Page 1 of I DATA TRANSMITTAL
l.EDT 624730
2. To: (Receiv ing Drgan iza t i on ) 3. From: ( O r i g i n a t i n g Organizat ion)
5. P r o j .lProg.lDept ./Div. : Distribution TWRS Projects/SST Retrieval
W-320 TWRSITCPN # 02991 6. Design A u t h o r i t y 1 Design AgentlCog.
Engr.: JW Bailey, NHC
8. O r i g i n a t o r Remarks: For approval and release o f a new supporting document. This document has been generated to ensure retrievabil ity o f the Project W-320 "Master Calculation List". 11. Receiver Remarks: 11A. Design Base l i ne Docunent? [ ] Yes [XI NO
4. Re la ted EDT No.:
7. Purchase Order No.: n/a
n/a
n/a 9. Equip./Corrponent No.:
io. System/BLdg. lFaci l i ty :
241-C-106 12. Major Assm. Dug. No.:
13. Pe rm i t lPe rm i t A p p l i c a t i o n No.:
14. Required Response Date:
15. DATA TRANSMITTED - IEI Title or Description of Data
IAI IC1 ID1
NO. NO. I01 DocumentlDrawinp No. Sheet Rev. Transmitted item NO.
- 1
( F ) Approval Dssiw nator
(H ) Origi- niltor
Dispo- sition
( 1 ) Rscsir
Dihpo- sition
er
I HNF-2527 - 0 Project W-320, NA
241-C-106 Sluicing, Master Calculation
Approval Designator (FI Roolion for Transmittal I51 E. S. Q. D or NIA 1. Approval 4. Review 1888 WHGCM-55, 2. Release 5. Post-Review Sec.12.71 3. Information 6. Dist. (Receipt Acknow. Required)
ED-7400172-1
Disposition [HI & Ill 1. Approved 4. Reviewed nolcomment 2. Approved wleommsnt 5. Reviewed wlcommsm 3. Disapproved wlcomment 6. Receipt acknowledged
HNF-2527, Rev. 0
Project W-320, 241 -C-I 06 Sluicing, Master Calculation List
John W. Bailey Numatec Hanford C o . , Richland, WA 99352 U.S. Department o f Energy Contract DE-AC09-96RL13200
EDT/ECN: 624730 UC: 506 Org Code: 8C452 Charge Code: D2991/HANA0600 B&R Code: EW3130010 Total Pages: /8
Key Words: Calcu la t ion , WRSS.
W-320, S lu ic ing , Tank 241-C-106, Tank 241-AY-102,
Abstract : "Master Calcu la t ion List" r e a d i l y r e t r i e v a b l e .
T h i s support ing document has been prepared t o make t h e
TRADEMARK DISCLAIMER. trade name, trademark, manufacturer, or otheruise, does not necessarily constitute or inply i t s endorsement, recmndation, or favoring by the United States Govermnt or any agency thereof or i t s contractors or subcontractors.
Printed i n the United States of America. To obtain copies of this docmnt, contact: Docmnt Control Services, P.O. Box 950, Maitstop Hb-08, Richland UA 99352, Phone (509) 372-2420; Fax (509) 376-4989.
Reference herein to any specific c m r c i a l product, process, or service by
& & 3" Reless ApprOV ate
Approved for Public Release
I A-6400-073 (01197) GEF321
Project W-320 Master Calculation List HNF-2527, Rev. 0
Issued Rev Status Discpl Calculation Title , Originator Comments Under
HNF-
Calc No. w320-
Page 1 of 17
HNF-2527, Rev. 0 Project W-320 Master Calculation List
27
29
30
I y::2 I Rev I Status I Discpl I Calculation Title I Originator I Comments
24-025 1 App'd :::At Cover Block Lifting Bail Evaluation MB Lasota C-Farm: 2468
24-026 Struct Missile Evaluation 51A/51B; Design Verified (simple SC 3/1) 2468
MB Lasota C-Farm: SC 3 Equip. Anchorage 2468 24-027 Struct Related Equipment Attachments
RW Davidson C-Farm: 2468 24-028 Struct Grade Items
Civl Seismic Shutdown System Padmind JR AY- & C-Farm: 241-AY-51A/51B, 241-C-
Civ/
Civ/ Engineering Evaluation of Commercial
Seismic Analysis for Misc. Safety
17 1 24-015 I 1 1 App'd I 1241-C-106 Dome Load Summary Repord RW Davidson IC-Farm: Tank 241-C-106 1 2466
32 24-030 As-Built Civ/ Struct
I MB Lasota IAY-Farm: Pit AY- 18 I 24-016 I 2 /As-Built1 L:v!+ ISluice Pit AY-OZE Analysis E P ,I
MR Custer HVAC Skid: 2468 Electrical Equipment and Conduit Supports-Process Bldg. Skid
Civ/ Equipment FOL 25 I 24-023 I 0 IAS-BUiltl P .... "I I0 .. -^^
31 I 24-029 I 2 I As-Built1 g::Lt lElemrical Structural Equipment Analysis of supports, safety Related I MB Lasota IAY- & C-Farm
33 24-031 0 As-Built Struct Process Bldg Equip Skid Rigging Frame MR Custer ~ ~ ~ ~ ~ t : ~ ~ ~ ~ b S n l ; h r , " ~ ~ ~ ~ ~ ~ ~ d 2468 I I I I civl I 34 I 24-032 I 0 ( As-Built1 :/::+ ICover Block Analysis-Sluice Pit AY-OZEI MB Lasota IAY-Farm: Pit AY-O2E; ECN W-320-173 I 2468
Page 2 of 17
Project W-320 Master Calculation List
Originator
RL Ackerman
HNF-2527, Rev. 0
Issued Comments Under
HNF-
C-Farm: 2468
41
Status Discpl
4 2
Calculation Title
43
MR Custer
NG Ha
AS Langevin
LA Valle
CA Fargo
44
2468 C-Farm: 241-C-91 retained for record only and listed on the drawing index
C-Farm: Exhaust Air Cleanup Train 2468
C-Farm: 2468
AY-Farm; 2468
AY- & C-Farm: Exhausters VTP-POR-007 & - 2468
45
4s-Built
4S-BUilt
App’d
As-Buiit
:ale No. w-320-
24-033
24-034
24-035
24-036
24-037
- - -
-
-
;::it Process Bldg Lower Lifting Frame
Civ/ RecirculationlExhaust Skid Strl Struct Evaluations
:::it Exhaust Skid Platform Modification
Struct Equipment Rack
Struct Exhauster
Civ/
Civ/ DBE Analysis for 1000 CFM Portable
Check Calcs for AY-102 Electrical
24-038
RC Campbell
RC Campbell
RC Campbell
RC Campbell
RC Campbell
25-001
Equipment Removal Sys: Use of Spray Ring deleted from project. Calc checked against released drawings, retained for record only and not listed on the drawing index
Equipment Removal Sys: Removal of the existing Transfer Pump and the use of the Pump Lifting Fixture deleted from project. Calc checked against released drawings, retained for record only and not listed on the drawing index Equipment Removal Sys: Removal of the existing Heel Jet and the use of the Heel Jet Lifting Fixture deleted from project. Calc checked against released drawings, retained for record only and not listed on the drawing index Equipment Removal Sys: Removal of the Heel Jet deleted from project. Calc given final review, retained for record only and not listed on the drawing index
Equipment Removal Sys: Removal of the Agitator Pump deleted from project. Calc given final review, retained for record only and not listed on the drawing index
No
No
No
No
No
25-002
25-003
__
25-004
____
25-005
0
1
1
0
0
hs-Built/ :::it IVehicle Load Over Pipeline
As-Built I Mech IDecontamination Spray Ring Pipe Stres:
Lifting Fixture Stress Analysis, Transfer Pump Lifting Fixture
Lifting Fixture Stress Analysis, Heel Jet Lifting Fixture
Mech Center of Gravity, Heel Jet, Tank 106C I IPitB
Mech Center of Gravity, Agitator Pump, Tank 1 102AY. Pit B App’d 1 Page 3 of 17
HNF-2527, Rev. 0 Project W-320 Master Calculation List
Originator Comments Calc No. w-320-
25-006
Issued Under CINE.
25-007
RC Campbell
RC Campbell
RC Campbell
RC Campbell
RC Campbell
RC
RC Campbell
25-008
Equipment Removal Sys: Removal ot the existing Transfer Pump deleted-from project. Calc given final review, retained for record only and not listed on the drawing index
Equipment Removal Sys: Removal of the existing Agitator Pump and the use of the Pump Lifting Fixture deleted from project. Calc checked against released drawings, retained for record only and not listed on the drawing index Equipment Removal Sys: Use of the Pit B spool piece deleted from project. Calc checked against released drawings, .retained for record only and not listed on the drawing index Equipment Removal Sys: Use of the Pit A spool piece deleted from project. Calc checked against released drawings, retained for record only and not listed on the drawing index Equipment Removal Sys: Use of the Pit B spool piece deleted from project. Calc checked against released drawings, retained for record only and not listed on the drawing index
Equipment Removal Sys: Use of spool pieces deleted from project. Calc checked against released drawings, retained for record only and not listed on the drawing index
Equipment Removal Sys: Removal of the existing Transfer Pump deleted from project. Calc checked against released drawings, retained for record only and not listed on the drawinp index
No
No
No
No
No
No
No
25-009
25-01 0
25-01 1
25-01 2
Status Discpl Calculation Title
106C. Pit A "Mystery Pump"
~s-Buiit Mech Lifting Fixture Stress Analysis, Agitator Pump Lifting Fixture I 1
As-Built Mech Spool Piece Weight, Pump Pit 102AY. Pit B
As-Buiit Mech Spool Piece Weight, Pump Pit 106C. Pii A
As-Built Mech Spool Piece Weight, Pump Pit 106C. Pi1 l lB As-Built Mech Tie Rod Sizing for Spool Pieces
As-Built Mech Pump Lifting Point Strength Analysis
Page 4 of 17
Project W-320 Master Calculation List
Originator
RC Campbell
RC
Rc Campbell
HNF-2527, Rev. 0
Issued Comments Under
HNF- Equipment Removal Sys: Removal of the Heel Jet deleted from project. Calc given final review, retained for record only and not listed on the drawing index Equipment Removal Sys: Removal of the Heel Jet deleted from project. Calc given final review, retained for record only and not listed on the drawing index
Equipment Removal Sys: Removal of the Agitator Pump deleted from project. Calc glven final review, retained for record only and not listed on the drawing index
No
No
No
:ale No. w.320- - 25-013
~
25-014
RC Campbell
RC
RC Campbell
RC Campbell
25-015
Equipment Removal Sys: Removal of the Trasfer Pump and the use of the Mock-up deleted from project. Calc checked against No released drawings, retained for record only and not listed on the drawing index
Equipment Removal Sys: Shielding plugs used for installation only and not part of permanent facility modification. Calc checked against released drawings, retained for record only and not listed on the drawing index Equipment Removal Sys: Shielding plugs used for installation only and not part of permanent facility modification. Calc checked against released drawings, retained for record only and not listed on the drawing index
Equipment Removal Sys: Removal of the Heel Jet deleted from project. Calc checked against released drawings, retained for record only and not listed on the drawing index
No
No
No
25-016
25-017
25-01 a
25-01 9
Status Discpl Calculation Title
Mech Weight and Center of Gravity for Heel App'd 1 1 Jet Mock-up
Weight and Center of Gravity for Transfer Pump Mock-up
As-Built Mech Flange Thickness of Shielding Plugs l l As-Built Mech Lifting Capacity of Bails
As-Built Mech Pin sizing of Heel Jet Mockup Joints l l Page 5 of 17
ON
ON
B Z O - 9 z
P Z O - 9 Z
-
EZO-9Z
z z o - 9 z
27-008 I I
Discpl
Piping
Piping
Piping
Piping
Project W-320 Master Calculation List
Calculation Title
Sizing of Drain Lines for the Pump Pit (241-CR-06A1, the Heel Pit (241-CR- 066). and the Sluice Pit (241-CR-06CI
Hydraulic Analysis for Slurry Pump Normal Operations at Maximum Operational Temperature
Slurry Pumps Hydraulic Calculation
Hydraulic Analysis for Slurry Pump Star up Operations at Maximum Operational Temperature
Originator Comments
Not Used I
NJ Juplo
DL Stone
NJ Juplo
Not Used I
C-Farm: Heel Pit work deleted. Drain slots covered and replaced by 6" dia. drain hole in sluicer top plate, see H-2-818551 sh 4. Calc voided, given final review, retained for record only and not listed on the drawing index. Superseded by calc 27-041
C-Farm: Calc voided, given final review, retained for record only and not listed on the drawing index. Superseded by calc 27-048
C-Farm: For Pumps P-1361 & P-1362 and Line 4" SL-100-M9. Calc not As-Built, given final review and original content retained for record, to suppon Pump P-Spec, W-32O-Pl7, dated 1/17/95. Superseded by 27-048
DL Stone
HNF-2527, Rev. 0
C-Farm: Calc voided, given final review, retained for record only and not listed on the drawing index. Superseded by calc 27-048
Piping Hydraulic Analysis for Slurry Pump Star up Operations at Minimum Operational Temperature
DL Stone C-Farm: Calc voided, given final review, retained for record only and not listed on the drawing index. Superseded by calc 27-048
I Not Used
Piping
I Not Used
Hydraulic Analysis for Sluice Pump at Maximum Operating Temperature DL Stone
- Issued Under HNF- - No
-
No
-
247 1
AY-Farm: Calc voided, given final review, retained for record only and not listed on the drawing index. Superseded by calc 27-048
No
No
NA
NA
No
Page 7 of 17
Project W-320 Master Calculation List
Status
HNF-2527, Rev. 0
Issued Discpl Calculation Title Originator Comments Under
7 4 Aw'd
75
AY-Farm: For Pumps P-0621 & P-0622 and Line 4" SN-200-M9. Calc not As-Built, given
record, to support Pump P-Spec, W-32O-Pl7. dated 1 I1 7/95. Superseded by 27-048
AY, C & Inter-Farm: Significant pressure
Piping Hydraulic Analysis for Sluice Pump at Minimum Operating Temperature K. Cleveland final review and original content retained for 2471
7 7
As-Built
Void
As-Built 78 - 7 9
80 -
- 81 - 82 -
index.
Piping Sizing of Compressor NJ Juplo C-Farm: Air Compressor CPR-1361 247 1
AY, C & Inter-Farm: Significant pressure transients due to sudden valve closure only.
Calc voided, given final review, retained for record only and not listed on the drawing index. AY, C & Inter-Farm: Lines 4" SL-lOO-Mg &
Piping Pressure Forces at Changes in Direction Merzouk Valves on process lines deleted from project. in Transfer Line During Transient States No
Piping Process Pipe Stress Analysis DL Stone 4" SN-200-M9. Ref calc's 27-016, 029 & 2472
83
As-Built
As-Built
As-Built
27-010
055 AY, C & Inter-Farm: Lines 4" SL-lOO-Mg & 4" SN-200-M9 encasements AY, C & Inter-Farm: Lines 4" SL-lOO-Mg & 4" SN-200-M9 structural supports C-Farm: Pit C-06A (jumper US-A,Bl & Pit C-
DL Stone
DL Stone JR Booth
2473 Piping Encasement Pipe Stress Analysis
2474 Piping Support Structural Analysis
Piping C Farm Jumper Stress Analysis DL Stone 06C (jumper U6-AI. Ref calc's 27-01 3 & 2474
0
C-Farm: Requirement to pressure relieve
Calc voided, retained for record only and not listed on the drawing index.
process flow (350 gpml deleted from project.
27-012
No
0
transients due to sudden valve closure only.
Calc voided, given final review, retained for record only and not listed on the drawing
No Estimate Water Hammer Due to Sudden
Transfer Pump Void 1 Piping 1 Valve Closure or Sudden Power Loss to Valves On process lines deleted from
As-Built I Piping IDistributor Stress Analysis I RC Campbell IAY-Farm; Distributor D-0621 I 2474
VOID Piping Sizing of Pressure Relief Valve 1 1 Page 8 of 17
Project W-320 Master Calculation List
Discpl
Piping
HNF-2527. Rev. 0
Calculation Title
Winch Analysis
85
D.L. Stone
86
AY & C-Farm: Winches W-0621 & W-1361 2474
87
-
88 -
89 -
Piping
9 0
Alternate Routing Analysis, M10, M1 1, M12, and M13
91
RC Campbell
RC Campbell
RC Campbell
M c ~ . ~ o l s
RC Campbell
RC Campbell
DL Stone
DL Stone
Calc No.
27-019 0
27-020 0
27-021 0
27-022 0
27-023
27-024 0
27-025 0
AY-Farm: Alternate routing not used, calc given final review, retained for record only & not listed on drawing index
AY-Farm: Calc given final review, retained for record only & not listed on drawing index. Superseded by calc's 27-045 & 27-048
AY-Farm: Caic given final review, retained for record only & not listed on drawing index. Superseded by calck 27-045 & 27-048
No
No
No
Not Used NA
AY & C-Farm: Calc voided, retained for record only & not listed on the drawing index. Superseded by calc 27-041
C-Farm: Heel Pump deleted from project. Calc voided, given final review, retained for record only & not listed on drawing index.
C-Farm: Eductor System deleted from project. Calc voided, given final review, retained for record only & not listed on drawing index.
No
No
No
Not Used NA
2475 C-Farm: Drain Line, 3" DR-302-M9, & it's 6" encasement AY-Farm: Pit AY-02E (jumper UP-A,B) & Pit AY-O2A (iumDer U l l -A I . Ref calc's 27-013 2475
I
Piping
Piping
Piping
Piping
27-027
27-030
27-031 0
Distributor Siphon Breakei
Sluice Pump Siphon Break
Not Used
Tank Template Drain Flow
Heel Pump System Operating Point
- status - - 4s-Buill
AW McNichols
~
Not Used
. . & 055 C-Farm: Loops 6" VT-1001-M42 & 6" VT- 1002 -M42 2475
Void __
Void
Void
- Not
Used
4s-Buili
4s-Buili
4s-Buili
4s-Buili
Piping Eductor Sizing System Curve
I Not Used
Piping IMiscellaneous Pipe Stress Analysis
Piping Miscellaneous Jumper Pipe Stress Analysis - AY Farm
Piping JHVAC Seal ~ o o p
Piping IBooster Pump Restrain Analysis
Originator I Comments
RC Campbell IAY-Farm: Sluice Pump, P-0622 I 2475
Page 9 of 17
Project W-320 Master Calculation List
Originator
NJ Juplo
HNF-2527. Rev. 0
Issued Comments Under
HNF-
C-Farm: Slurry Pump, P-1361 2476 97 27-032 0
9 8 27-033 0
99 27-034 0
100 27-035 0
101 27-036 1
102 27-037 0
103 27-038 0
104 27-039 0
105 27-040 0
106 27-041 1
107 27-042 0
AW McNichols
MB Lasota
A. Tedrow
DL Stone
DL Stone
MH Ahmed
JG Rupert
Status Discpl Calculation Title
As-Built Piping Slurry Pump Seismic Stability
C-Farm: Calc voided, given final review, retained for record only & not listed on the drawing index. Superseded by calc's 27-034 & 27-044
C-Farm: Sluicer, S-1361 2476
C-Farm: Sluicer, S-1361 2476
2476 AY & C-Farm: Rigging assembly for winches W-0621 & W-1361 AY & C-Farm; Test assembly used for trainingltesting only, not part of a permanent facility modification. Calc given final review, No retained for record only & not listed on drawing index.
AY & C-Farm: The option to bury encasement pipe in controlled fill was not used. Calc given final review, retained for record only & not listed on drawing index.
AY & C-Farm: The platform was used to support installation and was not part of a permanent facility modification. Calc given No final review, retained for record only & not
No
No
Void 1 Piping Istress on Sluicer Arm
DL Stone
Piping WinchlPump Simulation Testing App'd 1 1 Assembly
listed on drawing index. C-Farm: Booster Pump P-1362 seismic restraint AY & C-Farm: The 6" dia. drain is used in C-
2476
Piping Stress Analysis of Encasement Pipe Buried in Controlled Density Fill
App'd I I App'd Piping Temporary Winch Support Platform I 1
As-Built1 Piping IBooster Pump Assembly Components
As-Built Piping High Capacity Drain Flow
As-Built I Piping IAdapter Plate Stress Analysis
Farm Pits 06A & 06C and in AY-Farm Pits 02A & 02E. Drains have been installed in Winches W-0621 & W-1361, Distributor D- 0621, and Sluicer S-1361. Supersedes calc's 27-001 and 27-024 I::: DL Stone AY 1361 & C-Farm: & W-0621 Adapter plates for winches W-
DL Stone
Page 10 of 17
Project W-320 Master Calculation List HNF-2527, Rev. 0
Status
As-Built
As-Built
As-Built
Issued Discpl Calculation Title Originator Comments Under
HNF-
Piping Reynolds Numbers at Various % Solids DL Stone Inter-Farm: Lines 4" SL-100-M9 2476
2477 Piping Sluicer Nozzle Force Analysis
Piping Pipe Drain Flows & Anti-Siphon Sizing DL Stone Lines 4" SL-100-M9 (D-06211 & 4 " 2477
4" SN-200-M9 C-Farm: Hydraulic force of Sluicer (S-13611 nozzle. Supersedes calc 27-033
SN-200-M9 (W-06211
DL Stone
108 27-043
109 27-044
110 27-045
1'11 27-046
112 27-047
113 27-048
114 27-049
115 27-050
116 27-051
117 27-052
118 27-053
119 27-054
1 TK Peterson AY-Farm: Lifting force on shielding plugs in lcover blocks for AY-Farm's pits 02A & 02E I 2477 Flushing Nozzle Lifting Force
0
0
0
0
0
0
0
0
0
0
0
0
As-Built
As-Built
As-Built
App'd
As-Built
AY-Farm: Filter housing used for testing only
given final review, retained for record only & not listed on the drawing index.
1 2479 and removed before project turn over. Calc AY-102 Annulus Supply Air Filter Housing Installation Analysis
2477 MR Custer AY & C-Farm: 6C's Pits 06A & 06C and 2AY's Pits 02A & 02E
AY, C & Inter-Farm: Lines 4" SL-100-M9 & 4" SN-200-M9 and their appurtenances. As-
Calc. Supersedes Calc's 27-002, 003, 004, 005,008,009,021 & 022.
Piping Pit Volume and In/Out Flow Areas
Piping SlurrylSupernate Hydraulic Analysis K Hayase Built Slurry and Sluice Systems Hydraulic 2478
Piping Size of HVAC Duct Flushing System NJ Juplo HVAC Skid: Duct' lo" VT-l 'lo- 2479 M8 AY & C-Farm: Portable exhausters are for
installed. Calc given final review but not As- Build. AY-Farm: Pits 02A &02E jumpers to support
Piping Portable Exhauster Installation Analysis K Hayase emergency back-up and are not 2479
Piping Jumper Flushing Supply Head Analysis K Hayase flushing lines 4" SL-lOO-Mg & 4" SN-200- 2479
As-Built1 Piping lNew Supernate Jumper Analysis I K Hayase /AY-Farm: Pit 02A. (jumper U3-U11-B) I 2479
App'd
AY & C-Farm: System curves for portable exhausters to be used for 6C's dome exhaust
Portable exhausters are not installed. Calc given final review but not As-Built.
Piping System Curves for Exhauster K Hayase air and 2AY's dome & annulus exhaust air. 2479 Installation
Page 11 Of 17
Project W-320 Master Calculation List HNF-2527, Rev. 0
Issued Status Discpl Calculation Title Originator Comments Under
HNF-
Page 12 of 17
HNF-2527, Rev. 0 Project W-320 Master Calculation List
Rev Status Discpl Calculation Title Calc No. w-320-
I 3 2 28-01 2 0 As-built HVAC Process Building HVAC
Issued Originator Comments Under
HNF-
C-Farm: Process bldg's Fan FN-1364, Filter F-
Renumbered from H-012 to 28-01 2 RA Pina 1368 and Heaters UH-1362 & UH-1361. 2484
C-Farm: Lines 3" CWS-803-M4 & 3" CWR- 850-M4. Calc done by offsite subcontractor. Renumbered from H-013 to 28-013 and Heat Gain 133 28-013 0 As-built HVAC Water Line I I / / / 2484
Inter-Farm: Air &Water Service Bldg's Filter F-1366, Fan FN-1363, and Heater HC-1363 Renumbered from H-017 to 28-017
2484 37 28-o, As-built HVAC Service Building Fan Selection and I 1 1 1 IHeating Load
, 34 28-014 App,d HVAC Air Flow Calc System Review for Capture Velocity
135 28-015 1 As-built HVAC Sizing of Moisture Separator
136 28-01 6 0 As-built HVAC Pressure Relief Seal Loop Sizing
Loss Upstream of the Exhaust HVAC Skid & C-Farm: Fans FN-1361 and FN- 1362. Renumbered from H-018 to 28-018 2484
Equipment Removal Sys: Used to support equipment removal and not part of permanent
RG Hale faciliw modification. Calc given final review, No retained for record only and not listed on drawing index.
Renumbered from H-015 to 28-015
C-Farm: 6" VT-1001-M42 & 6" VT-1002-M9. Ref calc's 28-020 (commercial grade
verification). Renumbered from H-016 to 28- 01 6
RA Pins HVAC Skid: Moisture Separator MS-1361 2484
PH Langowski analysis) and 28-031 (independent 2484
139 28-019 Not Used Not Used
4o 28-020 As-built HVAC Commercial Grade Item Analysis, Pressure Relief Seal Loop pH Langowski
Not Used NA
C-Farm: 6" VT-1001-M42 & 6" VT-1002- M42. Ref calc's 28-020 (seal loop sizing) & 28-03 1 (independent verification). Renumbered from H-020 to 28-020
2484
Page 13 of 17
141 28-021 As-built HVAC Above Ground Pipe Stress Analysis for Duct Piping
C-Farm: 10" VT-1010-M8, 8" VT-1022-M8,
021 to 28-021 DL Stone and 6" VT-1060-M8 Renumbered from H- 2485
Project W-320 Master.Calculation List
Originator
RA Pins
HNF-2527, Rev. 0
Issued Comments Under
HNF-
2485 C-Farm: Process bldg 241-C-91's seal pot sizing. Renumbered from H-022 to 28-022
14
'H Langowski
14 - 14
14 -
-
AY & C-Farm: Heating/Cooling Units; AC- 1361, AC-1362, AC-0621, and AC-0622. Renumbered from H-023 to 28-023
2485
15
28-024
28-025
28-026
28-027
28-028
28-029
28-030
28-031 15
2
1
0
1
N/A
1
1
0
:ale No.
Langowskl
,H Langowskl
RA Pina
RC Campbell
N/A
I ~~ ~~
2485 AY-Farm: Enclosure Skid 241-AY-51. Renumbered from H-024 to 28-024
C-Farm: Enclosure Skid 241-C-51. Renumbered from H-025 to 28-025
HVAC Skid: Process Bldg 241-C-91 insulation. Renumbered from H-026 to 28- 2485 026
HVAC Skid: Bldg 241-C-91 duct supports Renumbered from H-027 to 28427
2485
2485
NA Void
I
N/A NIA
28-032 I 0
RA Plna
I
~~~~
2485 C-Farm: Pump Pit 06A cooling load. Renumbered from H-029 to 28-029
28-033 1 0
WJ Hodges
EL Dalpiaz
RC Campbell
RC Campbell
Status Discpl Calculation Title
As-built HVAC Seal Pot Sizing for Leak Detection
AY-Farm: Sluice Pit AY-OPE cooling load. Chiller R-0621 & Fan/Coil FC-0621.. Renumbered from H-030 to 2 8 4 3 0
C-Farm: 6" VT-1001-M42 & 6" VT-1002- M42. Ref calc's 28-01 6 (seal loop sizing) & 28-020 (commercial grade analysisl. Renumbered from H-031 to 28431
HVAC Skid: Process Bldg 241-C-91 dome exhaust air piping (ducting). Renumbered from H-032 to 28-032 HVAC Skid: Process Bldg 241-C-91 pipe (duct) supports. Renumbered from H-033
Cooling and Heating Required for Seismic Switch Missile Enclosure
As-built HVAC Cooling and Heating Required for 1 IVariable Speed Drive (VSD) Enclosure
As-built HVAC Above Ground Pipe Support Stress I IAnaIysis
Pressure Relief Seal Loop Design Verification
As-built HVAC Process Building Piping Stress Analysis I I Process Building Duct Support Stress Analysis
2486
-
2486
2486
2486
Page 14 of 17
Project W-320 Master Calculation List
y:k Rev Status Discpl Calculation Title
HNF-2527, Rev. 0
Issued Originator Comments Under
HNF-
Elect Total Loads for Fabrication Shop, Lunchroom Trailer & Office Trailer 162 31-007 1 App'd
I DL Equipment Removal Sys: Done to Support Levandowski Construction Trailer Installation. 1611 31-006 1 0 1 App'd I Elect ITotal Loads for Fabrication shop
NO DL Equipment Removal Sys: Done to Support Levandowski Construction Trailer Installation.
I
Tank C-106 Load Determination,
Lighting Calculations & Conduit Sizing. 166 31-01 1 1 As-built Elect FeederIProtection Sizing, Voltage Drop, DE Larson C-Farm:
Not Used Not Used Not Used 167 31-012
Equipment Removal Sys: Done to Support I Levandowski DL I Construction Trailer Installation. 1631 31-008 I 1 I App'd I Elect IWireway Sizes for Rack Details
2487
2487
NA
Equipment Removal Sys: Done to Support NO Levandowski Construction Trailer Installation. I DL I Conduit, Nipple, conductor, Grounding
164) 31-009 I 1 I I Elect 1 &Trip Setting sizing
C-106 Demand Load Analysis, Size 165 31-010 1 As-built I I I ' I Elect Ifeeders, Voltage Drop, and Fault Study I TJ Kasnick
Page 15 of 17
Calculation Title Calc No. w320- Rev Status Discpl
168 31-013 0 App'd Elect Cable Pulling Tension -C-Farm
Control Room: Cancelled by Descoping Control System to C-Farm Wire Sizing, Voltage Drop and Conduit Sizing 179 I 31-024 I 0 I Void I Elect I
Issued Originator Comments Under
HNF-
No DE Larson C-Farm: Not required for design will be used to direct wire instailation during construction.
180
Page 16 of 17
C-Farm: This calc was used to determined radiation fields during demolition and was not
Calc given final review, retained for record only & not listed on drawing index.
No Mech 33-001 0 App'd Above Open Pit (Tank c-106, Pump Pit GJ Peter part of a permanent facility modification. Exposure Rate with Pump Vertically
HNF-2527. Rev. 0 Project W-320 Master Calculation List
Originator
181 33-002
182 33-003
183 33-004
184 33-005
185 33-006
186 33-007
187 33-008
188 33-009
189 33-010
190 34-001
Comments Status Discpl Calculation Title
Mech Plug Thickness at End of Riser 42" Rise (ID = 32") Pit CR-O6A Tank C-106 App'd
Above Pit Shielding Thickness with Pump or Plug in Place - Pit CR - 06A (Tank C-106)
App'd Mech
GJ Peter
GJ Peter
SR Gedeon Earth Cover Shielding Thickness for Project W-320
C-Farm: This calc was used to size a shielding plug to be used during demolition and was not part of a permanent facility modification. Calc given final review, retained for record only & not listed on drawing index. C-Farm: This calc was used to size a shielding plug to be used during demolition and was not part of a permanent facility modification. Calc given final review, retained for record only & not listed on drawing index.
AY. C & Inter-Farm: Lines 4" SL-lOO-Mg & 4" SN-200-M9 earth cover Shielding. Caic done by onsite (WHC) subcontractor.
Cover Block, Sidewall Shielding As-Built Mech Thickness for Pump Pit 241-C-06A and
GJ Peter
Sluice Pit 241 C 0 6 C Individual Shielding Thickness for HEMF or HEME Shielding Thickness to Reduce 10
AS-BUilt Mech HVAC Skid: HME-1361 & HMF-1361 shielding
Plate or (6) Air Ga Determine if Shielding Necessary for
CT Li
SR Gedeon
GJ Peter
AR Snowhite
App,d Mech Determine the Worst Exposure Rate Inside the Pump Pit 241 G 0 6 A
C-Farm: Line 10" VT-1010-M8 shielding
AY-Farm: Pits 241-AY-02A & 241-AY-02E shielding. Calc done by onsite (WHC) subcontractor C-Farm: This calc was used to estimate exposure rates for an in Pit (C-06A) entry during demolition and was not part of a permanent facility modification. Calc given final review, retained for record only & not listed on drawing index.
Site work As-Built I Cthdc IRectifier 46 [Cross-Site Transfer Lines)
CT Li C-Farm: Pit 241-C-06A shielding
CT Li IHVAC Skid: Bldg 241-C-91 Shielding wail
- Issued Under HNF- -
No
No
2489
- 2489
2489
2489
2489 ___
2489
No
2492
Page 17 of 17
To From
Distribution JW Bai 1 ey Project Titleiwork Order Project W-320, HNF-2527, Master Calculation L i s t
JW Bailey S2-48 DE Evans S2-47 W-320 Project Fi les R1-29
Page 1 of 1 Date 6 August 1998 EDT No. 624730 ECN No. n/a
A-6000-135 (01/93) UEF067
Text Text Only Attach./ Name MSlN With All Appendix
Attach. Only
EDTlECN Only