WELCOME TO THE INNOVATION CLUSTER OF KAZAKHSTAN “Park of Innovative Technologies” development review

“Park of Innovative Technologies” development review

Embed Size (px)

Citation preview

Page 1: “Park of Innovative Technologies” development review

WELCOME TO THE INNOVATION CLUSTER

OF KAZAKHSTAN

“Park of Innovative Technologies” development review

Page 2: “Park of Innovative Technologies” development review

“Park of Innovative Technologies”Is the site for the creation of high-tech industries

Page 3: “Park of Innovative Technologies” development review

“Park of Innovative Technologies”established by the Decree of the President of the

Republic of Kazakhstan from 18.08.03. number 1166Opening of SEZ PIT took place in September 2006

Page 4: “Park of Innovative Technologies” development review

“Park of Innovative Technologies”

Opening of SEZ PIT took place in September 2006

2003-2011y.y. – development of 1 phase

Page 5: “Park of Innovative Technologies” development review

“Park of Innovative Technologies”

Opening of SEZ PIT took place in September 2006

2003-2011y.y. – development of 1 phase

In 2011 year SEZ PIT was felled by companies only on 30%.

Page 6: “Park of Innovative Technologies” development review

“Park of Innovative Technologies”

Opening of SEZ PIT took place in September 2006

2003-2011y.y. – development of 1 phase

In 2011 year SEZ PIT was felled by companies only on 30%.

Production shops were empty

Page 7: “Park of Innovative Technologies” development review

In 2011, on the instructions of the Head of State there were made the "reset" of the Park

1. In 2010, at the initiative of the Head of State started to be developed Master Plan for PIT 2020, approved during his visit to the Park in May 2011

Page 8: “Park of Innovative Technologies” development review

In 2011, on the instructions of the Head of State there were made the "reset" of the Park

1. In 2010, at the initiative of the Head of State started to be developed Master Plan for PIT 2020, approved during his visit to the Park in May 2011

2. Introduced unprecedented preferences for SEZ participants

Page 9: “Park of Innovative Technologies” development review

In 2011, on the instructions of the Head of State there were made the "reset" of the Park

1. In 2010, at the initiative of the Head of State started to be developed Master Plan for PIT 2020, approved during his visit to the Park in May 2011

2. Introduced unprecedented preferences for SEZ participants

3. Fulled 100% of the area of technopark park, at 1 June, 2013 – were registered more than 150 companies.

Page 10: “Park of Innovative Technologies” development review

In 2011, on the instructions of the Head of State there were made the "reset" of the Park

1. In 2010, at the initiative of the Head of State started to be developed Master Plan for PIT 2020, approved during his visit to the Park in May 2011

2. Introduced unprecedented preferences for SEZ participants

3. Fulled 100% of the area of technopark park, at 1 June, 2013 – were registered more than 150 companies.

4. There were started the construction of scientific research Center of

Kazakh Institute of Oil and Gas

Page 11: “Park of Innovative Technologies” development review

In 2011, on the instructions of the Head of State there were made the "reset" of the Park

1. In 2010, at the initiative of the Head of State started to be developed Master Plan for PIT 2020, approved during his visit to the Park in May 2011

2. Introduced unprecedented preferences for SEZ participants

3. Fulled 100% of the area of technopark park, at 1 June, 2013 – were registered more than 150 companies.

4. There were started the construction of scientific research Center of

Kazakh Institute of Oil and Gas

5. Now are finishing the construction of Date Center

of JSC “Kazakh Telecom”

Page 12: “Park of Innovative Technologies” development review

In 2011, on the instructions of the Head of State there were made the "reset" of the Park

1. In 2010, at the initiative of the Head of State started to be developed Master Plan for PIT 2020, approved during his visit to the Park in May 2011

2. Introduced unprecedented preferences for SEZ participants

3. Fulled 100% of the area of technopark park, at 1 June, 2013 – were registered more than 150 companies.

4. There were started the construction of scientific research Center of

Kazakh Institute of Oil and Gas

5. Now are finishing the construction of Date Center

of JSC “Kazakh Telecom”

Now 100% all buildings are filed by the companiesTax from с 2005y. – 3,5 billion тенге

(at 5 months in 2013y. – 772 million тенге)

Page 13: “Park of Innovative Technologies” development review

“Park of Innovative Technologies”The Park concentrates small and medium-sized high-tech enterprises.

Weekly events are held with the participation of businessmen, students, inventor

Page 14: “Park of Innovative Technologies” development review

“Park of Innovative Technologies”

The park becomes as a center of technological competence in the areas of:

information technology

The Park concentrates small and medium-sized high-tech enterprises.Weekly events are held with the participation of businessmen, students, inventor

Page 15: “Park of Innovative Technologies” development review

“Park of Innovative Technologies”

The park becomes a center of technological competence in the areas of:

communication equipment

The Park concentrates small and medium-sized high-tech enterprises.Weekly events are held with the participation of businessmen, students, inventor

Page 16: “Park of Innovative Technologies” development review

“Park of Innovative Technologies”

The park becomes a center of technological competence in the areas of:

electronic devices

The Park concentrates small and medium-sized high-tech enterprises.Weekly events are held with the participation of businessmen, students, inventor

Page 17: “Park of Innovative Technologies” development review

The 2nd phase are started

Page 18: “Park of Innovative Technologies” development review

The 2nd phase are started1. Approved construction documents for the construction of the second phase of infrastructure (140 ha)

Page 19: “Park of Innovative Technologies” development review

The 2nd phase are started1. Approved construction documents for the construction of the second phase of infrastructure (140 ha)

2. Collected 3.4 billion tenge for the construction of infrastructure in the second phase in 2013

Page 20: “Park of Innovative Technologies” development review

The 2nd phase are started

3. The construction of the Institute of Petroleum Engineering and Information Technology KBTU

1. Approved construction documents for the construction of the second phase of infrastructure (140 ha)

2. Collected 3.4 billion tenge for the construction of infrastructure in the second phase in 2013

Page 21: “Park of Innovative Technologies” development review

The 2nd phase are started

4. Designing of the 2nd stage of industrial park NATD

3. The construction of the Institute of Petroleum Engineering and Information Technology KBTU

1. Approved construction documents for the construction of the second phase of infrastructure (140 ha)

2. Collected 3.4 billion tenge for the construction of infrastructure in the second phase in 2013

Page 22: “Park of Innovative Technologies” development review

The 2nd phase are started

5. Completed the design of world-class college "KASIPKOR"

4. Designing of the 2nd stage of industrial park NATD

3. The construction of the Institute of Petroleum Engineering and Information Technology KBTU

1. Approved construction documents for the construction of the second phase of infrastructure (140 ha)

2. Collected 3.4 billion tenge for the construction of infrastructure in the second phase in 2013

Page 23: “Park of Innovative Technologies” development review

The 2nd phase are started

6. Considering the issue of buildingLG Electronics Factory

5. Completed the design of world-class college "KASIPKOR"

4. Designing of the 2nd stage of industrial park NATD

3. The construction of the Institute of Petroleum Engineering and Information Technology KBTU

1. Approved construction documents for the construction of the second phase of infrastructure (140 ha)

2. Collected 3.4 billion tenge for the construction of infrastructure in the second phase in 2013

Page 24: “Park of Innovative Technologies” development review

The 2nd phase are started

7. A decision on the construction of social amenities zone Estate Fund Samruk-Kazyna

6. Considering the issue of buildingLG Electronics Factory

5. Completed the design of world-class college "KASIPKOR"

4. Designing of the 2nd stage of industrial park NATD

3. The construction of the Institute of Petroleum Engineering and Information Technology KBTU

1. Approved construction documents for the construction of the second phase of infrastructure (140 ha)

2. Collected 3.4 billion tenge for the construction of infrastructure in the second phase in 2013

Page 25: “Park of Innovative Technologies” development review

The 2nd phase are started

8. Worked out the construction of a joint innovation and service center HEWLETT-PACKARD COMPANY and JSC "NC" KTZ "

7. A decision on the construction of social amenities zone Estate Fund Samruk-Kazyna

6. Considering the issue of buildingLG Electronics Factory

5. Completed the design of world-class college "KASIPKOR"

4. Designing of the 2nd stage of industrial park NATD

3. The construction of the Institute of Petroleum Engineering and Information Technology KBTU

1. Approved construction documents for the construction of the second phase of infrastructure (140 ha)

2. Collected 3.4 billion tenge for the construction of infrastructure in the second phase in 2013

Page 26: “Park of Innovative Technologies” development review

Joint innovation and service center HEWLETT-PACKARD COMPANY and JSC "NC" KTZ "

JOINT PRODUCT

PORTFOLIO

DEVELOPMENT: Replicability of IT products and information systems MEASURING SYSTEMS FOR THE NEEDS OF RAILWAY TRANSPORT- Microprocessing devices for railway control METHODOLOGY AND TECHNOLOGY MANAGEMENT

SERVICE: IMPLEMENTATION OF JOINT TECHNOLOGY "KEY" TECHNOLOGICAL SUPPORT UTILITY SERVICES OUTSOURCING

The volume of investments:> $ 200 million

Implementation period: 2013-2014 years

Number of Jobs: 3000 (plan)

Consumers: More than 100 railway companies around the world

Annual consumer market: more than $ 200 billion

Probable area laboratories: 18,000 sq.m.

Fast start by supporting 23 HP labs around the world.

Page 27: “Park of Innovative Technologies” development review

ICT Cluster PIT "Alatau"

The participants of the ICT

cluster

StartUp-companies

Found of ICT development

ICT - business

В портфеле -165 проектов4 проекта профинансировано - 12 млн. тг.6 проектов будет профинансировано до конца года

Меморандум с 4 мировыми венчурными фондами: Czech ICT Alliance, Segment Interactive (США), Softline ventures (РФ), Tex Drive (РФ)

R&D-Labs• 5 R&D центров

HP, Microsoft, Fraunhofer

• 800 сертифицированных инженеров • 26 специализированных курсов• 2 тестовые площадки.• 17 учебно-исслед. лабораторий IBM, Apple, Huawei ,SAP

• 87 ИКТ компаний 450 ИКТ-компаний в РК

• 1600 рабочих мест35 тыс. ИКТ-специалистов в РК

• 70 студенческих проектов

• 5 производств ИКТ Оборудование ЦОД

КАЗАХСКИЙ НАЦИОНАЛЬНЫЙ ТЕХНИЧЕСКИЙ УНИВЕРСИТЕТ ИМЕНИ К.И. САТПАЕВА

КАЗАХСТАНСКО-БРИТАНСКИЙ ТЕХНИЧЕСКИЙ УНИВЕРСИТЕТ

Page 28: “Park of Innovative Technologies” development review

International University of Informational Technologies

StudentsMaster, professor - PhD

Laboratories

Projects

Quantity 2350 151 13 70

2014 – 2015 уч. год 1 000 322 15 100

2015 – 2016 уч. год 1 000 436 17 120

2016 – 2017 уч. год 2 400 451 20 145

Total 6 500 451 20 145

3d – принтеры, «антисон», казахская клавиатура, 3 робота: автоматический, с ручным управлением и агрегат-коллектор

70 student projects :

Prizes in international competitions ACM, ROBOCON, IT-Planet

Education program from iCarnegie Mellon 1 in the world in Computer Sciencejoint training U.S., South Korea, Malaysia, Spain

Page 29: “Park of Innovative Technologies” development review

High-tech manufacturing

Fibre

Начало производства

2012 год

Произведено (патчкорды)

550 000 шт.

Каз. Содержание

60%

Equipment GPON

Начало производства

2012 г.

Произведено комплектов

19 551 шт.

Каз. Содержание 44 %

ELTEX Алатау

Начало производства

2011 г.

Произведено60 000 шт.

Каз. Содержание

21-30%

Personalcomputers

Начало производства

2011

Произведено125 000 шт.

Каз. содержание

54,1%

ResiversDVB-S2 и DVB-Т2

Завод им. Кирова

Alfa Network

Производство 2013

Мощность 5000 шт.

Каз. содержание

не менее 15%

Servers

Начало производства

2014

Мощность завода,

в мес.

360 000 шт.

Каз. содержаниене менее 15%

2011 г.

Pad

In SEZ PIT registered 87 ICT companies, 16 of which extraterritorially

LogycomLogycom (экстерриториально)

«Мобильные технологии»

2012 г. 2013 г.

2014 г.

Page 30: “Park of Innovative Technologies” development review

Established on the basis of academic buildings

Kazakh National University. Al-Farabi

autonomous territory with the regime SEZ PIT

for the implementation of ICT projects (extraterritoriality 2015);

Goal: to create favorable conditions for

IT professionals and organizations, and to promote cooperation

between them, the involvement of students and teachers

located near universities in Almaty

Description:

4-level building (Masanchi - Kirov) area of 4000 square meters. meters.

5-level building (Masanchi - Vinogradov) area of 7000 square meters. meters.

Park of innovative technologies 3.0 – creation of intellectual quarters in Almaty

Page 31: “Park of Innovative Technologies” development review

Expected results of the Park of innovative technology by 2020

The number of operating companies

The total income of companies

The total income of companies

Export earnings

The day average of people

250

60

150 billion tg/year

40%

50 000

Page 32: “Park of Innovative Technologies” development review

Short-term action plan

1. To acsept the Law of RK "On the innovation cluster "Park of innovative technologies"

2. Begin construction of the infrastructure of the 2nd turn SEZ

3. Start the construction of the 2nd stage of industrial park "Alatau"2013

2014

4. Complete construction of the data center JSC "Kazakhtelecom"

5. To hold the first meeting of the Board of Trustees

6. Complete the construction of a research center AO KING

7. Complete construction of the 2nd stage of industrial park "Alatau"

8. To begin the construction of a joint research center AO KTZ and HP

9. Complete the construction of the campus KBTU

2015 11. Attract companies to manage Jurong SEZ

10. Complete construction of infrastructure 2nd phase of SEZ

12. Expansion of the territory of SEZ PIT

Page 33: “Park of Innovative Technologies” development review

Our region

Almaty City1

2

43

Kazakh National University of Al-Farabi

Kazakh National Technical University

International Informational Technology University

TechnoparkALATAU

Page 34: “Park of Innovative Technologies” development review

Why not to join the cluster?

Almaty City1

2

43

Kazakh National Technical University

International Informational Technology University

TechnoparkALATAU

Kazakh National University of Al-Farabi

Page 35: “Park of Innovative Technologies” development review

We identified some key factors Almaty City

Page 36: “Park of Innovative Technologies” development review

We identified some key factors Almaty City

The concentration of researchers, professors, students (IT specialists)

Today in Almaty operate 52 universities, 69 colleges and 11 vocational schools. The number of young people aged 14 to 29 years is 390 000 people or 30% of the total population of the city. The number of students is 265 000 people, of whom 187 000 are enrolled in universities, 65 colleges, 500.

Page 37: “Park of Innovative Technologies” development review

We identified some key factors Almaty City

The presence of customers

(companies)

The concentration of researchers, professors, students (IT specialists)

Almaty has developed trade business, so many companies sell and service at the center of the city

Page 38: “Park of Innovative Technologies” development review

We identified some key factors Almaty City

Financial centers - Venture Capital

The presence of customers

(companies)

The concentration of researchers, professors, students (IT specialists)

Strategically located to ensure maximum visibility and identity, the individual buildings create an ensemble that establishes a unique monumentality on Al-Farabi Avenue.

Page 39: “Park of Innovative Technologies” development review

We identified some key factors Almaty City

Recreational facilities (parks, movie theaters, restaurants, etc.)

Financial centers - Venture Capital

The presence of customers

(companies)

The concentration of researchers, professors, students (IT specialists)

buildings, places that provides a particular service or is used for a particular industry

Page 40: “Park of Innovative Technologies” development review

We identified some key factors Almaty City

Recreational facilities (parks, movie theaters, restaurants, etc.)

Financial centers - Venture Capital

The presence of customers

(companies)

Transport and logistics factor

Availability of public transport, the presence of underground stations, the smallest traffic on the road, etc.)

The concentration of researchers, professors, students (IT specialists)

Page 41: “Park of Innovative Technologies” development review

We identified some key factors Almaty City

Recreational facilities (parks, movie theaters, restaurants, etc.)

Financial centers - Venture Capital

The presence of customers

(companies)

Transport and logistics factor

The concentration of researchers, professors, students (IT specialists)

The developed science infrastructure (research centers, laboratories, broadband

network, etc.)

Page 42: “Park of Innovative Technologies” development review

We have several intelligent blocks Almaty City

12

43

Intersection of the key factors has identified several intelligent quarters

Page 43: “Park of Innovative Technologies” development review

From 52 universities we selected 4Almaty City

12

43

Kazakh National University of Al-Farabi

Kazakh National Technical University

International Informational Technology University

TechnoparkALATAU

Page 44: “Park of Innovative Technologies” development review

Example of an intellectual block:“KAZGU GRAD”

Page 45: “Park of Innovative Technologies” development review

“Park of Innovative Technologies”Is for anchor projects

TechnoparkALATAU