Upload
others
View
1
Download
0
Embed Size (px)
Citation preview
we
Purpos
Networin unisoNetwortranspoamounttraffic band fun
The menetworkdata stacritical n
What i
A passivreal‐tim
TAPs arpaths onetworkTAPs intneeds t
Solutio
Panduitthroughconsists
FCT
FCT
FCT
FCT
The TAPcabling
The 70/These aconsideon the fthat trabit erro
eb: www.pand
se
rks comprisedon to transporrks need to beort delays andts of data trafbecomes vitalctional busin
thod used to k’s operationatistics. The dnetworks is a
is a Traffic A
ve optical Trame monitoring
e positioned f the same nek path (live potroduce addito be consider
on
t has developh to the live ps of the follow
T‐7ZA: Front li
T‐7ZB: Front li
T‐7ZC: Front li
T‐7ZD: Front li
Ps consist of dtopologies an
/30 TAPs introdditional losseration must bfollowing pagnsceiver sensrs do not exc
duit.com e-
Pand
d of switches,rt important e properly ded failures espeffic. The need for effective ess success.
obtain real‐ts while providdeployment on effective te
Analysis Poin
ffic Analysis Pg of ports. It is
in the netwoetwork signalort) and the mtional loss intred and caref
ed a family oport while 30%wing four type
ive 6‐port dup
ive 6‐port dup
ve 4‐port dup
ive 12‐port du
different connnd to enable
oduce additioses drasticallybe taken wheges serve onlysitivity and theed standard
-mail: cs@pa
duit® Fib
servers, and information isigned and mecially when bd for real‐timeperformance
ime network ding precise, f optical Traffechnique for o
nt (TAP)?
Point (TAP) iss minimally in
rk link betwe by splitting tmonitoring pato the networfully assessed
f TAP cassett% of the light es:
plex LC, front
plex LC, front
plex LC, front
uplex LC, two
nector combiease of deplo
onal insertiony reduce the ten designing cy as guidancehe network lods requiremen
nduit.com
ber Tap
storage elemn the form of
maintained to burdened wite network vise monitoring,
visibility mushighly detailefic Analysis Poobtaining rea
an access ponvasive and d
een two netwthe optical sigath (TAP portrk. With thesd.
es with a spliis diverted to
t TAP 6‐port d
t TAP 6‐port d
t TAP 4‐port d
o rear TAP 12‐
nations for thoyment within
loss of 1.8dBtotal channelchannels to b. Before comsses are comnts.
phone: 800-7
Module
ments must wf data traffic. prevent th very large sibility of data, robust secur
st not disturbed dimensionoints (TAPs) wal‐time netwo
oint installed does not disru
ork devices. gnal that is cat). Dependingse additional
t ratio of 70/o the TAP por
duplex LC, and
duplex LC, and
duplex LC, and
‐fiber MTPs, a
he live and TAn those differ
B to the live pl lengths for ae tapped. Re
mmitting to a dpatible with t
777-3300 p
es
work
a rity
b a nal within missioork visibility.
in networks tupt the netwo
The TAP provarrying the neg on the ratiolosses, the ov
/30 (70% of thrt). This TAP
d rear live 6‐p
d rear live 12
d front live 4‐
and two rear
AP ports to acrent cabling t
path and 5.8dall applicationeach charts andesign, custothe specific a
page 1
T E C H N I C A
n
that providesork signal.
vides two distetwork link; tho of light diveverall fiber bu
he light is divecassette offe
port duplex L
‐fiber MTP
‐port duplex L
live 12‐fiber
ccount for diftopologies.
B to the TAP ns and carefund designs promers should pplication, an
F
A L R E F E R E N C TR121
tinct he rted, udget
erted ring
LC
LC
MTPs
fferent
path. l rovided ensure nd that
FCT‐7ZC
E
we
FCT‐7Z
The FCTduplex
A typica
The colocalculat
eb: www.pand
A
T‐7ZA TAP solLC live ports a
al fiber deploy
ored paths inted to ensure
Figure
duit.com e-
ution containand 6 duplex
yment utilizin
the diagram the designat
e 1. Typical fib
-mail: cs@pa
ns 6 LC duplexLC TAP ports
ng the FCT‐7Z
show the thrted transmiss
ber topology u
nduit.com
x live ports os on the front
ZA TAP casset
ree paths of wion signal wil
utilizing the FC
phone: 800-7
on the rear of of the casset
te is shown b
which the chal effectively b
CT‐7ZA TAP cas
777-3300 p
the cassette tte.
below in Figur
annel insertiobe transmitte
ssette
page 2
T E C H N I C A
along with 6
re 1.
on loss needs ed.
A L R E F E R E N C TR121
to be
E
we
The live path (1) runs from NDevice and flochannel utilizi
The near ein Figure 1nearest to through a TAP port) o
The far endFigure 1) rfarthest frothrough a port) out t
eb: www.pand
(blue line showNetwork Deviceows through thing the live por
end TAP path (o1) runs from ththe TAP throulive port and oout to the mon
d TAP path (grruns from the Nom the TAP thrlive port and oto the monitori
duit.com e-
wn in the Figure to Network he entire rts on the TAP.
orange line shoe Network Devugh the TAP (inpoutput is througnitoring equipm
reen line showNetwork Devicerough the TAP output is througing equipment.
-mail: cs@pa
L
Near
Far
re
ownvice put is gh a ment.
n in e (input is gh a TAP .
nduit.com
Live Path
End TAP Path
End TAP Path
phone: 800-7
h
h
777-3300 ppage 3
T E C H N I C A
A L R E F E R E N C TR121
E
TfvtT
we
The corresponfollowing the values are thetransmitted thTAP cassette a
Live P0.15d
TAP P0.15d
TAP P0.15d
SiP
LP
TAP PaE
TAP(Fa
Note: Th
FCT‐7ZB
The FCTports an
eb: www.pand
nding connecsignal flow ofen used to cahrough the chare shown in
Path ConnectdB + 1.80dB +
Path (Near EndB + 5.8dB + 0
Port (Far End)dB + 0.15dB +
ignal Path
Live Path
ath (Near End)
P Path ar End)
hese values are
B
T‐7ZB TAP solnd six duplex
duit.com e-
ctor insertion f each path alculate the mhannel. The mthe tables be
or IL calculat0.15dB + 0.1
nd) Connecto0.15dB = 6.10
) Connector I5.8dB + 0.15
Connector Insertion Loss
2.25dB
6.10dB
6.25dB
e calculated w
ution consistTAP ports on
-mail: cs@pa
loss is calculand adding upaximum lengmaximum lenelow.
ion 5dB = 2.25dB
r IL calculatiodB
L calculationdB = 6.25dB
Technol
10GBASE
4G FC
8G FC
10GBASE
4G FC
8G FC
10GBASE
4G FC
8G FCwith “extra” ma
s of one live Mn the front of
nduit.com
ated for eachp the connectgth of the changths for the f
B
on
ogy O
E‐SR
C
C
E‐SR
C
C
E‐SR
C
Cargin (>3dB) re
MPO port on the cassette.
phone: 800-7
path. The inor losses. Thnnel based ufiber topolog
Max
OM3
300
370
140
170
75
18
165
70
15equired for the
the rear of th
777-3300 p
nsertion loss ihese calculatepon the techgy in Figure 1
ximum Reach (meters)
OM4
400
390
170
225
85
25
250
80
20e Analyzer rece
he cassette a
page 4
T E C H N I C A
s calculated bed insertion lonology beingutilizing the F
Sig Core
500
480
210
300
100
50
295
90
40 eiver
nd six duplex
A L R E F E R E N C TR121
by oss FCT‐7ZA
x live
E
A
we
A typical fiber
eb: www.pand
r deployment
Fig
duit.com e-
t utilizing the
gure 2. Typical Fi
-mail: cs@pa
FCT‐7ZB TAP
L
Near
iber Topology u
nduit.com
cassette is sh
Live Path
End TAP Path
tilizing FCT‐7ZB
phone: 800-7
hown below i
h
B TAP Cassette
777-3300 p
in Figure 2.
page 5
T E C H N I C A
A L R E F E R E N C TR121
E
TfvtT
we
The corresponfollowing the values are thetransmitted thTAP cassette a
Live P0.15d
TAP P0.15d
TAP P0.15d
SigPa
LiPa
TAP(Nea
TAP(Far
Note: Th
eb: www.pand
nding connecsignal flow ofen used to cahrough the chare shown in
Path: dB + 1.80dB +
Path (Near EndB + 5.80dB +
Path (Far EnddB + 5.80dB +
gnal ath
CoIn
ive ath
Path r End)
Path End)
hese values are
duit.com e-
ctor insertion f each path alculate the mhannel. The mthe tables be
0.35dB + 0.3
nd) 0.15dB = 6.1
) 0.35dB + 0.3
onnector nsertion Loss
2.65dB
6.10dB
6.65dB
e calculated w
-mail: cs@pa
Far E
loss is calculand adding upaximum lengmaximum lenelow.
5dB = 2.65dB
0dB
5dB = 6.65dB
Technology
10GBASE‐SR
4G FC
8G FC
10GBASE‐SR
4G FC
8G FC
10GBASE‐SR
4G FC
8G FC with “extra” ma
nduit.com
End TAP Path
ated for eachp the connectgth of the changths for the f
B
B
y OM
R 26
28
10
R 17
75
18
R 65
0
0argin (>3dB) re
phone: 800-7
path. The inor losses. Thnnel based ufiber topolog
Maxim(m
M3
60
85
05
70
5
8
5
0
0 equired for the
777-3300 p
nsertion loss ihese calculatepon the techgy in Figure 1
mum Reach meters)
OM4
355
295
110
255
85
25
140
5
5 e Analyzer rece
page 6
T E C H N I C A
s calculated bed insertion lonology beingutilizing the F
Sig Core
435
325
150
300
100
50
165
15
10 eiver
A L R E F E R E N C TR121
by oss FCT‐7ZB
E
F
Tc
we
FCT‐7ZC
The FCT‐7ZC Tcassette .
A typica
eb: www.pand
TAP solution c
al fiber deploy
Fig
duit.com e-
consists of eig
yment utilizin
gure 3. Typical
0.15dB
-mail: cs@pa
ght duplex liv
ng the FCT‐7Z
fiber topology u
nduit.com
ve ports and f
ZC TAP cassett
utilizing the FCZ
phone: 800-7
four duplex T
te is shown b
Z‐7ZC TAP
777-3300 p
AP ports on t
below in Figur
page 7
T E C H N I C A
the front of th
re 3.
A L R E F E R E N C TR121
he
E
we
eb: www.pandduit.com e--mail: cs@pa
L
Near
Far E
nduit.com
Live Path
End TAP Path
End TAP Path
phone: 800-7
h
777-3300 ppage 8
T E C H N I C A
A L R E F E R E N C TR121
E
TfvtF
F
Ta
we
The corresponfollowing the values are thetransmitted thFCT‐7ZC TAP c
Live P0.15d
TAP P0.15d
TAP P0.15d
S
TAP P
TA(Fa
Note: Th
FCT‐7ZD
The FCT‐7ZD Tand twelve du
eb: www.pand
nding connecsignal flow ofen used to cahrough the chcassette are s
Path: dB + 0.15dB +
Path (Near EndB + 5.80dB +
Path (Far EnddB + 0.15dB +
Signal Path
Live Path
Path (Near End)
AP Path ar End)
hese values ar
TAP solution uplex live por
duit.com e-
ctor insertion f each path alculate the mhannel. The mshown in the
1.80dB + 0.1
nd) 0.15dB = 6.1
) 5.80dB + 0.1
Connector Insertion Loss
2.25dB
6.10dB
6.25dB
re calculated w
consists of twts on the fron
-mail: cs@pa
loss is calculand adding upaximum lengmaximum lentables below
5dB = 2.25dB
0dB
5dB = 6.25dB
Technolog
10GBASE‐S
4G FC
8G FC
10GBASE‐S
4G FC
8G FC
10GBASE‐S
4G FC
8G FCwith “extra” m
wo MPO live pnt of the cass
nduit.com
ated for eachp the connectgth of the changths for the f.
B
B
gy OM
SR 300
370
140
SR 170
75
18
SR 165
70
15argin (>3dB) r
ports and twoette.
phone: 800-7
path. The inor losses. Thnnel based ufiber topolog
Max
M3
0
0
0
0
5
8
5
0
5required for th
o MPO TAP po
777-3300 p
nsertion loss ihese calculatepon the techgy in Figure 1
ximum Reach (meters)
OM4
400
390
170
225
85
25
250
80
20e Analyzer rec
orts on the re
page 9
T E C H N I C A
s calculated bed insertion lonology beingutilizing the
Sig Core
500
480
210
300
100
50
295
90
40ceiver
ear of the cas
A L R E F E R E N C TR121
by oss
ssette
E
A
web
A typical fibe
b: www.pand
r deployment
uit.com e-m
t utilizing the
Figure 4. Typ
mail: cs@pan
e FCT‐7ZD TAP
L
pical Fiber topolo
nduit.com p
P cassette is s
Live Path
ogy utilizing the
phone: 800-7
shown below
e FCT‐7ZD TAP C
777-3300 pa
in Figure 4.
Cassette
age 10
T E C H N I C A
A L R E F E R E N C TR121
E
web
b: www.panduit.com e-mmail: cs@pan
Near
Far E
nduit.com p
End TAP Path
End TAP Path
phone: 800-7
h
777-3300 paage 11
T E C H N I C A
A L R E F E R E N C TR121
E
TfvtT
S
Trp
web
The corresponfollowing the values are thetransmitted thTAP cassette a
Live P0.15d
TAP P0.15d
TAP P0.35d
SigPa
LivPa
TAP (Near
TAP (Far
Note: The
Summary
The need for robust securitperformance
b: www.pand
nding connecsignal flow ofen used to cahrough the chare shown in
Path: dB + 1.80dB +
Path (Near EndB + 5.80dB +
Path (Far EnddB +0.35dB + 5
nal ath
CoIn
ve ath
2
Path r End)
6
Path End)
6
ese values are
real‐time netty and functiomonitoring p
uit.com e-m
ctor insertion f each path alculate the mhannel. The mthe tables be
0.35dB + 0.3
nd) 0.35dB = 6.3
) 5.80dB + 0.35
onnector nsertion Loss
2.65dB
6.30dB
6.85dB
calculated wit
work visibilityonal business port along wit
mail: cs@pan
loss is calculand adding upaximum lengmaximum lenelow.
5dB = 2.65dB
0dB
5dB = 6.85dB
Technology
10GBASE‐SR
4G FC
8G FC
10GBASE‐SR
4G FC
8G FC
10GBASE‐SR
4G FC
8G FCth “extra” mar
y of data trafsuccess. Panth providing f
nduit.com p
ated for eachp the connectgth of the changths for the f
B
OM
260
285
105
165
70
15
35N/A
N/Argin (>3dB) req
fic becomes vduit offers folexibility for t
phone: 800-7
path. The inor losses. Thnnel based ufiber topolog
Maxi(
3
0
5
5
5
A
Aquired for the
vital for effecour types of Tthe TAP to fit
777-3300 pa
nsertion loss ihese calculatepon the techgy in Figure 1
imum Reach (meters)
OM4
355
295
110
250
80
20
110 5
5Analyzer recei
ctive performTAPs that can into various
age 12
T E C H N I C A
s calculated bed insertion lonology beingutilizing the F
Sig Core
435
325
150
295
90
40
135 10
10iver
ance monitorsupply this fiber topolog
A L R E F E R E N C TR121
by oss FCT‐7ZD
ring,
gies.
E
web
Installati
The TAP is compaadapter For examsee the f FS006
FS012 CM185A
Cleaningdocumen PN433A PN446
Assistan TR117
TAP Ope
For infor Optical T
b: www.pand
ion and Clean
cassettes areatible with Papanels.
mples of how following:
Opticom® FCE1UA, F
Opticam®
A Fiber Adapuse with F
g of the cassents:
MTP Fiber
Visual InspInterconne
ce with troub
Troublesho
eration
rmation on ho
Traffic Analysi
uit.com e-m
ning
e installed fronduit FRME,
the TAP cass
QuickNet™ RCE2U
QuickNet™ R
pter Patch PaMT1, FMT1A
ettes follows b
Cleaning Too
pection and Cect Compone
bleshooting t
ooting a Perm
ow a TAP ope
is Points (TAP
mail: cs@pan
Ap
om the front oFCEU, and FM
sette will inst
Rack Mount F
Rack Mount Fi
nel 1 & 2 RU , FMT2 or FM
basic fiber op
ols
Cleaning of Mnts.
the links can b
manent Link
erates refer to
Ps) and Their
nduit.com p
ppendix A
of the enclosuMT series enc
tall into the e
iber Cassette
iber Cassette
(CFAPPBL1, CMT2A type fibe
ptic connecto
ultimode and
be found in P
o Panduit Tec
Effect on Fibe
phone: 800-7
ure or fiber adclosure system
enclosure syst
e Enclosures I
Enclosures in
CFAPPBL1A, Cer trays.
or cleaning th
d Singlemode
Panduit docum
chnology Brie
er Link Budge
777-3300 pa
dapter panel.ms or the CFP
tems or fiber
nstall Instruct
nstall instruct
CFAPPBL2 or C
hat can be fou
Structured C
ment:
f titled:
ets.
age 13
T E C H N I C A
. The TAP casPPBL series fib
r adapter pan
tions for FCE1
tions for FCE4
CFAPPBL2A) f
und in Pandu
Cabling System
A L R E F E R E N C TR121
ssette ber
nels,
1U,
4U
for
uit
m
E
web
Testing t
There arto be tesThe thre
1. Live 2. Near3. Far E
Below arfurther tSinglemo
FTC‐7ZA
b: www.pand
the TAP Links
e three separsted utilizing Pe permanent
Link: Near Enr End Tap LinkEnd Tap Link:
re examples oesting guidanode Fiber Opt
Live Lin
uit.com e-m
s
rate permanePMLS (powert links that ne
nd to Far Endk: Near End t Far End to T
of how the fibnce refer to Ptic Cabling Sys
k
mail: cs@pan
Ap
ent links assocr meter light sed to be test
to TAP AP
ber links with anduit documstems.
Far E
nduit.com p
ppendix B
ciated with easource) testined are:
the various Tment PN 445
nd TAP
phone: 800-7
ach TAP confng in accordan
TAP cassettesPermanent L
Nea
777-3300 pa
figuration andnce with TIA‐
s installed canink Testing of
ar End TAP
age 14
T E C H N I C A
d each of thes‐526‐14‐B Ann
n be tested. Ff Multimode
A L R E F E R E N C TR121
se need nex ‘A’.
For and
E
web
FTC‐7ZB
Note thathe fibernormal o
b: www.pand
at for this testr harness. Thoperation.
uit.com e-m
t, an additionis is for testin
mail: cs@pan
al LC connectng only; the h
Liv
Near E
F
nduit.com p
tion is made barness is dire
ve Link
End TAP
ar End TAP
phone: 800-7
between the ectly attached
777-3300 pa
Power Meted to the far en
age 15
T E C H N I C A
r at the Far End equipment
A L R E F E R E N C TR121
nd and t during
E
web
FTC‐7ZC
b: www.pand
Live Link
uit.com e-m
k
mail: cs@pan
Fa
nduit.com p
ar End TAP
phone: 800-7777-3300 pa
Near
age 16
T E C H N I C A
r End TAP
A L R E F E R E N C TR121
E
web
FTC‐7ZD
Note thaTAP for tduring no
b: www.pand
at for this testtesting. This iormal operat
uit.com e-m
t, additional Lis for testing tion.
mail: cs@pan
LC connectiononly; the har
L
Ne
nduit.com p
ns are made bness is direct
ive Link
ear End TAP
Far End TAP
phone: 800-7
between the ly attached to
P
777-3300 pa
harness at tho the far end
age 17
T E C H N I C A
he far end andequipment a
A L R E F E R E N C TR121
d the and TAP
E