15
TOPIC PARETO BASED METERING STRATEGIC FRAMEWORK PRESENTER : Wilfred Shereni Metering & Revenue Assurance Expert, Zimbabwe

PARETO BASED METERING STRATEGIC FRAMEWORK

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PARETO BASED METERING STRATEGIC FRAMEWORK

TOPIC

PARETO BASED METERING

STRATEGIC FRAMEWORK

PRESENTER : Wilfred Shereni

Metering & Revenue Assurance Expert,

Zimbabwe

Page 2: PARETO BASED METERING STRATEGIC FRAMEWORK

PRESENTATION OVERVIEW

① Objective of Presentation② Pareto based Metering Strategic framework③ Meter To Cash (M2C) Value Chain④ Key Changes to the Meter To Cash (M2C) Value Chain⑤ Examples of Pareto cases in the M2C value chain⑥ Steps to follow when using Pareto based metering strategic

formulation approach⑦ Potential Challenges in the Meter to Cash Value Chain⑧ Problem mapping for the Metering Value Chain⑨ Keys issues to consider when using Pareto based metering

strategy formulation approach

Page 3: PARETO BASED METERING STRATEGIC FRAMEWORK

PRESENTATION OVERVIEW

① Objective of Presentation② Pareto based Metering Strategic framework③ Examples of Pareto cases in the M2C value chain④ Meter To Cash (M2C) Value Chain⑤ Changes in the Meter To Cash (M2C) Value Chain⑥ Steps to follow when using Pareto based metering strategic

formulation approach⑦ Potential Challenges in the Meter to Cash Value Chain⑧ Problem mapping for the Metering Value Chain⑨ Keys issues to consider when using Pareto based metering

strategy formulation approach

Page 4: PARETO BASED METERING STRATEGIC FRAMEWORK

OBJECTIVE OF PRESENTATION

To share information on the Pareto based Metering

Strategy formulation approach to enhance efficiency

and effectiveness of the “Meter to Cash (M2C)Value Chain”

Page 5: PARETO BASED METERING STRATEGIC FRAMEWORK

PARETO BASED METERING STRATEGIC FORMULATION FRAMEWORK

A “Pareto based Metering Strategic Framework” is an

enhanced strategy formulation approach that focuses

and prioritizes on key/mission critical issues based on

the 80/20 rule.

It is a decision-making technique that statistically

separates a limited number of input factors as having

the greatest impact on an outcome, either desirable

or undesirable.

Page 6: PARETO BASED METERING STRATEGIC FRAMEWORK

PARETO BASED METERING STRATEGIC FORMULATION FRAMEWORK

NOTE, the figures 80 and 20 are illustrative – the

Pareto Principle illustrates the lack of symmetry that

often appears between work put in and results

achieved. For example, 13 percent of work could

generate 87 percent of returns. Or 70 percent of

problems could be resolved by dealing with 30

percent of the causes.

Page 7: PARETO BASED METERING STRATEGIC FRAMEWORK

EXAMPLES OF PARETO CASES IN THE

METER TO CASH VALUE CHAIN

10% of customers contribute 90% of revenue

20% of customers account for 80% of Non Technical

Losses(NTL)

Metering faults constitutes 20% of utility faults but

account for 80% of revenue loss

10% of customers owing account for 90% of debt

10% of the technical specification cover 90% of meter

requirements

10% of processes in a project impact on 90% of the

outcome

Page 8: PARETO BASED METERING STRATEGIC FRAMEWORK

METER TO CASH (M2C) VALUE CHAIN

The Meter to Cash (M2C) value chain includes

Metering, Billing & Collection functions which

traditionally were handled separately but because of

technological advancements are now merging

Page 9: PARETO BASED METERING STRATEGIC FRAMEWORK

CHANGES IN THE METER TO CASH (M2C) VALUE CHAIN

Traditionally Metering, Billing & Collection were distinct processes but are now merging into one end to end process

METERING, BILLING & COLLECTION (MBC)

METERING BILLING COLLECTION

TRADITIONAL APPROACH

CURRENT APPROACH

Page 10: PARETO BASED METERING STRATEGIC FRAMEWORK

STEPS TO FOLLOW WHEN USING THE PARETO BASED STRATEGY FORMULATION APPROACH

Identify &

List

problems for

each phase

of the M2C

Value Chain

Group

Problems

together by

Root Cause

Add up the

scores for

each group

& Rank

Take Action

Score

Problems

All Root Causes

for Each M2C

Phase Identified

Root

Causes

No

Yes

Page 11: PARETO BASED METERING STRATEGIC FRAMEWORK

POTENTIAL CHALLENGES IN THE METER TO

CASH VALUE CHAIN

For any metering program, there will be challenges that

arise in: Planning/Design, Equipment Specification,

Purchasing, Installation & Maintenance and replacement

Using Pareto Based Metering Strategic framework will

assist focus on key issues, avoid pitfalls and optimise on

resource usage

The next slide shows problems that exist in the Meter to

Cash value chain of a typical Sub Saharan African Utility

referenced to best practice

Page 12: PARETO BASED METERING STRATEGIC FRAMEWORK

PROBLEM MAPPING FOR THE METERING VALUE CHAIN FOR A TYPICAL SSA UTILITY

Note: Problematic phases are highlighted in red

Pla

nn

ing

/ B

usi

nes

s C

ase

FAT

(En

d t

o E

nd

Tes

tin

g)

Tech

nic

al S

pec

ific

atio

n

Dra

ftin

g/R

evie

w

Acc

epta

nce

Tes

tin

g o

n

Del

iver

y

Met

er In

stal

lati

on

Des

ign

Fau

lt M

ain

ten

ance

&

Perf

orm

ance

Mo

nit

ori

ng

Rep

lace

men

t at

En

d o

f

Gu

aran

teed

life

sp

an

Met

er In

stal

lati

on

&

C

om

mis

sio

nin

g

15% 11% 12%11% 13%8% 5% 5%12% 15% 10% 20%10% 10%5% 5% 18% SPUs

MPUs

15% 20% 11% 11% LPUs12%13%8% 5% 5%

20%

Ten

der

Pro

cess

Note: SPUs – Small Power Users, MPUs – Medium Power Users, LPUs – Large Power Users

Page 13: PARETO BASED METERING STRATEGIC FRAMEWORK

PROBLEM MAPPING USING PIE

CHART – MPUS & LPUSPlanning/Business Case

Technical Spec

Tendering

FAT

Acceptance Testing

Meter Installation Design

Meter Installation & ComissioningFault Maintenance & Performance MonitoringReplacement @ End of Lifesapn

20%

11%8%11%

5%

13%

12%11%

15%

Page 14: PARETO BASED METERING STRATEGIC FRAMEWORK

TECHNICAL

SPECIFICATIONPURCHASING

METER

INSTALLATIONMETER O&M

Gorvenance

Budget

Technology

selection

Resource

Allocation

Feasibility

Analysis

Risks

Analysis

Project

Financing

Implementati

on timeframe

& Road map

Business

requirements

Functionality

required

BI Required

Standards

Statutory/Le

gal

requirements

Feedback

from meter

performance

analysis

Technical

due

diligence

Customer

numbers

Maturity of

Technology

Project

financing

Tender

Evaluation

& Award

FAT issues

Acceptance

testing

Warranty &

Guarantee

issues

After sales

support

Complexity of

Installations

In-house or

outsource

Skills

required

Project scope

Installation

processes &

procedures

Level of NTL

Post

implementati

on support

model

Skills

required

Reliability/A

vailability

Cost of

Support

Customer

queries

Tools &

Equipment

Resources –

vehicle,

manpower

REPLAEMENT @ END OF LIFESPAN

Replaceme

nt

programme

@ end of

life span

Meter

failure

statistics

Budget

Accuracy

required

Big Data

Analytics

PLANNING /DESIGN

KEY ISSUES TO CONSIDER WHEN FORMULATINGA PARETO BASED METERING STRATEGY

Page 15: PARETO BASED METERING STRATEGIC FRAMEWORK

END

THANK YOU

Cell Number: +263 774668303

Email: [email protected]