Upload
alanna-butts
View
222
Download
2
Embed Size (px)
Citation preview
Papro MillSystemPapro MillSystem
CMN Data OyAbCMN Data OyAb
26.10-06 CMN Data OyAb 2
CMN Data Oy Ab• Atk-Konsulttitoimisto 1983• CMN Data founded 1986 owned by Atk• Atk changes to CMN-Consulting 1995
TodayCMN-Consulting Magnus Nikander Spain Sweden
CMN-Data Juha tarvainen Finland / Sweden Ismo Nykänen Finland
Annual turnover 300.000 €
External consultants PB-Webb Solutions Sweden
ToimivaNet Solutions FinlandKehote Finland
26.10-06 CMN Data OyAb 3
Papro user history
• Heinola Fluting 1984 Heinola Finland• Savon Sellu 1985 Kuopio Finland• Mondi Package 1986 Örebro Sweden• SCA Vifsta 1991 Sundsvall Sweden• Skultuna Folie 1990 Skultuna Sweden• PankaBoard 1999 Pankakoski Finland
26.10-06 CMN Data OyAb 4
Papro tecnical history
• Mini computers + ISAM database 1984• PC computers + ISAM database 1989• UNIX servers + ISAM database 1992• HP servers + Oracle database 1995• WinServers + SqlServer database 1997
26.10-06 CMN Data OyAb 5
Papro concept
• Has the same kernel– Independent of database (Oracle, SQLServer etc.)– Semigraphic user interface (depends on functions)– Logging and history backup
• Prepared for each Mill to suit their needs– Business area– Product difference– Relative operating systems
26.10-06 CMN Data OyAb 6
Papro Functions
• Same functionality and basics
• Basicly independed of each other
• End solutions depending on– Mill– Device platform– Relative IT-systems
26.10-06 CMN Data OyAb 7
Available Papro functions
Paprokernel
Order handling
Production planning
Production follow up
Optimizing
Production
Millstock planning
Quality control
Foreign stocks
Truck system
Delivery planning
Production reporting
Machine reporting
Connections
26.10-06 CMN Data OyAb 8
Order Handling
• Full management to order data– Secured against eg. Sales system availability
• Final adjustments before production• Inside orders
– E.g.. Optimizing help, side runs, quota runs
• Allocations• Order reporting
26.10-06 CMN Data OyAb 9
Production planning
• Production lot based• Machine maintenance• Capacity maintenance• Rought planning• Final planning• Run maintenance• Timing• Mill calendar• Reporting
26.10-06 CMN Data OyAb 10
Optimizing
• 1 Optima or 27 best results• Fetch from
– Sales base, customer, dimension– Manual insert
• Main orders and side runs• Machine parameters• Final adjustments• Trim sorting
– %,reel sets, knive change, left
• Result checkup against orders• Result split to runs and lots• Run save to cycles
26.10-06 CMN Data OyAb 11
Production
• Papro as PM– Cutting maintenance
– Packing maintenance
– Converting
– Labeling
– Logic connections
– reporting
• Papro connected to other PM– Message based or
– Database based
– Order transfer to PM
– Unit history from PM
– Reporting
26.10-06 CMN Data OyAb 12
Production follow up
• Basic data on production lot level
• Order/position/run statistic• Main follow up tool
– Different checkup points (cutting, packing, stock etc.)
– Feedback from deliveries– Info texts– Cycle data– Run data and instructions– Order data and instructions– Used also for production
26.10-06 CMN Data OyAb 13
Quality control
• Laboratory system• Machine reel data• Product/ grade structure• Data input
– Manual
– On-line measurements
– Robot measurements
• Order based quality reports• Language versions for reports• Product history
26.10-06 CMN Data OyAb 14
Millstock planning
• On stock block level• Integrated to delivery planning• Holds
– Capacity of block
– Orders in block
– Plan for the coming orders
– Plan for deliveries from block
26.10-06 CMN Data OyAb 15
Truck system
• Radio or WLAN Platform• Papro programs in truck• ”Default 1-key” method • Controlled by delivery planning
– Straight from production into transportation unit
– Via stock to vehicle
– To stock
• Mill stock maintenance• Loading• Waybills
26.10-06 CMN Data OyAb 16
Delivery Planning
• Connected to production– Production lot level planning
– Every unit has ”address”
• Deliveries gathered – From production
– From stock
– From booking list
• Delivery reporting• Weight spesifications
26.10-06 CMN Data OyAb 17
Foreign stocks
• Web based solution• Transfer between stocks• Converting in stock
26.10-06 CMN Data OyAb 18
Production reporting
• Papro or CRW-reports• Machine level• Product level• Order level• Time level• Schema level
26.10-06 CMN Data OyAb 19
Machine reporting
• Machine utilization• Measurement of a Machine
and/or Customer, End Use, Material, Country, Product group etc. in a period – Speed
– Stop statistics
– Waste
• Traceability
26.10-06 CMN Data OyAb 20
Connections
• Sale systems– Fenix, SAP,IFS, System4,OHS
• Production– Honeywell Packman
– Siemens logic
– Valmet
• On-line measurement– Measurex, XIS, Metso DNAIA
• Laboratory– Metso Paperlab
• Automatic Email service– Waybills
– Weight specifications
– Customer based reports
• Automatic FTP service– Waybills
– Weight specifications
26.10-06 CMN Data OyAb 21
Contact
CMN Data Oy Ab
Kajaaninkatu 4 A13
00510 Helsinki
Finland
Tel: +358 (0)400 410 682
Email: [email protected]