Last chang 7/13/2010 ged on: L 0 ES Pro Last changed b SSAR P oject N by: Project Navoda MM-P ts (Ind aya – Purchase Version: 1.0 dia) L User M e Order P Phase MM- imited Manua P Project Nav IV User M -Purchase d al Page: 1 vodaya Manual Orders

PBG MM UM Domestic PO Creation 001

Embed Size (px)

Citation preview

Page 1: PBG MM UM Domestic PO Creation 001

Last chang7/13/2010

ged on: L0

ES

Pro

Last changed b

SSAR P

oject N

by:

Project

Navoda

MM-P

ts (Ind

aya –

Purchase

Version: 1.0

dia) L

User M

e Order

PPhase

MM-

imited

Manua

P

Project Nav IV User M-Purchase O

d

al

Page: 1

vodaya Manual Orders

Page 2: PBG MM UM Domestic PO Creation 001

Last chang7/13/2010

Revision

Version Number

1.0

ged on: L0

n History

Brief descriptiochange

Initial Rele

Last changed b

on of AffeSect

ase PS/F

by:

ected tion(s)

E

FICO 0

Effective Da

01/07/2010

Version: 1.0

ate Prepa

Panka

PPhase

MM-

ared By

aj Desai

P

Project Nav IV User M-Purchase O

Review

NilkantBorase

Page: 2

vodaya Manual Orders

wed By

t M e

Page 3: PBG MM UM Domestic PO Creation 001

Last chang7/13/2010

Table o1  Int2  Pu3  Pu4  Pu5  Pu6  Pu7  Pu8  Co9  Ma10  Op11  Im12  Co

ged on: L0

 of Contentroduction .....urchase Ordeurchase Ordeurchase Ordeurchase Ordeurchase Ordeurchase Ordeombinations oandatory Fielptional Fields

mportant detaiomplete proce

Last changed b

nts .....................

ers for Domesers for Domesers for Cost Cers for Asset Mers for Import ers for Import of Material Tyds for PO cre for PO creatls need to beess of Purcha

by:

.....................stic Project Mastic Non-Projeentre Based M

Materials .......Project MaterNon-Project M

ype, PO & PReation ............ion ................ checked dur

ase Order Cre

.....................aterials .........ect Materials .Materials ...........................rials ..............Materials ......

R Document T..........................................ring PO creatieation with va

Version: 1.0

.....................

.....................

.....................

.....................

.....................

.....................

.....................Types ......................................................ion ................

arious Screen

PPhase

MM-

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

..................... Shots ..........

P

Project Nav IV User M-Purchase O

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

Page: 3

vodaya Manual Orders

....... 4 

....... 4 

....... 5 

....... 5 

....... 5 

....... 5 

....... 5 

....... 5 

....... 6 

....... 6 

....... 6 

....... 9 

Page 4: PBG MM UM Domestic PO Creation 001

Last chang7/13/2010

1  In 1.1 PThe Purmateriaagainst the proj 1.2 DPurchas(Buyersquality w 1.3 SPurchasThe infoare show 1.4 DA documthe docu Followin

• Z• Z• Z• Z• Z

c• Z

to• Z• Z

Any typRequistiPurchascreated

2  P• F

R• P

Z

ged on: L0

ntroductio

Purpose rchase Ordels as per re released Cject.

Definition se Order is s) to Vendowithin stipu

Structure se Order (Pormation shwn in the I

Document ment type iument sep

ng documeZECP - AsseZDOP – EP(ZIOP - EP(IZLCS – EP(IZHSS – Higlient)

ZSIT – SIT o client)

ZCHM- ChaZSTO- Stoc

e of Purchaions or agase Requistio.

Purchase Oor Project

Requisition O Docume

ZLCS [EP(I)

Last changed b

on 

er is a docuequiremenContract or

a formal ror for supplulated time

PO) consisthown in theItem Detail

Type is defined farately. Au

nt types deet PO (I)L-Domes)L-Import I)L-Local Sh Sea Sale

Procureme

rgeable Mak Transfer

ase Order ainst RFQ. on must be

 Orders for Materials, shall only

ent types i.)L-Local Sa

by:

ument whit of the pro released P

equest or ily or provide duration

s of Docume Header rl tab views

for each tyuthorization

efined in th

stic (Materi(Material c

Sales (Matee (Material

ent (Materi

aterials Order

will be creaWhile creae referred.

 DomesticZNB (EPILbe referrede. ZDOP [Eales] shall b

ch can be ojects. ThePurchase R

instruction de certain mentioned

ment Headerelates to ts.

ype of procn control is

he in the sy

ial coming coming to Eerial coming ordered on

al ordered

ated againating PO ag Without P

c Project M-Project PRd. EP(I)L-Dombe referred

Version: 1.0

used for pre Purchase Requisition

from Purcqunatity of

d in the PO

er, Item Ovhe entire P

urement. Ts also contr

ystem:

to EPIL StEPIL stock g to stock n vendor a

on vendor

st Contractgainst any turchase Re

Materials R) docume

mestic], ZSd during PO

PPhase

MM-

rocuremen Order will as per req

hase Depaf goods & o.

verview & PO. For eac

This helps irolled by d

ock for EPI for EPIL puand sold tond directly

r and direct

t or againstype of Conequisition,

nt type of

SIT [SIT-ProO creation.

P

Project Nav IV User M-Purchase O

t of differe be createduirement o

artment of better

Item Detaich line, det

in identifyiocument ty

IL use) urpose) o client) y delivered

tly delivere

st Purchasentract, no PO sha

Purchase

ocurement

Page: 4

vodaya Manual Orders

ent d of

il. tails

ng ype.

to

ed

e

ll be

t] &

Page 5: PBG MM UM Domestic PO Creation 001

Last chang7/13/2010

3  P• F

R• P

4  P• F

Pim

• Pc

5  P• F

R• P

6  P• F

P• P

re

7  P• F

P• P

8  P• F

P• P

c

9  C Sr. No.

M

1 PD

2 NM

3 CM

ged on: L0

Purchase Oor Domest

RequisitionsO Docume

Purchase Oor Cost Ceurchase Remport mateO Documereation.

Purchase Oor Asset M

Requisition O Docume

Purchase Oor Import urchase ReO Documeeferred.

Purchase Oor Import urchase ReO Docume

Purchase Oor Traders R) documeO Documereation.

Combinatio

Material Ty

Project MateDomestic

Non project Materials- DoCost Centre Materials

Last changed b

 Orders for tic Materials shall be rent Type ZD

 Orders for ntre Basedequisition serial excep

ent type ZD

 Orders for aterials, ZAshall only

ent Type ZE

 Orders for Project maequisition sent Types Z

 Orders for Non-Projecequisition sent Types Z

 Orders for  Scenario Ment types oent type on

ons of Mat

pe

rials-

omestic Based

by:

 Domestics, ZNC (EP

referred. DOP [EP(I)

 Cost Centd Materialsshall be refpt Project &DOP [EP(I)L

 Asset MatAST (EPIL-be referredECP (Asset

 Import Praterials, ZNshall be refZIOP [EP(I)

 Import Noct materialshall be refZIOP [EP(I)

 Trader’s Materials, Zof Purchasely ZDOP [E

terial Type

PO Docum

ZDOP [EP(I[SIT-Procur[EP(I)L-LocZDOP [EP(I

ZDOP [EP(I

c Non­ProjPIL-Direct P

L-Domesti

tre Based M, ZNC (EPIferred i.e.

& Asset maL-Domestic

terials -Asset PR) d. PO) shall

roject MatNB (EPIL-Prferred. )L-Import]

on­Projecs, ZNC (EPferred. )L-Import]

 (Project/NZNB (EPIL-e RequisitioEP(I)L-Dom

e, PO & PR

ment Type

I)L-Domestirement], ZLcal Sales] I)L-Domesti

I)L-Domesti

Version: 1.0

ect MaterPR) docum

c] shall on

 Materials L-Direct PRrelated to terials. c] shall be

document

only be ref

terials roject PR) d

& ZHSS [H

t MaterialPIL-Direct P

shall only

Non­Proje-Project PRons shall onmestic] sha

R Documen

PT

ic], ZSIT LCS

ZP

ic] ZP

ic] ZP

PPhase

MM-

ials ent type o

ly be refer

 R) documeany type o

referred d

type of Pu

ferred.

document

High Sea S

ls PR) docum

be referre

ect) MateriR) & ZNC (Enly be refeall be referr

nt Types  

PR DocumeType

ZNB (EPIL-PPR)

ZNC (EPIL-DPR) ZNC (EPIL-DPR)

P

Project Nav IV User M-Purchase O

f Purchase

red.

ent type of of domestic

uring PO

urchase

type of

Sale] shall b

ent type o

d.

ials EPIL-Directrred. red during

 

ent AccAssCat

Project Q/Y

Direct Bla

Direct K

Page: 5

vodaya Manual Orders

c or

be

f

t

PO

count signment tegory Y

ank

Page 6: PBG MM UM Domestic PO Creation 001

Last chang7/13/2010

4 A

5 PIm

6 N–

10  M• D• P• P• P• C• V• P• In• T• N• D• S• V

a

11  O• D• B• U• O• In• T

12  Im• S• P• In• T• P• D• B• P• S• V• U

ged on: L0

Assets Mater

Project Matemport

Non-Project – Import

MandatoryDocument Turchasing urchasing R No. / Co

Company CVendor Codayment Tencoterms a

Tax Code Net Price Delivery DaStorage LocValuation Tyre assigne

Optional FiDP CategoryBuyers DataUnder / OveOrder Acknonspection R

Tag No. as T

mportant Selection ofayment Tencoterms a

Tax Codes iricing Cond

Down PaymBuyer’s Datlant codes

Storage LocValuation TyUnder Deliv

Last changed b

rials

rials –

Material

y Fields forType OrganizatiGorup

ontract No. ode e

erms along with

te cation ype (Selecd specifica

ields for Py (Paymena er DeliveryowledgemeRequiremeText

 details nef correct Doerms (Headalong with n Invoice Tditions in C

ment Detailsta (New Ta (New List)cations in Iypes in De

very & Over

by:

ZECP (Asse

ZIOP [EP(I)[High Sea SZIOP [EP(I)

r PO creat

on

details of l

t only Val Tlly for that

PO creationt Processin

y Toleranceent nt Text

eed to be cocument Tder) details of lTab (Item Conditions s in Paymeab) instead) in Item Otem Overvlivery Tab r Delivery T

et PO)

)L-Import], Sale] )L-Import]

tion 

ocation

Type againt material i

n ng)

e

checked duype of PO

ocation in level) Tab (Head

ent Processd of CustomOverview view (Item LeveTolerance

Version: 1.0

ZP

ZHSS ZPZP

nst which ‘Xn Material

uring PO c

Delivery/In

er/Item) sing Tab (Hmer Data (H

el) %age in D

PPhase

MM-

ZAST (EPIL-PR) ZNB (EPIL-PPR) ZNC (EPIL-DPR)

X’ mark is Master)

 creation 

nvoice Tab

Header) Header)

elivery Tab

P

Project Nav IV User M-Purchase O

-Asset A

Project Q/Y

Direct Bla

there, whic

b (Header)

b (Item lev

Page: 6

vodaya Manual Orders

Y

ank

ch

vel)

Page 7: PBG MM UM Domestic PO Creation 001

Last chang7/13/2010

Field

Document Type

Purchase Requisition

Contract

PurchasingGroup

Company Code

Vendor Co

Document Date

Payment Terms

Incoterms along with location details

ged on: L0

ds

DefinePurchcreate

n Purchto be creati

If Conto be PO cr

g The Bfor purequis

Requto be

ode Requto be

Date order create

Field paymdefinesystem

Incoteto sys

Last changed b

Descript

es whether ahase Order ised

hase Requisreferred for on

ntract exists,referred by

reation

Buyer is respurchasing thesition/item

ired companselected by

ired companselected by

on which Pudocument h

ed

where vendent mode toed, to be prom

erms to be pstem

by:

tion

a s to be

ition no. PO

, number Buyer for

ponsible e specific

ny code Buyer

ny code Buyer

urchase has to be

or o be ovided to

provided

R/O/C

R EntePurc

R PR systenteto c

R ConassireferespPO

R Idenpurc

R SpeComente

R VenBuypresbutt

R Docwill

R Payseleclickbutt

R As nvendseleclick

Version: 1.0

User ActValu

er type for rchase Order

No. assignetem to be refered in respereate PO

ntract & PR Nigned by sys

erred & entepective field

ntify the buyechase the m

ecific numbempany Codeered

ndor to be seyer as requiressing match ton or pressi

cument creatappear

yment terms ected thro’ keking on matcton

negotiated wdor, Incoterm

ected thro’ keking on matc

PPhase

MM-

tion and ues

regular r

ed by ferred & ective field

Nos. stem to be ered in

to create

er who will aterial

r of e to be

elected by ed by code ng key F4

tion date

to be ey F4 or ch code

with ms to be ey F4 or ch code

P

Project Nav IV User M-Purchase O

Comm

In this casemust be en

Specific PuGroup shoselected

Past & Futwill not accsystem, sythrow error

As negotiavendor, & document to be decid

As negotiavendor, & document to be decid

Page: 7

vodaya Manual Orders

ments

e, PR no. ntered

urchase ould be

ture dates cepted by ystem will r message

ated with as per type also

ded

ated with as per type also

ded

Page 8: PBG MM UM Domestic PO Creation 001

Last chang7/13/2010

Delivery da

Net Price

Quantity

Plant

Storage location

Tax Code

Material group

Req. tracknumber

Requisition

Valuation Type

ged on: L0

ate Date are todelivethan tcalculwarni

Net P

Field to be

Concethe O

Field storagspecif

Field requir

Groupmaterfeatur

ing This nto facof ma

ner Indicamater

Matercateg

Last changed b

on which theo be delivereery date is sothe system lated lead timng will be iss

Price to be en

where requispecified by

erned Plant rder materia

for determinge location ffic plant

for selectionred applicab

ping of severials with simres

number can cilitate the moaterial procur

ates for whorial is ordere

rial valuationory

by:

e goods ed. If ooner

me, a sued

ntered

rement y Buyer

requiring al

ning for a

n ble taxes

ral milar

be used onitoring rement

m the ed

n

buttto b

R Entewhe

R Buyfor eper on Pstate

R In thas pordesho

R Enteis to

R Speto bwhematunlo

R Appselebuttat It

O Matbe c

O ThisPR,purp

O ThisPR,purp

R Matmusconstype

Version: 1.0

ton & locatioe also provid

er the specifen material

yers will be reentering Netrequirement

Price Compaement

his qty. to beper requiremered on Venuld not exce

er plant wheo be shipped

ecific Storagee entered in

ere the orderterial needs oaded/stored

plicable Tax ected thro’ mton or pressitem level

terial Group captured from

s will be cap this is for mpose only

s will be cap this is for mpose only

terial Valuatist be selectesidering PO

e

PPhase

MM-

on details ded

fic date is required

esponsible t Price as t, based arison

e specified ment, to be

dor, which eed PR qty.

ere material d

e Location n this field red to be d

code to be match code

ng key F4

code will m PR

tured from monitoring

tured from monitoring

on Type ed

Document

P

Project Nav IV User M-Purchase O

date formavary by co

System wierror messqty exceed

Tax code wchanged arequireme

System wierror messcombinatiodoc type &val. Type n

Page: 8

vodaya Manual Orders

at may nfiguration

ll throw sage if PO ds PR qty.

will get as per nt

ll throw sage if on of PO & material not

Page 9: PBG MM UM Domestic PO Creation 001

Last chang7/13/2010

R – Req You canTransac Menu PaLogisticCreate (Select Or TransacME21N Create P Purchas

13  C Creatio

ged on: L0

quired, O –

n go to creaction code.

ath for creacs >> Mat >> ME21it, hit ente

ction code: (Put the t

Purchase O

se Requisiti

Complete p

on of Purch

Last changed b

Optional,

ate Purchas

ation of POterials MaN – Vend

er button or

ransaction

Order throu

ion will be

 process of 

hase Orde

by:

C - Conditi

se Order sc

O: anagemenor/Supplyr double cl

code in th

ugh T-code

the Pre-re

f Purchase

r for Dom

ional

creen throu

nt >> Purcying Plantick to go to

he comman

ME21N.

quisite for

e Order Cre

estic Proje

Version: 1.0

ugh SAP M

chasing >t Known o the trans

nd field and

creation o

eation wit

ect Materi

PPhase

MM-

enu path o

>> Purcha

saction)

d hit “Enter

f PO.

th various 

ials:

P

Project Nav IV User M-Purchase O

matches

or using

ase Order

r” button)

 Screen Sh

Page: 9

vodaya Manual Orders

>>

hots 

Page 10: PBG MM UM Domestic PO Creation 001

Last chang7/13/2010

ged on: L0

Or Enter T-directly in coto create PO

Last changed b

-code ME21Nommand fieldO

by:

N d

For Creaaccess t

Version: 1.0

ation of Purchhrough SAP M

Oncethis sc

PPhase

MM-

hase Order, Menu Path

double clickecreen will app

P

Project Nav IV User M-Purchase O

ed ME21N, pear

Page: 10

vodaya Manual Orders

Page 11: PBG MM UM Domestic PO Creation 001

Last chang7/13/2010

Select r

ged on: L0

espective D

Enter PRand pressall the relematerials

Last changed b

Document

o

R No & Line Its enter key to evant details o

by:

Type, acco

Select Docuof PO

tem No. capture of

ordingly PO

ment Type

Version: 1.0

O will get c

PPhase

MM-

reated.

P

Project Nav IV User M-Purchase O

Page: 11

vodaya Manual Orders

Page 12: PBG MM UM Domestic PO Creation 001

Last chang7/13/2010

After seRequisit‘Requisithe abov

Once yoagainst

ged on: L0

election of Dtion (PR) Ntion Item’ ve details,

ou enter th that partic

Last changed b

Document No. as well

respective press ente

e PR relatecular vendo

You caAssign

by:

Type, go tas line itemely againster.

ed details, or & enter.

an see here Anment Catego

to Item Ovem no. in tht which PO

select the

Acct. ory ‘Q’

Version: 1.0

erview & ee fields ‘Pu has to be

required V

Enter require

PPhase

MM-

nter respeurchase Recreated. A

Vendor to c

ed Vendor he

P

Project Nav IV User M-Purchase O

ctive Purchequisition’ &fter enterin

create PO

ere

Page: 12

vodaya Manual Orders

hase & ng

Page 13: PBG MM UM Domestic PO Creation 001

Last chang7/13/2010

ged on: L0

Last changed b

by:

Select the reavailable fromF4 or thro

Seavdrlo

espective Paym the list, by po’ dropdown

elect the requvailable list byropdown & als

ocation beside

Version: 1.0

yment Term pressing Key

uired Incotermy pressing keso enter the d

es Incoterms

PPhase

MM-

m from y F4 or thdetails of i.e. mandator

P

Project Nav IV User M-Purchase O

hro’

ry

Page: 13

vodaya Manual Orders

Page 14: PBG MM UM Domestic PO Creation 001

Last chang7/13/2010

ged on: L0

Last changed b

by:

Enter Neet Price

Version: 1.0

Entwrt

PPhase

MM-

ter Storage Lplant i.e. man

P

Project Nav IV User M-Purchase O

Location ndatory

Page: 14

vodaya Manual Orders

Page 15: PBG MM UM Domestic PO Creation 001

Last chang7/13/2010

After enlocationwrt Plan If PO qumessagquantity

Once alas per r

ged on: L0

ntering PR/, Net Price

nt entered

uantity entee as belowy.

l the aboverequiremen

Last changed b

line item ne, Storage Lin PR. All t

ered will bew i.e. Purch

e details wnt through

by:

no., PaymeLocation hathe above f

e more thaase Order

ill be enterInvoice Ta

nt Term, Ias to be enfields are m

an PR quan quantity is

red compleb at Item

Version: 1.0

ncoterm alntered. Stomandatory.

ntity, systes more tha

etely, Tax Clevel.

Select the rthro’ dropdkey F4

PPhase

MM-

long with dorage Locat.

m will thron Purchase

Code has t

required Tax own or by pre

P

Project Nav IV User M-Purchase O

details of tion should

ow error e Requisitio

to be selec

Code essing

Page: 15

vodaya Manual Orders

d be

on

cted

Page 16: PBG MM UM Domestic PO Creation 001

Last chang7/13/2010

In case throughto be cr

ged on: L0

of differenh ‘Invoice’ reated.

Last changed b

nt scenarios Tab at Ite

by:

s, differentem level for

t tax codesr the respe

Any Tax Ccan be sel

Version: 1.0

s as applicaective mate

Code whichevlected from th

PPhase

MM-

able can beerial for wh

ver is applicabhe list availab

P

Project Nav IV User M-Purchase O

e selected hich PO nee

ble le

Page: 16

vodaya Manual Orders

eds

Page 17: PBG MM UM Domestic PO Creation 001

Last chang7/13/2010

After sewill appparticula

ged on: L0

electing theear besidear line item

Last changed b

e tax code, s the field

m can be di

by:

press ente ‘Tax Codeisplayed &

er. At Iteme’ through viewed.

Taxebe ditab ‘T

Version: 1.0

m level in ‘Iwhich all t

es related to pisplayed & vieTaxes’

PPhase

MM-

nvoice’ tathe applied

particular line ewed by click

P

Project Nav IV User M-Purchase O

ab, ‘Taxes’ taxes for t

item can ing on

Page: 17

vodaya Manual Orders

’ tab the

Page 18: PBG MM UM Domestic PO Creation 001

Last chang7/13/2010

Tax Codbe view

ged on: L0

de once ented through

Last changed b

tered, resph ‘Conditio

by:

pective lineons’ Tab at

e items prict Item leve

All the taxes Tax Code ca

Basic Pbe viewConditio

Version: 1.0

cing conditel.

applicable asan be viewed

rice line item ed here in Pr

ons of ‘Condi

PPhase

MM-

ions & land

s per selectedfrom this scre

wise can icing tions’ Tab

P

Project Nav IV User M-Purchase O

ded cost ca

d een

Page: 18

vodaya Manual Orders

an

Page 19: PBG MM UM Domestic PO Creation 001

Last chang7/13/2010

In tab ‘BNo/Dateetc. det

ged on: L0

Buyer’s De, Ariba RFails shall b

Last changed b

ata’ at HeaFQ No/Datebe maintain

by:

ader level, e, Ariba Coned as per

all the detntract No/Dbelow scre

Version: 1.0

tails of ApeDate, Buyeeen shots.

Landed Cohere in Pric‘Condition

Different shall be m‘Buyer’s

PPhase

MM-

ex Meet Noer’s Contac

ost can be viecing Conditions’ Tab at Item

details relatemaintained in Data’ at Hea

P

Project Nav IV User M-Purchase O

o./Date, NFct No/email

ewed ns of m level

ed to PO tab

ader level

Page: 19

vodaya Manual Orders

FA l,

Page 20: PBG MM UM Domestic PO Creation 001

Last chang7/13/2010

Down PaProcessDP Cate Only onto be clishall be For AdvME2DP

ged on: L0

ayment Resing’ Tab aegory first t

e field has icked & go updated a

ance, sepaP & for Adh

Last changed b

equest (DPat Header then Due D

to be ente to continuautomatica

arate Downoc paymen

by:

R) fields shlevel of PODate & DP A

ered amongue (enter) slly. DP due

n Payment nt DPR has

hall be maiO wherever Amount or

g DP amouso that rese date is m

Request ha to created

Version: 1.0

ntained th applicabler DP %age

unt or DP %pective DPandatory.

as to be crd thro’ T-co

Different detshall be mai‘Buyer’s Da

Down PDate to‘PaymeHeade

PPhase

MM-

rough ‘Paye. One has shall be en

%age. ChecP %age or D

reated throode ZDPR.

tails related tontained in tab

ata’ at Header

Payment %ago be entered hent Processir level

P

Project Nav IV User M-Purchase O

yment to select tntered.

ck button hDP amount

o’ T-code

o PO b r level

ge & Due here in tab ing’ at

Page: 20

vodaya Manual Orders

he

has t

Page 21: PBG MM UM Domestic PO Creation 001

Last chang7/13/2010

Once agsave the

ged on: L0

gain click oe PO Docum

Last changed b

on check bument as be

After enterinDate, Chec

by:

utton for chelow.

ng DP %age ck Button to b

hecking an

& Due be clicked

DP Amountautomaticaclicked

Version: 1.0

y error, if

t will be pickelly once chec

PPhase

MM-

not press c

ed-up ck button

P

Project Nav IV User M-Purchase O

continue &

Page: 21

vodaya Manual Orders

Page 22: PBG MM UM Domestic PO Creation 001

Last chang7/13/2010

System

ged on: L0

will genera

Last changed b

ate the PO

by:

Number && will show

Version: 1.0

the messa

PPhase

MM-

age as belo

P

Project Nav IV User M-Purchase O

ow.

Page: 22

vodaya Manual Orders

Page 23: PBG MM UM Domestic PO Creation 001

Last chang7/13/2010

Once POME29N

ged on: L0

O will be cr.

Last changed b

reated, it h

by:

as to be reeleased for

Version: 1.0

r further pr

PPhase

MM-

rocessing th

P

Project Nav IV User M-Purchase O

hrough T-c

Page: 23

vodaya Manual Orders

code

Page 24: PBG MM UM Domestic PO Creation 001

Last chang7/13/2010

At Headscreen s

ged on: L0

der level thshots.

Last changed b

rough ‘Rel

by:

lease Straategy’ tab,

Version: 1.0

, PO can be

OncecreatreleaME2relea

PO relreleasehere. Nbe sav

PPhase

MM-

e released

e PO will be ted/saved thaased through 29N, Click on ase the PO at

eased at all lees can be vieNow this PO cved

P

Project Nav IV User M-Purchase O

as per belo

at has to be T-code release to t all levels

evels, wed can

Page: 24

vodaya Manual Orders

ow

Page 25: PBG MM UM Domestic PO Creation 001

Last chang7/13/2010

After cosaved, m

ged on: L0

ompletion omessage w

Last changed b

of releasingwill be displ

by:

g the PO, sayed with

After relebe saved

ystem will released in

ease of PO, itd with this me

Version: 1.0

ask to savndications.

t will essage

PPhase

MM-

ve the PO.

P

Project Nav IV User M-Purchase O

Once it wil

Page: 25

vodaya Manual Orders

l be

Page 26: PBG MM UM Domestic PO Creation 001

Last chang7/13/2010

If Basic updatedbe clickechanged

ged on: L0

Price will bd DP %ageed so that d price of P

Last changed b

be changed in Paymen respectivePO.

by:

d due to annt Processie DP Amoun

ny reason, ng Tab of nt shall get

If DP %ageDue date, changed a

Version: 1.0

again one Header & tt updated a

e is changed DP amount w

automatically

Price reducPrice field

PPhase

MM-

has to mathe Check automatica

w/o changingwill get

ction in Net of PO

P

Project Nav IV User M-Purchase O

intain the Button hasally wrt

g

Page: 26

vodaya Manual Orders

s to

Page 27: PBG MM UM Domestic PO Creation 001

Last chang7/13/2010

If any cmessag

ged on: L0

hanges wiles related

Last changed b

ll be done i to versions

by:

in PO, systs will be po

tem will asopped up.

Version: 1.0

k to update

Rswit

‘Versionupdate a

PPhase

MM-

e the Versi

Reasons will bsystem if any will be made it has got rele

Version foin Net Pricwill get upd

’ Tab shall beny change in

P

Project Nav IV User M-Purchase O

ions. Error

be asked by changes in PO, once

eased.

r reduction ce field of PO dated

e used to PO

Page: 27

vodaya Manual Orders

Page 28: PBG MM UM Domestic PO Creation 001

Last chang7/13/2010

Reasonsmaking

ged on: L0

s for specif respective

Last changed b

fic changese changes.

by:

s have to b

be selected

Aai

Version: 1.0

in ‘Versio

All the detailsand Requisitioin ‘Versions’

PPhase

MM-

ons’ Tab at

s like Reason,oner shall be tab at Heade

P

Project Nav IV User M-Purchase O

t Header fo

, Text updated

er level

Page: 28

vodaya Manual Orders

or

Page 29: PBG MM UM Domestic PO Creation 001

Last chang7/13/2010

ged on: L0

Last changed b

by:

Reqfromthro

Onceupdai.e. it

Version: 1.0

quired reasonm list by presso’ dropdown

e all the requiated, system wt’s allowing to

PPhase

MM-

ns can be selesing key F4

ired details wwill not show

o save the doc

P

Project Nav IV User M-Purchase O

ected or

ill be any error

cument

Page: 29

vodaya Manual Orders

Page 30: PBG MM UM Domestic PO Creation 001

Last chang7/13/2010

ged on: L0

Now if Net again systeupdation oderelease

Last changed b

Price will be em will show f Version & it the PO

by:

Once dthe me1, this

increased, error for will

document willessage as beldocument ha

Version: 1.0

be saved, syow i.e. with c

as been chang

PPhase

MM-

ystem will shohange of Verged

P

Project Nav IV User M-Purchase O

ow rsion

Page: 30

vodaya Manual Orders

Page 31: PBG MM UM Domestic PO Creation 001

Last chang7/13/2010

Once POeffected

ged on: L0

O will be red with relea

Last changed b

eleased, syase code L1

by:

stem will s1’.

show mess

Version: 1.0

age at bott

PO hsavedproce

PPhase

MM-

tom line i.e

has to be relead again for fueedings

P

Project Nav IV User M-Purchase O

e. ‘Release

ased & to be rther

Page: 31

vodaya Manual Orders

e

Page 32: PBG MM UM Domestic PO Creation 001

Last chang7/13/2010

Once mthroughviewed

• OP

• Insds

• Insds

 RemainSale In Project      Creatio

ged on: L0

aterial will h T-code MIin ‘PO His

Other two srocuremen

n case of Phall be onlyocument tyhould be ‘Y

n case of Phall be onlyocument tyhould be ‘Q

ing steps fTransit (ZSmaterial PO

on of Purch

Last changed b

be receiveIGO. Once tory’ tab a

scenarios mnt (Sale in

PO creationy ZSIT (SIype of PR sY’.

PO creationy ZLCS (Eype of PR sQ’.

or Project SIT) & LocaO creation,

hase Orde

by:

ed at site, G GRN will bat Item lev

may come uTransit) as

n for DomeIT-Procurshall be ref

n for DomeP(I)L-Locshall be ref

material POal Sales (Z, as describ

r for Dom

Once GRN it will be vieItem level o

GRN to be be preparedvel in PO th

under this s well as ZL

stic Non-Prrement) &ferred. Acc

stic Non-Prcal Sales) ferred. Acc

O creation ZLCS) shall bed above.

estic Non­

has been mawed in ‘PO Hf PO

Version: 1.0

prepared bd in systemhrough T-co

Domestic PLCS i.e. EP

roject mate& only ZNBcount Assig

roject mate & only ZNcount Assig

in the follo be followe. 

­Project M

ade by StoresHistory’ tab at

PPhase

MM-

by Stores im, it can beode ME23N

PO creationP(I)L-Local

erials, PO d (EPIL-Pr

gnment Cat

erials, PO dNB (EPIL-Pgnment Cat

owing scened as per D

Materials 

s, t

P

Project Nav IV User M-Purchase O

in system e displayedN.

n i.e. ZSIT Sales

document troject PR)tegory field

document tProject PRtegory field

narios i.e. iDomestic

Page: 32

vodaya Manual Orders

d &

-SIT

type d

type R) d

n

Page 33: PBG MM UM Domestic PO Creation 001

Last chang7/13/2010

In case be only of PR sh Remainper Domonly one Creatio In case only ZDPR shall Remainper Dom Creatio

While cryou entabove. Select rZIOP EP

ged on: L0

of PO crea ZDOP (EPhall be refe

ing steps fmestic Projee PO docum

on of Purch

of PO creaDOP (EP(I)l be referre

ing steps fmestic Proje

on of Purch

reating Impered in this

espective PP(I)L-Impo

Last changed b

ation for DoP(I)L-Domerred. Acco

or Domestect materiament type

hase Orde

ation for Co)L-Domesed. Accoun

or Domestect materia

hase Orde

port Projecs transactio

PO Documert.

by:

omestic Nomestic) & ount Assign

ic Non-Proal PO creatshall be al

r for Cost 

ost Centre stic) & onlyt Assignme

ic Non-Proal PO creat

r for Impo

ct material on, ‘Create

ent Type fo

After entefor creatioDocumen

on-Project monly ZNC (ment Cate

ject matertion, as deslowed for P

 Centre Ba

Based maty ZNC (EPent Catego

ject matertion, as des

ort Project

PO, go to e Purchase

or creation

ering in transaon of import Pnt Type here i

Version: 1.0

materials, (EPIL-Direegory field

rial PO creascribed aboPO creation

ased Mater

terials, PO PIL-Directry field sho

rial PO creascribed abo

t Materials

T-code ME Order’ scr

import pro

action ME21NPO, select i.e. ZIOP

PPhase

MM-

PO documeect PR) doshould be

ation shall ove. In thisn i.e. ZDOP

rials 

document t PR) docuould be ‘K’

ation shall ove.

s

E21N & hit reen will ap

oject mate

N

P

Project Nav IV User M-Purchase O

ent type shocument ty‘Blank’.

be followeds scenario,P.

type shall ment type ’.

be followed

enter. Oncppear as

erial PO i.e.

Page: 33

vodaya Manual Orders

hall ype

d as ,

be of

d as

 

ce

.

Page 34: PBG MM UM Domestic PO Creation 001

Last chang7/13/2010

In case the stepsteps. One hasmateria

• S• T

ta• P

m(JS

• Cre

ged on: L0

of Import ps followed

s to take cal PO creati

Selection ofTax Code – ab at Item ricing Cond

maintained JCDB – Bas

SECess on C

Currency caequiremen

Last changed b

project ma for Domes

are for the on:

f PO docum Only ‘V0’ level ditions – A in ‘Conditsic CustomCVD, JEDB

an be chant

by:

aterial PO cstic Project

following f

ment Type itax code to

All the followtions’ tab

ms (BCD), J – Ecess o

ged in ‘De

If wsea

creation, at material

fields durin

i.e. ZIOP o be select

wing imporat Item levJCV1 – CVDn BCD, JSD

livery/Inv

Enter PR Npress enterrelevant de

f Import vendowill be picked-elected, curreutomatically.

Version: 1.0

ll other stePO creation

ng creation

ted in Tax C

rt pricing cvel or HeadD, JECV – EDB – SECes

voice’ tab

No & Line Itemr key to captutails of mater

or will be seleup & if local v

ency INR will Currency can

PPhase

MM-

eps will remn except th

n of Import

Code field

onditions sder level ECess on Css on BCD,

at Header

m No. and re all the

rials

ected, currencvendor will bebe pick-up n be changed

P

Project Nav IV User M-Purchase O

main same he followin

t project

in ‘Invoic

shall be

CVD, J1CV , JSAD – S

level as pe

cy USD e

d here

Page: 34

vodaya Manual Orders

like g

e’

– AD)

er

Page 35: PBG MM UM Domestic PO Creation 001

Last chang7/13/2010

ged on: L0

Last changed b

by:

Tbpb

Tax Code ‘V0by drop downpress Enter kebesides Tax C

‘Taxes’ tab field in Invoion tab Taxe& viewed

Version: 1.0

0’ to be selectn in ‘Invoice’ Tey, ‘Taxes’ taCode field

will appear bice Tab at Item

es, all the taxe

PPhase

MM-

ted thro’ F4 kTab at Item leab will appear

esides Tax Cm level, by cles can be disp

P

Project Nav IV User M-Purchase O

ey or evel & r

Code icking played

Page: 35

vodaya Manual Orders

Page 36: PBG MM UM Domestic PO Creation 001

Last chang7/13/2010

Import

ged on: L0

Pricing Con

Last changed b

nditions sh

SylinVa

by:

all be main

ystem will throne of screen foaluation Type

ntained in C

ow error mesor incorrect s

e in Delivery T

ConPric

Version: 1.0

Conditions

sage at bottoelection of

Tab at Item le

nditions beforecing conditions

PPhase

MM-

tab at Item

om

vel

e maintainings

P

Project Nav IV User M-Purchase O

m level.

g Import

Page: 36

vodaya Manual Orders

Page 37: PBG MM UM Domestic PO Creation 001

Last chang7/13/2010

ged on: L0

Last changed b

Wecoad

Wepricreq

by:

e can see hernditions i.e. Jded at Item le

e can see herecing conditionuired

re the import JCDB – Basicevel

e the other rens. %age can

Version: 1.0

pricing c Customs Du

emaining impobe changed

PPhase

MM-

uty

ort as

P

Project Nav IV User M-Purchase O

Page: 37

vodaya Manual Orders

Page 38: PBG MM UM Domestic PO Creation 001

Last chang7/13/2010

ged on: L0

Last changed b

Landeafter a

All otOversCharg

by:

ed Cost can baddition of imp

her conditionseas Freight, ges, etc.

e viewed hereport pricing co

s can be mainDomestic Fre

Version: 1.0

e at bottom onditions

ntained like eight, Packing

PPhase

MM-

g

P

Project Nav IV User M-Purchase O

Page: 38

vodaya Manual Orders

Page 39: PBG MM UM Domestic PO Creation 001

Last chang7/13/2010

Once cliappear

ged on: L0

icked on as above.

Last changed b

Conditio

For cOthe

& cli

by:

on Details,

change of vener duty param

ck on Co

‘Item – Co

ndor for Dommeters, we hav

ondition deta

Vencha

Cch

Version: 1.0

onditions –

estic Freight ve to select th

ails at bottom

ndor can be anged here

urrency can bhanged here

PPhase

MM-

Detail’ scr

or hat line

m below

be

P

Project Nav IV User M-Purchase O

reen will

Page: 39

vodaya Manual Orders

Page 40: PBG MM UM Domestic PO Creation 001

Last chang7/13/2010

Once yo

can be coriginal

ged on: L0

ou enter in

changed he screen.

Last changed b

above scre

ere as per

by:

een, vendo

requireme

Chacan

or for dome

nt & click o

anged Currenn be viewed h

Version: 1.0

estic freigh

on Back

Changedcan be v

ncy here

PPhase

MM-

ht & curren

of SAP sc

d Vendor viewed here

P

Project Nav IV User M-Purchase O

cy of amou

creen to go

Page: 40

vodaya Manual Orders

unt

o to

Page 41: PBG MM UM Domestic PO Creation 001

Last chang7/13/2010

Once al

save thesystem

ged on: L0

l the condi

e PO documwill show t

Last changed b

tions will b

ment then the messag

by:

be maintain

click on Sage at botto

ned in the i

ave icon om line of s

Once POwill show

Version: 1.0

import PO,

so that Pscreen.

O will be savew the below m

PPhase

MM-

, system w

PO will get

ed, system message

P

Project Nav IV User M-Purchase O

ill allow to

saved &

Page: 41

vodaya Manual Orders