GENERAL NOTES:
INTERNAL
FLOOR COVERINGS:
· All existing vinyl floor finishes to be
removed and replaced with new full body
porcelain tiles.
WALLS:
· All painted walls to be repainted to
specifications.
· Allow for removal of wall tiles in bathrooms
& replace with new.
CEILINGS:
· Patch and repaint all damaged plasterboard
ceilings.
· Repaint all fibre cement ceilings.
SKIRTINGS:
· All timber skirtings to be removed and
replaced with new 100mm high tiled skirting.
CORNICE:
· All damaged 44mmx22mm timber ceiling
cornice to be replaced with new timber
44 x 22mm timber cornices.
WINDOW CILLS:
· All existing internal tiled window cills to be
cleaned.
DOORS & FRAMES:
· All timber external doors to be replaced with
new aluminium doors.
· All dents to door frames to be repaired and
frames repainted.
· All existing varnished timber doors to be
unhung, sanded down, varnished & rehung.
W
H
B
CELL BLOCK
SITE PLAN
scale 1:1500
N
ADMINISTRATION
BUILDING
WAITIN
G
FHR
DRESSING ROOMEX: Vinyl tiles
NEW: Porcelain tiles24.9 sqm SAPS STORE
EX: Vinyl tilesNEW: Porcelain tiles
28.7 sqm
I.D WAITING RM.EX: Vinyl tiles
NEW: Porcelain tiles5.7 sqm
FEMALE WCEX: Ceramic tiles
NEW: Porcelain Tiles6.2 sqm
MALE WCEX: Ceramic tiles
NEW: Porcelain Tiles6.2 sqm
VICTIM'S SUPPORTEX: Vinyl tiles
NEW: Porcelain Tiles10.35 sqm
VIEWING ROOMEX: Vinyl tiles
NEW: Porcelain Tiles14.35 sqm
LINE UP ROOMEX: Vinyl tiles
NEW: Porcelain Tiles20.9 sqm
ID/PHOTO RMEX: Vinyl tiles
NEW: Porcelain Tiles5.6 sqm
CSC PUBLIC AREAEX: Ceramic tiles
35.9 sqm
CSC STAFF AREAEX: Ceramic tiles
18.8 sqm
CUBICLES
RADIO RMEX: Vinyl tiles
NEW: Porcelain Tiles10.5 sqm
ARMAMENTSSTRONG RM
EX: Vinyl tilesNEW: Porcelain Tiles
6.2 sqm
STATION COMMISSIONEREX: Vinyl tiles
NEW: Porcelain Tiles15.4 sqm
TEAKITCHENEX: Vinyl tiles
NEW: Porcelain Tiles6.2 sqm
COMMITTEE ROOMEX: Vinyl tiles
NEW: Porcelain Tiles36.2 sqm
STATIONERY STOREEX: Vinyl tiles
NEW: Porcelain Tiles20.4 sqm
DFO/DPO ROOMEX: Vinyl tiles
NEW: Porcelain Tiles10.0 sqm
PROACTIVE ROOMEX: Vinyl tiles
NEW: Porcelain Tiles10.0 sqm
CRIME PREVENTIONROOMEX: Vinyl tiles
NEW: Porcelain Tiles10.0 sqm
ADMIN OFFICEEX: Vinyl tiles
NEW: Porcelain Tiles10.0 sqm
DOCUMENT STOREEX: Vinyl tiles
NEW: Porcelain Tiles10.0 sqm
CLE
AN
ER'S
STO
RE
EX: V
inyl
tile
sN
EW: P
orc
ela
in T
iles
5.7
sqm
FIN
GER
PR
INT
RM
EX: C
era
mic
tile
s7.
1 sq
m
COMMUNICATIONSOFFICEREX: Vinyl tiles
NEW: Porcelain Tiles10.0 sqm
PASSAGE 03EX: Ceramic tiles
PASS
AGE
02
EX: C
eram
ic ti
les
PA
SSA
GE
01EX
: Ce
ram
ic t
iles
SUPPLY CHAINOFFICE
EX: Vinyl tilesNEW: Porcelain Tiles
10.0 sqm
YARDCement screed
21.4 sqm
COVERED ENTRANCEEX: Cement screed
30.5 sqm
SHWR
SHWR
WC
WC
UR
UR
Showercubicle
Showercubicle
D01
D01
D01
D01
D01
D01
D01
D01
D01
D01
D01
D01
D01
D01
D01D01D01D01D01
D01 D01 D01 D01 D01
D01
D01
D01
D04
D07
D02
D02
D07
D01
D06
D01
BB
C
C
COUNTER
COUNTER
COUNTER
COUNTER
WO
RK
T
OP
WO
RK
T
OP
CO
UN
TE
R
FHR
COUNTER
GROUND FLOOR PLAN
scale 1:100
N
WHB
WHB
WHB
WHB
D04
Remove all ex. sanitary fittings and
fit new.
Replace ex. timber skirting with
new tiled skirting 100mm high.
Remove all ex. ceramic tiles and
lay new porcelain tiles.
Dirty walls in dressing room to be
cleaned with suitable cleaning
agent.
Remove damaged ceiling panels
and replace with new.
Ex. doors and shopfront to be
removed and new aluminium
shopfront and automatic sliding door
installed.
Replace ex. timber doors with new
glazed aluminium doors.
Replace ex. timber doors with new
glazed aluminium doors.
Replace ex. timber doors with new
glazed aluminium doors.
Replace ex. timber door with new
semisolid core timber door.
Sliding timber doors
to be serviced and
painted.
Remove existing timber counters
and fit new granite countertops.
Remove existing built in
cupboards and fit new with
granite countertops
Remove existing formica
countertop and replace with
new granite top.
EXISTING LOCKERS
NEW BENCHES
NE
W B
EN
CH
ES
D04
WHB
D08
D08
D03
D05
D01
New built in benches to detail
Remove existing door and
replace with new.
ex. sh
elve
se
x. sh
elve
s
ex. sh
elve
se
x. sh
elve
s
ex. shelves
2840
3695
2000
3095
3695
3695
3695
3695
5335
5534
1808
1588
31353060
3100 3163
3108
3100
3225
3667
9002
9810 41801713
32630
3683
24101270
3083
1015
4810
2885
7265
1380
3215
3215
3400
1000
890
1250
3215
3400
3220
3217
1200
2390
2338
1200
3775
2390
4470
3215
1030
1200
308021981760
2285
9385
6780
2385
1200
2980
9
8
0
7
6
7
5
2
7
7
0
1
3
1
0
1
3
2
0
4
8
2
6
1100
8980
3225
3225
3225
3225
3225
3225
2385
8915
27905
7705
9606
2505
24391
EX. C
on
cre
te a
pro
n
EX. C
on
cre
te a
pro
n
EX. Concrete apron EX. Concrete apron
EX. Concrete apron
EX. C
on
cre
te a
pro
n
1990
1990
w03 w03 w03 w03 w03 w03 w03 w03 w03 w03 w03 w03w01w02
w01w01w01w01w01w01w01 w03 w03 w05
w05
w02
w02
Remove ex. door and
replace with new timber
solid core door
D09
9
8
0
w06
w07
w06
w07
w02
w02
w02
w02
w03
w03
w03
w03
w03
w02
w04
w04
w04
w04
w02
w02
w01
w03
1210
1270
1200
EX. RAMP UP
4
8
2
5
ex. timber truss
ex. steel screen
1000
DRESSING ROOMfacebrick
SAPS STOREface brick
PASS-AGE
YARDfacebrick
ex. conc.
surface bed
SECTION B-B
scale 1:100
ex. conc.
surface bed
ex. conc.
surface bed
FFL 0.000
26
00
U/S CEILING 2.600
600
Scrap off loose dirt and
fungus on ex. roof tiles with
trowel. Apply fungicide to
surface of roof tiles.
All ex.fibre cement
fascia's to be repainted
All steel screen frames to
be sanded & repainted
All steel screen
frames to be sanded
& repainted. Refer to
paint specification
Rake out grass and weeds in
joints of concrete apron.
Clean out sand in joints.
Spray joints with weed killer.
FFL -0.700
new porcelain tile finish
new porcelain tile finish
Existing painted
plasterboard ceiling
to be repainted
Truss sprockets to be
painted with carbolineum
ex. tile finish
new bench
ex. shelves
ex. shelves
ex. shelves
ex. shelves
NGL
NGL
Concrete roof tiles Concrete roof tilesConcrete roof tiles
NORTH ELEVATION
scale 1:100 FacebrickFacebrick
Concrete roof tiles Concrete roof tilesConcrete roof tiles
WEST ELEVATION
scale 1:100
Facebrick
Facebrick
Facebrick
Concrete roof tiles Concrete roof tilesConcrete roof tiles
SOUTH ELEVATION
scale 1:100
Facebrick Facebrick Facebrick
Concrete roof tiles
ex. timber truss
1000
COMMITTEE ROOMfacebrick
PROACTIVE ROOMfacebrick
PASS-AGE
SECTION C-C
scale 1:100
ex. conc.surface bed
ex. conc.surface bed
FFL 0.000
26
00
U/S CEILING 2.600
600
1000
Rake out grass and weeds in
joints of concrete apron.
Clean out sand in joints.
Spray joints with weed killer.
Scrap off loose dirt and
fungus on ex. roof tiles with
trowel. Apply fungicide to
surface of roof tiles.
All ex.fibre cement
fascia's to be repainted
Truss sprockets to be
painted with carbolineum
Existing painted
plasterboard ceiling
to be repainted
Face brick walls to be jet
cleaned.Brick dressing to be
applied
NGL NGL
Ex. painted steel window
and frame to be sanded and
repainted.
ex. plasterboard ceiling ex. plasterboard ceiling
BB
C
C
steel mesh screen
steel mesh screen
Scrap off loose dirt and fungus
on roof tiles with trowel. Apply
fungicide to surface of roof
tiles.
Scrap off loose dirt and fungus
on roof tiles with trowel. Apply
fungicide to surface of roof
tiles.
ROOF PLAN
scale 1:150
N
Sand and paint underside
of steel frame of steel
overhead screens
to detail paint specifications.
Ex. Concrete roof tiles
Ex. Concrete roof tiles
Ex. Concrete roof tiles
Ex. Concrete roof tiles
Ex. Concrete roof tiles
Ex. Concrete roof tiles
Ex. Concrete roof tiles
E
x
.
C
o
n
c
r
e
t
e
r
o
o
f
t
i
l
e
s
Ex. Concrete roof tiles
Ex. Concrete roof tiles
Ex. Concrete roof tiles
Ex. Concrete roof tiles
WINDOWS & FRAMES:
· All existing painted steel windows and
frames to be sanded down and re-painted.
· All existing painted steel screen frames to
be sanded down and re-painted.
· Replace all blinds with new vertical fabric
blinds.
JOINERY/BUILT IN CUPBOARDS
· All existing cupboards to be removed and
replaced with new to specifications. See
detail joinery drawings
· All existing kitchen cupboards to be
removed and replaced with new to
specifications.
IRONMONGERY
· All existing door handles & locks to be
replaced with new. See ironmongery
schedule
SANITARYWARE
· All existing sanitary fittings to be removed
and replaced with new. See sanitary
schedule
EXTERNAL
GROUND COVERINGS:
· All joints in concrete apron and external
concrete floor coverings to be cleaned,
sprayed with weed killer and joints sealed
with cement sand mix.
EXTERNAL WALLS:
· All face brick external walls to be jet cleaned
to remove loose dirt,fungus & moss. Stained
areas to be treated in isolation with cleaning
agent. Brick dressing to be applied
EAVES:
· Exposed timber eaves to be painted with 2
coats of carbolineum wood preservative.
FASCIAS:
· All painted fibre cement fascia boards to be
repainted.
ROOF COVERINGS:
· Concrete roof tiles to be cleaned off loose
dirt, moss and fungus. Fungicide to be
applied to surface of tiles.
1:100/200/1:1500
consultant
NOV 2014
drawing title
ref. no.designed
scale
date
type number
checked
drawing number:
PLANS, SECTIONS, ELEVATIONS
NO. DATE AMENDMENT
NO. DATE NOTES
Copyright vests in SAPS
discipline
service
drawing title
ARCHITECTURE
SOUTH AFRICAN POLICE SERVICES
REPAIRS AND MAINTENANCE
TO MAKUYA POLICE STATION,
HA MAKUYA, VHEMBE DISTRICT
LIMPOPO.
SOUTH AFRICAN POLICE SERVICES
CRESSWELL ROAD ,SILVERTONPRETORIA, 0184
PL-AD- 01
- ADMINISTRATION