Social Monitoring Report Bi-annual Social Monitoring Report January 2015
PAK: MFF – Power Distribution Enhancement
Investment Program (Tranche 2)
Prepared by Multan Electric Power Company, Punjab for the Asian Development Bank.
NOTES
(i) The fiscal year (FY) of the Government of the Islamic Republic of Pakistan and its agencies ends on 30 June.
(ii) In this report “$” refer to US dollars. This social monitoring report is a document of the Borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
Re: Fw: L-2727, L-2972 PDEIP: Submission of BAEMRs (Jul-Dec 2014) Ashfaq Khokhar to. Liaqat Ali 29/01/2015 02:33 PM Cc: Adrian Tareen, Rizwan Haider
Please disclose both reports but ask EA to provide details of all annexes. Annexes are mentioned in the
report but have no details provided.
Thanks
Ashfaq
Ashfaq Ahmed Khokhar
Sr. Social Safeguard Officer
Pakistan Resident Mission
Asian Development Bank
Tel (92) 051-2087300 Ext 230
Fax. +92 51 260 0365-66/208 7397-98
www.adb.org
ADB
Liaqat All
Dear Ashfaq: The below reports has not yet bee... 29/01/2015 01:51:24 PM
From: Liaqat Ali/PRM/ADB To: Ashfaq Khokhar/PRM/ADB@ADB, Cc: Adnan Tareen/CWRD/ADB@ADB Date: 29/01/2015 01:51 PM Subject: Fw: L-2727. L-2972 PDEIP: Submission of BAEMRs (Jul-Dec 2014)
Dear Ashfaq:
The below reports has not yet been reviewed by you. Please review and provide your comments and approve for disclosure.
Regards,
Liaqat Ali, Project Analyst, Pakistan Resident Mission
Level 8, North, Serena Office Complex. G-5, Islamabad/Pakistan
Tele: (92-51) 2600351-69/2087210 Fax: (92-51) 2600365-66/2087397-98 email: [email protected].
Forwarded by Liaqat Ali/PRM/ADB on 29/01/2015 01:49 PM ---
From: Liaqat Ali/PRM/ADB To: Ashfaq Khokhar/PRM/ADB@ADB, Cc: Imran All Memon/PRM/ADB@ADB, Rizwan Haider/Contractors/ADB@ADB Date: 20/01/2015 02:23 PM Subject: Fw: L-2727, L-2972 PDEIP: Submission of BAEMRs (Jul-Dec 2014)
Dear Ashfaq:
Please review the Social Monitoring Reports for Loans 2727 and 2972 received from MEPCO..
ADB Tranche-III Biannual Social July-December, 2014(Excluding Photos).docx
ADB Tranche-II Biannual Social July-December, 2014(Excluding Photos).docx
Regards,
Liaqat Ali, Project Analyst, Pakistan Resident Mission
Level 8, North. Serena Office Complex, G-5, Islamabad/Pakistan
Tele: (92-51) 2600351-69/2087210 Fax: (92-51) 2600365-66/2087397-98
email: [email protected].
Forwarded by Liaqat Ali/PRM/ADB on 20/01/2015 02:21 PM
From: Asif Riaz <[email protected]> To: "[email protected]" <[email protected]>, Lali <[email protected]>, Cc: "[email protected]" <[email protected]>, "[email protected]" <[email protected]>,
"[email protected]" <[email protected]>, Jeffrey Bowyer <[email protected]>, "[email protected]" <[email protected]>, "[email protected]" <[email protected]>, "[email protected]" <[email protected]>, "[email protected]" <[email protected]>, "[email protected]" <[email protected]>
Date: 20/01/2015 02:11 PM Subject: Re: L-2727, L-2972 PDEIP: Submission of BAEMRs (Jul-Dec 2014)
Respected Madam & Sir
Kindly find attached following Internal Monitoring Reports in respect of MEPCO Multan
1- Bi-Annual Environment Monitoring Report of Tranche-Ill (L-2972-PK) 2- Bi-Annual Social Monitoring Report of Tranche-II (L-2727-PK) 3- Bi-Annual Social Monitoring Report of Tranche-Ill (L-2972-PK)
iks1 hegards: Syed Asif Riaz
On Tuesday, January 20, 2015 12:12 PM. "sshafiq.consultant©adb.org" <sshafiq.consultant©adb.org>
wrote:
Dear Asif,
Thank you for the Tranche 2 report. I have not yet received the Tranche 3 report, which was to be sent by Monday, January 19. Please send it at the earliest so that the disclosure deadline may be met.
Regards,
Safia Shafiq
Environment Specialist (Consultant)
Pakistan Resident Mission Asian Development Bank
Level 8, North Wing, Serena Office Complex.
Khayaban-e-Suhrawardy G-5, Islamabad, Pakistan.
Tel: +92-51-2087300, Ext: 344
Fax: +92-51-2087397-8 & 2600365-6
Cell: +92-333-2154462
Asif Riaz <[email protected]> wrote:
To: "[email protected]" <[email protected]>
From: Asif Riaz <[email protected]>
Date: 01/16/2015 12:13AM
Cc: "[email protected]" <[email protected]>, "[email protected]"
<[email protected]>, "[email protected]" <[email protected]>, Jeffrey Bowyer
<[email protected]>, "[email protected]"
<[email protected]>, "[email protected]" <[email protected]>,
"[email protected]" <[email protected]>
Subject: Re: L-2727, L-2972 PDEIP: Submission of BAEMRs (Jul-Dec 2014)
Respected Madam
Kindly find attached Bi-annual Environment Monitoring Report of Tranche-II subprojects
(L-2727-PK) in respect of MEPCO Multan.
BAEMR of Tranche-Ill (L-2972-PK) shall be submitted on Monday 19-01-2015
Insha-ALLAH.
Rest Regards.
Syed Asif Riaz
On Saturday. January 3. 2015 6:39 PM, Asif Riaz <[email protected]> wrote:
Acknowledged Madam
Best Regards
,Fyed Asif Riaz
On Friday, January 2, 2015 2:27 PM, "sshafiq.consultant©adb.org" <[email protected]> wrote:
Dear Asif,
The Bi-annual Environmental Monitoring Reports (Jul-Dec 2014) of MEPCO under PDEIP
tranches 2 (L-2727) and 3 (L-2972) are due for submission by January 15, 2015. Please note that two separate reports are required, one for each tranche. Kindly ensure that ADB's comments (if any) on the previous BAEMR Jan-Jun 2014 are taken into consideration
while preparing the new reports.
I look forward to a timely submission.
Regards,
Safia Shafiq
Environment Specialist (Consultant)
Pakistan Resident Mission
Asian Development Bank
Level 8, North Wing, Serena Office Complex,
Khayaban-e-Suhrawardy G-5, Islamabad, Pakistan.
Tel: +92-51-2087300, Ext: 344
Fax: +92-51-2087397-8 & 2600365-6
Cell: +92-333-2154462
[attachment "ADB Tranche-Il Biannual Env. report Jul-Dec, 2014 (excluding
Photos)1.docx" removed by Safia Shafiq/Consultants/ADB]
PAKISTAN RESIDENT MISSION ISLAMABAD
Project Number: 2727-PK
ASIAN DEVELOPMENT BANK
ADB
Bi-annual Social Safeguard Monitc.ring Report
Islamic Republic of Pakistan: Power Distribution Enhancement Investment
Program, Multi-Tranche Finance Facility (PDEPMFF-Tranche-II)
(Financed by the Asian Development Bank (ADB)
(July-December, 2014)
Prepared by: Muhammad Arif, Assistant Manage! Multan Electric Power Company (MEPCO)
Multan, Pakistan
For Pakistan Electric Power Company (PEPC0)
Multan Electric Power Company (MEPCO)
This report does not necessarily reflect the views of ADF.7, or the Cc-e7hinent concerned. And ADB and
the Government cannot be held liable for its contents.
f.
Asian Development Bank,
Table of Contents
Subject Page
No.
1. Introduction and Background of the Project 2
1.1 Basic Data 2
1.2 Introduction 3
1.3 Scope of Work 3
2. Project wise Summary of the Subprojects 4
2.1 Miranpur 132 kV New Grid Station 4
2.1 Alipur 132 kV 5
2.3 Fatehpur 132 KV 6
2.4 Kameer 132 kV New Grid Station 7
2.5 Noorsar 132 kV 7
2.6 Monitoring visits of subproject sites 8
3. Summary of Physical Works and Implementation Status 9
4. Involuntary Resettlement and Categorization of Project 10
4.1 Impact of Land Acquisition and Involuntary Resettlement
10
5. Social Safeguard Awareness and Training 13
6. Public Consultation 15
7. Conclusion and Recommendation 16
7.1 Conclusion 16
7.2 Crops Compensation Methodology 17
73. Recommendation 18
Photographs and Annex 19
INTRODUCTION AND BACKGROUND OF THE PROJECT
BASIC DATA OF TRANCHE-II PROJECT
ADB Loan No.
Project Title
Borrower
Executing Agency
e. Implementing Agency
f. (b)Total Project Cost
a. ADB Loan
Loan Approval Date
Loan Signing Date
Date of Closing
i) Original
ii) Revised
Date of Physical Completion
i) Original
ii) Revised
m. Elapsed Loan Period
i) Original
ii) Revised
2727-PAK
Power Distribution Enhancement
Investment Project Tranche II
Islamic Republic of Pakistan
Pakistan Electric Power Company
(PEPCO)
Multan Electric Power Company Ltd.
(MEPCO)
US $ 43.35 Million (Excluding
contingencies & other charges)
US $ 36.07 Million
September 12, 2008
January 28, 2011
March 31, 2015
•
•
•
•
3
1.2 MEPCO Introduction
Multan Electric Power Company (MEPCO) is a Public Limited Utility Company,
established in 1998 under Companies Ordinance 1984, responsible for distribution of
Electric Power within t,:rritc.ial jurisdiction in thirteen districts of Punjab Province. To
meet the increased peer demand and to improve the grid stations and transmission
lines infrastructure MEPCO decided to approach the loaning agencies through
Government of Pakistan like Asian Development Bank, World Bank and other financing
sources to arrange financing. Negotiations were carried out with the Asian Development
Bank and the Bank has agreed to support the program through Multi Tranche Financing
Facility-1 (MFF-1) to be imp!emented in three phases i.e. Tranche-I, II, Ill &IV.
1.3 Scope of Work
Asian Development Bank in Tranche - II is financing overall 20 Nos. of projects. The
detail of the subproject is as under.
i. Construction of 02 No. of New 132KV Grid Stations and allied
Transmission Lines
ii. Conversion of 03 Nos. of Grid Substations from 66kV to 132kV &
Transmission Lines
iii. 14 Nos. c' ,vigmentafions
iv. Capacitors installation
Overall the proposed MFF has been designed to address both investment and
institutional aspects in;electric power sector. Development Objectives/ Project Purpose
will be fully achieved after completion of the proposed Sub-projects.
Construction activities are near to completion at Alipur, Fatehpur, Miranpur
(Gallaywal) & Karrieer subprojects in Tranche-II. Construction activities ar
completed at Noosar conversion subproject. Status of Tranche-II subprojects
enclosed. (Annex- I)
Assistant Manager (Environment) & Assistant Manager (Social) are working in
Environment & Social Cell (ESC) under Chief Engineer (Development) MEPCO
Multan in Project Management Unit (PMU)
vaborAir44511-1201 v:1-Ja.ittriVv, 7.1 .
3
•
4
•
.11
•
PD(GSC), Contractor(s) and other related staff have been provided continuous
orientation on Environmental Management & Implementation of ADB guideline
and rules/regulations of Government of Fal:stan.
2. PROJECT WISE SUMMARY OF THE PROJECTS UNDER ADB TRANCHE -
II
2.1 Miranpur (Galleywal) 132 kV New Grid Station and allied Transmission Line
(Social Monitoring)
MEPCO has purchase 5.72 acres of land (see annex II) from two landowners on
voluntary saie bases against nenotiated ;-..rIce for construction new grid station and
compensation payment has been paid to the /Affected Persons (see annex III).
Therefore no social impacts associated with the construction of grid station. However,
there are some minor social impacts associated with the construction of 11.5 km.
transmission line that is being passed through four villages and hamlets.
• 37/42 foundations have been completed
• At foundation stage 55 HHs have been affected by the damages of their crops
and trees.
• Crops compensations cheques have been prepared and are being distributed
among the affected persons. Cheques distribution will be completed within a
week or two.
• Public consultation meeting carried out with general public, adjacent community
io grid station site and with the land owners whose land is being affected by the
construction activities of transmissir:n iin
• The fully implementation of Environment and Social Management Plan not
observed at the grid site i.e. Compia;nt register, social monitoring checklists, first
aid box, use of PPEs, solid waste Management, water sprinkling, and tree
plantation. The site supervisor revealed that work is getting completed therefore,
worst condition seems to be observed •
•
• • •04/...•••
5
• Contractor was asked to make sure the provision and use of all safety
gadgets/PPEs. Onsite orientation/training session was arranged for the use of
PPEs. They were also instructed to take into the account of local norms and
values.
2.2 Alipur Conversion of 66kV to 132 kV Grid Station and allied Transmission
Line (Social Monitoring)
Although the conversion works are carried out totally within the boundary of the existing
grid station without acquiring additional land. It is a conversion of 66 kV to 132 kV grid
station and all civil works are carried out at existing grid station. 100% civil works of the
grid station have been completed
• 43/47 foundations have been completed
• Crops compensations cheques have been prepared and are being distributed
among the affected persons. Cheques distribution will be completed within a
week or two.
• Public consultation meeting carried out with general public. adjacent community
to grid station site and with the land owners whose land is being affected by the
construction activities of transmission line.
• Contractor was asked to make sure the provision and use of all safety
gadgets/PPEs. Onsite orientation/training session was arranged for the use of
PPEs. They were also instructed to take into the account of local norms and
values.
5
k
• U.
2.3 Fatehpur Conversion of 66kV to 132 kV Grid Station and allied
Transmission Line (Social Monitoring)
Although the conversion works are carried out totally within the boundary of the existing
grid station without acquiring additional land. The construction of transmission line
passing through the two villages and hamlets have affected 12 HHs at foundation stage,
crops compensation to the all households affected at foundation stage have been paid
• 11/11 foundations have been completed
• At foundation stage 12 HHs have been affected by the damages of their crops
and trees.
• Crops compensations cheques have been paid to all 12 HHs
• 8/11 towers erected, assessment of damages for erection stage is being
executed.
• Public consultation meeting carried out with general public, adjacent community
to grid station site and with the land owners whose land is being affected by the
construction activities of transmission line.
• The fully implementation of Environment and Social Management Plan not
observed at the grid site i.e. Complaint register, social monitoring checklists, first
aid box, use of PPEs, solid waste management, and tree plantation.
• It is observed that contractor do not provide the basic facilities to the workers and
they have to go at petrol station for toilet use.
• The site supervisor revealed 200 Nos of plants were planted but only 12 Nos.
were observed at site.
• Contractor was asked to make sure the provision and use of all safety
gadgets/PPEs. Onsite orientation/training session was arranged for the use of
PPEs. They were also instructed to take into the account of local norms and.
values.
7
2.4 Kameer 132 kV New Grid Station (DDR) ( Social Monitoring)
MEPCO has purchased land (see annex IV) for construction new grid station on willing-
seller, willing-buyer bases and has paid compensation to the landowner (AP). Therefore
no land acquisition or involuntary resettlement impacts are involved in the construction
of new grid station. The construction of transmission is not involved and have nc.;
impact's on crops and tree therefore DDR has been prepared for this sub projects.
• 100% switch yard foundations completed
• 80% control house building completed
• 60% construction of colony work completed
• Construction of transmission line riot involved therefore, crops compensation not
involved.
• Public consultation meeting carried out wit.!-. general public, adjacent community
to grid station site and with the lanc:•owre..-._ whose and is being affected by the
construction activities of transmission line.
• The fully implementation of Envirunment and Social Management Plan not
observed at the grid site i.e. Complaint register, social monitoring checklists, first
aid box, use of PPEs; solid waste management, and tree plantation.
• Bare electric wires observed at site that may cause any incdent
• Contractor was asked to make sure the provision and use of all safety
gadgets/PPEs. Onsite orientation/training session was arranged for the use of
PPEs. They were also instructed to take into the account of local norms and
values.
2.5 Noorsar Conversation of 66 kV u, 132 kV Grid Station (DDR)
Conversion of the Noorsar grid station is being carried out within the existing boundaries
of it. which is already owned by the MEPCO. Therefore no land acquisition and
resettlement impacts are involved in the conversion of the substation. The construction
of transmission is not involved, therefore DDR has been prepared for this sub projects.
8
2-.6 Monitoring visits of Project Sites
t: ;
1 - ESC PMU has conducted site monitoring of following site. Detail is as under:
i. New 132kV Kamir Grid Station Site
Date:24-09-14, 19-12-14
ii. New 132 KV Miranpur (Gallaywal) Grid Station Site
Date:28-07-14, 29-08-14, 03-09-14, 30-09-14, 03-10-14, 17-12-14
iii. Conversion of 06KV to 132 KV /-Vipur Gi-A Station and allied Transmission
Line
Date:07-08-14, 16-10-14,
iv. Conversion of 66KV to 132 KV Fathpur Grid Station and allied Transmission
Line
Date:09-09-14, 10-10-14, 03-12-14, 18-12-14
v. Conversion of 66KV to 132 KV Noorsar Grid Station and allied Transmission
Line
n,te:19-0q-14
L. -- • •■•,.......m4/zrv..-..,...enstralrez■rrri Ft'
9
3. Summary of Physical Works and Compensation Status
Sr.
No. Name of Subproject Compensation
Status Remarks
1 Kameer 132 kV New
Grid Station Paid
2
Norsar '132 kV
1,-ran" -srSati011 from 66
kV to 132 kV) Grid
Station
Not applicable
Grid Station
• Land has been purchased on
willing seller willing buyer basis
and after negotiation
compensation amounting Rs.
6,446,738/- against land acquired has been paid to the
affected person(s).
Transmission Line
• All works are being execute
within the boundary of grid
station therefore land is not
acquired for this subproject.
• All works carried out within the
tuundary of existing grid station
therefore land is not acquired for this subproject.
Grid Station
3
132 kV Miranpur
(Gallyewal) New Grid
Station and Allied T/L
Paid
4
Fatehpur 132 kV
(conversation from 661',
kV to 132 kV) grid
station and allied T/L
Paid
• Compensation payment Rs.
6,435,000/- against the grid
station land has been paid to the
affected person(s).
Transmission Line
• 37/42 foundations have been completed. Crops compensation of the foundation stage has
prepared and is being
distributed to 55 HHs affected at
foundation stage.
Grid station
• All works are-tarried out within
the boundary of existing grid
station therefore land is not
acquired for this subproject.
9
10
Sr.
No.
Name of Subproject
Compensation
Status
Remarks
Transmission Line
• Foundation works completed
and crops compensation have
been paid to all 12 HHs affected
at foundation stage.
• 8/11 tower erected and crops
damages of erection works
being estimated.
Grid station
Alipur 132
'(conversation from
66 kV i 32 kV) grid
station and T/L
100% civil.
works of grid
station
completed
43/47
foundations
completed for
T/L. Cro
Compensation
cheque,
prepared.
• All works civil works are being
carried out within the boundary
of existing grid station therefore
land is not acquired for this
subproject.
Transmission Line
5
• Civil Works for Transmission
started and 43/47 foundations
completed and their crops
damages has been assessed,
crops compensation cheques
prepared and will be distributed
within a week of two.
4. Invo:Jntary Resettlement Identiii,:ation and Categorize ion
There are 03 out of 20 Projects which fall in Category-B (01 No. of New Grid Stations
and allied T/Lines and 02 No of T/L.ines for conversion of 66 KV to 132 KV grid stations)
requires short LARP preparation, implementation, monitoring and uploading/ posting at
ADB and MEPCO official website. While 02 Nos. of subprojects fall in Category-C,
does not require any LARP as projects are being executed within the boundary of
already existing grid stations.
Fatehpur
Conversion of
66 kV to 132
kV grid station
are being
executed on
existing grid
station
therefore no
land is
acquired for
this subproject
Name of
Project
• Land
Acquisition
Status
Category of Status of
subpro.,ci. ,j_ARP/DDR
Land for grid
station has
been
purchased
willing seller
willing buyer
bases.
As this
subproject falls
in category B
therefore a
short LARP
has b,-;c11
prepared and
uploaded on
MEPCO
website both
in Urdu and
English
Miranpur
(Galleywal)
132 kV New
Grid Station
This projc..-..t
fall in
category B
This project
fall in
category B
As this
subproject falls
in category B
therefore a
short LARP
has been
prepared and
uploaded on
website both
in Urdu and
English
Status of
1 Compensation
Grid Station
Compensation for
grid station land has
been paid
Transmission Line
37/42 foundations
have been
completed. Crops
compensation of the
foundation stage has
prepared and is
being distributed to
55 HHs affected at
foundation stage.
Grid Station
Compensation for
grid station not
applicable
Transmission Line
• Foundation works completed and crops compensation have been paid to all 12 HHs affected at foundation stage.
8/11 tower erected
and crops damages
of erection works
11
4.1 Impact of Land Acquisition and Involuntary Resettlement
11
As this
subproject falls
in category B
therefore a
short LARP
has been
r_s!epar9c'.. and
uploaded on
MEPCO
website both
in Urdu and
English
As this
subproject falls
in category C
therefore a
short DDR has
been prepared
and uploaded
on MEPCO
website both
in Urdu and
Status of
LARP/DDR
Status of
Compensation
being estimated.
Grid Station
Compensation for
grid station is not
applicable
Transmission Line
Civil Works for
Transmission started
and 43/47
foundations
completed and their
crops damages has
been assessed,
crops compensation
cheques prepared
and will be
distributed within a
week of two.
Grid Station
Compensation for
grid station has
been paid
Transmission Line
Not Applicable
As this
subproject falls
in category C
therefore a
short DDR has
been prepared
Grid Station
Not Applicable
Transmission Line
Not Applicable
12
Name of
Project
Alipur
Kameer 132
kV new grid
station
Noorsar
Land
Acquisition
Status
Conversion of
66 kV to 132
kV grid station
are being
executed on
existing grid
station
therefore no
land is
acquired for
this subproject
Land for grid
station has
been
purchased
willing seller
willing buyer
bases.
Conversion of
66 kV to 132
kV grid station
are being
executed on
existing grid
Category of
subproject
This project
fall in
catecory B
This project
fall in
category C
This project
fall in
category C
Name of
Project
Land
Acquisition
Status
Category of
subproject
S
Li
and
on P
web
in U
Eng
station
therefore no
land is
acquired for
this subproject ,
tatus of
~RP/DDR
uploaded
EPCO
site both
rdu and
lish
Status of
Compensation
Site Date Participants Contents
Ccntroctor / C')3C otaff/GSO Staff
Contractor / GSC staff/GSO Staff
Subproject Site
Kamir Subproject Site
Contractor / GSC staff/GSO Staff
• ENIP Implementatier
• RP implernentotign
• Compensation payment p rocedure
• EMP Implementation
• RP Implementation
• Compensation payment procedure
07-08-14 16-10-14
09-09-14 10-10-14 03-12-14 18-12-14
Alipur Cubproject Site
Fatehpur Subproject Site
28-07-14 29-08-14 03-09-14 30-09-14 03-10-14 17-12-14
• EMP Implementation
• RP Implementation
• Compensation payment procedure
Contractor / GSC staff
• EMP Implementation
• RP Implementation;
• Compensation payment procedure
24-09-14 19-12-14
Contractor / GSC staff
• EMP Implementation
• RP Implementation
• Compensation payment procedure
19-09-14
Noorsar Subproject site
13
5. Social Safeguard Awareness & Trainings
15- Several Environmental Training sessions are organized at each subproject site for
implementation of Environmental Managew,ent Plan. Awareness sessions with m/S
Siemens, M/S Al-FazI and M/S NeieAlhussain's subcontractor have conducted for
environmental and social safeguard awareness aid ADB's Environmental guidelines
which need be implemented on subproject sites.
Trainer
• AM(Environment)
• AM(Social)
• AM(Environment)
• AM(Social)
• AM(Environment)
• AM(Social)
• AM(Environment)
• AM(Social)
• AM(Environment)
• AM(Social)
13
15
6. Public Consultation
Consultation Meetings Conducted with Community Members (Public), Workers and
Displaced Persons of ADB Tranche - II Subprojects.
Public consultation meetings conducted with Displaced/affected Persons and
community members in last quarter are c-Jvcri below subproject wise.
6.1. kiircinpur (Galleyy.T.!) New Grid f.itation and Transmission Line
• Three Nos. of consultation meetings were conducted with community members,
workers and affected persons.
• Majority of community people were found aware about the project activities and
they appreciated the project. Thee had no complaint against the workers/project
activities getting underway.
• The major concern of the people was that of load shedding and over billing
charges which needs to curbed at the earliest.
• Permission/consent from the formers (DPs) taken for the construction of
foundation works of transmission line and all protective measures are being
adopted during foundation work.
• Contractor/workers were instructed to take into the account of local norms and
values.
• Prople were informed about the Crops/trees damages and their compensation
payment and process.
• Some of the owner complaints tIlcl their land not properly restored after
construction activities.
6.2. Alipur Grid station and Transmissic,n Line
• Three Nos. of consultation meetings were conducted with workers and
Displaced/Affected persons of transmission line.
• Permission/consent from the formers (DPs) are being taken for the construction
of foundation works of I..an6mit-,sion line ail pcotective measures are being
adopted during foundation work.
• Contractor/workers were instructed to take into the account of local norms and
values.
15
• People were informed about the Crops/trees damages and their compensation
payment and process.
6.3. Fatehpur Grid station and Transmission Line
• Three Nos. of consultation meetings were conducted with community members,
workers and affected persons.
• Majority of community peo-ple were found aware about the project activities and
they appreciated the project. They had no complaint against the workers/project
activities getting underwiy.
• The major concern of the people was that of load shedding. which needs to
curbed at the earliest.
• The communities requested for ,riskAn-.1 to semi-skilled jobs during the
construction and operation of the Project activities.
• Landowners showed their consent about the use of their land for transmission
line and they welcomed the project activity.
7. CONCLUSION AND RECOMMENDATIONS
7.1 COI1CIUSIOliS
Crops compensation for foundation stage of all three subprojects has been prepared
and cheques are being distributed to the affected persons. Crops compensation for
Fatepur subproject has been paid and compensation cheques distribution for Alipur and
Miran Pur (Gallewal) subprojects will be completed within a week or two.Civil works for
grid station of all subprojects have been almost completed except kameer grid station
and for transmission lines 91% foundation works have been completed. Contractor was
asked to make sure the provision and use of all safety gadgets/PPEs. Onsite
orientation/training session was arranged for the use of PPEs. They were also
instructed to take into the account of local norms and values.
17
7.2 Crops Compensation Assessment Methodology
There is no SOP available to pay crops compensation before the damages occurred.
MEPCO use a traditional way to make crops damages assessment and compensation
disbursement. ADB collaboration with WB drafted an SOP for crops compensation but it
remains a draft and still pending to be finalized. MEPCO follow the following 13 points
from assessment of damages to comperis.i.,tion disbursement.
1. The kanoongo visits the sites and measures the damages and types of crops and
tree.
2. After measurement the Kanoongo makes register of these damages crops/trees
compensation
3. The rates of the crops are taken from the Local Revenue Department (Tehsil dar
office)
4. The rates of trees are taken from Local Forest department
5. After verified by the Kanoongo & SDO/XEN concerned. They are sent to PD
(GSC) office.
6. After assessment sanction orders as per book of financial power is issued by the
officers as per their competency (SDO/XEN, PD& CD (development) etc)
7. Claims are prepared as per sanctioned order
8. Pass order by Division and approved by PD/CE
9. The approved pass order sent to Manager (Pr) and finally sent to FD
10.Amount is released. after getting necessary approval from the competent
authority.
11.The amount involved is trqnsferreci to PryGSC) & then same is further send
through cheque to the XEN concerned
12. XEN concerned then prepares cross Cheques in the names of Affected Person
17
13. The cross cheques in the name of concerned affected persons is distributed as
per their entitlement
MEPCO is reluctant to "pay before damages" as it has to fulfill departmental procedures
and the formalities mentioned above. MEPCO pay crops compensation to the affected
Persons in three installments i.e. Foundation, Erection and String work. Assessment of
the crops damages has been done and crops compensation cheques are being
distributed to the affected persons.
7.3 Recommendations
From the findings of the Monitoring Visits, the following mitigation measures are
proposed to be implemented in order to minirni7e i-iny potentially significant impacts:
• It is also recommended that the procts of communication and consultation with
the community representatives is aggressively maintained.
• Construction work of new T/lines should be planned in accordance with LARPs.
and DDRs to minimize the affect of construction activities.
• Site should restore properly after the completion of construction activities.
• Proper housekeeping can nvoid littering.
• ciVOit.; any acniclent c-Jntracto. should mace the use of PPEs compulsory.
• Timely compensation to the affected persons can avoid any hindrance and may
lead towards in time execution of the project.
• It is also observed that contractor(s) does not give value to environmental and
social aspects and considered them it unnecessary burden over him. Therefore
to make it effective bill payment:, regarding EMP may dully verified through
environmental and Social Safeguard section.
19
• Photographs
Figure 1: Crops Compensation cheques distribution at Fatehpur subproje
Figure 2:- Crops Compensation Payments paia to the APs of Fatehpur subprojects.
19
Figure 3:Meetings with the land owners at 132 KV Fatehpur T/L Line
20
21
Q "1- 4 ■
r ,
Figure 4: Consultation Meetings with the land owners at 132 KV Miranpur
(Gallaywal) T/L
•
Figure 4: AP made complaint that contractor do not restore the site after excavation at Fatehpur T/L
21
• 01- t
.ifs
Figure 6: Littering and lack of housekeeping observed at Miranpur Grid Station
Figure 5: Lack of safety measures may cause accident at Miranpur Grid Station
22
Figur
e; Temporary residence of wcrke Fig
r arkawareness at Kameer grid site
„,47t4w,-
W
5:7, v-r• 41
Figure 8: Orientation awareness
session with workers at Kam
Grid Station
2 3
23
Plants planted under the big shady trees at Fatepur site
24
, .
efe- i:;;
., ., ,krag- ,,..,
. NJ ).1.4t-L r ; 44 t'l. s- i ,.., _ ... .. 4' L.
49 .1!!! tt-- K. ' • .'4 7-"7r7r -.=. - • , iji 1 •=-N' ''4 "24i ,-:;-!'f.. .•
Before start of civil works this place was Wed with different kinds of fruit trees, neither
site restored nor plantation have been conducted here.(Fatepur site)
25
ANNEXES
Annex
ADB Tranche-II (Grid Stations & Asbu.iated Transmission Lines)
SR.NO. NAME OF
GRID STATION
Prop:
Voltage KV
1
Kamir a/w T/Line
N
132
REMARKS/PROGRESS
Contract Effective Date - 19.02.2014 Completion Period - 360 Days Contract Completion Date - 13.02.2015 Project Cost — PKR 222,723,971
USD 3,736,698 'EUR 96,096
Released up till now - PKR 160,721,000
USD 158,000 EUR 20,000
Physical Progress
A. Grid Station cs.ivil work 100`)/0 Switch yard foundations completed 80% Control House Building completed 60% Construction of colony work completed Electrical Work 02-No 20/26 MVA PTF erected at site. All main equipment / material available at site Excavation for earthing is in progress
25
26
ADB Tranche-II (Grid Stations & As7ociatedTransmission Linn)
2 Ali Pur a/w T/Line C 132
Contract E■fc.c~ive Date - 17.05.2013 Completion Period - 360 Days Contract Completion Date:-11.05.2014 Expected completion Date 15.01.2015 Project Cost — PKR 236,642,715 (AJ Pur + Fateh Pur) USD 203,286 -EUR 525,068 Released up till now - PKR 152,927,000 (Ali Pur + Fateh Pur) USD 526,000 EUR 203,000 Physical Progress A. Grid Station:-
Civil Work
95% of CHB completed. 100% Switch yard foundations completed Ele!7,trical Work BO% completed) RemininDlAlgAs
CE.tkt, "g & Wiring Termination, Testing and Commissioning B. Transmission Line: 128% Completed)
Foundations:- 43/47 completed. Erection work pending due to tower material yet not reached at site.
C
132
3 Fatehpur a/w T/Line
Miran Pur (Galaywal) a/w T/Line on turnkey basis (New)
4
ADB Tranche-II (Grid Stations & Associated Transmission Lines)
Contract Effective Date 17.05.2013 Completion Period - 360 Days Contract Completion Date:- 11.05.2014 LD Notice Issued to Contractor:-Expected Completion Date:-30.12.2014 .
Physical Progress
A. Grid Station Civil work Switch yard foundations completed. Renovation of CHB completed. Electrical Work Completed Remaining Work
esting in progress B. Transmission LineNO% Completed): Foundations:- 11/11 completed. Erection:- 08/11 completed..
Contract Effective Date -11.02.2014 Completion Period - 360 Days Contract Completion Date -5.02.2015 Project Cost -- PKR 162,318,624
USD 1,347,221 Released up till now - PKR 122.780,000
USD 286,000 Physical Progress
A. Grid Station
Civil work Switch yard foundations completed . Control House Building completed 85% construction of colony work completed. Electrical Work 1) 11-KV Panels, Control & Relay Panels have
hew" inPtalled. 2) Earthing mesh laid 3) CTs, PTs, Circuit Breaker, Isolators and LAs
are available at site. 4) Power Transformers are under shipment
132
2x26 M VA T/Bay
2xL/Bays & 1xPT/Bay
27
27
28
ADB Tranc110•1 (Grid
I
Stations & Associated Transmission Lines)
;:). Transmission Line (25% Compleied):
Foundations:- 37 /42 completed.
5 Noor Sar a/w T/Line
C 132
Contract Signed on 17.02.2012 10% Mobilization advance issued on 25.07.2012 (LCC) and 23.07.2012 (FCC). LC opened on 10.08.2012 (LCC) & 01.11.2012 (FCC) Letter of Committment from ADB issued on 17.05.2013 (LCC & FCC) Contract Effective Date - 17.05.2013 Completion Period - 360 Days Contract Completion Date:- 11.05.2014 Physical Progress
Civil work 100% Switch yard work completed. Elecrtical Work 02 No. 10/13MVA PTF's shifted at site (allocated from 132KV G/S's Chack 211 & Sheikh Fazil) and its erction work r,c0Ipieted, All material of switch yard ir::talled at site except 132KV Surge Arresters which is under shipment.
6 Duniya Pur A 132 Energized.on 06.09.2012.
7 Sheikh Fazal A 132 Energized on 05.11.2012.
basti M2.look /-■ •! 32 !Thergized on 27.1€.2012.
9 Multan Ind: Estate A 132 Energized on 04.12.2012.
10 Baghdad-ul-Jadeed
A 132 Energized on 24.01.2013.
29
ADb Tranche41 (Grid Stations ,4 Atisociated Transmission Lines)
11 Kot Addu A 132 Energized on 06.12.2012.
12 Noor Pur A 132
132
Energized on 11.12.2012.
13 Layyah . i '‘,4,, _.,
Energized on 20.12.2012.
14 Bahawal Nagar A 132 Energized on 22.01.2013.
15 Chak 2111WB A 132 Energized on 07.01.2013.
16 Multan Qasim Pur A 132 Energized on 31.01.2013.
17 Sadiqabad A 132 Err..mized on 04.02.2013.
18 Vehari Road A 132 Energized on 07.02.2013.
19 D.G.Khan A 132 Energized on 10.07-2012
•
29
Annex - II
Land Purchase deed and Comprmsation of Miranpur (Galleywal) New Grid
C TR IC P 01,f ‘M c 0 NJ P. A Ny_ANI_E 2'P.O.074
rifne',... V,4-') r4:220073 • bir,)rt• , I ,■•■<';
! I 09.2 fir s PD
(F.S.S) erCb. fvlulton.
eR0vI.51(..))■LQIT )AyrytE;.--,NT Rr Q.RIL) , ;,, TH)r! LANDS ADE: TRANQHE btli3PROJc.:cr
Your not,n9 datc,t109-0(1-2012
Photecot)10,,,, registry of Inert eittchzv),,d; I- .71110,,l' & 4:3;ciley
Mana0)>7 (PrAc.) mrinc,c) :'1-f:'1_2r 2
k=!)!Alkbgyq
PROJECT nIRECtOR MEM( IV1111LT AN
57 t-,.) c
i'.36 2 03.-17G1689-5
36203-1762952-3 4
31
Ann(bx - III Land Purchase deed and Corn ensation of Miranpur Gallewal) New Grid Station
31
4.-5-°r e :?6 ,
-4;3 Le::‘,.);( I. (:;."' •
N(1v 2f;09
?:20.); 1
•0 7 'NOV ZIN
Annex - IV
Land Purchase deed and Compensation of Kameer New Grid Station