page 1 of 14 Opportunities for Reliability Studies in ARIES M. S. Tillack ARIES Project Meeting 23-24 April 2009

Page 1 of 14 Opportunities for Reliability Studies in ARIES M. S. Tillack ARIES Project Meeting 23-24 April 2009

Embed Size (px)

DESCRIPTION

page 3 of 14 Very little R&D have been done to quantify expected reliability, and some have concluded that extensive testing is needed in fusion nuclear devices Statistical arguments have been used to highlight the possibility of infinitesimal reliability and the need for many long test runs in major facilities A = Π a i If i is large (like 100,000), then any value of a i much less than unity will cause A to be very small Confidence levels can be established from the results of testing, depending on the assumed statistics of failure (Weibull, exponential, Poisson, log-normal, …) Requirements for test time have been derived this way. aiai iA.9910, , ,0005x10 –5

Citation preview

Page 1: Page 1 of 14 Opportunities for Reliability Studies in ARIES M. S. Tillack ARIES Project Meeting 23-24 April 2009

page 1 of 14

Opportunities for Reliability Studies in ARIES

M. S. Tillack

ARIES Project Meeting23-24 April 2009

Page 2: Page 1 of 14 Opportunities for Reliability Studies in ARIES M. S. Tillack ARIES Project Meeting 23-24 April 2009

page 2 of 14

Previous efforts in ARIES focused on design improvements and reliability requirements Reliability “by design”, e.g.

Minimize joining, locate welds in low radiation environment Fault-tolerant interfaces (e.g., leaky SiC inserts) Low pressure LM coolant Derating (e.g., 90% )

Maintenance techniques to improve “availability” Requirements specification via system studies

“R&D needs” often omitted details on reliability growth Surprisingly, we didn’t describe reliability R&D very well in our

TRL exercise The emphasis was on proof of performance, system integration

and environmental relevance

Page 3: Page 1 of 14 Opportunities for Reliability Studies in ARIES M. S. Tillack ARIES Project Meeting 23-24 April 2009

page 3 of 14

Very little R&D have been done to quantify expected reliability, and some have concluded that

extensive testing is needed in fusion nuclear devices

Statistical arguments have been used to highlight the possibility of infinitesimal reliability and the need for many long test runs in major facilities

A = Πai

If i is large (like 100,000), then any value of ai much less than unity will cause A to be very small

Confidence levels can be established from the results of testing, depending on the assumed statistics of failure (Weibull, exponential, Poisson, log-normal, …) Requirements for test time have been derived this way.

ai i A.99 10,000 0

.9999 10,000 0.37

.9999 100,000 5x10–5

Page 4: Page 1 of 14 Opportunities for Reliability Studies in ARIES M. S. Tillack ARIES Project Meeting 23-24 April 2009

page 4 of 14

A typical hazard function includes a period of constant (random) failures characterized

by an exponential distribution

Page 5: Page 1 of 14 Opportunities for Reliability Studies in ARIES M. S. Tillack ARIES Project Meeting 23-24 April 2009

page 5 of 14

Example of confidence intervals for test data assuming a constant hazard function

Probability density: f(t) = (1/) exp(–t/)where is the (constant) failure rate

Most probable value: = (1/r) Σ(xi)where x is the test time and r is the number of failures

Confidence interval:where =(1–confidence)

Example case:80% confidence interval (=0.2): 10,500 ≤ ≤ 48,000

i t1 5,0002 4,0003 6,0004 9,0005 10,0006 10,0007 10,0008 10,0009 10,00010 10,000

2 tii=1

n

∑Χ(α / 2,2r+2)

2 ≤ τ ≤2 tii=1

n

∑Χ(1−α / 2,2r )

2

=21,000

(failures in red)

Example test data

Page 6: Page 1 of 14 Opportunities for Reliability Studies in ARIES M. S. Tillack ARIES Project Meeting 23-24 April 2009

page 6 of 14

Modern “Reliability Engineering” suggests much more can be done now to quantify and improve

reliability

1. Reliability program planning

2. Design for reliability

3. Failure Modes and Effects Analysis A formal and systematic approach to identifying potential system

failure modes, their causes, and the effects of the failure mode’s occurrence on the system’s operation.

4. Reliability modeling “Parts stress modeling” (empirical counting of parts and failure rates) “Physics of failure approach” (understanding failure mechanisms)

5. Reliability testing

Elements of reliability engineering:

Page 7: Page 1 of 14 Opportunities for Reliability Studies in ARIES M. S. Tillack ARIES Project Meeting 23-24 April 2009

page 7 of 14

“Physics of Failure” approach to reliability modeling

Information to plan tests and to determine stress margins are identified. Failure models are developed and used for new materials and

structures as well as existing designs. This approach involves several steps (Cushing et al, 1993):

Identify potential failure mechanisms (chemical, electrical, physical, mechanical, structural or thermal processes leading to failure), failure sites and failure modes.

Identify the appropriate failure models and their input parameters, including those associated with material characteristics, damage properties, relevant geometry at failure sites, manufacturing flaws and defects, and environmental and operating loads.

Determine the variability for each design parameter when possible. Compute the effective reliability function. Accept the design, if the estimated time-dependent reliability function

meets or exceeds the required value over the required time period.

proactively incorporates reliability into the design process by establishing a scientific basis for evaluating new materials,

structures & technologies.

Page 8: Page 1 of 14 Opportunities for Reliability Studies in ARIES M. S. Tillack ARIES Project Meeting 23-24 April 2009

page 8 of 14

Stress-Strength Interference Method

F(x)

Stress and strength can be measured independently.

Designs can be analyzed and improved to provide more “predictabilty”

Safety factors can be applied to reduce probability of failure.

This is highly reminiscent of optics damage threshold statistics

“Max of N”Probability Distribution

2.0

0.00E+000

5.00E+042

1.00E+043

1.50E+043

2.00E+043

2.50E+043

3.00E+043

Y Axis Title

X Axis Title

B

Damage fluenceMaximum laser

fluence

Page 9: Page 1 of 14 Opportunities for Reliability Studies in ARIES M. S. Tillack ARIES Project Meeting 23-24 April 2009

page 9 of 14

Reliability testing is performed in stages (Dodson and Nolan 2007)

1. Reliability growth testing: design changes and improvement2. Environmental stress screening: eliminate infant mortality failure

by subjecting parts to conditions harsher than their operating point3. Qualification testing: for “verification” of estimates4. Acceptance testing: performed by the manufacturer and/or buyer.

E.g., inspection, shake-down testing

5. In each of these stages, different types of tests can be performed1. Sequential testing2. Truncated testing (e.g., using exponential probability density)3. Accelerated life testing

Page 10: Page 1 of 14 Opportunities for Reliability Studies in ARIES M. S. Tillack ARIES Project Meeting 23-24 April 2009

page 10 of 14

For any reliable technology, the time to gather failure data can become unreasonable

Accelerated Testing is used… To discover failure modes To predict the normal field life

from the high-stress lab life

Models are used to transform accelerated test data to normal operating conditions

E.g., linear transformation of time scale The shape of the failure distribution does

not change due to acceleration

Example: accelerated testing with exponential probability density Transform time: to = t, where t is the time to fail under accelerated conditions f(t) = (1/) exp(–t/) accererated failure transforms to fo(t) = (1/) f(t/) Transform test data f(t) = (1/) exp(–t/) to

A demonstration of accelerated testing: nearly identical slope of failure probability under two different stress conditions

Page 11: Page 1 of 14 Opportunities for Reliability Studies in ARIES M. S. Tillack ARIES Project Meeting 23-24 April 2009

page 11 of 14

Question: Is there work we can do in ARIES to better define reliability R&D

needs1. Describe a scientific methodology for reliability R&D

Establish a paradigm for treating reliability issues in OFES, akin to our TRL work

Develop a reliability “program plan” specific to fusion

2. Perform a failure modes and effects analysis, e.g. for a DCLL blanket

3. Perform reliability modeling Use the physics of failure approach, rather than parts stress

modeling

4. Develop an R&D plan for reliability testing Describe stages of testing, opportunities for accelerated testing,

details of how materials and component tests should be conducted

Page 12: Page 1 of 14 Opportunities for Reliability Studies in ARIES M. S. Tillack ARIES Project Meeting 23-24 April 2009

page 12 of 14

Conclusions Reliability is (almost) universally understood to be one of the

most critical elements of commercially-viable fusion, yet little has been done to understand and improve reliability.

The field of reliability engineering is mature and can be used to structure a meaningful R&D program.

The ARIES Team has an opportunity to help define R&D needed to establish the credibility of fusion as a viable energy source.

Our Team is the best venue to perform this type of study. Specific research tasks can be envisioned, with several contributors.

Page 13: Page 1 of 14 Opportunities for Reliability Studies in ARIES M. S. Tillack ARIES Project Meeting 23-24 April 2009

page 13 of 14

References Thomas Stadterman and David Mortin, "Physics of Failure for Making High

Reliability a Reality,” U.S. Army Materiel Systems Analysis Activity (AMSAA), http://www.reliasoft.com/newsletter/v4i2/physics.htm

M. Cushing, D. Mortin, T. Stadterman and A. Malhotra, “Comparison of Electronics-Reliability Assessment Approaches,” IEEE Transactions on Reliability, Vol. 42, No. 1, December 1993.

Reliability Engineering, http://en.wikipedia.org/wiki/Reliability_engineering

Bryan Dodson and Dennis Nolan, Reliability Engineering Handbook, QA Publishing, Tucson AZ 1999.

Allisandro Birolini, Reliability Engineering: Theory and Practice, 5th Edition, Springer-Verlag Berlin 2007.

Page 14: Page 1 of 14 Opportunities for Reliability Studies in ARIES M. S. Tillack ARIES Project Meeting 23-24 April 2009

page 14 of 14

Other questions we might address

How do inspection and shakedown testing affect reliability? E.g., initial crack size is extremely important in crack growth If modules are stress tested prior to installation and defective

ones screened, then how does the reliability improve

How much nuclear testing is really required? If we understand material properties vs. neutron fluence

(including all joints, welds, under all service conditions), then how much risk is involved in extrapolating to full components?