23

Pak Mun Dam Report on Case study

  • Upload
    zihna

  • View
    49

  • Download
    0

Embed Size (px)

DESCRIPTION

Pak Mun Dam Report on Case study. Group 1 Nittana Southiseng Nguyen Nhan Tuan Nguyen Duc Thien Siriparn Phongphaew Oulavanh Sinsamphanh Hang Leakhna. Layout. Introduction Objectives and expected outcomes Methodologies Finding and analysis Conclusions and recommendations References. - PowerPoint PPT Presentation

Citation preview

Page 1: Pak Mun Dam  Report on Case study
Page 2: Pak Mun Dam  Report on Case study

Introduction Objectives and expected outcomes Methodologies Finding and analysis Conclusions and recommendations References

Page 3: Pak Mun Dam  Report on Case study

Sources: EGAT

Page 4: Pak Mun Dam  Report on Case study
Page 5: Pak Mun Dam  Report on Case study

Location: On Mun RiverLocation: On Mun River- 5.5Km upstream from Confluence of 5.5Km upstream from Confluence of

Mekong RiverMekong River- Time of construction: 1990-1994 Time of construction: 1990-1994 - Effective capacity: 76MWEffective capacity: 76MW- Operation procedure: 8 months in a year Operation procedure: 8 months in a year

or according to steer committeesor according to steer committees- The last dam built in ThailandThe last dam built in Thailand

Page 6: Pak Mun Dam  Report on Case study

To understand the PMD project

To identify the stakeholders

To determine the impacts of PMD

To compare situation before and after the project

To provide recommendations in improving the water resource management in the communities

Page 7: Pak Mun Dam  Report on Case study

Data collection Literature reviews

Observation Interview Applying Rural Participation Approach tools

Village map Seasonal calendar Trend analysis Problem ranking

Reporting Presentation

Page 8: Pak Mun Dam  Report on Case study

Village map Seasonal calendar Trend analysis Stakeholders analysis Problems ranking

Page 9: Pak Mun Dam  Report on Case study
Page 10: Pak Mun Dam  Report on Case study

Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec

Fisheries

On-Farm

Can find Most No fishery

1st crop of rice

2nd crop of rice

PMD Open

Shrimp

- Irrigation system: 70Baht/hour (about 1,000 annually/2-3 ha )- Yearly income from rice is about 14,000baht yearly

Page 11: Pak Mun Dam  Report on Case study
Page 12: Pak Mun Dam  Report on Case study

Variables Great (10-8)

Medium (7-5)

Little (4-1)

No (0) Ranking

Agriculture WQ 0 6

Consumption WQ

9 2

Bank erosion 1 5

Fish varieties 6.5 3

Shrimp varieties 0 6

Water quantity Flooding

0 6

Water quantity Agriculture/ fisheries

0 6

Water flow 4 4

Income (closed dam – 8 months)

0 6

Income (opened dam – 4 months)

10 1

Page 13: Pak Mun Dam  Report on Case study

$B

Page 14: Pak Mun Dam  Report on Case study

People in the affected area are seemed to be happy with support from the government of Thailand via EGAT

The villagers formerly fishermen are now have increased income from the other off-farm sources

This case study has showed the real meaningful of stakeholder participations

More than 10 years after the dam construction, there is a huge change in local villagers’ livelihoods

Page 15: Pak Mun Dam  Report on Case study

Recommendations from the villagers Improve infrastructure condition

Health centers, hospitals, temples, roads Want EGAT to continue developing community

EGAT Buy shrimp and fish e.g. More development of irrigation in the

community Provide the supports for cultural conservation Develop tourism activites in PMD area Want EGAT supporting them to have cows or

buffalos Provide them jobs

Page 16: Pak Mun Dam  Report on Case study

Some other recommendations Actively promote the PMD area for sustainable

tourism Duty-free shop, locally stay with villagers Other activities to conserve environment

resources and environmental friendly life

Page 17: Pak Mun Dam  Report on Case study
Page 18: Pak Mun Dam  Report on Case study
Page 19: Pak Mun Dam  Report on Case study
Page 20: Pak Mun Dam  Report on Case study
Page 21: Pak Mun Dam  Report on Case study
Page 22: Pak Mun Dam  Report on Case study
Page 23: Pak Mun Dam  Report on Case study