PAIRWISE WEIGHTING Complete the 3 sheets IN ORDER (i.e. 1, 2, 3) Instructions for this sheet: 1. Enter your Specifications in this column (they wil - ONE ROW for each specification. If a need or stak 2. If you need less than all 50 Specifications (a lik 3. For each comparison enter 0, 1, or 2 in the blue b Need(s) Pairwise Weights icole Sugerman Low Installation Cost icole Sugerman Less Time to water the beds icole Sugerman Low Maintenance costs icole Sugerman High percentage of useable water icole Sugerman Water the beds regularly icole Sugerman System will not be stolen Local Users Low training time for local residents Local Users A durable system Local Users that can be dismantled in a short time Community does not intrude in current open space Community System does not block entrances Consumers High vegatable yield icole Sugerman Low amount of excess physical labor Community Environmentally friendly Stakeholder(s )

Pairwise Weighting Determining Excel Sheet

Embed Size (px)

DESCRIPTION

The EPRA rainwater catchment and irrigation system project group used these sheets in order to determine the best plan to use in the irrigation system without the bias of opinion. It is used to scientifically make a project decision.

Citation preview

Page 1: Pairwise Weighting Determining Excel Sheet

PAIRWISE WEIGHTING

Complete the 3 sheets IN ORDER (i.e. 1, 2, 3)

Instructions for this sheet:1. Enter your Specifications in this column (they will popluate throughout the spreadhseet) - ONE ROW for each specification. If a need or stakeholder has multiple specifications, simply repeat that need/stakeholder in multiple rows2. If you need less than all 50 Specifications (a likely case), delete the unneeded rows and columns (delete the whole row/column ( not just the cell contents), but NOT the statistics columns!)3. For each comparison enter 0, 1, or 2 in the blue box.

Stakeholder(s)

Pair

wis

e W

eig

hts

icole Sugermanicole Sugermanicole Sugermanicole Sugermanicole Sugermanicole Sugerman

Local UsersLocal UsersLocal UsersCommunityCommunityConsumers

icole SugermanCommunity

Page 2: Pairwise Weighting Determining Excel Sheet

Complete the 3 sheets IN ORDER (i.e. 1, 2, 3)

Instructions for this sheet:1. Enter your Specifications in this column (they will popluate throughout the spreadhseet) - ONE ROW for each specification. If a need or stakeholder has multiple specifications, simply repeat that need/stakeholder in multiple rows2. If you need less than all 50 Specifications (a likely case), delete the unneeded rows and columns (delete the whole row/column ( not just the cell contents), but NOT the statistics columns!)3. For each comparison enter 0, 1, or 2 in the blue box.

Specification Values

Need(s) Units Ideal Low Installation Cost $ 300

Less Time to water the beds Hours 0.5Low Maintenance costs $/ Year 20

High percentage of useable water $ 100Water the beds regularly Times/ Week 4System will not be stolen yes/ no yes

Low training time for local residents hours 0.5A durable system Years 7

tem that can be dismantled in a short time Min 15em does not intrude in current open space Feet^2 20

System does not block entrances Entrances 2High vegatable yield % 100

Low amount of excess physical labor min 0Environmentally friendlyn (aproximate) Low

Page 3: Pairwise Weighting Determining Excel Sheet

1. Enter your Specifications in this column (they will popluate throughout the spreadhseet) - ONE ROW for each specification. If a need or stakeholder has multiple specifications, simply repeat that need/stakeholder in multiple rows2. If you need less than all 50 Specifications (a likely case), delete the unneeded rows and columns (delete the whole row/column ( not just the cell contents), but NOT the statistics columns!)

Specification Values

Marginal800 Interview

1 Interview70 Estimation of need85 Interview2 Interview

yes Interview1 Estimation of need2 Interview

25 Estimation of need100 Interview

1 Interview80 Interview/ Apparent need20 Estimation of need

Medium Estimation of need

IMPORATANCE REFERNCES

Page 4: Pairwise Weighting Determining Excel Sheet

- ONE ROW for each specification. If a need or stakeholder has multiple specifications, simply repeat that need/stakeholder in multiple rows2. If you need less than all 50 Specifications (a likely case), delete the unneeded rows and columns (delete the whole row/column ( not just the cell contents), but NOT the statistics columns!)

Cost

Cost 1

Time it takes for the bed to be watered 0

Annual Maintaniece cost 0

Percentage of usable water 0

How often the beds are watered 0

Security 0

Time for training 0

MTBF 0

Dismantling time 0

Space system occupies 0

Leave the garden entrances open 0

Percent vegetable yield 0

Physical labor time 0

Gobal Warming Potential 0

Is THIS (in the ROW) 0: less important 1: equally important 2: more important than THIS (in the column)?

Page 5: Pairwise Weighting Determining Excel Sheet

2. If you need less than all 50 Specifications (a likely case), delete the unneeded rows and columns (delete the whole row/column ( not just the cell contents), but NOT the statistics columns!)

Annual Maintaniece cost

2 2 2 2

1 2 2 1

0 1 2 1

0 0 1 1

1 1 1 1

2 2 1 2

0 0 0 0

0 2 0 0

0 1 0 0

0 0 1 0

0 0 1 0

2 2 2 1

2 2 2 2

0 0 0 0

Time it takes for the bed to be

wateredPercentage of usable water

How often the beds are watered

VALUES NEEDED ONLY IN LOWER LEFT SECTION

Page 6: Pairwise Weighting Determining Excel Sheet

Security Time for training MTBF Dismantling time

2 2 2 2

0 2 2 2

0 2 0 1

1 2 2 2

0 2 2 2

1 2 2 2

0 1 0 2

0 2 1 1

0 0 1 1

0 1 0 0

0 0 0 0

1 2 2 2

1 2 2 2

0 1 0 0

VALUES NEEDED ONLY IN LOWER LEFT SECTION

Page 7: Pairwise Weighting Determining Excel Sheet

Physical labor time

2 2 2 2

2 2 0 0

2 2 0 0

1 1 0 0

2 2 1 0

2 2 1 1

1 2 0 0

2 2 0 0

2 2 0 0

1 1 0 0

1 1 0 0

2 2 1 1

2 2 1 1

1 1 0 0

Space system occupies

Leave the garden entrances open

Percent vegetable yield

Page 8: Pairwise Weighting Determining Excel Sheet

Raw Totals Raw Pcts.

2 26 14.3% 5.0

2 17 9.3% 3.4

2 12 6.6% 2.5

2 12 6.6% 2.5

2 16 8.8% 3.2

2 21 11.5% 4.1

1 6 3.3% 1.4

2 11 6.0% 2.3

2 8 4.4% 1.7

1 4 2.2% 1.0

1 3 1.6% 0.8

2 21 11.5% 4.1

2 22 12.1% 4.3

1 3 1.6% 0.8

MAX 14.3%MIN 2.2%

Gobal Warming Potential

Normalized Totals

Page 9: Pairwise Weighting Determining Excel Sheet

CONCEPT RATINGS

Instructions1. Enter Concept titles in row 112. Delete unneeded rows (metrics) and columns (concepts)

ID: Concept 1

Title:

Con

cep

t R

ati

ng

s

Cost 3.5Time it takes for the bed to be watered 1

Annual Maintaniece cost 5Percentage of usable water 5

How often the beds are watered 4Security 5

Time for training 5MTBF 5

Dismantling time 5Space system occupies 5

Leave the garden entrances open 5Percent vegetable yield 4

Physical labor time 1Gobal Warming Potential 3

3. Choose a rating for each metric for each concept on a scale of 1 - 5: (5 is BEST, 1 is WORST

Watering Can + Water

Catchment

Page 10: Pairwise Weighting Determining Excel Sheet

2. Delete unneeded rows (metrics) and columns (concepts)

Concept 2 Concept 3 Concept 4 Concept 5 Concept 6 Concept 7

Rain Sprinkler

2 2 4 5 2.5 15 5 2 1 2 53 2 3 5 4 35 5 5 1 2 54 4 5 1 5 45 4 5 5 5 52 2 1 5 1 24 3 2 5 4 43 4 3 5 3.5 44 4 5 5 4 45 5 4 5 5 55 5 4 1 3 5

3.5 4 2 5 3.5 42.5 2.5 4 5 2.5 2.5

3. Choose a rating for each metric for each concept on a scale of 1 - 5: (5 is BEST, 1 is WORST with respect to all the available concepts)

Above Ground Drip-unattached

Underground Drip

Current System

Above ground drip attached

Page 11: Pairwise Weighting Determining Excel Sheet

Concept 8

34

3.5545

3.54.54455

2.752.5

with respect to all the available concepts)

Hose + Water Catchment

Page 12: Pairwise Weighting Determining Excel Sheet

FINAL SUMMARY

Instructions

2. Analyze the results for signficant differences, surprising results, te max total ("winner"), etc.

Weighted Ratings (original ratings from sheet 2)ID: Concept 1 Concept 2 Concept 3

Weight from \Sheet 1 normalized to a 1 - 5 scale --> Weight

Con

cep

t R

ati

ng

s

Cost 5.0 17.5 10.0 10.0me it takes for the bed to be watered 3.4 3.4 16.8 16.8

Annual Maintaniece cost 2.5 12.3 7.4 4.9Percentage of usable water 2.5 12.3 12.3 12.3

How often the beds are watered 3.2 12.7 12.7 12.7Security 4.1 20.5 20.5 16.4

Time for training 1.4 6.8 2.7 2.7MTBF 2.3 11.4 9.1 6.8

Dismantling time 1.7 8.6 5.2 6.9Space system occupies 1.0 5.0 4.0 4.0

Leave the garden entrances open 0.8 4.1 4.1 4.1Percent vegetable yield 4.1 16.4 20.5 20.5

Physical labor time 4.3 4.3 15.0 17.1Gobal Warming Potential 0.8 2.5 2.0 2.0

TOTAL 137.6 142.2 137.2

Concept Statistics

1. Delete unneeded rows (metrics) and columns (concepts), but NOT the statistics sections

Watering Can + Water

Catchment

Above Ground Drip-unattached

Underground Drip

Page 13: Pairwise Weighting Determining Excel Sheet

Max 146.8Min 124.2

Average 136.4Standard Deviation 7.3

Page 14: Pairwise Weighting Determining Excel Sheet

2. Analyze the results for signficant differences, surprising results, te max total ("winner"), etc.

Weighted Ratings (original ratings from sheet 2)Concept 4 Concept 5 Concept 6 Concept 7 Concept 8 Metric Statistics

Rain Sprinkler

Max Min Average

20.0 25.0 12.5 5.0 15.0 25.0 5.0 14.46.7 3.4 6.7 16.8 13.5 16.8 3.4 10.57.4 12.3 9.8 7.4 8.6 12.3 4.9 8.7

12.3 2.5 4.9 12.3 12.3 12.3 2.5 10.115.9 3.2 15.9 12.7 12.7 15.9 3.2 12.320.5 20.5 20.5 20.5 20.5 20.5 16.4 19.91.4 6.8 1.4 2.7 4.8 6.8 1.4 3.74.5 11.4 9.1 9.1 10.2 11.4 4.5 8.95.2 8.6 6.0 6.9 6.9 8.6 5.2 6.85.0 5.0 4.0 4.0 4.0 5.0 4.0 4.43.3 4.1 4.1 4.1 4.1 4.1 3.3 4.0

16.4 4.1 12.3 20.5 20.5 20.5 4.1 16.48.5 21.4 15.0 17.1 11.8 21.4 4.3 13.83.3 4.1 2.0 2.0 2.0 4.1 2.0 2.5

130.3 132.2 124.2 141.0 146.8

but NOT the statistics sections

Current System

Above ground drip attached

Hose + Water Catchment

Page 15: Pairwise Weighting Determining Excel Sheet

Metric Statistics

St. Dev

6.46.12.64.04.01.42.22.31.30.50.35.85.40.8