9
7/23/2019 Painting Procedure Jotun http://slidepdf.com/reader/full/painting-procedure-jotun 1/9  ,JOTUN · otu P ai  t s P INTING PROCEDURE FOR PL TU BABE LAN CIK R NG LISTRINDO EXTERN L STEEL STRUCTURE PROJECT 378 JTL 122015 1 December 2015 PAINTING PRO EDURE Prepared y Jotun Indonesia age 1 o 9

Painting Procedure Jotun

Embed Size (px)

Citation preview

Page 1: Painting Procedure Jotun

7/23/2019 Painting Procedure Jotun

http://slidepdf.com/reader/full/painting-procedure-jotun 1/9

 ,JOTUN ·

o

tu

Pai  ts

P INTING PROCEDURE

FOR

PLTU BABE LAN

CIK R NG LISTRINDO

EXTERN L

STEEL STRUCTURE

PROJECT

378 JTL 122015 1

December 2015

PAINTING PRO EDURE

Prepared y Jotun Indonesia

age

1

o

9

Page 2: Painting Procedure Jotun

7/23/2019 Painting Procedure Jotun

http://slidepdf.com/reader/full/painting-procedure-jotun 2/9

  otun Paints

P INTING

PROCEDURE

SECTION I P INT SPECIFIC TION

SECTION II GENER L SPECIFIC TION

SECTION l l SURF CE PREP R TION

SECTION IV PPLIC TION REQUIREMENT

SECTION V TECHNIC L

INSPECTION

SECTION VI STOR GE

SECTION VII

P INT

PPLIC TION PROCEDURE

378 JTL 122015

01

December 2015

PAINTING

PRO EDURE

Prepared

y Jotun Indones ia

age 2

o

9

Page 3: Painting Procedure Jotun

7/23/2019 Painting Procedure Jotun

http://slidepdf.com/reader/full/painting-procedure-jotun 3/9

  JOTUN

Jotun Pa ints

I

PAINT

SPECIFIC TION

Product description

Jotamastic 80

Futura

S

Application methods

Spray

Brush

Roller

This is a two

component

polyamine cured

epoxy mastic coating.

I t

is a surface

tolerant

high solids product. Specially designed

for

areas where

optimum

surface preparation is

not

possible

or

desired.

Can

be used

as

primer mid coat finish coat

or

as single coat

system in atmospheric and immersed

environments. Suitable

for

properly prepared

carbon steel and aged coating surfaces.

This is a

two

component chemically curing

aliphatic acrylic polyurethane coating. t has

a matt finish

with very

good gloss retention.

It is a high build product. To be used as

topcoat

in atmospheric environments.

Use

airless spray.

Recommended

for

stripe coating and small

areas. Care

must

be taken

to

achieve the

specified

dry

film thickness.

May be used For

Futura AS).

Care must

be

taken

to

achieve

the

specified

dry

film

thickness.

II GENER L SPECIFICATION

EXTERNAL:

Jotamastic 80 Red

Jotamastic 80 Grey

Futura

S

Total OFT

378 JTL 122015 01 December 2015

PAINTING

PRO EDURE

Prepared y Jotun Indones ia

1X

l

lX

7

µ

100

µ

50

µ

225 µ

Page

3 o 9

Page 4: Painting Procedure Jotun

7/23/2019 Painting Procedure Jotun

http://slidepdf.com/reader/full/painting-procedure-jotun 4/9

 )JOTUN

Jotun Paints

III

SURFACE PREPARATION

Surface preparation

with Sa

1

h:

1. All oil/grease, dust and other contaminant to surface shall be

remove/wash by fresh water with 250 bar pressure at nozzle. add

detergent if necessary to remove oil/grease)

2

All surfaces prepared

for

coating shall be abrasive blast clean in

accordance with the Swedish Standard SIS 05 5900 or the

following:

Comparative

Standard

Swedish

Standard

Sa

21 2

Japanese

Standard

lASH2

SSPC

Standard

SSPC-SP 1

3

The profile roughness achieved shall be between 30 - 85 microns

as measured using Keane Tator Surface Profile Comparator or 0  

testex film and profile gauge.

4. Abrasive used for blast cleaning should be dry and free from dirt oil

and grease and suitable

for

procuring the standard of cleanliness

and profile specified.

5. After blast cleaning removes loose adhering dust, debris and

abrasive material from surface by use of high pressure

air

blow

should be free

of

oil and moisture).

378 JTL 122015

01

December 2015

PAINTING

PRO EDURE

Prepared

y

Jotun Indonesia age 4

o

9

Page 5: Painting Procedure Jotun

7/23/2019 Painting Procedure Jotun

http://slidepdf.com/reader/full/painting-procedure-jotun 5/9

  JOTUN

Jo

tu

n Paints

IV. PPLIC TION

R QUIR M NT

1.

The

temperature

of

the

substrate should be

minimum

10°C and

at

least 3°C above the dew point of the air, temperature and relative

humidity

measured in the vicinity

of

the substrate maximum 85 .

Good ventilation is usually required in confined areas

to

ensure proper

drying. The coating should not be exposed

to

oil, chemicals or

mechanical stress until cured

2 All Paint should

be

applied by airless spray except for stripe coats

where brush or roller should in general be used.

3. Efficient mechanical stir rers

or

power

mixer for

the correct mixing

of

paint

should

be

used 7 wooden stick or something like

that is strongly

forbidden to use.

4. Available air pressure and capacity for spray

equipment

should be at

least 5.5

kg/cm2

and 1.4 m3 90

100

Psi and 50 Cfm).

5 Airless spray equipment

must

be in good working order and be capable

of performing to be out put requirements defined

in

the Jotun data

sheets.

6.

It

is recommended

that

pump ratios

for

45: 1

or

greater.

7. Tips should be the size stipulated on the product datasheets or as

agreed with the Jotun paint representatives on site. Tips should not be

in a worn condition.

8. Only thinners and additives supplied by or acceptable to Jotun are

to

be used and they are not to exceed the quantity recommended. Only

solvents acceptable by Jotun are to be used for cleaning equipment.

9. Re-coating

time

must

be

follow

to

TDS. In case re-coating time

exceeding than TDS, more treatment prior

to

apply

next

coat shall

be

done contact your Technical advisor).

78 JTL

 

122 15

1

December 2 15

PAINTING

PRO EDURE

Prepared y Jotun Indonesia

Page

5 o 9

Page 6: Painting Procedure Jotun

7/23/2019 Painting Procedure Jotun

http://slidepdf.com/reader/full/painting-procedure-jotun 6/9

  JOTUN

Jotun Paints

V

TECHNIC LINSPECTION

1.

Dry film thickness: each coat

must

be checked when

the paint

is dry.

f

the dry film thickness is lower than owner s specification, build up

thickness must

be

done to achieve minimum OFT requirement.

2. After exposure and contaminated with the environment surface shall

be fresh water washed and prepare clean before any coating

application.

3.

f

the maximum re coating interval exceed, roughening of the surface

by sandpaper and or light abrasive sweeping is mandatory.

4. Note batch

number of

paint (Comp. A and B on the log book.

VI

STORAGE

All paint and thinner shall be kept closed in original, undamaged can

before use and stored under shelter, away from direct sunlight, to keep

the air temperature below 25 C is the best recommendation, Any paint

exceeding shelf life, gelled or in damage can shall not be used (contact

your Technical advisor)

378 JTL 122015 Ol

December

2015

PAINTING

PRO EDURE

Prepared y Jotun Indonesia Page 6 o 9

Page 7: Painting Procedure Jotun

7/23/2019 Painting Procedure Jotun

http://slidepdf.com/reader/full/painting-procedure-jotun 7/9

Jotun Paints

VII. PAINT APPLICATION PROCEDURE

EXTERNAL:

Primer Coat : Jotamastic 80

1.

Flush equipment with JOTUN

THINNER

NO

17.

2 Stir Part A with an explosive-proof power

mixer

to an even

consistency.

3

Add Hardener Part B and continue to stir until even consistency.

Allow

to

stand

for

10 minutes.

4. Pot Life paint 2

Hours

at 23°C.

5. Apply a wet coat in even parallel passes. Overlap each pass 50 to

avoid bare areas pinholes or holidays.

6 Thinning normally not required. Thin only

for

workability with not

more than

10

by volume of

THINNER NO 17.

7. Apply a wet film thickness of 95 µ to provide

75

µ dry film

thickness.

8. Check thickness

of

dry

coating with a non-destructive

Dry

Film

Thickness Gauge

9. In confined areas, observe safety rules as in Industrial Hygiene

Safety Rules during Paint Application.

10. Clean all equipment with JOTUN THINNER NO 17 immediately

after use to prevent clogging of material in hose and spray

equipment.

11. Uncured paint should

not be

exposed to water, chemicals or

mechanical stress before the paint is fully cured.

12. Minimum re-coating interval must be follow to TDS 4 Hours

at

40°C, 10

hours at

23°C,

24 hours at 10°C .

378 JTL 122015 1

Decembe  

2 15

PAINTING

PRO EDURE

Prepared

y

Jotun Indones ia age

7 of 9

Page 8: Painting Procedure Jotun

7/23/2019 Painting Procedure Jotun

http://slidepdf.com/reader/full/painting-procedure-jotun 8/9

6JOTUN

Jotun

Paints

Intermediate

Coat

: Jotamastic 80

1. Flush equipment with JOTUN THINNER NO

17

2.

Stir

Part A with an explosive-proof power

mixer

to an

even

consistency.

3.

dd

Hardener Part B and continue to

stir

until even consistency.

Allow

to

stand

for 10 minutes.

4.

Pot Life paint 2 Hours at

23°C.

5.

Apply a

wet

coat in even parallel passes. Overlap each pass

50 to

avoid bare areas pinholes

or

holidays.

6. Thinning normally not required . Thin only

for

workability with

not

more than

10

by volume

of

THINNER NO

17

7.

Apply a wet film thickness

of

125 µ to provide 100 µ dry film

thickness.

8.

Check thickness

of

dry

coating with a non-destructive Dry Film

Thickness Gauge

9.

n

confined areas observe safety rules

as

in Industrial Hygiene

Safety Rules during Paint Application.

10.

Clean all equipment with

JOTUN THINNER NO 17

immediately

after

use

to

prevent clogging

of

material in hose and spray

equipment.

11. Uncured paint should

not

be

exposed to water chemicals

or

mechanical stress before

the

paint is fully cured .

12. Minimum re-coating interval

must

be follow to TDS

4 Hours at

40°C,

10 hours at 23°C,

24

hours at 10°C).

3 7 8  

J TL 1 2 2 0 1 5 1

D e c e m be r 2 0 1 5

PAINTING

PRO EDURE

Prepared

y Jotun Indonesia

Page

8

o

9

Page 9: Painting Procedure Jotun

7/23/2019 Painting Procedure Jotun

http://slidepdf.com/reader/full/painting-procedure-jotun 9/9

Jo

t

un Paints

Too

Coat: Futura

AS

1. Flush equipment's with

JOTUN

THINNER

NO 10.

2 Stir

Part A with

an

explosive-proof power

mixer to an

even

consistency.

3. Add Hardener Part B and continue to

stir

until even consistency.

4. Apply a wet coat in even parallel passes. Overlap each pass 50

to

avoid bare areas pinholes or holidays.

5 Thinning normally not required. Thin only

for

workability with

not

more than

10 by

volume of THINNER NO 10.

6 Apply a wet film thickness of

105

µ to provide 50 µ dry film

thickness.

7. Check thickness of dry coating with a non-destructive

Dry

Film

Thickness Gauge

8.

In

confined areas, observe safety rules

as

in Industrial Hygiene

Safety Rules during Paint Application.

9. Clean all equipment with JOTUN THINNER NO 10 immediately

after use to prevent clogging of material in hose and spray

equipment.

10. Uncured paint should

not be

exposed

to

water, chemicals or

mechanical stress before the paint

is

fully cured.

11. Minimum re-coating interval must be follow

to TDS

1,5

hours at

40°C, 3 hours at 23°C, 6 hours

at

10°C) .

378 JTL 122015 01

December

2015

PAINTING PRO EDURE

Prepared y Jotun Indonesia

age

9

o

9