AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Con(cac( Numbec Page of Pages 1 I 1 2. AmendmenUModification Number 3. Effective Dale 4. Requisition/Purchase Request No. 5. Solicitation Caption Design Build Services to replace GF-2019-R-0030-M003 See 16C Gymnasium Flooring 6. Issued By: Code l 7. Administered By (If other than line 6) University of the District of Columbia University of the District of Columbia Office of Contracts and Procurement - Capital Procurement Division Office of Contracts and Procurement - Capital Procurement Division 4200 Connec ti cut Avenue, NW, Bldg. 38 Suite 200C 4200 Connecticut Avenue, NW, Bldg. 38 Suite 200C Westchester, IL 60154 Washington, DC 20008 8. Name and Address of Contractor (No. Street, city, country, slate and ZIP Code) =- 9A. Amendment of Solicitation No. GF-20 19-R-0030 10A. Modification of Contract/Order No. X 10B. Dated (See Item 13) Code I I Facilityl 11 . THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATI ONS WThe above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers WiS not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning 1 copy of the amendment: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate leUer or fax which includes a reference to the solicitation and amendment number. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by leUer or fax, provided each leUer or telegram makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified. 12. Accounting and Appropriation Data (I f Required) 13. THIS ITEM APPLIES ONLY TO MODIFICATI ONS OF CONTRACTS/ORDERS , IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN I TEM 14 A. This change order is issued pursuant to: (Specify Authority) The changes set forth in Item 14 are made in the contract/order no. in item 10A. B. The above numbered contract/order is modified t9 reflect the administrative changes (such as changes in paying office, appropriation date, etc.) set forth in item 14, pursuant to the authority of 27 DCMR, Chapter 36, Section 3601 .2. C. This supplemental agreement is entered into pursuant to authority of: X D. Other (Specify type of modifi cation and authority) Title 8, DCMR, Chapter 30, Section 3062.3 E. IMPORTANT: Contractor L J is not, LXJ i required to sign this document and return 1 copy to the issuing off I<e 14. Description of amendment/modification (Organized by UCF Section headings, including solicitation/contract subject mailer where feasible.) RFP No . GF-2019-R-0030 for is hereby amended as follows: 1. Ar ticle 5. 1.1 DELETE: March 27, 2019 and SUBSTITUTE: April 3, 2019 not later (han 2:00 p.m. (0 officia lly ex (end (he proposal due date. 2. Answers to questions submitted prior to the deadline are attached. No ad ditional questions w ill be entertained. ALL OTH ER TERMS Ar'lD CONDITIONS REMAIN UNCHANGED Except as provided herein, all terms and conditions of the document referenced in Item (9A or 10A) remain unchanged and in fufl force and effect 15A. Name and Title of Signer (Type or print) 16A. Name of Contracting Officer EDDIE WHITAKER 15B. Name of Contractor 15C. Date Signed 16C. Dale Signed \.t 3/8J-.//fj V' (Signature of person authorized to sign) of Contracting Officer )

Page of Pages Solicitation Caption Design Build Services

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Page of Pages Solicitation Caption Design Build Services

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Con(cac( Numbec Page of Pages

1 I 1 2. AmendmenUModification Number 3. Effective Dale 4. Requisition/Purchase Request No. 5. Solicitation Caption

Design Build Services to replace

GF-2019-R-0030-M003 See 16C Gymnasium Flooring

6. Issued By: Codel 7. Administered By (If other than line 6)

University of the District of Columbia University of the District of Columbia

Office of Contracts and Procurement - Capital Procurement Division Office of Contracts and Procurement - Capital Procurement Division

4200 Connecticut Avenue, NW, Bldg . 38 Suite 200C 4200 Connecticut Avenue, NW, Bldg . 38 Suite 200C

Westchester, IL 60154 Washington, DC 20008

8. Name and Address of Contractor (No. Street, city, country, slate and ZIP Code) =- 9A. Amendment of Solicitation No.

GF-20 19-R-0030

10A. Modification of Contract/Order No.

X 10B. Dated (See Item 13)

Code I I Facility l 11 . THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

WThe above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers WiS extended .,~is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the

following methods: (a) By completing Items 8 and 15, and returning 1 copy of the amendment: (b) By acknowledging receipt of th is

amendment on each copy of the offer submitted; or (c) By separate leUer or fax which includes a reference to the solicitation and

amendment number. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of thi s amendment you desire to change

an offer already submitted, such change may be made by leUer or fax, provided each leUer or telegram makes reference to the

solicitation and this amendment , and is received prior to the opening hour and date specified.

12. Accounting and Appropriation Data (I f Required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS, IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14

A. This change order is issued pursuant to: (Specify Authority)

The changes set forth in Item 14 are made in the contract/order no. in item 10A.

B. The above numbered contract/order is modified t9 reflect the administrative changes (such as changes in paying office, appropriation date, etc.) set forth in item 14, pursuant to the authority of 27 DCMR, Chapter 36, Section 3601 .2.

C. This supplemental agreement is entered into pursuant to authority of:

X D. Other (Specify type of modification and authority) Title 8, DCMR, Chapter 30, Section 3062.3

E. IMPORTANT: Contractor L J is not , L XJ i required to sign this document and return 1 copy to the issuing off I<e 14. Description of amendment/modification (Organized by UCF Section headings, including solicitation/contract subject mailer where feasible.)

RFP No. GF-2019-R-0030 for is hereby amended as follows:

1. A rticle 5. 1.1 DELETE: March 27, 2019 and SUBSTITUTE: April 3, 2019 not later (han 2:00 p.m. (0 officia ll y ex (end (he proposal

due date.

2. Answers to questions submitted prior to the deadline are attached. No additional questions w ill be entertained.

ALL OTHER TERMS Ar'lD CONDITIONS REMAIN UNCHANGED

Except as provided herein, all terms and conditions of the document referenced in Item (9A or 10A) remain unchanged and in fufl force and effect

15A. Name and Title of Signer (Type or print) 16A. Name of Contracting Officer

EDDIE WHITAKER 15B. Name of Contractor 15C. Date Signed 16B~fCOlca 16C. Dale Signed

\.t 3/8J-.//fj V'

(Signature of person authorized to sign ) (S~nature of Contracting Officer)

Page 2: Page of Pages Solicitation Caption Design Build Services

1. Actual bid due date?

Answer: The bid opening date has been extended to April 3, 2019 not later than 2:00 p.m.

2. How the design need to be submitted? Ans: As mentioned in the solicitation if we are using sa me material suggested by University (Robbin Sports Floor),

design part is already mentioned in the so licitation . If we are using other material then we need to provide the design details as described in solicitation.

Answer: The Statement of Work included a certain flooring system to be used as a basis of design. It is not required that the offerors use that flooring system. Should the offeror decide to use a different type of flooring system, then the offeror will need to indicate that in the offer and describe the flooring system that they intend to use instead.

3. Test for flooring? Ans: As a Contractor we need to provide our proposal one with assuming after testing there is no Urethane in the floor and other with the floor containing Urethane material removal

Answer: To account for the possibility of having to remediate the existing flooring, offerors shall

provide an add-a ltern ate amount as a separate line item in their proposal for the remediation ofthe exist ing floor should test results prove positive.

4.What is the grade of wood & type of finish to be used - oil base or water base? Could not find in spec.

Answer : The grat of wood is 2nd

or better.

5. What is ha+ening with the electric box in the gym floor?

Answer: The electrical outlets in the floor must remain in place and functional. The floor will need to be framed arou nd the outlet with possibly an access box installed if the outlets will not be even with the new floor.

6. Is it possible to cut the interior doors & install ramps on exterior of doors to eleviate tripping hazards?

Answer: Yes. To accommodate for the need to provide a slight ramp, the ramp should be constructed on the outside of the entrance doors and the door heights will be adjusted by the contractor.

Page 3: Page of Pages Solicitation Caption Design Build Services

7.Can I have a copy of the sign-in sheets for the site visit?

Answer: A copy is attached.

8. The specs call for Bio-Channel 5B floorin g, but page 61 state Bio-Classic, which one is

correct?

Answer: The basis of design is th e Bio-Channel 5B is the flooring system.

9. The Bio-Channel 5B is the low profile system.

Answer: The Bio-Channel 5B is as shown on the attached drawing.

10. Is there any mechanical or electrical work included?

Answer: There is an electrical outlet on the side of the main court used for the scorer's table. That electrical outlet will remain . The contractor will need to maintain access to that outlet once the new floor is installed (see answer to question #5 above). There is no mechanical work.

11. Is a building permit requ ired?

Answer: Assume that a building permit will be required.

Page 4: Page of Pages Solicitation Caption Design Build Services

Vent Cove Base

q ,

q q

,.

Anchor Channel and Spike to accommodate lateral movement

q • • q

Concrete Slab

q. 4

q

6 MIL Vapor Retarder

Robbins 25/32" thick x 2~" wide Continuous Strip XL Maple Flooring (MFMA-FJ)

. , .!, '.

Factory prepared Bio-Channel SB Subftoor Panels

q. •.

Threshold Plate

Continuous Stage Resilient Strip Pad

q "

,q

4

Solid Block

Screw

.. q

ROBBINS SPORTS SURFACES BIO-CHANNEL SB SYSTEM DETAIL VIEW 4777 Eastern Ave.

Cincinnati , OH 45226 1-800-543-1913

40 q

lJ· 4

Page 5: Page of Pages Solicitation Caption Design Build Services

We request further clarification on the below listed items:

1. Is a building permit needed for this project?

ANSWER: Assume that a building permit is needed for this project.

2. Is new gaming equipment needed as part of this project? If so, please provide us with a list.

ANSWER: No new gaming equipment is needed as part of this project, however, new sleeves

for the standards/uprights to hold the volleyball netting are to be provided and installed for the

volleyball courts - on the main court and on one of the side courts.

3. Any mechanical, electrical and plumbing work (if any) is part of this project?

Answer: The electrica l outlets in the floor must remain in place and functional. The floor will need to be framed around the outlet with possibly an access box insta lled ifthe outlets will not be even with the new floor.

4. See below attached images of existing floor mounted devices and let us know if any work is

associated with these devices.

Thel electrica l outlets in the floor must remain in place and Ifunctional. The floor wi ll need to be

frarhed around the outlet with possibly an access box insta led ifthe outlets will not be even

Witl the new floor. New sleeves for the standards/uprightf to hold the volleyball netting are to

be , rovided and installed for the volleyball courts - on the ain court and on one of the side

cou ts.

Page 6: Page of Pages Solicitation Caption Design Build Services

,. I •• 'j -

f

Page 7: Page of Pages Solicitation Caption Design Build Services

Ca ll or e-mail me if needed.

Page 8: Page of Pages Solicitation Caption Design Build Services

2

4

-5

-6 I -r-:r

, 7 I

! .0. W\ 8 1~e-+f1J 9

'I)

11

12 , v , .

SOLICITATION NO.: GF-2019-R-0030 DESIGN BUILD SERVICES TO REPLACE GYMNASIUM FLOORING

FOR THE UNIVERSITY OF THE DISTRICT OF COLUMBIA

Thursday, March 14,2019 at 11:00 A.M. in the UDC Van Ness Campus Student Center Ballroom B

PRE-PROPOSAL CONFERENCE SIGN-IN SHEET

PLEASE PRINT " ~"""·~ T ·''''''·· II'

c \J, '\) -;,,-, - -=-

"7;75'

C' 0 "-\ c.... '/' / '1 ~I (; , (2. / > ~r; 1sTJ

AI'J>t2PO UA) I v/5lt 511. /, /'t-.<JCI/1. S,-r:-tJ{ .

s )re~l<...r(4 ,J

/t9; fTC, A--( ~

\,~.J.-

\-'- ~"" (I! L-...

Page 9: Page of Pages Solicitation Caption Design Build Services

15

16

17

18

19

20

21

22

1.3

24

25

26

27

SOLICITATION NO.: GF-2019-R-0030 DESIGN BUILD SERVICES TO REPLACE GYMNASIUM FLOORING

FOR THE UNIVERSITY OF THE DISTRICT OF COLUMBIA

Thursday, March 14,2019 at 11:00 A.M. in the UDC Van Ness Campus Student Center Ballroom B

PRE-PROPOSAL CONFERENCE SIGN-IN SHEET

PLEASE PRINT COMPA v:

3b( ll'1G"-S<.9\ 0

ZP-L. Z~4 ")Cl.Coc.. [-tl 14-

LAK 'lD0/z,7o/ -&&11 AcJla pc,Eot.{

elLl { r'\. c GOL) Z-~~_ci1L( (\ CAMc<<-L...r 0 QV1 ol~l. Wr>-.,

Le'

'd II t t Il ) II ",II @ lvrD< ~R ('" c n+~'f'" :"'\. ( \),1)0- ,JtJ 1-- 7--1 <.{ v t;' In ;J-r.f 1 t1-""'-' ~. \ -I'.~ 1(', '" s t2-- [JflC-. t;:: \) l!