16
WIND CRANES LIFETIME EXCELLENCE PALFINGER WIND – THE GLOBAL EXPERT FOR INNOVATIVE AND HIGH-QUALITY ONSHORE AND OFFSHORE WIND CRANES

PALFINGER WIND - Equipdraulic · wind cranes lifetime excellence palfinger wind – the global expert for innovative and high-quality onshore and offshore wind cranes

  • Upload
    lexuyen

  • View
    242

  • Download
    2

Embed Size (px)

Citation preview

WIND CRANESLIFETIME EXCELLENCE

PALFINGER WIND – THE GLOBAL EXPERT FOR INNOVATIVE AND HIGH-QUALITY ONSHORE AND OFFSHORE WIND CRANES

2

PALFINGER WIND PRODUCT PORTFOLIO

Hydraulic Nacelle Crane

Electric/Manual Platform Crane

Hydraulic Platform Crane

Hydraulic Marine Crane

3

Hydraulic Davit and Rescue Boat

Electric/Hydraulic Offshore Davit and Life/Rescue Boat

Hydraulic Substation Crane

Hydraulic Jetty Cranes

4

PALFINGER WIND is the expert for lifting solutions designed especially for the wind industry. The company produces cranes for nacelles,

platforms and substation/accommodation platforms as well as launch and recovery systems and boats. PALFINGER WIND guarantees its

customers a strong and reliable partnership with excellent lifetime operation during the entire product life cycle. Professional consultancy,

support with the installation and commissioning plus training for operation and maintenance are further benefits of this package. Customers

can rely on years of experience in the field of wind technology and successes achieved due to the use of PALFINGER wind cranes on many

wind farms. Innovative products that are certified by class societies ensure economic efficiency and maximum performance throughout the

crane’s lifetime. More than 2000 delivered wind cranes speak for themselves.

PALFINGER WIND CRANES

GENERAL FEATURES WIND CRANES

≥ Highest reliability and top-quality≥ Best-in-class surface protection system≥ Crane design life of 25+ years≥ Lifting capacity adjusted to wave height≥ Perfect product mix for a customer-optimised, matched

set of nacelle, platform and supply vessel cranes≥ Minimised downtime for servicing and repair work≥ Localised service and best customer care

5

PALFINGER MARINE is the global leading manufacturer of highly reliable, innovative and customised marine, offshore and wind cranes as

well as launch and recovery systems and boats. User-friendly application and functional design are the key benefits of the product range.

Special coating and high-quality materials guarantee resistance and loading capacity even under tough conditions. The overall concept of

PALFINGER MARINE is characterised by a global retailer network and local distribution and service partners. A worldwide service network

including the supply of spare parts ensures fast and professional on-site support. For detecting new market trends, PALFINGER MARINE

relies on more than 80 years of expert knowledge in the construction of cranes. PALFINGER MARINE is part of the PALFINGER Group, one of

the leading international manufacturers of hydraulic lifting systems in the area of commercial vehicles. Combining excellent products, strong

customer orientation and a highly competent service, PALFINGER MARINE occupies a leading position in the global marine market.

MANUFACTURING AND ASSEMBLY

Cost-efficient manufacturing in state-of-the-art production facilities and the use of high-class materials guarantee our customers a high-

quality product that can be certified by a number of class societies.

CERTIFICATIONS AND REGULATION

To manufacture safe and reliable wind cranes, PALFINGER MARINE pursues international, regional and national regulations and certificates.

PALFINGER MARINE works with internationally acknowledged classification societies. APC (Alternative Product Certification) and MSA

(Manufacturing Survey Arrangement) certification puts PALFINGER MARINE in the position to certify the products without the presence of

a surveyor. This ensures greater time flexibility and more efficiency in product certification. The component manufacturing plants in Austria,

Slovenia and Bulgaria are MCA certified by DNV. The in-house cylinder production is APC certified by GL. Other manufacturing plants hold

certifications like ISO 9001 and EN ISO 3834-2 among others and fulfil multiple rules, regulations and standards.

COMPANY PROFILE PALFINGER MARINE

6

PRODUCTOVERVIEW

PLATFORM CRANES

PF – Fixed Boom CranePS/PSM – Stiff Boom Crane

≥ Safe and fast unloading of supply vessels at main or auxiliary boat landing

≥ Flexible material handling on the platform≥ Customised to accommodate any sea

state (SWH)

NACELLE CRANES

PC – Compact Telescopic CranePK – Foldable Knuckle Boom Crane

≥ Safe and fast lifting from the platform to the nacelle

≥ Lifting from heli-deck into the nacelle≥ Handling within the nacelle≥ Optional man-riding

SUBSTATION / ACCOMODATION PLATFORM CRANES

PF – Fixed Boom CranePSM – Stiff Boom CranePKM – Knuckle Boom Crane

≥ Safe and fast loading and unloading of supply vessels at main boat landing

≥ Flexible material handling, servicing and handling of other equipment (e.g. gen-set parts, transformer parts ...) on the platform

≥ Customised to accommodate any sea state (SWH)≥ Optional features for extra functionality and safe operation

7

PLATFORM CRANES

PALFINGER WIND platform cranes are experts for flexible material handling to the platform. Platform cranes are customised to unload

supply vessels rapidly and safely under any marine conditions at sea. A special surface coating and processing of high-quality materials

protects PALFINGER WIND platform cranes against corrosion.

MAIN BOAT LANDING

PF – Fixed Boom Crane electric

≥ 0.5 mt to 4 mt≥ Simple design available with electric or

hydraulic drives

PS/PSM - Stiff Boom Crane hydraulic

≥ 10 mt to 183 mt≥ Simple and safe handling with variable

outreach

AUXILIARY BOAT LANDING

PF – Fixed Boom Crane manualPF – Fixed Boom Crane electric

≥ 0.5 mt to 4 mt≥ Typically paired with a compact telescopic

crane (PC) in the nacelle≥ Simple design available with electric or

hydraulic drives

8

SUBSTATION/ACCOMODATIONPLATFORM CRANES

PALFINGER WIND substation and accommodation platform cranes are customised to withstand harsh marine conditions at sea. Flexible

material handling allows safe and fast loading and unloading of supply vessels. With PALFINGER WIND substation and accommodation

platform cranes , the platform is executed with a versatile, reliable and low maintenance cargo handling tool to last for a lifetime. Optional

the PALFINGER WIND accommodation and platform cranes can be customised to different rules, legislation and incorporate features like

man-riding, constant tension as well as safety features like monitoring loads, warning systems and manual and automatic overload protection

systems.

MAIN BOAT LANDING

PS/PSM - Stiff Boom Crane hydraulic

≥ 10 mt to 300 mt≥ Simple handling with variable outreach

PKM – Knuckle Boom Crane hydraulic

≥ 20 mt to 280 mt≥ Easy handling with fixed safe working load

at every position

AUXILIARY BOAT LANDING

PF – Fixed Boom Crane manualPF – Fixed Boom Crane electric

≥ 0.5 mt to 4 mt≥ Simple design available with electric or hydraulic motor and

manual or electric slewing

9

NACELLE CRANES

Nacelle cranes feature compact design and an ideal weighting and performance ratio. Reliable operation is guaranteed even in tight spaces.

PALFINGER WIND nacelle cranes enable safe and fast lifting from the platform to the nacelle and from the heli-deck into the nacelle.

Passenger transportation, blade and tower inspections are also simplified and available for several crane types.

PC – Compact Telescopic Crane

≥ 1.5 mt to 6.6 mt≥ Typically used for handling tool kits

and spare parts≥ Light weight combined with high

performance

PK – Foldable Knuckle Boom Crane

≥ 4 mt to 117 mt≥ Typically used for handling of heavy loads such as generator parts, drives or electric

motors≥ Compact storage combined with highest

flexibility≥ Optional man-riding

10

CRANE FEATURES

1

1

4

4

75

5

2

2

THIRD-PARTY APPROVAL≥ Production-accompanying approval

through class societies (e.g. DNV, GL, etc.)≥ Design verification report (e.g. EN13852-1, ...)≥ PE stamping

OVERLOAD PROTECTION ≥ PALFINGER-specific Overload

Protection System (PALOPS)≥ Operated manually and/or

automatically and combines the (MOPS/AOPS) function

MAN-RIDING≥ For emergency evacuation≥ Easy blade, hub and tower inspection≥ Personnel handling from supply ship to

transition piece or platform

INCORPORATED POWER PACK≥ Hydraulic Power Unit (HPU) installed

inside the cranes mounting base

REMOTE CONTROL≥ Cable≥ Radio≥ Combined

CERTIFIED HOOK-ON POINTS≥ For external lifting devices ≥ Anchor point for emergency descent

equipment≥ Acc. to EN 50308 (1 person)

ADDITIONAL FEATURES≥ Biodegredable hydraulic oil≥ Lightning protection for over voltage≥ Helicopter warning light≥ Working light

CORROSION PROTECTION≥ Long-life & UV-resistant surface

protection≥ 3-layer paint system acc. to

ISO 12944-2-C5-M very high (marine)≥ NORSOK M501 System A1≥ Spray galvanisation surface treatment

EMERGENCY OPERATION≥ Emergency power pack with external

power supply e.g. generator, battery pack or supply ship

≥ Emergency control valve mounted on crane-column

OFFSHORE RESISTANCE≥ Multiple stainless steel components

(e.g. pipes, fittings, hoses, covers, etc.)≥ Bird protection≥ Ceramic coated piston rods (optional)≥ Stainless steel piston rods (optional)

BLADE COLLISION PREVENTION≥ Boom topping limitation≥ Interaction with turbine≥ Override function available

(optional)

3

3

6TURNKEY SOLUTIONS≥ Delivery ≥ Assembly≥ Installation≥ Commissioning

ADDITIONAL FEATURES PLATFORM CRANES /SUBSTATION CRANES

11

3

3

6

JETTY CRANES

Jetty cranes are in use at docks and in ports for the safe loading and hoisting of materials. Jetty cranes from PALFINGER WIND feature

zone- classed and ATEX- approved electrical components when needed. Electric motors and hydraulic pumps all are fully integrated within

the crane pedestal and column, and stainless steel cylinder rods give even greater protection to the elements.

PSM – Stiff Boom Crane hydraulic

≥ 20 mt to 180 mt≥ Fully CE marked and fitted with the latest

safety devices≥ Radio remote controls giving the operator

complete control from all angles and positions when operating the crane

PTM – Telescopic Boom Crane hydraulic

≥ 20 mt to 180 mt≥ Fully CE marked and fitted with the latest

safety devices≥ Radio remote controls giving the operator

complete control from all angles and positions when operating the crane

≥ Variable outreach

12

PALFINGER WIND offers best available customer service. A growing network of service partners specially focussed on offshore wind business

ensures responsive, reliable and cost efficient service. A comprehensive range of service is provided to ensure highly reliable operation during

the entire product life cycle.

AFTER SALES AND SERVICE

BEST AVAILABLE SERVICE≥ Installation and installation support≥ Commissioning supervision (onshore and offshore)≥ Annual service and inspection/maintenance≥ Technical support≥ Service management database for technical documentation,

service history and maintenance information≥ Always in compliance with the latest regulations ≥ Single point of contact

TRAINING≥ Operator and Maintenance Training ≥ On-site training: basic, advanced, troubleshooting≥ Detailed training documents and certificates≥ Different crane models and main components available

in PALFINGER training centre≥ Online e-learning courses and training material

SERVICE AGREEMENTS ≥ Custom-made package for wind park owners and

operators≥ Maintenance planning, original spares and service crews ≥ Packages for inspection, support, parts management

and maintenace

SPAREPARTS ≥ Global delivery≥ PALFINGER and OEM spare parts≥ Life cycle supply of spare parts

13

8

119

10

7

6

4

5

3 2 1

Odense, DenmarkSales O�cePalle AndersenT +45 [email protected]

1

Falkirk, United KingdomOutreach Ltd., PALFINGER WIND PartnerStuart GilliganT +44 1324 [email protected]

3 White Salmon, Washington, USASales O�ceJohn AdamsT +1 509 637 [email protected]

6

Houston, Texas, USASales O�ceLouis LeBourgeoisT +1 832 622 [email protected]

7

Cuxhaven, GermanyBesco GmbH, PALFINGER WIND PartnerBernd SchulzT +49 4721 508008 [email protected]

2

Madrid, SpainMycsa Mulder y Co., PALFINGER WIND PartnerDaniel BenitezT +34 91 [email protected]

4

Etoile Sur Rhone, FrancePalfinger France, PALFINGER WIND PartnerGilles AndreT +33 4 [email protected]

5 Rio de Janeiro, BrasilSales O�ceSuzana BarrosT +55 21 [email protected]

8

Busan, KoreaSales O�ceCB SeoT +82 55 314 [email protected]

9

SingaporeSales O�ceFranz SchnöllT +65 6861 2009 [email protected]

10

11 Sekigahara, JapanSekigahara Seisakusho Ltd.,PALFINGER WIND PartnerMasashi FujiiT +81 584 43 [email protected]

PALFINGER WIND SALES OFFICES:

Headquarter:

Salzburg, AustriaT +43 662 [email protected]

3

5

4

2 1

SALES NETWORK

14

1

5

14

7819

2328

17

29

24

13

15

1621

20

22

12

624

25

103

18

27269

11

WIND FARMS EQUIPPED WITH PALFINGER WIND CRANES

UK46 - Beatrice Demonstration – (10MW)Senvion 5M2 o� PK40002MD inside Nacelle

DE01 - Alpha Ventus - (60MW)AREVA M5000-1166 o� PK10000MB inside Nacelle6 o� PS15500-5 on PlatformSenvion 5M6 o� PK40002MD inside Nacelle6 o� PSM580-12 on Platform

BE01 - Thornton Bank Phase I – (30MW)Senvion 5M6 o� PK40002MD inside Nacelle6 o� PSM580-8 on Platform

DE27 - Borkum Phase 1 – (200MW)AREVA M5000-11622 o� PK10000MB inside Nacelle18 o� PK11001MB inside Nacelle40 o� PS15500-5 on Platform40 o� SCM2,5kN-2,6m on Platform

UK17 - Ormonde – (150MW)Senvion 5M30 o� PK40002MD inside Nacelle30 o� PSM400-10 on Platform1 o� PSM400-10 on Substation

UK62 - Galloper Wind Farm – (504MW)1 o� PSM1200-20 on Substation

UK31 - Walney Phase 1 – (183,6MW)Siemens SWT-3.6-12051 o� PCWM3300 inside Nacelle2 o� PK90002MG on Substation2 o� PK23500MD on Substation

UK32 - Walney Phase 2 – (183,6MW)Siemens SWT-3.6-12051 o� PCWM3300 inside Nacelle

UK13 - Lincs – (270MW)Siemens SWT-3.6-1201 o� PSM1200-18 on Substation

BE09 - Thornton Bank Phase II – (184,5MW)Senvion 6M30 o� PK40002MD inside Nacelle30 o� PSM400-10 on Platform1 o� PSM900-11 on Substation

BE10 - Thornton Bank Phase III – (110,7MW)Senvion 6M18 o� PK40002MD inside Nacelle18 o� PSM400-10 on Platform

DK13 - Anholt – (399,6MW)Siemens SWT-3.6-120111 o� SCM10-2,7SX on Platform

DE09 - Global Tech I – (400MW)AREVA M5000-11680 o� PK11001MB inside Nacelle80 o� PS15500-5 on Platform80 o� SCM2,5kN-3,1 on Platform

UK1E - Fife Energy Park – (7MW)Samsung S7.0-1711 o� PK40002MD inside Nacelle1 o� PSM1200-8 on Platform

DE02 - DanTysk – (288MW)Siemens SWT-3.6-12080 o� SCT10-1,3t – 5,0 on Platform

DE07 - Meerwind Ost/Süd – (288MW)Siemens SWT-3.6-12080 o� SCM20-2,3SX on Platform

UK10 - Humber Gateway – (219MW)V112-3.0 MW Vestas2 o� SCM10-2,6SX on Substation1 o� SCM20-2,3SX on Substation1 o� SCM14-3,5L on Substation

BE02 - Northwind – (216MW)V112-3.0 MW Vestas1 o� PSM900-16 on Substation

UK33 - West of Duddon Sands – (389MW)Siemens SWT-3.6-1201 o� PFM3500D on Substation1 o� PTM600-20 on Quayside

DE52 - EnBW Baltic 2 – (288MW)Siemens SWT-3.6-12080 o� PS23500-5 on Platform

DE06 - Nordsee Ost – (295,2MW)Senvion 6M48 o� PK40002MD inside Nacelle48 o� PSM400-10 on Platform48 o� SCMT 3kN-6,0 on Platform1 o� PSM1800-20 on Substation

DK15 - Avedøre Holme – (10,8MW)Siemens SWT-3.6-1203 o� PCWM3300 inside Nacelle

UK02 - Burbo Bank – (90MW)Siemens SWT-3.6-12025 o� PCWM3300 inside Nacelle

UK05 - Greater Gabbard – (504MW)Siemens SWT-3.6-120140 o� PCWM3300 inside Nacelle

UK07 - Gunfleet Sands I + II – (172,8MW)Siemens SWT-3.6-12048 o� PCWM3300 inside Nacelle

UK11 - Inner Dowsing – (97,2MW)Siemens SWT-3.6-12027 o� PCWM3300 inside Nacelle

UK15 - Lynn – (97,2MW)Siemens SWT-3.6-12027 o� PCWM3300 inside Nacelle

UK19 - Rhyl Flats – (90MW)Siemens SWT-3.6-12025 o� PCWM3300 inside Nacelle

UK27 - Sheringham Shoal – (316,8MW)Siemens SWT-3.6-12088 o� PCWM3300 inside Nacelle

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

WWW.PALFINGERMARINE.COM

Wind Farms equipped with PALFINGER WIND cranes

Other existing Wind Farms

Wind Farms in development

15

1

5

14

7819

2328

17

29

24

13

15

1621

20

22

12

624

25

103

18

27269

11

WIND FARMS EQUIPPED WITH PALFINGER WIND CRANES

UK46 - Beatrice Demonstration – (10MW)Senvion 5M2 o� PK40002MD inside Nacelle

DE01 - Alpha Ventus - (60MW)AREVA M5000-1166 o� PK10000MB inside Nacelle6 o� PS15500-5 on PlatformSenvion 5M6 o� PK40002MD inside Nacelle6 o� PSM580-12 on Platform

BE01 - Thornton Bank Phase I – (30MW)Senvion 5M6 o� PK40002MD inside Nacelle6 o� PSM580-8 on Platform

DE27 - Borkum Phase 1 – (200MW)AREVA M5000-11622 o� PK10000MB inside Nacelle18 o� PK11001MB inside Nacelle40 o� PS15500-5 on Platform40 o� SCM2,5kN-2,6m on Platform

UK17 - Ormonde – (150MW)Senvion 5M30 o� PK40002MD inside Nacelle30 o� PSM400-10 on Platform1 o� PSM400-10 on Substation

UK62 - Galloper Wind Farm – (504MW)1 o� PSM1200-20 on Substation

UK31 - Walney Phase 1 – (183,6MW)Siemens SWT-3.6-12051 o� PCWM3300 inside Nacelle2 o� PK90002MG on Substation2 o� PK23500MD on Substation

UK32 - Walney Phase 2 – (183,6MW)Siemens SWT-3.6-12051 o� PCWM3300 inside Nacelle

UK13 - Lincs – (270MW)Siemens SWT-3.6-1201 o� PSM1200-18 on Substation

BE09 - Thornton Bank Phase II – (184,5MW)Senvion 6M30 o� PK40002MD inside Nacelle30 o� PSM400-10 on Platform1 o� PSM900-11 on Substation

BE10 - Thornton Bank Phase III – (110,7MW)Senvion 6M18 o� PK40002MD inside Nacelle18 o� PSM400-10 on Platform

DK13 - Anholt – (399,6MW)Siemens SWT-3.6-120111 o� SCM10-2,7SX on Platform

DE09 - Global Tech I – (400MW)AREVA M5000-11680 o� PK11001MB inside Nacelle80 o� PS15500-5 on Platform80 o� SCM2,5kN-3,1 on Platform

UK1E - Fife Energy Park – (7MW)Samsung S7.0-1711 o� PK40002MD inside Nacelle1 o� PSM1200-8 on Platform

DE02 - DanTysk – (288MW)Siemens SWT-3.6-12080 o� SCT10-1,3t – 5,0 on Platform

DE07 - Meerwind Ost/Süd – (288MW)Siemens SWT-3.6-12080 o� SCM20-2,3SX on Platform

UK10 - Humber Gateway – (219MW)V112-3.0 MW Vestas2 o� SCM10-2,6SX on Substation1 o� SCM20-2,3SX on Substation1 o� SCM14-3,5L on Substation

BE02 - Northwind – (216MW)V112-3.0 MW Vestas1 o� PSM900-16 on Substation

UK33 - West of Duddon Sands – (389MW)Siemens SWT-3.6-1201 o� PFM3500D on Substation1 o� PTM600-20 on Quayside

DE52 - EnBW Baltic 2 – (288MW)Siemens SWT-3.6-12080 o� PS23500-5 on Platform

DE06 - Nordsee Ost – (295,2MW)Senvion 6M48 o� PK40002MD inside Nacelle48 o� PSM400-10 on Platform48 o� SCMT 3kN-6,0 on Platform1 o� PSM1800-20 on Substation

DK15 - Avedøre Holme – (10,8MW)Siemens SWT-3.6-1203 o� PCWM3300 inside Nacelle

UK02 - Burbo Bank – (90MW)Siemens SWT-3.6-12025 o� PCWM3300 inside Nacelle

UK05 - Greater Gabbard – (504MW)Siemens SWT-3.6-120140 o� PCWM3300 inside Nacelle

UK07 - Gunfleet Sands I + II – (172,8MW)Siemens SWT-3.6-12048 o� PCWM3300 inside Nacelle

UK11 - Inner Dowsing – (97,2MW)Siemens SWT-3.6-12027 o� PCWM3300 inside Nacelle

UK15 - Lynn – (97,2MW)Siemens SWT-3.6-12027 o� PCWM3300 inside Nacelle

UK19 - Rhyl Flats – (90MW)Siemens SWT-3.6-12025 o� PCWM3300 inside Nacelle

UK27 - Sheringham Shoal – (316,8MW)Siemens SWT-3.6-12088 o� PCWM3300 inside Nacelle

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

WWW.PALFINGERMARINE.COM

Wind Farms equipped with PALFINGER WIND cranes

Other existing Wind Farms

Wind Farms in development

KP-

WIN

DM

2+E

/ E 0

8 / 1

4, K

08

/ 14,

D 0

8 / 1

4

We reserve the right to change design and specification without prior notice. Applications shown in the leaflet do not always correspond to the standard specifications. Country-specific regulations must be considered for the crane installation. Dimensions may vary. Subject to technical changes, errors and translation mistakes.

WWW.PALFINGERMARINE.COM

Palfinger Marine- und Beteiligungs-GmbHF.-W.-Scherer-Straße 24 | 5020 SalzburgAustria

T +43 662 [email protected]