19
Paramix mid-term meeting in Barcelona November 13, 2002 Status of Swedish test sections for cold in-situ stabilization

Paramix mid-term meeting in Barcelona November 13, 2002

  • Upload
    petra

  • View
    14

  • Download
    0

Embed Size (px)

DESCRIPTION

Paramix mid-term meeting in Barcelona November 13, 2002. Status of Swedish test sections for cold in-situ stabilization. Test sections are located northwest of Umeå. Umeå. Stockholm. Gothenburg. Test road before stabilization. FWD measurement. Example only. Average thickness 50 mm. - PowerPoint PPT Presentation

Citation preview

Page 1: Paramix mid-term meeting in Barcelona November 13, 2002

Paramix mid-term meeting in Barcelona

November 13, 2002

Status of Swedish test sections for cold in-situ stabilization

Page 2: Paramix mid-term meeting in Barcelona November 13, 2002

Gothenburg

Umeå

Test sections are locatednorthwest of Umeå

Stockholm

Page 3: Paramix mid-term meeting in Barcelona November 13, 2002

Test road before stabilization

Page 4: Paramix mid-term meeting in Barcelona November 13, 2002

FWD measurementFWD measurement

Page 5: Paramix mid-term meeting in Barcelona November 13, 2002
Page 6: Paramix mid-term meeting in Barcelona November 13, 2002

Average thickness 50 mm

Page 7: Paramix mid-term meeting in Barcelona November 13, 2002

Under the surfacing ....

Unbound base ....

Page 8: Paramix mid-term meeting in Barcelona November 13, 2002

Swedish test sections

emulsion

SA 16 SA 16 SA 16

•50 mm aggregate A*•50 mm AC•50 mm gravel base

•50 mm aggregate B*•50 mm AC•50 mm gravel base

•50 mm AC•100 mm gravel base

Reference

emulsion no emulsion

Test 2Test 1 *added

100 mm new base

Page 9: Paramix mid-term meeting in Barcelona November 13, 2002

Existing

Adding unbound material

Emulsion mixed in”Dry”

mixing

New wearing course

In-situ cold stabilization steps

Page 10: Paramix mid-term meeting in Barcelona November 13, 2002

Emulsion production unit

Page 11: Paramix mid-term meeting in Barcelona November 13, 2002

Bitumen grades used in Sweden

10

100

1 000

10 000

50

/70

70

/10

0

10

0/1

50

16

0/2

20

33

0/4

30

V1

20

00

V6

00

0

V3

00

0

V1

50

0

Pe

ne

tra

tio

n

1000

10000

100000

1000000

Vis

co

sit

y

Bitumen grade used forthe bitumen emulsion

Page 12: Paramix mid-term meeting in Barcelona November 13, 2002
Page 13: Paramix mid-term meeting in Barcelona November 13, 2002
Page 14: Paramix mid-term meeting in Barcelona November 13, 2002
Page 15: Paramix mid-term meeting in Barcelona November 13, 2002
Page 16: Paramix mid-term meeting in Barcelona November 13, 2002
Page 17: Paramix mid-term meeting in Barcelona November 13, 2002
Page 18: Paramix mid-term meeting in Barcelona November 13, 2002
Page 19: Paramix mid-term meeting in Barcelona November 13, 2002