

lann

ing

Are

a

Sahu

arita

Inco

rpor

ated

Bou

ndar

y

Plan

ning

Jur

isdi

ctio

ns

Land

Man

agin

g A

reas

Ariz

ona

Sta

te L

and

Indi

an R

eser

vatio

n

Bure

au o

f Lan

d M

anag

emen

t

U.S

. For

est S

ervi

ce

Uni

ncor

pora

ted

Pim

a C

ount

y

Loca

l Par

k (P

ima

Cou

nty)

Ros

emon

t Cop

per F

acili

ties

Priv

ate

Land

s

Cla

im B

ound

ary

Tucs

on E

lect

ric P

ower

R

osem

ont 1

38kV

Tra

nsm

issi

on L

ine

Proj

ect

J-10

3C

EC A

pplic

atio

n N

ovem

ber 2

011

Page 92: PDF 8257 KB - Tucson Electric Power

THIS

PA

GE

INTE

NTI

ON

ALL

Y L

EFT

BLA

NK

Tucs

on E

lect

ric P

ower

R

osem

ont 1

38kV

Tra

nsm

issi

on L

ine

Proj

ect

J-10

4C

EC A

pplic

atio

n N

ovem

ber 2

011

Page 93: PDF 8257 KB - Tucson Electric Power

N:\p

roje

cts\

Ros

emon

t Cop

per\T

EP_L

opez

\mxd

s\R

MC

_Bas

e_H

illsh

ade_

inse

ts_d

ispl

ay.m

xd

Ari

zona

Ros

emon

t 138

kV

Ros

emon

t 138

kV

Tran

smis

sion

Lin

e P

roje

ctTr

ansm

issi

on L

ine

Pro

ject

Mar

ch 2

, 201

001

20.

5M

iles

I

R.

13

E.

R.

14

E.

R.

15

E.

R.

16

E.

R.

17

E.

T.

16

S.

T.

17

S.

T.

18

S.

T.

19

S.

DR

AFT

150

90

100

30

110

60

120

130

210

160

20

19017

0

105

25

185

135 15

5

9514

0

5585

!!

!

!

!

!

!

!

! !!

!!

!

!

!

!

!

# I

# I

# I

# I

# I

# I

Ros

emon

t

Pim

a C

ou

nty

Pim

a C

ou

nty

Sa

nta

Cru

z C

ou

nty

Sa

nta

Cru

z C

ou

nty

Sahu

arita

Rd.

Sonoita Hwy

Wentworth Rd.

SonoitaHwy

Sant

a RitaRd.

Madera Canyon Rd.

Duv

al M

ine

Rd.

Whi

teHou

seCan

yon

Rd.

Mar

shSt

atio

nRd

.

C

CO

RO

NA

DO

CO

RO

NA

DO

NAT

ION

AL

NAT

ION

AL

FOR

ES

TFO

RE

ST

d.

Sahu

arita

Rd.

Daw

n R

d.

HelvetiaRd.

Houghton Rd.

Main Ave.

Wilmot Rd.

Country Club Rd.

Pim

a M

ine

Rd.

El T

oro

Rd.

La Villita Rd.

SA

NTA

RIT

AS

AN

TA R

ITA

EX

PE

RIM

EN

TAL

EX

PE

RIM

EN

TAL

RA

NG

ER

AN

GE

Va

ilV

ail

Harrison Rd.

Rd 424 Rd

417

Rd41

3

Rd41

1LA

S

LAS

C

IEN

EG

ASC

IEN

EG

ASN

ATIO

NAL

NAT

ION

ALC

ON

SER

VATI

ON

CO

NSE

RVA

TIO

NAR

EAAR

EA

§̈ ¦10

§̈ ¦19

Gre

ater

ville

Gre

en Va

lley

Sahu

arita

Fort

H

uach

uca

Bre

aker

Sout

hern

Paci

fic R

ailro

ad

Sout

hern

Paci

fic Ra

ilroa

d

Sout

hern

Paci

fic Ra

ilroa

d

Southern Pacific

Railroad

UV83

t u89

East

Sah

uarit

a

Gre

en V

alle

y

Sahu

arita

Sono

ita

Sum

mit

Am

ado

Tucs

on

Lege

nd

Sour

ces

130

105

135 15

5

9514

0

!

!!

!

!

RD424RD424

!!

Sant

aRi

taRd

Sant

aRi

taRd

25

Inse

t AIn

set A

Inse

t BIn

set B

Inse

t BIn

set B

Inse

t AIn

set A

Stre

etM

ap U

SA

2008

; TE

P 20

08; E

PG

, 200

8,P

ima

Cou

nty

2008

, Ros

emon

t Cop

per C

ompa

ny20

08

Pre

limin

ar R

oute

Alte

rnat

ives

Pre

limin

ar R

oute

Alte

rnat

ives

Gen

eral

Ref

eren

ce F

eatu

res

Cou

nty

Bou

ndar

y

Exi

stin

g 46

kV T

rans

mis

sion

Lin

eE

xist

ing

115k

V T

rans

mis

sion

Lin

eE

xist

ing

138k

V T

rans

mis

sion

Lin

eE

xist

ing

230k

V T

rans

mis

sion

Lin

eE

xist

ing

345k

V T

rans

mis

sion

Lin

e

Nat

iona

l For

est B

ound

ary

Pro

pose

d S

witc

hyar

d/S

ubst

atio

n# I

Exi

stin

g S

ubst

atio

n# I

Proj

ect L

ocat

ion

Mex

i co

Ari

z on

a

Upd

ated

Pro

ject

Stu

dy A

rea

Bou

ndar

y

Sec

onda

ry R

oad

Rai

lroad

Hig

hway

Inte

rsta

te

Tow

nshi

p B

ound

ary

Riv

er /

Was

h

§̈ ¦10

§̈ ¦40

§̈ ¦15

§̈ ¦10

PHO

ENIX

TUC

SON

§̈ ¦8

§̈ ¦17

§̈ ¦19M

exic

o

Ari

z on

a

Prop

osed

Switc

hyar

d/Su

bsta

tion

Link

Nod

eP

relim

inar

y A

ltern

ativ

e Li

nk

Link

Iden

tific

atio

n N

umbe

r10

Per

man

ent L

ink

(20,

25,

55,

85,

90,

95,

140

, 170

, 16

0, 1

90, 2

10)

Nor

th R

oute

Fam

ily -

Opt

ion

#3

Tucs

on E

lect

ric P

ower

R

osem

ont 1

38kV

Tra

nsm

issi

on L

ine

Proj

ect

J-10

5C

EC A

pplic

atio

n N

ovem

ber 2

011

Page 94: PDF 8257 KB - Tucson Electric Power

THIS

PA

GE

INTE

NTI

ON

ALL

Y L

EFT

BLA

NK

Tucs

on E

lect

ric P

ower

R

osem

ont 1

38kV

Tra

nsm

issi

on L

ine

Proj

ect

J-10

6C

EC A

pplic

atio

n N

ovem

ber 2

011

Page 95: PDF 8257 KB - Tucson Electric Power

N:\p

roje

cts\

Ros

emon

t Cop

per\T

EP_L

opez

\mxd

s\R

MC

_Bas

e_H

illsh

ade_

inse

ts_d

ispl

ay.m

xd

Ari

zona

Ros

emon

t 138

kV

Ros

emon

t 138

kV

Tran

smis

sion

Lin

e P

roje

ctTr

ansm

issi

on L

ine

Pro

ject

Mar

ch 3

, 201

001

20.

5M

iles

I

R.

13

E.

R.

14

E.

R.

15

E.

R.

16

E.

R.

17

E.

T.

16

S.

T.

17

S.

T.

18

S.

T.

19

S.

DR

AFT

150

90

100

30

110

60

120

130

210

160

20

19017

0

105

25

185

135 15

5

9514

0

5585 # I

!!

!

!

!

!!

! !!

!!

!

!

!

!

!

# I

# I

# I

# I

# I

# I

Ros

emon

t

Pim

a C

ou

nty

Pim

a C

ou

nty

Sa

nta

Cru

z C

ou

nty

Sa

nta

Cru

z C

ou

nty

Sahu

arita

Rd.

Sonoita Hwy

Wentworth Rd.

SonoitaHwy

Sant

a RitaRd.

Madera Canyon Rd.

Duv

al M

ine

Rd.

Whi

teHou

seCan

yon

Rd.

Mar

shSt

atio

nRd

.

C

CO

RO

NA

DO

CO

RO

NA

DO

NAT

ION

AL

NAT

ION

AL

FOR

ES

TFO

RE

ST

d.

Sahu

arita

Rd.

Daw

n R

d.

HelvetiaRd.

Houghton Rd.

Main Ave.

Wilmot Rd.

Country Club Rd.

Pim

a M

ine

Rd.

El T

oro

Rd.

La Villita Rd.

SA

NTA

RIT

AS

AN

TA R

ITA

EX

PE

RIM

EN

TAL

EX

PE

RIM

EN

TAL

RA

NG

ER

AN

GE

Va

ilV

ail

Harrison Rd.

Rd 424 Rd

417

Rd41

3

Rd41

1LA

S

LAS

C

IEN

EG

ASC

IEN

EG

ASN

ATIO

NAL

NAT

ION

ALC

ON

SER

VATI

ON

CO

NSE

RVA

TIO

NAR

EAAR

EA

§̈ ¦10

§̈ ¦19

Gre

ater

ville

Gre

en Va

lley

Sahu

arita

Fort

H

uach

uca

Bre

aker

Sout

hern

Paci

fic R

ailro

ad

Sout

hern

Paci

fic Ra

ilroa

d

Sout

hern

Paci

fic Ra

ilroa

d

Southern Pacific

Railroad

UV83

t u89

East

Sah

uarit

a

Gre

en V

alle

y

Sahu

arita

Sono

ita

Sum

mit

Am

ado

Tucs

on

Lege

nd

Sour

ces

130

105

135 15

5

9514

0

!

!!

!

!

RD424RD424

!!

Sant

aRi

taRd

Sant

aRi

taRd

25

Inse

t AIn

set A

Inse

t BIn

set B

Inse

t BIn

set B

Inse

t AIn

set A

Stre

etM

ap U

SA

2008

; TE

P 20

08; E

PG

, 200

8,P

ima

Cou

nty

2008

, Ros

emon

t Cop

per C

ompa

ny20

08

Pre

limin

ar R

oute

Alte

rnat

ives

Pre

limin

ar R

oute

Alte

rnat

ives

Gen

eral

Ref

eren

ce F

eatu

res

Cou

nty

Bou

ndar

y

Exi

stin

g 46

kV T

rans

mis

sion

Lin

eE

xist

ing

115k

V T

rans

mis

sion

Lin

eE

xist

ing

138k

V T

rans

mis

sion

Lin

eE

xist

ing

230k

V T

rans

mis

sion

Lin

eE

xist

ing

345k

V T

rans

mis

sion

Lin

e

Nat

iona

l For

est B

ound

ary

Pro

pose

d S

witc

hyar

d/S

ubst

atio

n# I

Exi

stin

g S

ubst

atio

n# I

Proj

ect L

ocat

ion

Mex

i co

Ari

z on

a

Upd

ated

Pro

ject

Stu

dy A

rea

Bou

ndar

y

Sec

onda

ry R

oad

Rai

lroad

Hig

hway

Inte

rsta

te

Tow

nshi

p B

ound

ary

Riv

er /

Was

h

§̈ ¦10

§̈ ¦40

§̈ ¦15

§̈ ¦10

PHO

ENIX

TUC

SON

§̈ ¦8

§̈ ¦17

§̈ ¦19M

exic

o

Ari

z on

a

Prop

osed

Switc

hyar

d/Su

bsta

tion

Link

Nod

eP

relim

inar

y A

ltern

ativ

e Li

nk

Link

Iden

tific

atio

n N

umbe

r10

Tem

pora

ry L

ink

Nor

th R

oute

Fam

ily -

Opt

ion

#8

(20,

25,

55,

85,

90,

95,

140

)

(120

, 130

, 135

)

Tem

pora

ry In

terc

onne

ctio

n# I

Per

man

ent L

ink

Tucs

on E

lect

ric P

ower

R

osem

ont 1

38kV

Tra

nsm

issi

on L

ine

Proj

ect

J-10

7C

EC A

pplic

atio

n N

ovem

ber 2

011

Page 96: PDF 8257 KB - Tucson Electric Power

THIS

PA

GE

INTE

NTI

ON

ALL

Y L

EFT

BLA

NK

Tucs

on E

lect

ric P

ower

R

osem

ont 1

38kV

Tra

nsm

issi

on L

ine

Proj

ect

J-10

8C

EC A

pplic

atio

n N

ovem

ber 2

011

Page 97: PDF 8257 KB - Tucson Electric Power

N:\p

roje

cts\

Ros

emon

t Cop

per\T

EP_L

opez

\mxd

s\R

MC

_Bas

e_H

illsh

ade_

inse

ts_d

ispl

ay.m

xd

Ari

zona

Ros

emon

t 138

kV

Ros

emon

t 138

kV

Tran

smis

sion

Lin

e P

roje

ctTr

ansm

issi

on L

ine

Pro

ject

Mar

ch 2

, 201

001

20.

5M

iles

I

R.

13

E.

R.

14

E.

R.

15

E.

R.

16

E.

R.

17

E.

T.

16

S.

T.

17

S.

T.

18

S.

T.

19

S.

DR

AFT

150

90

100

30

110

60

120

130

210

160

20

19017

0

105

25

185

135 15

5

9514

0

5585 # I

!!

!

!

!

!!

! !!

!!

!

!

!

!

!

# I

# I

# I

# I

# I

# I

Ros

emon

t

Pim

a C

ou

nty

Pim

a C

ou

nty

Sa

nta

Cru

z C

ou

nty

Sa

nta

Cru

z C

ou

nty

Sahu

arita

Rd.

Sonoita Hwy

Wentworth Rd.

SonoitaHwy

Sant

a RitaRd.

Madera Canyon Rd.

Duv

al M

ine

Rd.

Whi

teHou

seCan

yon

Rd.

Mar

shSt

atio

nRd

.

C

CO

RO

NA

DO

CO

RO

NA

DO

NAT

ION

AL

NAT

ION

AL

FOR

ES

TFO

RE

ST

d.

Sahu

arita

Rd.

Daw

n R

d.

HelvetiaRd.

Houghton Rd.

Main Ave.

Wilmot Rd.

Country Club Rd.

Pim

a M

ine

Rd.

El T

oro

Rd.

La Villita Rd.

SA

NTA

RIT

AS

AN

TA R

ITA

EX

PE

RIM

EN

TAL

EX

PE

RIM

EN

TAL

RA

NG

ER

AN

GE

Va

ilV

ail

Harrison Rd.

Rd 424 Rd

417

Rd41

3

Rd41

1LA

S

LAS

C

IEN

EG

ASC

IEN

EG

ASN

ATIO

NAL

NAT

ION

ALC

ON

SER

VATI

ON

CO

NSE

RVA

TIO

NAR

EAAR

EA

§̈ ¦10

§̈ ¦19

Gre

ater

ville

Gre

en Va

lley

Sahu

arita

Fort

H

uach

uca

Bre

aker

Sout

hern

Paci

fic R

ailro

ad

Sout

hern

Paci

fic Ra

ilroa

d

Sout

hern

Paci

fic Ra

ilroa

d

Southern Pacific

Railroad

UV83

t u89

East

Sah

uarit

a

Gre

en V

alle

y

Sahu

arita

Sono

ita

Sum

mit

Am

ado

Tucs

on

Lege

nd

Sour

ces

130

105

135 15

5

9514

0

!

!!

!

!

RD424RD424

!!

Sant

aRi

taRd

Sant

aRi

taRd

25

Inse

t AIn

set A

Inse

t BIn

set B

Inse

t BIn

set B

Inse

t AIn

set A

Stre

etM

ap U

SA

2008

; TE

P 20

08; E

PG

, 200

8,P

ima

Cou

nty

2008

, Ros

emon

t Cop

per C

ompa

ny20

08

Pre

limin

ar R

oute

Alte

rnat

ives

Pre

limin

ar R

oute

Alte

rnat

ives

Gen

eral

Ref

eren

ce F

eatu

res

Cou

nty

Bou

ndar

y

Exi

stin

g 46

kV T

rans

mis

sion

Lin

eE

xist

ing

115k

V T

rans

mis

sion

Lin

eE

xist

ing

138k

V T

rans

mis

sion

Lin

eE

xist

ing

230k

V T

rans

mis

sion

Lin

eE

xist

ing

345k

V T

rans

mis

sion

Lin

e

Nat

iona

l For

est B

ound

ary

Pro

pose

d S

witc

hyar

d/S

ubst

atio

n# I

Exi

stin

g S

ubst

atio

n# I

Proj

ect L

ocat

ion

Mex

i co

Ari

z on

a

Upd

ated

Pro

ject

Stu

dy A

rea

Bou

ndar

y

Sec

onda

ry R

oad

Rai

lroad

Hig

hway

Inte

rsta

te

Tow

nshi

p B

ound

ary

Riv

er /

Was

h

§̈ ¦10

§̈ ¦40

§̈ ¦15

§̈ ¦10

PHO

ENIX

TUC

SON

§̈ ¦8

§̈ ¦17

§̈ ¦19M

exic

o

Ari

z on

a

Prop

osed

Switc

hyar

d/Su

bsta

tion

Nor

th R

oute

Fam

ily -

Opt

ion

#10

Tem

pora

ry L

ink

(20,

25,

55,

85,

90,

95,

140

)

(120

, 105

, 155

)

Tem

pora

ry In

terc

onne

ctio

n# I

Link

Nod

eP

relim

inar

y A

ltern

ativ

e Li

nk

Link

Iden

tific

atio

n N

umbe

r10

Per

man

ent L

ink

Tucs

on E

lect

ric P

ower

R

osem

ont 1

38kV

Tra

nsm

issi

on L

ine

Proj

ect

J-10

9C

EC A

pplic

atio

n N

ovem

ber 2

011

Page 98: PDF 8257 KB - Tucson Electric Power

THIS

PA

GE

INTE

NTI

ON

ALL

Y L

EFT

BLA

NK

Tucs

on E

lect

ric P

ower

R

osem

ont 1

38kV

Tra

nsm

issi

on L

ine

Proj

ect

J-11

0C

EC A

pplic

atio

n N

ovem

ber 2

011

Page 99: PDF 8257 KB - Tucson Electric Power

N:\p

roje

cts\

Ros

emon

t Cop

per\T

EP_L

opez

\mxd

s\R

MC

_Bas

e_H

illsh

ade_

inse

ts_d

ispl

ay.m

xd

Ari

zona

Ros

emon

t 138

kV

Ros

emon

t 138

kV

Tran

smis

sion

Lin

e P

roje

ctTr

ansm

issi

on L

ine

Pro

ject

Mar

ch 2

, 201

001

20.

5M

iles

I

R.

13

E.

R.

14

E.

R.

15

E.

R.

16

E.

R.

17

E.

T.

16

S.

T.

17

S.

T.

18

S.

T.

19

S.

DR

AFT

150

90

100

30

110

60

120

130

210

160

20

19017

0

105

25

185

135 15

5

9514

0

5585

!!

!

!

!

!

!

!

! !!

!!

!

!

!

!

!

# I

# I

# I

# I

# I

# I

Ros

emon

t

Pim

a C

ou

nty

Pim

a C

ou

nty

Sa

nta

Cru

z C

ou

nty

Sa

nta

Cru

z C

ou

nty

Sahu

arita

Rd.

Sonoita Hwy

Wentworth Rd.

SonoitaHwy

Sant

a RitaRd.

Madera Canyon Rd.

Duv

al M

ine

Rd.

Whi

teHou

seCan

yon

Rd.

Mar

shSt

atio

nRd

.

C

CO

RO

NA

DO

CO

RO

NA

DO

NAT

ION

AL

NAT

ION

AL

FOR

ES

TFO

RE

ST

d.

Sahu

arita

Rd.

Daw

n R

d.

HelvetiaRd.

Houghton Rd.

Main Ave.

Wilmot Rd.

Country Club Rd.

Pim

a M

ine

Rd.

El T

oro

Rd.

La Villita Rd.

SA

NTA

RIT

AS

AN

TA R

ITA

EX

PE

RIM

EN

TAL

EX

PE

RIM

EN

TAL

RA

NG

ER

AN

GE

Va

ilV

ail

Harrison Rd.

Rd 424 Rd

417

Rd41

3

Rd41

1LA

S

LAS

C

IEN

EG

ASC

IEN

EG

ASN

ATIO

NAL

NAT

ION

ALC

ON

SER

VATI

ON

CO

NSE

RVA

TIO

NAR

EAAR

EA

§̈ ¦10

§̈ ¦19

Gre

ater

ville

Gre

en Va

lley

Sahu

arita

Fort

H

uach

uca

Bre

aker

Sout

hern

Paci

fic R

ailro

ad

Sout

hern

Paci

fic Ra

ilroa

d

Sout

hern

Paci

fic Ra

ilroa

d

Southern Pacific

Railroad

UV83

t u89

East

Sah

uarit

a

Gre

en V

alle

y

Sahu

arita

Sono

ita

Sum

mit

Am

ado

Tucs

on

Lege

nd

Sour

ces

130

105

135 15

5

9514

0

!

!!

!

!

RD424RD424

!!

Sant

aRi

taRd

Sant

aRi

taRd

25

Inse

t AIn

set A

Inse

t BIn

set B

Inse

t BIn

set B

Inse

t AIn

set A

Stre

etM

ap U

SA

2008

; TE

P 20

08; E

PG

, 200

8,P

ima

Cou

nty

2008

, Ros

emon

t Cop

per C

ompa

ny20

08

Pre

limin

ar R

oute

Alte

rnat

ives

Pre

limin

ar R

oute

Alte

rnat

ives

Gen

eral

Ref

eren

ce F

eatu

res

Cou

nty

Bou

ndar

y

Exi

stin

g 46

kV T

rans

mis

sion

Lin

eE

xist

ing

115k

V T

rans

mis

sion

Lin

eE

xist

ing

138k

V T

rans

mis

sion

Lin

eE

xist

ing

230k

V T

rans

mis

sion

Lin

eE

xist

ing

345k

V T

rans

mis

sion

Lin

e

Nat

iona

l For

est B

ound

ary

Pro

pose

d S

witc

hyar

d/S

ubst

atio

n# I

Exi

stin

g S

ubst

atio

n# I

Proj

ect L

ocat

ion

Mex

i co

Ari

z on

a

Upd

ated

Pro

ject

Stu

dy A

rea

Bou

ndar

y

Sec

onda

ry R

oad

Rai

lroad

Hig

hway

Inte

rsta

te

Tow

nshi

p B

ound

ary

Riv

er /

Was

h

§̈ ¦10

§̈ ¦40

§̈ ¦15

§̈ ¦10

PHO

ENIX

TUC

SON

§̈ ¦8

§̈ ¦17

§̈ ¦19M

exic

o

Ari

z on

a

Prop

osed

Switc

hyar

d/Su

bsta

tion

Link

Nod

eP

relim

inar

y A

ltern

ativ

e Li

nk

Link

Iden

tific

atio

n N

umbe

r10

(20,

25,

60,

100

, 105

, 155

, 140

, 170

, 16

0, 1

90, 2

10)

San

ta R

ita R

oad

Fam

ily -

Opt

ion

#1

Per

man

ent L

ink

Tucs

on E

lect

ric P

ower

R

osem

ont 1

38kV

Tra

nsm

issi

on L

ine

Proj

ect

J-11

1C

EC A

pplic

atio

n N

ovem

ber 2

011

Page 100: PDF 8257 KB - Tucson Electric Power

THIS

PA

GE

INTE

NTI

ON

ALL

Y L

EFT

BLA

NK

Tucs

on E

lect

ric P

ower

R

osem

ont 1

38kV

Tra

nsm

issi

on L

ine

Proj

ect

J-11

2C

EC A

pplic

atio

n N

ovem

ber 2

011

Page 101: PDF 8257 KB - Tucson Electric Power

N:\p

roje

cts\

Ros

emon

t Cop

per\T

EP_L

opez

\mxd

s\R

MC

_Bas

e_H

illsh

ade_

inse

ts_d

ispl

ay.m

xd

Ari

zona

Ros

emon

t 138

kV

Ros

emon

t 138

kV

Tran

smis

sion

Lin

e P

roje

ctTr

ansm

issi

on L

ine

Pro

ject

Mar

ch 2

, 201

001

20.

5M

iles

I

R.

13

E.

R.

14

E.

R.

15

E.

R.

16

E.

R.

17

E.

T.

16

S.

T.

17

S.

T.

18

S.

T.

19

S.

DR

AFT

150

90

100

30

110

60

120

130

210

160

20

19017

0

105

25

185

135 15

5

9514

0

5585

!!

!

!

!

!

!

!

! !!

!!

!

!

!

!

!

# I

# I

# I

# I

# I

# I

Ros

emon

t

Pim

a C

ou

nty

Pim

a C

ou

nty

Sa

nta

Cru

z C

ou

nty

Sa

nta

Cru

z C

ou

nty

Sahu

arita

Rd.

Sonoita Hwy

Wentworth Rd.

SonoitaHwy

Sant

a RitaRd.

Madera Canyon Rd.

Duv

al M

ine

Rd.

Whi

teHou

seCan

yon

Rd.

Mar

shSt

atio

nRd

.

C

CO

RO

NA

DO

CO

RO

NA

DO

NAT

ION

AL

NAT

ION

AL

FOR

ES

TFO

RE

ST

d.

Sahu

arita

Rd.

Daw

n R

d.

HelvetiaRd.

Houghton Rd.

Main Ave.

Wilmot Rd.

Country Club Rd.

Pim

a M

ine

Rd.

El T

oro

Rd.

La Villita Rd.

SA

NTA

RIT

AS

AN

TA R

ITA

EX

PE

RIM

EN

TAL

EX

PE

RIM

EN

TAL

RA

NG

ER

AN

GE

Va

ilV

ail

Harrison Rd.

Rd 424 Rd

417

Rd41

3

Rd41

1LA

S

LAS

C

IEN

EG

ASC

IEN

EG

ASN

ATIO

NAL

NAT

ION

ALC

ON

SER

VATI

ON

CO

NSE

RVA

TIO

NAR

EAAR

EA

§̈ ¦10

§̈ ¦19

Gre

ater

ville

Gre

en Va

lley

Sahu

arita

Fort

H

uach

uca

Bre

aker

Sout

hern

Paci

fic R

ailro

ad

Sout

hern

Paci

fic Ra

ilroa

d

Sout

hern

Paci

fic Ra

ilroa

d

Southern Pacific

Railroad

UV83

t u89

East

Sah

uarit

a

Gre

en V

alle

y

Sahu

arita

Sono

ita

Sum

mit

Am

ado

Tucs

on

Lege

nd

Sour

ces

130

105

135 15

5

9514

0

!

!!

!

!

RD424RD424

!!

Sant

aRi

taRd

Sant

aRi

taRd

25

Inse

t AIn

set A

Inse

t BIn

set B

Inse

t BIn

set B

Inse

t AIn

set A

Stre

etM

ap U

SA

2008

; TE

P 20

08; E

PG

, 200

8,P

ima

Cou

nty

2008

, Ros

emon

t Cop

per C

ompa

ny20

08

Pre

limin

ar R

oute

Alte

rnat

ives

Pre

limin

ar R

oute

Alte

rnat

ives

Gen

eral

Ref

eren

ce F

eatu

res

Cou

nty

Bou

ndar

y

Exi

stin

g 46

kV T

rans

mis

sion

Lin

eE

xist

ing

115k

V T

rans

mis

sion

Lin

eE

xist

ing

138k

V T

rans

mis

sion

Lin

eE

xist

ing

230k

V T

rans

mis

sion

Lin

eE

xist

ing

345k

V T

rans

mis

sion

Lin

e

Nat

iona

l For

est B

ound

ary

Pro

pose

d S

witc

hyar

d/S

ubst

atio

n# I

Exi

stin

g S

ubst

atio

n# I

Proj

ect L

ocat

ion

Mex

i co

Ari

z on

a

Upd

ated

Pro

ject

Stu

dy A

rea

Bou

ndar

y

Sec

onda

ry R

oad

Rai

lroad

Hig

hway

Inte

rsta

te

Tow

nshi

p B

ound

ary

Riv

er /

Was

h

§̈ ¦10

§̈ ¦40

§̈ ¦15

§̈ ¦10

PHO

ENIX

TUC

SON

§̈ ¦8

§̈ ¦17

§̈ ¦19M

exic

o

Ari

z on

a

Prop

osed

Switc

hyar

d/Su

bsta

tion

Link

Nod

eP

relim

inar

y A

ltern

ativ

e Li

nk

Link

Iden

tific

atio

n N

umbe

r10

Per

man

ent L

ink

(20,

25,

60,

100

, 130

, 135

, 95,

140

, 17

0, 1

60, 1

90, 2

10)

San

ta R

ita R

oad

Fam

ily -

Opt

ion

#3

Tucs

on E

lect

ric P

ower

R

osem

ont 1

38kV

Tra

nsm

issi

on L

ine

Proj

ect

J-11

3C

EC A

pplic

atio

n N

ovem

ber 2

011

Page 102: PDF 8257 KB - Tucson Electric Power

THIS

PA

GE

INTE

NTI

ON

ALL

Y L

EFT

BLA

NK

Tucs

on E

lect

ric P

ower

R

osem

ont 1

38kV

Tra

nsm

issi

on L

ine

Proj

ect

J-11

4C

EC A

pplic

atio

n N

ovem

ber 2

011

Page 103: PDF 8257 KB - Tucson Electric Power

N:\p

roje

cts\

Ros

emon

t Cop

per\T

EP_L

opez

\mxd

s\R

MC

_Bas

e_H

illsh

ade_

inse

ts_d

ispl

ay.m

xd

Ari

zona

Ros

emon

t 138

kV

Ros

emon

t 138

kV

Tran

smis

sion

Lin

e P

roje

ctTr

ansm

issi

on L

ine

Pro

ject

Mar

ch 2

, 201

001

20.

5M

iles

I

R.

13

E.

R.

14

E.

R.

15

E.

R.

16

E.

R.

17

E.

T.

16

S.

T.

17

S.

T.

18

S.

T.

19

S.

DR

AFT

150

90

100

30

110

60

120

130

210

160

20

19017

0

105

25

185

135 15

5

9514

0

5585 # I

!!

!

!

!

!!

! !!

!!

!

!

!

!

!

# I

# I

# I

# I

# I

# I

Ros

emon

t

Pim

a C

ou

nty

Pim

a C

ou

nty

Sa

nta

Cru

z C

ou

nty

Sa

nta

Cru

z C

ou

nty

Sahu

arita

Rd.

Sonoita Hwy

Wentworth Rd.

SonoitaHwy

Sant

a RitaRd.

Madera Canyon Rd.

Duv

al M

ine

Rd.

Whi

teHou

seCan

yon

Rd.

Mar

shSt

atio

nRd

.

C

CO

RO

NA

DO

CO

RO

NA

DO

NAT

ION

AL

NAT

ION

AL

FOR

ES

TFO

RE

ST

d.

Sahu

arita

Rd.

Daw

n R

d.

HelvetiaRd.

Houghton Rd.

Main Ave.

Wilmot Rd.

Country Club Rd.

Pim

a M

ine

Rd.

El T

oro

Rd.

La Villita Rd.

SA

NTA

RIT

AS

AN

TA R

ITA

EX

PE

RIM

EN

TAL

EX

PE

RIM

EN

TAL

RA

NG

ER

AN

GE

Va

ilV

ail

Harrison Rd.

Rd 424 Rd

417

Rd41

3

Rd41

1LA

S

LAS

C

IEN

EG

ASC

IEN

EG

ASN

ATIO

NAL

NAT

ION

ALC

ON

SER

VATI

ON

CO

NSE

RVA

TIO

NAR

EAAR

EA

§̈ ¦10

§̈ ¦19

Gre

ater

ville

Gre

en Va

lley

Sahu

arita

Fort

H

uach

uca

Bre

aker

Sout

hern

Paci

fic R

ailro

ad

Sout

hern

Paci

fic Ra

ilroa

d

Sout

hern

Paci

fic Ra

ilroa

d

Southern Pacific

Railroad

UV83

t u89

East

Sah

uarit

a

Gre

en V

alle

y

Sahu

arita

Sono

ita

Sum

mit

Am

ado

Tucs

on

Lege

nd

Sour

ces

130

105

135 15

5

9514

0

!

!!

!

!

RD424RD424

!!

Sant

aRi

taRd

Sant

aRi

taRd

25

Inse

t AIn

set A

Inse

t BIn

set B

Inse

t BIn

set B

Inse

t AIn

set A

Stre

etM

ap U

SA

2008

; TE

P 20

08; E

PG

, 200

8,P

ima

Cou

nty

2008

, Ros

emon

t Cop

per C

ompa

ny20

08

Pre

limin

ar R

oute

Alte

rnat

ives

Pre

limin

ar R

oute

Alte

rnat

ives

Gen

eral

Ref

eren

ce F

eatu

res

Cou

nty

Bou

ndar

y

Exi

stin

g 46

kV T

rans

mis

sion

Lin

eE

xist

ing

115k

V T

rans

mis

sion

Lin

eE

xist

ing

138k

V T

rans

mis

sion

Lin

eE

xist

ing

230k

V T

rans

mis

sion

Lin

eE

xist

ing

345k

V T

rans

mis

sion

Lin

e

Nat

iona

l For

est B

ound

ary

Pro

pose

d S

witc

hyar

d/S

ubst

atio

n# I

Exi

stin

g S

ubst

atio

n# I

Proj

ect L

ocat

ion

Mex

i co

Ari

z on

a

Upd

ated

Pro

ject

Stu

dy A

rea

Bou

ndar

y

Sec

onda

ry R

oad

Rai

lroad

Hig

hway

Inte

rsta

te

Tow

nshi

p B

ound

ary

Riv

er /

Was

h

§̈ ¦10

§̈ ¦40

§̈ ¦15

§̈ ¦10

PHO

ENIX

TUC

SON

§̈ ¦8

§̈ ¦17

§̈ ¦19M

exic

o

Ari

z on

a

Prop

osed

Switc

hyar

d/Su

bsta

tion

Link

Nod

eP

relim

inar

y A

ltern

ativ

e Li

nk

Link

Iden

tific

atio

n N

umbe

r10

Tem

pora

ry In

terc

onne

ctio

n# I

(20,

25,

60,

100

, 105

, 155

, 140

)

San

ta R

ita R

oad

Fam

ily -

Opt

ion

#7

Tem

pora

ry L

ink

(120

)

Per

man

ent L

ink

Tucs

on E

lect

ric P

ower

R

osem

ont 1

38kV

Tra

nsm

issi

on L

ine

Proj

ect

J-11

5C

EC A

pplic

atio

n N

ovem

ber 2

011

Page 104: PDF 8257 KB - Tucson Electric Power

THIS

PA

GE

INTE

NTI

ON

ALL

Y L

EFT

BLA

NK

Tucs

on E

lect

ric P

ower

R

osem

ont 1

38kV

Tra

nsm

issi

on L

ine

Proj

ect

J-11

6C

EC A

pplic

atio

n N

ovem

ber 2

011

Page 105: PDF 8257 KB - Tucson Electric Power

N:\p

roje

cts\

Ros

emon

t Cop

per\T

EP_L

opez

\mxd

s\R

MC

_Bas

e_H

illsh

ade_

inse

ts_d

ispl

ay.m

xd

Ari

zona

Ros

emon

t 138

kV

Ros

emon

t 138

kV

Tran

smis

sion

Lin

e P

roje

ctTr

ansm

issi

on L

ine

Pro

ject

Mar

ch 2

, 201

001

20.

5M

iles

I

R.

13

E.

R.

14

E.

R.

15

E.

R.

16

E.

R.

17

E.

T.

16

S.

T.

17

S.

T.

18

S.

T.

19

S.

DR

AFT

150

90

100

30

110

60

120

130

210

160

20

19017

0

105

25

185

135 15

5

9514

0

5585 # I

!!

!

!

!

!!

! !!

!!

!

!

!

!

!

# I

# I

# I

# I

# I

# I

Ros

emon

t

Pim

a C

ou

nty

Pim

a C

ou

nty

Sa

nta

Cru

z C

ou

nty

Sa

nta

Cru

z C

ou

nty

Sahu

arita

Rd.

Sonoita Hwy

Wentworth Rd.

SonoitaHwy

Sant

a RitaRd.

Madera Canyon Rd.

Duv

al M

ine

Rd.

Whi

teHou

seCan

yon

Rd.

Mar

shSt

atio

nRd

.

C

CO

RO

NA

DO

CO

RO

NA

DO

NAT

ION

AL

NAT

ION

AL

FOR

ES

TFO

RE

ST

d.

Sahu

arita

Rd.

Daw

n R

d.

HelvetiaRd.

Houghton Rd.

Main Ave.

Wilmot Rd.

Country Club Rd.

Pim

a M

ine

Rd.

El T

oro

Rd.

La Villita Rd.

SA

NTA

RIT

AS

AN

TA R

ITA

EX

PE

RIM

EN

TAL

EX

PE

RIM

EN

TAL

RA

NG

ER

AN

GE

Va

ilV

ail

Harrison Rd.

Rd 424 Rd

417

Rd41

3

Rd41

1LA

S

LAS

C

IEN

EG

ASC

IEN

EG

ASN

ATIO

NAL

NAT

ION

ALC

ON

SER

VATI

ON

CO

NSE

RVA

TIO

NAR

EAAR

EA

§̈ ¦10

§̈ ¦19

Gre

ater

ville

Gre

en Va

lley

Sahu

arita

Fort

H

uach

uca

Bre

aker

Sout

hern

Paci

fic R

ailro

ad

Sout

hern

Paci

fic Ra

ilroa

d

Sout

hern

Paci

fic Ra

ilroa

d

Southern Pacific

Railroad

UV83

t u89

East

Sah

uarit

a

Gre

en V

alle

y

Sahu

arita

Sono

ita

Sum

mit

Am

ado

Tucs

on

Lege

nd

Sour

ces

130

105

135 15

5

9514

0

!

!!

!

!

RD424RD424

!!

Sant

aRi

taRd

Sant

aRi

taRd

25

Inse

t AIn

set A

Inse

t BIn

set B

Inse

t BIn

set B

Inse

t AIn

set A

Stre

etM

ap U

SA

2008

; TE

P 20

08; E

PG

, 200

8,P

ima

Cou

nty

2008

, Ros

emon

t Cop

per C

ompa

ny20

08

Pre

limin

ar R

oute

Alte

rnat

ives

Pre

limin

ar R

oute

Alte

rnat

ives

Gen

eral

Ref

eren

ce F

eatu

res

Cou

nty

Bou

ndar

y

Exi

stin

g 46

kV T

rans

mis

sion

Lin

eE

xist

ing

115k

V T

rans

mis

sion

Lin

eE

xist

ing

138k

V T

rans

mis

sion

Lin

eE

xist

ing

230k

V T

rans

mis

sion

Lin

eE

xist

ing

345k

V T

rans

mis

sion

Lin

e

Nat

iona

l For

est B

ound

ary

Pro

pose

d S

witc

hyar

d/S

ubst

atio

n# I

Exi

stin

g S

ubst

atio

n# I

Proj

ect L

ocat

ion

Mex

i co

Ari

z on

a

Upd

ated

Pro

ject

Stu

dy A

rea

Bou

ndar

y

Sec

onda

ry R

oad

Rai

lroad

Hig

hway

Inte

rsta

te

Tow

nshi

p B

ound

ary

Riv

er /

Was

h

§̈ ¦10

§̈ ¦40

§̈ ¦15

§̈ ¦10

PHO

ENIX

TUC

SON

§̈ ¦8

§̈ ¦17

§̈ ¦19M

exic

o

Ari

z on

a

Prop

osed

Switc

hyar

d/Su

bsta

tion

Link

Nod

eP

relim

inar

y A

ltern

ativ

e Li

nk

Link

Iden

tific

atio

n N

umbe

r10

(20,

25,

60,

100

, 130

, 135

, 95,

140

)

San

ta R

ita R

oad

Fam

ily -

Opt

ion

#9

Tem

pora

ry L

ink

(120

)

Tem

pora

ry In

terc

onne

ctio

n# I

Per

man

ent L

ink

Tucs

on E

lect

ric P

ower

R

osem

ont 1

38kV

Tra

nsm

issi

on L

ine

Proj

ect

J-11

7C

EC A

pplic

atio

n N

ovem

ber 2

011

Page 106: PDF 8257 KB - Tucson Electric Power

THIS

PA

GE

INTE

NTI

ON

ALL

Y L

EFT

BLA

NK

Tucs

on E

lect

ric P

ower

R

osem

ont 1

38kV

Tra

nsm

issi

on L

ine

Proj

ect

J-11

8C

EC A

pplic

atio

n N

ovem

ber 2

011

Page 107: PDF 8257 KB - Tucson Electric Power

N:\p

roje

cts\

Ros

emon

t Cop

per\T

EP_L

opez

\mxd

s\R

MC

_Bas

e_H

illsh

ade_

inse

ts_d

ispl

ay.m

xd

Ari

zona

Ros

emon

t 138

kV

Ros

emon

t 138

kV

Tran

smis

sion

Lin

e P

roje

ctTr

ansm

issi

on L

ine

Pro

ject

Mar

ch 3

, 201

001

20.

5M

iles

I

R.

13

E.

R.

14

E.

R.

15

E.

R.

16

E.

R.

17

E.

T.

16

S.

T.

17

S.

T.

18

S.

T.

19

S.

DR

AFT

150

90

100

30

110

60

120

130

210

160

20

19017

0

105

25

185

135 15

5

9514

0

5585 # I

!!

!

!

!

!!

! !!

!!

!

!

!

!

!

# I

# I

# I

# I

# I

# I

Ros

emon

t

Pim

a C

ou

nty

Pim

a C

ou

nty

Sa

nta

Cru

z C

ou

nty

Sa

nta

Cru

z C

ou

nty

Sahu

arita

Rd.

Sonoita Hwy

Wentworth Rd.

SonoitaHwy

Sant

a RitaRd.

Madera Canyon Rd.

Duv

al M

ine

Rd.

Whi

teHou

seCan

yon

Rd.

Mar

shSt

atio

nRd

.

C

CO

RO

NA

DO

CO

RO

NA

DO

NAT

ION

AL

NAT

ION

AL

FOR

ES

TFO

RE

ST

d.

Sahu

arita

Rd.

Daw

n R

d.

HelvetiaRd.

Houghton Rd.

Main Ave.

Wilmot Rd.

Country Club Rd.

Pim

a M

ine

Rd.

El T

oro

Rd.

La Villita Rd.

SA

NTA

RIT

AS

AN

TA R

ITA

EX

PE

RIM

EN

TAL

EX

PE

RIM

EN

TAL

RA

NG

ER

AN

GE

Va

ilV

ail

Harrison Rd.

Rd 424 Rd

417

Rd41

3

Rd41

1LA

S

LAS

C

IEN

EG

ASC

IEN

EG

ASN

ATIO

NAL

NAT

ION

ALC

ON

SER

VATI

ON

CO

NSE

RVA

TIO

NAR

EAAR

EA

§̈ ¦10

§̈ ¦19

Gre

ater

ville

Gre

en Va

lley

Sahu

arita

Fort

H

uach

uca

Bre

aker

Sout

hern

Paci

fic R

ailro

ad

Sout

hern

Paci

fic Ra

ilroa

d

Sout

hern

Paci

fic Ra

ilroa

d

Southern Pacific

Railroad

UV83

t u89

East

Sah

uarit

a

Gre

en V

alle

y

Sahu

arita

Sono

ita

Sum

mit

Am

ado

Tucs

on

Lege

nd

Sour

ces

130

105

135 15

5

9514

0

!

!!

!

!

RD424RD424

!!

Sant

aRi

taRd

Sant

aRi

taRd

25

Inse

t AIn

set A

Inse

t BIn

set B

Inse

t BIn

set B

Inse

t AIn

set A

Stre

etM

ap U

SA

2008

; TE

P 20

08; E

PG

, 200

8,P

ima

Cou

nty

2008

, Ros

emon

t Cop

per C

ompa

ny20

08

Pre

limin

ar R

oute

Alte

rnat

ives

Pre

limin

ar R

oute

Alte

rnat

ives

Gen

eral

Ref

eren

ce F

eatu

res

Cou

nty

Bou

ndar

y

Exi

stin

g 46

kV T

rans

mis

sion

Lin

eE

xist

ing

115k

V T

rans

mis

sion

Lin

eE

xist

ing

138k

V T

rans

mis

sion

Lin

eE

xist

ing

230k

V T

rans

mis

sion

Lin

eE

xist

ing

345k

V T

rans

mis

sion

Lin

e

Nat

iona

l For

est B

ound

ary

Pro

pose

d S

witc

hyar

d/S

ubst

atio

n# I

Exi

stin

g S

ubst

atio

n# I

Proj

ect L

ocat

ion

Mex

i co

Ari

z on

a

Upd

ated

Pro

ject

Stu

dy A

rea

Bou

ndar

y

Sec

onda

ry R

oad

Rai

lroad

Hig

hway

Inte

rsta

te

Tow

nshi

p B

ound

ary

Riv

er /

Was

h

§̈ ¦10

§̈ ¦40

§̈ ¦15

§̈ ¦10

PHO

ENIX

TUC

SON

§̈ ¦8

§̈ ¦17

§̈ ¦19M

exic

o

Ari

z on

a

Prop

osed

Switc

hyar

d/Su

bsta

tion

Link

Nod

eP

relim

inar

y A

ltern

ativ

e Li

nk

Link

Iden

tific

atio

n N

umbe

r10

Per

man

ent L

ink

Tem

pora

ry In

terc

onne

ctio

n# I

(30,

110

, 120

, 105

, 155

, 140

)

Adj

acen

t 46k

V F

amily

- O

ptio

n #1

Tucs

on E

lect

ric P

ower

R

osem

ont 1

38kV

Tra

nsm

issi

on L

ine

Proj

ect

J-11

9C

EC A

pplic

atio

n N

ovem

ber 2

011

Page 108: PDF 8257 KB - Tucson Electric Power

THIS

PA

GE

INTE

NTI

ON

ALL

Y L

EFT

BLA

NK

Tucs

on E

lect

ric P

ower

R

osem

ont 1

38kV

Tra

nsm

issi

on L

ine

Proj

ect

J-12

0C

EC A

pplic

atio

n N

ovem

ber 2

011

Page 109: PDF 8257 KB - Tucson Electric Power

N:\p

roje

cts\

Ros

emon

t Cop

per\T

EP_L

opez

\mxd

s\R

MC

_Bas

e_H

illsh

ade_

inse

ts_d

ispl

ay.m

xd

Ari

zona

Ros

emon

t 138

kV

Ros

emon

t 138

kV

Tran

smis

sion

Lin

e P

roje

ctTr

ansm

issi

on L

ine

Pro

ject

Mar

ch 2

, 201

001

20.

5M

iles

I

R.

13

E.

R.

14

E.

R.

15

E.

R.

16

E.

R.

17

E.

T.

16

S.

T.

17

S.

T.

18

S.

T.

19

S.

DR

AFT

150

90

100

30

110

60

120

130

210

160

20

19017

0

105

25

185

135 15

5

9514

0

5585 # I

!!

!

!

!

!!

! !!

!!

!

!

!

!

!

# I

# I

# I

# I

# I

# I

Ros

emon

t

Pim

a C

ou

nty

Pim

a C

ou

nty

Sa

nta

Cru

z C

ou

nty

Sa

nta

Cru

z C

ou

nty

Sahu

arita

Rd.

Sonoita Hwy

Wentworth Rd.

SonoitaHwy

Sant

a RitaRd.

Madera Canyon Rd.

Duv

al M

ine

Rd.

Whi

teHou

seCan

yon

Rd.

Mar

shSt

atio

nRd

.

C

CO

RO

NA

DO

CO

RO

NA

DO

NAT

ION

AL

NAT

ION

AL

FOR

ES

TFO

RE

ST

d.

Sahu

arita

Rd.

Daw

n R

d.

HelvetiaRd.

Houghton Rd.

Main Ave.

Wilmot Rd.

Country Club Rd.

Pim

a M

ine

Rd.

El T

oro

Rd.

La Villita Rd.

SA

NTA

RIT

AS

AN

TA R

ITA

EX

PE

RIM

EN

TAL

EX

PE

RIM

EN

TAL

RA

NG

ER

AN

GE

Va

ilV

ail

Harrison Rd.

Rd 424 Rd

417

Rd41

3

Rd41

1LA

S

LAS

C

IEN

EG

ASC

IEN

EG

ASN

ATIO

NAL

NAT

ION

ALC

ON

SER

VATI

ON

CO

NSE

RVA

TIO

NAR

EAAR

EA

§̈ ¦10

§̈ ¦19

Gre

ater

ville

Gre

en Va

lley

Sahu

arita

Fort

H

uach

uca

Bre

aker

Sout

hern

Paci

fic R

ailro

ad

Sout

hern

Paci

fic Ra

ilroa

d

Sout

hern

Paci

fic Ra

ilroa

d

Southern Pacific

Railroad

UV83

t u89

East

Sah

uarit

a

Gre

en V

alle

y

Sahu

arita

Sono

ita

Sum

mit

Am

ado

Tucs

on

Lege

nd

Sour

ces

130

105

135 15

5

9514

0

!

!!

!

!

RD424RD424

!!

Sant

aRi

taRd

Sant

aRi

taRd

25

Inse

t AIn

set A

Inse

t BIn

set B

Inse

t BIn

set B

Inse

t AIn

set A

Stre

etM

ap U

SA

2008

; TE

P 20

08; E

PG

, 200

8,P

ima

Cou

nty

2008

, Ros

emon

t Cop

per C

ompa

ny20

08

Pre

limin

ar R

oute

Alte

rnat

ives

Pre

limin

ar R

oute

Alte

rnat

ives

Gen

eral

Ref

eren

ce F

eatu

res

Cou

nty

Bou

ndar

y

Exi

stin

g 46

kV T

rans

mis

sion

Lin

eE

xist

ing

115k

V T

rans

mis

sion

Lin

eE

xist

ing

138k

V T

rans

mis

sion

Lin

eE

xist

ing

230k

V T

rans

mis

sion

Lin

eE

xist

ing

345k

V T

rans

mis

sion

Lin

e

Nat

iona

l For

est B

ound

ary

Pro

pose

d S

witc

hyar

d/S

ubst

atio

n# I

Exi

stin

g S

ubst

atio

n# I

Proj

ect L

ocat

ion

Mex

i co

Ari

z on

a

Upd

ated

Pro

ject

Stu

dy A

rea

Bou

ndar

y

Sec

onda

ry R

oad

Rai

lroad

Hig

hway

Inte

rsta

te

Tow

nshi

p B

ound

ary

Riv

er /

Was

h

§̈ ¦10

§̈ ¦40

§̈ ¦15

§̈ ¦10

PHO

ENIX

TUC

SON

§̈ ¦8

§̈ ¦17

§̈ ¦19M

exic

o

Ari

z on

a

Prop

osed

Switc

hyar

d/Su

bsta

tion

Link

Nod

eP

relim

inar

y A

ltern

ativ

e Li

nk

Link

Iden

tific

atio

n N

umbe

r10

Tem

pora

ry In

terc

onne

ctio

n# I

(30,

110

, 120

, 130

, 135

, 95,

140

)

Adj

acen

t 46k

V F

amily

- O

ptio

n #2

Per

man

ent L

ink

Tucs

on E

lect

ric P

ower

R

osem

ont 1

38kV

Tra

nsm

issi

on L

ine

Proj

ect

J-12

1C

EC A

pplic

atio

n N

ovem

ber 2

011

Page 110: PDF 8257 KB - Tucson Electric Power

THIS

PA

GE

INTE

NTI

ON

ALL

Y L

EFT

BLA

NK

Tucs

on E

lect

ric P

ower

R

osem

ont 1

38kV

Tra

nsm

issi

on L

ine

Proj

ect

J-12

2C

EC A

pplic

atio

n N

ovem

ber 2

011

Page 111: PDF 8257 KB - Tucson Electric Power

N:\p

roje

cts\

Ros

emon

t Cop

per\T

EP_L

opez

\mxd

s\R

MC

_Bas

e_H

illsh

ade_

inse

ts_d

ispl

ay.m

xd

Ari

zona

Ros

emon

t 138

kV

Ros

emon

t 138

kV

Tran

smis

sion

Lin

e P

roje

ctTr

ansm

issi

on L

ine

Pro

ject

Mar

ch 2

, 201

001

20.

5M

iles

I

R.

13

E.

R.

14

E.

R.

15

E.

R.

16

E.

R.

17

E.

T.

16

S.

T.

17

S.

T.

18

S.

T.

19

S.

DR

AFT

150

90

100

30

110

60

120

130

210

160

20

19017

0

105

25

185

135 15

5

9514

0

5585

!!

!

!

!

!

!

!

! !!

!!

!

!

!

!

!

# I

# I

# I

# I

# I

# I

Ros

emon

t

Pim

a C

ou

nty

Pim

a C

ou

nty

Sa

nta

Cru

z C

ou

nty

Sa

nta

Cru

z C

ou

nty

Sahu

arita

Rd.

Sonoita Hwy

Wentworth Rd.

SonoitaHwy

Sant

a RitaRd.

Madera Canyon Rd.

Duv

al M

ine

Rd.

Whi

teHou

seCan

yon

Rd.

Mar

shSt

atio

nRd

.

C

CO

RO

NA

DO

CO

RO

NA

DO

NAT

ION

AL

NAT

ION

AL

FOR

ES

TFO

RE

ST

d.

Sahu

arita

Rd.

Daw

n R

d.

HelvetiaRd.

Houghton Rd.

Main Ave.

Wilmot Rd.

Country Club Rd.

Pim

a M

ine

Rd.

El T

oro

Rd.

La Villita Rd.

SA

NTA

RIT

AS

AN

TA R

ITA

EX

PE

RIM

EN

TAL

EX

PE

RIM

EN

TAL

RA

NG

ER

AN

GE

Va

ilV

ail

Harrison Rd.

Rd 424 Rd

417

Rd41

3

Rd41

1LA

S

LAS

C

IEN

EG

ASC

IEN

EG

ASN

ATIO

NAL

NAT

ION

ALC

ON

SER

VATI

ON

CO

NSE

RVA

TIO

NAR

EAAR

EA

§̈ ¦10

§̈ ¦19

Gre

ater

ville

Gre

en Va

lley

Sahu

arita

Fort

H

uach

uca

Bre

aker

Sout

hern

Paci

fic R

ailro

ad

Sout

hern

Paci

fic Ra

ilroa

d

Sout

hern

Paci

fic Ra

ilroa

d

Southern Pacific

Railroad

UV83

t u89

East

Sah

uarit

a

Gre

en V

alle

y

Sahu

arita

Sono

ita

Sum

mit

Am

ado

Tucs

on

Lege

nd

Sour

ces

130

105

135 15

5

9514

0

!

!!

!

!

RD424RD424

!!

Sant

aRi

taRd

Sant

aRi

taRd

25

Inse

t AIn

set A

Inse

t BIn

set B

Inse

t BIn

set B

Inse

t AIn

set A

Stre

etM

ap U

SA

2008

; TE

P 20

08; E

PG

, 200

8,P

ima

Cou

nty

2008

, Ros

emon

t Cop

per C

ompa

ny20

08

Pre

limin

ar R

oute

Alte

rnat

ives

Pre

limin

ar R

oute

Alte

rnat

ives

Gen

eral

Ref

eren

ce F

eatu

res

Cou

nty

Bou

ndar

y

Exi

stin

g 46

kV T

rans

mis

sion

Lin

eE

xist

ing

115k

V T

rans

mis

sion

Lin

eE

xist

ing

138k

V T

rans

mis

sion

Lin

eE

xist

ing

230k

V T

rans

mis

sion

Lin

eE

xist

ing

345k

V T

rans

mis

sion

Lin

e

Nat

iona

l For

est B

ound

ary

Pro

pose

d S

witc

hyar

d/S

ubst

atio

n# I

Exi

stin

g S

ubst

atio

n# I

Proj

ect L

ocat

ion

Mex

i co

Ari

z on

a

Upd

ated

Pro

ject

Stu

dy A

rea

Bou

ndar

y

Sec

onda

ry R

oad

Rai

lroad

Hig

hway

Inte

rsta

te

Tow

nshi

p B

ound

ary

Riv

er /

Was

h

§̈ ¦10

§̈ ¦40

§̈ ¦15

§̈ ¦10

PHO

ENIX

TUC

SON

§̈ ¦8

§̈ ¦17

§̈ ¦19M

exic

o

Ari

z on

a

Prop

osed

Switc

hyar

d/Su

bsta

tion

Link

Nod

eP

relim

inar

y A

ltern

ativ

e Li

nk

Link

Iden

tific

atio

n N

umbe

r10

(30,

110

, 150

, 170

, 160

, 190

, 210

)

Adj

acen

t 46k

V F

amily

- O

ptio

n #4

Per

man

ent L

ink

Tucs

on E

lect

ric P

ower

R

osem

ont 1

38kV

Tra

nsm

issi

on L

ine

Proj

ect

J-12

3C

EC A

pplic

atio

n N

ovem

ber 2

011

Page 112: PDF 8257 KB - Tucson Electric Power

THIS

PA

GE

INTE

NTI

ON

ALL

Y L

EFT

BLA

NK

Tucs

on E

lect

ric P

ower

R

osem

ont 1

38kV

Tra

nsm

issi

on L

ine

Proj

ect

J-12

4C

EC A

pplic

atio

n N

ovem

ber 2

011

Page 113: PDF 8257 KB - Tucson Electric Power

N:\p

roje

cts\

Ros

emon

t Cop

per\T

EP_L

opez

\mxd

s\R

MC

_Bas

e_H

illsh

ade_

inse

ts_d

ispl

ay.m

xd

Ari

zona

Ros

emon

t 138

kV

Ros

emon

t 138

kV

Tran

smis

sion

Lin

e P

roje

ctTr

ansm

issi

on L

ine

Pro

ject

Mar

ch 2

, 201

001

20.

5M

iles

I

R.

13

E.

R.

14

E.

R.

15

E.

R.

16

E.

R.

17

E.

T.

16

S.

T.

17

S.

T.

18

S.

T.

19

S.

DR

AFT

150

90

100

30

110

60

120

130

210

160

20

19017

0

105

25

185

135 15

5

9514

0

5585

!!

!

!

!

!

!

!

! !!

!!

!

!

!

!

!

# I

# I

# I

# I

# I

# I

Ros

emon

t

Pim

a C

ou

nty

Pim

a C

ou

nty

Sa

nta

Cru

z C

ou

nty

Sa

nta

Cru

z C

ou

nty

Sahu

arita

Rd.

Sonoita Hwy

Wentworth Rd.

SonoitaHwy

Sant

a RitaRd.

Madera Canyon Rd.

Duv

al M

ine

Rd.

Whi

teHou

seCan

yon

Rd.

Mar

shSt

atio

nRd

.

C

CO

RO

NA

DO

CO

RO

NA

DO

NAT

ION

AL

NAT

ION

AL

FOR

ES

TFO

RE

ST

d.

Sahu

arita

Rd.

Daw

n R

d.

HelvetiaRd.

Houghton Rd.

Main Ave.

Wilmot Rd.

Country Club Rd.

Pim

a M

ine

Rd.

El T

oro

Rd.

La Villita Rd.

SA

NTA

RIT

AS

AN

TA R

ITA

EX

PE

RIM

EN

TAL

EX

PE

RIM

EN

TAL

RA

NG

ER

AN

GE

Va

ilV

ail

Harrison Rd.

Rd 424 Rd

417

Rd41

3

Rd41

1LA

S

LAS

C

IEN

EG

ASC

IEN

EG

ASN

ATIO

NAL

NAT

ION

ALC

ON

SER

VATI

ON

CO

NSE

RVA

TIO

NAR

EAAR

EA

§̈ ¦10

§̈ ¦19

Gre

ater

ville

Gre

en Va

lley

Sahu

arita

Fort

H

uach

uca

Bre

aker

Sout

hern

Paci

fic R

ailro

ad

Sout

hern

Paci

fic Ra

ilroa

d

Sout

hern

Paci

fic Ra

ilroa

d

Southern Pacific

Railroad

UV83

t u89

East

Sah

uarit

a

Gre

en V

alle

y

Sahu

arita

Sono

ita

Sum

mit

Am

ado

Tucs

on

Lege

nd

Sour

ces

130

105

135 15

5

9514

0

!

!!

!

!

RD424RD424

!!

Sant

aRi

taRd

Sant

aRi

taRd

25

Inse

t AIn

set A

Inse

t BIn

set B

Inse

t BIn

set B

Inse

t AIn

set A

Stre

etM

ap U

SA

2008

; TE

P 20

08; E

PG

, 200

8,P

ima

Cou

nty

2008

, Ros

emon

t Cop

per C

ompa

ny20

08

Pre

limin

ar R

oute

Alte

rnat

ives

Pre

limin

ar R

oute

Alte

rnat

ives

Gen

eral

Ref

eren

ce F

eatu

res

Cou

nty

Bou

ndar

y

Exi

stin

g 46

kV T

rans

mis

sion

Lin

eE

xist

ing

115k

V T

rans

mis

sion

Lin

eE

xist

ing

138k

V T

rans

mis

sion

Lin

eE

xist

ing

230k

V T

rans

mis

sion

Lin

eE

xist

ing

345k

V T

rans

mis

sion

Lin

e

Nat

iona

l For

est B

ound

ary

Pro

pose

d S

witc

hyar

d/S

ubst

atio

n# I

Exi

stin

g S

ubst

atio

n# I

Proj

ect L

ocat

ion

Mex

i co

Ari

z on

a

Upd

ated

Pro

ject

Stu

dy A

rea

Bou

ndar

y

Sec

onda

ry R

oad

Rai

lroad

Hig

hway

Inte

rsta

te

Tow

nshi

p B

ound

ary

Riv

er /

Was

h

§̈ ¦10

§̈ ¦40

§̈ ¦15

§̈ ¦10

PHO

ENIX

TUC

SON

§̈ ¦8

§̈ ¦17

§̈ ¦19M

exic

o

Ari

z on

a

Prop

osed

Switc

hyar

d/Su

bsta

tion

Link

Nod

eP

relim

inar

y A

ltern

ativ

e Li

nk

Link

Iden

tific

atio

n N

umbe

r10

Per

man

ent L

ink

(30,

110

, 120

, 105

, 155

, 140

, 170

, 160

, 19

0, 2

10)

Adj

acen

t 46k

V F

amily

- O

ptio

n #6

Tucs

on E

lect

ric P

ower

R

osem

ont 1

38kV

Tra

nsm

issi

on L

ine

Proj

ect

J-12

5C

EC A

pplic

atio

n N

ovem

ber 2

011

Page 114: PDF 8257 KB - Tucson Electric Power

THIS

PA

GE

INTE

NTI

ON

ALL

Y L

EFT

BLA

NK

Tucs

on E

lect

ric P

ower

R

osem

ont 1

38kV

Tra

nsm

issi

on L

ine

Proj

ect

J-12

6C

EC A

pplic

atio

n N

ovem

ber 2

011

Page 115: PDF 8257 KB - Tucson Electric Power

S:\EPG\projects\Rosemont Copper\TEP Rosemont Line\Public Participation\Stakeholder group\Meeting #5\Agenda meeting #5.docx

Rosemont 138kV Transmission Line Project

Agenda – Stakeholder Group Meeting #5October 27, 2010 11:00am – 2:00pm

Unisource building One South Church Street Tucson, Arizona 85702

�� Welcome �� Project Status

�� Preferred and Alternative Routes likely to be carried forward

�� Next Steps

�� Comments and Questions

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-127 CEC Application November 2011

Page 116: PDF 8257 KB - Tucson Electric Power

THIS PAGE INTENTIONALLY LEFT BLANK

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-128 CEC Application November 2011

Page 117: PDF 8257 KB - Tucson Electric Power

1

�Stakeholder�Group�Roster�� � EPG�Rosemont�138kV�Transmission�Line�Project� � October�27,�2010�Tucson�Electric�Power�

ROSEMONT 138KV TRANSMISSION LINE PROJECT STAKEHOLDER GROUP

Revised October 2010

MEMBERSHIP

The purpose of the Stakeholder Group is to establish a group representing a range of opinions in a forum small enough to allow for thorough education of the participants, detailed discussion of issues, and informal dialogue. EPG, Inc. (EPG) contacted various individuals/organizations for selection of the members that would assist Tucson Electric Power (TEP) and EPG in identifying issues and concerns relevant to the proposed project. Representation of a cross-section of the region includes federal, state, county, and municipal agencies that have administrative jurisdiction within the project area; industry/business; and citizens on behalf of their neighborhoods. Members were selected based on their knowledge of the project area, capability to commit the time required to participate in the Stakeholder Group throughout the planning process, and willingness to participate in an impartial manner.

ROSTER OF STAKEHOLDER GROUP MEMBERS

Federal�� Jim Copeland ([email protected]), representative for the transmission line on behalf of

the Coronado National Forest (replacement for Kent Ellett) o� Bev Everson ([email protected]) o� Mindee Roth ([email protected])

�� Linda Hughes ([email protected]), representative for the transmission line on behalf of the Bureau of Land Management, Tucson

o� Cindy Alvarez ([email protected]) o� Dan Moore ([email protected])

�� Kurt Tek ([email protected]), representative for Arizona Air National Guard

State�� Tim Bolton ([email protected]), Arizona State Land Department �� Steve Husman ([email protected]), Santa Rita Experimental Range

City/Town�� Chris Kaselemis ([email protected]), City of Tucson �� Orlanthia Henderson ([email protected]), Town of Sahuarita �� Eddie Peabody ([email protected]), Planning and Zoning Committee, Green Valley

Coordinating Council

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-129 CEC Application November 2011

Page 118: PDF 8257 KB - Tucson Electric Power

2

�Stakeholder�Group�Roster�� � EPG�Rosemont�138kV�Transmission�Line�Project� � October�27,�2010�Tucson�Electric�Power�

Industry/Business�� Bob Iannarino ([email protected])/Mark Weinberg

([email protected])/Ken Abrahams ([email protected]), Diamond Ventures

�� Nan Walden ([email protected])/Larry Robertson ([email protected]), Farmers Investment Company

Citizens �� Marshall Magruder ([email protected]) �� Elizabeth Webb ([email protected])

PROJECT TEAM

Tucson Electric Power�� Ed Beck ([email protected]) �� Shannon Breslin ([email protected])�� Cheryl Hall ([email protected]) �� Larry Lucero ([email protected]) �� Erik Bakken ([email protected]) �� Cory Pintor ([email protected])

EPG, Inc. – Phone (602) 956-4370 �� Lauren Weinstein ([email protected]) �� Paul Trenter ([email protected]) �� Chelsa Johnson ([email protected])

Rosemont Copper �� Kathy Arnold ([email protected]) �� Laurie Woodall, KR Saline (law@krsaline)

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-130 CEC Application November 2011

Page 119: PDF 8257 KB - Tucson Electric Power

ROSEMONT 138KV TRANSMISSION LINE PROJECT

ROSEMONT 138KV TRANSMISSION LINE PROJECT

Presentation�������� �� ������������8

G���� ��>������

G���� ��>������

AgendaAgenda

� ���� �� ���� �

� # $���������!

� # �1� �������)��� ����%��"���!��������������� ����1 &� �

� /�0������!

G���� ��>������

� - ���!�����J��!���!

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-131 CEC Application November 2011

Page 120: PDF 8257 KB - Tucson Electric Power

Planning Process ChartPlanning Process Chart

G���� ��>������

2

Public Comments ReceivedPublic Comments Received

� )�� 0� ������428�� ����1 !������� !��� ���!����������� � 1 �� � $ � � �� �2 ��� � �!!���!� ����%����1��&����� $������&!����� ��2� �����������

������������!�� ������!�)� ����2������4�����������- ������*��!������� ����7������� �!�����%���

� - ���!� �����1 �+�,�%� ���������1�!��� ��1 ����� $������+�,�!����&�������������%� ����"!� ���� $�����!���� %�����+2,�� $����!��� �

� -��� �! &�� �������� � ����! � %��&! �&� � �� ����� "���

G���� ��>������

4

� -��� �!�&������������� ����!���%��&!��&� �����������"�����������!��� !!����������"����(0�� � ������"����

� �����!����1��!����!����1��������� !�����1���!�!Q�� �1� ����!��0� �!!���1 � �!���� ��!�&�����!��������� ���

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-132 CEC Application November 2011

Page 121: PDF 8257 KB - Tucson Electric Power

2

Agency Comments Received

� ������"����(0�� � ������"����A) �9���������:����<��� � ���B # �1� �� ��! �!!������������ ����%��������������� ��!����1�

����� "��� "�� � ���� ����%�! ���� � �� � ����������"����"��������� ����%�!������� �� �� ���������� ������4;�7������ ���

B # �1� ����6����������� ���������!�+� �!���&��� ���������������25�7�� ��! �!!�������,������������"����"��

B <�!����!��� ����������� *&��1����� ���

B # �1� !��0�!�����4;�7�� ��! �!!��������� �� ����6������&����0�!�������1 �!� ���� �

B -��� ����&�������������� ���%���%�!����� ����!��� �!�����!�1 � � �� �A � � ��

G���� ��>������

8

1 �� �!���&�!�� ��!&����� �A!��!������ #� ��-����

B /�� ���!� ����%��

Additional Agency Comments Received (summer 2010)Additional Agency Comments Received (summer 2010)

� - ����/�������� �!�B -��� ! &�� �6������� � �!�� ������� ����-��� !�&���� ��������� �!����������������&���� �!���&��� ������������ ������� ������!�� ������1�� ���

B # �1� !��� ��� �9��������1�� ��! �!!�������� ����� !!����- ����/�������� �!�C�31�����!��;����������������� �� ��������� �.��!��������8���!� � %��C�#���������!��;������������

G���� ��>������

;

���&�!�����!���������!��� ������%�!�������B )�$������4;�7� ����+����������� ���� %������������,����!��� �1� ���1 �%�!����� ����!

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-133 CEC Application November 2011

Page 122: PDF 8257 KB - Tucson Electric Power

4

Alternative Route MapsAlternative Route Maps

B "����1� ���� ���+!����!����!� ���,* � � �� �� �� + � �,B * ��! �!!������������ ����%�!� ���+�����,

B # �1� ����������� ����%�� ���� ��!�+�����!,

G���� ��>������

>

Key Considerations for Alternative RoutesKey Considerations for Alternative Routes

� # $������!� ������������ ������&� �����!� ���� �9������%� � ������� ����!� (���� �����!�!�� ���������� �.�� � ���!������� �1 � �!� (������ ����B -�!� ����������B -!�B "���616&��

� #����������������������� "������ � �� ��!

G���� ��>������

5

� "������ ���� ��!� G��� � ������ ����%��� ��! �!!�������� ���!� �������� ����1 &� �������������������1 ���-� ��1������1�(�%� � ������- �����������+-(-,������!�� �����������) �9���- � �����- �!!��

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-134 CEC Application November 2011

Page 123: PDF 8257 KB - Tucson Electric Power

8

Preferred RoutePreferred Route

� -6�����!�&���� �!���&��� ���������

� ������"����(0�� � ������"���������)M�������:����

� �1� ����

� ������"����"�����!��������!���������#� ��-�����

+��� �� ������,

G���� ��>������

� "�!������!���� �������88

Alternative 1Alternative 1

� -6�����!�&���� �!���&��� ���������

� ��$ ����1� ����!��� �������������"����

(0�� � ������"���������)M�������:�����&������

�0�������1�������2�

� ������"����"�����!��������!���������#� ��-�����

G���� ��>������

+��� �� ������,

� :�����2����28'���&�� �� �����6�������&���

����������1� �� �1 � �!������!

��

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-135 CEC Application November 2011

Page 124: PDF 8257 KB - Tucson Electric Power

;

Alternative 2Alternative 2

� -6�����!�&������� ������!�4;�7�!� ���� �!��������������

� "�.�� �!���&�����!!�1 ���� ����1���������� -6�����!�&���� �!���&��� �������������������"����"��

� ������"����(0�� � ������"��������� ��1 �� ����!��!!�������&������������� �1� !��6�������&���

G���� ��>������

� �!������������ "�!������!���� �������88

��

Alternative 3Alternative 3

� -6�����!�&������� ������!�4;�7�!� ���� �!��������������

� "�.�� �!���&�����!!�1 ���� ����1���������� -6�����!�&���� �!���&��� �������������������"����"��

� ������"����(0�� � ������"��������� ��1 �� ����!��!!�������&�������!����������2���� �1� !��6�������

G���� ��>������

&���� �!������������ :�����2����28'���&�� �� �����6�������&�������������1� �� �1 � �!������!

��

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-136 CEC Application November 2011

Page 125: PDF 8257 KB - Tucson Electric Power

>

Alternative 4Alternative 4

� -6�����!�&������� ������!�4;�7�!� ���� �!���� ���� %���� ���!������ ���� %���� ���!�����

� *&��1����� ��� � �1� ����� - ����/�������� �!��!���������!��� �1� ���1 �%�!����� ����!

� :�����8��&�����=0�-������ ��� /�&�����!!� �.�� ���1 �������;��&���� !!�!�=0�

G���� ��>������

-�����"��� :���!�� ���

�2

Next StepsNext Steps

� #����! ��&!����� �4 /%� �� � #����!���&!����� ��4�B /%� ��

� #�����������!���4�B /%� �� ��>����������"����"�! ��-����!�

� ������9��-(-�����������

� �����-(-������������B 1� !��.�� �� �������

G���� ��>������

�4

�� . ���������������<(3������������

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-137 CEC Application November 2011

Page 126: PDF 8257 KB - Tucson Electric Power

THIS PAGE INTENTIONALLY LEFT BLANK

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-138 CEC Application November 2011

Page 127: PDF 8257 KB - Tucson Electric Power

N:\p

roje

cts\

Ros

emon

t Cop

per\T

EP_L

opez

\mxd

s\R

MC

_Bas

e_H

illsh

ade.

mxd

Ari

zona

Ro

se

mo

nt

13

8k

V

Ro

se

mo

nt

13

8k

V

Tra

ns

mis

sio

n L

ine

Pro

jec

tT

ran

sm

iss

ion

Lin

e P

roje

ct

Oct

ober

25,

201

0

01

20.

5M

iles

I

R.

13

E.

R.

14

E.

R.

15

E.

R.

16

E.

R.

17

E.

T.

16

S.

T.

17

S.

T.

18

S.

T.

19

S.

Sour

ces

Gen

eral

Ref

eren

ce F

eatu

res

§̈¦10

§̈¦40

§̈¦15

§̈¦10

PHO

ENIX

TUC

SON

§̈¦8

§̈¦17

§̈¦19

Proj

ect L

ocat

ion

Mex

i co

Ari

zon

a

!

!

!

!!

! !!

!!

!

!

!

!

!

150

100

30

110

60

120

130

210

160

20

19017

0

105

4515

25

135 15

5

95

# I

# I

# I

# I

# I

# I

# I

Ros

emon

t

Pim

a C

ou

nty

Pim

a C

ou

nty

Sa

nta

Cru

z C

ou

nty

Sa

nta

Cru

z C

ou

nty

Sonoita Hwy

Wentworth Rd.

Kolb Rd.

SonoitaHwyEm

pire

Ran

chR

d.

Sant

a RitaRd.

Madera Canyon Rd.

Whi

teHou

seCan

yon

Rd.

Mar

shSt

atio

nRd

.

CO

RO

NA

DO

CO

RO

NA

DO

NA

TIO

NA

LN

AT

ION

AL

FO

RE

ST

FO

RE

ST

Sahu

arita

Rd.

Helvet

iaRd.

Houghton Rd.

Main Ave.

Wilmot Rd.

Country Club Rd.

Pim

a M

ine

Rd.

El T

oro

Rd.

La Villita Rd.

Duval

MineRd.

BB oo xx

CCaannyyoonn RRdd..

SA

NT

A R

ITA

SA

NT

A R

ITA

EX

PE

RIM

EN

TA

LE

XP

ER

IME

NT

AL

RA

NG

ER

AN

GE

Va

ilV

ail

SS.. CCooppppeerr ccuutt TTrraaii ll

Harrison Rd.

SS.. VViiaa LLoommaa ddeell VVeennaa ddoo

Rd42

4

Rd

417

Rd

413

Rd

411

§̈ ¦10

§̈ ¦19

SSoouutthheerrnnPPaacciiffiicc

RRaaiillrrooaadd

140

Prop

osed

Switc

hyar

d/Su

bsta

tion

Gre

en

Valle

y

Gre

ater

ville

Fort

H

uach

uca

Bre

aker

Sahu

arita

Sahu

arita

Gre

en V

alle

y

East

Sah

uarit

a

Sono

ita

Sum

mit

Cor

ona

de T

ucso

n

t u89

UV83

Not

es: N

ot a

ll of

the

prel

imin

ary

alte

rnat

ive

links

sho

wn

on

the

map

will

be

cons

truc

ted.

Pro

ject

stu

dy a

rea

boun

dary

has

bee

n up

date

d as

of J

uly

2009

.

Lege

nd

Tra

ns

mis

sio

n L

ine

Tra

ns

mis

sio

n L

ine

Alt

ern

ati

ve

Ro

ute

sA

lte

rna

tiv

e R

ou

tes

Stre

etM

ap U

SA 2

008;

TEP

200

8; E

PG

200

8; P

ima

Cou

nty

200

8;Ar

izon

a G

ame

and

Fish

Dep

artm

ent 2

001

Seco

ndar

y R

oad

Exis

ting

46kV

Tra

nsm

issi

on L

ine

Exis

ting

115k

V T

rans

mis

sion

Lin

e

Exis

ting

138k

V T

rans

mis

sion

Lin

e

Exis

ting

230k

V T

rans

mis

sion

Lin

e

Exis

ting

345k

V T

rans

mis

sion

Lin

e

Rai

lroad

Hig

hway

Prop

osed

Sw

itchy

ard/

Sub

stat

ion

# IEx

istin

g S

ubst

atio

n# I

Cou

nty

Bou

ndar

y

Inte

rsta

te

Cor

onad

o N

atio

nal F

ores

t

Upd

ated

Pro

ject

Stu

dy A

rea

Bou

ndar

y

Sant

a R

ita E

xper

imen

tal R

ange

Con

stru

ctio

n P

ower

Inte

rcon

nect

ion

# I!Li

nk N

ode

Con

stru

ctio

n P

ower

Opt

ions

Pref

erre

d R

oute

Alte

rnat

ive

Rou

te 1

Alte

rnat

ive

Rou

te 2

Alte

rnat

ive

Rou

te 3

Alte

rnat

ive

Rou

te 4

Tucs

on E

lect

ric P

ower

R

osem

ont 1

38kV

Tra

nsm

issi

on L

ine

Proj

ect

J-13

9C

EC A

pplic

atio

n N

ovem

ber 2

011

Page 128: PDF 8257 KB - Tucson Electric Power

THIS

PA

GE

INTE

NTI

ON

ALL

Y L

EFT

BLA

NK

Tucs

on E

lect

ric P

ower

R

osem

ont 1

38kV

Tra

nsm

issi

on L

ine

Proj

ect

J-14

0C

EC A

pplic

atio

n N

ovem

ber 2

011

Page 129: PDF 8257 KB - Tucson Electric Power

N:\p

roje

cts\

Ros

emon

t Cop

per\T

EP_L

opez

\mxd

s\R

MC

_Bas

e_H

illsh

ade_

inse

ts_d

ispl

ay.m

xd

Ari

zona

Ros

emon

t 138

kV

Ros

emon

t 138

kV

Tran

smis

sion

Lin

e P

roje

ctTr

ansm

issi

on L

ine

Pro

ject

Oct

ober

25,

201

0

01

20.

5M

iles

I

R.

13

E.

R.

14

E.

R.

15

E.

R.

16

E.

R.

17

E.

T.

16

S.

T.

17

S.

T.

18

S.

T.

19

S.

DR

AFT

150

100

30

110

60

120

130

210

160

20

190

105

25

185

135 15

5

9514

0

!!

!

!

!

!

!

! !!

!!

!

!

!

!

# I

# I

# I

# I

# I

# I

Ros

emon

t

# I

Pim

a C

ou

nty

Pim

a C

ou

nty

Sa

nta

Cru

z C

ou

nty

Sa

nta

Cru

z C

ou

nty

Sahu

arita

Rd.

Sonoita Hwy

Wentworth Rd.

SonoitaHwy

Sant

a RitaRd.

Madera Canyon Rd.

Duv

al M

ine

Rd.

Whi

teHou

seCan

yon

Rd.

Mar

shSt

atio

nRd

.

C

CO

RO

NA

DO

CO

RO

NA

DO

NAT

ION

AL

NAT

ION

AL

FOR

ES

TFO

RE

ST

d.

Sahu

arita

Rd.

Daw

n R

d.

HelvetiaRd.

Houghton Rd.

Main Ave.

Wilmot Rd.

Country Club Rd.

Pim

a M

ine

Rd.

El T

oro

Rd.

La Villita Rd.

SA

NTA

RIT

AS

AN

TA R

ITA

EX

PE

RIM

EN

TAL

EX

PE

RIM

EN

TAL

RA

NG

ER

AN

GE

Va

ilV

ail

Harrison Rd.

Rd 424 Rd

417

Rd41

3

Rd41

1

§̈ ¦10

§̈ ¦19

Gre

ater

ville

Gre

en Va

lley

Sahu

arita

170

Fort

H

uach

uca

Bre

aker

Sout

hern

Paci

fic R

ailro

ad

Sout

hern

Paci

fic Ra

ilroa

d

Sout

hern

Paci

fic Ra

ilroa

d

Southern Pacific

Railroad

UV83

t u89

East

Sah

uarit

a

Gre

en V

alle

y

Sahu

arita

Sono

ita

Sum

mit

Am

ado

Tucs

on

Lege

nd

Sour

ces

130

105

135 15

5

9514

0!

!!

!

!

RD424RD424

!!

Sant

aRi

taRd

Sant

aRi

taRd

25

Inse

t AIn

set A

Inse

t BIn

set B

Inse

t BIn

set B

Inse

t AIn

set A

Stre

etM

ap U

SA

2008

; TE

P 20

08; E

PG

, 200

8,P

ima

Cou

nty

2008

, Ros

emon

t Cop

per C

ompa

ny20

08

Gen

eral

Ref

eren

ce F

eatu

res

Cou

nty

Bou

ndar

y

Exi

stin

g 46

kV T

rans

mis

sion

Lin

eE

xist

ing

115k

V T

rans

mis

sion

Lin

eE

xist

ing

138k

V T

rans

mis

sion

Lin

eE

xist

ing

230k

V T

rans

mis

sion

Lin

eE

xist

ing

345k

V T

rans

mis

sion

Lin

e

Nat

iona

l For

est B

ound

ary

Pro

pose

d S

witc

hyar

d/S

ubst

atio

n# I

Exi

stin

g S

ubst

atio

n# I

Proj

ect L

ocat

ion

Mex

i co

Ari

z on

a

Upd

ated

Pro

ject

Stu

dy A

rea

Bou

ndar

y

Sec

onda

ry R

oad

Rai

lroad

Hig

hway

Inte

rsta

te

Tow

nshi

p B

ound

ary

Riv

er /

Was

h

§̈ ¦10

§̈ ¦40

§̈ ¦15

§̈ ¦10

PHO

ENIX

TUC

SON

§̈ ¦8

§̈ ¦17

§̈ ¦19M

exic

o

Ari

z on

a

Prop

osed

Switc

hyar

d/Su

bsta

tion

Link

Nod

eP

relim

inar

y A

ltern

ativ

e Li

nk

Link

Iden

tific

atio

n N

umbe

r10

Pre

ferr

ed R

oute

Pre

ferr

ed R

oute

Con

stru

ctio

n P

ower

Inte

rcon

nect

ion

# I

Ope

ratio

n P

ower

Con

stru

ctio

n P

ower

Opt

ions

(120

, 170

, 160

, 190

, 210

)

(20,

25,

60,

100

, 105

, 155

, 140

)

Tucs

on E

lect

ric P

ower

R

osem

ont 1

38kV

Tra

nsm

issi

on L

ine

Proj

ect

J-14

1C

EC A

pplic

atio

n N

ovem

ber 2

011

Page 130: PDF 8257 KB - Tucson Electric Power

THIS

PA

GE

INTE

NTI

ON

ALL

Y L

EFT

BLA

NK

Tucs

on E

lect

ric P

ower

R

osem

ont 1

38kV

Tra

nsm

issi

on L

ine

Proj

ect

J-14

2C

EC A

pplic

atio

n N

ovem

ber 2

011

Page 131: PDF 8257 KB - Tucson Electric Power

N:\p

roje

cts\

Ros

emon

t Cop

per\T

EP_L

opez

\mxd

s\R

MC

_Bas

e_H

illsh

ade_

inse

ts_d

ispl

ay.m

xd

Ari

zona

Ros

emon

t 138

kV

Ros

emon

t 138

kV

Tran

smis

sion

Lin

e P

roje

ctTr

ansm

issi

on L

ine

Pro

ject

Oct

ober

25,

201

0

01

20.

5M

iles

I

R.

13

E.

R.

14

E.

R.

15

E.

R.

16

E.

R.

17

E.

T.

16

S.

T.

17

S.

T.

18

S.

T.

19

S.

DR

AFT

150

100

30

110

60

120

130

210

160

20

190

105

25

185

135 15

5

9514

0

!!

!

!

!

!

!

! !!

!!

!

!

!

!

# I

# I

# I

# I

# I

# I

Ros

emon

t

# I

Pim

a C

ou

nty

Pim

a C

ou

nty

Sa

nta

Cru

z C

ou

nty

Sa

nta

Cru

z C

ou

nty

Sahu

arita

Rd.

Sonoita Hwy

Wentworth Rd.

SonoitaHwy

Sant

a RitaRd.

Madera Canyon Rd.

Duv

al M

ine

Rd.

Whi

teHou

seCan

yon

Rd.

Mar

shSt

atio

nRd

.

C

CO

RO

NA

DO

CO

RO

NA

DO

NAT

ION

AL

NAT

ION

AL

FOR

ES

TFO

RE

ST

d.

Sahu

arita

Rd.

Daw

n R

d.

HelvetiaRd.

Houghton Rd.

Main Ave.

Wilmot Rd.

Country Club Rd.

Pim

a M

ine

Rd.

El T

oro

Rd.

La Villita Rd.

SA

NTA

RIT

AS

AN

TA R

ITA

EX

PE

RIM

EN

TAL

EX

PE

RIM

EN

TAL

RA

NG

ER

AN

GE

Va

ilV

ail

Harrison Rd.

Rd 424 Rd

417

Rd41

3

Rd41

1

§̈ ¦10

§̈ ¦19

Gre

ater

ville

Gre

en Va

lley

Sahu

arita

170

Fort

H

uach

uca

Bre

aker

Sout

hern

Paci

fic R

ailro

ad

Sout

hern

Paci

fic Ra

ilroa

d

Sout

hern

Paci

fic Ra

ilroa

d

Southern Pacific

Railroad

UV83

t u89

East

Sah

uarit

a

Gre

en V

alle

y

Sahu

arita

Sono

ita

Sum

mit

Am

ado

Tucs

on

Lege

nd

Sour

ces

130

105

135 15

5

9514

0!

!!

!

!

RD424RD424

!!

Sant

aRi

taRd

Sant

aRi

taRd

25

Inse

t AIn

set A

Inse

t BIn

set B

Inse

t BIn

set B

Inse

t AIn

set A

Stre

etM

ap U

SA

2008

; TE

P 20

08; E

PG

, 200

8,P

ima

Cou

nty

2008

, Ros

emon

t Cop

per C

ompa

ny20

08

Gen

eral

Ref

eren

ce F

eatu

res

Cou

nty

Bou

ndar

y

Exi

stin

g 46

kV T

rans

mis

sion

Lin

eE

xist

ing

115k

V T

rans

mis

sion

Lin

eE

xist

ing

138k

V T

rans

mis

sion

Lin

eE

xist

ing

230k

V T

rans

mis

sion

Lin

eE

xist

ing

345k

V T

rans

mis

sion

Lin

e

Nat

iona

l For

est B

ound

ary

Pro

pose

d S

witc

hyar

d/S

ubst

atio

n# I

Exi

stin

g S

ubst

atio

n# I

Proj

ect L

ocat

ion

Mex

i co

Ari

z on

a

Upd

ated

Pro

ject

Stu

dy A

rea

Bou

ndar

y

Sec

onda

ry R

oad

Rai

lroad

Hig

hway

Inte

rsta

te

Tow

nshi

p B

ound

ary

Riv

er /

Was

h

§̈ ¦10

§̈ ¦40

§̈ ¦15

§̈ ¦10

PHO

ENIX

TUC

SON

§̈ ¦8

§̈ ¦17

§̈ ¦19M

exic

o

Ari

z on

a

Prop

osed

Switc

hyar

d/Su

bsta

tion

Link

Nod

eP

relim

inar

y A

ltern

ativ

e Li

nk

Link

Iden

tific

atio

n N

umbe

r10

Alte

rnat

ive

1A

ltern

ativ

e 1

Con

stru

ctio

n P

ower

Inte

rcon

nect

ion

# I

Con

stru

ctio

n P

ower

Opt

ions

(120

, 170

, 160

,190

, 210

)

Ope

ratio

n P

ower

(20,

25,

60,

100

, 130

, 135

, 95,

140

)

Tucs

on E

lect

ric P

ower

R

osem

ont 1

38kV

Tra

nsm

issi

on L

ine

Proj

ect

J-14

3C

EC A

pplic

atio

n N

ovem

ber 2

011

Page 132: PDF 8257 KB - Tucson Electric Power

THIS

PA

GE

INTE

NTI

ON

ALL

Y L

EFT

BLA

NK

Tucs

on E

lect

ric P

ower

R

osem

ont 1

38kV

Tra

nsm

issi

on L

ine

Proj

ect

J-14

4C

EC A

pplic

atio

n N

ovem

ber 2

011

Page 133: PDF 8257 KB - Tucson Electric Power

N:\p

roje

cts\

Ros

emon

t Cop

per\T

EP_L

opez

\mxd

s\R

MC

_Bas

e_H

illsh

ade_

inse

ts_d

ispl

ay.m

xd

Ari

zona

Ros

emon

t 138

kV

Ros

emon

t 138

kV

Tran

smis

sion

Lin

e P

roje

ctTr

ansm

issi

on L

ine

Pro

ject

Oct

ober

25,

201

0

01

20.

5M

iles

I

R.

13

E.

R.

14

E.

R.

15

E.

R.

16

E.

R.

17

E.

T.

16

S.

T.

17

S.

T.

18

S.

T.

19

S.

DR

AFT

150

100

30

110

60

120

130

210

160

20

190

105

25

185

135 15

5

9514

0

!!

!

!

!

!

!

! !!

!!

!

!

!

!

# I

# I

# I

# I

# I

# I

Ros

emon

t

# I

Pim

a C

ou

nty

Pim

a C

ou

nty

Sa

nta

Cru

z C

ou

nty

Sa

nta

Cru

z C

ou

nty

Sahu

arita

Rd.

Sonoita Hwy

Wentworth Rd.

SonoitaHwy

Sant

a RitaRd.

Madera Canyon Rd.

Duv

al M

ine

Rd.

Whi

teHou

seCan

yon

Rd.

Mar

shSt

atio

nRd

.

C

CO

RO

NA

DO

CO

RO

NA

DO

NAT

ION

AL

NAT

ION

AL

FOR

ES

TFO

RE

ST

d.

Sahu

arita

Rd.

Daw

n R

d.

HelvetiaRd.

Houghton Rd.

Main Ave.

Wilmot Rd.

Country Club Rd.

Pim

a M

ine

Rd.

El T

oro

Rd.

La Villita Rd.

SA

NTA

RIT

AS

AN

TA R

ITA

EX

PE

RIM

EN

TAL

EX

PE

RIM

EN

TAL

RA

NG

ER

AN

GE

Va

ilV

ail

Harrison Rd.

Rd 424 Rd

417

Rd41

3

Rd41

1

§̈ ¦10

§̈ ¦19

Gre

ater

ville

Gre

en Va

lley

Sahu

arita

170

Fort

H

uach

uca

Bre

aker

Sout

hern

Paci

fic R

ailro

ad

Sout

hern

Paci

fic Ra

ilroa

d

Sout

hern

Paci

fic Ra

ilroa

d

Southern Pacific

Railroad

UV83

t u89

East

Sah

uarit

a

Gre

en V

alle

y

Sahu

arita

Sono

ita

Sum

mit

Am

ado

Tucs

on

Lege

nd

Sour

ces

130

105

135 15

5

9514

0!

!!

!

!

RD424RD424

!!

Sant

aRi

taRd

Sant

aRi

taRd

25

Inse

t AIn

set A

Inse

t BIn

set B

Inse

t BIn

set B

Inse

t AIn

set A

Stre

etM

ap U

SA

2008

; TE

P 20

08; E

PG

, 200

8,P

ima

Cou

nty

2008

, Ros

emon

t Cop

per C

ompa

ny20

08

Gen

eral

Ref

eren

ce F

eatu

res

Cou

nty

Bou

ndar

y

Exi

stin

g 46

kV T

rans

mis

sion

Lin

eE

xist

ing

115k

V T

rans

mis

sion

Lin

eE

xist

ing

138k

V T

rans

mis

sion

Lin

eE

xist

ing

230k

V T

rans

mis

sion

Lin

eE

xist

ing

345k

V T

rans

mis

sion

Lin

e

Nat

iona

l For

est B

ound

ary

Pro

pose

d S

witc

hyar

d/S

ubst

atio

n# I

Exi

stin

g S

ubst

atio

n# I

Proj

ect L

ocat

ion

Mex

i co

Ari

z on

a

Upd

ated

Pro

ject

Stu

dy A

rea

Bou

ndar

y

Sec

onda

ry R

oad

Rai

lroad

Hig

hway

Inte

rsta

te

Tow

nshi

p B

ound

ary

Riv

er /

Was

h

§̈ ¦10

§̈ ¦40

§̈ ¦15

§̈ ¦10

PHO

ENIX

TUC

SON

§̈ ¦8

§̈ ¦17

§̈ ¦19M

exic

o

Ari

z on

a

Prop

osed

Switc

hyar

d/Su

bsta

tion

Link

Nod

eP

relim

inar

y A

ltern

ativ

e Li

nk

Link

Iden

tific

atio

n N

umbe

r10

Alte

rnat

ive

2A

ltern

ativ

e 2

Con

stru

ctio

n P

ower

Inte

rcon

nect

ion

# I

Ope

ratio

n P

ower

Con

stru

ctio

n P

ower

Opt

ion

(170

, 160

, 190

, 210

)

(30,

110

, 120

, 105

, 155

, 140

)

Tucs

on E

lect

ric P

ower

R

osem

ont 1

38kV

Tra

nsm

issi

on L

ine

Proj

ect

J-14

5C

EC A

pplic

atio

n N

ovem

ber 2

011

Page 134: PDF 8257 KB - Tucson Electric Power

THIS

PA

GE

INTE

NTI

ON

ALL

Y L

EFT

BLA

NK

Tucs

on E

lect

ric P

ower

R

osem

ont 1

38kV

Tra

nsm

issi

on L

ine

Proj

ect

J-14

6C

EC A

pplic

atio

n N

ovem

ber 2

011

Page 135: PDF 8257 KB - Tucson Electric Power

N:\p

roje

cts\

Ros

emon

t Cop

per\T

EP_L

opez

\mxd

s\R

MC

_Bas

e_H

illsh

ade_

inse

ts_d

ispl

ay.m

xd

Ari

zona

Ros

emon

t 138

kV

Ros

emon

t 138

kV

Tran

smis

sion

Lin

e P

roje

ctTr

ansm

issi

on L

ine

Pro

ject

Oct

ober

25,

201

0

01

20.

5M

iles

I

R.

13

E.

R.

14

E.

R.

15

E.

R.

16

E.

R.

17

E.

T.

16

S.

T.

17

S.

T.

18

S.

T.

19

S.

DR

AFT

150

100

30

110

60

120

130

210

160

20

190

105

25

185

135 15

5

9514

0

!!

!

!

!

!

!

! !!

!!

!

!

!

!

# I

# I

# I

# I

# I

# I

Ros

emon

t

# I

Pim

a C

ou

nty

Pim

a C

ou

nty

Sa

nta

Cru

z C

ou

nty

Sa

nta

Cru

z C

ou

nty

Sahu

arita

Rd.

Sonoita Hwy

Wentworth Rd.

SonoitaHwy

Sant

a RitaRd.

Madera Canyon Rd.

Duv

al M

ine

Rd.

Whi

teHou

seCan

yon

Rd.

Mar

shSt

atio

nRd

.

C

CO

RO

NA

DO

CO

RO

NA

DO

NAT

ION

AL

NAT

ION

AL

FOR

ES

TFO

RE

ST

d.

Sahu

arita

Rd.

Daw

n R

d.

HelvetiaRd.

Houghton Rd.

Main Ave.

Wilmot Rd.

Country Club Rd.

Pim

a M

ine

Rd.

El T

oro

Rd.

La Villita Rd.

SA

NTA

RIT

AS

AN

TA R

ITA

EX

PE

RIM

EN

TAL

EX

PE

RIM

EN

TAL

RA

NG

ER

AN

GE

Va

ilV

ail

Harrison Rd.

Rd 424 Rd

417

Rd41

3

Rd41

1

§̈ ¦10

§̈ ¦19

Gre

ater

ville

Gre

en Va

lley

Sahu

arita

170

Fort

H

uach

uca

Bre

aker

Sout

hern

Paci

fic R

ailro

ad

Sout

hern

Paci

fic Ra

ilroa

d

Sout

hern

Paci

fic Ra

ilroa

d

Southern Pacific

Railroad

UV83

t u89

East

Sah

uarit

a

Gre

en V

alle

y

Sahu

arita

Sono

ita

Sum

mit

Am

ado

Tucs

on

Lege

nd

Sour

ces

130

105

135 15

5

9514

0!

!!

!

!

RD424RD424

!!

Sant

aRi

taRd

Sant

aRi

taRd

25

Inse

t AIn

set A

Inse

t BIn

set B

Inse

t BIn

set B

Inse

t AIn

set A

Stre

etM

ap U

SA

2008

; TE

P 20

08; E

PG

, 200

8,P

ima

Cou

nty

2008

, Ros

emon

t Cop

per C

ompa

ny20

08

Alte

rnat

ive

3A

ltern

ativ

e 3

Gen

eral

Ref

eren

ce F

eatu

res

Cou

nty

Bou

ndar

y

Exi

stin

g 46

kV T

rans

mis

sion

Lin

eE

xist

ing

115k

V T

rans

mis

sion

Lin

eE

xist

ing

138k

V T

rans

mis

sion

Lin

eE

xist

ing

230k

V T

rans

mis

sion

Lin

eE

xist

ing

345k

V T

rans

mis

sion

Lin

e

Nat

iona

l For

est B

ound

ary

Pro

pose

d S

witc

hyar

d/S

ubst

atio

n# I

Exi

stin

g S

ubst

atio

n# I

Proj

ect L

ocat

ion

Mex

i co

Ari

z on

a

Upd

ated

Pro

ject

Stu

dy A

rea

Bou

ndar

y

Sec

onda

ry R

oad

Rai

lroad

Hig

hway

Inte

rsta

te

Tow

nshi

p B

ound

ary

Riv

er /

Was

h

§̈ ¦10

§̈ ¦40

§̈ ¦15

§̈ ¦10

PHO

ENIX

TUC

SON

§̈ ¦8

§̈ ¦17

§̈ ¦19M

exic

o

Ari

z on

a

Prop

osed

Switc

hyar

d/Su

bsta

tion

Link

Nod

eP

relim

inar

y A

ltern

ativ

e Li

nk

Link

Iden

tific

atio

n N

umbe

r10

Con

stru

ctio

n P

ower

Inte

rcon

nect

ion

# I

Ope

ratio

n P

ower

Con

stru

ctio

n P

ower

Opt

ion

(170

, 160

, 190

, 210

)

(30,

110

, 120

, 130

, 135

, 95,

140

)

Tucs

on E

lect

ric P

ower

R

osem

ont 1

38kV

Tra

nsm

issi

on L

ine

Proj

ect

J-14

7C

EC A

pplic

atio

n N

ovem

ber 2

011

Page 136: PDF 8257 KB - Tucson Electric Power

THIS

PA

GE

INTE

NTI

ON

ALL

Y L

EFT

BLA

NK

Tucs

on E

lect

ric P

ower

R

osem

ont 1

38kV

Tra

nsm

issi

on L

ine

Proj

ect

J-14

8C

EC A

pplic

atio

n N

ovem

ber 2

011

Page 137: PDF 8257 KB - Tucson Electric Power

N:\p

roje

cts\

Ros

emon

t Cop

per\T

EP_L

opez

\mxd

s\R

MC

_Bas

e_H

illsh

ade_

inse

ts_d

ispl

ay.m

xd

Ari

zona

Ros

emon

t 138

kV

Ros

emon

t 138

kV

Tran

smis

sion

Lin

e P

roje

ctTr

ansm

issi

on L

ine

Pro

ject

Oct

ober

25,

201

0

01

20.

5M

iles

I

R.

13

E.

R.

14

E.

R.

15

E.

R.

16

E.

R.

17

E.

T.

16

S.

T.

17

S.

T.

18

S.

T.

19

S.

DR

AFT

150

100

30

110

60

120

130

210

160

20

190

105

25

185

135 15

5

9514

0

!!

!

!

!

!

!

! !!

!!

!

!

!

!

# I

# I

# I

# I

# I

# I

Ros

emon

t

Pim

a C

ou

nty

Pim

a C

ou

nty

Sa

nta

Cru

z C

ou

nty

Sa

nta

Cru

z C

ou

nty

Sahu

arita

Rd.

Sonoita Hwy

Wentworth Rd.

SonoitaHwy

Sant

a Rita

Rd.

Madera Canyon Rd.

Duv

al M

ine

Rd.

Whi

teHou

seCan

yon

Rd.

Mar

shSt

atio

nRd

.

C

CO

RO

NA

DO

CO

RO

NA

DO

NAT

ION

AL

NAT

ION

AL

FOR

ES

TFO

RE

ST

d.

Sahu

arita

Rd.

Daw

n R

d.

HelvetiaRd.

Houghton Rd.

Main Ave.

Wilmot Rd.

Country Club Rd.

Pim

a M

ine

Rd.

El T

oro

Rd.

La Villita Rd.

SA

NTA

RIT

AS

AN

TA R

ITA

EX

PE

RIM

EN

TAL

EX

PE

RIM

EN

TAL

RA

NG

ER

AN

GE

Va

ilV

ail

Harrison Rd.

Rd 424 Rd

417

Rd41

3

Rd41

1

§̈ ¦10

§̈ ¦19

Gre

ater

ville

Gre

en Va

lley

Sahu

arita

170

Fort

H

uach

uca

Bre

aker

Sout

hern

Paci

fic R

ailro

ad

Sout

hern

Paci

fic Ra

ilroa

d

Sout

hern

Paci

fic Ra

ilroa

d

Southern Pacific

Railroad

UV83

t u89

East

Sah

uarit

a

Gre

en V

alle

y

Sahu

arita

Sono

ita

Sum

mit

Am

ado

Tucs

on

Lege

nd

Sour

ces

Stre

etM

ap U

SA

2008

; TE

P 20

08; E

PG

, 200

8,P

ima

Cou

nty

2008

, Ros

emon

t Cop

per C

ompa

ny20

08

Alte

rnat

ive

4A

ltern

ativ

e 4

Gen

eral

Ref

eren

ce F

eatu

res

Cou

nty

Bou

ndar

y

Exi

stin

g 46

kV T

rans

mis

sion

Lin

eE

xist

ing

115k

V T

rans

mis

sion

Lin

eE

xist

ing

138k

V T

rans

mis

sion

Lin

eE

xist

ing

230k

V T

rans

mis

sion

Lin

eE

xist

ing

345k

V T

rans

mis

sion

Lin

e

Nat

iona

l For

est B

ound

ary

Pro

pose

d S

witc

hyar

d/S

ubst

atio

n# I

Exi

stin

g S

ubst

atio

n# I

Proj

ect L

ocat

ion

Mex

i co

Ari

z on

a

Upd

ated

Pro

ject

Stu

dy A

rea

Bou

ndar

y

Sec

onda

ry R

oad

Rai

lroad

Hig

hway

Inte

rsta

te

Tow

nshi

p B

ound

ary

Riv

er /

Was

h

§̈ ¦10

§̈ ¦40

§̈ ¦15

§̈ ¦10

PHO

ENIX

TUC

SON

§̈ ¦8

§̈ ¦17

§̈ ¦19M

exic

o

Ari

z on

a

Prop

osed

Switc

hyar

d/Su

bsta

tion

Link

Nod

eP

relim

inar

y A

ltern

ativ

e Li

nk

Link

Iden

tific

atio

n N

umbe

r10

Ope

ratio

n P

ower

(30,

110

, 150

, 170

, 160

, 190

, 210

)

Tucs

on E

lect

ric P

ower

R

osem

ont 1

38kV

Tra

nsm

issi

on L

ine

Proj

ect

J-14

9C

EC A

pplic

atio

n N

ovem

ber 2

011

Page 138: PDF 8257 KB - Tucson Electric Power

THIS

PA

GE

INTE

NTI

ON

ALL

Y L

EFT

BLA

NK

Tucs

on E

lect

ric P

ower

R

osem

ont 1

38kV

Tra

nsm

issi

on L

ine

Proj

ect

J-15

0C

EC A

pplic

atio

n N

ovem

ber 2

011

Page 139: PDF 8257 KB - Tucson Electric Power

S:\EPG\projects\Rosemont Copper\TEP Rosemont Line\Public Participation\Stakeholder group\Meeting #6\Agenda meeting #6.docx

Rosemont 138kV Transmission Line Project

Agenda – Stakeholder Group Meeting #6May 12, 2011 11:30am – 1:00pm

Unisource building One South Church Street Tucson, Arizona 85702

�� Welcome �� Project Status

�� Construction Power Options Removed

�� Next Steps

�� Comments and Questions

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-151 CEC Application November 2011

Page 140: PDF 8257 KB - Tucson Electric Power

THIS PAGE INTENTIONALLY LEFT BLANK

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-152 CEC Application November 2011

Page 141: PDF 8257 KB - Tucson Electric Power

ROSEMONT 138KV TRANSMISSION LINE PROJECT

ROSEMONT 138KV TRANSMISSION LINE PROJECT

Presentation�������� �� ������������;

������������

������������

AgendaAgenda

� ���� �� ���� �

� # $����!����!

� -�!� �������&� �����!� � %��

� /�0��!���!

� - ���!�����.��!���!

������������

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-153 CEC Application November 2011

Page 142: PDF 8257 KB - Tucson Electric Power

Project StatusProject Status

� -���������� ��� �����1�-(-�����������

� "�%�!����� $������!� �������� � %����!� �������&� �����!

� 3�1 ����!������� �� ���1�� $������!� �����������

������������

2

Construction Power Options RemovedConstruction Power Options Removed

� "!� �� ��!��� ��� "!� �����!��� ��

B ������� �������%� � ������������������������������

B ��� ���!�����%� ��!��������� ������ �����������!� �������� ����1��� ����������

� <��� �������!��� ������!� �������&� �������!��� ������ �! �� � 1 �� %� ��� � ��! �!!��

������������

4

�����������!��� ��1����%� ����� ��! �!!���� $������� �����&� ���"!� ����� ����!�!���

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-154 CEC Application November 2011

Page 143: PDF 8257 KB - Tucson Electric Power

2

Alternative Routes MapAlternative Routes Map

B # �1� ����������� ����%�� ���� ��

������������

8

Next StepsNext Steps

� "�%��& "!� �� # $��� < �1� (3�� "�%��&�"!� ���# $����< �1��(3�

� ������9��-(-�����������

� #����!���&!����� ��8�������������������� ���!

� �����-(-������������B ���A2 � .�� �� ���������������������<(3������������

������������

;

� � � �

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-155 CEC Application November 2011

Page 144: PDF 8257 KB - Tucson Electric Power

THIS PAGE INTENTIONALLY LEFT BLANK

Tucson Electric Power Rosemont 138kV Transmission Line Project

J-156 CEC Application November 2011

Page 145: PDF 8257 KB - Tucson Electric Power

N:\p

roje

cts\

Ros

emon

t Cop

per\T

EP

_Lop

ez\m

xds\

CE

C_i

nset

s.m

xd

Ari

zona

Ro

se

mo

nt

13

8k

V

Ro

se

mo

nt

13

8k

V

Tra

ns

mis

sio

n L

ine

Pro

jec

tT

ran

sm

iss

ion

Lin

e P

roje

ct

May

11,

201

1

01

20.

5M

iles

I

R.

13

E.

R.

14

E.

R.

15

E.

R.

16

E.

R.

17

E.

T.

16

S.

T.

17

S.

T.

18

S.

T.

19

S.

§̈ ¦10

§̈ ¦40

§̈ ¦15

§̈ ¦10

PH

OE

NIX

TUC

SO

N

§̈ ¦8

§̈ ¦17

§̈ ¦19

Proj

ect L

ocat

ion

Mex

ico

Ari

zona

DR

AFT

Wor

king

Dra

ft

!!

!

!

!

!

! !!

!!

!

!

!

# I

# I

# I

# I

# I

# I

Pim

a C

ou

nty

Pim

a C

ou

nty

Sa

nta

Cru

z C

ou

nty

Sa

nta

Cru

z C

ou

nty

Sonoita Hwy

Wentworth Rd.

Kolb Rd.

Sonoita HwyEmpi

reR

anch

Rd.

Santa

RitaRd.

Madera Canyon Rd.

Whi

teHou

seCan

yon

Rd.

Mar

shSt

atio

nR

d.

CO

RO

NA

DO

CO

RO

NA

DO

NA

TIO

NA

LN

AT

ION

AL

FO

RE

ST

FO

RE

ST

Sahu

arita

Rd.

Helveti

aRd.

Houghton Rd.

Main Ave.

Wilmot Rd.

Country Club Rd.

Pim

a M

ine

Rd.

El T

oro

Rd.

La Villita Rd.

Duval

MineRd.

CCoo nn tt ii nn

eenn tt aall RR

dd ..

BB oo xx CCaannyyoonn RR dd..

SA

NT

A R

ITA

SA

NT

A R

ITA

EX

PE

RIM

EN

TA

LE

XP

ER

IME

NT

AL

RA

NG

ER

AN

GE

Va

ilV

ail

SS.. CCoopppp eerrccuu tt TTrraaiill

Harrison Rd.

SS .. VV iiaa LLoommaa ddee ll VVee nnaa ddoo

Rd42

4

Rd

417

Rd

413

Rd

411

LA

S

LA

S

CIE

NE

GA

SC

IEN

EG

AS

NA

TIO

NA

LN

AT

ION

AL

CO

NS

ER

-C

ON

SE

R-

VA

TIO

NV

AT

ION

AR

EA

AR

EA

§̈ ¦10

§̈ ¦19

Sycamore Leaf Rd.

30

6020

25

110

120

100

130

105

150

135

95

155

140

210

190160

Prop

osed

Toro

Sw

itchy

ard

Ros

emon

tSu

bsta

tion

Gre

en

Valle

y

Gre

ater

ville

Subs

tatio

n

Fort

H

uach

uca

Bre

aker

Sp Railroad

Southern Pacific Railroad

Sout

hern

Pacif

ic

Rai

lroad

South

ern

Paci

fic

Railr

oad

Southern Pacific Railroad

Southern Pacific Railroad

Southern Pacific Railroad

Southern Pacific

Railroad

UV83

t u89

Cor

ona

de T

ucso

n

East

Sahu

arita

Gre

enVa

lley

Sahu

arita

Sono

ita

Sum

mit

Sahu

arita

Lege

nd

Sour

ces

!

!!

!

!

RD424RD424

Santa

RitaRd

Santa

RitaRd

130

105

155

140

135

95

120

Inse

t AIn

set A

Inse

t AIn

set A

Stre

etM

ap U

SA

2008

; TE

P 2

008;

EP

G 2

008,

Pim

a C

ount

y 20

08, R

osem

ont C

oppe

r Com

pany

200

8

Gen

eral

Ref

eren

ce F

eatu

res

Cou

nty

Bou

ndar

y

Exi

stin

g 46

kV T

rans

mis

sion

Lin

e

Exi

stin

g 11

5kV

Tra

nsm

issi

on L

ine

Exi

stin

g 13

8kV

Tra

nsm

issi

on L

ine

Exi

stin

g 23

0kV

Tra

nsm

issi

on L

ine

Exi

stin

g 34

5kV

Tra

nsm

issi

on L

ine

Pro

pose

d S

witc

hyar

d/S

ubst

atio

n# I

Exi

stin

g S

ubst

atio

n# I

Sec

onda

ry R

oad

Rai

lroad

Hig

hway

Inte

rsta

te

Sec

tion

Bou

ndar

y

Tow

nshi

p B

ound

ary

Pro

ject

Stu

dy A

rea

Bou

ndar

y

Con

tour

Inte

rval

= 1

00 fe

et

Pre

ferr

ed

Ro

ute

an

d A

lte

rna

tiv

es

Pre

ferr

ed

Ro

ute

an

d A

lte

rna

tiv

es

Fig

ure

1F

igu

re 1

Ros

emon

t Min

e P

lan

of O

pera

tions

Bou

ndar

y U

nder

NE

PA P

roce

ss

Land

Man

agin

g A

reas

Ariz

ona

Sta

te L

and

Bur

eau

of L

and

Man

agem

ent

U.S

. For

est S

ervi

ce

Uni

ncor

pora

ted

Pim

a C

ount

y

Ros

emon

t Cop

per F

acili

ties

Priv

ate

Land

s

Cla

im B

ound

ary

Gre

en V

alle

y P

lann

ing

Are

a

Sah

uarit

a In

corp

orat

ed B

ound

ary

Plan

ning

Jur

isdi

ctio

ns

Cor

onad

o N

atio

nal F

ores

t

San

ta R

ita E

xper

imen

tal R

ange

Las

Cie

nega

s N

atio

nal C

onse

rvat

ion

Are

a

Spec

ial M

anag

emen

t Are

as

Pre

ferr

ed R

oute

Alte

rnat

ive

Rou

te 1

Alte

rnat

ive

Rou

te 2

Alte

rnat

ive

Rou

te 3

Alte

rnat

ive

Rou

te 4

Link

Nod

eA

ltern

ativ

e Li

nk

Link

Iden

tific

atio

n N

umbe

r!

!10

Not

e:T

he

alte

rna

tive

ro

ute

s s

ho

wn

on

th

e m

ap

are

a g

rap

hic

al re

pre

se

nta

tio

n.

Tucs

on E

lect

ric P

ower

R

osem

ont 1

38kV

Tra

nsm

issi

on L

ine

Proj

ect

J-15

7C

EC A

pplic

atio

n N

ovem

ber 2

011

Page 146: PDF 8257 KB - Tucson Electric Power

THIS

PA

GE

INTE

NTI

ON

ALL

Y L

EFT

BLA

NK

Tucs

on E

lect

ric P

ower

R

osem

ont 1

38kV

Tra

nsm

issi

on L

ine

Proj

ect

J-15

8C

EC A

pplic

atio

n N

ovem

ber 2

011