Social Monitoring Report Bi-annual Social Monitoring Report July 2014
PAK: MFF – Power Distribution Enhancement
Investment Program (Tranche 2)
Prepared by Hyderabad Electric Supply Company, Sindh for the Asian Development Bank.
NOTES
(i) The fiscal year (FY) of the Government of the Islamic Republic of Pakistan and its agencies ends on 30 June.
(ii) In this report “$” refer to US dollars. This social monitoring report is a document of the Borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
ADB Pakistan Power Distribution Enhancement Investment Program Tranche-11 Environment & Social Safeguard, PMU HESCO
HYDERABAD ELECTRIC POWER SUPPLY COMPANY LTD (HESCO)
HESCO it ifsoror hlt 11APPA
SOCIAL SAFEGUARD MONITORING REPORT For the Period: Jan - June, 2014
Project Number: 2727 - PK, Tranche - II
[Jan - June 2014]
Islamic Republic of Pakistan
Power Distribution Enhancement Investment Project
(PDEIP) - Tranche - II
Multi - Tranche Financing Facility (MFF)
Financed by the ASIAN DEVELOPMENT BANK
Prepared By:
(Mr. Asif Sheeraz /Mr. Sulman)
Environment & Social Safeguards Section - Project Management Unit
Office of the Chief Engineer (Development)
HYDERABAD ELECTRIC SUPPLY COMPANY (HESCO),
Bungalow No.A-1 HESCO Power Wing Colony
Hussainabad Hyderabad.
Ph. No. 022-9260070
Fax No.022-9260 525
E-mail: [email protected]
www.hesco.gov.pk
1
ADB Pakistan Power Distribution Enhancement Investment Program Tranche-Il Environment & Social Safeguard, PMU HESCO
Table of Contents
Abbreviations 3
1. Introduction of the Company 4
1.1. About Project Management Unit (PMU) 4
2. Brief Detail of the Project 4
2.1-Objectives of the Project 5
2.2-Scope Of Work 5
3. Findings/ Observations of visited Project Sites 6
3.1 New 132kV Jacobabad II Grid Station Site and Transmission Line 6
3.2 Conversion of 66 kV to 132kV Sukkur Grid Station and Allied Transmission Line 7
3.3 Conversion of 66 kV to 132 kV Larkana Grid Station and Allied Transmission Line 7
3.4 Conversion of 66 kV to 132 kV Talhar Grid Station and allied Transmission Line 8
3.5 Second circuit Stringing of Shikarpur- Larkana 132 kV T/L 8
3.6 Second circuit Stringing of Sanghar-Kandiari-MirpurKhas 132 kV T/L 9
3.7 Construction of Dadu-Meher-Larkana 132kV DC T/L (New) Transmission Line 9
4. Compensation Status 10
5. Social Safeguard Work Status 13
6. Social Safeguard Awareness and Training. 14
7. Conclusion 14
8. AnnexureA : HESCO Internal Monitoring 15
9. Annexure B : Reporting to the E&SS by the Contractor. 19
10. Annexure C: Land acquisition documents of Jacobabad II Grid Station 26
11. Annexure D: Compensation Payments: Details of feed for Talhar Grid Station 36
12. Annexure E: Compensation Payments Details of feed for Jacobabad II Grid Station 39
13. Annexure F: Compensation Payments of 132 kV Arain Road- Sukkur City Transmission Line 40
Annexure G: GRIEVANCE REDRESSAL MECHANISM 41
Annexure H: PICTURES 42
2
ADB Pakistan Power Distribution Enhancement Investment Program Tranche-II Environment & Social Safeguard, PMU UESCO
Abbreviations
ADB Asian Development Bank
AH Affected Household
APs Affected Persons
EMP Environmental Management Plan
ESM Environmental & Social Monitor
E&SS Environment & Social Safeguard
GoP Government of Pakistan
GSC Grid System Construction
HESCO Hyderabad Electric Supply Company
Km Kilometer
kV Kilo-Volt
LARP Land Acquisition and Resettlement Plan
MFF Multi-Tranche Financing Facility
PEPCO Pakistan Electric Power Company
PMU Project Management Unit
RoW Right of Way
SEPCO Sukkur Electric Power Company
T/L Transmission Line
3
ADB Pakistan Power Distribution Enhancement Investment Program Tranche-II Environment & Social Safeguard, PMU HESCO
1. Introduction of the Company
Hyderabad Electric Supply Company Limited; HESCO is a Public Limited Utility
Company, established in 1998 under Companies Ordinance 1984 responsible for
distribution of Electric Power within its territorial jurisdiction and presently serving more
than 0.841 Million customers (Domestic, Commercial, Agricultural, Industrial and others) in
twelve Districts of Sindh Province.
1.1. About Project Management Unit (PMU)
To effectively plan, execute and monitor the Power Distribution Enhancement
Investment Program (Tranche II), a Project Management Unit (PMU) has been established
under General Manager (Development) comprising of five sections i.e. Planning, Scheduling &
Coordination, Procurement, Finance and Environment & Social Safeguard along with the
Project Director (GSC) for physical execution of grid stations and transmission lines.
2. Brief Detail of the Project
Existing conditions of the HESCO power distribution and transmission system are
inadequate to meet rapidly growing demand for electrical power. To cope with this situation,
the existing power infrastructure has to be improved and upgraded. The overall contribution of
power infrastructure requires institutional arrangements, capacity building that support
strategic management of the sector, planning and management of investments.
The basic information/ data about the loan are here as under:-
Loan Number: (ADB TA Loan No. 2727-PAK)
Project Title:- Power Distribution Enhancement Investment Program, Multi-Tranche
Financing Facility PDEPMFF-Tranche-II
Borrower:- GOP/ HESCO
Executing Agency:- PEPCO
Implementing Agency:- HESCO
Location of the Project:- The Sub-Projects under Tranche-II are in Sanghar, Mirpurkhas, Shikarpur,
La rka n a, Sukkur, Badin, Dadu and Jacobabad Districts of Sindh Province.
4
ADB Pakistan Power Distribution Enhancement Investment Program Tranche-Il Environment & Social Safeguard, PMU HESCO
2.1-Objectives of the Project
HESCO through GoP has undergone a Project Financing agreement with
Asian Development Bank for:
1. Strengthening the capacity of Power Distribution and Transmission networks
2. To meet the increasing electricity demand in the selected areas more efficiently
3. To upgrade the existing power infrastructure.
2.2-Scope Of Work
There are 7 Nos. of projects under ADB Tranche-II. Detail is as under:
1. Construction of 01 No. of New 132 kV Grid Station and allied Transmission Line.
2. Conversion of 03 Nos. of Grid Substations from 66kV to 132kV and allied
Transmission Line
3. Second Circuit stringing of 02 Nos. 132 kV Transmission Lines
4. Construction of 01 No. 132 kV Transmission Line
Overall the proposed MFF has been designed to address both investment and
institutional aspects in electric power sector. Development Objectives/ Project
Purpose will be fully achieved after completion of the proposed Sub-projects.
5
ADB Pakistan Power Distribution Enhancement Investment Program Tranche-11 Environment & Social Safeguard, PMU HESCO
3. Findings/ Observations of visited Project Sites
Findings/ Observations noted during the site visit. Its detail is as follows:
3.1 New 132kV Jacobabad II Grid Station Site and Transmission Line
• Land has already been purchased by HESCO for the sub-project. (Sale Deed attached in
Annexure C)
• The foundation, erection and stringing work of the transmission line is completed (5
towers). However the civil works for the grid station is 85 % completed.
• HESCO had purchased 8.3 acres of land from one landowner on voluntary sale bases
against negotiated price for construction of new grid station. The purchase land was a
empty dry patch for no constructive use since 6 years therefore no social impacts were
associated with the construction of grid station.
• However, there were some potential social impacts associated with the construction of
transmission line that passed through private farmland affecting crops. The compensation
payment of foundation work is paid to the affectees while the erection and stringing
compensation cases are going through official procedures. (Annexure E)
• Affected people were informed about the public information material, complaint
register which is placed at the construction site and about the process that how can
they record their complaints (if any) about the project activities. This activity was
performed by holding a meeting with the affected people at the grid station site.
• Complaint regarding the late working of laborers was lodged by the affected person
through complaint register and which was amicably resolved by binding the contractor to
stop the work before the sunset.
• They were provided information pamphlets along with offi ce address
information and telephones of concerned persons for any suggestion/complaint.
(Annexure G)
• During consultation the APs complained about the delay in compensation cases which
was communicated to the Project Director (GSC) SEPCO in the wrap up meeting and he
assured for the timely payments to the APs by 31-08-2014
6
ADD Pakistan Power Distribution Enhancement Investment Program Tranche-II Environment Si Social Safeguard, PMU HESCO
3.2 Conversion of 66 kV to 132kV Sukkur Grid Station and Allied Transmission
Line
• Civil works of the grid station is complete and the grid is energized.
• The conversion works were being carried out totally within the boundary of the existing
grid station without acquiring additional land so there was no potential social impacts
associated with this part of the subproject.
• Transmission Line work is completed by successfully energizing it. The
Transmission line consisted of 12 towers and 30 poles. Out of total 12 towers 8
towers fell in private farmland and the compensation for the foundation work
has been paid, the rest of the 4 towers 30 poles fell in the Government land so
no compensation is required for those. The details are given in chapter 4 and
Annexure F.
• Public consultation meeting carried out with APs and they were mostly concerned about
the delay in the second payment of their due compensation.
• Adjacent communities were informed about the public information material,
complaint register and about the process that how can they record their complaints (if
any) about the project activities by organizing a meeting with them and distributing
pamphlets. (Annexure G)
• The Project Director (GSC) SEPCO was informed about the concerns of the affected people
he assured for the timely payments to the APs by 31-08-2014.
3.3 Conversion of 66 kV to 132 kV Larkana Grid Station and Allied Transmission
Line
• 85 % of Civil works inside the Grid Station has been completed and equipment foundation
works were underway during the monitoring visit.
• 70 % of the Transmission Line work has been completed. There are 12 poles and 3 towers
for the transmission line out of which foundation work for the 12 poles and 1 tower has
been completed and they fall inside the Government Land while the remaining two
towers had right of way issues which are now resolved and these are on the verge of
construction.
• Public consultation meeting carried out with general public, adjacent community to
grid station site and they were informed about the progress of the project.
7
ADB Pakistan Power Distribution Enhancement Investment Program Tranche-TI Environment & Social Safeguard, PMU HESCO
• They were also informed about the public information material complaint register and
about the process that how can they record their complaints (if any) about the project
activities. (Annexure G)
• The community complained about the unattended debris left at some of the poles by
writing a complaint at the complaint register placed at the Grid station site and
subsequently immediate efforts were made by the E&SS Cell , HESCO and the contractor
was asked to remove it which they complied and subsequently removed the debris.
• PD (GSC) SEPCO was informed to pay the compensation payments prior to the foundation of
the remaining two towers to avoid any further delays he assured to pay the compensation by
31-08-2014.
3.4 Conversion of 66 kV to 132 kV Talhar Grid Station and allied Transmission
Line
• Civil works for this subproject has just been 100% complete. The conversion work was
carried out totally within the boundary of the existing grid station without acquiring
additional land so there was no any social issue associated with this aspect.
• The transmission line included 5 towers and foundation, erection and stringing work of all
the towers has been completed alongwith the timely compensation payments to the Aps.
• Post project completion meeting was carried out with APs, they were asked of any
grievance that arose from the sub-project and the community requested to make sure
that compensation payments should be paid without unusual delays in the future projects.
• Overall the community was happy from the future benefits of this sub-project.
3.5 Second circuit Stringing of Shikarpur- Larkana 132 kV T/L
• The civil works have not yet been started and the contract for the material has been awarded
and delivery of the material is awaited.
• The potential social impacts of this subproject will be in the shape of 146.43 ha of crops and
187 trees. 15 structures may also likely be affected by the stringing of conductor activity.
• Public consultation meeting carried out with general public, adjacent community at the
Lodra/Shikarpur Grid Station and they were informed about the expected
commencement o f project activities.
8
ADB Pakistan Power Distribution Enhancement Investment Program Tranche-Il Environment Si Social Safeguard, PMU IIESCO
• They were also informed about the public information material complaint register and
about the process that how can they record their complaints (if any) when the project
activities starts.
• They were provided information pamphlets along- with office address information
and telephones of concerned persons for any suggestion/complaint. (Annexure G)
3.6 Second circuit Stringing of Sanghar-Kandiari-MirpurKhas 132 kV T/L
• The civil works have not yet been started and the contract for the material has been awarded
and delivery of the material is awaited.
• The transmission line will pass through twelve villages and will temporarily affect a total of
112.89 ha of crops and 254 trees. 9 structures will also have some effect in this sub project.
• Public consultation meeting was carried out with general public, adjacent community
at the Kandiari Grid station and they were informed about the project activities.
• They were also informed about the public information material complaint register and
about the process that how can they record their complaints (if any) when the project
activities starts.
• They were provided information pamphlets along with office address information
and telephones of concern persons for any suggestion/complaint. (Annexure G)
3.7 Construction of Dadu-Meher-Larkana 132kV DC T/L (New) Transmission
Line
• Contract for construction of 132 kV Dadu-Meher-Larkana has been awarded to M/s LSN
& SEAN in April 2014.
• The LARP will be updated after the detailed/final transmission line route survey including
public consultations final assessment and estimation of crops/structures likely to be
damaged during the construction phase of this sub-project.
• Necessary environment and social clauses have been added in the relevant
bidding/contract documents for implementation by the contractor.
9
vs ... L n3
E a)
CC
+, C cri,
07-•
_c
co 7:3 cn C L cil C 03
c13 a) _C a
a) __,.
'4 4-, C
C N 0j +-, cu 0 Cl) 0 (13 c "Z:3
E u t/1 0 mc 4-, -t In --, 4-, .,=, -1= n15 0.0 — (1) .7, Cl) al 4
a a) < D C _C Cl) _C -0 CU -o ,, >-- ,,, , >.
_a ---". 4-, cz o 0 U (13
V) • C V)
_C • - ..... -I-, (.9 4-, rO >. .L--) C — -o Q. as 7-) (LI
CCU cu v .11 E o ,5 _a c E n o_ „„ = a,
s
_o u w vl ....,- _c c o V) a] 4_, L., -o ro
woni IP
rinrilm
en
tc frn
m t
he
Tenta
tive
Tim
e S
ch
ed
ule
for
Pa
ym
ent
of
Cro
p
Com
pe
nsa
tion 4-, C b.0 CI 1
C 0 C _0 DO CU • , .47, au
0
E u C_ ,li >.. 0.) •,-: = cr) ca "+-' a CU v) >.
-0 ‘- 7:3 T-I CU ,_ 0 • - _C 0 C ., IL) 0 H 4- (13 a NJ
Oi NJ s-,.... _C u 4-,
0- L CU 4- • C
4-, • .•
(13'- E 4-, CU v s_
4 r0
-C -I-
v, '- s.).d
0 4_,
> 0 cc
-0 (12_
_s_
a./
D ,V,I) . _
CO C 4- +-; o a) 0 v, >
4-, cu a) 0 _o ' o 0 0 in v)
a) a 4-' CI) =
••■.,
CZ CU > V) C
Cl.) I cll
-C 0 c13 c13 _C 0 L-- H 4— 0_ < 0- 4-+ 4.--, (I3
-0 C r0 —I
-0 cu
.4-, ,.._ as 4-, V)
8 4-; CU
Z >
8 4- 13 0 "0 C. '7 C 0 (13 co 4, —I (/)
-0 c CU co ." — =
CT 0 (..) Z < -0
-D c a) a) .'- — 5
CT 0 o Z < -0
(A 13 ,,3
ra o cuV)
°- CC
--6 ° -0- 0.. 5 5 i z ,. cu
-... CC
,--1 N. ,--,
N.
73 OR L.. CI CI- 4-. . cu.'" = o o = a 5 < I- 2 < cu _1
,.,
to cu c
n. 11) V)
_C CU '— in c CU
CU c .— u _C u ...- o
a Ca s...
U a
in <V >-
"0 04 4, 0 cc G.)
,-, ac
cu _, cu a CC V)
o 4-,
c c° (2., 0 vl <
> > _CI o ,... a 0_ -0 < cU
co 0 <
4,, u (1)
-CI CD C m ._, ,,, •o ca
et- z
C > V) NJ CID . _ 0 Y (..9 rY) C vi • 7, L.0 L-I 0 cc' . s- L0 ,_ (13 E Cl) n v) > _c C C 0 -I-, (13 0 4- = -',- > • .....- l_.
U 0 V1 . :7- 5 H
(I) c
C 0
C > 0 Y • ,.-7, Lo
,._ L..0 a)
C
0 4-
(-) 0
v) (.7
n:5 C n3
03
—)
IN M r-I
0
4-' .
S-
0.0 C 0
TIZI
>
..c
. -
. - v) ,.r, • — E Ln C
H
ci tn z
,--1 (-NI
ron
men
t &
So
cia
l S
afe
gu
ard
, P
MU
HE
SC
O
AD
B Pa
kis
tan
Po
wer
Dis
trib
uti
on E
nh
an
cem
en
t In
vest
men
t P
rog
ram
Tra
nche
-Il E
n
Com
pen
sati
on
Sta
tus
O
No c
ase
pe
nd
ing
.
Deta
iled
Su
rvey is in
pro
cess.
ad cu ad • _c CO c C 4-, CO 4., 0
..C. co V)
ui C cu c ad 4-,
U o a
cu 'e_. E — 4-.= w (1 o < < 0. O. U
vl _....- = 0 (1) co ‘-? c ..,— U -C cu c) 5 c
-0 47, -0 0 0 a)
co cti v% il...) c c-) 4-, VI 4, ..,
C c -, :10 — 0 C U .— CU n^.1 a3 Cll cu CO • 4 ' 1- 4-, C °- E aS ci—u ' E
71 u E c a) E >. >-. ad 0 ad 0 ca ad cU -C x 0 U 0 u O. _0 _0 0_ ad u
>. aJ lil
o_ E 73 0 ' FS
(...) 0-
a) t (O 4-, V)
4-, 4-, a) Z > ,
-0 C a) (3:3 .'-- - 0 0 a- Z < "O
"0 -0 c a) (13 .s-
•5 - 0 o
Z Z 1-
0 •rt
0 C vl
0- Cl3 u
CL MI 0 <0- J = C CI-
til
Lr, cu >-
0 Z
0 4-,
-I-, ,4,e) C '""
0 ccu r) <
a) c =A
C 0
C > NNton 0 Y CD rn c ,7, o s- Lo (a a.) > CO C .0 o o )4- 76 4 - ',_ > u o 1 — . '= -)c
_c : 5. . 5
._. v,
E , c 12
I—
. v, a...) — • _1 a 0
r,..1 —1 1,7-, 0 rn --- c., z c0 ,-I /— c U ...._
4-, C -- V) cts ,-"' -0 c Cs
0 c a , , r ti > U 0 --p .e 0 .7.0.
m .1.
AD
B Pakis
tan P
ow
er D
istr
ibuti
on
Enhancem
ent
Investm
ent
Pro
gra
m T
ran
che-1
1 E
nviro
nm
ent
& S
ocia
l S
afe
gu
ard
, P
MU
HE
SC
O
The tra
nsm
issio
n
lin
e is c
om
ple
te
but the d
ela
y in
la
st p
aym
ent
is s
till
the
re a
nd PD
(
GS
C) S
EP
CO
ha
s
assu
red
to
w
ind up t
he
co
mp
ens
ati
on p
aym
ents
b
y 3
1-0
8-
2014.
-i -1-, 0 (I) 4- ..".-, 0 0
.47,
._ cu (1)
to , D -I-, c ..:4'. . . r.' -0 -0 , CU
‘-' (3)_c _c u
< La C4= 4-, V)
C
as (A c 0-
_ (- 0 c L- o U U
(1.I
-o 0 - 0)
0 •
4-, oi D 0 ,_, E b CO C
> =
CU
o
Gi = -0
CU b.0 2 in
----• -0 (....) G.)
cn co
0 (....)
,_, a. I-I Lu CL v)
-.. 0 U 4-,
tn 4-, E L,2, (1) CI-
>, E a ,_ >- a, Q) CCS _c > 0_ .1,
-o a..) o ate' v) C D
(13" L13 4-, VI (1)
_o
4-, 0
4-,
Z >. 4E)
(1.) E CU u C a,
E 8
•
,.., "
s>' ' o
-0 CU CU v' 4-, CCI" 3 4-, VI CU
_0
0 t
Z >
0 C
,_,_
0
(LI E 0.) u _..Y
L- C 0 CU > ' 4-
E c) 0 -1-'' ,..., C
s- 0 0
.47, 4-
(13 L,1 E
CL E 0 U C
CU
Lil a' 4-, •in -- — L'I .
C ..E n:3
0 ''''
117, 4-,
C OA
-0 a) c
c -0 E 'ca D • - a, >- c 0 ,,3 c ,-,:, a-, 4_ 0._ ., 12 0
-a c cu C6 .‘- — D
- 0 u z < -0
-o c a) n3 '- _ • -
D Cr
o u Z < -0
c cu 0_ E E ° ....-:, ° (13 L.) (n
0 •■:1-
-o c CO
lao 9 ,- s_ s_
. _ CU v> - -0 - a) ,_ • - = o'5 ru N c cu 4- 0- > v) co _o _o
liD N al s-I
NI CT M c-I
Cr c--1 NI
CO x-I Ill
0 Z
0 Z
vl W >
0 4-,
4-' 1:12I C cu 0 v") <
0 4-,
4-' CO C (zu 0 v) <
>- > -0 0
- a-0 < W
CIO
CI <
4_, . ET0
O c ,--) E ' E 0..) • - -La V) U V)
4- 0
no _.• . _ -C tz)
_i
co -•• .__ s_ NJ
(-13 CY) --J ,H
-0 E • o a u U (3.) . "
Lc) U
CIO c • E
ii.) 4- o
, • i-:
_C • - to -0 C C (7 CU
t . r )
NJ M -i
o_ v., ----- 1- (13 H
_0 >
n
>
NJ Cry 0..I
, - 1 z
-o -0 CI3 c _0 n3
-0 7° 0 -o -o ° 5. .4'7' C (3) U ‘j 0.3 (I3 =
m - -I ell -1 ::"-t
.- v,
E (A C (1]
I- =
0-) c
.... C
o
Lil Lc. 1--,
AD
B P
akis
tan P
ow
er
Dis
trib
uti
on E
nh
an
ce
me
nt
Inve
stm
en
t P
rog
ram
Tra
nc
hc
-11 E
nvi
ron
me
nt
& S
ocia
l S
afe
guard
, PM
U H
ES
CO
ADD Pakistan Power Distribution Enhancement Investment Program Tranche-II Environment & Social Safeguard, PMU HESCO
5. Social Safeguard Work Status
Land Acquisition and Resettlement Plans (CARP):
(i) All LARPs and DDR Reports in respect of HESCO sub-projects under Tranche-II (both in
English & Urdu versions) have been translated, typed/edited and uploaded/ displayed on
HESCO official websites. (www.hesco.gov.pk) and at each sub-project site.
(ii) Summary of LARPs after translation into Urdu has been sent through mail to the all
Affected Persons.
(iii) These LARPs of subprojects have been revised/updated on actual basis for Tranche-
II in respect HESCO and same have been submitted to the Asian Development Bank for
approval.
(iv) Regular monitoring is being conducted of Grid and Transmission Lines by E&SS Cell
(Annexure A).
(v) Regular meetings with ESM are held to reach out to the problems at site and fortnightly
monitoring sheets are required of them.( Annexure B)
(vi) Urdu version of Environmental Management Plan (EMP) after translation has been
provided to Contractors and is placed at each grid site and HESCO Website.
(vii) Proper compensation on account of loss of crops/ trees on actual basis is being paid
to the affected persons/ households.
(viii) Environmental & Social Complaint Register is made available on each active project
site to record complaints of affected household / persons at each project site.
(ix) Grievance redressal committee has been constituted and documented procedure for
grievance redressal is functional.
13
ADB Pakistan Power Distribution Enhancement Investment Program Tranche-11 Environment & Social Safeguard, PMI1 HESCO
6-Social Safeguard Awareness and Training.
For capacity building, HESCO arranged a number of trainings for different cadres / staff of GSC
Directorate, who are responsible for supervision of development projects. On site/ on job
trainings were also arranged during the site visits regarding environmental issues, social
issues, housekeeping, communicable diseases especially Dengue, Malaria, Airborne,
Waterborne diseases & drugs, defensive driving, site restoration after the work and overall
implementation of the Environmental Management Plan (EMP) of the Tranche-II sub-projects.
7-Conclusion
Timely compensation payment is the most outstanding issue in all the bi annual monitoring
reports. As of June 2014, implementation of compensation is fulfilled at the Talhar
Transmission Line sub-project which is in the HESCO Jurisdiction while the remaining
subprojects at the SEPCO jurisdiction are quite late in disbursing the last compensation to
the affected Persons.
The wrap up meeting held with the Project Director SEPCO revolved around the delay in
compensation payments and updated data submission to the PMU on regular basis. PD GSC
SEPCO again confirmed that all the remaining compensation issues will be resolved with two
months.
14
In
2 \ \ \
\ VES 1
\ 0 \
\ \
\ Compensation being paid for damaged crops, trees and structure
In case of the b lockage of the existing routes, alternate routes will be identified in
consultation with affected communities
Bypass routes will be identified, if required, especially those fequented by women folk,
such as route to the local well or water source. 1)
Construction crew will avoid entering villages and settlements.
2)
Local norms and practices will be respected
3)
No child labor will be employed at sites
In case of discovery of any sites or artifacts of historical, cultural, a rcheological or
religious significance, the work will be stopped at that site. The provincial and federal
archeological departments will be notified immediately , and their advice will be
sought before resupmtion of the construction activities at such sites.
First Aid Box must be present at site.
IPPEs ( Personal Protective Equipments) should be provided at site.
The construction crew will be provided will LPG as cooking (and heating, if required)
fuel. Use of fuel wood will not be a llowed.
1Availabilty of Fire extinguisher at site.
The communities near the transmission line routes will be informed a bout the
construction activities. Protective fencing will be installed where required.
1Complaint Registers to be maintained at the project site.
Any indigenous Population
Any Women headed household
1Appointment of Environmental & Social Inspector
iPayment of Compensation
,
ILoss of Agriculture
Blocked Access
Gender Issues
!Social Issues
Sites of Historical, Cultural,
Archeological or Religious
Significance
Health, Safety & Environment
IPublic Grievances
Indigenous Population _ I Women headed household
,
Ei,
Compensati&T—g
N
m e
l
ADE Pakistan Power Distribution Enhancement Investment Program Tranche-II Environment & Social Safeguard, PMU HESCO
AnnexureA : HESCO Interna l Monitoring
Date 26 - 06 - 2014
Date 2 4-06- ..01L.1 O
3
0
N a
o 3
1
ADB Pakistan Power Distribution Enhancement Investment Program Tranche-II Environment & Social Safeguard, PMU HESCO
C. a)
ov C
co U
C C
ao C
0 O
a a
3
1y"
13 a)
7:3 5 O a a) _a
3
-0
O
To
_ow
O C
3 3 lc 0.) 0 s- 0
C O al
U 4.4 • so-
0 IA 5) C 0
Tij _c
4-•
a) U C ra
C :4=
He
alth
, Saf
ety
& Env
ironm
ent
C 0 ro ro C a) a. E O U
0
C
E >- a
C 0
fa C a) a. E O U
Date
?-
za_.2
0//
f
Sub-P
roje
ct-
0 z
4,
a) E a)
C
a) OD (a
OD C
4S)
a)
0
ro
3
a) b C 0 U
In 0 U
Soc
ial
Issue
s
-o a) U a) a
a) .0
3 to•■
a) U
7.5
a
C et,
E O C
U 0 -J
1a),CA
0 a)
0 o. E 0) a) _o 3
co
0
O
kr,
C ro
aa))
T.
In a 2
0 a) oa
E fa 0
O
7 a as a)
C 0
a E O U
_o
ro
Lo
ss of A
gri
cultu
re
C
O 47: C
:0 CI)
In
a)
.0
2 a) to C `ar,
a)
O 41)
• v
■
ao C
• E • E C
o
C5 W 0) oa • ro
o §-
a) _c c 4-, 0
O co
03 V) • C
C
In
Blo
cked
Acc
ess
Gend
er
Issu
es
ei N m
ai
co
a) _c • - 00 C
X 0.1
CIE
0
>•• 4-,
:5
a, _c
.5 0 w
-0 a) L..
a,
E 8 aJ
..c .5_ 3
0) -o
3
if;
•--
O
67
O trt
_c
a;
U
.9_ a
ro U aJ C
C fa
E a)
O
a) 00
a)
C "ri a E O U
Pub
lic G
rie
van
ces
C 0
co
a O a. v't
0 C
ao C
•
0
0 a
0 C
ao C
0 -C a)
O .c 13 a)
433 .0 C a) E O
U
a
0
02$
To C a) E C O
'5 C
1.1)
O
C
E 4e-'
0 a a
1-4 r1'sco 0)
0
AD
B Pak
ista
n P
ow
er
Dis
trib
uti
on E
nhancem
en
t In
vest
ment
Pro
gra
m T
ran
ch
e-I
l En
vir
on
ment
& S
ocia
l S
afe
guard
, P
MU
HE
SC
O
(SO
to
N
M et
ct
C. c
o
CI
rl
O YES
\
\ \
\ \I
\\
Compensation being paid for damaged crops, trees and structure
In case of the blockage of the existing routes, a lternate routes will be identified in
consultation with affected communities
Bypass routes will be identified, if required, especially those fequented by women folk,
such as route to the local well or water source.
1) Construction crew will avoid entering villages and settlements. 2)
Local norms and practices will be respected
3)
No child labor will be employed at sites
In case of discovery of any s ites or artifacts of historical, cultural, a rcheological or
religious significance, the work will be stopped at that site. The provincial and federal
archeological departments will be notified immediately, and their advice will be
sought before resupmtion of the construction activities at such sites.
First Aid Box must be present at site.
!Ws ( Personal Protective Equipments) should be provided at site.
The construction crew will be provided will LPG as cooking (and heating, if required)
fuel. Use of fuel wood will not be a llowed.
lAvailabilty of Fire extinguisher at site.
The communities near the transmission line routes will be informed about the
construction activities. Protective fencing will be installed where required.
Complaint Registers to be maintained at the project site.
Any indigenous Population
Any Women headed household
Appointment of Environmental & Social Inspector
Payment of Compensation
ILoss of Agriculture
Blocked Access
Gender Issues
VI
Ci) Z
V
I V
I
0
CA
V
Sites of Historical, Cultur
Archeological or Religiou,
Significance
CO
Health, Safety & Envirom
I Public Grievances
Indigenous Population _
Women headed househc
IESI
Compensation
Date .2 L( -06-2.e/
ADB Pakistan Power Distribution Enhancement Investment Program Tranche-11 Environment & Social Safeguard, PMU HESCO
Sub-Project:-
ADB Pakistan Power Distribution Enhancement Investment Program Tranche-II Environment & Social Safeguard, PMU HESCO
Annexure B : Reporting to the E&SS by the Contractor.
Social Monitoring check list for contractors.
Project title: 66 KV Grid Station
Project location:
Name of contractor: Siemens
Date: 25.06.2014
Jacobabad
Questions
1-Was the community informed about the detailed
events during the construction of grid station/transmission
line?
✓
Yes No
2-How was the community informed? By arranging meetings
3-Is the Grievance Redressal Mechanism distributed in the community and pasted at the sub-
project site? Yes
4-Is there any document available at the Project Site showing the overall scope of work like LARP
and LARF? Yes
5- How many Towers have been laid the foundation, erected and stringing completed?
FOUNDATION 5 ERECTION STRINGING
5 5 5
6-Is payment the compensation to the affected Household affected)? (tower started
If yes then how many tower affectees have been paid? Yes, foundation payment is paid.
7-Is the labor instructed to keep the local norms and traditions while entering villages and other
community places? Yes
8-Did the Sub-project involve community labour or hired labour from outside? Yes
9-Was child labour involved? No
10-Additional comments (if any)? No any
19
ADD Pakistan Power Distribution Enhancement Investment Program Tranche-II Environment & Social Safeguard, PMU IIESCO
Social Monitoring Check List for Contractors.
Project title: Conversion of 66KV Grid station into 132KV Date: 26-06-2014
Project location: SUKKUR
Name of contractor: Siemens
Questions
1-Was the community informed about the detailed
events during the construction of grid station/transmission
line? Yes
2-How was the community informed? By Distributing the pamphlets
3-Is the Grievance Redressal Mechanism distributed in the community and pasted at the sub-
project site? Yes, disrtibuted
4-Is there any document available at the Project Site showing the overall scope of work like LARP
and LARF? Yes
5- How many Towers have been laid the foundation, erected and stringing completed?
FOUNDATION =41 ERECTION =41 STRINGING =41
6-Is the compensation payment started to the affected Household (tower affected)?
If yes then how many tower affectees have been paid? Foundation payment is completed.
7-Is the labor instructed to keep the local norms and traditions while entering villages and other
community places? Yes
8-Did the Sub-project involve community labour or hired labour from outside? Community as
well from outside Yes 9-Was child labour involved? No one
10-Additional comments (if any)? Nill
20
ADB Pakistan Power Distribution Enhancement Investment Program Tranche-Il Environment & Social Safeguard, PMU HESCO
Social Monitoring Check List for Contractors.
Project title: Conversion of 66KV Grid station into 132KV Date: 26-06-2014
Project location: Talhar
Name of contractor: Siemens
Questions
1-Was the community informed about the detailed
events during the construction of grid station/transmission
line? Yes
2-How was the community informed? By Distributing the pamphlets
3-Is the Grievance Redressal Mechanism distributed in the community and pasted at the sub-
project site? Yes, disrtibuted
4-Is there any document available at the Project Site showing the overall scope of work like LARP
and LARF? Yes
5- How many Towers have been laid the foundation, erected and stringing completed?
FOUNDATION =5 ERECTION =5 STRINGING =5
6-Is the compensation payment started to the affected Household (tower affected)?
If yes then how many tower affectees have been paid? Compensation payment completed
7-Is the labor instructed to keep the local norms and traditions while entering villages and other
8-Did the Sub-project involve community labour or hired labour from outside? Community as
well from outside Yes 9-Was child labour involved? No one
10-Additional comments (if any)? Nill
21
ADB Pakistan Power Distribution Enhancement Investment Program Tranche-❑ Environment & Social Safeguard, PMU HESCO
Social Monitoring check list for contractors.
Project title: Conversion of 66KV Grid station into 132KV Date: 25-06-2014
Project location: LARKANA
Name of contractor: Siemens
Questions
1-Was the community informed about the detailed
events during the construction of grid station/transmission
line? Yes
2-How was the community informed? By Distributing the pamphlets
3-Is the Grievance Redressal Mechanism distributed in the community and pasted at the sub-
project site? Yes, disrtibuted
4-Is there any document available at the Project Site showing the overall scope of work like LARP
and LARF? Yes
5- How many Towers have been laid the foundation, erected and stringing completed?
FOUNDATION =13 ERECTION =13 STRINGING =0
6-Is the compensation payment started to the affected Household (tower affected)?
If yes then how many tower affectees have been paid? No compensation payment started
7-Is the labor instructed to keep the local norms and traditions while entering villages and other
community places? Yes
8-Did the Sub-project involve community labour or hired labour from outside? Community as
well from outside Yes 9-Was child labour involved? No one
10-Additional comments (if any)? Nill
22
Pu b lic consu ltat ion for ADB su b proje cts
Date of consultation: 19.06.2014
Action ta ken/
Proposed
P D GSC SEPCO
informed
Proposed
measures
Informed to HESCO
F
Z
r=
z
E
z
r=
z
Location: Jacobabad
Issue Ra ised/
concerns expressed
suggestions & Request
Compensation delay
Z
z
z
z
Participants
Profession
Land lord
La nd lord
Landlord
Farmer
Shopkeeper
Name of sub project: 66 KV Grid Station
Address/
Location
Jacoba bad
Jacoba bad
"0
to
(13 _0 0
U
co —
,
Jacoba bad
73
n3
40
(13 _0 0
U
ro —
,
Name of
Name of pa rticipants
Ali Dost Golato
Za heer Ali
Ahmed Nawaz
Fateh Muhamma d
Ahsan A li
0
tn Z
c-I
(NI
m
'71' in
ADB Pakistan Power Distribution Enhancement Investment Program Tranche-II Environment & Socia l Safeguard, PNIU HESE@
Pu blic consu lta t ion for ADB su b projects
Proposed measures sugestions & Request Profession Location
Name of
participants
<
----- Z
<
----, z
<
"..... z
<
*----- z
<
--■
z
<
*---, z
<
'---. z
<
-,
Z
<
-,
z
<
..., z
<
-,
z
<
..., z
<
..., z
<
--..„ z
A
NO COM PLAIN
NO ANY COMPLAINT
NO SUGG ESTION/ COMPL
NO COMPLAIN
NO COMPLAI N
NO COM PLA N
NO COMPLAIN
STUDENT
SHOPKEEPER
STUDENT
HOUSE WIF E
SWEE PER
STUDENT
STUDENT
Name of sub project: cony: 66kv in to 132kv G.S
LARKANA
LARKA NA
LARKANA
LARKANA
LARKANA
LARKANA
LARKANA
Sha hi d
Sameer
Suheb
Masooma
D
z
<
7
E
0
c2
Mola Bux
$. N
Z
N
C
r) V
U
l V
D
r---
ADB Pakistan Power Distribution Enhancement Investment Program Tranche-II Environment & Social Safeguard, PMU HESCO
Date of consultation: 19-06-2014
Proposed
Issue Raised/ concerns
expressed Participants Address/
Public consultation proforma for ADB sub projects
Date of consu ltation: 19.06.2014
Action taken/
Proposed
Proposed
measures
Location: Talhar
Issue Ra ised/
concerns expressed
Suggestions & Request
No Issue & no compla in
Participants
Profession
shopkeeper
c
0
G) ..
c
0
0
o_
Shopkeeper
Shopkeeper
Name of sub project: 132 kv Grid station Talhar
Address/
Location
Ta lha r
Talhar
,_ co _c To I—
Ta lhar
Ta lha r
Name of
Name of participants
ear) Ahmed
M.Akram
To To
M. Shar i f
K hadim
1_ 0
tn Z
`—
' (N
C
O
d'
It)
ADB Pakistan Power Distribution Enhancement Investment Program Tranche-II Environment & Social Safeguard, PMU HESCO
Zanier .!-,tit)-Rdeyt
facobahad .:ub Rix* S.A. I 1• :
1r0
Sub-Regis acob ~bad
.....- Irtdi"---7 .....,_ ,,,,,,,,,,, oly ,-----w, T------7---
:.,, tw 0,4 . iw ,,,t ; #57. 4, • ,47;
--------- --.''.1.:.--:''' ---- .4:
Z. ''"?'+■'! ;6: ‘.:,.: ,.•:!•... --',..---.,1.:
ar N A, K::
.....20 liv...-
.,...4
t'At%1glt s t'~ ..fth
/7. 41-
Abiatze A-Area- 2ye, "T. 141, ,,Ttw r-fese e •
jc.45 {4-s C CAP- 414, • Arroi
Note Ur ntQf_eeit.p.-400/ -
<
four hun orrty, recovered
No:... „Dated
(-)
8. Ise! • e'-'1 -7 I Received Foca as under
let receipt N4,- 1 r
Presented In the Officio of Registration fee
• ' , reorro,or, fee . .bet the boor. of,
Note Urgent fee Re: 40001* .--Tour tarn dere l ,* 1 ,17 referrers",
time St) h-I tegieti er oobaba4 Copying fee.
• _pier ing fee..
e ::ittg
t..1 ......
ADD Pakistan Power Distribution Enhancement Investment Program Tranche-II Environment & Social Safeguard, PMU HESCO
Annexure C: Land acquisition documents of Jacobabad II Grid Station.
PAKISTAN
rtooi,if • vn . ........
10,000 R S
THIS INDENTURE made on this2,14 day of December 201)9
between Amiruddin s/o Ali Nawaz Golato, adult, muslim, (CNIC No. 43102-6790539-
l), resident of God' All Nawaz Khan Oolato, Taluka and District Jacobabad, hereinafter
together with his heirs, successors-in-interest and assigns, where the context so required
called the VENDOR of the one part: A N D
Caned ( n IVO 2
26
Contd on p/3.
• PAKISTAN 10,000 RS. rtecist•-, .... ... .. ....... .
/ //. ""heurrut.4.)aldic .4",0149r7 .•41{/-
7a,/,
- 02 -
A N
II1 DERADAD ELECTRIC SUPPLY COMPANY (HESCO)
Hyderabad through Mr. Abdul Malik Jamali sio Mchar Ali Jatriali. (CNIC No. 45403-
9690740-3) Executive Engineer, Civil Construction Division (GSC) HESCO Hyderabad.
(hereinafter called the VENDEE ) of the other part.
ADB Pakistan Power Distribution Enhancement Investment Program Tranche-Il Environment & Social Safeguard, PMU HESCO
27
ADB Pakistan Power Distribution Enhancement Investment Program Tranche-II Environment & Social Safeguard, PMU HESCO
`,:',., f)7-, . ..10
liteg PAKISTAN . •,... NO: •••
•-•,......, f ;7:r.i 1:-., ..:,:,. 6.,.-7,;:',.. , , -,-?--;,:;..,,. , ,rzk,.- ;rx.z _-....- W 0,4400+1A ' ' " q
)FN WC ' -6-,-.111i
4,—
1
—
.1,,r—,-,-
.,,.;_
v
_.
r
4.c
.
,..
c±
w
v,
ir
-
„,
-- --_.
/
-_..---------,.
..
-
..
-- —_••-.-
.._./_
i Cdr —\auSA1 .
rfi _, _,,
✓ --
• 1...i...-̀ v 74 lm- , ct
10,000 PS.
,W141
--I, S- 17 /4 -2007 4-6,/ee/A4.741c % lelelmfy-Air',..7.1,-,2,1-it"
,I c I) If ("s .71,437,, '',„...- 1 il
(. .-- --
-03-
WHEREAS the Vendor is the sole and exclusive owner of the propert■
viz: agricultural land bearing revenue Survey No. 158 total measuring 09 acres and 02
ghuntas situated in Deh IvIchrabpur, •aluka and District Jaeobabad, out of which the
Vendor hereby convey 08 acres and 12 glum tits to Hyderabad Electric Supply Company
Hyderabad, in full share (hereinafter referred to as the "SAID LAND").
Contd On p / 04
28
- at 4..
4.400.4 Nad
244 AsurgdAi,.6.*
POUSTAM
ADB Pakistan Power Distribution Enhancement Investment Program Tranche-II Environment & Social Safeguard, PMU HESCO
AND 44t4.: Nxi.A.4“ fp; 1.104•CO .44 ftr
0.4444444. CONSTRUCTION Of I37 KN. CAM ,*(CATICOd 4t J.4000411.41)
Nar.rasloy 411 • of Lilft.1 A0440P404 Ader.1 Of IMF. Joss: falawa Man,
Moiarpec. Imam t4s 00 00 r LA: 3401Or7igarva Wry ;AWL. am 4,
.1101041 WWI,. 16. na yll }i1C0,14444 4+4.3 1344 ZOO, p...4444441 *as
Eamr4 ■74,4041ri. roglib *Me M.11 &wear. &AM :17 4: 7CrW sea $ L41.2001
revozewaj, •.ki agreed Qat 044.44;24, .4 du ma ai0i. dr tart AMSWIS.ol.
woutIl cam* .44:44,4441 coonaota.4atty. asoortomveret owl trribilsirion. V .5.10r
.1/410 444417 pe:.42r anptarint y T 'PH •4,44.4 42h4 10.■ 7y aaaati «vista ,ita ase
sirt .1 70 et aboot..o. rats of ass: tool sow.* sey w OK Vorolos Coe • il"di ./IS
41„33,,soo.. as the rm. IL...L.WL.,144).- pc, *oft (.r eons.
C■Iral sot ,
29
ADB Pakistan Power Distribution Enhancement Investment Program Tranche-II Environment & Social Safeguard, PMU HESCO
e
■ 1"/ -.44e, -,,t ,
....Zit...4:s.:
i111011111,.t1L51,..ivrs vt!
R. TEAT la pas...ancr ea. *us • 4....eancu, 444 A toradissmoam Ora
win of 4.41.8“-- (Coma Forst) Et& Lic.1 Fier rr-g 1%,:t4,40SE t Aw Agibil"d
acetyl pod vautee y ma Wei& ■0=1 14411« of Dironteta, NIS
dare40 ertrao.1 Cbocrat KvSalk Vedusoi 3.1147,4400 ov~~ lavr4+ .01.0044 VOW,
atimo■dilsa~4 ua YerK2,. 44qh IttagM,,, 94 M•zaesI" Owes. OWL ee01. Olamtri
viwr
Sub-Remstrar Jacobob
*itAti it?, 0 7/4,
" - / • •
10,000 "S /ISTAN
/ 7 // 4 44.'7-rnA- "49f14.1•S 4 e,
<4 ea)
ADI3 Pakistan Power Distribution Enhancement Investment Program Tranche-II Environment & Social Safeguard, PMU HESCO
IM U IS 1v0:
- 06 -
and assigns unto the Vendee all that piece or parcel of said us acres and 12 ghuntas
land out of revenue Survey Nos. 158, situated in Deh Mehrttbpur. aluka and District
.tacobubad, and more particularly described or delineated in the map or plan hereto
annexed, together with all trees. plants, liberties. privileges. easements and appurtenances
whatsoever to the same, belonging or in any way appertaining to and all ihe estate. right.
title, claim or demand, of the Vendor and to and every part thereof To EIAVE AND TO
HOLD the saute unto and to the absolute use and benefit or the Vendee and his
successors and assigns in full proprietary right free from all encumbrances FOREVER.
Contd p 07
31
,4•4 ;p, • .‘r• -44 1-,••-• . • ---
Al\M-
ADB Pakistan Power Distribution Enhancement Investment Program Tranche-II Environment & Social Safeguard, PMU HESCO
PAKISTAN
Seglator No: '''' ' . ir),Cloo
41.-4714. 5',, .A,7,-A4Ar 4 7/4 7
-07-
AND the Vendor hereby covenant with the Vendee that he has good right.
title and power to sell and convey the same to the Vendee. in manner :dim:sant free From
encumbrances and dispute of any nature and that the Vendee may at all times hereafter
peaceably and quietly possess and enjoy the same without any interruption. claim or
demand from or by the Vendor or any .person or persons lawfully or equitable claiming
for or under him AND that the Vendor•shall whenever reasonably so required execute
and do any such further act. assurance or things as may he deemed necessary by the
Velidce.
Contd ... p1 08
32
orb ettaistor Nor
l'IS N
...A1j4
- • -----, ..-
\(:)k3S11.3\10 )
/ //.. 2 ao
120/4,/ Agerlac g/e, W4, •
s:rc- r....cha,a,ct
- 08 -
10.000 RS.
3. THAT it is also agreed by the Vendor that the boundaries of said land
shall be testricted according to the convenience of Vendee as per survey measurements '
demarcation carried out by Director of Settlements, Survey & Land Records Sindlt
Hyderabad / Survey Superintendent Larkana, alongwith representative of Vendee /
Executive Engineer, Civil Construction Division (GSC) HESCO Hyderabad. In ease any
dispute arises as to the ownership of said land or any part thereof the Vendor shall be
solely responsible to immediately make all the consequent losses good to the Vendee.
Contd On p 109
ADD Pakistan Power Distribution Enhancement Investment Program Tranche-ll Environment & Social Safeguard, PMU IIESCO
33
ADB Pakistan Power Distribution Enhancement Investment Program Tranche-II Environment & Social Safeguard, PMU HESCO
Flia;igter c•-->
PAK I STA N I , ) RS.
,1 41. .44-aell///Y7.7/iic /14.44 rIAIL • CO
-09-
4. THAT the Vendor further hereby covenants with the purchaser that the
property under sale is free from all the charges and encumbrances of whatsoever nature
and is not sold out, mortgaged, exchanged or gifted to any one prior to this. if any lime
lbund to be incorrect the Vendor shall be responsible for the same,
5. THAT the Vendor has today .1 z: 2.3 .1 2. 2009 handed over vacant
physical possession of said land at site to Mr. Shall-ur-Rchman Domki. Sub-Divisional
Officer (Civil) OSC HESCO Sukkur, official representative of the Vendee.
Contd . on p / 10
-\
34
WITNESSES:
1. ay' 7:7(7" - i/f +7.4
1
ADB Pakistan Power Distribution Enhancement Investment Program Tranche-II Environment & Social Safeguard, PMU HESCO
PAKISTAN 10,000 RS.
., '7,7
• • ti'.l. ' .2 .•;s0'":;!::---=---7--- 1." --- .„ - ° ''' -------.-----"i±-7:-7
,..._...,:-.-__ e..1-r b., .. .4,...„------- . ::.,.-13:.-1:—Ct_iki*7-:111-I'7:=17:;::11)11....--":"---•%--:7‘'izczei:-:::::171::.
‘A‘..,2-1.:.•- ---v-, e------- - . '
_._ . ..„ , .. .. ,. ... ,.•. .•., ..... . ••• •••••
0 z. -r.
-.7.--_- ‘,.._.. ,.-mii,:ii --;-- - -......,......f --N.
. . -0t..\;\-r if .'.7 t. 4-- „.... ,.;. . ;• - -,,,..
- - . ft
i■ '''-',•.:''-:0-',.,- 3'''
X: ; , . . • ;...,,,,,,r4144„,.,,tx,:z. 4,
.11
-J .,;(.").003 • Abder7-474,-;*
r- •
e-1
6. THAT the Vendee shall bear all the expenses pertaining ?o rhe
execution of this Sale-Deed and mutation of said land in the revenue record in favour of
HESCO Hyderabad.
7. THAT the Said land/ property is situated within the jurisdiction
of Sub- District and District Registration Jacobabad.
RE
( AMIRUDDIN S/0 ALI NAWAZ coLATo CNIC NO. 43 1 02 - 6790539 - I
VENDOR (ABDUL MALIK jAMALD
Executive Engineer Civil Construction Division (GSC) HESC()
VE'NDEE
35
36
CC TO:
PRO -"I -I I IRECTOR GSC II 'SCO HYDERABAD
ADB Pakistan Power Distribution Enhancement Investment Program Tranche-li Environment & Social Safeguard, PMU HESCO
Annexure D: Compensation Payments: Details of feed for Talhar Grid
Station
W.11±2k.,,,Lia HYDERABAD ELECTRIC SUPPLY COMPANY
OFFICE OF THE PROJECT DIRECTOR
GSC HESCO C-9 NTPS COLONY
T.M.KHAN ROAD HYDERABAD
DATED: 7_ — Cl c
j7-0,4 X / '3-9
As per Clause15.18 of Section-XV of Book of Financial power (Revised 2007 of NTDC)
regarding payment of crops compensation the effectives land owner (on individual basis) the sanction is hereby
accorded for crops compensation of Concrete work for 132KV Feed For Talhar T/Line, prepared & submitted
by XEN T/L C. Division GSC HESCO Hyderabad vide las letter No. 1518-19 dated 19-07-2013.
Sr. No.
Name & Fathers's . Name Of Land Owner with NIC No.
T/No. S/No.
Name effected area in Ghunta.
Rate of crop per Ghunta.
Crop wise compensa lion.
Total Amount
(Rs.)
.....
Ahson All Jatol S/o Muhammad
Hoshlm Jotoi NIC No. 41105-7721296-1
TNo.01 Sugarcan-08 4800/- 38400/- 38400/- I
it ,
,----
Mohr, Bux Khawajo Sio Shale Din.° Khawaja
Nic No, 41105-5297881-5 TNo.02 Sugarcan-07 4800/- 33600/. 33600/- (
3 Malts Bux Khowolo 5/o Bhole
Dino Khavroja
NIC No. 41105-5297881-5 TNo.03 Sugarcan-08 4800/- 38400/- 38400- t
_ ..-
.., .•-'
Nizar All 5/o Foiz Muhomad
KhoWalo
NIC No. 41105-9185884-3 TNo.04 Sugarcan-08 4800/. 38400/- 38400/-
5 k,.. /
Ngror All Khawala 5/o Nawaz All Khowaf a
Nic No.41105-8290014-1
TNo.04
(Passage) Sugarcan-05 4800/- 240001-
,- 1 24000/- t
Mstt Shohnaz D/o Allah Dino
Khawajo NIC Na. 41105-8674676-0
TNo.05 Sugorcon-08 4800/- 38400/- ?
38400/- I
..
1. The General Manager (Dev) PMU HESCO Hyderabad. 2. The Protect Manager PES (Prt) Ltd HESCO Power Wing Colony Nyd.
.... 3. The XEN T/L CcJ Division GSC HESCO Hyderabad, w/r to his letter No. mentioned above, along with 06 Nos. original vouchers & allied relevant supporting documents. •
4. The Assistant Manager (CA) GSC HESCO Hyderabad. 5. The A.L.A.O GSC HESCO Hyderabad.
CC-FF 7411w-24713 (A.)) I -
/HONE NO. 0223886552
FAX NO. 0223886471
NO. PD/GSC/HESCO/HYD
OFFICE ORDER.
attached.
'IDA/ 06 No. Crops Compensation Cases (In Original) along with relevant documents.
The rates supply by ALAO GSC HESCO Hyderabad, from Mukhtiar Kor (Revenue) Talhar is
ADB Pakistan Power Distribution Enhancement Investment Program Tranche-II Environment & Social Safeguard, PMU HESCO
101101.•■■■■■•
HESCO HYDERABAD ELECTRIC SUPPLY COMPANY
tcr- Office of the Project Director GSC HESCO
e.-7‘7 Water Wing Colony Hussainabad Hyderabad
q ,lcil I k Email: paps hes
eco Photmail.com Phone No.022-9260123 Fax No. 022-9260124
No. PD/GSC/HESCO/HYD/I 2? 20 Dated: 6.2
2C1'/
(Revised-200
individual ba
—work for 132
HESCO Hyd
OFFICE ORDER
M per c au 15.18 of Section-XV, S.No-lII of book of Financial power . .
'of NTDC) regarding ayment of Crops Compensation the effectives land owner (on
the sanction is her ..y accorded for Crops Compensation of Erection & Stringing
V—Veed for Talhar. Tra mission Line, prepared & submitted by XEN T/L Division GSC
ad, Vide his letter N 979-80 Dated: 21.03.14.
St? Name da-Pglitti;'s-Same-of- -
Land Owner with NIC No.
YT/No.
S/No. Name effected area
in Gunta
Rate of Crop per Gunta
Crop wise
compensation
Total
Amount
RS:
I Mr. Ahsan Ali Jatoi S/0 Muhammad Hashim Jatoi
NIC NO.41105-7721296-I
01-E-S Sugarcan-8 4800/- 38400/- 38400/-
2. Mr. Hassan Ali S/0 Imam
Dino Laghari
NIC NO:41105-2649855-1
I -2-S(P) Sugarcan-5 4800/- 24000/- 24000/-
3. Mr. Azhar Hussain Khawaja
S/O Mola Bux Khawaja
NIC NO:42000-3322713-9
2-E-S Sugarcan-8 4800/- 38400/- 38400/-
4. Mr. Ayyaz Hussain S/O Mola
Bux Khawaja
NIC NO:41303-3324348-7
2-3-S(P) Sugarcan-4 4800/- 19200/- 19200/-
5. -do- 3-E(P) Sugarcan-4 4800/- 19200/- 192001-
6. Mr. Mazhar Hussain Khawaja
S/OHaji Mola Bux Khawaja
NIC NO:41105-0247860-1
3-E-S Sugarcan-7 4800/- 33600/- 33600/-
7. Aslam Hussain Khawaja S/O
Faiz Muhammad
NIC NO:41105-7068545-1
3-4-S(P) Sugarcan-6 4800/- 28800/- 28800/-
8. Mr.Nizar Ali S/O Faiz
Muhammad Khawaja
NIC NO:41 105-9185884-3
4-E-S Sugarcan-8 4800/- 38400/- 38400/-
9. Mr. Nisar Ali Khawaja S/O
Nawaz All Khawaja
NEC NO:41105-8290014-1
4 & 4-
5-E(P)-S
Sugarcan-5 4800/-
7'1
24000/- 24000/-
CC elan 25)14-1
k-
ADB Pakistan Power Distribution Enhancement Investment Program Tranche-II Environment & Social Safeguard, PMU HESCO
10 Mr. Deedar Ali S/0 Allah
Dino Khawaja
NIC NO:41105-8196620-1
4-5-S(P) Sugarcan-4 4800/- 19200/- 19200/-
II Mst: Shahnaz D/O Allah
Dino Khawaja NIC NO:41105-8674676-0
5-E-S Sugarcan-8 4800/- 38400/- 38400/-
The rates supply by ALAO/Qanoongo GSC HESCO Hyderabad. from
Mukhtiarkar (Revenue) Talhar is attached.
DA/as above. II Nos Crops Compensation Cases (In Original) along wittirelevant documents.
;..1PROJE ,T DIRECTOR (7 Af/ci GSC H CO HYDERABAD
C.C.TO: --> 1. The Chief Engineer (Dev) PMU HESCO Hyderabad.
2. The XEN T/L Division GSC HESCO Hyd, w/r to his letter No.979-80 Dated:
21.03.2014, along with 1 1-Nos original vouchers & allied relevant supposing
documents.
3. The Assistant Manager (C/A) GSC HESCO Hyderabad.
4. The A.L.A.O GSC HESCO Hyderabad.
CC cues 21314-1
ADB Pakistan Power Distribution Enhancement Investment Program Tranche-II Environment & Social Safeguard, PMU HESCO
Annexure E: Compensation Payments Details of feed for Iacobabad II Grid
nittie.s., 749 , .P,4e,x00
SUKKUR ELECTRIC POWE7171,,COMPARlr OFFICE OF TH PRO.JECT DIRECTOR GSC SEPCO SUKKUR
NO. PD/GSC/SEPCO/SUIN/ Dated:
OFFICE ORDER
In accordance with the instructions NO: 2 to the reference of financial power book for distribution companies (Discos) of jan-03 the sanction of the following is hereby accorded vide delegation of financial power (Revised-2007), Section XV, Sub Section 15-18 (NTDC). for payment of crop compensation to the effectives /and owner (On individual basis) concrete work of 132kv T/Zine Humayoun-Thull prepared process & submitted by the Executive Engineer r&G (c_, Division GSC SEPCO Sole- •-•
S.
,.P xe r '
- - - - -• .•....._ .....-.
Name & Fathers name
of Land owner with r/A'a NIG' No. , S/No.
Name of affected
crop
, — - i..,- -c..cutv..-eriz-64
Area in ghunta
Rate as per
Ghunta
dated,19.08.2013.
Cropwise compen Sat/On
rota/ Amount
(Rs) .1 Mr. Shakeel Ahmed 5/0
Sikandar All Domki' 48 1 161 I
Vegetable 0.7 3000 21000 21000.00 43102-0927030-7 •
2 Mr. Sikandar A/i 5/0 Sher Mohammad Domki
I
3 Vegetable 10 3000 30000 30000.00 43102-3597631-3 161 I ,
3 Mr. A/i Sux S/0 Atta Mohammad Khan Do,-..k, 4 I Vegetable 8 3000 24000 24000.00 43102-0•135815-1 ' 160
4 Mr. Chuttal Khan 570 I Sheer Mohammad • 43102-19-12906-9
4.5 i Vegetable 160 .
7 3000 21000 21000.00
i I .
5 - -
---"hr. Mohammad Nurad YO a Vwta., 1,11.1,7
- 43102-0545-109-1
-/.$ : Vegetable 159
8 3000 24000 24000.00
6 Ni11,141.0 Cicdoto 1 1 Vegetable 9 3000 27000 27000.00 43102-4299787-1 _ 161 I
0,1 PROJECIAECTOR GSCS nth sUKKUR
The Exec.::.1,, Engineer T&G (CI) Division GSC SEPCO Sukkur. (C. A) GSC SEPCO Sukkur.
39
ADB Pakistan Power Distribution Enhancement Investment Program Tranche-II Environment & Social Safeguard, PMU HESCO
Annexure F: Compensation Payments Details of 132 kV Arain Road-
Sukkur City Transmission Line.
,r-ii / L., im.1-k n m 1.-/ C L C k:. I K.. 1 l... Li 1.-" 11-' L. If IL.- C., lv II 1,-• IA iNi V .4.t. . - Rtanna I n tkr No . A - 1 14 VSCA P •••••....• ‘A/1....... •....... -.. • ....-.*.....—.......... • ..., .......,----..
2
'■•
. ..,.',
o OFFICE OF THE PROJECT DIRECTOR GSC SEPCO SUKKUR
NO. PO/GSC/SEPa..)/StrA,
OFFICE ORDER accoi dance,
with the instructions NO: 2 to the reference of financra/ power book for distnbuht,ii compdolea (Oscos) or Jan-03 the
sanction of the fallowing is hereby accorded vide' delegation of financial power (Revised-2007), Section XV, Sub Section 15-18 (NTOC), for payment
of crop conwensatron to the offectiws land owner (On individual basis) Erection and Stringing work of 132kV TA/he Aram Road -
-Sukkur City, prepared process & submitted by the Executive Engineer
dated. 08..0,7.2014.
1'&G Cc.) DiviSiOn GSC SEPCO Sukkur vide his office letter No. XEN/T&G/GSC/SEPCO/SUK/3035-37,
44,
- ; S. I Name 8 Fathers name of # I Land owner with NIC No
:.:, [ j,";
•----- - 1 1:- Mr Chularn MustaIn
, j• - r 8/0 Muhammad Paha l I 'I Bhutto
-' ;45504-0445.720-9 ., LT?, ! Mr. Ghulam Al.:stale . I . 1S/0 Muthimma; I Prue
1 f.Bhutlo
' • . 4 45504-0448725-9 ■ Mr. Gleam', Mustafa f i 8/0 Muhammad Paha
. I Bhutto
4 45504-0448726-9
Mr. Chularn Mustafa ,,-;.i.....47Y-\ 5/0 Muhammad Pan;;
Bhutto
I 4550470448726.$:, !..1. 5. i Mr Ghulam Mustafa
' i 5/0 Muhammad rat)ti Bhut/o
Lf /5504-0448 7:1'6- Mr. Giltdiut? mustaki S/0 Muliwilmad Paha Bhutto 45504-0448726-9 lii.lr.Abdull-faleoz ::.;•/(..) Ghlilam Mustni.i RI 101to 45504-03104:::'4 -4
r'NO S/No Nomen
cteodl ; Rate as ,
: Area in “
cr0P gImma I Ggietcra
Crop wis compere sation
231/?
Vegetabli.
231.2
2.31/3
231/3. V•.7,-..171Nr.,
231/3 l'eflc'tohlo
231/3 Ve,_4(qahu,
62 Vegetable
10
8 4000 32/ 00 32000 00
4000 40000 l 40000. (4.
36000 36000 00
40000 00
/4# pire9i
PROJ d
_CLIREcTO
GSC SEPCO SUKKUR C 1'43
c.c. 4z:is.
\\:\\ Excutive Ettyne•• Division GSC SEPCC) Sukkur.
The Asistant Manage, ;C.A) GSC: SEPCO Sukkur. The Assistant Land Acquit:ition Officer GSC SEPCO Sukkur,
40
ADB Pakistan Power Distribution Enhancement Investment Program Tranche-II Environment & Social Safeguard, PMU HESCO
Annexure G
GRIEVANCE REDRESSAL MECHANISM
All stake holders, interested / affected persons and general public are notified that Hyderabad
Electric Supply Company Limited (HESCO) in Districts of Larkana, Jacobabad, Shikarpur, Mehar,
Dadu, Badin, Talhar, Sanghar, Kandiari and Mirpurkhas is carrying out work of construction of
new Grid stations, extensions, augmentation and conversion of Grid Stations under ADB Tranche-
II of following Sub-Projects.
1 Construction of New 132 kV Jacobabad-II Grid station and allied 132 kV Transmission
Line.
2 Conversion of 66 kV Sukkur City Grid Station into 132 kV Grid Station and allied 132
kV Transmission Line.
3 Conversion of 66 kV Larkana Grid Station into 132 kV Grid Station and allied 132 kV
Transmission Line.
4 Conversion of 66 kV Talhar Grid Station into 132 kV Grid Station and allied 132 kV
Transmission Line.
5 Second Circuit Stringing of Sanghar-Kandiari-Mirpurkhas 132 kV Transmission Line.
6 Second Circuit Stringing of Shikarpur-Larkana 132 kV Transmission Line.
7 Construction of Larkana-Mehar-Dadu 132 kV Double Circuit Transmission Line (New).
All stake holders, interested / affected persons and general public are informed that if they have
any kind of grievance related to the project work, they are requested to register their complaint
along with their contact number in Environmental and Social Complaint Register which is already
available at respective project site. Any action or mitigation measure shall be taken in minimum of
10 days and this would be informed to the complainant. For any further information, you can
contact Environmental and Social Cell HESCO.
1. Dy. Manager (Environment & Social Safeguard)
PMU HESCO Hyderabad
Mobile: 0300-8376715
2. Assistant Manager (Social)
PMU HESCO Hyderabad
Mobile: 0300-8376716
41
ADB Pakistan Power Distribution Enhancement Investment Program Tranche-II Environment & Social Safeguard, PMU HESCO
Annexure H
Public Consultation with Project Affected People at Talhar Grid Station
Public Consultation with the Project Affected People at Jacobabad Grid Station
42
43
ADI3 Pakistan Power Distribution Enhancement Investment Program TranchedI Environment & Social Safeguard, PMU HESCO
Meeting the Project Affectee at the Jacobabad Transmission Line Site
Meeting the Project Affectee at the Sukkur City Area