61
Ar St r. Devdatt M tudio919 Ar S A THE A PART TENDE NAME ADDR DATE ARCHI AR. DE STUDI 2 ND FL B/S PU NR. PA AHME PHON Email: M Pandya rchitects STATE BA SBIIMS AIR COND AUTHORIZ DE T – A: TE ER SUBMI ESS ITECT: EVDATT M O 919 AR OOR/8, AJ ULKIT HIG ALDI POST DABAD-38 E: (079) 26 919studio SBI INFR ANK OF IN LA S INVITE T DITIONING ZED DEAL EALERSH ECHNICA ITTED BY M. PANDYA RCHITECTS JITNATH S H SCHOO T OFFICE 80 007 6630154 @gmail.co RA MANAG NDIA, 3 RD LDARWAJ TENDERS G WORKS LER HAVIN HIP FORM AL BID : : : : A S SOCIETY OL om 1 GEMENT S FLOOR, L JA, AHME S ON BEHA OF MITHA JAMNAGA FROM NG VALID THE REC SOLUTION LOCAL HE EDABAD-3 ALF OF SB APUR-SU AR. M AUTHOR OMMEND NS PVT. LT EAD OFFIC 380001 BI FOR PR RAJKARA RIZATION C DED COMP Signature TD. CE, BHAD ROPOSED ADI BRAN CERTIFIC PANY. e & Seal of RA, D CH, ATE FOR Tenderer

PART CHNICAL BID · 2018. 5. 2. · BI Infra M SBI Infra Third Flo CONDITIO M o AHMEDA 18/05/201 Not applic NA NA. 0.50% of max. 5% o 12 Months 90 days fr NO INTER The con insurance

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PART CHNICAL BID · 2018. 5. 2. · BI Infra M SBI Infra Third Flo CONDITIO M o AHMEDA 18/05/201 Not applic NA NA. 0.50% of max. 5% o 12 Months 90 days fr NO INTER The con insurance

ArSt

r. Devdatt Mtudio919 Ar

S

A

THE A

PART

TENDENAME

ADDR

DATE

ARCHI AR. DESTUDI2ND FLB/S PUNR. PAAHMEPHONEmail:

M Pandya rchitects

STATE BA

SBIIMSAIR COND

AUTHORIZDE

T – A: TE

ER SUBMI

ESS

ITECT:

EVDATT MO 919 AROOR/8, AJ

ULKIT HIGALDI POSTDABAD-38E: (079) 26919studio

SBI INFRANK OF IN

LA

S INVITE TDITIONING

ZED DEALEALERSH

ECHNICA

ITTED BY

M. PANDYARCHITECTS

JITNATH SH SCHOOT OFFICE 80 007 6630154 @gmail.co

RA MANAGNDIA, 3RD LDARWAJ

TENDERSG WORKS

LER HAVINHIP FORM

AL BID

: :

:

:

A S SOCIETY

OL

om

1

GEMENT SFLOOR, LJA, AHME

S ON BEHA

OF MITHAJAMNAGA

FROM

NG VALIDTHE REC

SOLUTIONLOCAL HEEDABAD-3

ALF OF SBAPUR-SUAR.

M

AUTHOROMMEND

NS PVT. LTEAD OFFIC380001

BI FOR PRRAJKARA

RIZATION CDED COMP

Signature

TD. CE, BHAD

ROPOSEDADI BRAN

CERTIFICPANY.

e & Seal of

RA,

D CH,

ATE FOR

Tenderer

Page 2: PART CHNICAL BID · 2018. 5. 2. · BI Infra M SBI Infra Third Flo CONDITIO M o AHMEDA 18/05/201 Not applic NA NA. 0.50% of max. 5% o 12 Months 90 days fr NO INTER The con insurance

ArSt

r. Devdatt Mtudio919 Ar

SBIIMStenderscertificathe valHitachi

The de

S.No

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

M Pandya rchitects

S on behas in two ate for dealid authorizi / Voltas /

etails of ten

o. Descrip

Name of

Nature o

Time allo

Applicati

Earnest

Initial Se

Total Se

Start adownloadocumenwebsite Last dsubmissEMD ansealed cin sealedAddress

lf of SBI thbid syste

alership fozation certTrane / To

nder are as

ption

f work

of Work

owed for c

ion Fees

Money De

ecurity Dep

ecurity depo

and end ading ofnts from

date & ion of techd applicati

cover-A andd cover-B s at which

NOTICE

hrough itsem from torm the rectificate for

oshiba / Mi

s under:

completion

eposit

posit

osit

date forf tender

m Bank’s

time for hnical bid,ion fess ind price bid

h technical

2

E INVITING

Architect the authorcommendedealershi

tsubishi ele

Proposed Surajkarad

Air Condit

(60 days)of work oRs. 1,000/refundabPart-A by SBI in favoSolutionsAhmedabRs.2,000/Demand D180 Days tender) frodrawn in payable a

2% of con

5% of the

rr s

04/05/201under<Lin

nd

18/05/201

l Circle H

G TENDER

M/s. STUDrized dealed companp from theectric etc.

Air Conditdi Branch

tioning Wo

) 2 Monthorder. /- (One Thle (To be dway of Deour of SBI

s Pvt. Ltd. bad) - (Two ThDraft / Payfrom the lom any sfavour o

at Jamnag

ntract amou

final bill am

8 to 18nk>procure

8 by 3.00

Head &

RS

DIO 919 Aer having

ny. The vee Blue sta

tioning woat Mithapu

rk

s from da

housand odeposited aemand Draf

Infra Manand paya

housand oy Order (Vast date ofcheduled f State B

gar.

unt includin

mount inclu

8/05/2018 ement new

PM

Vice

Signature

ARCHITEC valid au

endor has r / Daikin

orks of Mitur Distt: Jam

ate of acc

only) Non-along with ft / Self che

nagement able at

only) by mValid for a f submissioNationaliz

Bank of In

ng EMD

uding ISD.

at wwws.

Presiden

e & Seal of

CTS invitesthorizationto enclose/ Carrier /

thapur-mnagar

ceptance

- Tender eque of

means of period of on of the ed Bank

ndia and

.

.sbi.co.in

t (AIR

Tenderer

s n e /

Page 3: PART CHNICAL BID · 2018. 5. 2. · BI Infra M SBI Infra Third Flo CONDITIO M o AHMEDA 18/05/201 Not applic NA NA. 0.50% of max. 5% o 12 Months 90 days fr NO INTER The con insurance

ArSt

r. Devdatt Mtudio919 Ar

21. The Pa

a. b. c. d. e.

11.

12.

13.

14.

15.

16. 17. 18. 19.

20.

M Pandya rchitects

e contractort A- TechnForwardinNIT cum dBill of quaSet of all dBanker chfee (Non rat Ahmeda

bid (harEMD & price bidbe submDate andtechnicaSBIIMS,address No.10 Date &SubmissindicativDate & tonline inDate & tauction Liquidate

Defects Validity oValue ofInsuranc

Water &

or shall subnical bid (Cg letter.

draft tenderntities stamdrawings seque/ DD

refundable)abad.

rd copy) aapplication

d (hard copmitted

d time of oal bid and p circle

mentione

& timesion of e price bidime for ope

ndicative prime for e-r

ed Damag

liability peof offer f Interim Cece

electricity

bmit the teCover-A) s

r stamped mped and stamped anof Rs. 1,00) favoring S

along withn fees andpy) has to

opening ofprice bid ate officeed at sr.

e foronline

d. ening of rice bid. reverse

es

riod

ertificate

3

ender in twohall contai

and signesigned on nd signed.00/- (RupeSBI Infra M

hd o

CONDITIOSBI Infra MThird FlooAHMEDA

ft e .

18/05/201

e Not applic

NA

NA.

0.50% of max. 5% o12 Months90 days frNO INTERThe coninsurance the centreoriginal papplicableWater & Eat one pextension switches, be arrangwithin therecover consump

o bid systen the follow

d on each each pape

ees one thoManageme

ONING), Managemeor, SBI, LHBAD-38008 at 3:30 P

cable

contract aof contracts from the rom the daRIMtractor shpolicies a

e & shall policies ane in the maElectricity spoint. How

& light fixswitch boed by the e accepte

0.5% ption of wa

em kept in wing docum

paper. er.

ousand onent Solution

ent SolutioO, Bhadra

001 PM

amount pet value or fidate of Virte of open

hall obtaas per thebe require

nd receiptatter to the shall be prowever furtxture etc. woards, lamp

contractoed tender of fina

ater & elec

Signature

separate cments:

ly) as an ans Pvt Ltd,

ons Pvt. Ltda, Laldarwa

r weeks sinal bill valrtual Comping of Pric

in all nee law appled to prodt of the Architect/Bovided by ther distribwith requirps, tube, er at their o

cost. Bal bill ctricity.

e & Seal of

covers.

application payable

d. aja

ubject to ue.

pletione-bid

ecessary icable at duce the premium Bank.the Bank bution & red MCB etc. shall own cost ank will amount

Tenderer

Page 4: PART CHNICAL BID · 2018. 5. 2. · BI Infra M SBI Infra Third Flo CONDITIO M o AHMEDA 18/05/201 Not applic NA NA. 0.50% of max. 5% o 12 Months 90 days fr NO INTER The con insurance

ArSt

r. Devdatt Mtudio919 Ar

f.

Part B Both th Mentio

22. TenderNews>technicbe disq

23. The coensurin

24. No conwill hav

25. The SBor in pshall be

26. Tendersuch te

27. In caseopened

28. SBIIMSand no Yours For: AR. DESTUDI2ND FLB/S PUNR. PAAHMEPHONEmail:

M Pandya rchitects

Banker ch(Refundab

- Financialhe covers soned in Pa

rs can be d>. It shall becal and finaqualified.

ontractor sng the num

nditions othve to be wi

BIIMS resepart withoue entertain

rs receivedenders sha

e the dated on the ne

S has the o correspon

Faithfully,

EVDATT MO 919 AROOR/8, AJ

ULKIT HIGALDI POSTDABAD-38E: (079) 26919studio

eque/ DD ble) favorin

l bid (Coveshall be kera 10 abov

downloadee responsiancial bid

shall sign mber and s

her than mithdrawn b

erve their rut assigningned in this

d without Eall not be a

e of openinext working

right to acndence sha

M. PANDYARCHITECTS

JITNATH SH SCHOOT OFFICE 80 007 6630154 @gmail.co

of Rs. 2,00ng State Ba

er-B) shall ept in a largve.

ed from theibility of theare prope

and stamequence o

mentioned efore open

ights to acg any reasregard.

EMD andllowed to p

ng of tendg day at th

ccept / rejeall be ente

A S SOCIETY

OL

om

4

00/- (Rupeank of India

contain thege cover a

e bank’s we contractorly bound

mp each of all pages

in the tendning of the

ccept or rejson for do

Applicatioparticipate

ders is dece same tim

ect any / aertained in t

ees Two Tha, payable

e Price bidand it shall

websitewwwor to arrangseparately

page of ts.

der will beprice-bid.

ect any oroing so an

n Fees shin the onli

clared as me.

ll tenders this regard

housand o at Ahmed

d only. be send to

w.sbi.co.inge and ensy. Tenders

the tender

e considere

r all the tend any clai

hall be sumne price bi

a holiday,

without asd.

Signature

nly) as EMdabad.

o the addre

n(link) <Prosure that ain loose p

r documen

ed, and if

nders, eithem / corres

mmarily rejidding proc

, the tende

ssigning an

e & Seal of

MD

ess as

ocurementall pages ofpages may

nt thereby

given they

er in wholespondence

jected andcess.

ers will be

ny reasons

Tenderer

t f y

y

y

e e

d

e

s

Page 5: PART CHNICAL BID · 2018. 5. 2. · BI Infra M SBI Infra Third Flo CONDITIO M o AHMEDA 18/05/201 Not applic NA NA. 0.50% of max. 5% o 12 Months 90 days fr NO INTER The con insurance

ArSt

r. Devdatt Mtudio919 Ar

To, The CiCircle OSBI InfAhmed Dear S Havingto the examinthe reqexecutattachespecifictender,Conditirespec

Descri

Earnes

Percendeductto be reTime aWorks date ohandinlater)to I/We hamounShouldagree tLtd.

M Pandya rchitects

rcle Head Office, fra Managedabad- 380

Sir,

g examinedworks spe

ned the sitequisite infoe the wored Schedcations, de, the Articions of Co

cts in accor

iption of w

st Money

ntage, if anted from Bietained allowed fofrom four

of writteng over of

o commenc

ave deposnt as Earned I / We faithat this su

& VP (AIR

ement Solu0001.

d the drawecified in te of the wo

ormation rerks specifiedule of Qesign, drawcles of Agontract andrdance with

work

ny, to be ills and tota

or complerteenth da

n order othe site (wce the work

sited a sumest Money l to executum shall be

F

R CONDITI

utions Pvt.

wings, speche memororks specielating theed in the

Quantities wings andgreement, d with suchh such con

M

al amount

etion of thay after thor date owhichever k

m of Rs.2,0with the St

te the Conte forfeited

5

ORM TEN

ONING),

Ltd.,

cification, drandum hefied in the

ereto as afsaid memand in

instructioSpecial C

h materialsnditions so

MEMORANProposeSurajkarRs. 2,00of DemaNationalof India a10 % froTotal 5%value inc

he heofis

2 (Two)

000/- (Two tate Bank otract when by me/us t

NDER

design andereinafter s said memffecting the

morandumaccordancns in writi

Conditions,s as are pfar as they

NDUM ed Air Condradi branch00.00 - (Twand Draft / ized Bank and payab

om Running% of contraccluding EMmonths (6

Thousandof India wh called upoto SBI Infra

schedule set out and

morandum e tender, Iat the rate

ce in all ng referred, Schedulerovided foy may be a

ditioning woh, Jamnagawo ThousaPay Orderdrawn in f

ble at Jamng Bills, subct amount

MD & Initial60 days)

d only) ofhich is not on to do soa Managem

Signature

of quantitid having vand havingI/We herebes mention

respects d to in coe of Quanr by, and iapplicable.

orks of Mitar. and only) r from any favour of S

nagar. bject to maor actual F Security D

the total teto bear an

o I/ We do ment Solut

e & Seal of

es relatingvisited andg acquiredby offer toned in the

with thenditions ofntities andin all other

thapur-

by meansscheduled

State Bank

aximum Final Bill Deposit.

ender ny interest. hereby tions Pvt.

Tenderer

g d d o e e f d r

s d k

Page 6: PART CHNICAL BID · 2018. 5. 2. · BI Infra M SBI Infra Third Flo CONDITIO M o AHMEDA 18/05/201 Not applic NA NA. 0.50% of max. 5% o 12 Months 90 days fr NO INTER The con insurance

ArSt

r. Devdatt Mtudio919 Ar

1) Our Ban

ii) The na

ii) Name

Or (Name

(Certifi

Yours f

Signat

Signatu

i)

i

M Pandya rchitects

nkers are:

ames of pa

of the part

e of person

ed true co

faithfully,

ture of Con

ure and ad

i)

artners of o

ner of the

having Po

py of the P

ntractors.

ddresses o

our firm are

firm Autho

ower of Att

Power of A

of Witnesse

6

e: i)

orized to sig

orney to si

Attorney sho

es

gn

ign the Co

ould be att

ntract.)

tached)

Signaturee & Seal of Tenderer

Page 7: PART CHNICAL BID · 2018. 5. 2. · BI Infra M SBI Infra Third Flo CONDITIO M o AHMEDA 18/05/201 Not applic NA NA. 0.50% of max. 5% o 12 Months 90 days fr NO INTER The con insurance

ArSt

r. Devdatt Mtudio919 Ar

(On no

ARTICSBIIMSService

and haprepare

AND Winclusivbehalf AND WConditiConditiare colthe saScheduthereinreferre NOW I

1) In consset forConditidescrib

2) The Emas shaConditi

The teArchiteContrathat pufor reasperson

M Pandya rchitects

on-judicial S

CLES OF AS PVT. LTe Provider"WHEREAS

as caused ded by M/s.

WHERE ASve, the Speof the partWHEREASions set fions and illectively hid Drawingule of Qua

n arrived atd to as “the

T IS HEREsideration rth in the ions execbed in the smployer shall becomeions.

erm “the Aects, or in

act for whaturpose by tsons cons

n or person

Stamp Pap

AGREEMEND., on beh" of t

S the

drawings a. Studio91

S the said Decificationsties heretoS the Conforth heren the Sch

hereinafter gs and / o

antities at tht our such e said Con

EBY AGREof the saidsaid Cond

cute and said Specihall pay to e payable

Architects” ithe event

tever reasohe Employidered to b

ns subsequ

ARTICL

per of Rs. 5

NT made thalf of SBI,the SBIIMS

and specifi9 Architec

Drawings ns and the . ntractor hain and toedule of Qreferred t

or describehe respectother sum

ntract Amo

EED AS FOd Contract ditions, thecomplete fications athe Contra

e, at the

in the saidof their ceon, such oyer, not bebe sufficienuently appo

7

ES OF AG

500/- or as

the having its

OPVT.LT

cations dects, its Arc

numberedSchedule

as agreed the Con

Quantities o as “the ed in the tive rates t

m as shall bount.)

OLLOWS:Amount toe Contracthe work

and the pricactor, the stimes and

d Conditioeasing to bether persoing a perso

nt by the Eointed to b

GREEMEN

s per latest

s office at MOneTD. is

escribing thchitects.

of Quantit

d to execuditions seand Condsaid condsaid Spec

therein set become pa

o be paid actor shall u

shown uced Schedsaid Contrad in the m

ns shall me the Archn or persoon to whommployer, Pe Architect

NT

t Govt. Rul

date oMumbai he

desirou

he work to

ies have b

ute upon et forth heitions of Citions”) thecifications forth amo

ayable the

at the timeupon and upon the ule of Quaact Amounmanner sp

ean the Mitects for th

ons as shalm the ContPROVIDEDts under th

Signature

es)

of erein after

Part us of

be done to

to been signe

and subjeerein in thContract (ae works shand includ

ounting to tre under (h

es and in thsubject tosaid Draw

antities. nt, or such pecified in

M/s. Studihe purposel be nomintractor sha

D ALWAYShis Contrac

e & Seal of

between called" the

o be

ed by or on

ect to thehe Speciaall of whichhown uponded in thehe sum ashereinafter

he mannero the saidwings and

other sumn the said

o919 e of this nated for all object S that no ct shall be

Tenderer

e and

n

e l

h n e s r

r d d

m d

Page 8: PART CHNICAL BID · 2018. 5. 2. · BI Infra M SBI Infra Third Flo CONDITIO M o AHMEDA 18/05/201 Not applic NA NA. 0.50% of max. 5% o 12 Months 90 days fr NO INTER The con insurance

ArSt

r. Devdatt Mtudio919 Ar

entitledexpres

3) The saof this to the sConditi

4) The PlContra

5) This CcontracaccordQuanti

6) The Corelatinginstallain the after th

7) The SBby addwithout

8) Time sagreesof issuand to for exte

9) All pay10) All disp

to haveto dete

11) That thundersIN WIThands written SIGNA

M Pandya rchitects

d to disregased in writ

aid ConditioAgreemensaid Condiions contaans, Agre

act. Contract is ct to carry ing to actties and Rontractor sg to AIR ations, fittinsaid Cond

he completBIIMS reseding to or ot prejudiceshall be cos to commee of formacomplete

ension of tyments by tputes arisine arisen at ermine the he severastood by thTNESS WHto these p.

ATURE CLA

ard or overting by the ons and Ant, and the itions and ined. ements an

neither aout the w

tual measates or as shall afford

CONDITngs air-conditions, andion of his werves to itsomitting an

e to this Coonsidered ence the wal work ordthe entire

ime. the SBI unng out of o Ahmedabsame. l parts of e Contract

HERE OF Tresents an

AUSE

rrule any poutgoing A

Appendix thparties heperform th

nd Docume

a fixed lumwork in resured quanprovided i

d every reIONING wnditioning ad shall mawork. self the rigny items o

ontract. as the ess

work soon ader as pro

e work with

nder this coor in any wabad and on

this Conttor. THE SBIIMnd two dup

8

previous deArchitects hereto shaereto shallhe Agreem

ents ment

mp-sum cospect of thntities at tn the said

easonableworks, insand other ake good a

ght of alterof work or

sence of tafter the Siovided for ihin 60 day

ontract will ay connec

nly the cour

ract have

MS and thelicates her

ecisions orfor the timll be read respectiveents on th

ioned here

ontract nore entire bthe rates Conditionsfacility for

stallation oancillary wany dama

ring the drahaving po

this Contraite is handein the said

ys subject

be made octed with thrts in Ahme

been rea

e Contractoreof the da

r approval oe being. and const

ely abide beir part res

ein shall fo

r a piece uilding comcontained s. r the carryof lifts, Tworks in thges done

awings andortions of t

act and thed over to

d Conditionto neverth

only at Ahmhis agreemedabad i s

d by the

or have setay and year

Signature

or direction

trued as foby submit thspectively

orm the ba

work contmplex to bin the Sc

ying out ofTelephone, he manner

to walls, f

d nature ohe same c

e Contrachim or fro

ns whichevheless the

medabad. ment shall bshall have j

Contractor

t their respr first herei

e & Seal of

n given or

orming parthemselvesin the said

asis of this

tract but abe paid forchedule of

f all workselectrica

r laid downfloors, etc

of the workcarried out

ctor herebym the datever is laterprovisions

be deemedjurisdiction

r and fully

pective inabove

Tenderer

t s d

s

a r f

s l

n .

k t

y e r s

d n

y

Page 9: PART CHNICAL BID · 2018. 5. 2. · BI Infra M SBI Infra Third Flo CONDITIO M o AHMEDA 18/05/201 Not applic NA NA. 0.50% of max. 5% o 12 Months 90 days fr NO INTER The con insurance

ArSt

r. Devdatt Mtudio919 Ar

SIGNE hand o (Name

presen

1) Shri /S

Addres _____ (Witne SIGNE

(Contra in the p

Shri/ S

Addres

(Witnes

M Pandya rchitects

ED AND DE

of Shri

e and Desig

nce of:

mt.

ss _______

_________

ess)

ED AND DE

actor)

presence o

mt.

ss

ss)

ELIVERED

gnation) In

_________

_________

ELIVERED

of:

D by the

By

the

_________

______

D by the

By

9

the (Emplo

___

the

oyer)

(Signat

(Signat

ture of Em

ture of Wit

(Signa

(Signa

Signature

mployer)

tness)

ature of Co

ature of Wit

e & Seal of

ontractors)

tness)

Tenderer

Page 10: PART CHNICAL BID · 2018. 5. 2. · BI Infra M SBI Infra Third Flo CONDITIO M o AHMEDA 18/05/201 Not applic NA NA. 0.50% of max. 5% o 12 Months 90 days fr NO INTER The con insurance

ArSt

1.0

1.1

2.0

2.1

2.2

2.3

r. Devdatt Mtudio919 Ar

Scope Sealedof SBIsurajka Site an The proDistt: J

Tende The wtender InstrucGeneraSpeciaAdditioDrawinPriced The abone anorder g

a) Price B

b) Additio

c) Techni

d) Drawin

e) Specia

f) Genera

g) Instruc Complethe we

M Pandya rchitects

e of work

d Tenders / SBIIMS

aradi Branc

nd its loca

oposed woJamnagar.

r docume

ork has toconsisting

ctions to tal conditioal conditioonal Specngs d bid A

bove docunother but given belowBid

onal Specif

cal specific

ngs

al condition

al condition

ctions to Te

ete set of tbsite www

INS

are invitedSPL for thch at mitha

ation

ork is to be

nts

o be carrieg of the foll

tenderers ons of Coons of Concifications

ments shain case of

w;

fications

cations

ns of contra

ns of contr

enderers

tender docw.sbi.co.in

STRUCTIO

d by M/s She work ofapur Distt:

e carried o

ed out strowing doc

ntract ntract

all be takef ambiguiti

act

ract

cuments in

10

SECTION

ONS TO TH

Studio919 f ProposeJamnagar

ut at Main

ictly accoruments an

en as comies or disc

ncluding re

– 1

HE TENDE

Architected Air Conr.

mithapur-s

rding to thnd the mos

plementarcrepancies

elative draw

ERERS

ts, Ahmednditioning

surajkarad

he conditiost workmen

ry and mut, shall tak

wings can

Signature

dabad for aworks for

di Branch a

ons stipulan like mann

tually explke precede

be downlo

e & Seal of

and behalfmithapur-

at Mithapur

ated in thener.

lanatory ofence in the

oaded from

Tenderer

f -

r

e

f e

m

Page 11: PART CHNICAL BID · 2018. 5. 2. · BI Infra M SBI Infra Third Flo CONDITIO M o AHMEDA 18/05/201 Not applic NA NA. 0.50% of max. 5% o 12 Months 90 days fr NO INTER The con insurance

ArSt

2.4

3.0

3.1

4.0

4.1

4.2

4.3

4.4

4.5

5.0

r. Devdatt Mtudio919 Ar

The ten Site Vi The teinformaand enrequescommulaw anregulatof any Earnes The tenThousfrom thdrawn EMD inaccom No inte EMD o EMD o

Initial S The suvalue lwithin a 5.1 SecTotal sin the fbe dedrespec10% til50% ofcertifyinthe def

M Pandya rchitects

nder docum

isit:

nderer muation and dnter into a sted satisfyunication fand order tions etc; Tor all the fa

st Money:

nderers arand only)

he last datin favour

n any othepanied by

erest will be

of unsucces

of successf

Security D

uccessful teless EMD a period of

curity Depsecurity deform of Iniducted froctive runninl Total Secf the Total ng the virtufects liabilit

ments are

ust obtain data that mcontract foy himself acilities, thsituation,

The tenderactors whi

re requeste by meanste of submof State B

er form oththe EMD i

e paid on t

ssful tende

ful tendere

Deposit:

enderer wiby means

f 7 days of

posit: posit shallitial Securi

om the runng accountcurity DepoSecurity Dual complety period a

not transfe

himself onmay be reqor the satiregarding

he characteclimatic

rer will be fle submitti

ed to subms of Dema

mission of tBank of Ind

her than asn accorda

the EMD.

erer will be

r will be re

ill have to s of DD drf acceptanc

be 5% ofity Depositnning accot bill i.e., dosit (TSD) Deposit shaetion. The as specified

11

erable.

n his own uired for thsfactory p

g the avaier quality aconditions

fully respong his tend

mit the Earand Draft/Pthe tender)dia and pa

s specifiednce with cl

e refunded

etained as

submit a srawn in face of tende

f contract vt (ISD) whount bill o

deduction fincluding I

all be paid balance 50d in the co

responsibhe purposeerformancilability of and quantis local aonsible forder.

rnest MonePay Order) from anyayable at J

d above wilause 4.1 a

within 30 d

a part of se

sum equivavour of SBer.

value. Out ich includeof the worfrom eachISD reacheto the con

0% would ntract.

bility and he of filling tce of the w

water, poity of the muthorities considerin

ey of Rs 2r(Valid for ay scheduleJamnagar

ll not be aabove shal

days of aw

ecurity dep

alent to 2%BIIMS Pay

of this 2%es the EMrk at therunning b

es to 5% ontract on thbe paid to

Signature

his own exthis tender

work. The tower, tranmaterials, l

requiremeng the finan

,000/- (Rua period of

ed Nationar.

accepted. Tll be reject

ward of Con

posit.

% of accepyable at A

% of contraD. Balancerate of 10ill account

of contract he basis of

the contra

e & Seal of

xpenses alr documenttenderer isnsport andlabour, theent, trafficncial effect

pees Twof 180 Dayslized Bank

Tender noted.

ntract.

pted tenderhmedabad

act value ise 3% shal0% of thet will be @value. Thearchitect’s

actors after

Tenderer

l t s d e c t

o s k

t

r d

s l

e @ e s r

Page 12: PART CHNICAL BID · 2018. 5. 2. · BI Infra M SBI Infra Third Flo CONDITIO M o AHMEDA 18/05/201 Not applic NA NA. 0.50% of max. 5% o 12 Months 90 days fr NO INTER The con insurance

ArSt

r. Devdatt Mtudio919 Ar

5.2 Ad In caseprojectequivaof contFDR / of workwork inat liberits sole No intethe deHowe

5.3 SigThe suagreemof intimof the succesnot. 6.0 ComTime iaccordof work 7.0 ValTenderdate ofor makprejudi 8.0 LiqThe liqcontrac 9.0 Ra 9.0.1 InThe te

M Pandya rchitects

ditional S

e L-1 biddt cost), thelent to diffetract. SuchBank’s guak ASD willn time or arty to recove discretion

erest shall efect liabilitver, interes

gning of couccessful ment and cmation of a

tenders byssful tende

mpletion Pis essencance with

k.

idity of ters shall ref e-reversekes modificce to any o

uidated Dquidated dct value.

te and pri

n case of nderers sh

Security De

der quotes bank mayerence of

h ASD couarantee as be return

as per tendver the duen.

be paid to ty period ost on FDR

ontract Dotenderer

conditions cceptancey the Bankerer wheth

Period: e of the the terms

nder: main valid

e auction. Ications in hother right

Damages: damages s

ces:

item rate thall quote

eposit:

s abnormay ask suchestimatedld be in th

s per formaed to the c

der specifices from AS

the amounof one year

for additio

ocumentsshall be bof contract

e of the tenk will conser such fo

contract.of contrac

d and openIf the tendehis/her origor remedy

shall be 0

tender: their rates

12

ally low ratbidder tocost vis-à

he joint namat approvedcontractor.cation or leSD or to for

nt retainedr from the donal securit

s: bound to t attached

nder by thestitute a binormal agre

The workct within a p

n for acceerer withdrginal offer wy the Bank

.50% per

s for indiv

tes (i.e. 10deposit ad-vis L-1qume of the Bd by the B. In case ceave the jorfeit such A

d by the Badate virtuaty deposit

implemenherewith w

e Bank. Honding agreeement is

k shouldperiod of 6

ptance forraws his/hewhich are shall be a

week sub

idual items

0% or modditional seoted amouBank and ank. On su

contractor ob incomplASD as the

ank as Secl completiowill be rec

nt the conwithin 15 dowever, theeement besubseque

be compl60 days fro

r a period er offer dunot accept

at liberty for

bject to a

s both in w

Signature

ore, below ecurity depunt for duebidder in tuccessful cfails to comlete, the bae case may

curity Depoon certificaceived by th

ntract by sdays from te written atween the ntly entere

leted in aom the dat

of 90 dayring the vatable to Barfeit the EM

maximum

words and

e & Seal of

estimatedposit (ASD)e fulfillmentthe form ofcompletionmplete theank will bey be within

osit for ate (VCC).he bidder.

signing anthe receipt

acceptanceBank and

ed in to or

all respecte of award

s from thealue periodank withoutMD.

of 5% of

d figure. In

Tenderer

d ) t f n e e n

n t e d r

t d

e d t

f

n

Page 13: PART CHNICAL BID · 2018. 5. 2. · BI Infra M SBI Infra Third Flo CONDITIO M o AHMEDA 18/05/201 Not applic NA NA. 0.50% of max. 5% o 12 Months 90 days fr NO INTER The con insurance

ArSt

r. Devdatt Mtudio919 Ar

case oin wordpaid fothe reqamounwill gov

The tecase thnot be The techangewould descripthe knoauthoriEach p The ralabour

The SBentrustprojectclaim / 10.0 M

wthreinreereac Tinafo

SIGNA

M Pandya rchitects

f discrepands will prevor that itemquisite totant calculatevern and th

nderers nehe tendereconsidered

enderers sed the tenbe paid a

ption of theowledge oized persopage shall

ate quotedrs, taxes e

BIIMS reset the workt within its correspon

Material hawork is morhe differenecovered fnclude all espect. Ranquiry by easonable ccount.

he SBIIMSn part or mny stage oor doing so

ATURE OF

ncy betweevail. If no r

m when it isal is given.ed from muhe amount

eed not quers quote td during exhould not

nders woulaccordinglye item. If af the Archn and cuttibe totaled

d shall beetc. except

erve their rk in phase

sole discndence sha

aving basire or less tnce will befrom the coother tax

ates shouldthe bank

and advan

S Pvt. Ltd. may entrusof the projeo and no cl

F THE CON

en the raterate is quos executed. In case oultiplicationt will be co

uote their their rates xecution. change th

ld be evaly. The tenany discreitect/ SBIIMing or oveand the gr

e firm andt G.S.T, w

rights to acs or mayretion withall be enter

c price: Ifhen the bae calculatontractor. Ges, transpd be howek and thentageous,

Reserve tt the workect within aim/corres

NTRACTO

13

e quoted inoted for a pd. The amoof discrepan of unit rarrected.

rates for wfor such it

he units aluated asderer shopancy is oMS Each p

er writing shrand total s

d shall inchich shall

ccept any tdrop the

hout assignrtained in t

f the basic asic rate gied (eitherGST shall portation, lever, fair quantity if any due

heir rights k in phasesits sole dis

spondence

R WITH S

n words anparticular itount of eacancy betweate and the

which no qtems those

as specifiedper the ould not ch

observed hpage of thhall be dulshall be giv

clude all cl be payab

tenders, eipart scopening any rthis regard

rate of anyven in sch

r plus or be excludloading, uand comppurchasedto bulk pu

to accept s or may dscretion w

e shall be e

EAL

nd figures, tem the coch item shaeen the une quantity

quantities e rates wil

d in the teriginal unit

hange or mhe should he BOQ shy attested ven.

costs, alloble / reimb

ither in whe of workreason(s) f.

y material hedule of qminus) aned from th

unloading, petitive andd in everyurchase ma

any tendedrop the p

without assientertained

Signature

the unit raontractor sall be calcnit rate anthe unit ra

have beenl be ignore

ender. If at and the modify or immediate

hall be signby him.

owances, bursed at a

ole or in pat any stafor doing

actually usuantities, ind shall bhe basic ra

etc compd verified y period ay be also

ers, either iart scope igning any

d in this reg

e & Seal of

te quantityhall not beulated andd the totaate quoted

n given. Ined and wil

any unit iscontractordelete the

ely bring toned by the

materials,actual

part or mayage of theso and no

sed for then the case

be paid orate and wilplete in alby marketshould be taken into

n whole orof work at

y reason(s)gard.

Tenderer

y e d l

d

n l

s r e o e

,

y e o

e e r l l t

e o

r t )

Page 14: PART CHNICAL BID · 2018. 5. 2. · BI Infra M SBI Infra Third Flo CONDITIO M o AHMEDA 18/05/201 Not applic NA NA. 0.50% of max. 5% o 12 Months 90 days fr NO INTER The con insurance

ArSt

r. Devdatt Mtudio919 Ar

1.0 De“Contraformal and thconditiotime byto form In the have th 1.0.1 ManagBhadrasucces 1.0.2 Interior 1.0.3 represecontrac 1.0.4 incorpoindividuindividu The edescripincludekinds tothe con 1.0.5 1.0.6 Engineas maythe entthere t

M Pandya rchitects

efinitions:-act means agreemen

he contracons, the sy the Arch

m one contr

contract thhe meaning

‘SBIIMS’ gement Sea, Laldarwssors and a

‘Architectsr Designers

‘Site Enginentative foctors.

‘The Conorate not, uual or theual or firms

xpression ption in thees materiao be providntractor un

‘Engineer’

‘Drawingseer and refy be issuedtire work ato or dedu

GEN

- the docum

nt executedctor, togethspecificatioitects / Baract and sh

he following hereby r

shall mervices Pro

waja, Ahmassigns.

s/ Consultas, Ahmeda

neer’ shallor day-to-

ntractor’ sundertakine composis of compa

‘works’ oe “Scope ofals, apparaded, the obder the co

shall mea

’ shall meafer red to id by the E

as stipulateuctions the

NERAL CO

ments formd betweenher with t

ons, designnk and all

hall be com

ng expressespectively

ean SBIvider-PMSedabad-38

ants’ shallabad.

mean an day supe

hall meang the workng the fir

any.

or ‘work’ f work” and

atus, equipbligations o

ontract.

an the repre

an the drawin the specngineer fro

ed in the leere from a

14

ONDITIONS

ming the tenn SBI Infra the documns, drawinthese doc

mplementa

sions shally assigned

Infra MaS) having it80001 and

l mean M

Engineer rvision of

n the indks and sharm or com

shall mead/or to be epment, temof the cont

esentative

wings prepcificationsom time to

etter of accas may be

S OF CON

nder and tManagem

ments refegs and ins

cuments tary to one a

l, unless thd to them.

nagementts Circle Od includes

M/s Studio

appointed work and

dividual oll include le

mpany and

an the peexecuted imporary sutractor here

of the Arc

pared by thand any m

o time Contceptance ofe made u

NTRACT

he acceptament Soluti

rred therestructions

aken togethanother.

he context

SolutionOffice at Ths the clien

o919 Arch

by the SBd to give

r firm or egal persod the perm

ermanent n accordaupports, fieunder and

chitect/cons

he Architecmodificatiotract valuef tender su

under the

Signature

ance thereons Pvt. L

e in includissued fro

her shall b

t otherwise

s Pvt. Lhird Floor, nt’s repres

hitects, Ar

BIIMS at siinstructio

companyonal represmitted ass

or temponce with thttings andd work to b

sultant.

cts and issons of suche shall meaubject suchprovide he

e & Seal of

eof and theLtd. (client)ding theseom time tobe deemed

e requires

Ltd.(ProjectSBI, LHOsentatives

rchitects &

ite as theirons to the

y whethersentative ofsignees of

orary workhe contractd things ofbe done by

ued by theh drawingsan value ofh additionserein after

Tenderer

e ) e o d

,

t , ,

&

r e

r f f

k t f y

e s f s r

Page 15: PART CHNICAL BID · 2018. 5. 2. · BI Infra M SBI Infra Third Flo CONDITIO M o AHMEDA 18/05/201 Not applic NA NA. 0.50% of max. 5% o 12 Months 90 days fr NO INTER The con insurance

ArSt

r. Devdatt Mtudio919 Ar

contain 1.0.7 modificArchite 1.0.8 1.0.9 1.0.10 respec 1.1.11 chargeAhmed 1.1.12 to as Jissue inArchiteexecut i) Viceii) SBIIiii) Con CLAUS

1.0 Tot

Total SRetent

1.1 EaThe teform ofon anyin the unsucctaken whis tenacceptenter infails to 1.2 Init

M Pandya rchitects

ned.

Specificatications thect/Consult

“Month” m“Week” m “Day” m

ctively.

“SBIIMS’se of the Prdabad

The followJPC) for asnstructions

ects Site Eion of the p

e PresidentMS Enginecerned pa

SE

tal Securit

Security deion Money

rnest Monnderer shaf Demand

y Schedulerequired

cessful tenwithout intender at anance by thnto a formcommenc

tial Securi

ions’ shalereof as tant.

means calemeans seve

eans a ca

Engineer”roject, as n

wing shall cssessing as or directioEngineer /project.

t – Circle Heer (AIR Crtner of the

ty Deposit

eposit compy

ney Deposall furnish draft or ba

ed Bank. Nform. No

derer shalerest. Theny time thhe SBIIMS

mal agreemce the com

ity Deposi

l mean thmay tim

endar monen consecualendar da

” shall meanominated

constitute tand reviewons from t/ PMC and

Head of SBCONDITIONe Architect

t

prise of Ea

sit- EMD of R

ankers cheo tender s

o interest l be refund EMD shahe period

S or after itment or fails

mence the

it (lSD)

15

he specificme to time

th. utive days.ay beginni

an The AIRd by the C

the Joint Pwing the pro

ime to timed other co

BIIMS NING and ts and their

arnest Mon

Rs. 2,000/-eque drawnhall be conshall be

ded soon aall stand ab

when het is acceptes to pay th

e work with

cations ree be fur

. ing and e

R CONDITircle Head

Project Comogress of te for beingonsultants

Electrical) r Resident

ney Deposi

- (Rupeesn in favournsidered upaid on

after the debsolutely foe is required by the he initial sehin the stipu

eferred to nished or

ending at

TIONING/Ed and Vice

mmittee (hthe work o

g observed/ contract

in-charge Architect M

it, Initial se

s Two Thor of SBI pa

unless the Ethis EMD

ecision to aorfeited if tred to keeSBIIMS, thecurity depulated time

Signature

in the ter approve

00 Hrs an

lectrical Ee Presiden

herein undeon the projd and followtors engag

of the ProMember.

ecurity dep

ousand onayable at JEMD is so

D. The EMaward the the tendereep his tenhe contracposit as ste.

e & Seal of

ender anded by the

nd 24 Hrs

ngineer in-t, SBIIMS

er referredject and towed by theged in the

oject

osit and

nly) in theJamnagar.o depositedMD of thecontract iser revokesnder openctor fails toipulated or

Tenderer

d e

s

-,

d o e e

e ,

d e s s n o r

Page 16: PART CHNICAL BID · 2018. 5. 2. · BI Infra M SBI Infra Third Flo CONDITIO M o AHMEDA 18/05/201 Not applic NA NA. 0.50% of max. 5% o 12 Months 90 days fr NO INTER The con insurance

ArSt

r. Devdatt Mtudio919 Ar

The amform odeposi

1.3 ADIn caseprojectequivaof contFDR / of workwork inat liberits sole No intedefect Howev 1.4 ReBesidemoneyvalue odeposithe cocontracArchitethe conprovideconditio 2.0 LanThe lan 3.0 ErrIn casdimensfollowin

i) Betwbe ado

ii) Betw

M Pandya rchitects

mount of ISf DD/Fixedted within

DDITIONALe L-1 biddt cost), thelent to diffetract. SuchBank’s guak ASD willn time or arty to recove discretion

erest shall liability pe

ver, interes

tention Moes the SD ay shall be dof work dot i.e. ISD pntract valuctor withoect/consultantractors wed the conons of con

nguage: nguage in

rors, omisse of errosions on tng order sh

ween scaleopted.

ween the w

SD shall bd Deposit 15 days fro

L SECURITder quotes bank mayerence of eh ASD couarantee as be returns per tend

ver the duen.

be paid toeriod of onst on FDR f

oney: as depositededucted fne by the plus EMD ue. The 5ut any inant. The b

without intentractor hastract includ

which the

ssions andors, omissthe drawinhall apply.

ed and wri

written or

be 2% of aReceipt (Fom the dat

TY DEPOSs abnormay ask suchestimatedld be in th

s per formaed to the c

der specifices from AS

o the amoune year frfor addition

ed by the cfrom the rucontractor plus Rete

50% of thenterest on alance 50

erest withins satisfactoding site cl

contract do

d discrepasions and/ngs or be

tten dimen

shown de

16

accepted vFDR) drawte of accep

SIT / PERFally low rat

bidder tocost vis-à-

he joint namat approvedcontractor.

cation or leSD or to for

unt retainedrom the danal security

contractorunning accand claimntion Mone total sec

issue of% of the to

n fifteen daorily attendlearance.

ocuments

ancies: / or disag

etween the

nsion (or d

escription

value of tewn on any ptance of te

FORMANCtes (i.e. 10deposit ad-vis L-1 qume of the Bd by the B. In case c

eave the jorfeit such A

d by the Baate virtual y deposit w

in the abocount bill a

med in eachey shall bocurity depf Virtual Cotal securi

ays after thded to all d

shall be dr

greement e drawings

description

or dimens

nder includscheduled

ender.

CE GUARA0% or mo

dditional seuoted amouBank and ank. On su

contractor ob in compASD as the

ank as Seccompletio

will be rece

ove said mat the rate h bill providoth togethe

posit shall Completionty deposit

he end of ddefects in

rawn shall

between s and spe

) on a dra

sions in th

Signature

ding the Ed Bank an

ANTEE ore, below ecurity depunt for duebidder in tuccessful cfails to comlete, the bae case may

curity Depoon certificaeived by th

anner, theof 10% of

ded the toter not excbe refund

n certificashall be re

defects liabaccordanc

be in Engl

written aecifications

awing, the

he drawing

e & Seal of

EMD in thend shall be

estimatedposit (ASD)e fulfillmentthe form ofcompletionmplete theank will bey be within

osit for theate (VCC)e bidder.

e Retentionf the grosstal security

ceed 5% ofded to thete by theefunded to

bility periodce with the

lish.

nd scaleds etc., the

latter shal

gs and the

Tenderer

e e

d ) t f n e e n

e .

n s y f e e o d e

d e

l

e

Page 17: PART CHNICAL BID · 2018. 5. 2. · BI Infra M SBI Infra Third Flo CONDITIO M o AHMEDA 18/05/201 Not applic NA NA. 0.50% of max. 5% o 12 Months 90 days fr NO INTER The con insurance

ArSt

r. Devdatt Mtudio919 Ar

corresp iii) Betwof quan

a) In cashall pr

b) Betwtaken a

4.0 ScoThe costrictly Bank tthe dirinstrucreferenmodificsubstituand/or Contraexecutengage 5.0 i) LWithin directlycontracper thebetwee ii) ConOn recsuccesthere o 6.0 OwAll drawArchiteother w 7.0 DeThe SB

M Pandya rchitects

ponding on

ween writtentities of th

ase of diffrevail. ween the das correct.

ope of Woontractor saccordanc

o be commrections of tions, det

nces to ascation of thution workspecificati

actor and aion of anyed the re u

Letter of Athe validit

y or througctor as givee terms ofen the SBII

tract Agreceipt of intssful tendeof shall sign

wnership owings, spe

ect / consuwork.

tailed drawBIIMS thro

ne in the sp

en descriphe same ite

ference be

duplicate /

ork: shall carryce with thimunicated f the SBIIMails directs Architecthe design, k. Any discions. The

any substity work exeupon.

Acceptancety period o

gh the archen in the tef the tendeIMS and th

eement: timation of

erer shall bn an agree

of drawingecificationsultants are

wings andough its a

pecification

tion of theem, the for

etween rate

subseque

out complis contractthrough th

MS from titions and t’s / consquality or

crepancy inremoval frution of anecuted by

e: of the tendhitect by reender to ener. The lethe contract

f the accebe boundement in a

gs: s and copiee the prope

d instructirchitects /

17

n the forme

e item in thrmer shall b

es written

nt copies o

ete and mt and with he architecime to tim

explanatiultant’s inquantity o

n the drawom the siteny other mhim. The

der the SBegistered pnter into atter of acctor.

eptance ofto implemnon-judicia

es thereof ferties of th

ions: / consultan

er shall be

he specificbe adopted

in figures

of the tend

maintain ththe direct

ct/consultame issue fu

ions whicstructions f any work

wings or bee of any m

materials thdismissal

BIIMS shapost or othContract f

ceptance s

f tender frment the co

al stamp p

furnished bhe SBIIMS

nts shall fu

taken as c

ations andd:

and word

der, the ori

he said wotions of anant. The arurther drawh are hein regard

k or the adetween BOmaterial broherefore the

from the

ll issue a erwise dep

for the exeshall const

rom the SBontract andaper of ap

by the SBIS They are

urnish with

Signature

correct.

d descriptio

ds, the rate

ginal tende

ork in evend to the srchitect/cowings andre after c to the vdition or o

OQ and / oought theree removal work of a

letter of apositing atcution of thitute a bin

BIIMS /Arcd within fifpropriate v

IMS / SBI e not to b

h reasona

e & Seal of

ons in bills

e in words

er shall be

ery respectsatisfactionnsultant at / or writecollectivelyariation or

omission orr drawingseon by theand/or re-

any person

acceptancet the of thehe work asnd contract

chitect thefteen daysvalue.

through itse used on

ble proper

Tenderer

s

s

e

t n t e y r r s e - n

e e s t

e s

s n

r

Page 18: PART CHNICAL BID · 2018. 5. 2. · BI Infra M SBI Infra Third Flo CONDITIO M o AHMEDA 18/05/201 Not applic NA NA. 0.50% of max. 5% o 12 Months 90 days fr NO INTER The con insurance

ArSt

r. Devdatt Mtudio919 Ar

additiothe wodocum The wdetailevariousthrough 7(a) CoTwo cohanded

8.0 LiqIf the cto comcontracof delaunder tthe ratcontrac 9.0 MaUnlesslabour,requirespecifiequalityhis emin the unsatisimmed 10.0 PePermitscontracregulatobservnotify contracmeet aarising

M Pandya rchitects

nal instrucork. All sents, true

work shall d programs activitiesh the archi

opies of aopies of ad over to th

quidated dcontractor f

mplete the wcted or ext

ay, he may the law to te of 0.50ct value.

aterials, Aps or otherw, water, poed for the sed all mate. The contployees anwork ass

sfactory byiately.

ermits, Las and licector at his tions, lawsves any disthe SBIIMctor perforall the cost

there from

ctions by msuch drawdevelopme

be executmme scheds on receiitect/consu

greementgreement he contract

damages: fails to mawork and tended datbe called the SBIIM% of the

ppliances wise speciower, toolssatisfactoryerials shaltractor shand shall nosigned to y the SBIIM

aws and Rnses requown expe

s, and ordscrepancy MS in writrms any ats arising t

m.

means of drwings andents thereo

ted in condule indicapt of the

ultant

t: duly signetors.

intain the rclear the ste or compupon withoS on accocontract v

and Empified the cs, equipmey executiol be new a

all at all timot employ him. Wor

MS /Archit

Regulationired for th

enses. Thedinances r

between tting undect, whichthe reform

18

rawings or instructioof and reas

nformity thating therework orde

ed by both

required psite includipletion, witout prejudi

ount of sucvalue whic

loyees: contractor ent transpon and comand both w

mes enforcon the workman whtect/ consu

s: he executioe contractoules, applthe drawinr intimatiois againstand shall

otherwiseons shall sonably inf

here with ein the daer and sub

h the parti

rogress ining vacatinthout justifice to any

ch breach tch subject

shall provortation an

mpletion of workmanshe strict dis

ork any unfhose work ultant he s

on of the wor shall givicable to

ngs and spon of the

the law, indemnify

necessarybe consi

ferable the

and the cate of starbmit the s

ies with th

terms of cng their offfication in sother rightto pay a liq

to a max

vide and pnd any oththe work.

hip and mascipline andfit person o

or behavshall be re

work shallve notices the contra

pecificationArchitect/

rules andy the SBIIM

Signature

y for the existent with

ere.

contractor rt and comsame to th

he drawing

clause 6.0 fice on or support of t of remedyquidated dximum of

pay for all her facilitieUnless or

aterials shad good ordor anyone vior is foumoved fro

be obtainand comp

act. If the ns, he sha/ Consultaregulation

MS any leg

e & Seal of

xecution ofh contract

prepare ampletion ofhe SBIIMS

gs shall be

of GOC orbefore thethe cause

y availableamages at5% of the

materialses that arer otherwiseall be bestder amongnot skilled

und to beom the site

ned by theply with the

contractorll promptlyant. If thens he shalgal actions

Tenderer

f t

a f

S

e

r e e e t e

, e e t g d e e

e e r y e l s

Page 19: PART CHNICAL BID · 2018. 5. 2. · BI Infra M SBI Infra Third Flo CONDITIO M o AHMEDA 18/05/201 Not applic NA NA. 0.50% of max. 5% o 12 Months 90 days fr NO INTER The con insurance

ArSt

r. Devdatt Mtudio919 Ar

11.0 SeThe cosetting alignmproceeprogresarchiteexpens 12.0 PrThe codamagwith cobeyond He shacontracworks laws anor adjaclause SBIIMS 13.0 InThe SBhave frwhere every finspectunless /Consuat any also beVigilan 14.0 AThe whnot direany pathroughresponprogres 15.0 Q

M Pandya rchitects

etting out ontractor s

out of theent of all

eding with tss of the w

ect / consuses rectify

rotection ontractor sge and shaontract. Hed his contro

all take adctor shall tand shall nd buildingacent to hat his own

S and the o

nspection BIIMS / Arcree accessmaterials

facility to thtion and eauthorized

ultant excetime. The e inspectece commis

ssignmenhole of worectly entru

art or shareh the Arc

nsibility of ss.

Quality of m

Work: hall set ou

e same andparts therethe work. I

works, irresltant the csuch error

of works ashall continall protect te shall makol and due

dequate catake all precomply wi

g codes to is place o

n cost. Theoriginal po

of work: chitect / Cos to the ware lying ohe SBIIMSexaminatiod by the SB

ept the reprproposed w

ed by the ssion.

nt and subrk included

ust and enge there of chitect anthe contra

materials,

ut the workd for the coeof and geIf at any timspective ofcontractor sr, if so, req

and propenuously mthe SBI’s ke good ane to his fau

are and stecautions fth all applprevent ac

of work. Te policy malicy may be

onsultant owork site anor from whS/Architect/on and tesBIIMS/ Arcresentativework eitheChief Tec

bletting: d in the congage or inor interest

nd no undactor from

workman

19

k and shalorrectnesset it approme any errf the fact thshall be reuired to sa

erty: maintain ad

properties ny such dalt or neglig

eps for prfor safety icable proccidents, ohe contracay be takene lodged w

or their repnd / or to ere they a/consultanst of the mchitect e of Publicer during itshnical Exa

ntract shaldirectly trat therein wdertaking

active &

ship &Tes

l be respoof the pos

oved by theror in this rhat the layoesponsible atisfaction o

dequate prfrom injur

amage, injugence.

rotection oand protecvisions of

or injuries toctor shalln in joint n

with the SB

presentativethe works

are obtainet and theirmaterials a

c authorities constructaminer’s O

l be execuansfer, ass

without the shall reliesuperinten

st:

onsible for sitions, leve architectrespect shaout had befor the sa

of the SBII

rotection. ry or loss aury, loss, e

f the adjacctions of hGovt. ando personstake insurames of th

BIIMS

es shall at hop, facto

ed and the r representand workm

s shall be tion stage

Organizatio

uted the cosign or undwritten co

eve the cndence of

Signature

the true aels, diment / consultall appear een approvame ad shaIMS

of all his arising in cexcept due

cent propeis employe

d local bodor propert

rance covehe contract

all reasonries, or otcontractor

tatives necmanship. N

allowed oor its comp

on a wing

ontractor anderlet the consent of thcontractor

the work

e & Seal of

and perfectnsions, andtant beforeduring the

ved by, theall his own

work fromconnection

e to causes

erties. Theees on the

dies’ safetyy on abouters as pertor and the

nable timesher placesr shall givecessary forNo person

n the workpletion canof Centra

nd he shalcontract orhe SBIIMS

from theduring its

Tenderer

t d e e e n

m n s

e e y t r e

s s e r n

k n l

l r

S e s

Page 20: PART CHNICAL BID · 2018. 5. 2. · BI Infra M SBI Infra Third Flo CONDITIO M o AHMEDA 18/05/201 Not applic NA NA. 0.50% of max. 5% o 12 Months 90 days fr NO INTER The con insurance

ArSt

r. Devdatt Mtudio919 Ar

All matcontracfrom timanufacontracas are part ofrequire

ii) Sam All samsupplieused adetaileArchitehimselfmeet win writiand insthe sigsite offArchitemight oother dmanufaequipm

iii) CosThe cosprovide

iv) CosIf any tea) If sparticuConsulor the approv

16.0 ONo claconseqaffectininforma

M Pandya rchitects

terials andct and in ame to timeacture or ctor shall pnormally r

f work befed by the a

mples: mples of aded by the are of sucd literature

ect/consultaf that the

with the reqng by the stallation oned by thefice until thect/Consultoccur in apdiscrepancacturers an

ment etc. sh

st of testsst of makined for in th

sts of testest is orderso intendelarized, orltant to be place of m

ved laborat

Obtaining iaim by thquent uponng the exeation or the

d workmanaccordance to such fabrication

provide surequired fofore in co

architect/co

dequate nucontractor

ch nature te / test certant beforematerial / quirement architect/c

of the parte Architecthe complettant shall tpproving thcies inadeqnd such othall be to t

s: ng any test e specifica

ts not provred by the

ed by or pr though scarried ou

manufacturtory, then t

nformatioe contracn failure ocution of te failure to

nship shalle with Arctests as t

n or on tuch assistaor examininorporationonsultant.

umbers, sizwithout a

that samptificate of t

e submittinequipmentof tender s

consultanticular matt / Consulttion of the take reasohe samplesquacy in fther aspecthe accoun

shall be bation or BO

vided for:Architect/

provided foso intendeut by an inre or fabricthe cost of

on related tor for adon his parhe work n

o obtain co

20

l be best ochitect/conthe architethe site oance, instrung measurin the wo

ze, shadesany extra cples cannohe same sg the samt for whichspecificatiothe contraerial / equant for idework for i

onable times for reasofurnishing

cts causingnt of the co

borne by thOQ.

Consultanor or (in t

ed or provndependencation of thsuch test s

to executdditional prt to obtaior any mis

orrect inform

of the respsultant ins

ect/consultar an appruments, mring sampl

ork for test

s & patterncharges. Ifot be presshall be promple/literatuh he is subon. Only wactor shalluipment. Thentification nspection e to approns of its nosamples

g delay on ontractor.

he contract

t which is ethe cases

vided for bt person a

he materiashall be bo

ion of worpayment sn correct

sunderstanmation reli

pective kinstructions aant may droved test

machinery, ing and teting as m

n as per spf certain iteented or povided to ture the cobmitting th

when the saproceed whe approvand shall / comparisve the samot meetingof best quthe approv

or if such t

either above m

but orderedat any placals tested oorne by the

rk: shall be e

informationding or theve him fro

Signature

nds descriand shall

direct at thting laboralabor, andsting any may be sel

pecificationems propoprepared ahe satisfac

ontractor she sample

amples arewith the proved samplebe kept onson at anymple. Any the specifualities froval of the

test is inten

mentioned) d by the

ce other thaor any Gove contracto

entertainedon as to ae obtainingom any ris

e & Seal of

bed in thebe subjecte place ofatory. Thed materialsmaterial orected and

ns shall beosed to beat the sitection of thehall satisfy/ literature

e approvedocurementes shall byn record aty time. The

delay thatfications orom variousmaterials /

nded by or

is not soArchitect /an the sitevernment /or.

d which isany matterg incorrect

sks or from

Tenderer

e t f

e s r d

e e e e y e d t y t

e t r s /

r

o /

e /

s r t

m

Page 21: PART CHNICAL BID · 2018. 5. 2. · BI Infra M SBI Infra Third Flo CONDITIO M o AHMEDA 18/05/201 Not applic NA NA. 0.50% of max. 5% o 12 Months 90 days fr NO INTER The con insurance

ArSt

r. Devdatt Mtudio919 Ar

the ent 17.0 CThe coworks the exp 18.0 QThe bilpreparequantititem toamoun 19.0 WThe ArequirequantitcalculaSuch mdetail imeasuenteredsign alrecorderepreseattend measuAll autmeasu 20.0 VaNo altethe conprogresor any.Consulwithin somit froany woany decontracthe vadeterm

M Pandya rchitects

tire respon

ontractor’ontractor shand as lonpiry of the d

Quantities:ll of quanted in accties. The rao any extents of prime

Works to beArchitect/Coes the worty represeation and tomeasuremin the sperements wd in the mell the pageed in tokeentatives. or neglec

rements rethorized exrement.

ariations: eration, omntract. In css of work. Alterationltant shall seven dayom as theork extra toeviation froct drawing

alue of sucmined by th

sibility for

’s superinhall give nng, thereaftdefects lia

ities (BOQcordance ate quotedent. The ee cost and

e measureonsultant mrk to be mentative too furnish aents shallcifications.with the ceasuremenes of the mn of his acNo over wct or omitecorded byxtra work,

mission or vcase the Sks to maken in the kin

give noticys of giving case may

o or make om any of s without ch extras,

he Architec

the fulfillm

ntendenceecessary pter, as thebility perio

Q) unless owith the

d shall rementire amoprovision s

ed: may fromeasured a

o assist thll particula be taken. The reprontractor’snt book. Thmeasuremcceptance

writings shat to deputy the repreomissions

variation oBIIMS/ Arc

e any alterad or quality

ce thereof g such oray be in accany alteratthe provisprevious c, alterationct / Consu

21

ent of cont

e: personal s Architect/d, stated h

or otherwisIndian Sta

main valid fount paid usums, if an

time to tand the cohe Architers or to giv

n in accordresentatives represenhe contrac

ment book. All the co

all be madete his repesentatives and all v

rdered in wchitect / Coation in, ory of the main writing

al instructiocordance wtions or adsions of theconsent in ns, additioltant and t

tract.

superintend/Consultanhereto.

se stated sandard Mfor variatiounder Clauny, shall be

time intimaontractor shect in takive all assisdance with

e of the Arntative andctor or his ain which t

orrections e in the Mpresentativ

of the Arcvariations

writing by tonsultant tr additions aterials toto the conons the cowith such

dditions to oe contractwriting of

ons or omthe same s

dence durit may cons

shall be deethod of n of quantuse 19, 2e excluded

ate to thehall forthwing such

stance requh the Modrchitect / Cd the meaauthorizedthe measushall be dbook shoue to take

chitect/consmade sha

the Architethinks propto or omisbe used th

ntractor shontract shabut the coor omissio, stipulatiof the Archi

missions shshall be ad

Signature

ng the exesider nece

eemed to hMeasurem

tity against0 hereof a

d.

e contractowith attend

measuremuired by ande of meaConsultant asurementsd representurements hduly attesteuld the con

measuresultant shaall be inclu

ect/consultaper at any ssion fromherein, the all confirm

all alter to, ontractor shons from thons, speciftect/ Conshall in all dded to or

e & Seal of

ecution theessary unti

have beenments andt individuaas well as

or that heor send a

ments andny of themsurementsshall take

s shall betative shalhave beened by bothntractor notments theall be finaluded such

ant vitiatesduring the the worksArchitect /

m in writingadd to, or

hall not doe works or

fications orsultant and

cases ber deducted

Tenderer

e l

n d l s

e a d . s e e l

n h t e . h

s e s / g r o r r d e d

Page 22: PART CHNICAL BID · 2018. 5. 2. · BI Infra M SBI Infra Third Flo CONDITIO M o AHMEDA 18/05/201 Not applic NA NA. 0.50% of max. 5% o 12 Months 90 days fr NO INTER The con insurance

ArSt

r. Devdatt Mtudio919 Ar

from th 21.0 VaNo claauthorimentioin acco (i) The where the wo(ii) Ratpriced The neprovideWorks Clause Where conditioremainreceiptintendsclaimedin his oWhere allowedstated provideArchiteverificawhich t It is fuderivedanalysiequipmoverhe 22.0 FiThe memonths

M Pandya rchitects

he contract

aluation oim for an ity of the A

oned. Any sordance wi

net rates such extrark price hees for all itBOQ.

et prices ofed if omissare carried

e ‘c’ hereun

the extraons as afo

ning items t of the letts to charged and the Aopinion are

extra wod day workthen in a

ed that in ect/Consultations to ththe work h

urther clarid from theis worked

ment and weads and p

inal measeasuremens of the virt

t value, as

of Variatioextra shaArchitect /such extrath the follo

or prices ia work is oerein. tems, wher

f the originasions do nod out, othender.

a works aoresaid or or works ater of accee for such Architect/c

e reasonabork cannotk prices at

accordanceeither casetant) the w

he Architecas been ex

ified that fe tender, on the ‘mawastages rofit. Such

urement: nt and valutual compl

the case m

ns: ll be allow/ Consultaa is herein owing prov

n the contof similar c

rever poss

al tender sot vary the erwise the

are not of where the

are carriedeptance infitems of w

consultant sble and prot be propet the net rae with thee, voucherworkman’sct /consultaxecuted.

for all sucthe Contr

arket rate etc. plus items sha

uation in reetion of the

22

maybe.

wed unlessnt with thereferred toisions.

ract shall dcharacter a

sible should

shall determconditionsprices for t

similar che omission

d out, then form the A

work, duly sshall fix su

oper, basederly measuates stated

local dayrs specifyi

s name anant at or be

ch authorizractor shabasis for m15% towa

all, not be e

espect of the work.

s it shall he concurreo as autho

determineand execut

d be derive

mine the vas under whthe same s

haracter ans vary ththe contra

Architect/ csupported uch rate ord on the mured or vad in the teny work rateng the dai

nd materiaefore the en

zed extrall submitmaterial, laards estabeligible for

he contrac

have been ence of thorized extra

the valuatted under

ed out of th

alue of theich any remshall be va

and/or exee conditioactor shall consultant by analysiprices asarket rate.alued thender, of thes and waily time (anals employnd of the w

items wherates duly

abour hire lishment cescalation

ct shall be c

Signature

executed e SBIIMS a and shal

tion of the similar con

he rates giv

e items omimaining ite

alued unde

ecuted undns under within 7 dof the rates of the rain the circu contracto

he BOQ orages for thnd if requiyed be deweek follow

ere rates y supporte/ running c

charges, c.

completed

e & Seal of

under theas herein

ll be made

extra worknditions as

ven in the

itted, ems of r sub-

der similarwhich any

days of thee which heate or ratesumstances

or shall ber, if not, sohe districtred by the

elivered forwing that in

cannot beed by ratecharges of

contractor’s

within two

Tenderer

e n e

k s

r y e e s s

e o ; e r n

e e f s

o

Page 23: PART CHNICAL BID · 2018. 5. 2. · BI Infra M SBI Infra Third Flo CONDITIO M o AHMEDA 18/05/201 Not applic NA NA. 0.50% of max. 5% o 12 Months 90 days fr NO INTER The con insurance

ArSt

r. Devdatt Mtudio919 Ar

23.0 VOn sucof the comple Clear tequipm Demoliincludinbroughnot inc Removthe SB Shall pby the Shall h All defArchite Upon tentitledRelativshall wissue aThis iscontracliabilityconstrurespec

24.0 WThe SBthe sitedesire only alcontracexecutcarriedcontrac

M Pandya rchitects

irtual Comccessful co

SBIIMS, eted the sa

the site oment and m

ish, dismang labour sht upon or orporated

ve all rubbIIMS and s

put the SBISBIIMS

hand over t

fects / impects to the

the satisfad to apply ve to whichwithin fourtea VCC in ressuance octor liability nor shall uction as act of or wor

Work by otBIIMS / Arce for executo have callow but actor howevion of such

d out in succt.

mpletion Completion o

the contatisfaction o

f all scaffomachinery.

ntle and resheds/camerected atin the perm

ish, debrisshall clear,

IIMS in und

the work in

perfectionsfull satisfa

actory fulfilto the Ar

h the compeen (14) daespect of thf a VCC ties under

the issuaa waiver ork at the sit

her agencchitect / coution of anyarried out b

also extendver shall h work excch manner

Certificate of entire wractor shaof the SBII

olding, wir

emove themps and cot the site omanent wo

s etc. from, level and

disputed c

n a peacefu

s have bection of SB

llment by rchitect / cpletion cerays of thehe work foshall not the contr

nce of VCof any rightte and in re

cies: onsultant rey work notby other pd reasonanot be re

cept by sper as not to

23

(VCC): works coverall ensureIMS:

ring, pipes

contractoonstructionor any landorks.

the site adress, com

custody and

ul manner

een attendBIIMS

the contraconsultant rtificate hareceipt of

or which thebe withou

ract includCC in respt or claim espect of w

eserves tht included iersons simble facilitie

equired toecial arrano impede th

red by the e that the

s, surplus

r’s site offis and othe

d allotted to

and the lanmpact the

d possess

to the SBI

ed and re

actor as stis satisfie

as been sothe applic

e VCC hasut prejudicding the cect of the of the SBI

which the V

he rights toin the scop

multaneouses for the

provide agement wihe progres

contract t following

materials,

ce, tempoer items ano the contr

nd allotted site as req

ion of the s

IMS

ectified as

tated aboved of the ought, the ation for cos applied.e to the Sontractor’sworks or

IIMS againVCC has b

o use prempe of this csly and the

executionany plantith the SBIss of the w

Signature

o the full sg works h

, contracto

rary worksnd things wractor by th

to the conquired by th

site and al

pointed o

ve, the cocompletionArchitect/ ompletion

SBIIMS’s s liability f

work at anst the coeen issued

mises and acontract whe contracton of such

or materI. Such woworks inclu

e & Seal of

satisfactionhave been

or’s labour

s, structurewhatsoeverhe SBIIMS

ntractor byhe SBIIMS

ll land allot

out by the

ontractor isn of workconsultantcertificate

rights andfor defectsany site beontractor ind.

any portionhich it mayor shall notwork. Theial for the

ork shall beuded in the

Tenderer

n n

r

e r

S

y

t

e

s . t ,

d s e n

n y t e e e e

Page 24: PART CHNICAL BID · 2018. 5. 2. · BI Infra M SBI Infra Third Flo CONDITIO M o AHMEDA 18/05/201 Not applic NA NA. 0.50% of max. 5% o 12 Months 90 days fr NO INTER The con insurance

ArSt

r. Devdatt Mtudio919 Ar

25.0 InWithoushall indamagresponcontracduring prior tooccasiopurpos The Wor suchin the w The coreplace Such inwhich requirepayme 26.0 DThe cothe SBmateriaconseqproceerelation a) The

b) The throughc) Injurexecutd) InjurSBIIMScontracexpenscontribas may

M Pandya rchitects

nsurance out limiting nsure in thges from wnsible undector are cothe period

o the commoned by th

se of comp

Works for thh additionaworks at th

onstructionement valu

nsurance sapproval s

ed producent of the c

amage to ontractor sBI against aal or physiquence of edings, damn thereto e

permanen

right of Sh any landries or damion or mainries or damS their agctor or for ses in respbuted to byy be just a

of works: his obligahe joint na

whatever cer the termovered for d of maintmencemenhe contractlying with h

he time beial sum as mheir replace

al plant anue of such

shall be efshall not be to the Arcurrent prem

persons ahall, excepall losses aical damagthe execu

mages, coexcept any

nt use or oc

BIIMS to es. mages to ntenance omage to pgents, emor in respepect thereoy the contrand equita

tions and ames of thcause arisims of contthe periodenance font of the ptor in the chis obligat

ng executmay be spement valu

nd other thconstructio

ffected withbe unreasochitect / comiums.

and propept if and soand claimsge to any ution and osts, chargcompensa

ccupation o

execute th

persons oof the work

persons orployees oect of any of or in reractor, his able havin

24

responsibhe SBIIMSng other ttract and d stipulatedor loss or deriod of mcourse of aions under

ed to the eecified tog

ue.

hings brougonal plant

h an insureonably withonsultant th

erty: o far as th in respectproperty wmaintenan

ges and exation of dam

of land by

he works o

or propertiks in accor

property or other coclaims, pro

elation therservants og regard t

bilities undS And thethan the ein such a d I clause damage a

maintenancany operatr clause.

estimated gether with

ght on to thand other

er and in thheld and he policy if

he contractt of injurieswhatsoevence of the xpenses wmages for

or any par

or any part

ies which rdance withresulting fontractors oceedings,reto or whor agents sto the exte

er the concontracto

excepted rimanner tof GCC a

rising fromce and for tions carrie

current Co the mater

he site by things.

terms apprthe contra

f insurance

t provides s or damagr which mworks an

whatsoeveor with res

rt thereof.

t thereof o

are unavoh the contrfrom any a

not being, damagesere the injsuch part oent of the

Signature

ntract the or against isks, for what the SB

and are alsm a cause,

any loss oed out by h

ontract valurials for inc

the contra

roved by thactor shall e and the r

otherwiseges to anyay arise o

nd against r in respespect to:

on, over, u

oidable resract. act or negg employe

s, costs, chjury or daof the comresponsib

e & Seal of

contractorall loss of

which he isBIIMS andso covered, occurringor damagehim for the

ue thereofcorporation

actor to the

he SBIIMSwhenever

receipts for

indemnifyy person orout of or in

all claimsct of or in

nder, in or

sult of the

lect of theed by theharges andmage was

mpensationbility of the

Tenderer

r f s d d g e e

, n

e

S r r

y r n s n

r

e

e e d s n e

Page 25: PART CHNICAL BID · 2018. 5. 2. · BI Infra M SBI Infra Third Flo CONDITIO M o AHMEDA 18/05/201 Not applic NA NA. 0.50% of max. 5% o 12 Months 90 days fr NO INTER The con insurance

ArSt

r. Devdatt Mtudio919 Ar

SBIIMSfor the 27.0 CThe cocosts, clause 28.0 CThe coaction, any allerespecmade uthe conat his there frinfringeresult o 29.0 ThBefore obligatliabilitypropertSBIIMScontracthereof 30.0 MSuch inwhich below. the popremiu

The moccurrecontracoccurre 31.0 AThe Spayabl

M Pandya rchitects

S, their emdamage o

ontractor ontractor scharges a26.0 of thi

ontractor’ontractor sclaim, or

eged patect to any arunder or antractor shown experom, providement of tof an order

hird Partycommenc

ions and y for any mty includinS, by or act, otherwif.

Minimum ansurance sapproval sThe contr

olicy or poums.

inimum insence with ctor will pences alwa

ccident orBIIMS Shae at law in

mployees, oor injury.

to indemnshall indemnd expensis clause.

’s superinshall fully proceedinnt or desigrticle or paaction brouall be immnses to seded that thhe patent r passed by

y Insuranccing the eresponsib

material orng that of arising out se than du

mount of shall be afshall not bractor shaolicies of

surance cothe numb

pay additioays.

r Injury toall not be

n respect o

or agents o

nify SBIIMmnify the Sses in resp

ntendenceindemnify

ng relating gn rights anart thereofught agains

mediately nettle any dhe contractor design y the Arch

ce: execution oilities undr physical SBIIMS, oof the exe

ue to the m

Third Parffected withbe reasonll, whenevinsurance

over for phber of occonal premi

workmanliable for

or inconseq

25

or other em

MS: SBIIMS agpect of the

e: y and kee

to infringend shall paincluded i

st SBIIMSotified ther

dispute ortor shall noor any allitect / cons

of the worer clausedamage,

or to any ecution ofmatters re

rty Insuranh an insureably withh

ver requirecover an

hysical procurrences ium neces

n: or in res

quence of a

mployees,

gainst all cmatters re

p indemnement or uay any royan the contin respec

reof and thto conduc

ot be liableeged patesultant in th

rk the con25.0 of Gloss, or inperson, inthe works

eferred to i

nce: er and in theld and fod, produce

nd receipts

perty, injurlimited to

ssary to m

spect to anany accide

or agents

claims, proeferred to

ified the Suse of anyalties whictract. In the

ct of such mhe contractct any litige to indemnent or desihis behalf.

tractor butGCC shalnjury whichncluding as or in then the prov

terms appror at lease to the. As for paym

ry, and deo four. Aftmake insu

ny damagent or injur

Signature

or other c

oceedings, in the prov

SBIIMS agy patent orch may be e event ofmatters astor shall beation that nify the SBgn right is

t without ll insure ah may occ

any employe carrying vision to c

roved by tht the amo

Architect / ment of th

ath is Rs.5ter each orance vali

es or comry to any w

e & Seal of

contractors

damagesvision sub-

gainst anyr design orpayable in

f any claims aforesaide at libertymay arise

BIIMS if thes the direct

imiting hisagainst hiscur to anyyee of theout of thelause 25.0

he SBIIMSount stated

consultanthe current

5 Lakh peroccurrenceid for four

mpensationworkmen or

Tenderer

s

, -

y r n

m d , e e t

s s y e e 0

S d t t

r e r

n r

Page 26: PART CHNICAL BID · 2018. 5. 2. · BI Infra M SBI Infra Third Flo CONDITIO M o AHMEDA 18/05/201 Not applic NA NA. 0.50% of max. 5% o 12 Months 90 days fr NO INTER The con insurance

ArSt

r. Devdatt Mtudio919 Ar

other pexcept agentsagainsagainsthereof 32.0 InThe coDuring shall, wreceiptpersonaforesainsuredindemnproducthe pay 33.0 RIf the cother iand in pay sutime dewhich contrac Withousuch dcontracSBIIMSshall upolicy tdestroyof suchto any of the m

34.0 CThe daby the

M Pandya rchitects

person in an accide

s, or emplot all sucht all claimf or in relat

nsurance aontractor sh

the wholewhen requt for paymns employeaid under d against tnified undece to the Ayment of th

emedy oncontractor fnsurance wany such ch premiueduct the may beco

ctor.

ut prejudicedefault, thector the amS And whipon settlemtaken undeyed or damh damage further pa

materials o

ommenceate of commSBIIMS

the emploent or injuoyees. Th

h damagess, proceedtion thereto

against achall insure e of the timired, produ

ment of theed by anythis sub-

the liabilityer the pol

Architect /che current

n contractofails to effewhich he case the Sm or premamount so

ome due

e to the ote employemount of aich are pament by ther this claumaged. In t

shall be pyment in r

or goods de

ement of Wmencemen

oyment ofury resultine contracts and comdings, coso.

ccidents eagainst su

me that anuce to the e current py sub-con-clause shy in respecicy but th

consultant premium.

or’s failurect and kemay be re

SBIIMS mamiums as mo paid by tto the co

thers rightsr shall beny damage

ayable bye Insurer ouse, procethis event

paid to the respect of estroyed o

Works: nt of the wo

26

f the contng from antor shall inmpensationsts, charge

etc. to woruch liabilityy personsarchitect /

premium. Pntractor thehall be sact of such e contractwhen such

re to insureep in forceequired toay effect an

may be necthe SBIIMntractor, o

s of the Sentitled to

es costs, cthe contra

of any claimed with duall the mocontractorthe expen

or damaged

ork will be

ractor or ny act or dndemnify an, save aes and exp

rkmen: y with an in

are emplo/ consultanProvided ae contracttisfied if tpersons intor shall rh policy of

re: e the insureffect undnd keep incessary forS as afore

or recover

BIIMS agao deduct fcharges, aactors undm made ague diligencenies receivr and the Cditure incud.

reckoned

any sub-cdefault of and keep

and exceptpenses wh

nsurer appoyed by hint such polalways thator’s obligthe sub-con such marequire sucf insurance

rance refeder the tern force anyr that purpoesaid fromr the same

ainst contrfrom any snd other eer this clagainst the e to rebuildved from thContractor urred for re

from the d

Signature

contractor, the SBIIMindemnifiet as aforehatsoever

roved by thim on the licy of insuat, in respation to iontractor sanner that ch sub-coe and the

rred to aborms of cony such insuose and fro

m any amoe as debt

ractors. In sums payaexpenses pause. The insurer purd or repairhe Insurer shall not

ebuilding o

ate of awa

e & Seal of

save andMS or theired SBIIMSesaid, andin respect

he SBIIMSworks and

urance andect of anynsured asshall haveSBIIMS isntractor toreceipt for

ove or anyntract, thenurance andom time tount due ort from the

respect ofable to thepaid by thecontractor

rsuant to ar the works

in respectbe entitled

or repairing

ard of letter

Tenderer

d r

S d t

S d d y s e s o r

y n d o r e

f e e r a s t

d g

r

Page 27: PART CHNICAL BID · 2018. 5. 2. · BI Infra M SBI Infra Third Flo CONDITIO M o AHMEDA 18/05/201 Not applic NA NA. 0.50% of max. 5% o 12 Months 90 days fr NO INTER The con insurance

ArSt

r. Devdatt Mtudio919 Ar

35.0 TiTime isentire commeThe cowork. Hwork is 36.0 ExIf, in thcontrolSBIIMSthe termwork odate ofThrougschedudetail atheir retime. Wextendin exceprovisioFurthercomple 37.0 RWhole manneconducprogresconsulttime osuch sso as commufulfillingout of s 38.0 WSubjecshall sapermis

M Pandya rchitects

ime for cos essencework sha

encement. ontractor sHowever, ts complete

xtension ohe opinion o of the con

S to grant ms of contr if the comf completiogh the Arculed time aand his juecommendWhile graned time wess of origon of liquidr the contretion irresp

ate of proof the mat

er and speected in a mss of the wtant too Sr extendedteps as co

to compunications g obligatiosuch direct

Work durinct to any pave as he

ssion in wr

ompletion:e of the coall be com

If requiredhall compthe compled as per th

of time: of the Archntractor, tha fair andtract. If thempletion ofon as stipuchitect’ Conand while stification

dations to tnting extenhich will qginal stipudated damract shall rpective whe

ogress: terials, plaed of exec

manner to work or anylow to ensd time for onsidered plete the from the Ans under ttions.

g nights aprovision torein providiting of the

: ontract andmpleted wd in the colete certainetion date he terms of

hitect/conshe Architec reasonab

e contractof work is liklated in thensultant inapplying foif an’, for

the SBIIMSnsion of tualify for lelated perio

mages as sremain in ether the e

nt and labocution and the satisfay part thersure the co

completionecessaryworks by

Architect / cthe contrac

and holidao the contded be care Architect/

27

d shall be within a pontract or an portions shall be ref the contra

sultant, thect/consulta

ble extensioor needs akely to be e contract, writing ator extensiothe delay

S in the prtime the cevy of liquod and dustated undforce even

extension is

our to be pmaintenan

action of theof be at aompletion on the Arcy by the Ary the presconsultant ct nor he w

ays: rary contarried on du/consultan

strictly obperiod of as directedof work b

eckoned aact.

work be dant may suon of timen extensiodelayed fo, the contrat least 30on of timeys. The arescribed fo

contractor uidated damuly sanctioder clause n for the ps granted o

provided bynce of the he Architecany time bof the who

chitect/consrchitect / cscribed timneither sh

will be entit

ined in theuring the nt, save wh

bserved by60 days

d by the Abefore comas the date

delayed forubmit a rec

for complon of time for any reasactor shall Days befohe shall f

rchitect/conormat for gshall be

mages. Fooned exten

10.0 shallperiod beyor not.

y the contrworks are

ct/consultae in the opole of the sultant shaonsultant tme or ex

hall relieve.tled to rais

e contract ight or on

hen the wo

Signature

y the contr from the

Architect / cmpletion of e by which

r reasons bcommendaletion of wfor the comsons beyonapply to th

ore the exfurnish thensultant shgranting exinformed t

or the balansion of timl become a

yond the d

ractor and e to be of ant should

pinion the. work the

all the re to expeditextended ti. The contrse any clai

no permaholidays w

ork is unav

e & Seal of

ractor. Thee date ofconsultantf the entire

the whole

beyond theation to thework as permpletion ofnd the duehe SBIIMSpiry of the

e reason inhall submitxtension ofthe periodnce periodme by theapplicableue date of

the modea kind andthe rate ofArchitect /prescribedupon takee progressme. Suchractor fromims arising

anent workwithout thevoidable or

Tenderer

e f . e e

e e r f e S e n t f d d e . f

, d f / d e s h

m g

k e r

Page 28: PART CHNICAL BID · 2018. 5. 2. · BI Infra M SBI Infra Third Flo CONDITIO M o AHMEDA 18/05/201 Not applic NA NA. 0.50% of max. 5% o 12 Months 90 days fr NO INTER The con insurance

ArSt

r. Devdatt Mtudio919 Ar

absoluwhich cthe probecomand quapprov All worwithout 39.0 NIf at anthe scopart of that effcontracever oexecutclosure Provideactuallysurplusand theshall hpurcha In casecontracwhich deductthe con 40.0 SThe co(whoseworks consideor enda a) On ab) For the conc) For s

M Pandya rchitects

tely necescase the covisions oes essent

uality of theval of the A

rk at night t unreason

o compenny time afteope of worthe work

fect to thector shall h

on accountion of thee of the wh

ed that they and bons as a resuen taken b

have in suase price o

e of such ctor to stowere orig

tion for clantractor an

uspensionontractor se decision or any parer necessaanger the s

account anproper exentractor, orsafety of th

ssary for thcontractor f the clauial to carrye part of th

Architect / c

after obtainable noise

nsation or er acceptark for any rto be carri contractohave no ct of any p Work full

hole or part

e contractonafide brouult of the aback by thch cases r a local cu

stores haores, creditginally issuims on accd in this re

n of work:shall, on rshall be f

rt the offerary so as safety ther

ny default oecution of r he works o

he saving shall immese shall ny by rotaryhe works bconsultant

ning approe and distu

restrictioance of thereason whied out. Th

or and thelaim to an

profit or adly but whit of the wo

or shall be ught to theabandonme contractthe option

urrent rate

aving beent shall be ued to thecount of a

espect the

: receipt of inal and br such timenot to caureof for any

on the partthe works

or part ther

28

of life or pediately adnot be appy or doublebeing technat no extra

oval from curbance.

ons of wore tender SBhatsoever ahe Architeccontractory paymendvantage ch he did rk.

paid the ce site of thent, curtaior, provide

n of takingwhichever

n issued frgiven to he contractny deteriodecision o

the order binding on e and in sse any day of followi

t of the cons or part th

reof.

property odvise the Aplicable ine shifts in nically reqa cost to th

competent

rk: BIIMS shaand hencect / consulr shall actt of compewhich he not deriv

charges onhe work byilment of thed howeveg over all or is less.

rom SBIIMhim at the tor after tration or d

of Architect

in writingthe contrauch mannmage or inng reason

ntractor, orhereof for

or for the sArchitect / the caseorder to auired / con

he SBIIMS.

authorities

ll decide toe not requirtant shall gaccordinglensation omight have in conse

n the cartay the conthe work orer that theor any suc

MS stores arates not

taking intodamage wht / consulta

g of the Aactor) susper as Archnjury to thes:

r reasons ot

Signature

safety of thconsultant of any w

achieve thentinued wit.

s shall be c

o abandonred the whgive noticely in the m

or otherwisve derivedequence o

age only otractor andr any portiArchitect/C

ch materia

and return exceedingo considerhile in the ant shall be

Architect / pend the phitect/conse work alre

ther than t

e & Seal of

he work int. However

work whiche progressth the prior

carried out

n or reducehole or anye in writing

matter. These what sod from theof the fore

f materialsd renderedion thereofConsultantals at their

ned by theg those atration andcustody of

e final.

consultantprogress ofultant mayeady done

the default

Tenderer

n r h s r

t

e y g e o e e

s d f t r

e t d f

t f y e

t

Page 29: PART CHNICAL BID · 2018. 5. 2. · BI Infra M SBI Infra Third Flo CONDITIO M o AHMEDA 18/05/201 Not applic NA NA. 0.50% of max. 5% o 12 Months 90 days fr NO INTER The con insurance

ArSt

r. Devdatt Mtudio919 Ar

The coextent consulti)If the

The cosuspen 41.0 AIn any have rsecuritfollowin To resArchitedeposi To empart of such laconclusall resphad bearchitecontrac To meunexeccase apaid toof whicconclusto him procee In the ehave npurchaadvancof the the confor actuhave c

M Pandya rchitects

ontractor shnecessarytant. suspensio

ontractor shnsion. No c

ction whecase in w

rendered hy deposit ng course

scind the cect / consut of the con

ploy labouthe work,

abour and sive againpects in theeen carriedect /consultctor.

easure up cuted, out ny expens

o the originch excess sive) shall by SBIIM

eds of sale

event of ano claim toased or prces on acccontract antractor shually perfo

certified in w

hall, duringy and carr

on is ordere

hall be entcompensat

en the whowhich unde

himself liathe Architas they ma

contract (oultant shalntractor sh

ur paid by tdebiting thmaterials

st the cone same mad out by ttant as to

the work of his han

ses which mal contractthe certifibe borne

S under ththereof, or

ny of abovo compensaocured an

count of, orand incase hall not be rmed undewriting the

g such susry out the

ed for reas

itled to antion whatso

ole securitr any clau

able to patect / consay deem b

of which rll be conc

hall be forfe

the SBIIMShe contract

as worketractor) ananner andhe contracthe value

of the conds, and tomay be inctor, if the wcates in wby origina

he contracr sufficient

ve coursesation for a

ny materiar with a viethe contra

entitled to er this conte performa

29

pension, pinstruction

sons (b) an

extensionoever shal

ty depositse or clau

ay compensultant sha

best suited

rescission clusive evideited and b

S and to stor with the

ed out by tnd crediting at the samctor underof work do

ontractor, o give it to curred in exwhole workwriting of thal contractoct or otherw part there

s being adoany loss sul or entereew to the eact shall brecover o

tract, unlesnce of suc

properly prons given in

nd (c) in su

of time eql be paid o

t is forfeiteses of this

nsation amall have thto the inte

notice in dence) anbe absolute

supply mate cost of ththe Architeg him withme manner the termsone shall b

and to takanother c

xcess of thk had beenhe Architecor and maywise, or fr

eof.

opted by thustained byed into anexecution obe rescindr to be paiss, and untch work an

otect and sn that beha

b-para (i) a

qual to theon this acco

ed: s contract, mounting the power erest of the

writing to nd in whichely at the d

terials to che labour aect / consuthe value

er and at ths of this cbe final co

ke such pcontractor the sum whn executedcts / consy be deducrom his se

he SBIIMSy him by reny engageof the workunder thed any sumtil the Arch

nd the valu

Signature

secure thealf by the

above:

period of eount.

the Contrto the whto adopt a SBIIMS:

the contrh case thedisposal of

arry out thand materiultant shalof the wor

he same racontract ceonclusive a

part thereoto completich would by him (T

ultant shalcted any m

ecurity dep

S the contreasons of ments or k or the pe provision

m or any wohitect / cone payable

e & Seal of

e works theArchitect /

every such

ractor shalole of hisany of the

ractor by -e securityf SBIIMS.

he work, orials cost ofll final andrk done, inates as if itertificate ofagainst the

of as shalte in whichhave beenhe amountll final andmoney dueosit or the

ractor shalhis havingmake any

erformanceaforesaid

ork theretosultant wilin respect

Tenderer

e /

h

l s e

- ,

r f d n t f e

l h n t d e e

l g y e , o l t

Page 30: PART CHNICAL BID · 2018. 5. 2. · BI Infra M SBI Infra Third Flo CONDITIO M o AHMEDA 18/05/201 Not applic NA NA. 0.50% of max. 5% o 12 Months 90 days fr NO INTER The con insurance

ArSt

r. Devdatt Mtudio919 Ar

thereof 42.0 OIf the cadjustecompuOfficialunablesatisfaccontrac Or if thexecutor on b Or shathroughpayme has ab has faconditioSBIIMS has faiprogreshas faiseven consultperformperformthe coworkmcontraror the seven therebyand liacontracby or consultand all

M Pandya rchitects

f, and he s

Owner’s rigcontractor ed an insolsory windl Assignee

e within section of thct, and to d

he contracion to be is

behalf of an

all assign h the Arcnt due to w

bandoned t

iled to coons suspeS through t

iled to pross as wouled to remdays afte

thatant under m all or anmed by theontractor toanship or iry subject aArchitect days’ not

y affectingbilities of tct had not on behalf tant their a plants, to

shall only b

ght to termbeing an iolvent or ding up voe of the liqeven dayshe Architedye securit

ctor (whethssued or sny of the cr

or sublet hitect/Conwhich may

he contrac

ommence tended the the Archite

ceed with uld enable

move the mr written nt the said these con

ny of the ae contactoro observein defianceany part of/ consulta

tice in writ the powehe contracbeen deteof the co

agents or eok scaffold

been titled t

minate thendividual obeing an

oluntarily oquidator in after notct / Consty therefore

her an indishall sufferreditors of

this contrsultant or become d

ct; or

the worksprogress

ect / consu

the worksthe works

materials fronotice from materials

nditions; or acts matter for sevene or perfoe of the SBf the contra

ant, may nting to thers of the S

ctor the whermined anontractor. employeesdings, mate

30

to be paid

e contract:or a firm co

incorporaor subject n such actice to himultant thate if so requ

ividual firmany paymthe contra

act withoushall cha

due to the c

, or has wof the worltant writte

s with suchs to be comom the sitem the SBIs were con

has negleers or thinn days afteorm the saBIIMS or Aract. Then a

not withstae contractSBIIMS or hole of whicnd as if theAnd, furth

s may enteerials, she

the value

: ommit any

ated compto the su

ts of insolm to do sot he is abuired by the

m or incorpment underactor.

ut the conarge or encontractor

without anrks for 14

en notice to

h diligencempleted we or to pullIMS throu

ndemned aected or faigs by this

er written name or hrchitect’s / and in any

anding anytor, determthe Architech shall co

e works subher the SBer upon aneds, machin

so certified

y ‘Act of inspany shall pervision vency oro, to showble to carre Architect

porated Cothis contra

sent in wrncumber tthere unde

ny lawful edays afte

o proceed,

e and failewithin the ti

down andugh the Arand rejectled persist

s contract notice shalas to theconsultan

y of said cay previous mine the cect/consult

ontinue in fbsequentlyBIIMS thrond take posneries lying

Signature

d.

solvency’ ohave an

of Govt. awinding u

w to the rry out andt /Consulta

ompany) sact to be a

riting of ththis contraer:

excuse uner receiving

or

d to makeime agreedd replace wrchitect / Cted by thetently to obto be obsl have bee

e detriment’s instruct

ases the Swaiver, a

contract, btant or theforce as fuly had beenough the Assession og upon the

e & Seal of

or shall beorder for

and of thep shall bereasonabled fulfill theant.

shall sufferttached by

he SBIIMSact or any

nder theseg from the

e such dued upon, orwork withinConsultant Architect/

bserve andserved anden given tont of goodtions to theBIIMS and

after givingbut withoute obligationlly as if then executedArchitect /

of the worke premises

Tenderer

e r e e e e

r y

S y

e e

e r n t/ d d o d e d g t n e d / k s

Page 31: PART CHNICAL BID · 2018. 5. 2. · BI Infra M SBI Infra Third Flo CONDITIO M o AHMEDA 18/05/201 Not applic NA NA. 0.50% of max. 5% o 12 Months 90 days fr NO INTER The con insurance

ArSt

r. Devdatt Mtudio919 Ar

or on tworkmor persmatter comple When tarchitemateriathereofshall, aquestio 43.0 CThe coconsultpaymeother dalwaysworks contrac The Arpart thecertificaThe SconsultThe coproperlThe Coby him

The finof virtuwithin amonthsrates a The co 44.0 A. SettExceptmeanin

M Pandya rchitects

the adjoinien in carrysons to theor thing to

ement and

the works ect/consultaals and plaf by him thadjust the on any of th

ertificate oontractor stant to thent from SBdues inclus that the i

or complector from h

rchitect / cereof is noate make a

SBIIMS shtant from tontractor sly recordedontractor sis less tha

nal bill mayual complea period ofs from theand quantit

ontractor sh

tlement oft where otng of the

ng lands oying on ane work ando prevent o

finishing o

shall be coant shall gants and she SBIIMSamount rehe act of th

of paymenshall be ene contractBIIMS Fromding the rssue of anetion shal

his liability u

consultant ot carried oany correc

hall modifyime to timeshall submd in the Meshall not suan Rs. 3.0

y be submietion and Af two mont date of isies.

hall submit

f Disputestherwise p

e specifica

or roads usnd completd the contror hinder suor using the

ompleted oive a notichould the c sell the s

ealized by she SBIIMS

nt: ntitled undtor within m time to tretention any certifical not haveunder clau

shall haveout to their

ctions requy the certe while ma

mit interim easuremenubmit interLakhs.

tted by coArchitect /hs. The SBssue of ce

t the interim

s and Arbiprovided inations, de

31

se the samting the woractor shauch other ce materials

or as soonce in writingcontractor ame by pusuch aucti

S incidental

er the cer10 workintime SBIIMamount froate by the e effect a

use.

e power tor satisfactiired previotificate of

aking the pabills only

nt books. rim bills wh

ntractor wi/ consultanBIIMS Shaertificate pr

m bills in th

tration: n the conesign, dra

me by meaork or by ell not in ancontractor s and plant

n thereafteg to the cofail to do s

ublication, on. The col to the sal

rtificates tong days frMS shall reom the ceArchitect /

as certifica

o withhold on. The A

ous certificapayment

ayment after taki

hen the ap

ithin a perint shall issall pay the arovided the

he prescrib

tract all qawings an

ans of theiengaging any was inteor other p

t for the wo

r as conveontractor toso within 1and after

ontractor se of the ma

o be issuerom the decover theertificate of/ consultanate of sat

the certificrchitect/coate.

as issue

ng actual

pproximate

iod of onesue the ceamount witere is no d

bed format

questions ad instruct

Signature

ir own emany other cerrupt or d

persons emorks.

enient the So remove h14 days aftdue public

shall have aterials etc

ed by the date of ce

statutory f paymentnt during pisfaction r

cate if the onsultant m

ed by the

measurem

e value of w

month fromertificate othin a periodispute in

with all de

and disputions here

e & Seal of

ployees orcontractorsdo any actmployed for

SBIIMS Orhis surpluster receivecation, andno right to

c.

Architect /ertificate torecovering. Provided

progress ofrelieve the

work or inmay by any

architect/

ments and

work done

m the dateof paymentod of threerespect of

etails.

tes to theein before

Tenderer

r s , r

r s e d o

/ o g d f

e

n y

/

d

e

e t e f

e e

Page 32: PART CHNICAL BID · 2018. 5. 2. · BI Infra M SBI Infra Third Flo CONDITIO M o AHMEDA 18/05/201 Not applic NA NA. 0.50% of max. 5% o 12 Months 90 days fr NO INTER The con insurance

ArSt

r. Devdatt Mtudio919 Ar

mentioany othrelatingor thesexecutcancellmentio If the crespecor in cmade oforthwiSBIIMS30 daysaid nodetaileraise aby the the Setime ashis righMumba B. SettThe Seclaims decisionamelyall deta If the ccontracthe coadjudicto have ExceptcontracaforesaarbitratDeputythe Arbto whic

M Pandya rchitects

oned and aher questiog to the cose conditioe the samlation, term

oned herein

contractor ct of the woase the coor proposeth give noS, Head Oys from theotice shalld calculati

any claim ncontractornior Vice Ps aforesaidhts in respai in writing

tlement ofenior Vice notified by

on of the Sy the M.D. ails and co

conciliationctor shall, oncerned Mcate the noe been con

t where thct, all dispuaid and all tion by they General Mbitrator so ch the Co

as to the quon , claim, ontract, desons or othme whethmination, cnafter:

considers orks over aontractor wed to be maotice in wr

Office, Mume date of di give full ions of theor shall the

r unless noPresident, d. The Conect of any g in the ma

f DisputesPresident,y the receSr. V.P., H & C.E.O.,pies of cor

n proceedwithin a pM.D. & Cotified claimnsidered ab

e decisionutes or diffclaims of

e Sole ArbManager rappointed

ontract rela

uality of wright, mattsigns, draw

herwise coer arisingcompletion

that he isand abovewants to dade from thriting of hismbai and eisallowancparticulars

e amount ce SBIIMS otice of sucSBIIMS, H

ntractor shclaim not

anner and w

s and Arbi Head Offiipt of the c

Head Offic, SBIIMSPrresponden

ings are teriod of 30

C.E.O. of ms falling wbsolutely b

n has becoferences athe SBIIMSbitrator apprank. It will is a SBIIM

ates in the

32

orkmanshiter or thingwings speconcerning during th

n or aband

entitled to the amouispute the he contracs claim, o

endorse a cce thereof os of the clclaimed anPvt. Ltd bech claim shHead Officall be deemnotified towithin the

tration: ice, Mumbcontractor

ce / SubmiPL, Head Once exchan

erminated 0 days of tthe SBIIMwhich the cbarred and

ome final, arising out oS Pvt. Ltdpointed byalso be no

MS, Officere course o

ip or mateg whatsoevcifications,the work he progredonment t

o any extraunts admitt

validity ofctor raise ar dispute tcopy of theor the datelaim, ground the cone in any wahall have b

ce, Mumbamed to hav

o the Seniotime afore

ai shall givmay within

it his claimOffice, Mumnged betw

without stermination

MS for apclaims of twaived.

binding aof the notifshall be re

y the M.D.o objectionr and that hof his duti

rials used ver in any , estimatesor the exe

ess of thethereof sh

a paymented as payaf any dedu

any disputeto The See same to

e of deductnds on wh

ntractor shay liable inbeen givenai in the mave waivedor Vice Presaid.

ve his decin 30 days

ms to the cmbai for co

ween him a

settlement n thereof spointment the contrac

and conclufied claimseferred for. & C.E.O.n to any suhe had to dies as SB

Signature

on the woway arisin

s, instructioecution or

e work or all be dea

t or compeable by theuctions or e, the contrenior Vice

the Archittion or recohich it is ball not be respect of

n by the coanner andand exting

esident, He

sion in writof the rec

conciliatingonciliation nd the SBI

of the disshall give a

of an arctor shall b

usive in ters of the conadjudicatio. and whouch appoindeal with th

BIIMS, Offi

e & Seal of

ork or as tong out of orons ordersr failure tor after thealt with as

ensation ine Architectrecoveriesractor shalPresident

tect, withinovery. Thebased andentitled to

f any claimontractor to within theguished alead Office

ting on theceipt of theg authorityalong withIIMS

sputes, thea notice torbitrator tobe deemed

rms of thentractor ason through

o will be ofntment thathe matterscer. If the

Tenderer

o r s o e s

n t s l . n e d o

m o e l ,

e e y h

e o o d

e s h f t s e

Page 33: PART CHNICAL BID · 2018. 5. 2. · BI Infra M SBI Infra Third Flo CONDITIO M o AHMEDA 18/05/201 Not applic NA NA. 0.50% of max. 5% o 12 Months 90 days fr NO INTER The con insurance

ArSt

r. Devdatt Mtudio919 Ar

arbitratvacateappoinpersonby his p It is a twith amof arbit It is alsChief GarbitratConcilithe rule It is alsbe paidhe is a It is alsthe reftheir stshall bany ofpublishthe awarbitratthereof 45.0 WThe conothing i) Thasatisfac ii) ThearrangeArchite iii) In cconnecof cont

M Pandya rchitects

tor so apps his officted in the

n shall be epredecess

term of thismounts clatrator.

so a term General Mtion shall ation Act 1es made th

so a term od equally bSBIIMS O

so a term ference ontatement oe such plaf the arbithed, be paward (includtor who maf, shall be

Water suppontractor sg extra will

at the watection of the

e contractoement ma

ect / consu

case contction, Boretract amou

pointed is ce due toe manner entitled to sor.

s contract aimed in re

of this conManager abe conduc1996 or anhere under

of the contby both theOfficer.

of the conn the date of claims aace as maytrators shaid half andding the feay direct topaid and fi

ply: shall make be paid fo

er used bye Architect

or shall made by theltant is uns

tractor is e well (exisnt form the

unable oo any reasaforesaidproceed w

that the paespect of e

ntract that as aforesacted in acy or any a

r.

tract that ife parties. H

ntract that the issuesnd countey be fixed all, if requd half by eaees, if anyo any by wix or settle

his own aor the same

y the contrt /consultan

ake alterne contractosatisfactory

permitted sting or nee final bill o

33

or unwillingson whatsby the sa

with the refe

arty invokieach dispu

no personid should

ccordance ccordance

f any fees However, n

the Arbitras notice tor statemenby the arb

uired to beach of the y of the arwhom and

the amoun

arrangemee. This will

ractor shant’s.

native arraor for procy.

to use Sw) etc., th

of contracto

g to act osoever anoaid M.D. &erence fro

ng arbitratute along w

n other thaact as arwith the p

e modificati

are payabno fees wil

ator shall bboth the

nt of claimbitrator in he paid beparties. Thbitrator) shdin what mnt of costs

ents for wal be subjec

ll be fit for

ngements curement o

BIIMS’s se SBIIMS or.

or resigns other sole

& C.E.O. om the stag

tion shall gwith the no

an a persorbitrator. Tprovisions ion or reen

ble to the All be payab

be deemedparties cas. The venhis sole dis

efore the ahe Cost of hall be inmanner, su

to be so p

ater requirct to the fol

r construct

for the suof water in

ource of Pvt. Ltd w

Signature

his appoe arbitratoof the SBIge at which

give a list ootice for ap

n appointeThe concilof the Ar

nactment th

Arbitrator tble to the a

d to have ealling themnue of the scretion. Taward is the referethe discre

uch costs opaid.

red for thelowing con

tion purpo

upply of wn the opin

water i.e. will recover

e & Seal of

intment orr shall beIIMS Suchh it was let

of disputesppointment

ed by suchliation andbitration &hereof and

these shalarbitrator if

entered on to submitarbitration

The fees, ifmade andnce and oftion of theor any part

e work andndition.

oses to the

water if thenion of the

Municipar @ 0.25%

Tenderer

r e h t

s t

h d & d

l f

n t n f

d f e t

d

e

e e

l %

Page 34: PART CHNICAL BID · 2018. 5. 2. · BI Infra M SBI Infra Third Flo CONDITIO M o AHMEDA 18/05/201 Not applic NA NA. 0.50% of max. 5% o 12 Months 90 days fr NO INTER The con insurance

ArSt

r. Devdatt Mtudio919 Ar

The co

taking wSBIIMSthe waaccidenwells. own coon comdirecte 46.0 PoThe cosystemcost, thprices, same inecess In casepoint, t 47.0 TrAny trepropert 48.0 M

Unlessthe meto datedisagrecorrect

49.0 MThe coof workwhenevrequire

50.0 Fo

M Pandya rchitects

ontractor swater for cS The contater at his nts or damHe has toost. He shampletion of ed by the a

ower suppontractor s

m for drivinhe cost of He shall p

n his tendesary approv

e contractothe SBIIMS

reasure treasure trovty of SBIIM

Method of m

s otherwiseeasuremene rules laideement thetor.

Maintenancontractor shk and shover desired

ed by the loi) Regii) Regiii) Regiv) Reg

orce Maje

shall constconstructiotractor hasown cost

mages cauo obtain neall restore work or harchitect /co

ply: shall makeg plant or running anpay all feesered rates val from th

or is permS will recov

rove etc. ve, coin or

MS and sha

measurem

e mentionent will be od down bye decision

ce of regishall maintauld producd by themocal authorgister for sgister for hgister for rgister for la

ure:

truct tempoon purposes to make t. He hassed due toecessary athe groundand over thonsultant.

e his own machiner

nd maintens and charand hold t

he appropr

itted to usver @ 0.25

r object anall be hand

ment:

ed in the sn the net q

y the Bureof the Arc

sters: ain the folloce the sam. The contrities / Govsecured adhindrance tunning accabour

34

orary well s only aftehis own ato make

o constructapprovalsd to its orighe well to t

arrangemery for the wnance of thrges requirthe owner fiate author

se Bank’s 5% of contr

ntique whicded over to

schedule oquantities au of India

chitect / co

owing regime for inspractor sha

vt. from timdvance to work count bill

/ tube weer obtainingrrangemennecessarytion and sfrom localginal condthe SBIIMS

ents for powork and fhe plants ared, by thefree from arities, if req

source of ract amoun

ch may beo the bank

f quantitiesor work pran Standansultant sh

sters as pepection of ll also mai

me to time.

ell in SBIIMg permissionts for drawy arrangemubsequent authoritieition after S without a

ower and for lightingare to be ine power suall such coquired.

power supnt from the

found on immediate

s or in moroduced inards. In thehall be fina

er the encSBIIMS /Antain the r

Signature

MS Pvt. Lton in writinwing and d

ments. To t maintena

es, if requiwells are d

any compe

supply / d purpose ncluded in upply and iosts. He ha

pply provide bill of con

the site shely.

ode of mean accordane event anal and bind

losed perfoArchitect / records / re

e & Seal of

td land forng from thedistributingavoid any

ance of thered, at hisdismantled

ensation as

distributionat his ownhis tendernclude the

as to obtain

ded at onentractor.

hall be the

asurementce with up

ny dispute/ding on the

orm at siteconsultant

egisters as

Tenderer

r e g y e s d s

n n r e n

e

e

, p / e

e t s

Page 35: PART CHNICAL BID · 2018. 5. 2. · BI Infra M SBI Infra Third Flo CONDITIO M o AHMEDA 18/05/201 Not applic NA NA. 0.50% of max. 5% o 12 Months 90 days fr NO INTER The con insurance

ArSt

r. Devdatt Mtudio919 Ar

Neitherobligathostiliticonflagordinanparty a30 daycontracdelay. As sooperformthe acsuppor From thaffecte

51.0 WThe raprovidiarrangequality well / open SBIIMS The rapower The cotake poby thearrangemutualconnecpayablthe SB The SBContrarespon

In cas

M Pandya rchitects

r contractoions if sucies revolugrations, ences or anaffected or ys from thect ,if it is no

on as the m its obligactual delayrt thereof.

he date of ed.

Water poweate quotedng all the ements fordrinking w

well and S will not b

te quoted connection

ontractors ower and we contracements to ly agreed ction for Ce for permIIMS will re

BIIMS as wactor’s to onsibility for

e contract

or nor SBch performaution, rioepidemics, ny act of o

prevents e happeninot possible

cause of ations has

y incurred

occurrenc

er and othd by the c

water reqr the supplwater for t

bring watebe liable to

in the tendns and sha

for other twater connctor Howe

draw the rates bet

Constructiomanent coneimburse t

well as the obtain the obtaining t

tor is per

IIMS shalance is prets, AIR

accidentsor for any or delayed

ng of the eve to serve a

force majs been affe

in such a

ce of a case

her facilitiecontractor quired for y of good

their worke

er by meanpay any c

der shall inall pay for t

trades direnections froever, the

supply antween themon purposennections,the amoun

Architect /requisite

the same i

rmitted to

35

l be consievented orCONDITIO

s, fire, stoother causd. Howevevent with ca notice, w

jeure has ected, shaaffected a

e off or for

es: shall incluthe work quality waters If nece

ns of tankeharges in c

nclude thethe consum

ectly appoiom the tem

concernend pay direm. All mues shall bif any, sht on produ

/ consultanPermission time sha

use Bank

idered in r delayed bONING corms, floodse beyond

er, a noticecomplete dwithin the s

been remll notify thctivity add

rce majeure

ude all exand the cter suitableessary the

ers at his connection

e expensesmption cha

inted by thmporary waed contraectly the anicipal cha

be borne ball be initiction of re

nt shall givon from thall be of the

k’s source

default in by eventscommotionds, droug

d the reasoe is requiredetails, to tshortest po

moved the e other of ducing nec

e obligatio

xpenses thcontractor e for the cocontracto

own cost n with the a

s for obtainarges

he SBIIMSater and poactor shalactual consarges for by the conally paid bceipts.

e all possihe various e contracto

e of water

Signature

performansuch as bu

n, strikeshts, earthonable coned to be githe other possible peri

party whsuch cess

cessary ev

ns of the p

hat are reshall mak

onstructionr has to s

for the puabove

ning and m

S shall be ower suppll make sumption cdrainage

ntactor anby the con

ble assistaauthoritie

or.

r and pow

e & Seal of

nce of theut not war, lockoutquakes orntrol of theiven within

party to theiod without

ose abilitysation andvidence in

party

equired forke his ownn and goodsink a tube

rpose The

maintaining

entitled toy obtainedtheir owncharges atand waterd charges

ntactor and

ance to thees, but the

wer supply

Tenderer

e , , r e n e t

y d n

r n d e

e

g

o d n t r s d

e e

y

Page 36: PART CHNICAL BID · 2018. 5. 2. · BI Infra M SBI Infra Third Flo CONDITIO M o AHMEDA 18/05/201 Not applic NA NA. 0.50% of max. 5% o 12 Months 90 days fr NO INTER The con insurance

ArSt

r. Devdatt Mtudio919 Ar

provideelectric 51.0 FaThe coand womake tworkm 52.0 LiThe cothe pro 53.0 FiThe copurposbucketthese eand sh Any deat his ofollowin a) Prob) Wo

c) Accd) Typ

rube) Typf) Ge

54.0 SA site betweeconveyto the osite ormainta/consulike to consultone co

M Pandya rchitects

ed at one pcity separa

acilities foontractor shorkmen inthe arrangen to and f

ighting of ontractor shoper execu

irefightingontractor sse he shall s, some oequipmentall be prop

eficiency inown cost ang arrange

oper handliork operatio

cess for firepe, numberbbish. pe, size, nuneral hous

ite order border boo

en the Arcyed througother shallder book ined and pltant as anissue to

tant two coopy will be

point, the Sately from t

or contrachall make

ncluding adements at from site o

works: hall at all ttion and su

g arrangemhall providprovide re

of which at shall be perly maint

n the fire saand, to the ements at h

ng, storagons which

e-fighting er and locat

umber andsekeeping.

book: k shall be

chitect / Ch records be deemeshall have

preserved bnd when dethe contraopies of sue handed

SBIIMS wilhe bill of c

ctor’s emphis own ardequate dhis own c

of work at h

times proviupervision

ments: de suitableequisite nure to be aprovided a

tained.

afety or unapproval o

his own co

e and dispcan create

equipmenttion of cont

location o

maintaineonsultant. in the siteed to havee machineby the conemanded-actor or thuch instrucover to th

36

ll recover @ontractor.

ployees: rrangemen

drinking wacost for trahis own cos

ide adequaand inspe

e arrangemmber of fir

always kepat suitable

safe condiof the relev

ost but not

posal of come fire hazar

. tainers for

of fire exting

ed at site fAny commorder boo

e been adee numberetractor andAny instru

he contracctions shahe party a

@ 0.5% of

nt for the hater facilitinsport whest.

ate and apection of wo

ment for firre extinguispt filled wie prominen

itions shallvant autholimited the

mbustible rds.

the remov

guishers o

for the pumunicationk. Such a

equately sed pages id shall be muction whicctor may lill be taken

against pro

f contract a

housing anies. The cere necess

pproved ligork.

refighting ashers andth sand a

nt and eas

be correcorities. The e following:

materials a

val of surpl

or other tire

rpose of qn relating tcommunic

erved in tern triplicatemade avaich the archike to brinn from the oper ackno

Signature

amount for

d welfare contractor sary for his

ghting as re

at his own adequate nd some sily access

cted by the contractor

and waste

us materia

e fighting e

quick commto the wor

cation fromrms of cone and shalable to the

hitect/consng to the

site orderowledgmen

e & Seal of

water and

of his staffshall also

s staff and

equired for

cost. Thisnumber ofwith watersible place

contractorr make the

.

als and

quipment.

municationrk may be

m one partyntract Eachll carefullye architectultant mayarchitect /

r book andnt and the

Tenderer

d

f o d

r

s f r e

r e

n e y h y

y / d e

Page 37: PART CHNICAL BID · 2018. 5. 2. · BI Infra M SBI Infra Third Flo CONDITIO M o AHMEDA 18/05/201 Not applic NA NA. 0.50% of max. 5% o 12 Months 90 days fr NO INTER The con insurance

ArSt

r. Devdatt Mtudio919 Ar

second 55.0 TeThe cogates apublic requirebe altecomple 56.0 SSite meshall dapprovfollow archite

57.0 DThe coand deresponeffect tother o 58.0 CThe cospecialdrawinthe wo 59.0 DThe coconsultarchite 60.0 AsFor theConsulchangeArchitereturn requireout thecorrect

M Pandya rchitects

d copy will

emporary ontractor shat his cost and for the

ement of thered, relocetion of the

ite meetineetings wiepute a se

ved sub-coup action

ect/ consult

Disposal ofontractor sheposit the snsibility of that all ruboff-site activ

ontractor ontractor slists contrag and passrks.

isplaying ontractor stant indica

ect/consulta

s built drae drawingsltant will ises have beect / Consuthese cop

ed or the ce discrepantions and /

be retaine

fencing/bhall providto adequa

e proper exhe architeccated and e work.

ngs: ll be held tenior repreontractors as. Any adtant.-

f refuse: hall cart awsame as dthe contra

bbish arisinvities borro

to verify shall check actors or os on the in

the namehall put up

ating there ant at his o

awings: s issued tossue two een made.ultant. The ies to the correctionsncies to thor attend

ed for their

barricadinge and mai

ately enclosxecution act/consultaadopted f

to review tesentative aand suppliedditional re

way all debdirected byactor to ong out of cow pits has

site measand verify

ther sub-cnformation

of the wop a name in the nam

own cost a

o the contsets of dr. From thecontractorarchitect /

s are not phe contractto discrep

37

record.

g: intain a suse all boun

and securitynt and regfrom time

the progresalong withers as reqeview mee

bris, refusey the architbtain from

contractor’ss been pro

urement:y all site montractorswith suffic

ork: board of sme of the pnd remove

ractor by trawings to

e approvedr will make/ Consultanproperly mtor. The coancies eith

uitable temndaries of ty of the wo

gulations oto time a

ss and quathe site reuired to thetings sha

e etc. arisitect / cons

m the locals activities operly dispo

measuremeto enable

cient promp

suitable sizproject ande the same

the Architeo the Contd drawings e the changnt for their

marked theontractor wher on cop

porary fenthe site forork and in

of local auts necessa

ality evaluaepresentathe site meeall he held

ing from thsultant at hl authoritieat the con

osed off.

ents whenethem to p

ptness as w

ze as direcd other de

e on comple

ect / Constractor for as instruc

ges made r approval.

architect/will have toies as dire

Signature

ncing/barricr the protecaccordanc

thorities. Tary and re

ation. The ive and othetings and d if requir

he work frohis own coses concernnstruction s

ever requerepare thewill in any

cted by theetails as givetion of wo

sultant. Thethe items

cted by theon these c In cases Consultano incorporaected by th

e & Seal of

cading andction of thece with the

These shalemoved on

contractorher staff ofensure al

red by the

om the sitest. It is thened to thesite or any

ested othere own shop

way delay

e architect/ven by theork.

e architects for somee SBIIMS /copies andrevision ist will pointated thesee architect

Tenderer

d e e l

n

r f l

e

e e e y

r p y

/ e

t e / d s t e t

Page 38: PART CHNICAL BID · 2018. 5. 2. · BI Infra M SBI Infra Third Flo CONDITIO M o AHMEDA 18/05/201 Not applic NA NA. 0.50% of max. 5% o 12 Months 90 days fr NO INTER The con insurance

ArSt

r. Devdatt Mtudio919 Ar

/ consucopy d For theThe cothe SBthe arcthe app 61.0 AThe cocost atreatmeThe argiven in 62.0 PrThe cofor the 63.0 ExThe coroyaltietax, taxequipmduties, Shall ntaxes, includeduties, the quonew taduring GST w 64.0 AThe Sreasontenderetranspa

65.0 PThe Cocopies

M Pandya rchitects

ultant and uly approv

e drawingsontractor wBIIMS / arcchitect/ conproved dra

pproved montractor sand also ent, aluminrchitect/conn the tende

rocuremeontractor swork. All w

xcise dutyontractor ses, fees, cex on work

ment plant levies, fe

not be requduties, fe

ed in the qfees, levie

oted rates ax or duty

the currenwill be paid

cceptanceBIIMS sha

n. They areers shall harency wou

hotographontractor sof large p

resubmit tved by him

prepared will modify t

hitect / connsultant foawing to the

make: shall providappoint thnum doorsnsultant mer after ins

nt of matehall make

wastages a

y, taxes, leshall pay aess or chaks contrac

and otheres and ch

uired to payes, levies

quoted ratees etc. if aand no exor levy or ncy of conextra.

e of tendeall have the not to bhave no riguld be mai

hs: shall at hishotograph

to him for .

by the conthe drawinnsultant. Ar approvale contracto

de all matehe specias and wind

may approvspection of

erials: his own a

and losses

evies etc.;and be resarges in rest excise dr things reharges shay any addietc. if an

es and no any, till comxtra claim o

cess or rontract the

er: he right toind to accght to quentained by

s own exps not less

38

approval.

ntractor: g prepared

And submit l. The archor.

erials fromlized agenows and a

ve any maf the sampl

arrangemes in weight

; sponsible spect of thduty, and equired forall be to thitional or ey, till comextra amo

mpletion ofon this accoyalty or Osame sha

o reject ancept the loestion the y the SBIIM

pense suppthan 25 cm

The archit

d by him wtwo copie

hitect / con

m the list oncy for thany other itake / agenle/mockup

ents to proshall be to

for paymee works inOctroi, par the contahe contracextra amoumpletion of

ount on thf work shacount will iOctroi is imll be borne

ny or all towest or an

acts of thMS

ply to the m. x 20 cm

tect / cons

wherever ths of such m

nsultant wi

of approvehe waterptem as spe

ncy within .

cure all tho the contra

ent of all tncluding buyable in r

act. All of ctor’s accont on this work sha

his accountll be deemn any case

mposed une by the c

tenders winy tender e SBIIMS.

Architectsm. (10” x 8”

Signature

ultant will

he changemodified dll return on

d makes aproofing, aecified in tthe approv

he requiredactors acco

taxes, dutiut not limiterespect of the aforesunt and thaccount. V

all be deemt. Variation

med to be ie be entertnder as stacontractor.

ithout assiand the te

. However

s with dupl”) of the wo

e & Seal of

return one

s made bydrawings tone copy of

at his ownanti-termitethe tenderved list as

d materialsount

es, leviesed to sales

materialssaid taxeshe SBIIMSVariation ofmed to ben of taxesncluded intained. If aatutory law However

igning anyenderer orr adequate

licate hardorks, taken

Tenderer

e

y o f

n e . s

s

, s , ,

S f e , n a w ,

y r e

d n

Page 39: PART CHNICAL BID · 2018. 5. 2. · BI Infra M SBI Infra Third Flo CONDITIO M o AHMEDA 18/05/201 Not applic NA NA. 0.50% of max. 5% o 12 Months 90 days fr NO INTER The con insurance

ArSt

r. Devdatt Mtudio919 Ar

from twduring In addphotogprogresconsideenterta 66.0 Sa

1. First ashall be

2. An injuthe inju

3. Suitabl

safely b 4. No por

rails shrunningengage

5. The ex

half of provide

6. Every o

meanswhose

7. No floo

as to re 8. Worker

concre 9 Those

and glo 10. (i) No

readym

M Pandya rchitects

wo approvethe progre

ition to abgraphs aloss of work er returnin

ained.

afety Cod

id appliance kept in a

ured personury necess

le and strobe done fro

rtable singhall not bg's shall noed for hold

xcavated mthe depth

ed with nec

opening ins to preven

minimum

or, roof or oender it un

rs employeete and lime

engaged ioves.

paint contmade paint

ed portionsess of the w

bove, the ong with e

measuredg the Bill to

es:

ces includa readily ac

n shall be sitates hosp

ong scaffolom the gro

le ladder se less thaot be moreing ladder

material shh of trenchcessary fen

the floor ont the fall oheight sha

other part osafe.

ed on mixe shall be

n welding

taining lea.

s of eachwork or at e

contractoreach Runnd and claimo the contr

ding adequccessible p

taken to apitalization

ds should ound.

shall be ovan 30 cm.e than 30 c.

all not be h whichevencing and

of a buildinof persons all be one m

of the struc

xing and haprovided w

works sha

ad or lead

39

building, aevery impo

r shall bening Bill f

med thereinractor and

uate supplyplace.

public hosn.

be provide

ver 8 mete. (clear) acm. When

placed witer is morelighting.

g or in a wor materia

meter.

cture shall

andling mawith protect

all be prov

products s

at intervalsortant stag

bound tofor the prn failing whno claim f

y of sterili

spital witho

ed for wor

ers in lengtand the dia ladder is

thin 1.5 mee. All trenc

working plaals by prov

be so ove

aterial suctive footwe

vided with

shall be us

s of not moe of constr

o submit aroject cleahich the Arfor delay on

zed dress

out loss of

rkmen for a

th. The widstance bes used an

eters of thches and e

atform be pviding suita

erloaded w

ch as asphear and rub

welders’ p

sed except

Signature

ore than onruction.

adequate naring showrchitect/ SBn this acco

ing and co

f time, in ca

all works t

dth betweeetween twoextra labo

e edge of excavation

provided wiable fencing

with debris o

halt, cemebber hand

protective

in the form

e & Seal of

ne months

no. of sitewing majorBIIMS mayount will be

otton woo

ases when

hat cannot

en the sideo adjacentur shall be

the trenchns shall be

ith suitableg or railing

or materia

nt, mortargloves.

eye shield

m of paste

Tenderer

s

e r y e

l

n

t

e t

e

h e

e g

l

,

d

e

Page 40: PART CHNICAL BID · 2018. 5. 2. · BI Infra M SBI Infra Third Flo CONDITIO M o AHMEDA 18/05/201 Not applic NA NA. 0.50% of max. 5% o 12 Months 90 days fr NO INTER The con insurance

ArSt

r. Devdatt Mtudio919 Ar

(ii)Suitablin the f

11. Overa

be prov 12 Hoistin

suppor 13. The ro

durable

M Pandya rchitects

le face maform of spr

alls shall bevided to en

ng machinrts shall be

opes usede quality an

sks shouldray or surfa

e supplied nable the w

es and tace in perfect

in hoistingnd adequa

d be suppliace having

by the conworking pa

ckle used int condition.

g or lowerate strength

40

ed for useg lead paint

ntractor to inters to w

n the work.

ing materiah and free

by the wot dry rubbe

the paintewash during

ks including

al or as a form defec

orkers whened and scra

ers and adeg cessation

g their atta

means of cts.

Signature

n the paintapped.

equate facn of work.

achments a

suspensio

e & Seal of

t applied

cilities shal

anchor and

on shall be

Tenderer

l

d

e

Page 41: PART CHNICAL BID · 2018. 5. 2. · BI Infra M SBI Infra Third Flo CONDITIO M o AHMEDA 18/05/201 Not applic NA NA. 0.50% of max. 5% o 12 Months 90 days fr NO INTER The con insurance

ArSt

r. Devdatt Mtudio919 Ar

1) NaSBIIMS

2) Con

3) SiteJamna

4) Sco

5)Nam

6)Addr

7) Peri

8) EarnThousDays fBank d 9) Rete 10) De 11) Ins 12) Liqshown value. 13) Va

M Pandya rchitects

ame of theS, Circle O

sultants

e Addressagar.

ope of Wor

e of the Co

ress of the

od of Com

nest Moneyand only)

from the ladrawn in fa

ention Mon

efects Liabi

surance to

quidated dain the tend

lue of Inter

APPEN

e organizaOffice, SBI,

:A R . D

M/s St

s: State

rk : Pro

ontractor

Contracto

mpletion

y Deposit ) by meanast date of avour of S

ney

lity Period

be underta

amages der per we

rim Bill (Mi

NDIX HER

ation OfferLHO, Bha

Devdatt M

tudio919 A

e Bank of

oposed Air

r

ns of Demf submissiotate Bank

aken by the

eek subject

in.)

41

REIN BEFO

ring Contradra, Lalda

M Pandya

Architects

f India, M

r Condition

mand Drafon of the tk of India a

e : Contract

t to max. 5

ORE REFE

ract: The arwaja, Ahm

s

Mithapur-S

ning worksAhmedaba

: -----------

: ------------

: 60• Iss: Rs

ft/Pay Ordtender) froand payab

: As gen

: Tw Virt

: 125tor at his c

: 0.55% of the c

: Rs

ERRED TO

Circle Heamedabad-1

Surajkaradi

of Main Bad

------------------------------------------

-------------------------------------------

days fromue of work. 2,000/der (Validm any sch

ble in Jam

per clauseneral Cond

welve Monthtual comple

5% of Contost(Contra

5% of thecontract va

. 3.00Lakh

Signature

O

ad &Vice 1

i branch,

Branch, La

--------------------------------------------

--------------------------------------------

the date ok order. /- (Rupe

for a periheduled Nanagar.

e no. 1.4 oitions

hs from theetion.

tract Valueactor’s all r

e Contracalue or actu

hs.

e & Seal of

President

Mithapur

al Darwaja

----- ----- ------

------ ------ ------

of

ees Twoiod of 180ationalized

f

e date of

e isk policy)

ct amountual final bil

Tenderer

.

,

,

o 0 d

t l

Page 42: PART CHNICAL BID · 2018. 5. 2. · BI Infra M SBI Infra Third Flo CONDITIO M o AHMEDA 18/05/201 Not applic NA NA. 0.50% of max. 5% o 12 Months 90 days fr NO INTER The con insurance

ArSt

r. Devdatt Mtudio919 Ar

14) Daissued posses 15) Pe

16) Init 17) To 18) Re Compshall beonly af 19) Pe 20) Thfor comreceiptreports

M Pandya rchitects

ate of Commto the Con

ssion of the

riod of Fina

tial Securit

otal Securit

efund of initrising of Ee refundedfter the Def

riod for Ho

he final bill mpletion wot of final bils etc. presc

mencemenntractor/ ore site whic

al Measure

y Deposit

ty Deposit

tial SecuritMD and IS

d to the Cofect Liabilit

onoring Ce

will be subork and thel provided cribed in th

nt r the day ohever is ea

ement

ty DepositSD. ontractor onty Period is

rtificate

bmitted by e Bill shall the bills a

he tender.

42

on which tharlier.

: 2

:

n completios over.

the Contrabe certifiedre submitte

Date:

: Frohe Contract

: 2 M Com

2% of the A

5% of the f

: 50%on of the w

: One Mon

actor withind within 3 ed with all

Signa

om the datetor is instru

Months frommpletion.

Accepted V

final bill am

% of the Swork and b

nth for R.A

n one monmonths fropre-requis

ature of Te

Signature

e of work oucted to ta

m the date

Value of th

mount inclu

ecurity Dealance refu

A.Bills

nth of the dom the datesite docum

enderer.

e & Seal of

order ke

e of Virtual

he Tender.

uding ISD.

posit unded

date fixed e of ents/test

Tenderer

Page 43: PART CHNICAL BID · 2018. 5. 2. · BI Infra M SBI Infra Third Flo CONDITIO M o AHMEDA 18/05/201 Not applic NA NA. 0.50% of max. 5% o 12 Months 90 days fr NO INTER The con insurance

ArSt

r. Devdatt Mtudio919 Ar

To, The C.SBI InfBhadraAhmed Dear S PROPOMITHA

Havingworks examinthe reqto execthe sain accowriting contrac MEMO (a) D

(b) Ea

(c) Tiww

Shouldprovisio

M Pandya rchitects

H. &V.P., Cfra Managea, Laldarwadabad-1

Sir,

OSED AIRPUR, DIST

g examinedspecified

ned the sitequisite infocute the woaid memoraordance in

referred ct and with

ORANDUM

escription

arnest Mon

ime allowework from thwork order.

d this tendeons of the

Circle Officement Soluaja,

R CONDITIT: JAMNAG

d the termsin the m

e of the woormation reorks specifandum on all respecto in cond

h such cond

M

of work

ney

ed for comphe date of

er be accee said con

LETTER

ce, utions Pvt.

IONING WGAR.

s & conditiomemoranduorks speci

elating therfied in the the item r

ct with the ditions of ditions so f

pletion of issue of

epted, I/wenditions of

43

R OF DEC

Ltd., Third

WORKS OF

ons, drawium hereinfied in thereto and a said mem

rate basis specificatioTender, tfar as they

ProposeMithapuDistt: JaRs. 2,0only) byfrom adrawn ipayable60 daysper tend

e hereby agContract

LARATIO

d Floor, SB

F MITHAPU

ngs, specinafter set said mem

affecting thmorandummentionedons, desighe articles

y may be a

ed Air Conur-Surajkaramnagar.000.00 -y means oany schein favour oe at Jamnas from the der.

gree to abannexed h

N

BI, LHO,

UR-SURAJK

ifications, dout and

morandumhe quotatiom within thd in the attn, drawings of agreepplicable.

nditioning wradi Branch

(Rupees of Demand duled Naof State B

agar. date of com

ide by andhereto so

Signature

KARADI BR

design relahaving v

and havingon, I/We hehe time sptached schgs and instement, con

works for h, at Mitha

Two ThoDraft / Pay

ationalizedBank of Ind

mmencem

d fulfill the far as the

e & Seal of

RANCH AT

ating to theisited andg acquiredereby offerpecified inhedule andtructions innditions of

apur,

ousand y Order Bank dia and

ment as

terms andey may be

Tenderer

T

e d d r n d n f

d e

Page 44: PART CHNICAL BID · 2018. 5. 2. · BI Infra M SBI Infra Third Flo CONDITIO M o AHMEDA 18/05/201 Not applic NA NA. 0.50% of max. 5% o 12 Months 90 days fr NO INTER The con insurance

ArSt

r. Devdatt Mtudio919 Ar

applicathe sai

I/we ha(RupeeManagupon toManag We undtender InstituttherefoBank dat any entrustwithoutto Tend We, heprices period. Yours f

Signatu

M Pandya rchitects

able or in dd condition

ave deposes Two

gement Solo do so, I/

gement Sol

derstand thin part o

e Buildingore, undertdeciding to stage duri

ted to us t any extraderers” of t

ereby, alsoof any o

.

faithfully,

ure of cont

default thens.

ited DemaThousandlutions Pvt/we herebylutions Pvt

hat as per r whole o

g, Staff Qtake that wdrop any

ing the conin phases

a claim for this tender

o undertakof the mat

tractor With

ereof to for

and Draft /d only) at. Ltd. Shoy agree that. Ltd.

terms of tr may enttrs. And D

we shall notof the buildntract perio

on our aprice esca

r.

ke that, weterial durin

h Seal

44

rfeit and p

/ Banker’s as Earnesuld I/we doat this sum

his tender,trust the w

Director’s Bt raise anyding/buildinod. Furtherpproved raalation as

e will not rng the cu

pay to SBII

Cheque / st moneyo fail to ex

m shall be

, the SBIIMwork of vaBungalow/y claim/comngs from thr, we also ates and wprovided fo

raise any currency of

IMS, the a

FDR for adeposit

ecute the forfeited b

MS may coarious buildInterior wo

mpensationhe scope oundertakewithin the or in Claus

claim for acontract/e

Signature

amount me

a sum of Rwith the contract w

by me/us to

onsider accdings propork) in phn in the eveof work of

e to executstipulated

se 9.0.1 “In

any escalaexecution/c

e & Seal of

entioned in

Rs 2,000 /-SBI Infra

when calledo SBI Infra

cepting ourposed (i.eases. Weentuality ofthis tendere the work

d time limitnstructions

ation in thecompletion

Tenderer

n

- a d a

r . , f r k t s

e n

Page 45: PART CHNICAL BID · 2018. 5. 2. · BI Infra M SBI Infra Third Flo CONDITIO M o AHMEDA 18/05/201 Not applic NA NA. 0.50% of max. 5% o 12 Months 90 days fr NO INTER The con insurance

ArSt

i.

ii.

iii.

iv.

v.

vi.

vii.

r. Devdatt Mtudio919 Ar

Name Name Sr. No. No. & D Refere Date of Date of

S.No

ItemDes

1 2

Note: 1.

2.

M Pandya rchitects

of Contrac

of Work

. of this Bil

Date of pre

ence to Agr

f Written o

f Completi

m scription

U

3

If part ratshould bea rate.

If ad-hoc mentione

PR

ctor/ Agenc

l:

evious Bill

reement N

order to com

on as per A

Unit Rate (Rs.)

3 4

te is allowee indicated

payment ied specifica

ROFORMA

cy

:

o.

mmence :

Agreemen

As per Tend

Qty Amo(Rs.)

5 6

ed for any id with reaso

s made, it ally.

45

A FOR RUN

TABLE - X

nt

der Up PreviouBill

unt Qty A(

7 8

items, itons for allo

should be

NNING A/CXIII

:

:

:

:

to us R.A.

Up(Gr

Amount (Rs.)

Qty

8 9

owing such

C BILL

p to Date ross)

y Amount (Rs.) 10

h

Net Va

Signature

Present Bil

Qty Amo(Rs

11 12

alue since

bill

e & Seal of

l Rema

ount .)

13

previous

Tenderer

arks

Page 46: PART CHNICAL BID · 2018. 5. 2. · BI Infra M SBI Infra Third Flo CONDITIO M o AHMEDA 18/05/201 Not applic NA NA. 0.50% of max. 5% o 12 Months 90 days fr NO INTER The con insurance

ArSt

r. Devdatt Mtudio919 Ar

The me

---------

recorde

No.-----

--------Signa

Contra

The wo

satisfac

--------Archi

M Pandya rchitects

easuremen

--------------

ed at page

--------------

--------------ature and d

actor

ork recorde

ctorily as p

--------------itect

nts on the

were mad

es -----------

---------.

-------------- date of

ed in the a

per tender

--------------

C

basis of w

de have be

---------------

---------Sign

Rep

bove-ment

drawings,

Sign

46

CERTIFICA

hich the ab

en taken jo

-- to --------

---------------nature and

Architecpresentative

tioned mea

conditions

--------nature and

ATE

bove entrie

ointly on --

--------------

-------------- date of

cts e (Seal)

asurement

s and spec

-------------- date of Si

es for the R

---------------

----- of me

- ---------Sign

Site En

ts has bee

ifications.

-------------ite Enginee

Signature

Running Bi

----------- an

asurement

--------------nature and gineer

n done at t

er

e & Seal of

ill No.----

nd are

t book

-------------date of

the site

Tenderer

Page 47: PART CHNICAL BID · 2018. 5. 2. · BI Infra M SBI Infra Third Flo CONDITIO M o AHMEDA 18/05/201 Not applic NA NA. 0.50% of max. 5% o 12 Months 90 days fr NO INTER The con insurance

ArSt

r. Devdatt Mtudio919 Ar

R/A BI

1.

2.

3.

4.

5.

i)

ii)

iii)

(a)

(b)

iii.

iv.

M Pandya rchitects

LL NO.

Totalprevi

Totalsince

Total(C) (A

PVA of Stand state

Total OBJ

SecuR/A

Reteper amou

Less

Balan

Mobi

Outsintere

To be

Any oto be

Any chargcontrstate

l value ous bill (A

l amount oe Previous

l amount dA+B)

on accounteel, Cemelabour as

ements enc

l amount d

ECTIONS

ured Advan

ntion moneaccepted

unt Rs.

already re

nce to be r

lization Ad

tanding est) as on

e recovere

other Depae recovered

other ges to be rract (water

ement.

MEMORA

of work)

of secured Bill (B)

due since P

nt of declaent and ots detailed closed.

due to the C

:

nce paid in

ey on valutenders

ecovered

recovered

dvance, if a

amount (date

ed in this b

artmental md as per co

Departmerecovered r, power etc

47

ANDUM FO

done sinc

advance d

Previous B

ration in prther mater

in separ

Contractor

the previo

e of worksup to d

any

(principal

ill

materials contract, if a

ntal servif any, as c.) enclose

OR PAYME

ce Rs...

due Rs...

ill Rs...

rice rials rate

Rs...

Rs...

ous Rs...

s as date

Rs...

Rs...

Rs...

Rs...

+ Rs...

Rs...

cost any

Rs...

vice per

e

Rs...

ENT

................

................

................

................

................

................

................

................

................

................

................

................

................

................

Signatur

TA

.....

.....

.....

.....

.....

.....

.....

.....

.....

.....

.....

.....

.....

.....

re & Seal of

ABLE - XV

f Tenderer

V

Page 48: PART CHNICAL BID · 2018. 5. 2. · BI Infra M SBI Infra Third Flo CONDITIO M o AHMEDA 18/05/201 Not applic NA NA. 0.50% of max. 5% o 12 Months 90 days fr NO INTER The con insurance

ArSt

r. Devdatt Mtudio919 Ar

The bilafter dupayme Date:-- The bilafter dupayme

Date : Signatu

This figpayme Date:-- ---------Signatu

M Pandya rchitects

l amount toue checkinnt.

---------------

l amount toue test chent for an a

--------------

ure of Ban

gures givennt ----------

---------------

---------------ure of the C

i)

ii)

iii)

o Rs. ------ng of the m

----------

o Rs.-------ecking of mamount of R

--------------

ks/ SBIIMS

n in the Me--------------

-------

------------ Circle Hea

STA

Total Am

Less I.T

Less S.T

Net Pay

------------ (bmeasureme

-----------cemeasuremeRs.............

--

S Engineer

emorandum--------------

ad & VP

ATUTORY

mount due

T. Payable

T. Payable

yable

48

both figureents of wor

ertified by Cents of wor.................

r

m for paya---------------

DEDUCTI

(E)

e

es and work as requir

---- Sig wit

Consultantsrks as requ......

ble has be--------------

ION:

ds) has bered and is

---------------gnature of Ath Seal

s has beenuired and is

een verified- (in words

Signatur

een scrutinrecommen

------------ Architect

n scrutinizes recomme

d and bill pand figure

Rs. --------

Rs. --------

Rs. --------

Rs. --------

re & Seal of

ized by usnded for

ed by me ended for

passed for es)

----

----

----

----

f Tenderer

Page 49: PART CHNICAL BID · 2018. 5. 2. · BI Infra M SBI Infra Third Flo CONDITIO M o AHMEDA 18/05/201 Not applic NA NA. 0.50% of max. 5% o 12 Months 90 days fr NO INTER The con insurance

ArSt

r. Devdatt Mtudio919 Ar

TECH SR. NO 01 S

Wh4boTEwB

02 SWp4btTEwB

03 ITa&cTsl

04 Ea

M Pandya rchitects

HNICAL S

Supply of sWall mounhour at the45/46 dB nbe suitableoperation. The air filteEvery unitwarrantee BE OF COSUPPLY OWall mounper hour at45/46 dB nbe suitablethe operatiThe air filteEvery unitwarrantee BE OF COnstallation

Total work as outdoor& fabricatincontrol panThe installasplit and ceakages, lExtra coppa) The co

laggingwithouexcellelaying insulatand doTHAN

a) Then cthe pe

SPECIFICA

split A/C 1.ted air cone ambient noise level e for 230 v(5- Start A

er shall be t shall be must be g

OPPER MEOF SPLIT anted air cot the ambienoise level e for 230 voons. (5- st

er shall be t shall be must be g

OPPER MEn of split 1&

comprisinr. Connecting for hannel. ation of A/

cassette A/loading, un

per pipe : ontractor sg to make

ut joints anent workmit on conn

tion shall bo not com SUPPLIEcontractor erfect job

ATION FOR

.0 tr. (5 standitioner sof 40 degat the dist

volts poweAC high wa

easy to msupported

given for 5ETAL. a/c 1.5 Tr. onditioner sent of 40 dat the dist

olts of powar A/C higeasy to msupported

given for 5ETAL. & 1.5 Tr :-ng of unpaing the pipnging the u

/C. chargin/C. this incnloading, g

shall have e the perfnd proper

manship. Nnecting it tobe provide

mpromise aD for 1.0 &shall haveof insulatio

49

R THE AIR

Descripti

ar) :- hall have 1gree centigtance of 1

er supply. Wall type splitaintain andd by warr5 years fro

(5 star):- shall have

degree centant of 1 M

wer supply.h wall typeaintain andd by warr5 years fro

cking till copes & electunit from c

ng towardscludes nitrgas chargin

to providefect job of

flare-up sNo dent sho machine/ed. Entire pany aesthe& 1.5 TR. Ae to provideon. All the

R CONDIT

on of work

1.0Tr i.e ngrade capaMT for ou

With tempet A/C). d preferablrantee of om the ma

e 1.5 Tr i.etigrade ca

MT for indo With temp

e split A/C)d preferablrantee of om the ma

ommissiontrical cableceiling. Ins

s installatiorogen flushng and pan

e extra lenf insulationshall be d

hall be allo/evaporatepiping shaetic look. TA/C with me copper pe copper p

IONING C

k

ominal 12.acity. Unittdoor/indooerature ind

le showingone year

anufacturer

e. nominal pacity. Un

oor/outdooperature in) ly showingone year

anufacturer

ning of eaces/wires. Wstallation s

on testing hing, pressnel fittings.

ngth of con. All the done with owed whilee/condensell be doneTHIS IS Tanufacture

pipe with ppipe shall

Signatur

ONTRACT

.000 BTU/ct shall havor units. Tdicator and

g the statushowever

r. CONDE

18,000 Bit shall havr units. Thdicator an

g the statushowever

r. CONDE

ch units indWith necessshall be do

and commsure testin

opper pipe copper pitools and

e bending er. High gre over the THE LENGer kit. proper lagg

be withou

re & Seal of

T WORK

capacity pve maximuhe unit shad remote f

s of chokinsealed unSOR MUS

BTU/capacive maximue units shad remote f

s of chokinsealed unSOR MUS

door as wesary suppoone with th

missioning g, attendin

with propipe shall b tackles fthe pipe

rade of foafalse ceilin

GTH OTHE

ging to makut joints an

f Tenderer

er um all for

ng. nit ST

ity um all for

ng. nit ST

ell ort he

of ng

er be for of

am ng ER

ke nd

Page 50: PART CHNICAL BID · 2018. 5. 2. · BI Infra M SBI Infra Third Flo CONDITIO M o AHMEDA 18/05/201 Not applic NA NA. 0.50% of max. 5% o 12 Months 90 days fr NO INTER The con insurance

ArSt

r. Devdatt Mtudio919 Ar

05 WSTeToaA

06 DCbcd

07 s08 C

Ttb

9.1. T

cso

9.2. U

ocpfo

Itsoty

M Pandya rchitects

properNo demachiprovidcomprsaddlin

Wiring :- SPLIT UNIThe A/C celectrical cThe wiring of materialand finisheA.C contraDrain wateCondensedblock throucarry conddone beforsupply andCivil work :The A/C cthe civil cobe done by

VARIABL

Scope: The scopecommissionspecificatioof quantities

Type: Unit shall bone outdoocool indepeprovided wior servicingt shall be shown in thon any circype of indo

r flare- up snt shall bene/evaporaed. Entireromise anyng and cla

T TO OUTcontractor contractor i

shall passs. Any dril

ed by the Actor for ea

er piping :- d water in ugh gravitydensed ware connectd installatio: ontractor hntractor wy the A/C c

LE REFRIG

e of thisning of Vns and in as.

be air cooor unit andendently foith isolationg, while sypossible to

he drawingcuit can beoor units sh

shall be doe allowed wator /cond

e piping sy aestheticmping.

TDOOR UNhas to g

n house. As through ling of the A.C contra

ach & every

the interioy-slop. Theater. All theing.

on of fabric

has to comhile doing

contractor w

GERANT F

s section Variable Raccordanc

led, variab multiple ior the reqn valves soystem keepo connect

gs or as inde of differehall be con

50

one with towhile benddense. Hishall be dc look. Si

NIT et the wir

All the wirinISI approvwall for ge

actor. Size y A.C unit.

or of the be entire pipe piping s

cated steel

mplete the flooring towith requir

FLOW SYS

compriseefrigerant

ce with the

ble refrigerndoor unit

quirement o that a paps function

multiple indicated in sent type annnected to

ools and tacding the pipigh gradedone over ze of cop

ring from ng shall beved conduitetting copp

of the wir

banking haing shall bhall be ma

supports f

zari work o run the drred labour

STEM

es the suVolume requireme

rant volumts. Each iof the roo

articular uning in normndoor unitschedule ond also cothe system

ckles for epe of layin of foam

the falsepper shall

the MCB e of approvts as ment

per pipe or res shall be

all shall bebe 25 M.M.aintainable

for outdoor

in the warainage pip&materials

upply, ereSystem c

ents of Dra

me air condndoor unitoms. All init can be is

mal way. ts on one of quantitieontrolled inm:

Signatur

xcellent wog it or con

m insulatioe ceiling asleeve ins

unit provved make otioned in awiring sha

e 3x 2.5 s

e drained o ISI approv

e and test

r units for (

all and coope etc. finiss.

ection, teconformingawings and

ditioner cot having candoor unitsolated and

refrigerantes. The inndividually.

re & Seal of

orkmanshinnecting it on shall band do nsulated wi

ided by thonly. approved liall be sealesq. m. m. f

outside/toilved pipes ing shall b

(1T.1.5 Tr)

ordinate wishing has

sting and to these

d Schedule

onsisting ofapability tos shall bed removed

t circuit asndoor units Following

f Tenderer

ip. to

be not ith

he

ist ed for

let to

be

ith to

d e e

f o e d

s s g

Page 51: PART CHNICAL BID · 2018. 5. 2. · BI Infra M SBI Infra Third Flo CONDITIO M o AHMEDA 18/05/201 Not applic NA NA. 0.50% of max. 5% o 12 Months 90 days fr NO INTER The con insurance

ArSt

r. Devdatt Mtudio919 Ar

- - -

mrecin

T

uss

B

fi 9.3. O T

fr

Ac

Ind

T

h T T 9.4. T

cthcsp

Te

Afl

M Pandya rchitects

Ceiling m Wall Mou

Compmechanismefrigerant

cooling. ndoor units

The refrigeupto 100m system shasystem / co

Both indoorrst charge

Out Door UThe outdoorom heavy

All outdoorcompresso

n case of disrupted w

The noise horizontally

The outdoo

The unit sh

CompressThe comprcontrolling. he variatiochanged byshall incorppressure. The invert

efficient andAll outdooructuation

mounted caunted Split pressor ins

m and capby scroll eOutdoor u

s.

rant pipingwith maxim

all be manompressor.

r unit and o of refriger

Unit: or unit sha gauge mil

r units abrs.

outdoor uwith failure

level shall y 1m away

or unit shal

all be prov

sor: ressor sha It shall ch

on in cooly speed moporate liqui

ter used, d quiet oper units shand indoo

ssette typetype

stalled in opable of cengaging

unit shall b

g between mum 50 mnaged with

outdoor unrant before

all be factold steel pa

bove 5 HP

units with of any com

not be mand 1.5 m

l be modul

vided with m

all be highhange the ling load odulation od sub-coo

shall be eration. hall have or unit ind

51

e.

outdoor unihanging th/ dis enga

be suitable

indoor unm level diffehout distur

nit shall be e delivery a

ory assemnels with p

P rating s

multiple cmpressor.

ore than 6m above gro

lar in desig

microproce

h efficiencspeed / refrequiremeof compresling mecha

IGBT (ins

multiple sividual con

it shall be he rotatingaging mece for mix-m

nits and ouerence withrbance to

factory asat site.

mbled, weapowder coa

shall have

compresso

60 dB (A) ound level

gn with pos

essor contr

cy scroll tyfrigerant mnt. Refrige

ssor / mechanism with

ulated gat

steps of cntrol. All

equipped g speed /

chanism tomatch conn

ut door unihout any onormal op

ssembled,

ather proofated finish.

minimum

rs, the op

at normal .

ssible futur

rol panel.

ype and cmass flow rerant mashanical con

h liquid inje

te bipolar

capacity coparts of c

Signatur

with capac/ mass flo

o follow vanection of

ts shall beoil traps. Operation cy

tested and

f casing c.

m two num

peration sh

operation

re expansio

capable forate in accoss flow ratntrol syste

ection at int

transistor

ontrol to compresso

re & Seal of

city controow rate ofariations inall type of

e extendedOil recoveryycle of the

d filled with

onstructed

mber scrol

hall not be

measured

ons.

or capacityordance tote can bem. Systemtermediate

r) type for

meet loador shall be

f Tenderer

l f n f

d y e

h

d

l

e

d

y o e

m e

r

d e

Page 52: PART CHNICAL BID · 2018. 5. 2. · BI Infra M SBI Infra Third Flo CONDITIO M o AHMEDA 18/05/201 Not applic NA NA. 0.50% of max. 5% o 12 Months 90 days fr NO INTER The con insurance

ArSt

r. Devdatt Mtudio919 Ar

s

O 9.5. H T

to T

tr T

s T

ph

9.6. R T

sp

9.7. S A

s F

lofo

9.8. P A

q A In

a F

P F

p 9.9. O U

lo

M Pandya rchitects

sufficiently

Oil heater s

Heat ExchaThe Heat Eo aluminumThe fins sreatment sThe casingstandard feThe unit shpropeller tyhave a safe

RefrigerantThe Refrigeshut off vaprovided to

Safety DevAll necessasystem. Following sow pressuror inverter,

Piping: All connectquality with All connectnsulation oand tubes o

For individuPiping with

For outdoorpaints to wi

Oil RecoveUnit shall bong refrige

lubricated.

shall be pro

anger: Exchanger m fins to foshall haveshall be suigs, fans, meatures. hall be provype fans aety guard.

t Circuit: erant Circualves and ensure th

vices: ary safety

safety devire switch, , and short

ions of Ref Eddy Curions, tees,

of cold linesof appropri

ual Piping Bands for

r piping, thithstand ou

ery Systembe equippeerant piping

. Forced l

ovided in th

shall be coorm a crosse anticorroitable for amotors etc

vided with arranged fo

uit shall inca solenoi

e safety op

devices s

ices shall fuse, cran

t recycling

frigerant prent Testin reducers s shall be ate thickne

50 / 100 midentificat

he finish shutside amb

m: d with an o

g.

52

lubrication

he compre

onstructeds fan coil aosion treatareas of higc. shall als

necessaryor vertical

clude an lid valve. peration of

shall be pr

be part of nkcase heaguard time

iping shall ng and matetc. shall bcarried ouess so that

mm wide Aion.

hall be wovbient condit

oil recover

may also

essor casin

d with coppand larger stment for gh pollutionso be with

y number o/ horizont

iquid receiAll neces

f the system

rovided to

the outdoater, fusibler.

be in highterial test Cbe standart with Armt condensa

Aluminum T

ven GRP Mtions and U

ry system t

be employ

ng.

per tubes msurface are

Heat Excn, moistureh anticorro

of direct dal discharg

iver /accumssary safem..

ensure s

oor unit : he plug, ov

h grade CoCertificatesrd make fittaflex / K-Fation does

Tape shall

Mat finishedUV Radiati

to ensure s

Signatur

yed.

mechanicaea. changer Ce and salt lsion treatm

riven low nge. Each

mulator, liqety devices

afe operat

high pressuver current

pper of Res. tings.

Flex insulatnot occur.

l be used

d with coloon.

stable ope

re & Seal of

ally bonded

Coil. Theaden air. ment as a

noise leveh fan shal

quid & gass shall be

tion of the

ure switchprotection

efrigeration

tion sheets.

at joints of

ored Epoxy

eration with

f Tenderer

d

e

a

l l

s e

e

, n

n

s

f

y

h

Page 53: PART CHNICAL BID · 2018. 5. 2. · BI Infra M SBI Infra Third Flo CONDITIO M o AHMEDA 18/05/201 Not applic NA NA. 0.50% of max. 5% o 12 Months 90 days fr NO INTER The con insurance

ArSt

r. Devdatt Mtudio919 Ar

Sd

T

w 9.10. In U U

e U

N U A

m U A

p A A

c V

in C

w A A C

sutese

9.11. C T

asc

Uh

Elo

9.12 C U

M Pandya rchitects

System shdistribution

The refrigewithout oil t

ndoor UniUnits shall Units shall efficient heaUnits shall Noise. Units shall All componmaintenancUnits shall All units witproper Air dAll unit shaAll units mconnectionsVisible indoncluded in Concealed which can bAnticorrosioAll units shaCooling coiupply air teemp, whicelected su

Ceiling MoThe unit shand DX-coisteel. The bcorners. Unit shall hhave four wEach unit sow gas lev

Ceiling MoUnit shall b

all be desof oil to in

rant pipingtraps.

ts: be factory have DX cat transferhave Cen

have inlet nents of ce. have very th Factory distributionll be contro

mounted inss, and speoor units cost of unindoor uni

be controlleon treatmeall have adl and refriemperatur

chever is pply air tem

ounted Casall be ceiliil section. body shall

have a extway supply shall have el detectio

ounted Dube suitable

signed fordividual co

g shall be

assembledcoils with c.

ntrifugal fan

filters, whiUnits are

low noise.manufact

n. olled by eleside the ccial filters shall haveit by defauits shall haed with wir

ent for avoidequate insigeration pre shall nomore. Co

mperature

ssette Typng mounteThe housbe light in

ternal attraair grilles high lift d

on system a

ctable Typfor ceiling

53

r proper oompressor.

extended

d, wired, pcopper tub

ns for ade

ch are ease easily a

ured Units

ectronic Exceiling shaif necessae wireless

ult. ave sensorreless remding corrossulation orparameterst be less tontractor s.

pe Unit (Med type. Ting of the weight an

active panon sides arain pumpand very lo

pe Unit: g mounted

oil return t.

upped 100

piped and tbes and bo

equate amo

sily cleanabaccessible

s, Grills sha

xpansion Vll have fary.

s remotes.

r mounted otes unlession of coi

r Lining to as shall be than 140C shall guar

Multi-Flow he unit shaunit shall

nd shall be

el for suppand return ap, fresh airow operatin

type. The

to compre

0 M with 5

ested. onded alum

ount of Ai

ble and repfor conn

all have au

Valves onlyns capable

. Price of

on supplyss specifiedls. avoid conddesigned or 10C ab

rantee ins

Type): all include be powde

e possible t

ply and reair grille in r intake prong sound.

unit shall

Signatur

ssor along

50-M level

minum fins

r circulatio

placeable. ection, re

uto swing

y. e of susta

the same

y air grilles d.

densation. in such a

bove room side condi

pre-filter, fer coated gto suspend

eturn air. centre. ovision (if

include pre

re & Seal of

g with the

difference

s for highly

on and low

epairs and

feature for

aining duct

e shall be

/ diffusers

a way thatdew point

itions with

fan sectiongalvanizedd from four

Unit shal

specified)

e filter, fan

f Tenderer

e

e

y

w

d

r

t

e

s

t t h

n d r

l

,

n

Page 54: PART CHNICAL BID · 2018. 5. 2. · BI Infra M SBI Infra Third Flo CONDITIO M o AHMEDA 18/05/201 Not applic NA NA. 0.50% of max. 5% o 12 Months 90 days fr NO INTER The con insurance

ArSt

r. Devdatt Mtudio919 Ar

sg

9.13 H T

sg

U 9.14. C U

sg

9.15. C A

c T

c- - - - -

-

9.16. U U T

m

- - -

M Pandya rchitects

section & Dgalvanized

High Wall MThe units ssection & Dgalvanized Unit shall h

Ceiling MoUnit shall bsection & Dgalvanized

Central ReA multi-funcontroller) sThe controlconsisting o

Tempe On/Off Indicat Select The co

by a nothe ind

The co& controutdooof the s

Unified OnUnified ON

The contromaximum 1

On / OffIndicatioSelect o

DX-coil secsteel. The

Mounted Ushall be hiDX-coil sec

steel. ave an attr

ounted Cobe suitable DX-coil sec

steel. It sh

emote Connctional mshall be suller shall beof max. 16 erature settf as a zoneion of operON of all o

ontroller shon polar 2 oor unit.

ontroller shrolling of a

or unit. All nsystem to i

n/Off Contr/ OFF con

ller shall b16 indoor u

f as a zoneon of operaone of 4 op

ction. The e unit shall

Units: gh wall m

ction. The

ractive ext

ncealed tyfor ceiling

ction. The hall be slim

ntroller (Oicroproces

upplied as ae able to cunits) or 1

ting for eace or individrating condoperation mall have wwire transm

all be integll above pnecessary integrate to

roller (Optntroller sha

be able to units) or 12

e or individation condiperation mo

54

housing of have high

mounted typhousing of

ernal casin

ype units:g mounted

housing ofm and quite

ption if Spssor basedan optiona

control upto128 nos. ofch zone, oual unit. dition. modes for ide screenmission ca

grated to Bparameters

interface co the BAS

tion if Speall be suppl

control mi28 nos. of i

ual unit. ition of eacodes.

f unit shallh static fan

pe. The uf unit shall

ng for supp

type. The f unit shall

e in operati

pecified ind centraliz

al accessoro min. 64 zf indoor unr group, or

each zonen liquid crysable to a di

BAS systems includingcards / unitSoftware.

ecified in Blied as an

nimum 2 gndoor unit

ch group.

be light wfor ductab

unit shall i be light w

ply and ret

unit shall be light won

n BOQ): zed controry. zones of 6

nits with ther indoor un

e.. stal displaystance of 1

m thru softwg start/ stopts should b

BOQ): optional ac

groups (eas with the

Signatur

weight powdble arrange

nclude preweight powd

urn air.

include preweight powd

oller (centr

64 group (ee followingnit.

y and shall1000m aw

ware for mp of each inbe supplied

ccessory.

ach group following f

re & Seal of

der coatedement.

e-filter, fander coated

e filter, fander coated

ral remote

each group functions.

l be wired ay from

monitoring ndoor / d as a part

containingunctions.

f Tenderer

d

n d

n d

e

p .

t

g

Page 55: PART CHNICAL BID · 2018. 5. 2. · BI Infra M SBI Infra Third Flo CONDITIO M o AHMEDA 18/05/201 Not applic NA NA. 0.50% of max. 5% o 12 Months 90 days fr NO INTER The con insurance

ArSt

r. Devdatt Mtudio919 Ar

To

Tcus

9.17. C2csinMAa

9.18 E Flopth

10.1

10.2 10.2.1

M Pandya rchitects

The controlof 1 km awa

The controlcontrolling unit. All necsystem to i

Condensat25mm dia condensatesealed so tnsulation dMounting All indoor uanchor Fas

lectrical in

For Variablocation. Hphase powhese outdo AIR DISTR SCOPE

The scopeall sheet mgrilles, regand the ge

DUCT MA

RA Galvanisurface acertificatesat randomfor thickne

ller shall bay from ind

ler shall beof all abovcessary intntegrate to

te: uPVC pip

e, from Evthat there

drain tray s

units shall steners.

nstallation

le RefrigerVAC Con

wer to outdoor units. P

RIBUTION

e of this semetal / alumgisters andeneral arra

ATERIALS

AW MATERizing shallrea and Ls. In additi

m by owneress and zin

e wired bydoor unit.

e integrateve parameterface caro the BAS

pes, 40mmvaporator is no watehall be pro

be mount

n:

rant flow stractor to oor units

Power / con

N

ction compminum duc diffusers.

angement s

RIALS be ClassLock Formion, if deemr’s site repnc coating

55

y a non-po

ed to BAS seters includrds / units sSoftware.

m dia uPVUnit to drer leakageovided belo

ted with B

systems, pprovide s

and singlentrol cablin

prises suppcts, supply,All to be in

shown on t

s VII – lighming Qualmed necesresentativeat contract

olar 2 wire

system thrding start/ should be

VC headerain point.

e. U-trap sow the Eva

Brackets, H

power will suitable dise phase pong along w

(AS PER

ply fabricat, installation accordanthe Drawin

ht coating ity prime ssary, same shall be tor's expen

transmissi

ru softwarestop of easupplied a

s & fitting The join

shall be paporator Un

Hangers et

be providestribution ower to all

with support

“SMACNA

tion, instalon, testing ance with thngs.

of zinc, nmaterial

mples of rasubject to

nse.

Signatur

ion cable t

e for monitoch indoor /

as a part of

gs shall bents shall brovided. nit, if requi

tc. with p

ed near oupanel alonl indoor unts shall be

A” STAN

lation and and balancese specif

nominal 18along with

aw materiaapproval a

re & Seal of

to distance

oring & / outdoor f the

e used fore properlyAdditionared.

proper size

utdoor unitng with 3-nits fed byincluded.

DARDS)

testing of cing of all fications

80gm/sq.mh mill testal, selectedand tested

f Tenderer

e

r y l

e

t -y

m t d d

Page 56: PART CHNICAL BID · 2018. 5. 2. · BI Infra M SBI Infra Third Flo CONDITIO M o AHMEDA 18/05/201 Not applic NA NA. 0.50% of max. 5% o 12 Months 90 days fr NO INTER The con insurance

ArSt

r. Devdatt Mtudio919 Ar

10.2.2.

10.2.2.

10.3 10.4

M Pandya rchitects

. GAAll ducts sfollowing t

.1 ForRectanDucts GMaximuDuct Si

1–500501 –

751 –

901 –

1201 –

1501 –

1801 –

2101 –

*Distance as of mate

DUCT CO

All ductsconformin

a) Ducinsuindiare reqdimto eany

AUGES, BRshall be fachickness,

r Ducts wingular G. S. um ize

G

0 mm – 750

mm – 900

mm 1200

mm – 1500

mm – 1800

mm – 2100

mm above

of reinforcerial used f

ONSTRUCT

s shall bng to relev

cts so ideulated fromicated in s overall shuired and

mensions shensure thay gaps.

RACING Bctory fabricas indicate

ith externa

DGaug

e 26 26

24

24

22

20

20

18

cement/brafor joining o

TION

be fabricavant SMAC

entified onm outside chedule ofheet metal

indicatedhould be at all conne

56

BY SIZE OFcated from ed as below

al SP up toPre

Duct SectioJoi

C&S C&S

TD

TD

TD

TD

TD

TD

acing from of duct sec

ated andCNA code

n the Draas descr

f Quantitie dimensio in Sched

as per apprecting sect

F DUCTSgalvanizedw:

o 250 Pa (essure 250on Lengthint Type

ConnectorConnector

F Flange

F Flange

F Flange

F Flange

F Flange

F Flange

each joint.ctions.

installedes.

awings sharibed in ths. Duct dins inclusiv

dule of quroved drawtions are d

d steel / al

(ESP up to0 Pa h 1.2 m (4

r r

. Bracing m

d in wor

all be acohe section imensions ve of the aantities.

wings and cimensiona

Signatur

uminum of

o 25mmW

ft) Bracing Spacing

Nil Nil

Nil

Nil

Nil

JTR or ZEBAR

JTR or ZEBAR

JTR or ZEBAR

material to

rkmanlike

oustically “Insulatioshown on

acoustic linThe fabriccare shoul

ally matche

re & Seal of

f the

g)

EE

EE

EE

be same

manner,

lined andn” and as

n drawingsning wherecated ductd be taken

ed to avoid

f Tenderer

,

d s , e t n d

Page 57: PART CHNICAL BID · 2018. 5. 2. · BI Infra M SBI Infra Third Flo CONDITIO M o AHMEDA 18/05/201 Not applic NA NA. 0.50% of max. 5% o 12 Months 90 days fr NO INTER The con insurance

ArSt

r. Devdatt Mtudio919 Ar

10.5

a.

10.6 S

SSex

a) R

resccoa

b) Skesp

DOCUAdo

a) B

Mexw

Esee

Uth

Dmsu

M Pandya rchitects

DAMPERS

Dampers: 16 G GSScontrol sh

SUPPLY A

Supply and Schedule ofxtruded alu

Rectangulaectangular chedule oonsultant /pproval f

Supply air ey-operatepecific app

MENTATIOAll ducts fabocumentat

Bill of mater

Measuremexternal sur

wise.

Each and eerial numbnsure spee

Unless othehe basis of

Ductwork shmeasuremeurface are

S

All duct dS construchall be sui

AND RETU

return air f Quantitieuminium se

r Diffuse diffusers

of quantit/ client. Thfrom CLIEdiffusers s

ed volumeplications, a

ON & MEAbricated antion viz: rial/Packin

ent sheet crface area

every duct ber, assignedy and pr

erwise spef centerline

hall be meents shall ea shall be

dampers sction and titable for

URN AIR D

diffusers ss. Aluminection as s

ers shall s with fluties Theshese shallNT for eacshall be eq control dand as pe

ASUREMEnd installed

g list for ev

covering eaalong with

piece to hned to it inroper site m

ecified, mee measurem

easured onbe taken be calculate

57

shall be opight fittingthe locatio

DIFFUSER

shall be asnium diffusspecified in

be extruush fixed se shall be procu

ch type of dquipped widampers, er requirem

ENTS FORd should b

very duct s

ach fabricah summary

ave a tag n the measmeasurem

easuremenments des

n the basisbefore app

ed by mea

pposed bla. The desi

on and serv

RS / GRILL

shown onsers shall bn schedule

uded alumpattern fobe selecred only

diffuser. th fixed aand anti-s

ments of

R DUCTINGe accompa

section sup

ated duct py of extern

number, wsurement sent and ve

ts for ductcribed here

s of externplication oasuring the

ade louver ign, methovice requir

LS

n the Drawbe powder e of quantit

minium coor differencted in c

after

air distributsmudge rischedule

G anied and

pplied.

piece shownal surface

which shousheet. Therification.

ting for theewith

al surface f the insul

e perimete

Signatur

dampers od of hanred.

ings and incoated & mies.

nstruction,nt spacesconsultatio

obtaining

tion grids, ngs as reof quantiti

supported

wing dimen area of du

uld corresphe above s

e project s

area of dulation. Th

er compris

re & Seal of

of robustdling and

ndicated inmade from

, square &s as pern with the written

removableequired ines.

d by proper

nsions anduct gauge-

pond to thesystem wil

shall be on

ucts. Ducthe externaing overal

f Tenderer

t d

n m

& r e n

e n

r

d -

e l

n

t l l

Page 58: PART CHNICAL BID · 2018. 5. 2. · BI Infra M SBI Infra Third Flo CONDITIO M o AHMEDA 18/05/201 Not applic NA NA. 0.50% of max. 5% o 12 Months 90 days fr NO INTER The con insurance

ArSt

r. Devdatt Mtudio919 Ar

wmsein

Fpebese

Fmce

TadovichintoN

b) Spe

I. Gcose

II. DVsh

III. L

flash

IV. F

penere

10.7 Insulat

M Pandya rchitects

width and dmultiplying ection and

n a similar or taperederimeter, wetween laection shaor special

measuremeenterline. he quotedllowances,ouble nutsibration ihamber/ac

ndication, to complete

NOT be sep

pecial Itemerpendicul

Grilles and ontrol dameparately a

Diffusers - Volume conhall not be

inear diffusanges for hall be me

lexible coerpendiculecessary equisite le

FLEXIBLE

ed flexible

depth, inclwith the o adding upmanner.

d rectangulwhereas forge and sll be the cel pieces lient shall be

d unit rate, flanges as for suppisolator sccess panturning vane the duct iparately me

ms for Air Dlar to air flo

registers mpers shaaccounted

cross secntrol damp

e separately

sers - shamounting

easured wit

onnection lar to the mounting

ength of ca

E DUCT:

e duct shou

uding the overall lenp areas of

ar ducts, thor tapered mall diameenterline dke bends,e identical

e for extend gasketsports, rubbsuspension

nel, splittenes, straignstallationeasured no

Distributionow, as iden

- width mll form pa.

ction area pers shall y accounte

all be measof linear dth ducting

- shall direction arrangem

anvas cloth

uld be UL 58

corner joigth from fall duct se

he averagecircular dueter shall istance be, tees, redto that des

ernal surfas for jointsber strip 5n where r damper

ghtening va as per theor paid for

n shall be mntified heremultiplied art of the

for air flowform part

ed.

sured by diffusers. Tas describ

be measof air flow

ment, flangeh.

181 CLAS

ints, in theflange face

ections. Pl

e width anducts, the dbe adopte

etween the ducers, brscribed ab

ace of duc, nuts and 5mm thick

specifiewith qua

anes, and e specifica.

measured bewith: by heightunit rate f

w at dischof unit rat

cross-secThe supplybed earlier.

sured by w. Quotedes, nuts a

SS I AIR D

e center oe to flangeenums sha

d depth shdiameter ofed, the lenflanges of

ranches anbove using

cts shall bolts, han

k betweened or readrant and

all other ations. The

by the cros

, excludinfor registe

harge areate for sup

ctional areay air plenum

their crod rates and bolts

UCT LIST

Signatur

of each due face of all also be

hall be consf the sectiongth of tapf the duct snd collarsthe length

include algers and a

n duct andequired, d lever foaccessorieese access

ss-section

g flanges.ers and sh

a, excludinply air diff

as and sham for linea

oss sectioshall incland trea

ED AND L

re & Seal of

ct sectioneach ductmeasured

sidered foron midwaypered ductsection. , mode of

h along the

ll wastageangles withd supportinspection

or positiones requiredsories shal

area

. Volumehall not be

ng flangesfusers and

all excludear diffusers

onal arealude the

ated-for-fire

LABELLED

f Tenderer

, t d

r y t

f e

e h , n n d l

e e

. d

e s

a e e

D

Page 59: PART CHNICAL BID · 2018. 5. 2. · BI Infra M SBI Infra Third Flo CONDITIO M o AHMEDA 18/05/201 Not applic NA NA. 0.50% of max. 5% o 12 Months 90 days fr NO INTER The con insurance

ArSt

r. Devdatt Mtudio919 Ar

WITH laminatinner cValue 4in a rug Flexibproper into enties.

M Pandya rchitects

NFPA 90tion of tou

core, doub4.2, Greengged and d

le duct cflexible rig

nergy efficie

0A & 90Bugh polyesle layer co

n guard cerdurable tri

connectionsght formingent. and S

B ANDSEAster whichore wrappertification odirectional

s should g brace conStrapping th

59

AL OF AI encapsul

ed in a muof fiberglaslly reinforc

be madennection ahe flexible

R DIFFUSates steel

ultiple thickss wool mued metaliz

e as per Uallowing rig

duct conn

SION CO helix wire

kness of fibust. , Reinfzed polyest

UL181 listght connectnections wi

Signatur

UNCIL we forms thberglass wforced andter jacket.

ting procetions for fleith flexible

re & Seal of

ith doublehe air tightwool with Rd sheathed

edure withexible ductduct strap

f Tenderer

e t

R d

h t p

Page 60: PART CHNICAL BID · 2018. 5. 2. · BI Infra M SBI Infra Third Flo CONDITIO M o AHMEDA 18/05/201 Not applic NA NA. 0.50% of max. 5% o 12 Months 90 days fr NO INTER The con insurance

Sr. Equipment / Material Makes1 VRF / VRV Units Mitsubishi/ Toshiba / Daikin / Carrier / Hitachi2 DUCTABLE Unit Mitsubishi / Toshiba / Daikin / Carrier / Hitachi

3 SPLIT Unit Blue star / Daikin / Carrier / Hitachi / Voltas / Trane / Toshiba / Mitsubishi electric etc.

4 Copper Pipe Mandev / Rajco / Totaline

5 Hard PVC Pipes Supreme / Prince

6 G.I SHEET Tata / Jindal/Essar / Nippon7 ACOUSTIC INSULATION Arma sound(Arma cell) / Equivalent

Thermal Insulation Material:a) Nitrile Rubber Armaflex / K Flex / Equivalentb) Thermocole Breadshell / Eq. Cable 1) Armored Cable Finolex / Universal / Polycab / RR Kabel 2) Flexible Cable Finolex / Universal / Polycab / RR Kabel

10 PVC rigid conduits & Accessories 2.0mm thick Precision Plastic Co. ISI and FIA approved

List of Approved Makes

8

9

Ar. Devdatt M Pandya

Studio919 Architects Signature Seal of Tenderer

Page 61: PART CHNICAL BID · 2018. 5. 2. · BI Infra M SBI Infra Third Flo CONDITIO M o AHMEDA 18/05/201 Not applic NA NA. 0.50% of max. 5% o 12 Months 90 days fr NO INTER The con insurance

ODU

WRI

TING

DES

K

4'

BRAN

CH

H

EAD

15'-0"X9'-0"

ATM

CD

MEC

D SWAYAM

TEC

HM

ITRA

GRA

HAK

MITR

A

PAN

TRY

9'-9" X 9'-2"

UP

GEN

TS TO

ILET

8'-6" X 5'-6"

L. TO

ILET

3'-0" X 4'-6"

LO

CKER RO

OM

11'-8" X 13'-10"

CASH

RO

OM

9'-10" X 13'-10"

UPS RO

OM

10'-0" X 6'-0"

SERVER RO

OM

10'-0" X 6'-0"

CU

STO

MER'S AREA

24'-0" X 19'-6"

low

height storage

low

height storage

S A L E S

low height storage

low height storage

5'2'-6"5'

1'-6

"3'

2'-6

"

6'-8

"3'

3"5'

3"5'

3"5'

3"3'

6'

5'-11"

full height storage

ELEC

TRIC

AL

PAN

EL

4'2'

-6"

6'-6"

1'-6"2'-3"

5'

E lobby

9'-9" X 10'-6"

7'-4" x 15'-4"

1.0

TR1.

0 TR 1.

5 TR

1.0 TR

1.0 TR

2.0

TR2.

0 TR

2.0 TR2.0 TR

2.0 TR

OLD

OLD

OLD

OLD

OLD

OLD

ODU ODU ODU ODU ODU

ODUODUODUODU

12

3

45

6

7

89

10

* D

WG

S. A

RE P

ROPE

RTY

OF

"STU

DIO

919

"& S

HALL

NO

T BE

CO

PY W

ITHO

UT P

ERM

ISSI

ON

50

010

25100

50 10025100

NO

TE

:

* A

LL

D

IM

EN

SIO

NS

A

RE

T

O B

E R

EA

D, N

OT

T

O B

E M

EA

SU

RE

D.

*A

LL

D

IM

EN

SIO

NS

A

RE

IN

F

EE

T - IN

CH

ES

* B

EF

OR

E S

TA

RT

IN

G C

ON

ST

RU

CT

IO

N, T

HE

C

ON

TR

AC

TO

R/S

UB

C

ON

TR

AC

TO

R S

HA

LL

R

EV

IE

W A

ND

V

ER

IF

Y. A

LL

DR

GS

,D

IM

EN

SIO

N A

ND

C

ON

DIT

IO

NS

, D

IS

CR

EP

AN

CIE

S. IN

T

HE

D

RG

S, O

R IN

B

ET

WE

EN

T

HE

D

RG

S A

ND

A

CT

UA

L. F

IE

LD

CO

ND

IT

IO

NS

S

HA

LL

B

E R

EP

OR

TE

D T

O T

HE

A

RC

HIT

EC

TS

B

EF

OR

E S

TA

RIN

G C

ON

ST

RU

CT

IO

N.

* T

HE

A

RC

HIT

EC

TS

S

HA

LL

N

OT

B

E R

ES

PO

NS

IB

LE

IN

A

NY

W

AY

F

OR

T

HE

C

ON

TR

AC

TO

R/ S

UB

C

ON

TR

AC

TO

R

CO

MP

LIA

NC

E W

IT

H S

AF

ET

Y A

ND

R

EG

UL

AT

IO

N.

*A

NY

A

MB

IG

UIT

Y F

OU

ND

, C

ON

TA

CT

A

RC

HIT

EC

T / IN

TE

RIO

R D

ES

IG

NE

R B

EF

OR

E E

XE

CU

TIO

N.

* D

WG

S. A

RE

P

RO

PE

RT

Y O

F "S

TU

DIO

9

19

A

RC

HIT

EC

TS

"&

S

HA

LL

N

OT

B

E C

OP

Y W

IT

HO

UT

P

ER

MIS

SIO

N

STU

DIO

919

SBI-

MIT

HAP

UR

NTS

SHAI

LESH

DEV

DAT

T

01.0

6.20

17

DEV

DA

TT P

AN

DYA

+91

987

9 23

4 91

9

SHA

ILY

SHUK

LA P

AN

DYA

+91

987

9 63

5 77

9

Arc

hite

ct

Inte

rior D

esig

ner

2nd

Flr.

- 8,

AJI

TNA

TH S

OC

., N

r. PA

LDI P

.O.,

AHM

EDA

BAD

- 38

0007

, IN

DIA

.TE

LEFA

X: 0

79 -

2663

0154

, EM

AIL

: 919

stud

io@

gmai

l.com

01A

IR C

ON

DITIO

NIN

GLA

YOUT

date

: 27.

06.2

017

"MITH

APU

R-SU

RAJK

ARA

DI" B

RAN

CH

AT J

AM

NA

GA

R, G

UJA

RAT.

STA

TE B

AN

K O

F IN

DIA

PRO

POSE

D LA

YOUT

of