REF_CE_18012018 Page 1/12
PARTICULATE MATTER (PM) EMISSION CONTROL
Examples of Hurricane and ReCyclone® Systems in Existing Installations
Hurricane HR cyclone system ( 8 x Ø900mm ) to reduce particulate matter emissions from 20ton/h coal boiler Gas flow: 38 880m3/h at 220°C | Type of Particles: Coal fly ashes | Emissions: <110mg/Nm3 at 10% O2
Client: Associated Energy Services | Location: Durban, South Africa | Year: 2017
HT3
17
5
Hurricane HR cyclone system ( 8 x Ø700mm ) to reduce particulate matter emissions from a rotary dryer Gas flow: 26.175 m3/h at 64ºC| Type of Particles: Coffee grounds | Emissions: <150 mg/Nm3 at 13% O2 Client: Industrias Aliadas S.A.S.| Location: Cartagena, Colombia | Year: 2017
RF3
13
2
Hurricane HC cyclone system ( 2 x Ø2500mm ) to reduce particulate emissions from a sawdust dryer. Gas flow: 65 000m3/h at 60°C | Type of Particles: fly ash | Emissions: <60mg/Nm3
dry
Client: Vertdeshy | Location: Meximieux, France| Year: 2017
HT2
78
2
Hurricane RE cyclone system ( 4 x Ø1000mm ) optimized to reduce pm emissions after a boiler burning coal. Gas flow: 11,500m3/h at 140°C | Type of Particles: fly ash | Emissions: <75mg/Nm3
dry at 6% O2
Client: JAKSA | Location: Warsaw, Poland | Year: 2017
PA
302
1
Hurricane MK cyclone system ( 8 x Ø900mm ) to reduce particulate matter from a biomass boiler (coal / wood)
Gas flow: 11 520m3/h at 220°C | Type of Particles: coal/wood shavings Emissions: < 95mg/Nm3
Client: Southpine, Windsor | Location: Nelson, New Zeland | Year: 2017
RF3
079
Hurricane RX cyclone system ( 32 x Ø1050mm ) to reduce emissions from a biomass boiler burning wood Gas flow: 188 861m3/h at 153°C | Type of Particles: fly ash | Emissions: <100mg/Nm3
dry at 8% O2
Client: SSB Energia Renovável. | Location: Limeira, SP, Brazil | Year: 2017
DB
326
9
Hurricane HR cyclone system ( 2 x Ø1800mm ) to reduce particulate matter from a coal boiler.
Gas flow: 39 000m3/h at 120°C | Type of Particles: wood shavings | Emissions: 42mg/Nm3 Client: Sugimat | Location: Valencia, Spain | Year: 2017
HT3
285
Hurricane HR cyclone system ( 4 x Ø750mm ) to reduce particulate matter emissions from 8 ton/h coal boiler Gas flow: 12 096m3/h at 220°C | Type of Particles: Coal fly ashes | Emissions: <110mg/Nm3 at 10% O2
Client: Associated Energy Services | Location: Durban, South Africa | Year: 2017
HT3
15
5
Hurricane HR_MK cyclone system ( 16 x Ø900mm ) to reduce PM emissions from a Coal Bubbling Fluidized Bed (BFB) 10 ton/h boiler. Gas flow: 22 500m3/h at 230°C | Type of Particles: Coal fly ashes | Emissions: <100mg/Nm3 Client: Basuki | Location: Indonesia | Year: 2017
PA
3140
Hurricane RE cyclone system ( 4 x Ø725mm ) to reduce particulate matter from a 3ton/h of steam biomass boiler,burning wood chips. Gas flow: 6 500m3/h at 108°C | Type of Particles: Wood fly ashes| Emissions: <75mg/Nm3 Client: Avipronto | Location: Azambuja, Portugal | Year: 2017
HT2
690
REF_CE_18012018 Page 2/12
PARTICULATE MATTER (PM) EMISSION CONTROL
Examples of Hurricane and ReCyclone® Systems in Existing Installations
Hurricane HR_MKi cyclone system, optimized to reduce the particle emission from an 12ton/h ICAVI boiler burning wood chips. Gas flow: 23 660m3/h at 200°C | Type of Particles: Wood chips fly ashes | Emissions: <70mg/Nm3 Client: Icavi | Location: Estação, Rio Grande Do Sul, Brasil | Year: Ongoing
JB3
00
2
Hurricane HR_MKi cyclone system, optimized to reduce the particle emission from an 15ton/h BREMER boiler burning wood chips. Gas flow: 40 203m3/h at 170°C | Type of Particles: Wood chips fly ashes | Emissions: <65mg/Nm3 Client: Bremer | Location: Estação, Rio Grande Do Sul, Brasil | Year: Ongoing
JB2
92
8
Hurricane HR_MK cyclone system optimized to reduce the amount of PM (toasted coffee) from a grinder tower. Gas flow: 456m3/h at 32°C | Type of Particles: Toasted coffee | Emissions: <150mg/Nm3 Client: Colcafé | Location: Medellín, Colombia | Year: 2017
JB2
94
3
ReCyclone® HR optimised to reduce particulate matter from a biomass boiler burning wood shavings after a multicyclone. Gas flow: 10 300m3/h at 236°C | Type of Particles: Wood fly ash | Emissions: <100mg/Rm3@ 7%O2 Client: Resolute | Location: Quebec, Canada | Year: 2017
MW
279
6
Hurricane HR_MKi cyclone system optimised to reduce the quantity of particulate material leaving from a coal boiler Gas flow: 25 485m3/h at 104°C | Type of Particles: Coal fly ashes | Emissions: <50mg/Nm3 Client: Agrosan | Location: Sabaneta, Antioquia, Colombia | Year: 2017
JB28
02
Hurricane HR_AT cyclone system to reduce PM from a Heizomat biomass boiler (300kW) Gas flow: 1 165m3/h at 180°C | Type of Particles: Wood fly ashes Biomass | Emissions: <50mg/Nm3 Client: Saelen Energie | Location: St Fulgent, France | Year: 2017
HT2
741
Hurricane HR_AT cyclone system to reduce PM from 2 Heizomat biomass boilers (500kW + 850kW) Gas flow: 1 800m3/h at 180°C | Type of Particles: Wood fly ashes | Emissions: <50mg/Nm3 Gas flow: 2 455m3/h at 180°C | Type of Particles: Biomass | Emissions: <50mg/Nm3 Client: Saelen Energie | Location: Thouars, France | Year: 2017
HT2
781
Hurricane HR_MK cyclone system to reduce PM from 2 Heizomat biomass boilers (300kW + 500kW) Gas flow: 1 165m3/h at 180°C | Type of Particles: Wood fly ashes | Emissions: <50mg/Nm3 Gas flow: 1 800m3/h at 180°C | Type of Particles: Biomass | Emissions: <50mg/Nm3 Client: Saelen Energie | Location: Verneuil-sur-Avre , France | Year: 2017
HT2
770
Hurricane HR cyclone system optimised to reduce the amount of particulate material (coffee grounds) from a rotating dryer. Gas flow: 32 796m3/h at 79°C | Type of Particles: Coffee grounds | Emissions: <50mg/Nm3 Client: Colcafé | Location: Medellín, Colombia | Year: 2016
JB24
43
Hurricane HR hurricane cyclone system to separate particulate matter from pyrolysis gases at high temperature. Gas flow: 392m3/h at 450°C | Type of Particles: Paper sludge PM | Separation efficiency: [97.5 – 99.0%] Client: Alucha | Location: Arnhem, Netherlands | Year: 2016
HT2
531
REF_CE_18012018 Page 3/12
PARTICULATE MATTER (PM) EMISSION CONTROL
Examples of Hurricane and ReCyclone® Systems in Existing Installations
Hurricane HR_MK type cyclone system for reducing particulate matter from a 15ton/h Coal Bubbling Fluidized Bed (BFB) boiler flue gases. Gas flow: 34 000m3/h at 230°C | Type of Particles: Coal fly ashes | Emissions: <100mg/Nm3 Client: Basuki | Location: Indonesia | Year: 2016
PA
28
41
Hurricane HR_MK cyclone system to recover particles of borosilicate glass from air stream, on the grind milling process line 2. Gas flow: 1 250m3/h at 80°C | Type of Particles: Borosilicate glass | Separation efficiency: [99.6 – 99.7] Client: Le Creuset | Location: Fresnoy le Grand, France | Year: 2016
HT1
98
7
Hurricane HR cyclone system to reduce particles from a 700kW biomass boiler (wood panels), after a multicyclone. Gas flow: 1 557m3/h at 132°C | Type of Particles: Wood fly ashes | Emissions: <50mg/Nm3 Client: Coulidoor | Location: Verson, France | Year: 2016
HT2
77
9
ReCyclone® EH cyclone system to reduce particles from a 1.7MW biomass boiler (wood panels), after a multicyclone. Gas flow: 4 164m3/h at 135°C | Type of Particles: Wood fly ashes | Emissions: <50mg/Nm3 Client: Loire Compost Environnement | Location: Cizay La Madelaine, France | Year: 2016
HT2
751
Hurricane HR cyclone system optimized to reduce particulate matter from a 600HP biomass bark boiler after a multicyclone. Gas flow: 27 959m3/h at 254°C | Type of Particles: Bark fly ash | Emissions: <150mg/Rm3@ 7%O2 Client: KMW Energy | Location: Quebec, Canada | Year: 2016
MW
263
6
Hurricane HR_MK type cyclone system for reducing particulate matter from a 6ton/h Coal Bubbling Fluidized Bed (BFB) boiler flue gases. Gas flow: 14 000m3/h at 230°C | Type of Particles: Coal fly ashes | Emissions: <70mg/Nm3 Client: Basuki | Location: Jawa Timur, Indonesia | Year: 2016
PA
2816
Hurricane HR_MKi for particulate matter abatement downstream of an existing multicyclone, installed on 3.5 MWth LHV biomass boiler running on clean wood chips. Gas flow: 8 250m3/h at 140°C | Type of Particles: Wood fly ashes | Emissions: <45mg/Nm3 Client: Ignis | Location: Wick, United Kingdom | Year: 2016
HT2
755
Hurricane HR_AT_MS cyclone systems (2x6 cyclones of ø2800mm) to reduce particulate matter emissions, remove silica and sparks particulates before the 2 dryers and allowing the units to safely work at full capacity. Gas flow: 2x580 000am3/h at 500°C | Type of Particles: Biomass fly ash (silica & sparks) | Emissions: <400mg/Nm3
dry Client: Tafisa| Location: Quebec, Canada | Year: 2017
MW
258
8
Hurricane HR cyclone system used to capture particles from a biomass boiler. Gas flow: 12 543m3/h at 220°C | Type of Particles: Biomass fly ashes | Emissions: <40mg/Nm3 Client: Norbidel, Adafios | Location: Felgueiras, Portugal | Year: 2016
RF2
720
Hurricane HR cyclone system used to capture particles from a biomass boiler. Gas flow: 12 543m3/h at 220°C | Type of Particles: Biomass fly ashes | Emissions: <40mg/Nm3 Client: Norbidel, Frulact | Location: Maia, Portugal | Year: 2016
RF2
716
REF_CE_18012018 Page 4/12
PARTICULATE MATTER (PM) EMISSION CONTROL
Examples of Hurricane and ReCyclone® Systems in Existing Installations
Hurricane MK cyclone system to reduce particulate matter from a biomass boiler burning cork powder. Gas flow: 23 000m3/h at 250°C | Type of Particles: Cork fly ashes | Emissions: <100mg/Nm3 Client: Flucal, Amorim Irmãos | Location: Valongo, Portugal | Year: 2016
H26
56
Hurricane HR cyclone system, to separate iron oxide particulates from compressed air Gas flow: 104 342Nm3/h AT 6.9 Bar(A), 40°C. | Type of Particles: Iron Oxide | Efficiency: >89,8% Client: Air Liquide | Location: Dabrowa Górnicza, Poland | Year: 2016
H21
23
Hurricane HR_MK for to recover particles of borosilicate glass from air stream, on the grind milling process line 1 Gas flow: 2 350m3/h at 90°C | Type of Particles: Borosilicate glass powder| Efficiency: 99.7-99.8 % Client: Le Creuset | Location: Freynoy-Le-Grand, France | Year: 2016
H19
69
Hurricane HR Cyclone system to capture biomass fly ash and sawdust particles from rotary dryer in a wood pellet plant, placed after pre-separator.
Gas flow: 8 074m3/h at 110°C | Particles: Sawdust| Emissions: <150mg/Nm3
Client: Vimasol | Location: Celourico da Beira, Portugal | Year: 2016
H26
46
Hurricane HR_MK type cyclone system for reducing particulate matter from a 20 ton/h Coal Bubbling Fluidized Bed (BFB) boiler flue gases. Gas flow: 45 039m3/h at 230°C | Type of Particles: Coal fly ashes | Emissions: <100mg/Nm3 Client: Basuki, Tirtha Freshindo Jaya | Location: West Java, Indonesia | Year: 2016
P24
53
Hurricane HR_MK type cyclone system for reducing particulate matter from a 15ton/h Coal Bubbling Fluidized Bed (BFB) boiler flue gases. Gas flow: 34 000m3/h at 230°C| Type of Particles: Coal fly ashes | Emissions: <100mg/Nm3 Client: Basuki, Tirtha Freshindo Jaya | Location: West Java, Indonesia | Year: 2016
P25
58
Hurricane HR cyclone system to separate a mixture of steam and solid biomass. Gas flow: 1 554m3/h at 124°C | Type of Particles: Biomass | Expected efficiency (%) 99.5 - 99.6 Client: Axens / Tereos | Location: France | Year: 2016
RF2
508
Hurricane HR_MK to reduce PM emissions from a Rice Husk Bubbling Fluidized Bed (BFB) 4 ton/h boiler Gas flow: 9300m3/h at 230°C | Type of Particles: Rice Husk fly ashes | Emissions: <100mg/Nm3 Client: Basuki | Location: Indonesia | Year: 2016
PA
219
5
Recyclone® MH to reduce particulate matter from a biomass boiler burning a mixture of palm kernel shell and mesocarp fiber. Gas flow: 122.328m3/h at 270°C | Type of Particles: Biomass fly ashes | Emissions: <150mg/Nm3 Client: Kulim, Pasir Panjang | Location: Kota Tinggi, Malaysia | Year: 2016
P21
93
Several Hurricane HR cyclone systems in two sizes HR_TMø275mm and HR_TMø400mm to capture the pharmaceutical waste particles from the combined flow of a deduster and tablet press for product waste compliance. Gas flow: 416m3/h & 850 m3/h at 25°C | Type of Particles: Waste particles | Efficiency: >98% Client: Actavis | Location: New Jersey, USA | Year: 2016
MW
221
5
REF_CE_18012018 Page 5/12
PARTICULATE MATTER (PM) EMISSION CONTROL
Examples of Hurricane and ReCyclone® Systems in Existing Installations
ReCyclone® MH to reduce PM emissions from a coal Bubbling Fluidized Bed (BFB) 4 ton/h boiler Gas flow: 9300m3/h at 230°C | Type of Particles: Coal fly ashes | Emissions: <100mg/Nm3 Client: Basuki | Location: Indonesia | Year: 2016
PA
21
68
Recyclone® MH to reduce particulate matter from a biomass boiler burning a mixture of mesocarp fibre and palm kernel shell Gas flow: 120 000m3/h at 260°C | Type of Particles: Biomass fly ashes | Emissions: <150mg/Nm3 Client: MPOB, Sindora Pall Oil Mill | Location: Kluang, Malaysia | Year: ongoing
P1
99
3
ReCyclone® MH optimized to reduce particles emission from a biomass boiler burning wood chips. Gas flow: 101 206m3/h at 160°C | Type of Particles: Biomass fly ashes | Emissions: <150mg/Nm3
dry Client: Combio Energias Renovaveis | Location: Minas Gerais, Brasil | Year: ongoing installation, prevision in January 2017
JB2
44
1
ReCylone® MH to reduce particulate matter from a biomass boiler burning a mixture of mesocarp fibre and palm kernel shell Gas flow: 183 600m3/h at 320°C | Type of Particles: Biomass fly ashes | Emissions: <100mg/Nm3
dry Client: LKPP Corporation Sdn. Bhd | Location: Pahang, Malaysia | Year: ongoing
P23
04
Hurricane MK for reducing particulate matter from Coal Bubbling Fluidized Bed (BFB) 4 ton/h boiler boiler flue gas. Gas flow: 9 300m3/h at 230°C | Type of Particles: Coal fly ashes | Emissions: <100mg/Nm3
dry Client: Basuki | Location: Jawa Barat, Indonesia | Year: 2016
P26
00
Hurricane HR cyclone system used to capture particles from a biomass boiler. Gas flow: 12 543m3/h at 220°C | Type of Particles: Biomass fly ashes | Emissions: <40mg/Nm3
dry Client: Norbidel | Location: V.N.Famalicão, Portugal | Year: 2016
PA
2626
Hurricane HR cyclone system used to capture particles from a biomass boiler. Gas flow: 12 543m3/h at 220°C | Type of Particles: Biomass fly ashes | Emissions: <40mg/Nm3
dry Client: Norbidel | Location: Braga, Portugal | Year: 2016
PA
26
25
Hurricane MK cyclone system optimized to reduce particulate matter from a biomass boiler burning wood. Gas flow: 12 900m3/h at 209°C | Type of Particles: Biomass fly ashes | Emissions: <50mg/Nm3
dry Client: L. Solé S.A. | Location: Bavaro, Dominican Republic | Year: 2016
JB2
492
Hurricane MK cyclone system optimized to reduce particulate matter from a biomass boiler burning wood pellets. Gas flow: 28 558m3/h at 180°C | Type of Particles: Biomass fly ashes | Emissions: <150mg/Nm3
dry Client: L. Solé S.A. | Location: Costa Rica | Year: 2016
P25
64
Hurricane MK cyclone system for reducing particulate matter from a pyrolysis process. Gas flow: 184m3/h at 450°C | Type of Particles: Lithium Iron Phosphate | Emissions Guarantee: <325mg/Nm3
dry Client: Confidential | Location: Quebec, Canada| Year: 2016
MW
194
8
REF_CE_18012018 Page 6/12
PARTICULATE MATTER (PM) EMISSION CONTROL
Examples of Hurricane and ReCyclone® Systems in Existing Installations
Recyclone® MH_MK optimized to reduce the emission of particles of a biomass boiler burning eucalyptus wood. Gas flow: 13 176m3/h at 178°C | Type of Particles: Biomass fly ashes | Emissions: <70mg/Nm3 Client: Florestal, S.A.| Location: Rio Grande do Sul, Brasil| Year: 2016
JB2
12
8
Hurricane MK cyclone system optimized to reduce particulate matter from a biomass boiler. Gas flow: 8 760m3/h at 328°C | Type of Particles: Biomass fly ashes | Emissions: <50mg/Nm3 Client: Britton Timbers | Location: Tasmania, Australia | Year: 2016
RF2
43
7
Hurricane HR cyclone system for cleaning particulate matter from the gas entrainment in the pipes working at a pressure of 16BAR.
Gas flow: 16016 Nm3dry/h (16 Bar) at 11°C | Type of Particles: Iron oxide dust | Efficiency: > 94%
Client: EDP Gás | Location: Porto, Portugal | Year: 2015
RF2
36
9
Hurricane MK for reducing particulate matter from Coal Bubbling Fluidized Bed (BFB) 4 ton/h boiler boiler flue gas.
Gas flow: 9300m3/h at 230°C. | Type of Particles: Coal fly ashes | Emissions: <68mg/Nm3 Client: Basuki | Location: Indonesia| Year: 2015
P22
45
Hurricane HR cyclone system for particulate matter abatement on 420hpb biomass boiler downstream existing multicyclone
Gas flow: 14 400m3/h at 171°C | Type of Particles: Wood fly ashes | Emissions: <150mg/Nm3
Client: Cargill | Location: San Pedro Sula, Honduras | Year: 2015
H21
36
Hurricane HC series for dust collection on two lines of wet wood chips grinding (hammermill).
Gas flow: 8 000m3/h at 20°C | Type of Particles: Wood dust | Expected Emissions: 15mg/Nm3
Client: Verdo| Location: Andover, UK | Year: 2015
H16
98
Hurricane MK type cyclone system for reducing particulate matter from 30ton/h coal BFB boiler flue gas
Gas flow: 68 000m3/h at 230°C. | Type of Particles: Coal fly ashes | Emissions: <100mg/Nm3 Client: Basuki | Location: Indonesia, Jakarta | Year: 2015
P2
239
Hurricane HR cyclone system with hurricane SD pre-separation to reduce particulate matter from a biomass boiler.
Gas flow: 298 921m3/h at 170°C | Type of Particles: Sugar cane bagasse fly ashes | Emissions: <50mg/Nm3 Client: Azunosa| Location: El Progreso, Yoro, Honduras| Year: 2015
H21
19
Hurricane HR Cyclone systems and dust evacuation system to reduce sinter dust from extraction air of cooling section of sinter strand
Gas flow: 651 864m3/h at 350°C | Type of Particles: Sinter Dust | Emissions: <100mg/Nm3 Client: Arcelor Mittal | Location: Gent, Belgium | Year: 2015
H19
53
Hurricane HR Cyclones system to capture fine fly ash particulate enabling the use of wood waste fired thermal oil heater for Sonae Indústria (one of the largest wood-based panel producers in the world ) Gas flow: 247 088m3/h at 330°C | Type of Particles: Wood waste residues | Emissions: <77mg/Nm3
dry
Efficiency: 91,2% Client: EDP Comercial / Sonae Indústria| Location: Viseu, Portugal | Year: 2015
P2
25
4
REF_CE_18012018 Page 7/12
PARTICULATE MATTER (PM) EMISSION CONTROL
Examples of Hurricane and ReCyclone® Systems in Existing Installations
Hurricane MK for particulate reduction emissions in the biomass boiler (chicken beds in rice husk). Gas flow: 56 012m3/h at 150°C| Type of Particles: Chicken beds fly ashes| Expected Emissions: <150mg/Nm3 Client: Campoaves | Location: Viseu, Portugal | Year: 2015
H77
6
Recyclone® MH system to reduce particulate matter from a biomass boiler burning a mixture of mesocarp fibre and palm kernel shell
Gas flow: 137 620m3/h at 320°C | Type of Particles: Biomass fly ashes | Emissions: <150mg/Nm3 Client: TradeWinds | Location: Sarawak, Malaysia | Year: 2015
P2
23
7
Hurricane HR cyclone system to capture PM emissions from a biomass boiler burning wood pellets
Gas flow: 12 543m3/h at 220°C | Type of Particles: Biomass fly ashes | Emissions: <40mg/Nm3 Client: Norbidel, Racentro | Location: Leiria, Portugal| Year: 2015
RF2
39
6
Hurricane HR cyclone system to capture PM emissions from a biomass boiler burning wood pellets
Gas flow: 12 543m3/h at 220°C | Type of Particles: Biomass fly ashes | Emissions: <40mg/Nm3 Client: Norbidel, Facol| Location: Guimarães, Portugal| Year: 2015
RF2
395
Hurricane MK cyclone for reducing particulate matter from a syngas flow. Gas flow: 603m3/h at 223oC | Type of Particles: Tar and Particles escaping a wood gasifier | Guaranteed Emissions: <500mg/Nm3 Client: Biosus Energy | Location: Aberdeenshire, UK| Year: 2015
MW
226
9
Hurricane MK for reducing particulate matter from 15ton/h coal BFB boiler flue gas. Gas flow: 34 000m3/h at 230°C | Type of Particles: Coal fly ashes | Emissions: <100mg/Nm3 Client: Basuki | Location: Surabaya, Indonesia| Year: 2015
P23
07
Hurricane MK for reducing particulate matter from 6ton coal BFB boiler flue gas.
Gas flow: 14 000m3/h at 230°C | Type of Particles: Coal fly ashes | Emissions: <100mg/Nm3 Client: Basuki | Location: Surabaya, Indonesia| Year: 2015
P2
306
Hurricane HR for product recovery and emission control of an organic fertilizer dryer. Gas flow: 14 519m3/h at 60°C | Type of Particles: Organic fertilizer dust| Emissions: <200mg/Nm3 Client: Nutrofertil | Location: São Tiago de Besteiros, Portugal | Year: 2014
H20
73
Hurricane MK for fly ash PM emission control of a coal BFB boiler.
Gas flow: 24 000m3/h at 350°C | Type of Particles: Coal fly ashes| Emissions: <150mg/Nm3
Client: Basuki | Location: Surabaya, Indonesia | Year: 2014
P20
87
Hurricane HR Cyclone systems to reduce emissions of dryer cyclones in Glowood pellet plant. Gas flow: 71 839m3/h at 87°C | Particles: Fines of mill sawdust | Emissions: <15mg/Nm3 Client: Glowood| Location: Cercal do Alentejo, Portugal| Year: 2014
P1
68
5
REF_CE_18012018 Page 8/12
PARTICULATE MATTER (PM) EMISSION CONTROL
Examples of Hurricane and ReCyclone® Systems in Existing Installations
ReCyclone® MH to reduce pm emissions from a coal bubbling fluidized bed (bfb) 6 million kilocalories per hour heater. Gas flow: 46 175m3/h at 380°C | Type of Particles: Coal fly ahes | Emissions: <159mg/Nm3
Client: Basuki | Location: Batam, Indonesia | Year: 2014
P1
92
3
Hurricane HR Cyclone system for reducing particulate matter from a syngas. Gas flow: 3 611m3/h at 400°C | Type of Particles: Biomass PM from gasification| Emissions: <41mg/Nm3
Client: KB Energy | Location: Etoliko, Greece | Year: 2014
JB2
14
7
Hurricane MK for fly ash PM emission control of a 4ton/h coal BFB boiler. Gas flow: 9 300m3/h at 230°C | Type of Particles: Coal fly ashes| Emissions: <54mg/Nm3
Client: Basuki | Location: Cikarang – West Java, Indonesia | Year: 2014
P1
99
6
Hurricane MK for fly ash PM emission control of a grate type biomass boiler, placed after existing multicyclone/cyclone pre-separator. Gas flow: 3 200m3/h at 190°C | Type of Particles: Cork fly ashes| Emissions: <30mg/Nm3 at 11%O2
Client: Scierie de Miremont | Location: Lanouaille, France | Year: 2014
P19
72
Hurricane HR cyclone system to capture PM emissions from a grate type biomass boiler burning wood pellets Gas flow: 12 543m3/h at 220°C | Type of Particles: Biomass fly ashes| Emissions: <30mg/Nm3 Client: Norbidel Artemalhas | Location: Fafe, Portugal | Year: 2014
P20
41
Hurricane HR cyclone system for PM emission control from a grate type biomass boiler burning wood pellets Gas flow: 8 042m3/h at 220°C | Type of Particles: Biomass fly ashes | Emissions: <30mg/Nm3
Client: Norbidel Mirafios | Location: Santo Tirso, Portugal | Year: 2014
P20
42
Hurricane HR cyclone system for PM emission control from a grate type biomass boiler. Gas flow: 8 360m3/h at 220°C | Type of Particles: Pellets fly ashes| Emissions: <30mg/Nm3
Client: Norbidel Vicaima | Location: Vale de Cambra, Portugal | Year: 2014
P2
066
Recyclone® MH to reduce PM emissions from a Coal or Rice Husk Bubbling Fluidized Bed (BFB) 4 ton/h boiler Gas flow: 34 000m3/h at 230°C | Type of Particles: Coal or Rice Husk fly ashes | Emissions: <100mg/Nm3 Client: Basuki | Location: Indonesia | Year: 2016
PA
166
4
Hurricane HR cyclone system for reducing particulate matter emissions from black liquor recovery boiler before ventury scrubber. Gas flow: 37 000m3/h at 238°C | Type of Particles: Pellets fly ashes| Expected separation efficiency: 78.5 - 79.3% Client: Celesa | Location: Tortosa, Spain | Year: 2014
H17
82
Hurricane MK cyclone system for PM emission control from a grate type biomass boiler burning wood pellets Gas flow: 12 500m3/h at 220°C | Type of Particles: Biomass fly ashes | Emissions: <55mg/Nm3
Client: Norbidel | Location: Riba D´ave, Portugal | Year: 2014
P2
18
2
REF_CE_18012018 Page 9/12
PARTICULATE MATTER (PM) EMISSION CONTROL
Examples of Hurricane and ReCyclone® Systems in Existing Installations
Recyclone® MH for fly ash PM emission control of a 6ton/h coal BFB boiler. Gas flow: 14 000m3/h at 230°C | Type of Particles: Coal fly ashes| Expected efficiency: <114mg/Nm3
Client: Basuki | Location: Tambun West Java, Indonesia| Year: 2014
P1
58
9
Hurricane HR for fly ash PM emission control of a grate type biomass boiler, placed after existing multicyclone/cyclone pre-separator. Gas flow: 12 500m3/h at 100°C | Type of Particles: Wood chip fly ashes| Emissions: <50mg/Nm3
Client: Flucal | Location: Valongo, Portugal | Year: 2014
H19
34
Hurricane HR cyclone system to capture PM emissions from a grate type biomass boiler. Gas flow: 12 543m3/h at 220°C | Type of Particles: Wood chip fly ashes| Emissions: <40mg/Nm3
Client: Sorgal | Location: Ovar, Portugal | Year: 2014
P1
94
6
Recyclone® MK for fly ash PM emission control of a 10ton/h coal BFB boiler. Gas flow: 22 500m3/h at 230°C | Type of Particles: Coal fly ashes| Emissions: <100mg/Nm3 Client: Basuki | Location: Surabaya – East Java, Indonesia | Year: 2013
P18
57
Hurricane HR cyclone system to capture waste particules from a tablet pressing process and reduce load into HEPA filter. Gas flow: 234m3/h at 25°C | Type of Particles: Pharma particles | Guaranteed emissions: <50mg/Nm3
Client: Bluepharma | Location: Coimbra, Portugal | Year: 2014
MW
182
5
Hurricane MK system to reduce particulate matter emissions from straw burning boilers’ flue gases (850kW) Gas flow: 2 552m3/h at 152°C | Type of Particles: Straw fly ashes| Expected efficiency: 93.3–97.6% Client: Topling | Location: Scotland, UK | Year: 2013
H16
44
Hurricane HR cyclone system to capture at high temperature PM emissions from the off-gases of an MBM gasification unit. Gas flow: 8 000m3/h at 700°C | Type of Particles: MBM PM from gasification| Efficiency: 91.2 - 98.1% Client: Careco | Location: São João da Madeira, Portugal | Year: 2013
H18
69
Hurricane HR cyclone system to reduce particulate matter emissions from syngas
Gas flow: 3 250m3/h at 375°C | Type of Particles: tar and particles escaping a wood gasifier Expected efficiency: 97.2 - 98.4% | Expected Emissions: 24mg/Nm3
dry
Client: Storm Energy | Location: Plovdiv, Bulgary | Year: 2013
MW
183
8
Hurricane HR Cyclone system for reducing particulate emissions from heavy fuel oil boiler.
Gas flow: 7 241m3/h at 296°C | Type of Particles: Fly ash from HFO combustion | Emissions: 94 - 128mg/Nm3 at 11% O2
Client: Babcock Wanson | Location: Ilha Terceira Açores, Portugal | Year: 2013
P66
8
ReCyclone® MH for fly ash PM emission control of 6ton/h coal BFB boiler.
Gas flow: 14 000m3/h at 230°C | Type of Particles: Coal fly ashes | Emissions: <150mg/Nm3
Client: Basuki | Location: Jakarta, Indonesia | Year: 2013
1795
REF_CE_18012018 Page 10/12
PARTICULATE MATTER (PM) EMISSION CONTROL
Examples of Hurricane and ReCyclone® Systems in Existing Installations
ReCyclone® MH for fly ash PM emission control on 4ton/h boiler burning palm shell. Gas flow: 6 972m3/h at 230°C | Type of Particles: Palm shell fly ashes| Emissions: <100mg/Nm3
Client: Basuki | Location: Sumatera, Indonesia | Year: 2013
17
91
Hurricane HR cyclone system for PM emission control from a grate type biomass boiler (2ton/h). Gas flow: 4 500m3/h at 230°C | Type of Particles: Pellets fly ashes | Efficiency: 85% | Emissions: <30mg/Nm3 at 11% O2
Client: Norbidel | Location: Coimbra, Portugal | Year: 2013
P1
78
5
Hurricane HR cyclone system to reduce particulate matter in a gasification process
Gas flow: 1 000m3/h at 450°C | Type of Particles: Tar and particles escaping a wood gasifier | Fuel: wood
Expected efficiency: 96.8 – 98.6%
Client: Biosus Energy | Location: Aberdeenshire, UK | Year: 2013
P1
66
6
Hurricane HR cyclone system for PM reduction of clinker fine and petroleum coke fly ash in a cement plant. It was installed downstream of the last existing cyclone of the pre-heater to reduce fines emissions Gas flow: 37 513m3/h at 327°C | Type of Particles: Fly ash from petroleum coke kiln | Expected efficiency: 87.15 - 92.92% Client: Duna Drava Cement | Location: Beremend, Hungary | Year: 2013
P80
6
ReCyclone® MH for fly ash PM emission control of a 10ton/h coal BFB boiler, placed after multicyclone/ cyclone pre-separator. Gas flow: 22 500m3/h at 230°C | Type of Particles: Coal and palm shell fly ashes| Emissions: <150mg/Nm3
Client: Basuki | Location: Makati City, Philippines | Year: 2013
P16
38
ReCyclone® MH to reduce PM emission from a Coal Bubbling Fluidized Bed (BFB) 6 Million Kilocalories Per Hour Heater. Gas flow: 42 638m3/h at 330°C | Type of Particles: Coal fly ashes | Emissions: <150mg/Nm3
Client: Basuki | Location: Batam Island, Indonesia | Year: 2013
P16
39
ReCyclone® MH for fly ash PM emission control of a 15ton/h coal BFB thermal oil heater, placed after multicyclone/cyclone pre-separator. Gas flow: 34 000m3/h at 230°C | Type of Particles: Coal fly ashes | Emissions: <150mg/Nm3
Client: Basuki | Location: Cikarang – West Java, Indonesia | Year: 2013
P1
640
ReCyclone® MH type cyclone system for reducing particulate matter from a Coal/Palm Shell Bubbling Fluidized Bed (BFB) boiler flue gases. Gas flow: 22 500m3/h at 230°C | Type of Particles: Coal and Palm shell| Emissions: <150mg/Nm3
Client: Basuki | Location: Makati City, Philippines | Year: 2013
P18
60
Hurricane MK cyclone system for fly ash PM emission control of 3 grate type biomass boilers, placed after existing multicyclone/cyclone pre-separators Gas flow: 54 000m3/h at 175°C | Type of Particles: Cork dust fly ashes| Emissions: <100mg/Nm3
Client: Amorim Cork Composits | Location: Mozelos, Portugal | Year: 2013
H28
0
Two single Hurricane MK cyclones to reduce PM emissions from laser cutting machines Gas flow: 650m3/h at 20°C | Type of Particles: Paper particles from cutting | Emissions: <23mg/Nm3
Client: Laser Automation, Switzerland | Location: USA & Poland | Year: 2013
MW
169
1
REF_CE_18012018 Page 11/12
PARTICULATE MATTER (PM) EMISSION CONTROL
Examples of Hurricane and ReCyclone® Systems in Existing Installations
Hurricane HR cyclone system for fly ash PM emission control of a 25ton/h grate type biomass boiler, placed after multicyclone/cyclone pre-separator. Gas flow: 85 127m3/h at 256°C | Type of Particles: Palm shell and fibers fly ashes | Emissions: <150mg/Nm3 at 11% O2
Client: Jaremar – Caicesa | Location: Tela, Honduras | Year: 2012
P1
86
4
Hurricane HR Cyclone system for fly ash PM emission control of a 35ton/h grate type biomass boiler, placed after multicyclone/cyclone pre-separator.
Gas flow: 114 935m3/h at 204°C | Type of Particles: Palm shell and fibers fly ashes | Emissions: <150mg/Nm3 at 11% O2
Client: Jaremar – Agrotor | Location: Villanueva, Honduras | Year: 2012
P1
49
9
Recyclone® EH for fly ash PM emission control of a grate type biomass boiler, placed after existing multicyclone/cyclone pre-separator.
Gas flow: 25 306m3/h at 250°C | Type of Particles: Wood pellet grat fly ashes | Emissions: <30mg/Nm3 at 11% O2
Client: L Solé | Location: Santo Domingo, Dominican Republic | Year: 2012
P1
65
0
ReCyclone® MH type cyclone system for reducing particulate matter from a Coal Bubbling Fluidized Bed (BFB) boiler flue gases.
Gas flow: 6 972m3/h at 230°C | Type of Particles: Coal fly ashes | Emissions: <100mg/Nm3
Client: Basuki | Location: Bali, Indonesia | Year: 2012
P15
07
Hurricane HR Cyclone system to reduce PM from Syngas in a gasification process.
Gas flow: 425m3/h at 160°C | Type of Particles: Biomass fly ash and calcium carbonate | Emissions:
<50mg/Nm3
Client: Anguil | Location: Milwaukee, USA | Year: 2012
P13
98
Hurricane HR Cyclone system to recover fine particles from a calcination kiln reducing concentration to the final dust collector (bag filter).
Gas flow: 22 408m3/h at 131°C | Type of Particles: Quicklime and dolomitic Lime | Separation efficiency: 97%
Client: Microlime | Location: Seixal, Portugal | Year: 2012
H12
75
Hurricane HR Cyclone system to reduce tobacco fine particles in a tobacco drying line
Gas flow: 4 720m3/h at 180°C | Type of Particles: Tobacco particle | Emissions: <100mg/Nm3
Client: Garbuio Dickinson | Location: Hannover, Germany | Year: 2012
P1
556
ReCyclone® MH for PM emission control of two grate type biomass boilers, placed after multicyclone/ cyclone pre-separator
Gas flow: 90 000m3/h | Type of Particles: Wood waste and wood chips fly ashes | Emissions: <100mg/Nm3
Client: Sonae Novobord | Location: Nelspruit, South Africa | Year: 2012
H12
45
Hurricane HR Cyclone system for sinter PM emission control in a sintering process
Gas flow: 84 500m3/h at 150°c | Type of Particles: Sinter fines | Emissions: <70mg/Nm3
Client: Tecnosulfur, S.A. | Location: Sete Lagoas, Brazil | Year: 2012
P11
93
ReCyclone® MH for PM emission control of a grate type biomass boiler (6MWth), placed after multicyclone/cyclone pre-separator.
Gas flow: 30 000m3/h at 280°C | Type of Particles: Crushed pallets and bush residues | fly ashes Emissions: <100mg/Nm3 at 11% O2 Client: L. Solé. | Location: Los Angeles, Chile | Year: 2011
P1
18
9
REF_CE_18012018 Page 12/12
PARTICULATE MATTER (PM) EMISSION CONTROL
Examples of Hurricane and ReCyclone® Systems in Existing Installations
ReCyclone® MH type cyclone system for reducing particulate matter from a Coal Bubbling Fluidized Bed (BFB) boiler flue gases. Gas flow: 14 000m3/h at 230°C | Type of Particles: Coal fly ashes | Emissions: <100mg/Nm3 Client: Basuki | Location: Indonesia | Year: 2011
PA
14
76
Recyclone® EH for fly ash PM emission control of a grate type biomass boiler, placed after multicyclone/ cyclone pre-separator.
Gas flow: 3 900m3/h at 180°C | Type of Particles: Pine residues fly ashes | Emissions: <30mg/Nm3 at 11% O2
Client: L. Solé | Location: Poitiers, France | Year: 2011
P1
16
9
Recyclone® EH Pilot System for PM emission control of a CaSi kiln.
Gas flow: 11 300m3/h at 150°C | Type of Particles: Casi | Emissions: <100mg/Nm3
Client: Bozel | Location: São João Del Rey, Brazil | Year: 2011
P9
89
Hurricane HR Cyclone system for PM emission control, working as a pre-filtering solution upstream of electrical power engines. Aim is to increase the life of cartridge filters.
Gas flow: 2 109m3/h at 30°C | Type of Particles: Sider Gas (GLD) PM| Emissions: <10mg/Nm3
Client: HC Energía | Location: Astúrias, Spain | Year: 2011
H15
5
ReCyclone® MH for fly ash PM emission control of a coal BFB boiler.
Gas flow: 14 000m3/h at 230°C | Type of Particles: Coal fly ashes | Emissions: <100mg/Nm3
Client: PT Basuki | Location: Jawa Barat, Indonesia | Year: 2011
P11
98
Hurricane HR Cyclone system to capture biomass fly ash and sawdust particles from rotary dryer in a wood pellet plant, placed after pre-separator.
Gas flow: 8 074m3/h at 110°C | Type of Particles: Sawdust and fly ash | Emissions: <150mg/Nm3
Client: Vimasol | Location: Celourico da Beira, Portugal | Year: 2011
H12
99
ReCyclone® MH convertible to a ReCyclone® EH for fertilizer dust emission control after a tunnel dryer
Gas flow: 50 400m3/h at 40°C | Type of Particles: Animal fertilizer dust | Emissions: <40mg/Nm3
Client: Plateau ASP | Location: Ferrol, Spain | Year: 2010
P1
139
Hurricane HR Cyclone system for dedusting of card board particles from cutting operations
Gas flow: 16 400m3/h at 30°C | Type of Particles: Card board from cutting | Emissions: <10mg/Nm3
Client: Efacec Energia | Location: Leça do Bailio, Portugal | Year: 2010
H12
22
ReCyclone® MH for for fly ash PM emission control of a biomass boiler
Gas flow: 9 500m3/h at 320°C | Type of Particles: Cork waste fly ashes | Emissions: < 100mg/Nm3 at 11% O2 Client: Granorte | Location: Avintes, Portugal | Year: 2008
ReCyclone® MH for fly ash PM emission control of a grate type biomass boiler
Gas flow: 9 600m3/h at 250°C | Type of Particles: Wood waste fly ashes | Emissions: <100mg/Nm3 at 11% O2
Client: CSC (Portuguesa) | Location: Varaize, France | Year: 2008
REF_CE_18012018 Page 13/12
PARTICULATE MATTER (PM) EMISSION CONTROL
Examples of Hurricane and ReCyclone® Systems in Existing Installations
ReCyclone® MH for fly ash PM emission control of a grate type biomass boiler, placed after existing multicyclone/cyclone pre-separator
Gas flow: 27 000m3/h at 200°C | Type of Particles: Wood waste fly ashes | Emissions: <100mg/Nm3 at 11% O2
Client: Laminar, S.A. | Location: Pedroso, Portugal | Year: 2006
ReCyclone® MH for fly ash PM emission control of a 6MWth grate type biomass boiler, placed after existing multicyclone/cyclone pre-separator
Gas flow: 50 000m3/h at 280°C | Type of Particles: Cork dust fly ashes | Emissions: <150mg/Nm3 at 11% O2
Client: MJO Lda. | Location: Vendas Novas, Portugal | Year: 2007
ReCyclone® MH for fly ash PM emission control of a 9MWth grate type biomass boiler, placed after existing multicyclone/cyclone pre-separator
Gas flow: 57 000m3/h at 280°C | Type of Particles: Wood waste fly ashes | Emissions: <100mg/Nm3 at 11% O2
Client: Plysorol – Epernay | Location: Magenta, France | Year: 2006
ReCyclone® MH for fly ash PM emission control of a grate type biomass boiler
Gas flow: 8 000m3/h at 280°C | Type of Particles: Cork dust fly ashes | Emissions: 30 - 90mg/Nm3 at 11% O2
Client: Amorim & Irmãos, S.A. | Location: Vendas Novas, Portugal | Year: 2003
ReCyclone® MH for fly ash PM emission control of a grate type biomass boiler, placed after existing multicyclone/cyclone pre-separator.
Gas flow: 15 000m3/h at 220°C | Type of Particles: Cork waste fly ashes | Emissions: <150mg/Nm3 at 11% O2
Client: Corkart Lda. | Location: Vendas Novas, Portugal | Year: 2003
ReCyclone® MH for fly ash PM emission control of a grate type biomass boiler, placed after existing multicyclone/cyclone pre-separator.
Gas flow: 9 500m3/h at 320°C | Type of Particles: Cork waste fly ashes | Emissions: <50mg/Nm3 at 11% O2
Client: Granorte, Lda. | Location: Rio Meão, Portugal | Year: 2002
H32
2
Hurricane HR cyclone system for fly ash PM emission control in a fuel oil boiler Gas flow: 4 000m3/h at 160°C | Type of Particles: HFO fly ashes | Emissions: <10mg/Nm3
Client: RAR, S.A. | Location: Porto, Portugal | Year: 2005