    This estimate is prepared with the following provisions

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    Supply and errection of Centering and Shuttering

    Supply and Fabrication of steel rod

    R.R. masonry in c.m.1:5 mix using rough stones and bond stones

    Specification report to accompany the estimate for the work of Construction of

    compound wall at Pannaipatty PU Ele School in Eriyodu town panchayat.

    ESTIMATE AMOUNT Rs : Rs 3.60 lakhs

    It is proposed to Construction of compound wall at Pannaipatty PU Ele School in Eriyodu

    town panchayat. The above work is taken up under MLACDS- 2012 - 2013, The

    administrative sanction has been accorded by District collector, Dindigul Roc

    No:2721/2012/A5, Date : 31.10.2013.

    Earthwork excavation in all clauses of soils and depositing

    Cement concrete 1:4:8 mix using 40mm ISS HBG metal

    Assistant Engineer

    Panchayat Union

    Vedasandur.

    RCC 1:1.5:3 Mix using 20mm ISS HBG Metal etc., complete.

    BW. masonry in c.m.1:5 mix using country bricks

    Plastering with cement mortar 1:5 mix to 12mm thick

    colour washing two coats with exterior emulsion

    Provision of lumsam charges

    The current schedule of rates for the year 2013 - 2014 are adopted in this estimate. On

    sanction this work will be carried out as per standard specifications and relevant circulars

    given by higher authorities received from time to time.

    Provision for CC Pavement

  • 8/11/2019 Pannaipatty - Compound Wall

    2/38

    Sl.

    NoQTY DESCRIPTION OF WORK RATE UNIT AMOUNT

    1 71.56

    Earthwork excavation in all clauses of soils and

    depositing on bank with initial lead and lift for

    foundation as per ss20B

    83.70 cum 5989

    2 20.45

    Cement concrete 1:4:8 mix using 40mm ISS

    HBG metal including cost and conveyance of

    all matials to site and all labour charges etc.,

    complete.

    2390.10 cum 48866

    3 58.39

    R.R. masonry in c.m.1:5 mix using rough stones

    and bond stones with simultaneous pointing

    including cost and conveyance of all materials

    to site and all labour charges etc., complete.

    2256.25 cum 131742

    4 0.475

    Supply and fabrication of steel including cost

    and conveyance of all materials to site and all

    labour charges etc., complete.

    57201.60 mt 27171

    5 3.37

    RCC 1:1.5:3 mix using 20mm ISS HBG Metal

    including cost and conveyance of all materials

    to site and all labour charges etc., complete.

    4504.76 15192

    6 15.92

    Brick work in cm 1;5 mix using country bricks

    including cost and conveyance of all materials

    to site and all labour charges etc., complete.

    3355.34 cum 53418

    7 388.71

    Plastering in cm 1:5 mix 12 mmthick including

    cost and conveyance of all materials to site and

    all labour charges etc., complete.

    97.78 sqm 38008

    ABSTRACT ESTIMATEConstruction of compound wall at Pannaipatty PU Ele School in Eriyodu town panchayat.

    Name of union : Vedasandur Scheme: MLACDS

    Name of Panchayat : Eriyodu Town Year: 2012-13

    Estimate Amount : Rs 3.60 lakhs Tech. Sanction No.:

    Admin. Sanction No :

  • 8/11/2019 Pannaipatty - Compound Wall

    3/38

    8 495.35

    Colour washing two coats with approved

    exterior eulsion two coatsincluding cost and

    conveyance of all materials to site and all

    labour charges etc., complete.

    59.75 sqm 29597

    9 LS Provision for Grill gate LS 8500

    10 LS Provision for Name board LS 500

    11 LS Provision for Photographic charges LS 200

    12 LS Contigencies & other unforeseen charges LS 817

    360000

    ASSISTANT ENGINEER

    PANCHAYAT UNION

    VEDASANDUR

    TOTAL

  • 8/11/2019 Pannaipatty - Compound Wall

    4/38

    Sl.No Description of work L B D Qty

    1

    North facing Building 1 x 1 83.55 0.75 0.70 43.86

    East facing Building 1 x 1 52.75 0.75 0.70 27.69

    Total Quantity 71.56

    2

    North facing Building 1 x 1 83.55 0.75 0.20 12.53

    East facing Building 1 x 1 52.75 0.75 0.20 7.91

    Total Quantity 20.45

    3

    North facing Building

    I Footing 1 x 1 18.50 0.60 0.23 2.55

    II Footing 1 x 1 18.50 0.45 0.23 1.91

    III Footing 1 x 1 18.50 0.38 0.45 3.16

    D/F Gate -1 x 1 3.00 0.38 0.45 -0.51

    I Footing 1 x 1 25.65 0.60 0.23 3.54

    II Footing 1 x 1 25.65 0.45 0.23 2.65

    III Footing 1 x 1 25.65 0.38 0.45 4.39

    I Footing 1 x 1 13.90 0.60 0.23 1.92

    II Footing 1 x 1 13.90 0.45 0.23 1.44

    III Footing 1 x 1 13.90 0.38 0.75 3.96

    I Footing 1 x 1 25.50 0.60 0.23 3.52

    II Footing 1 x 1 25.50 0.45 0.23 2.64

    III Footing 1 x 1 25.50 0.38 0.45 4.36

    DETAILED ESTIMATE

    Construction of compound wall at Pannaipatty PU Ele School in Eriyodu

    town panchayat.

    Nos.

    Earthwork excavation for foundation in all clauses of soils and subsoils to fulldepth as may be directed except in hard rock requiring blasting but inclusive of

    shoring, struting and bailing out water wherever neccessary and refilling the sides

    of foundation with excavated earth in layers of not more than 15cm thick well

    rammed and consolidated and depositing the

    Cement concrete 1:4:8 mix using 40mm ISS HBG metal for foundation including

    watering whenever necessary and laid in layers not more than 15cm thickcompacting etc., complete complying with std. Specifications and as directed. Rate

    for 10 cum.

    R.R. masonry in c.m.1:5 mix for foundation and basement using rough stones and

    bond stones with simultaneous pointing with same mortar including cost and

    conveyance of all materials to site and all labour charges etc., complete.

  • 8/11/2019 Pannaipatty - Compound Wall

    5/38

    East facing Building

    I Footing 1 x 1 20.90 0.60 0.23 2.88

    II Footing 1 x 1 20.90 0.45 0.23 2.16

    III Footing 1 x 1 20.90 0.38 0.45 3.57

    I Footing 1 x 1 9.60 0.60 0.23 1.32

    II Footing 1 x 1 9.60 0.45 0.23 0.99

    III Footing 1 x 1 9.60 0.38 0.75 2.74

    I Footing 1 x 1 22.25 0.60 0.23 3.07

    II Footing 1 x 1 22.25 0.45 0.23 2.30

    III Footing 1 x 1 22.25 0.38 0.45 3.80

    58.39

    4

    LS 0.475

    0.475

    5

    For plinth beam

    North facing Building 1 x 1 80.55 0.23 0.11 2.04

    East facing Building 1 x 1 52.75 0.23 0.11 1.33

    3.37

    6

    North facing Building

    Brick on edge 1 x 2 80.55 0.075 0.11 1.33

    Brick wall 1 x 1 80.55 0.11 1.20 10.63

    D/F Brick pillar -1 x 19 0.23 0.11 1.20 -0.58

    D/F Brick pillar -1 x 5 0.40 0.11 1.20 -0.26

    Add for Brick pillar 1 x 19 0.23 0.30 1.20 1.57

    Add for Brick pillar 1 x 5 0.40 0.40 1.20 0.96East facing Building

    Brick on edge 1 x 2 52.75 0.075 0.11 0.87

    D/F Brick pillar -1 x 16 0.23 0.11 1.20 -0.49

    D/F Brick pillar -1 x 4 0.40 0.11 1.20 -0.21

    Add for Brick pillar 1 x 16 0.23 0.30 1.20 1.32

    Add for Brick pillar 1 x 4 0.40 0.40 1.20 0.77

    Supply and fabrication of steel including cost and conveyance of all materials to

    site and all labour charges etc., complete.

    RCC 1:1.5:3 mix using 20mm ISS HBG Metal including cost and conveyance of all

    materials to site and all labour charges etc., complete.

    Brick work in cm 1:5 mix using country bricks including all cost and conveyance ofall materials to site and all labour charges etc., complete.

  • 8/11/2019 Pannaipatty - Compound Wall

    6/38

    15.92

  • 8/11/2019 Pannaipatty - Compound Wall

    7/38

    7

    North facing Building

    wall Sides 1 x 2 80.55 1.20 193.32

    wall top 1 x 1 80.55 0.11 8.86

    Pillaster top 1 x 19 0.23 0.19 0.83

    Pillar sides 2 x 19 0.19 1.20 8.66

    Pillaster top 1 x 5 0.40 0.29 0.58

    Pillar sides 2 x 5 0.29 1.20 3.48

    Brick on edge 1 x 2 80.55 0.11 17.72

    East facing Building

    wall Sides 1 x 2 52.75 1.20 126.60

    wall top 1 x 1 52.75 0.11 5.80Pillaster top 1 x 16 0.23 0.19 0.70

    Pillar sides 2 x 16 0.19 1.20 7.30

    Pillaster top 1 x 4 0.40 0.29 0.46

    Pillar sides 2 x 4 0.29 1.20 2.78

    Brick on edge 1 x 2 52.75 0.11 11.61

    388.71

    Pillar sides

    wall Sides 1 x 2 80.55 1.20 193.32

    wall top 1 x 1 80.55 0.11 8.86

    Pillaster top 1 x 19 0.23 0.19 0.83

    Pillar sides 2 x 19 0.19 1.20 8.66

    Pillaster top 1 x 5 0.40 0.29 0.58

    Pillar sides 2 x 5 0.29 1.20 3.48

    Brick on edge 1 x 2 80.55 0.11 17.72

    Basement sides 1 x 2 80.55 0.40 64.44

    Pillaster top

    wall Sides 1 x 2 52.75 1.20 126.60

    wall top 1 x 1 52.75 0.11 5.80

    Pillaster top 1 x 16 0.23 0.19 0.70

    8Colour washing two coats with approved Snowcem paint two coatsincluding cost

    and conveyance of all materials to site and all labour charges etc., complete.

    plastering in cm 1:5 mix 12mm thick including all cost and conveyance etc

    compelete.,

  • 8/11/2019 Pannaipatty - Compound Wall

    8/38

    Pillar sides 2 x 16 0.19 1.20 7.30

    Pillaster top 1 x 4 0.40 0.29 0.46

    Pillar sides 2 x 4 0.29 1.20 2.78

    Brick on edge 1 x 2 52.75 0.11 11.61

    Basement sides 1 x 2 52.75 0.40 42.20

    495.35

    9 LS

    10 LS

    Provision for Grill gate

    Contigencies & other unforeseen charges

    ASSISTANT ENGINEER

    PANCHAYAT UNION

    VEDASANDUR

  • 8/11/2019 Pannaipatty - Compound Wall

    9/38

    DESCRIPTION LEAD (km) Conveyance cost of materials total

    Cement 13 61.60 4700.00 4761.60

    Steel/MT 13 61.60 45600.00 45661.60

    Sand for mortor 25 174.50 110.00 284.50

    Sand for filling 25 174.50 110.00 284.50

    Rough

    stone(reverment) 10 78.00 288.00 366.00

    Rough stone 10 78.00 332.00 410.00

    Bond stone 10 78.00 455.00 533.00

    Country bricks 10 66.00 3985.00 4051.00

    40 mm metal ISS 10 78.00 742.00 820.00

    25mm metal ISS 10 78.00 638.00 716.00

    12mm metel ISS 10 78.00 958.00 1036.00

    10mm metal ISS 10 78.00 705.00 783.00

    10-12mm metal ISS 10 78.00 831.50 909.50

    20mm metal ISS 10 78.00 1034.00 1112.00

    6mm metal ISS 10 78.00 478.00 556.00

    90mm metal IRC 10 78.00 243.00 321.00

    63mm metal IRC 10 78.00 350.00 428.00

    53mm metal IRC 10 78.00 514.00 592.00

    45mm metal IRC 10 78.00 571.00 649.00

    22.40mm metal IRC 10 78.00 800.00 878.00

    13.2mm metal IRC 10 78.00 894.00 972.00

    11.2mm metal IRC 10 78.00 608.00 686.00

    6.7mm metal IRC 10 78.00 374.00 452.00

    lime stone 0 0.00 77.00 77.00

    Shell lime 0 0.00 1180.00 1180.00

    Brick Jelly 20mm 10 54.00 550.00 604.00

    Brick Jelly 40mm 10 54.00 495.00 549.00Slaked lime 0 0.00 869.00 869.00

    Pressed tiles 0 0.00 8710.00 8710.00

    Binding wire/MT 0.00 48.00 48.00

    10MM Jelly 0.00 705.00 705.00

    stone(reverment) 10 78.00 0.00 78.00

    bricks class I,II 0.00 0.00

    wood 0.00 0.00

    U S gravel 1 7.80 130.00 137.80

    well gravel 1 7.80 107.80 115.60

    suruki 0.00 0.00

    Mangalore tiles 0 0.00 8295.00 8295.00Mangalore ridge tiles 0 0.00 23790.00 23790.00

    Ceiling tiles 0 0.00 5000.00 5000.00

    LEAD &COST OF MATERIALS-2013-14

  • 8/11/2019 Pannaipatty - Compound Wall

    10/38

    Cement/steel 13

    Sand 25

    Metal 10

    Country Brick 10

    Pressed Tiles 0

    Gravel 1

    PLEASE INSERT LEAD HERE

  • 8/11/2019 Pannaipatty - Compound Wall

    11/38

    720 cement 4761.6 3428.35 480 cement 4761.6 2285.57 36

    1 sand 284.5 284.50 1 sand 284.5 284.50

    total 3712.85 total 2570.07

    43.35 mixing 43.35

    3756.20 2613.42

    288 cement 4761.6 1371.34 240 cement 4761.6 1142.78 57

    1 sand 284.5 284.50 1 sand 284.5 284.50

    total 1655.84 total 1427.28

    mixing 43.35 mixing 43.35

    1699.19 1470.63

    960 cement 4761.6 4571.14 0.5 lime 869 434.50

    1 sand 284.5 284.50 1 sand 284.5 284.50

    1 Grinding 105.9 105.90

    total 4855.64 total 824.90

    CEMENT MORTOR

    DATA - 2013-14

    CEMENT MORTOR 1:1.5

    including mixing for

    masonary works

    including mixing for

    masonary works

    CEMENT MORTOR 1:5 CEMENT MORTOR 1:6

    CEMENT MORTOR 1:2 CEMENT MORTOR 1:3

    i

    iincluding mixing for

    masonary works

    Lime mortar 1:2

  • 8/11/2019 Pannaipatty - Compound Wall

    12/38

    9 40mm metal 820 7380.00 9 20mm 1112 10008.00 10 R

    4.5 cm 1:5 1655.84 7451.28 4.5 sand mortor 284.5 1280.25 1 B

    1.8 mason II 326 586.80 3231 cement 4761.6 15384.73 3.4 C

    17.7 mazdoor I 228 4035.60 3.5 masonII 326 1141.00 7.1 m

    14.1 mazdoor II 206 2904.60 21.2 mazdoor I 228 4833.60 10.6 m

    sundries 0.00 35.3 mazdoor II 206 7271.80 14.1 m

    total 22358.28 sundries 0.00 14.1 m

    total 39919.38 s

    to

    FOR 1CM 2235.83 FOR 1CM 3991.94 F

    abovebasement 44.65 4036.59

    9 20mm 1112 10008.00 0.1 CM 1:3 2613.42 261.34 0.14 C

    4.5 sand mortor 284.5 1280.25 1.1 mason II 326 358.60 1.1 m

    4308 cement 4761.6 20512.97 1.1 mazdoor I 228 250.80 0.5 m

    3.5 masonII 326 1141.00 1.1 mazdoor II 206 226.60 1.1 m

    21.2 mazdoor I 228 4833.60

    35.3 mazdoor II 206 7271.80

    sundries 0.00 sundries 0.00 s

    total 45047.62 total 1097.34 to

    FOR 1CM 4504.76 FOR1CM 109.73 Fa ove

    basement 44.65 4549.41

    1300 bricks 4051 5266.30 1 qtl- steel 45661.6 4566.16 9 1

    0.71 CM 1:5 1699.19 1203.03 1 qtl-binding wir 48.00 48.00 4.5 C

    1 mason I 363 363.00 3.5 fitter I 316 1106.00 1.8 m

    3 mason II 326 978.00 sundries 0.00 17.7 m

    2 mazdoor I 228 456.00 5720.16 14.1 m

    6 mazdoor II 206 1236.00

    sundries total to

    total 10cft 9502.33

    for 1c 2.832 3355.34 total 57201.60 toa ove

    basement 29.55 3384.89

    CC 1:5:10

    Plastering 1:3,10mm TKRCC 1:1.5:3

    BW 1:5

    RCC 1:2:4

    STEEL

  • 8/11/2019 Pannaipatty - Compound Wall

    13/38

    0.22 CM 1:5 1699.19 373.82 0.04 CM1:3 2613.42 104.54 250 P.

    2.2 mason I 363 798.60 2.2 mason II 326 717.20 0.12 CM

    0.5 mazdoor I 228 114.00 0.5 mazdoor I 228 114.00 10 Po

    3.2 mazdoor II 206 659.20 1.1 mazdoor II 206 226.60 1.15 wa

    1.1 m

    2.1 m

    sundries sundries 2.2 m

    total 1945.62 total 1162.34 1.1 m

    su

    to

    FOR 1CM 194.56 for 1m2 116.23 fo

    0.07 shell lime 1180 82.60 9 40MMmetal 820 7380.00 1300 br

    1.6 mason II 326 521.60 4.5 CM 1:4 1998.68 8994.04 0.71 CM

    0.5 mazdoorI 228 114.00 1.8 mason II 326 586.80 1 m

    2.7 mazdoorII 206 556.20 17.7 mazdoor I 228 4035.60 3 m

    sundries 14.1 mazdoor II 206 2904.60 2 m

    total 1274.40 sundries 6 m

    for1m2 12.74 su

    1911.60 23901.04 to

    for1m2 19.12 FOR 1CM 2390.10 fo

    9 20MMmetal 1112 10008.00 3.23 Distember 53.10 171.51 1.34 Di

    4.5 CM 1:2 3712.85 16707.83 0.5 Painter I 293.00 146.50 0.5 Pa

    1.8 mason II 326 586.80 0.5 mazdoor I 228 114.00 0.5 m

    17.7 mazdoor I 228 4035.60 0.8 mazdoor II 206 164.80 0.8 m

    14.1 mazdoor II 206 2904.60

    sundries 0.00 sundries 0.69 su

    34242.83 597.50

    for 1CM 3424.28 for 1m2 59.75 fo

    WHITE WASH

    Snowcem

    colour wash

    Plastering 1:5,20mm TK

    CC 1:2:4

    POINTING 1:3 FOR PRES. TIL

    O

    CC 1:4:8

  • 8/11/2019 Pannaipatty - Compound Wall

    14/38

    9 40 mm metal 820 7380.00 0.22 cm 1:4 2042.03 449.25 2.22 Pain

    4.5 CM 1:3 2570.07 11565.31 2.2 mason I 363 798.60 1.1 pain

    1.8 mason II 326 586.80 0.5 mazdoor I 228 114.00 sun

    17.7 mazdoor I 228 4035.60 3.2 mazdoor II 206 659.20

    14.1 mazdoor II 206 2904.60 sundries

    sundries 0.00

    Total 26472.31 Total 2021.05

    for 1CM 2647.23 for 1CM 202.10 for

    2910.03

    2.22 paint 138.5 307.47 260 ceramic tiles 16.25 4225 12.8 20m

    1.1 painter I 293.00 322.30 0.1 cm1;2 3712.85 371.29 5 slac

    4

    white cement

    with colour

    pigment 26.65 106.6 1.8 mas

    1 masonI 363 363 17.7 maz

    3.7 masonII 326 1206.2 14.1 maz

    sundries 0.23 3.3 mazdoor I 228 752.4 sun

    2.2 mazdoor II 206 453.2

    630.00 sundries

    7477.69

    for 1m2 63.00 for 1m2 747.77

    450 glazed tiles 9.65 4342.50 0.22 cm 1:3 2613.42 574.95 11 roug

    0.10 cm1:2 3712.85 371.29 2.2 mason I 363 798.60 3.5 woo

    4.00

    white cement

    with colour

    pigment 26.65 106.60 0.5 mazdoorI 228 114.00 10.6 maz

    1.10 mason I 363.00 399.30 3.2 mazdoor I I 206 659.20 7.1 maz

    4.10 mason II 326.00 1336.60 sundries 0.00 sun

    2.70 Mazdoor I 228.00 615.60 1.15 water proof 42.35

    3.30 Mazdoor II 206.00 679.80 2146.75

    7851.69

    for 1m2 785.17 for 1m2 214.68 for

    PAINTING Black Board FLOORING TILES(CERAMIC)

    Plastering 1:4, 20 MM THK

    roWALL TILES(DADDOOING)

    cc 1:3:6

    With CC 1:3:6 20 mm

    metal

    Plastering 1:3, 20mm THK

    BRICK

  • 8/11/2019 Pannaipatty - Compound Wall

    15/38

    160 Manglore tiles 8295.00 1327.20 10 Manglore tiles 2268.44 2268.44

    0.09 lime mortar 824.90 74.24 250 ceiling tiles 5000 1250.00 0.09 lime

    0.5 mason II 326 163.00 0.5 mason II 326 163.00 0.5 Carp

    1.1 mazdoorI 228 250.80 1.1 mazdoorII 206 226.60 1.1 mazd

    2.2 mazdoor I I 206 453.20 2.2 mazd

    sundries 0.00 sundries 0.00 sund

    2268.44 3908.04

    for 1m2 226.84 for 1m2 390.80 for 1m

    1.33

    Red oxide

    primer 145.5 193.52 9 40MMmetal 820 7380.00 1.4 Plast

    0.7 painter I 293.00 205.10 4.5 CM 1:2.5 3027.18 13622.32 0.98 Prim

    1.8 mason II 326 586.80 2.2 Paint

    for 1m2 398.62 17.7 mazdoor I 228 4035.60

    14.1 mazdoor II 206 2904.60

    10 Priming coat 398.62 398.62 sundries sund

    2.22 paint 220.50 489.51

    1.1 painter I 293.00 322.30 28529.32 for 1m

    Brush cleaning etc., 5.40 FOR 1CM 2852.93

    1215.83

    for 1m2 121.58

    4Steel size3"x11/2" 48.00 192.00 0.14 CM 1:3 2613.42 365.88 0.09 CM1

    0.23 paint 121.58 27.36 1.1 mason I 363 399.30 1.6 maso

    4 Labour for fixing 19.25 77.00 0.5 mazdoor I 228 114.00 0.5 mazd

    Brush cleaning etc., 9.65 1.1 mazdoor II 206 226.60 1.1 mazd

    306.01 1.1 water proof 42.35

    Rate for 1 Kg 298/4 76.50 sundries 0.00 sund

    total 1105.78 total

    FOR1CM 110.58 for 1m

    EXTER

    Roofing with Mangalore tiles RemTiled roofing with Mangalore tilesover ceiling tiles

    POINTINPlastering 1:3,12 mm TK

    Supply and fixing of hollow MS pipes &

    painting two coats etc., CC 1:2.5:5

  • 8/11/2019 Pannaipatty - Compound Wall

    16/38

    One coat of Primer 1 US Gravel 137.8 137.80 1

    10

    Scrapping

    charge 1.7 17.00 1 filling charge 13 13.00 1

    0.98 Pimer(liquid) 132.00 129.36

    0.7 Painter I 293.00 205.10 total 150.80

    For 10 Sq.m. 351.46

    MAIN DATA

    10 Priming 1 coat 35.15 351.46

    1.34 Distember 71.4 95.68

    0.5 Painter I 293.00 146.50 1 US Gravel 115.6 115.60 1

    0.5 mazdoor I 228 114.00 1 filling charge 13 13.00 1

    0.8 mazdoor II 206 164.80

    total 128.60

    sundries 0.56

    873.00

    87.30

    85.60

    Dismantling1 Brick / Stone masonry in L.M cum 78.65

    2 Brick / Stone masonry in C.M cum 96.40

    3 Mangalore tiles without roof sqm 6.90

    4 9.60 3

    5 AC sheet roof without roof timber sqm 6.30 1

    6 Door, window incl moral of hinges sqm 45.35 1

    7 Dismantling P.C.C cum 165.60 1

    8 Dismantiling RCC cum 2515.00 2

    9 Chipping of concrete sqm 13.90 1

    10 Pressed tiles & weathering course sq.m 16.00

    11 Pressed tiles only sq.m 8.90

    12 Cleaning & Removing of cement plaster sq.m. 3.05

    Dismantling B.W & clearing from site

    US GRAVEL FILLING FOR BUILDINGDistember with one coatprimer

    Suppl

    pipes

    WELL GRAVEL FILLING FOR BUILDING

    Mangalore tiles over flat tiles without roof timber -

    Sqm

    Distemper with primer for

    New surface -1 Sq.m.

    Distemper with primer for

    old surface -1 Sq.m.

  • 8/11/2019 Pannaipatty - Compound Wall

    17/38

    Sub Data 4.59 x100 Co

    Brick Jelly Lime Concrete 1:2:5 3.50 nos Ma

    9.5 Brik jelly 40mm 549 m3 5216 m3 7.20 nos Ma3.8 Lime Mortar 1:2 824.90 m3 3135 m3 7.10 nos Ma

    1.8 Mason II Class 326 Nos 587 Nos 14.10 nos Ma

    17.7 Mazdoor I Class 228 Nos 4036 Nos

    14.1 Mazdoor II Class 206 Nos 2905 Nos

    Rate Rs. 15877.12 /1M3

    Say Rs. 1587.71 /1M3

    Main Data

    1 White glazed Indian type 1089 Each 1089 Nos

    0.6 110mm dia PVC pipe 107.5 Rm 64.5 Rm S.no Itm

    0.45 Sand for filling 297.50 Cum 134 Cum 155

    0.11 Brick jelly lime concrete 1 1587.71 1 Cum 175 Cum

    1 Plumber I Class 322 Each 322 Nos

    1 Mason I Class 363 Each 363 Nos 156

    0.25 Plumber II Class 300 Each 75 Nos a1 Mazdoor I Class 228 Each 228 Nos b

    1 White Cement 23.00 1 Kg 23 kgs

    6 Cement 4761.6 MT 28.6 kgs

    400 Spun yarn 12 1 Kg 4.8 gms

    2506

    Rate Rs. 2506.3927 /1No

    Say Rate R 2506.39 /1No

    Dry Brick work usi

    including cost and

    labour charges etc

    Supplying and fixing in position best Indian make White glazed earthern

    ware Oriya type Indian Water Closet

    15877.12

  • 8/11/2019 Pannaipatty - Compound Wall

    18/38

    11.00

    AC sheets

    6mm thick 175.50 1930.50

    2.20 Fitter II class 300.00 660.00

    1.10

    Carpenter I

    class 355.00 390.50

    3.20

    Mazdoor I

    class 228.00 729.60

    20.00

    A j. J o t

    with nuts

    6mm dia. 3.60 72.00

    20.00

    Bitumen

    washer 15

    mm dia. 1.20 24.00Sundries for

    white lead

    3806.60

    for 1m2 380.66

    sheet 6mm thk with "J' bolts

  • 8/11/2019 Pannaipatty - Compound Wall

    19/38

    Rate Amount Rate Amount Rate Amount

    1 71.56

    Earthwork excavation in all clauses of soils

    and depositing on bank with initial leadand lift for foundation as per ss20B

    83.70 5989.36 83.50 5975.05 85.00 6082.39

    2 20.45

    Cement concrete 1:4:8 mix using 40mm ISS

    HBG metal including cost and conveyance

    of all matials to site and all labour charges

    etc., complete.

    2390.10 48865.59 2390.00 48863.55 2392.00 48904.44

    3 58.39

    R.R. masonry in c.m.1:5 mix using rough

    stones and bond stones with simultaneous

    pointing including cost and conveyance of

    all materials to site and all labour charges

    etc., complete.

    2256.25 131741.87 2256.00 131727.28 2257.00 131785.67

    4 0.48

    Supply and fabrication of steel including

    cost and conveyance of all materials to site

    and all labour charges etc., complete.

    57201.60 27170.76 57200.00 27170.00 57250.00 27193.75

    5 3.37

    RCC 1:1.5:3 mix using 20mm ISS HBG

    Metal including cost and conveyance of all

    materials to site and all labour charges etc.,

    complete.

    4504.76 15192.26 4504.00 15189.69 4505.00 15193.07

    Construction of compound wall at Pannaipatty PU Ele School in Eriyodu town panchayat.

    COMPARATIVE STATEMENT

    Estimate Amount : Rs 3.60 lakhs

    S.No Qty Description of WorkAs per Estimate Thiru A.John Bose Thiru M.Ponnuvel

  • 8/11/2019 Pannaipatty - Compound Wall

    20/38

    6 15.92

    Brick work in cm 1;5 mix using country

    bricks including cost and conveyance of all

    materials to site and all labour charges etc.,

    complete.

    3355.34 53417.85 3355.00 53412.44 3356.00 53428.36

    7 388.71

    Plastering in cm 1:5 mix 12 mmthick

    including cost and conveyance of all

    materials to site and all labour charges etc.,

    complete.

    97.78 38007.72 97.70 37976.63 98.00 38093.24

    8 495.35

    Colour washing two coats with approved

    exterior eulsion two coatsincluding cost

    and conveyance of all materials to site and

    all labour charges etc., complete.

    59.75 29596.95 59.70 29572.19 60.00 29720.79

    349982.38 349886.82 350401.70

    349982.38 - 349886.82

    349982.38

    127396.00 - 130926.00

    127396.00

    The lowest rate quanted by the contractor Thiru.A.John Bose was 0.06% less than the estimate rate. So this rate is may be approved

    :

    :

    0.03

    -2.77

    Thiru A.John Bose

    Thiru M.Ponnuvel

    x 100

    x 100

  • 8/11/2019 Pannaipatty - Compound Wall

    21/38

    QTY RATE AMOUNT QTY RATE AMOUNT

    1

    Earthwork excavation in allclauses of soils and depositing

    on bank with initial lead and

    lift for foundation as per ss20B

    71.56 83.70 5989 83.50 0.00 83.50

    2

    Cement concrete 1:4:8 mix

    using 40mm ISS HBG metal

    including cost and conveyance

    of all matials to site and all

    labour charges etc., complete.

    20.45 2390.10 48866 2390.00 0.00 2390.00

    3

    R.R. masonry in c.m.1:5 mix

    using rough stones and bond

    stones with simultaneous

    pointing including cost and

    conveyance of all materials to

    site and all labour charges etc.,

    com lete.

    58.39 2256.25 131742 2256.00 0.00 2256.00

    COMPLETION REPORTConstruction of compound wall at Pannaipatty PU Ele School in Eriyodu town panchayat.

    Estimate Amount : Rs 3.60 lakhs

    Sl.

    NoDECREASEDESCRIPTION OF WORK

    As per Estimate As per Working billINCREASE

  • 8/11/2019 Pannaipatty - Compound Wall

    22/38

    4

    Supply and fabrication of steel

    including cost and conveyance

    of all materials to site and all

    labour charges etc., complete.

    0.48 57201.60 27171 57200.0 0.00 57200.00

    5

    RCC 1:1.5:3 mix using 20mm

    ISS HBG Metal including costand conveyance of all

    materials to site and all labour

    charges etc., complete.

    3.37 4504.76 15192 4504.00 0.00 4504.00

    6

    Brick work in cm 1;5 mix using

    country bricks including cost

    and conveyance of all

    materials to site and all labour

    charges etc., complete.

    15.92 3355.34 53418 3355.00 0.00 3355.00

    7

    Plastering in cm 1:5 mix 12mmthick including cost and

    conveyance of all materials to

    site and all labour charges etc.,

    complete.

    388.71 97.78 38008 97.70 0.00 97.70

  • 8/11/2019 Pannaipatty - Compound Wall

    23/38

    8

    Colour washing two coats

    with approved exterior eulsion

    two coatsincluding cost and

    conveyance of all materials to

    site and all labour charges etc.,

    complete.

    495.35 59.75 29597 59.70 0.00 59.70

    9 Provision for Grill gate 8500

    10Contigencies & other

    unforeseen chargesLS 817

    TOTAL 359300 69945.90 0.00 69945.90

    359300.00 69945.90Difference = Difference =

  • 8/11/2019 Pannaipatty - Compound Wall

    24/38

    M.F. Form No.83

    P.U. Form No.55 Voucher No.

    How executed Authority

    Last Certificate granted for this if any Voucher No Month

    Rate

    Up to

    date

    Since last

    CertificateRs P Up to date

    Since last

    Certificate

    Rs P Rs P

    0.00 0.00

    Earthwork excavation in all

    clauses of soils and depositing on

    bank with initial lead and lift for

    foundation as per ss20B

    83.50 0.00 0.00

    0.00 0.00

    Cement concrete 1:4:8 mix using

    40mm ISS HBG metal including

    cost and conveyance of all matials

    to site and all labour charges etc.,

    complete.

    2390.00 0.00 0.00

    0.00 0.00

    R.R. masonry in c.m.1:5 mix using

    rough stones and bond stones

    with simultaneous pointing

    including cost and conveyance of

    all materials to site and all labour

    charges etc., complete.

    2256.00 0.00 0.00

    0.00000 0.00000

    Supply and fabrication of steel

    including cost and conveyance of

    all materials to site and all labour

    charges etc., complete.

    57200.00 0.00 0.00

    0.00 0.00

    RCC 1:1.5:3 mix using 20mm ISS

    HBG Metal including cost and

    conveyance of all materials to site

    and all labour charges etc.,

    complete.

    4504.00 0.00 0.00

    Esrimate amount : Rs.180000/-

    CONTRACT CERTIFICATE

    Quantity Executed or

    Supplied

    Per

    Amount

    Remarks

    Name of Contractor :Thiru: A.JOHN BOSE

    Construction of compound wall at Pannaipatty PU Ele School in Eriyodu town panchayat.

    DESCRIPTION OF WORK

  • 8/11/2019 Pannaipatty - Compound Wall

    25/38

    0.00 0.00

    Brick work in cm 1;5 mix using

    country bricks including cost and

    conveyance of all materials to site

    and all labour charges etc.,

    complete.

    3355.00 0.00 0.00

    0.00 0.00

    Plastering in cm 1:5 mix 12

    mmthick including cost andconveyance of all materials to site

    and all labour charges etc.,

    complete.

    97.70 0.00 0.00

    0.00 0.00

    Colour washing two coats with

    approved exterior eulsion two

    coatsincluding cost and

    conveyance of all materials to site

    and all labour charges etc.,

    complete.

    59.70 0.00 0.00

    Provision for Grill gate 0.00 0.00

    Carry over the Page 0.00 0.00

  • 8/11/2019 Pannaipatty - Compound Wall

    26/38

    FiguresWords

    1 71.56

    Earthwork excavation in all clauses of

    soils and depositing on bank withinitial lead and lift for foundation as

    per ss20B

    cum

    2 20.45

    Cement concrete 1:4:8 mix using

    40mm ISS HBG metal including cost

    and conveyance of all matials to site

    and all labour charges etc., complete.

    cum

    3 58.39

    R.R. masonry in c.m.1:5 mix using

    rough stones and bond stones with

    simultaneous pointing including cost

    and conveyance of all materials to site

    and all labour charges etc., complete.

    cum

    4 0.48

    Supply and fabrication of steel

    including cost and conveyance of all

    materials to site and all labour charges

    etc., complete.

    cum

    5 3.37

    RCC 1:1.5:3 mix using 20mm ISS HBG

    Metal including cost and conveyance of

    all materials to site and all labour

    charges etc., complete.

    cum

    Rate in

    TENDER SCHEDULEConstruction of compound wall at Pannaipatty PU Ele School in Eriyodu town panchayat.

    Estimate Amount : Rs 3.60 lakhs

    Sl

    No.

    Probable

    quantityDescription of work Unit

  • 8/11/2019 Pannaipatty - Compound Wall

    27/38

    6 15.92

    Brick work in cm 1;5 mix using

    country bricks including cost and

    conveyance of all materials to site and

    all labour charges etc., complete.

    cum

    7 388.71

    Plastering in cm 1:5 mix 12 mmthick

    including cost and conveyance of all

    materials to site and all labour charges

    etc., complete.

    sqm

    8 495.35

    Colour washing two coats with

    approved exterior eulsion two

    coatsincluding cost and conveyance of

    all materials to site and all labour

    charges etc., complete.

    sqm

  • 8/11/2019 Pannaipatty - Compound Wall

    28/38

    Up to dateSince last

    CertificateUp to date

    Since last

    Certificate

    1 2 3 4 5 6 7 8

    Rs Rs Rs

    Work was

    Material work Chairman

    Commissio

    ner

    Ps.

    .---------

    .---------

    .--------- Chairman

    Commissio

    ner

    Witness :

    Head of Account

    Chairman

    Commission

    er

    Rs. Ps.

    Station

    Dated :20

    Received Rs. (

    .)n y as na paymen s se emen o a

    demands.....Pa

    Expenditure including this bill

    Balance Available

    Resolution NoDate.20

    COMPLETION CERTIFICATE

    Rs.

    Allotment for the year

    Office in - charege of work

    CHECK MEASUREMENTS CERTIFICATE

    Certificate that theduly check measured by me on

    (date).

    .

    Balance Due.. .

    Amount

    Remarks

    Brought forward

    uan y xecu e or

    Su lied

    ITEMSRate Per

  • 8/11/2019 Pannaipatty - Compound Wall

    29/38

    l

  • 8/11/2019 Pannaipatty - Compound Wall

    30/38

    Sl.No Description of work L B D Qty

    1

    1 x 1 140.00 0.75 0.60 63.00

    Total Quantity 63.00

    2

    1 x 1 140.00 0.75 0.10 10.50

    Total Quantity 10.50

    3

    I Footing 1 x 1 140.00 0.60 0.23 19.32

    II Footing 1 x 1 140.00 0.45 0.23 14.49

    III Footing 1 x 1 140.00 0.38 0.45 23.94

    D/F Gate -1 x 1 3.00 0.38 0.45 -0.51

    57.24

    4

    LS 0.35

    0.35

    5

    For plinth beam 1 x 1 140.00 0.23 0.11 3.54

    3.54

    6

    DETAILED ESTIMATE

    Construction of compound wall at Pannaipatty PU Ele School in Eriyodu

    town panchayat.

    Nos.

    Earthwork excavation for foundation in all clauses of soils and subsoils to fulldepth as may be directed except in hard rock requiring blasting but inclusive of

    shoring, struting and bailing out water wherever neccessary and refilling the sides

    of foundation with excavated earth in layers of not more than 15cm thick well

    rammed and consolidated and depositing the

    Brick work in cm 1:5 mix using country bricks including all cost and conveyance of

    all materials to site and all labour charges etc., complete.

    Cement concrete 1:4:8 mix using 40mm ISS HBG metal for foundation including

    watering whenever necessary and laid in layers not more than 15cm thick

    compacting etc., complete complying with std. Specifications and as directed. Rate

    for 10 cum.

    R.R. masonry in c.m.1:5 mix for foundation and basement using rough stones and

    bond stones with simultaneous pointing with same mortar including cost and

    conveyance of all materials to site and all labour charges etc., complete.

    Supply and fabrication of steel including cost and conveyance of all materials to

    site and all labour charges etc., complete.

    RCC 1:1.5:3 mix using 20mm ISS HBG Metal including cost and conveyance of all

    materials to site and all labour charges etc., complete.

  • 8/11/2019 Pannaipatty - Compound Wall

    31/38

    Brick on edge 1 x 2 140.00 0.075 0.11 2.31

    Brick wall 1 x 1 140.00 0.11 1.35 20.79

    Brick pillar 1 x 45 0.23 0.11 1.35 1.54

    D/F Gate -1 x 1 3.00 0.11 1.35 -0.45

    24.19

    7

    wall Sides 1 x 2 140.00 1.35 378.00

    wall top 1 x 1 140.00 0.11 15.40

    Pillaster top 1 x 45 0.23 0.11 1.14

    Pillar sides 2 x 45 0.11 1.35 13.37

    Brick on edge 1 x 2 140.00 0.20 56.00

    463.90

    wall Sides 1 x 2 140.00 1.35 378.00

    wall top 1 x 1 140.00 0.11 15.40

    Pillaster top 1 x 45 0.23 0.11 1.14

    Pillar sides 2 x 45 0.11 1.35 13.37

    Brick on edge 1 x 2 140.00 0.20 56.00

    463.90

    9 LS

    10 LS

    ASSISTANT ENGINEER

    8

    Provision for Grill gate

    VEDASANDUR

    plastering in cm 1:5 mix 12mm thick including all cost and conveyance etc

    compelete.,

    colour washing two coats with approved exterior emulsion paint

    PANCHAYAT UNION

    Contigencies & other unforeseen charges

  • 8/11/2019 Pannaipatty - Compound Wall

    32/38

    cement 4700.00 Mangalore ridge

    tiles/1000

    23790.00

    Mangalore tiles/1000 8295.00

    Mangalore ceiling tiles 5000.00

    steel 45600.00 Pressed

    tiles(20x20x2cm) /1000

    8710.00 40mm 742.00

    bitumen 45100.00 pan tiles(23x8x

    1.7cm)/1000

    339.00 25mm 638.00

    Emulsion 40500.00 Blasted soling stone 138.60 20mm 1034.00

    Brick 3985.00 un blasted stone 84.70 12mm 958.00Brick jelly

    (20mm)

    550.00 C.W.reeper(50x25mm)/R

    M

    29.00 10mm 705.00 10-12MM

    metal ISS832

    Brick jelly

    40mm

    495.00 C.W.reeper(50x12mm)/R

    M

    21.10

    rough stone 332.00 country wood planks 33030.00 6mm 478.00

    bond stone 455.00 C.W.scantling (upto 4m) 28790.00

    rough stone

    (revetment)

    288.00 U S Gravel 130.00 90mm&

    75mm

    293

    328.00

    KM stone 328.00 Well Gravel 107.80 63mm 423.00

    Hectameter

    stone

    (0.9x0.15x0.15)

    165.00 sand for mortor 110.00 53mm 514.00

    slacked lime 869.00

    sand for filling

    110.00 45mm&

    46.5mm

    37.50mm

    689

    689703

    shell lime 1180.00 Cuddappah slab 50mm

    Tk

    342.00 26.5mm&

    25mm

    665

    665

    22.40mm 965.00

    stone lime 77.00 Cuddappah slab 38/40

    Tk

    330.00 13.2mm894.00

    Mangalore tiles

    AA

    8295.00 Cuddappah slab 20/30

    Tk

    304.00 11.2mm608.00

    Binding wire 48.00

    6.7mm,

    6mm,

    5.60mm

    4.75m

    451

    451

    451

    400

    Mason 1 363 Road mazdoor 1 228 Fitter 1 322.00

    Mason 2

    except BW326

    Road mazdoor 2206

    Fitter 2300.00

    Mazdoor 1 228 Head mazdoor 236 Painter 1 293.00

    Mazdoor 2 206 Carpenter 1 355 Painter 2 271.00

    Wodder

    236

    Carpenter 2

    326

    Fitter 1 ( For

    pipe laying &

    Barbending)

    316.00

    Mason II class 326

    Refilling sand 13.00 JC scrub 2.15 For street 41.85

    Refilling soil 14.70 JC light 2.35 Drain 62.78

    laying of well

    gravel

    4.14 JC heavy 3.10 for foundation 83.70

    including rolling 10.56 Juliflora with uprooting 3.45 Road 44.60

    tack coat over BT 5.12 Juliflora without uprooting 2.65 Silt 35.00

    over WBM 12.74 1 st lead 5.25

    1 st lift 4.20

    metal 3.15 Benching 1.75

    Gravel 3.05 Centering

    Charges

    #REF!

    WBM 259.24 sand 3.05 Ghat #REF!

    WBM Patch work 77.86 mixing charges 43.35

    BT patch 167.5 Grinding lime mortor ordinary 105.9

    Picking 5.59

    PC& SC 457.11

    LABOUR

    WORK

    Hire &labour

    jungle clearence earth work

    Stacking

    COST OF MATERIALS ,LABOUR &WORK 2013-2014

    MATERIALS

    ISS METAL

    IRC METAL

  • 8/11/2019 Pannaipatty - Compound Wall

    33/38

  • 8/11/2019 Pannaipatty - Compound Wall

    34/38

    31 145.60 209.90 177.50 237.70 294.35 131.70

    32 149.70 215.80 182.50 244.40 302.70 135.40

    33 153.80 221.70 187.50 251.10 311.05 139.10

    34 157.90 227.60 192.50 257.80 319.40 142.80

    35 162.00 233.50 197.50 264.50 327.75 146.50

    36 166.10 239.40 202.50 271.20 336.10 150.2037 170.20 245.30 207.50 277.90 344.45 153.90

    38 174.30 251.20 212.50 284.60 352.80 157.60

    39 178.40 257.10 217.50 291.30 361.15 161.30

    40 182.50 263.00 222.50 298.00 369.50 165.00

    41 185.95 267.95 226.70 303.60 376.50 168.10

    42 189.40 272.90 230.90 309.20 383.50 171.20

    43 192.85 277.85 235.10 314.80 390.50 174.30

    44 196.30 282.80 239.30 320.40 397.50 177.40

    45 199.75 287.75 243.50 326.00 404.50 180.50

    46 203.20 292.70 247.70 331.60 411.50 183.60

    47 206.65 297.65 251.90 337.20 418.50 186.70

    48 210.10 302.60 256.10 342.80 425.50 189.80

    49 213.55 307.55 260.30 348.40 432.50 192.90

    50 217.00 312.50 264.50 354.00 439.50 196.00

    51 220.45 317.45 268.70 359.60 446.50 199.10

    52 223.90 322.40 272.90 365.20 453.50 202.20

    53 227.35 327.35 277.10 370.80 460.50 205.30

    54 230.80 332.30 281.30 376.40 467.50 208.40

    55 234.25 337.25 285.50 382.00 474.50 211.50

    56 237.70 342.20 289.70 387.60 481.50 214.60

    57 241.15 347.15 293.90 393.20 488.50 217.70

    58 244.60 352.10 298.10 398.80 495.50 220.80

    59 248.05 357.05 302.30 404.40 502.50 223.90

    60 251.50 362.00 306.50 410.00 509.50 227.00

    61 254.95 366.95 310.70 415.60 516.50 230.10

    62 258.40 371.90 314.90 421.20 523.50 233.20

    63 261.85 376.85 319.10 426.80 530.50 236.30

    64 265.30 381.80 323.30 432.40 537.50 239.40

    65 268.75 386.75 327.50 438.00 544.50 242.50

    66 272.20 391.70 331.70 443.60 551.50 245.60

    67 275.65 396.65 335.90 449.20 558.50 248.70

    68 279.10 401.60 340.10 454.80 565.50 251.80

    69 282.55 406.55 344.30 460.40 572.50 254.90

    70 286.00 411.50 348.50 466.00 579.50 258.00

  • 8/11/2019 Pannaipatty - Compound Wall

    35/38

    71 289.45 416.45 352.70 471.60 586.50 261.10

    72 292.90 421.40 356.90 477.20 593.50 264.20

    73 296.35 426.35 361.10 482.80 600.50 267.30

    74 299.80 431.30 365.30 488.40 607.50 270.40

    75 303.25 436.25 369.50 494.00 614.50 273.50

    76 306.70 441.20 373.70 499.60 621.50 276.6077 310.15 446.15 377.90 505.20 628.50 279.70

    78 313.60 451.10 382.10 510.80 635.50 282.80

    79 317.05 456.05 386.30 516.40 642.50 285.90

    80 320.50 461.00 390.50 522.00 649.50 289.00

    81 323.60 465.50 394.25 527.05 655.80 291.85

    82 326.70 470.00 398.00 532.10 662.10 294.70

    83 329.80 474.50 401.75 537.15 668.40 297.55

    84 332.90 479.00 405.50 542.20 674.70 300.40

    85 336.00 483.50 409.25 547.25 681.00 303.25

    86 339.10 488.00 413.00 552.30 687.30 306.10

    87 342.20 492.50 416.75 557.35 693.60 308.95

    88 345.30 497.00 420.50 562.40 699.90 311.80

    89 348.40 501.50 424.25 567.45 706.20 314.65

    90 351.50 506.00 428.00 572.50 712.50 317.50

    91 354.60 510.50 431.75 577.55 718.80 320.35

    92 357.70 515.00 435.50 582.60 725.10 323.20

    93 360.80 519.50 439.25 587.65 731.40 326.05

    94 363.90 524.00 443.00 592.70 737.70 328.90

    95 367.00 528.50 446.75 597.75 744.00 331.75

    96 370.10 533.00 450.50 602.80 750.30 334.60

    97 373.20 537.50 454.25 607.85 756.60 337.45

    98 376.30 542.00 458.00 612.90 762.90 340.30

    99 379.40 546.50 461.75 617.95 769.20 343.15

    100 382.50 551.00 465.50 623.00 775.50 346.00

  • 8/11/2019 Pannaipatty - Compound Wall

    36/38

  • 8/11/2019 Pannaipatty - Compound Wall

    37/38

    1 :

    2 :

    3 :

    4 :

    5 :

    6 :

    7 :

    8 :

    9 :

    10 :

    11 :

    12 :

    13 :

    14 :

    15 :

    :

    :

    16 :

    17 :

    18 :

    QUESTIONARIE FORM

    b) Subsiding contractor value

    Is this are lowest schedule tender or percentage

    tender

    If it is schedule tender is comprative statement

    enclosed?

    Whether the lowest tender has remitted EMD, if

    so give details

    Date of Technical sanction

    PANCHAYAT UNION WORKS

    Name of the lowest tenderer and his percentage

    value of tendered amount

    Are the tender or offers are enclosed in orginal

    Whether the lowest tenderer is a registered in

    orginal

    a) If so , his money limit

    Classification of the road

    Estimate value of contractor to putup tender

    Date of tender calls and its results in full

    Name of the contractor and their tenderpremium

    Construction of compound wall at

    Pannaipatty PU Ele School in Eriyodu town

    DR No . SDN No . P.U.E.R.No

    Date of DE (H) recommendation

    Name of the scheme in which the above work

    sanctioner it is? Or orginal work administrative

    sanction accorded in G.O. Ms. No. etc.,

    PERCENTAGE TENDER OR SCHDULE TENDER

    Date of receipt of tender form P.U.C :

    Date of receipt of tender form Assistant DWL

    Engr

    Name of the work

    Estimate cost

  • 8/11/2019 Pannaipatty - Compound Wall