Our ref: 2161087A-GEO-LTR-001 RevA
2161087A-GEO-LTR-001 RevA:OJ /OJ : 1/5
22 February 2013
Bill Drobnik
Design Manager
Vaughan Constructions Pty Ltd
880 Lorimer Street
Port Melbourne 3207
Dear Bill
Bullsbrook Development Geotechnical Desk Study
This desk study of the subsurface ground conditions was completed for the proposed Bullsbrook
Development site. The proposed Bullsbrook Development site is located west of Great Northern Highway
between Butternab and Dewar Roads in Bullsbrook, Western Australia, and includes Lots 2, 11 and 12. The
plan of the site, as provided by the client, is attached in Annex A.
The findings in this letter are based on the publically available sources of information referred to, which werethe only sources of information known to exist by Parsons Brinkerhoff at the time of writing. No intrusive
investigation was undertaken due to time constraints.
1. Site location and existing land use
The site is located approximately 35 km northeast of Perth in Bullsbrook, Western Australia. The elevation of
the site, according to the Perth Groundwater Atlas (www.water.gov.au), is approximately between 40 m and
45 m AHD. A drive-past site inspection (the property was not entered), indicated the site topography is
predominantly flat, except in the area of the Nambah Brook, an approximately 5 m deep gully running from
the intersection of Butternab Road and Great Northern Highway to approximately the southern intersection of
Lot 2 and Lot 11. The gully appears to cross cut Lot 11 just south of the boundary with Lot 2. However, thefull extents of the gully could not be confirmed. Such of the gully as could be seen was dry at the time of
drive-past (n.b. viewed in February after a dry summer).
Current land use of the development site (Lots 2, 11 and 12) appears to be industrial and/or agricultural
storage. The exact use of the sheds could not be definitely determined. Lot 2 is shown in Photo 1 and Lot 11
is shown in Photo 2 below. Photo 1 shows what appear to be warehouses for storage of mechanical
equipment, while Photo 2 appears to unused land around the sheds land.
7/29/2019 PB 2161087A-GEO-LTR-001 RevA-1
2/29
2161087A-GEO-LTR-001 RevA:OJ /OJ : 2/5
Photo 1 View of Lot 2 looking southeast
Photo 2 View of Lot 11 looking east
2. Geology
Perth Metropolitan Region 1:50,000 Environmental Geology Series Map Sheet 2034 I and part of 2134 W
(1984) indicates that the subsurface conditions consist of sandy silt in the southeast portion (approximately
20% of the site area) and gravelly silt for the remainder. The site is approximately 500 m due east of the
north/south trending Darling Fault.
The relevant extract from the geologic map is presented in Annex B. The Bullsbrook development site is
circled in red. The light green is indicative of the alluvial gravelly silt of the Guildford Formation, while the
yellow is indicative of the colluvial sandy silt.
7/29/2019 PB 2161087A-GEO-LTR-001 RevA-1
3/29
2161087A-GEO-LTR-001 RevA:OJ /OJ : 3/5
The gravelly silt is of alluvial origin and is part of the Guildford Formation. The geological map indicates it is
likely to comprise fine to coarse, subrounded laterite, quartz and weathered granite gravel with some fine to
medium siliceous sand. The sandy silt can be dispersive. The geological map indicates this formationgenerally has low permeability, low corrosion potential, moderate to high slope stability, high ease of
excavation, low shrink-swell potential, and moderate to high bearing capacity. A site visit indicated silty sand
with gravel at the surface. However, ponding water, as shown in Photo 3, indicates a low permeability soil
such as silt.
Photo 3 View of Lot 2 looking south showing ponding water on the west side along the fence
The sandy silt is of colluvial origin with occasional gravelly layers consisting of quartzite, quartz, granite and
laterite gravel. The sandy silt can be dispersive and friable. The geological map indicates that it generally has
low permeability, low corrosion potential, moderate to high slope stability, high ease of excavation, low to
moderate shrink-swell potential, and moderate bearing capacity. It is indicated that the presence of silt and
the heterogeneity of the sand particle size within the deposit may produce unfavourable foundation
conditions and that permanent slopes may be unstable (GSWA 1984). Use of a sand pad, either above
existing ground or to replace it to some depth may provide better founding conditions than the in situ silty
material.
The geological map presents a number of historical boreholes. The closest to the site is about 4 km away
and indicated the presence of shale at approximately 10 m depth. Other boreholes in the area, but furtherafield, indicate rock may be at significantly greater depth. It should be noted the rock depth can vary
significantly over relatively short distances and that the existing data does not present rock levels close to
this site.
3. Acid Sulfate Soils
The Western Australia Planning Bulletin 64 (DOE 2003) indicates that the development site has no known
risk of acid sulfate soils (ASS) occurring within 3 m of natural soil surface. The relevant extract from Bulletin
64 is shown in Annex C, where the Bullsbrook development site is circled in red. The light orange shading
indicates no known risk within 3 m of ground surface. Also, the Guildford Formation is not generally
considered to present an ASS risk.
7/29/2019 PB 2161087A-GEO-LTR-001 RevA-1
4/29
2161087A-GEO-LTR-001 RevA:OJ /OJ : 4/5
ASS risk cannot be definitively ruled out without site-specific tests but the available data indicates the risk to
be low.
4. Groundwater
The site is outside the metropolitan area and therefore slightly beyond the scope of detailed data in the Perth
Groundwater Atlas (www.water.gov.au). However, the online atlas shows some coarse data for the area,
which indicates groundwater to be approximately 5 m below ground (elevation 35 m to 40 m AHD). The drive
past indicated that the Numbab Brook (dry at the time of viewing) is approximately 4 to 6 m deep indicating
groundwater is deeper than 4 m below ground surface as indicated by the Perth Groundwater Atlas. Photo 4
shows Numbab Brook looking southwest from the intersection of Butternab Road and Great Northern
Highway. Although the location of photo 4 is off the development site, it shows the depth of the gully.
It should be noted that the groundwater levels in the atlas represent levels to be expected in May, beforeonset of winter, and the viewing of the brook took place in February after a dry summer. Therefore, higher
groundwater levels might be expected during winter conditions, particularly in the vicinity of the Numbab
Brook.
The silty nature of the soils underlying the site may result in water ponding in low points and generally
difficult trafficking over unprotected soil during wet conditions as shown in Photo 3 above.
Photo 4 View of Numbab Brook from the intersect ion of Butternab Road and Great Northern Highway
5. Contamination
The Department of Environment provide an online resource for checking the contamination status of a site.
Hence, risk of contamination was researched online for the following classifications: Contaminated
remediation required, Contaminated restricted use or Remediated for restricted use. According to the
online query, the development site is not listed as contaminated. However, there are four further
classifications: Report not substantiated, Possibly contaminated investigation required, Not
contaminated unrestricted use and Decontaminated which require a Detailed or Basic Summary of
Records to be submitted to the DEC. The turnaround time for these four classifications is two weeks, which
7/29/2019 PB 2161087A-GEO-LTR-001 RevA-1
5/29
2161087A-GEO-LTR-001 RevA:OJ /OJ : 5/5
is outside the turnaround time for this report. However, the development site currently appears to be used for
warehouse storage to there may be potential for spills of fuels and chemicals. Therefore, it is recommended
that a Detailed or Basic Summary of Records be submitted to the DEC.
6. Limitations
The information presented in this document is limited to the information available to and known of by
Parsons Brinckerhoff at the time of writing. The references used are described in the text.
This document and the information are solely for the use of the authorised recipient and this document may
not be used, copied or reproduced in whole or part for any purpose other than that for which it was supplied
by Parsons Brinckerhoff. Parsons Brinckerhoff makes no representation, undertakes no duty and accepts no
responsibility to any third party who may use or rely upon this document or the information.
Furthermore, the report is further limited by the statements in Annex D.
References
Department of Environment, Government of Western Australia. Western Australian Planning Commission
Bulletin 64, Figure 18, Central Metropolitan Region Scheme acid sulphate soils.
Geological Survey of Western Australia, 1984. Muchea, Sheet 2034 I and Part of 2134 IV. Perth Metropolitan
Region 1:50,000 Environmental Geology Series,
Government of Western Australia, Department of Water, Perth Groundwater Atlas (www.water.wa.gov.au),
referenced 21 February 2013.
Yours sincerely
Paul Hutchinson
Principal Geotechnical Engineer
Parsons Brinckerhoff
7/29/2019 PB 2161087A-GEO-LTR-001 RevA-1
6/29
7/29/2019 PB 2161087A-GEO-LTR-001 RevA-1
7/29
ANNEX A Site plan
7/29/2019 PB 2161087A-GEO-LTR-001 RevA-1
8/29
7/29/2019 PB 2161087A-GEO-LTR-001 RevA-1
9/29
7/29/2019 PB 2161087A-GEO-LTR-001 RevA-1
10/29
7/29/2019 PB 2161087A-GEO-LTR-001 RevA-1
11/29
ANNEX B Geology map extract
7/29/2019 PB 2161087A-GEO-LTR-001 RevA-1
12/29
7/29/2019 PB 2161087A-GEO-LTR-001 RevA-1
13/29
Extract fr om Perth Metropol itan Region 1:50000 Environmental Geology Series Muchea Sheet
7/29/2019 PB 2161087A-GEO-LTR-001 RevA-1
14/29
7/29/2019 PB 2161087A-GEO-LTR-001 RevA-1
15/29
7/29/2019 PB 2161087A-GEO-LTR-001 RevA-1
16/29
7/29/2019 PB 2161087A-GEO-LTR-001 RevA-1
17/29
ANNEX C Bulletin 64 Figure 18 ASS map and extract
7/29/2019 PB 2161087A-GEO-LTR-001 RevA-1
18/29
7/29/2019 PB 2161087A-GEO-LTR-001 RevA-1
19/29
7/29/2019 PB 2161087A-GEO-LTR-001 RevA-1
20/29
7/29/2019 PB 2161087A-GEO-LTR-001 RevA-1
21/29
Extract from North Metro Region Scheme Planning Bulletin 64, Figure 18
7/29/2019 PB 2161087A-GEO-LTR-001 RevA-1
22/29
7/29/2019 PB 2161087A-GEO-LTR-001 RevA-1
23/29
ANNEX D Standard Work of Pract ice
7/29/2019 PB 2161087A-GEO-LTR-001 RevA-1
24/29
7/29/2019 PB 2161087A-GEO-LTR-001 RevA-1
25/29
Legal
Standard Work Practice SP-LGL-2002
Limitations of Geotechnical Site Investigation Rev: A
Parsons Brinckerhoff Australia Pty Limited ABN 80 078 004 798Prepared: Approved: Legal Counsel
Page 1 of 3
Instructions for use
1. This limitations statement is to be used in accordance with the PB Quality Assurance System.
2. The explanatory and limitation statement is drafted on the assumption that expressions P and clientare defined elsewhere in the document.
3. The report for benefit of client section of the explanatory and limitation statement is aimed atprecluding third parties from stating that they relied upon the contents of the report (and thereforeprovide an impediment to the recovery of damages by third parties for inaccurate or incompletestatements made in the report).
4. The statement is set up as a stand alone document, however, the text can be copied and inserted asa separate chapter in reports, etc.
Scope of services
This geotechnical site assessment report (the report) has been prepared in accordance with the scope ofservices set out in the contract, or as otherwise agreed, between the client and PB (scope of services). In
some circumstances the scope of services may have been limited by a range of factors such as time,budget, access and/or site disturbance constraints.
Reliance on data
In preparing the report, PB has relied upon data, surveys, analyses, designs, plans and other informationprovided by the client and other individuals and organisations, most of which are referred to in the report(the data). Except as otherwise stated in the report, PB has not verified the accuracy or completeness ofthe data. To the extent that the statements, opinions, facts, information, conclusions and/orrecommendations in the report (conclusions) are based in whole or part on the data, those conclusionsare contingent upon the accuracy and completeness of the data. PB will not be liable in relation toincorrect conclusions should any data, information or condition be incorrect or have been concealed,withheld, misrepresented or otherwise not fully disclosed to PB.
Geotechnical investigation
Geotechnical engineering is based extensively on judgment and opinion. It is far less exact than otherengineering disciplines. Geotechnical engineering reports are prepared to meet the specific needs ofindividuals. A report prepared for a consulting civil engineer may not be adequate for a constructioncontractor or even some other consulting civil engineer. This report was prepared expressly for the clientand expressly for purposes indicated by the client or his representative. Use by any other persons for anypurpose, or by the client for a different purpose, might result in problems. The client should not use thisreport for other than its intended purpose without seeking additional geotechnical advice.
This geotechnical report is based on project-specific factors
This geotechnical engineering report is based on a subsurface investigation which was designed forproject-specification factors, including the nature of any development, its size and configuration, thelocation of any development on the site and its orientation, and the location of access roads and parkingareas. Unless further geotechnical advice is obtained this geotechnical engineering report cannot beused:
when the nature of any proposed development is changed
when the size, configuration location or orientation of any proposed development is modified.
This geotechnical engineering report cannot be applied to an adjacent site.
7/29/2019 PB 2161087A-GEO-LTR-001 RevA-1
26/29
Legal
Standard Work Practice SP-LGL-2002
Limitations of Geotechnical Site Investigation Rev: A
Parsons Brinckerhoff Australia Pty Limited ABN 80 078 004 798Prepared: Approved: Legal Counsel
Page 2 of 3
Subsurface conditions are time dependent
Subsurface conditions may be modified by changing natural forces or man-made influences. Ageotechnical engineering report is based on conditions which existed at the time of subsurfaceexploration.
Construction operations at or adjacent to the site, and natural events such as floods, or groundwaterfluctuations, may also affect subsurface conditions, and thus the continuing adequacy of a geotechnicalreport. The geotechnical engineer should be kept appraised of any such events, and should be consultedto determine if additional tests are necessary.
Avoid misinterpretat ion
A geotechnical engineer should be retained to work with other appropriate design professionalsexplaining relevant geotechnical findings and in reviewing the adequacy of their plans and specifications
relative to geotechnical issues.
Geotechnical involvement during construction
During construction, excavation is frequently undertaken which exposes the actual subsurfaceconditions. For this reason geotechnical consultants should be retained through the construction stage, toidentify variations if they are exposed and to conduct additional tests which may be required and to dealquickly with geotechnical problems if they arise.
7/29/2019 PB 2161087A-GEO-LTR-001 RevA-1
27/29
Legal
Standard Work Practice SP-LGL-2002
Limitations of Geotechnical Site Investigation Rev: A
Parsons Brinckerhoff Australia Pty Limited ABN 80 078 004 798Prepared: Approved: Legal Counsel
Page 3 of 3
Report for benefit of client
The report has been prepared for the benefit of the client and no other party. PB assumes noresponsibility and will not be liable to any other person or organisation for or in relation to any matter
dealt with or conclusions expressed in the report, or for any loss or damage suffered by any other personor organisation arising from matters dealt with or conclusions expressed in the report (including withoutlimitation matters arising from any negligent act or omission of PB or for any loss or damage suffered byany other party relying upon the matters dealt with or conclusions expressed in the report). Other partiesshould not rely upon the report or the accuracy or completeness of any conclusions and should maketheir own enquiries and obtain independent advice in relation to such matters.
Other limitations
PB will not be liable to update or revise the report to take into account any events or emergentcircumstances or facts occurring or becoming apparent after the date of the report.
Amendment detailsRevis ion Details Date By
A Original 18/07/08 M J enkins
7/29/2019 PB 2161087A-GEO-LTR-001 RevA-1
28/29
Legal
Standard Work Practice SP-LGL-2006
Limitations of Report prepared in Connection with
Potential Sale of Land or other Assets (no testing)Rev: A
Parsons Brinckerhoff Australia Pty Limited ABN 80 078 004 798Prepared: Approved: Legal Counsel
Page 1 of 2
Instructions for use
1. This limitations statement is to be used in accordance with the PB Quality Assurance System.2. The explanatory and limitation statement is drafted on the assumption that expressions PB and
client are defined elsewhere in the document.
3. The report for benefit of client and purchaser from client section of the explanatory and limitationstatement is aimed at precluding third parties from stating that they relied upon the contents of thereport (and therefore provide an impediment to the recovery of damages by third parties forinaccurate or incomplete statements made in the report).
4. The statement is set up as a stand alone document, however, the text can be copied and inserted asa separate chapter in reports, etc.
Scope of services
This report (the report) has been prepared in accordance with the scope of services set out in thecontract, or as otherwise agreed, between the client and PB (scope of services). In some circumstancesthe scope of services may have been limited by a range of factors such as time, budget, access and/orsite disturbance constraints.
Reliance on data
In preparing the report, PB has relied upon data, surveys, analyses, designs, plans and other informationprovided by the client and other individuals and organisations, most of which are referred to in the report(the data). Except as otherwise stated in the report, PB has not verified the accuracy or completeness ofthe data. To the extent that the statements, opinions, facts, information, conclusions and/orrecommendations in the report (conclusions) are based in whole or part on the data, those conclusionsare contingent upon the accuracy and completeness of the data. PB will not be liable in relation to
incorrect conclusions should any data, information or condition be incorrect or have been concealed,withheld, misrepresented or otherwise not fully disclosed to PB.
Environmental conclusions
In accordance with the scope of services, PB has relied upon the data and has not conducted anyenvironmental field monitoring or testing in the preparation of the report. The conclusions are basedupon the data and visual observations and are therefore merely indicative of the environmental conditionof the site, including the presence or otherwise of contaminants or emissions.
Within the limitations imposed by the scope of services, the assessment of the site and preparation ofthis report have been undertaken and performed in a professional manner, in accordance with generallyaccepted practices and using a degree of skill and care ordinarily exercised by reputable environmental
consultants under similar circumstances. No other warranty, expressed or implied, is made.
Structural conclusions
This report represents views formed by an experienced structural engineer from a visual inspection ofthe building structure and from a review of data. In accordance with the scope of services, PB did notconduct any structural testing or design checks on the building. Because of the limited nature of thework, PB is not able to certify the structural adequacy of the building nor provide an estimate of thedesign life of the structure. Our conclusions presented in this report may differ if a more thoroughinspection and detailed design check were undertaken.
7/29/2019 PB 2161087A-GEO-LTR-001 RevA-1
29/29
Legal
Standard Work Practice SP-LGL-2006
Limitations of Report prepared in Connection with
Potential Sale of Land or other Assets (no testing)Rev: A
Report for benefit of client and purchaser from client
The report has been prepared exclusively for the benefit of the Client and a purchaser of the site fromthe client. PB will not be liable to any other person or organisation and assumes no responsibility to anyother person or organisation for or in relation to any matter dealt with or conclusions expressed in thereport, or for any loss or damage suffered by any other person or organisation arising from matters dealtwith or conclusions expressed in the report (including without limitation matters arising from anynegligent act or omission of PB or for any loss or damage suffered by any other party relying upon thematters dealt with or conclusions expressed in the report). No person or organisation other than the clientand a purchaser of the site from the client is entitled to rely upon the report or the accuracy orcompleteness of any conclusions and such other parties should make their own enquiries and obtainindependent advice in relation to such matters.
Other limitations
PB will not be liable to update or revise the report to take into account any events or emergentcircumstances or facts occurring or becoming apparent after the date of the report.
The scope of services did not include any assessment of the title to or ownership of the properties,buildings and structures referred to in the report nor the application or interpretation of laws in thejurisdiction in which those properties, buildings and structures are located.
Amendment details
Revis ion Details Date By
A Original 18/07/08 M J enkins