PARAMBIKULAM ALIYAR PROJECT
( P.A.P ALIYAR BASIN )( an overview )
Presentation byA.K Chinnaswamy B.Sc agriChairman PAP Aliyar Basin
W E L C O M E
PARAMBIKULAM ALIYAR PROJECT ( P. A. P )
• INTERTSATE PROJECT / T.N & KERALA
• MULTI-VALLEY, MULTI-PURPOSE
• DIVERSION OF WEST FLOWING WATERS TO THE EAST SIDE
PARAMBIKULAM ALIYAR PROJECT ( P. A. P )
Irrigation
Power generation
Domestic & Industrial water supply
Aquaculture
Recreation / Tourism
Inter-State AgreementTAMILNADU & KERALA
• FINAL AGREEMENT ON 09-05-1970WITH RETROSPECTIVE EFFECT FROM
09-11-1958
PARAMBIKULAM ALIYAR BASIN
• ALIYAR SUB – BASIN
• TAMILNADU
OLD COMMAND 2591
HaNEW COMMAND
17967 Ha
TOTAL 20558 Ha
IRRIGATION PATTERN – ALIYAR SUB BASIN
YEAR SEASON(JAN – MAY)
FIRST YEAR
ZONE A( 50% AREA )
SECOND YEAR
ZONE B( 50% AREA)
PARAMBIKULAM ALIYAR PROJECT
PROJECT COMMITTEE FOR ALIYAR SUB BASIN
DISTRIBUTORY COMMITTEE : 4 NOS
WUA : 21 NOS
CROPPING PATTERN
• In alliyar basin major crop is coconut plantation. Covered more than 85 percent of the area.
• Paddy, sugarcane, and groundnut can also be grown in the remaining areas.
Requirments of w.u.a
• The following amenities should be provided for strenthening the water users association.
• Enough finance should be provided for cleaning and maintance of canals under the control w.u.a’s.
• Facilities like office computer and staffs should be alloted for effiecent running of the water users association.
• The vehicle should be alloted at the time of irrigation period for inspection of canals to facilitate for supply of water till the tailends and also to prevent water theft in canals