KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - THRU 2014 2020 COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION 17 JAN 2014 INTERCHANGE LIGHTING AT LOUIE B. NUNN PARKWAY. (12CCR) IMPROVE THE SAFETY OF KY 98 NEAR DURHAM SPRINGS CHURCH (12CCR) IMPROVEMENTS TO KY 100: CURVE, BRIDGE, AND INTERSECTION IMPROVEMENTS FROM NEAR THE STONY POINT ROAD INTERSECTION TO EAST OF THE ALONZO LONG HOLLOW ROAD INTERSECTION (12CCR) REPLACE BRIDGE ON CR-1372 (MP 1.388) OVER LANCASTER BRANCH; 1.4 MI SW OF JCT US 231; (STRUCTURALLY DEFICIENT, SR=32.9) 002C00025N REPLACE BRIDGE ON KY 2160 OVER FLORIDA CREEK SOUTH OF INTERSECTION WITH HUNT LANE (CR 1155) (SR 40.8) 002B00048N REPLACE BRIDGE ON HADE BELL RD (CR 1167) OVER BAYS FORK 0.5 MILE N OF PARDUE RD (CR 1163)(SR 28.7)002C00012N REPLACE BRIDGE OVER BAYS FORK ON MITCHELL WEAVER ROAD (CR 1328) 2.1 MI W OF KY 1332 (002C00063N)(SR=31.5) RECONSTRUCT KY-100 (OLD GALLATIN ROAD) FROM 0.2 MILES SOUTH OF KY- 2160 (MP 14.1) TO KY-980 (MP 14.41). (06CCN) .197 1.100 1.100 .100 .040 .040 .020 .310 ADAIR ALLEN ALLEN ALLEN ALLEN ALLEN ALLEN ALLEN KY-61 KY-98 KY-100 CR-1372 KY-2160 CR-1167 CR-1328 KY-100 $740,000 $4,300,000 $2,200,000 $280,000 $680,000 $330,000 $400,000 $2,710,000 Total Total Total Total Total Total Total Total D C R U C D R U C R U C R U C D R U C PHASE PHASE PHASE PHASE PHASE PHASE PHASE PHASE 2015 2016 2014 2015 2017 2016 2018 2018 2017 2014 2014 2015 2014 2014 2016 2020 2014 2014 2015 YEAR YEAR YEAR YEAR YEAR YEAR YEAR YEAR SPP SPP SPP SPP SPP SPP SPP SPP BRZ BRO BRO BRO BRZ BRZ BRZ BRZ SPP SPP SPP FUNDING FUNDING FUNDING FUNDING FUNDING FUNDING FUNDING FUNDING $170,000 $570,000 $1,050,000 $750,000 $2,500,000 $800,000 $500,000 $900,000 $280,000 $80,000 $30,000 $570,000 $70,000 $85,000 $175,000 $400,000 $250,000 $960,000 $1,500,000 AMOUNT AMOUNT AMOUNT AMOUNT AMOUNT AMOUNT AMOUNT AMOUNT 08 03 03 03 03 03 03 03 170.00 201.00 320.00 1074.00 1080.00 1081.00 1088.00 8305.00 - - - - - - - - Purpose and Need: Purpose and Need: Purpose and Need: Purpose and Need: Purpose and Need: Purpose and Need: Purpose and Need: Purpose and Need: 08 03 03 03 03 03 03 03 170.00 201.00 320.00 1074.00 1080.00 1081.00 1088.00 8305.00 - - - - - - - - Parent No.: Parent No.: Parent No.: Parent No.: Parent No.: Parent No.: Parent No.: Parent No.: 2012 2012 2012 2010 2012 2012 2014 2006 2012 2012 2012 2010 2012 2012 2014 2006 10.69 3.64 3.1 1.338 .626 1.674 .36 14.1 10.887 4.74 4.2 1.438 .666 1.714 .38 14.441 Milepoints: Milepoints: Milepoints: Milepoints: Milepoints: Milepoints: Milepoints: Milepoints: To: To: To: To: To: To: To: To: From: From: From: From: From: From: From: From: SAFETY / SAFETY(P) SAFETY / SAFETY(P) RELIABILITY / RECONSTRUCTION(O) RELIABILITY / BRIDGE REPLACEMENT(P) RELIABILITY / BRIDGE REPLACEMENT(P) RELIABILITY / BRIDGE REPLACEMENT(P) RELIABILITY / BRIDGE REPLACEMENT(P) RELIABILITY / RECONSTRUCTION(O)

Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

Embed Size (px)

Citation preview

Page 1: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 1

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

INTERCHANGE LIGHTING AT LOUIE B. NUNN PARKWAY. (12CCR)

IMPROVE THE SAFETY OF KY 98 NEAR DURHAM SPRINGS CHURCH (12CCR)

IMPROVEMENTS TO KY 100: CURVE, BRIDGE, AND INTERSECTIONIMPROVEMENTS FROM NEAR THE STONY POINT ROAD INTERSECTION TO EASTOF THE ALONZO LONG HOLLOW ROAD INTERSECTION (12CCR)

REPLACE BRIDGE ON CR-1372 (MP 1.388) OVER LANCASTER BRANCH; 1.4 MI SWOF JCT US 231; (STRUCTURALLY DEFICIENT, SR=32.9) 002C00025N

REPLACE BRIDGE ON KY 2160 OVER FLORIDA CREEK SOUTH OF INTERSECTIONWITH HUNT LANE (CR 1155) (SR 40.8) 002B00048N

REPLACE BRIDGE ON HADE BELL RD (CR 1167) OVER BAYS FORK 0.5 MILE N OFPARDUE RD (CR 1163)(SR 28.7)002C00012N

REPLACE BRIDGE OVER BAYS FORK ON MITCHELL WEAVER ROAD (CR 1328) 2.1MI W OF KY 1332 (002C00063N)(SR=31.5)

RECONSTRUCT KY-100 (OLD GALLATIN ROAD) FROM 0.2 MILES SOUTH OF KY-2160 (MP 14.1) TO KY-980 (MP 14.41). (06CCN)

.197

1.100

1.100

.100

.040

.040

.020

.310

ADAIR

ALLEN

ALLEN

ALLEN

ALLEN

ALLEN

ALLEN

ALLEN

KY-61

KY-98

KY-100

CR-1372

KY-2160

CR-1167

CR-1328

KY-100

$740,000

$4,300,000

$2,200,000

$280,000

$680,000

$330,000

$400,000

$2,710,000

Total

Total

Total

Total

Total

Total

Total

Total

D

C

R

U

C

D

R

U

C

R

U

C

R

U

C

D

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2015

2016

2014

2015

2017

2016

2018

2018

2017

2014

2014

2015

2014

2014

2016

2020

2014

2014

2015

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SPP

SPP

SPP

SPP

SPP

SPP

SPP

BRZ

BRO

BRO

BRO

BRZ

BRZ

BRZ

BRZ

SPP

SPP

SPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$170,000

$570,000

$1,050,000

$750,000

$2,500,000

$800,000

$500,000

$900,000

$280,000

$80,000

$30,000

$570,000

$70,000

$85,000

$175,000

$400,000

$250,000

$960,000

$1,500,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

08

03

03

03

03

03

03

03

170.00

201.00

320.00

1074.00

1080.00

1081.00

1088.00

8305.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

08

03

03

03

03

03

03

03

170.00

201.00

320.00

1074.00

1080.00

1081.00

1088.00

8305.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2012

2012

2012

2010

2012

2012

2014

2006

2012

2012

2012

2010

2012

2012

2014

2006

10.69

3.64

3.1

1.338

.626

1.674

.36

14.1

10.887

4.74

4.2

1.438

.666

1.714

.38

14.441

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

SAFETY / SAFETY(P)

SAFETY / SAFETY(P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / RECONSTRUCTION(O)

Page 2: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 2

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

CONDUCT A SCOPING STUDY ON THE EASTERN SCOTTSVILLE BYPASS. (08CCN)(10CCR)

REPLACE GUARDRAIL END TREATMENTS ON VARIOUS ROUTES IN ANDERSON,BOURBON, BOYLE, CLARK, FAYETTE, JESSAMINE, MADISON, MERCER,MONTGOMERY, SCOTT, AND WOODFORD COUNTIES. (2010BOP)

WIDENING AND IMPROVEMENTS ON US-62 FROM 0.103 MILE WEST OF THE NEWSCHOOL ENTRANCE/WESTWOOD ESTATES TO 0.095 MILE EAST OF US-127B(LAWRENCEBURG BYPASS). (02CCN)(04CCN)(08CCR)(12CCR)

PADUCAH-WICKLIFFE RD; 4-LANE US-60 FROM STAFFORD ROAD TO BETHELCHURCH ROAD (INCLUDES KEVIL BYPASS)(TO BE LET WITH 1-115.10)(06CCR)(12CCR).

PE AND ENVIRONMENTAL FOR REPLACEMENT OF CAIRO BRIDGE AT OR BESIDEEXISTING LOCATION.

REPLACE BRIDGE ON KY 358 OVER CLAYTON CREEK APPR. 0.5 MILE NORTH OFKY 473 (SR 26.5) 004B00044N

PRIORITY SECTION 3: RECONSTRUCT KY-90 EAST OF GLASGOW FROM APPROX.0.38 MILE EAST OF KY-839 TO THE METCALFE COUNTY LINE.(2002BOPC)(08CCR)(10CCR)(12CCR)

CONNECT US-31E (MP 12.6) TO OLD CALVARY DRIVE (CS 1196) AT THE EXISTINGINTERSECTION OF US-31E AND TROJAN TRAIL.(12CCN)

4.000

.900

3.700

3.590

.300

ALLEN

ANDERSON

ANDERSON

BALLARD

BALLARD

BALLARD

BARREN

BARREN

KY-98

US-127

US-62

US-60

US-51

KY-358

KY-90

US-31E

$500,000

$907,850

$7,450,000

$15,700,000

$4,500,000

$980,000

$10,010,000

$780,000

Total

Total

Total

Total

Total

Total

Total

Total

P

C

R

C

R

U

P

D

R

U

C

C

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2014

2014

2014

2015

2016

2017

2017

2019

2014

2014

2015

2014

2014

2014

2015

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SP

SAF

SP

SP

SPP

SPP

BRO

BRO

BRO

BRO

BRO

SPP

SPP

SPP

SPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$500,000

$907,850

$3,800,000

$3,650,000

$9,980,000

$5,720,000

$2,000,000

$2,500,000

$150,000

$250,000

$580,000

$10,010,000

$50,000

$180,000

$550,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

03

07

07

01

01

01

03

03

8400.00

918.00

8100.00

115.00

1140.01

1143.00

108.50

8705.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

BOURBONBOYLE

MCCRACKEN

03

99

07

01

01

01

03

03

8400.00

911.01

8100.00

115.00

1140.00

1143.00

108.00

8705.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2008

2010

2002

1998

2004

2012

2000

2012

2008

2006

2002

1998

2004

2012

2000

2012

17.251

7.327

14.034

18.413

18.167

8.297

14.074

22.022

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / SCOPING STUDY(O)

SAFETY / SAFETY-HAZARD ELIM(P)

SAFETY / SAFETY(P)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / SPOT IMPROVEMENTS(O)

RELIABILITY / NEW ROUTE(O)

Milepoints:Milepoints:

Milepoints:

To:To:

To:

From:From:

From:

Page 3: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 3

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

INTERSECTION REALIGNMENT ON US 68 AT KY 255 IN BARREN COUNTY AT M.P.3.971. (2012BOP)(AR/W)

RECONSTRUCT KY-111 IN THE VICINITY OF THE "S-CURVE" EAST OFOWINGSVILLE.

IMPROVE INTERSECTION OF KY 36 AND KENDALL SPRINGS ROAD TOACCOMODATE INDUSTRIAL TRUCK TRAFFIC.

STUDY FOR RECONSTRUCTION FROM US-60 IN OWINGSVILLE NORTH TOPRICKLY ASH ROAD. (08CCN) (10CCN)

NEW CONSTRUCTION FROM KENDALL SPRINGS ROAD TO BATH COUNTY HIGHSCHOOL IN OWINGSVILLE. (08CCN)

RECONSTRUCT CURVE AT .8 MILE SOUTH OF KY-36. (08CCN)(12CCR)

CONSTRUCT NEW ROUTE FROM KY 441 TO US 25E IN MIDDLESBORO. (08CCR)

.063

.500

.100

1.900

.100

.800

BARREN

BATH

BATH

BATH

BATH

BATH

BELL

US-68

KY-111

KY-36

KY-111

-

KY-965

KY-441

$250,000

$8,140,000

$1,500,000

$8,100,000

$1,440,000

$1,150,000

$7,910,000

Total

Total

Total

Total

Total

Total

Total

C

R

U

C

D

R

U

C

R

U

C

P

D

R

U

C

D

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2014

2017

2017

2018

2014

2015

2015

2016

2014

2014

2015

2014

2014

2014

2014

2015

2014

2015

2015

2016

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SAF

SP

SP

SP

SPP

SPP

SPP

SPP

SP

SP

SP

SP

SP

SPP

SPP

SPP

SP

SP

SP

SP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$250,000

$1,580,000

$1,040,000

$5,520,000

$250,000

$300,000

$200,000

$750,000

$1,600,000

$1,000,000

$5,500,000

$240,000

$1,200,000

$350,000

$50,000

$750,000

$400,000

$620,000

$490,000

$6,400,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

03

09

09

09

09

09

11

9005.00

193.00

394.00

8402.00

8403.00

8404.00

110.00

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

99

09

09

09

09

09

11

911.01

193.00

394.00

8402.00

8403.00

8404.00

110.00

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2012

2006

2014

2008

2008

2008

2000

2006

2006

2014

2008

2008

2008

2000

3.929

1

12.65

0

7.147

3.992

1.5

12.75

1.909

7.247

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

SAFETY / SAFETY-HAZARD ELIM(P)

RELIABILITY / RECONSTRUCTION(O)

SAFETY / SAFETY(P)

RELIABILITY / SCOPING STUDY(O)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / NEW ROUTE(O)

Page 4: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 4

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

IMPROVE CONGESTION AND FREIGHT MOVEMENT BY CONSTRUCTING A TWOWAY LEFT TURN LANE.(12CCR)

RECONSTRUCT KY-66 FROM 500' S OF NCL PINEVILLE TO KY-221

REPLACE BRIDGE ON KY-2011 (MP 8.498) OVER RED BIRD CREEK; .55 MI SOUTHOF JCT KY 66; (SR=3.5) 007B00074N

REPLACE BRIDGE ON CR-1327 (MP 0.014) OVER LEFT FORK STRAIGHT CREEK; .10MI W OF JCT KY 66; (STRUCTURALLY DEFICIENT, SR=2) 007C00048N

REPLACE BRIDGE ON DAVIS OXENDINE RD (CR 1184) OVER HANCES CREEK ATJCT WITH KY 1344(SR 12.9) 007C00061N

CUMBERLAND GAP TUNNEL PAVEMENT REPAIRS. (12CCR)

PAGE SCHOOL TURN LANE. (12CCN)

PROVIDE A PASSING BAY ON US 119 IN THE VICINITY OF MP 15 IN BELL COUNTY.(12CCN)

.800

.900

.100

.100

.600

.100

1.000

BELL

BELL

BELL

BELL

BELL

BELL

BELL

BELL

US-119

KY-66

KY-2011

CR-1327

CR-1184

US-25E

US-119

US-119

$2,624,500

$11,030,000

$950,000

$800,000

$450,000

$10,000,000

$1,074,555

$3,900,000

Total

Total

Total

Total

Total

Total

Total

Total

U

C

R

U

C

R

U

C

C

U

C

C

U

C

D

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2014

2015

2014

2014

2015

2014

2014

2016

2016

2014

2015

2014

2014

2014

2015

2016

2016

2017

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SPP

SP

SP

SP

BRX

BRX

BRX

BRZ

BRZ

BRZ

SPP

SPP

SPP

SPP

SPP

SPP

SPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$200,000

$2,424,500

$2,220,000

$830,000

$7,980,000

$250,000

$150,000

$550,000

$800,000

$50,000

$400,000

$10,000,000

$94,555

$980,000

$400,000

$500,000

$500,000

$2,500,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

11

11

11

11

11

11

11

11

189.00

217.00

1079.00

1083.00

1093.00

2032.10

8701.00

8702.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

11

11

11

11

11

11

11

11

189.00

217.00

1079.00

1083.00

1093.00

2032.10

8701.00

8702.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2012

1996

2010

2010

2012

2012

2012

2012

2012

1996

2010

2010

2012

2012

2012

2012

.37

.41

8.35

0

.01

0

3.45

14.5

1.17

1.557

8.65

.1

.05

.6

3.55

15.5

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

SAFETY / SAFETY(P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

SAFETY / SAFETY(P)

SAFETY / SAFETY(P)

RELIABILITY / MINOR WIDENING(O)

Page 5: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 5

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

I-275 BRIDGE OVER THE OHIO RIVER NEAR LAWRENCEBURG, INDIANA (B52);JOINT PROJECT WITH INDIANA TO PERFORM FRACTURE CRITICAL INSPECTION.(008B00052N)

RECONSTRUCT THE KY-536 (MT. ZION ROAD) INTERCHANGE.

ADD AUXILIARY LANES ON I-71/75 FROM KY 536 TO US 42 (NB & SB) AS PER THEINTERCHANGE JUSTIFICATION STUDY (IJS).(10CCR)(12CCR)

RECONSTRUCT THE KY-338 (RICHWOOD ROAD) INTERCHANGE. (FUNDING FORIMR SHOWN UNDER 6-14.01) (10CCR)(12CCR)

RECONSTRUCT KY-536 TO A 5-LANE URBAN SECTION FROM 1500' WEST OF US-42TO I-75 (MP 10.3 TO MP 13.24). (DOES NOT INCLUDE INTERCHANGERECONSTRUCTION) (00CCR) (10CCR)(12CCR)

LIMABURG ACCESS ROAD AND SIDEWALK FROM THE INTERSECTION OFGATEWAY BLVD AND KY-237 TO EXISTING LIMABURG ROAD (KY-3168) NEARMILEPOINT 2.10 (2008BOPC).(10CCR)

CONSTRUCT ADDITIONAL TURN LANES AT THE INTERSECTION OF KY 842 ANDUS 42.(12CCR)

NORTHERN KENTUCKY RIDESHARE PROGRAM. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)

.600

.100

1.500

.100

3.000

.263

BOONE

BOONE

BOONE

BOONE

BOONE

BOONE

BOONE

BOONE

I-275

I-75

I-75

I-75

KY-536

KY-237

US-42

-

$20,000

$33,870,000

$24,700,000

$63,900,000

$32,790,000

$224,343

$4,400,000

$44,000

Total

Total

Total

Total

Total

Total

Total

Total

C

R

U

C

R

U

C

D

R

U

C

U

C

C

R

U

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2014

2017

2018

2019

2016

2017

2018

2016

2017

2018

2020

2018

2019

2014

2014

2014

2015

2014

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

IM

IM

IM

IM

IM

IM

IM

IM

IM

IM

IM

SPP

SP

CM

CM

CM

CM

SNK

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$20,000

$8,930,000

$5,200,000

$19,740,000

$6,300,000

$800,000

$17,600,000

$5,000,000

$20,950,000

$6,240,000

$31,710,000

$4,060,000

$28,730,000

$224,343

$1,750,000

$150,000

$2,500,000

$44,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

06

06

06

06

06

06

06

06

9.00

14.00

14.50

18.00

158.00

318.00

367.00

400.09

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

KENTONCAMPBELL

06

06

06

06

06

99

06

06

9.00

14.00

14.01

18.00

158.00

219.08

367.00

400.09

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2000

2004

2008

2004

2000

2008

2012

2008

2000

2004

2006

2004

2000

2002

2012

2008

13.275

177.659

178.039

175.217

10.3

12.803

13.892

178.345

180.106

175.622

13.24

13.066

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

SAFETY / BRIDGE INSPECTION(P)

ECONOMIC DEVELOPMENT / I-CHANGE RECONST(O)

RELIABILITY / MINOR WIDENING(O)

ECONOMIC DEVELOPMENT / I-CHANGE RECONST(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / CONGESTION MITIGTN(O)

SAFETY / SAFETY(P)

RELIABILITY / MATCHED FED FUNDS(O)

Milepoints:Milepoints:

To:To:

From:From:

Page 6: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 6

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

NORTHERN KENTUCKY RIDESHARE PROGRAM. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)

NORTHERN KENTUCKY RIDESHARE PROGRAM. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)

NORTHERN KENTUCKY RIDESHARE PROGRAM. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)

NORTHERN KENTUCKY RIDESHARE PROGRAM. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)

NORTHERN KENTUCKY RIDESHARE PROGRAM. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)

NORTHERN KENTUCKY RIDESHARE PROGRAM. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)

OKI REGIONAL TRANSPORTATION PLANNING. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)

OKI REGIONAL TRANSPORTATION PLANNING. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)

BOONE

BOONE

BOONE

BOONE

BOONE

BOONE

BOONE

BOONE

-

-

-

-

-

-

-

-

$44,000

$44,000

$44,000

$44,000

$44,000

$44,000

$56,000

$56,000

Total

Total

Total

Total

Total

Total

Total

Total

C

C

C

C

C

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2015

2016

2017

2018

2019

2020

2014

2015

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SNK

SNK

SNK

SNK

SNK

SNK

SNK

SNK

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$44,000

$44,000

$44,000

$44,000

$44,000

$44,000

$56,000

$56,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

06

06

06

06

06

06

06

06

400.10

400.11

400.12

400.13

400.14

400.15

401.09

401.10

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

KENTONCAMPBELL

KENTONCAMPBELL

KENTONCAMPBELL

KENTONCAMPBELL

KENTONCAMPBELL

KENTONCAMPBELL

06

06

06

06

06

06

06

06

400.10

400.11

400.12

400.13

400.14

400.15

401.09

401.10

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2012

2012

2012

2012

2014

2014

2008

2012

2012

2012

2012

2012

2014

2014

2008

2012

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

Milepoints:Milepoints:

Milepoints:Milepoints:

Milepoints:Milepoints:

Milepoints:Milepoints:

Milepoints:Milepoints:

Milepoints:Milepoints:

To:To:

To:To:

To:To:

To:To:

To:To:

To:To:

From:From:

From:From:

From:From:

From:From:

From:From:

From:From:

Page 7: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 7

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

OKI REGIONAL TRANSPORTATION PLANNING. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)

OKI REGIONAL TRANSPORTATION PLANNING. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)

OKI REGIONAL TRANSPORTATION PLANNING. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)

OKI REGIONAL TRANSPORTATION PLANNING. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)

OKI REGIONAL TRANSPORTATION PLANNING. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)

CONSTRUCT A RAMP FROM THE MALL ROAD INTERCHANGE TO SOUTHBOUND I-75.(12CCR)

INTERSECTION IMPROVEMENT PROJECT AT US 42 AND RICE PIKE/HICKS PIKE.US 42 MP 8.4 TO 8.6. TOLL CREDITS. (2012BOP)

PROVIDE ADDITIONAL LEFT TURN LANE ONTO WORLDWIDE BLVD FROM KY 237.ADD ADDITIONAL THROUGH LANES ON KY 237 NORTH OF KY 2846 (TANNERS LN).PROVIDE LANE EXTENSION ON WORLDWIDE BLVD FROM KY 237. (2012BOP)(ADM.BY KYTC)

.083

.200

.450

BOONE

BOONE

BOONE

BOONE

BOONE

BOONE

BOONE

BOONE

-

-

-

-

-

I-75

US-42

KY-237

$56,000

$56,000

$56,000

$56,000

$56,000

$1,800,000

$4,100,000

$4,500,000

Total

Total

Total

Total

Total

Total

Total

Total

C

C

C

C

C

R

U

C

R

U

C

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2016

2017

2018

2019

2020

2014

2014

2015

2014

2014

2015

2015

2016

2017

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SNK

SNK

SNK

SNK

SNK

SPP

SPP

SPP

SNK

SNK

SNK

SNK

SNK

SNK

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$56,000

$56,000

$56,000

$56,000

$56,000

$250,000

$50,000

$1,500,000

$750,000

$600,000

$2,750,000

$1,000,000

$500,000

$3,000,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

06

06

06

06

06

06

06

06

401.11

401.12

401.13

401.14

401.15

409.00

412.00

415.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

KENTONCAMPBELL

KENTONCAMPBELL

KENTONCAMPBELL

06

06

06

06

06

06

06

06

401.11

401.12

401.13

401.14

401.15

409.00

966.00

966.02

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2012

2012

2012

2014

2014

2012

2002

2012

2012

2012

2012

2014

2014

2012

2002

2004

180.3

8.4

10.9

180.6

8.6

11.35

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

SAFETY / SAFETY(P)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

Milepoints:Milepoints:

Milepoints:Milepoints:

Milepoints:Milepoints:

To:To:

To:To:

To:To:

From:From:

From:From:

From:From:

Page 8: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 8

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

EXTENSION OF WENDELL FORD BLVD TO AERO PKWY, 0.48 MILES. (2012BOP)

RECONSTRUCTION OF THE INTERSECTION OF CAMP ERNST ROAD ANDLONGBRANCH ROAD. WIDENING OF 1,900 FEET OF LONGBRANCH ROAD.(2012BOP)

CORRECT GEOMETRIC DEFICIENCIES AND ADD LEFT TURN LANES ONFROGTOWN ROAD AT TRIPLE CROWN BLVD AND CEDARWOOD.(2012BOP)(ADM.BY KYTC)

TWO-LANE EXTENSION OF EXISTING VETERANS WAY BETWEEN KY 18 AND KY237. LPA PROJECT (2012BOP)

DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR NKY URBANIZED AREAAND SUBJECT TO MPO CONTROL FOR FY 2014. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)

DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR NKY URBANIZED AREAAND SUBJECT TO MPO CONTROL FOR FY 2016. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)

DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR NKY URBANIZED AREAAND SUBJECT TO MPO CONTROL FOR FY 2018 (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)

.753

.558

.450

BOONE

BOONE

BOONE

BOONE

BOONE

BOONE

BOONE

PV-1011

CR-1002

KY-3060

CR-1057L

-

-

-

$2,576,717

$744,240

$1,640,000

$1,650,000

$8,300,000

$3,300,000

$5,400,000

Total

Total

Total

Total

Total

Total

Total

C

D

R

U

C

D

R

U

C

C

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2015

2014

2015

2015

2016

2016

2017

2017

2018

2014

2014

2016

2018

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SNK

SNK

SNK

SNK

SNK

SNK

SNK

SNK

SNK

SNK

SNK

SNK

SNK

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$2,576,717

$57,600

$50,000

$112,000

$524,640

$120,000

$200,000

$120,000

$1,200,000

$1,650,000

$8,300,000

$3,300,000

$5,400,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

06

06

06

06

06

06

06

417.00

422.00

423.00

700.00

966.02

966.04

966.06

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

KENTONCAMPBELL

KENTONCAMPBELL

KENTONCAMPBELL

06

06

06

06

06

06

06

966.02

966.02

966.02

966.01

966.02

966.04

966.06

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2012

2012

2012

2012

2004

2006

2008

2004

2004

2004

2002

2004

2006

2008

.747

2.1

1.5

1.5

2.658

1.95

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

Milepoints:Milepoints:

Milepoints:Milepoints:

Milepoints:Milepoints:

To:To:

To:To:

To:To:

From:From:

From:From:

From:From:

Page 9: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 9

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR NKY URBANIZED AREAAND SUBJECT TO MPO CONTROL FOR FY 2019 (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)

DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR NKY URBANIZED AREAAND SUBJECT TO MPO CONTROL FOR FY 2020. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)

REPLACE BRIDGE ON KY 20 OVER WOOLPER CREEK SE OF STONE CREEK LANE(PR 1300)(SR 39.7) 008B00018N

DECK OVERLAY ON THE CARROLL CROPPER BRIDGE, I-275 OVER OHIO RIVER INBOONE COUNTY. (LET BY KYTC W/ INDOT TO REIMBURSE 50% OF THECOST)(2012BOP)

OVERLAY BRIDGE DECK AND REPLACE EXPANSION JOINTS ON THE POINTPLEASANT ROAD BRIDGE OVER I-275 (MP 0.363) NORTHEAST OF KY 236.(008B00053N) (2012BOP)

CONSTRUCT AN ADDITIONAL US-42 LEFT TURN LANE TO NORTHBOUND MALLROAD (2006BOPC)

I-275/KY-212 INTERCHANGE AND KY-20 RECONSTRUCTION NEAR GREATERCINCINNATI AIRPORT. (2004BOPC)(KYTC SHARE @ 46.6%)

RECONSTRUCT AND WIDEN KY 237 FROM VALLEY VIEW DRIVE TO ROGERSLANE.

.559

.089

.100

3.119

BOONE

BOONE

BOONE

BOONE

BOONE

BOONE

BOONE

BOONE

-

-

KY-20

I-275

I-275

US-42

I-275

KY-237

$7,000,000

$7,000,000

$1,650,000

$13,050,000

$250,000

$1,980,000

$25,310,000

$32,000,000

Total

Total

Total

Total

Total

Total

Total

Total

C

C

R

U

C

D

C

C

C

C

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2019

2020

2014

2014

2015

2014

2014

2014

2014

2020

2016

2016

2018

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SNK

SNK

BRO

BRO

BRO

IM

IM

IM

CM

STP

STP

SP

SP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$7,000,000

$7,000,000

$100,000

$50,000

$1,500,000

$50,000

$13,000,000

$250,000

$1,980,000

$25,310,000

$10,320,000

$1,120,000

$20,560,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

06

06

06

06

06

06

06

06

966.07

966.08

1079.00

2039.00

2045.00

3700.00

8000.20

8001.21

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

KENTONCAMPBELL

KENTONCAMPBELL

06

06

06

99

99

99

06

06

966.07

966.08

1079.00

337.08

65.10

219.06

8000.11

8001.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2014

2014

2012

2008

2012

2006

2004

2004

2014

2014

2012

2008

2008

2000

2002

2000

2.8

13.299

.363

13.4

4.842

2.251

2.86

13.858

.363

13.489

4.942

5.37

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REHAB(P)

RELIABILITY / BRIDGE REHAB(P)

RELIABILITY / CONGESTION MITIGTN(O)

ECONOMIC DEVELOPMENT / I-CHANGE RECONST(O)

RELIABILITY / RECONSTRUCTION(O)

Milepoints:Milepoints:

Milepoints:Milepoints:

To:To:

To:To:

From:From:

From:From:

Page 10: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 10

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

CONSTRUCT A NEW LOOP ROAD AROUND THE CAMPUS OF GATEWAY COLLEGELOCATED OFF MOUNT ZION ROAD. (10CCN)

PARIS-MAYSVILLE ROAD; CONSTRUCT MILLERSBURG BYPASS (SECTION2)(08CCR)

STRUCTURE OVER SCOTTS CREEK ON KY 3364, 0.7 MILE NORTH OF US 460 ATNORTH MIDDLETOWN (BRIDGE IMPROVEMENTS). (03KYDN)(2012BOP)

TOWNSEND VALLEY ROAD; REPLACE BRIDGE AND APPROACHES OVERTOWNSEND CREEK (C42) 1.6 MILES WEST OF JCT. US-27. (SR=32.0): (009C00042N)

REPLACE BRIDGE ON CR-1308 (MP 3.588) OVER TOWNSEND CREEK; .9 MI E OF JCTKY 353; (STRUCTURALLY DEFICIENT, SR=33.2) 009C00043N

RECONSTRUCT US 460 FROM RUSSELL CAVE ROAD TO US 27 BYPASS IN PARIS;MP 1.394 TO MP 7.696.(12CCN)

EXTEND FIFTH STREET IN MILLERSBURG TO THE MILLERSBURGBYPASS.(12CCN)

RECONSTRUCT US 60 FROM KY 716 TO ROSE HILL CEMETERY. (12CCR)

4.400

.100

.100

.100

6.302

.070

1.800

BOONE

BOURBON

BOURBON

BOURBON

BOURBON

BOURBON

BOURBON

BOYD

-

US-68

KY-3364

CR-1308

CR-1308

US-460

CS-2016

US-60

$500,000

$13,160,000

$18,723

$620,000

$930,000

$5,500,000

$1,450,000

$1,840,000

Total

Total

Total

Total

Total

Total

Total

Total

C

C

D

U

C

R

U

C

R

U

D

R

U

C

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2014

2014

2014

2014

2015

2014

2014

2016

2015

2016

2014

2015

2015

2016

2015

2016

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SB2

NH

KYD

BRZ

BRZ

BRZ

BRZ

BRZ

SP

SP

SP

SP

SP

SP

SPP

SPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$500,000

$13,160,000

$18,723

$120,000

$500,000

$90,000

$75,000

$765,000

$3,000,000

$2,500,000

$150,000

$300,000

$100,000

$900,000

$100,000

$1,740,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

06

07

07

07

07

07

07

09

8630.00

310.20

365.10

1119.00

1124.00

8705.00

8707.00

206.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

NICHOLAS

06

07

07

07

07

07

07

09

8630.00

310.01

365.00

1119.00

1124.00

8705.00

8707.00

206.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2010

2000

2012

2008

2010

2012

2012

2012

2010

1996

2002

2008

2010

2012

2012

2012

5.389

1.64

3.538

1.394

0

8

5.489

1.657

3.638

7.696

.07

9.8

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / NEW ROUTE(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / BRIDGE REHAB(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / RECONSTRUCTION(O)

Milepoints: To:From:

Page 11: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 11

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

FEDERAL 'STP' FUNDS DEDICATED TO HUNTINGTON-ASHLAND MPO FOR FY 2014.(FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)

FEDERAL 'STP' FUNDS DEDICATED TO HUNTINGTON-ASHLAND MPO FOR FY 2015.(FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)

FEDERAL 'STP' FUNDS DEDICATED TO HUNTINGTON-ASHLAND MPO FOR FY 2016.(FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)

FEDERAL 'STP' FUNDS DEDICATED TO HUNTINGTON-ASHLAND MPO FOR FY 2017.(FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)

FEDERAL 'STP' FUNDS DEDICATED TO HUNTINGTON-ASHLAND MPO FOR FY 2018.(FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)

FEDERAL 'STP' FUNDS DEDICATED TO HUNTINGTON-ASHLAND MPO FOR FY 2019.(FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)

FEDERAL 'STP' FUNDS DEDICATED TO HUNTINGTON-ASHLAND MPO FOR FY 2020.(FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)

US 60 FROM I-64 AT INTERCHANGE 181 (MP 0.2) EXTENDING NORTHERLY TO THEKY 180 (MP 4.02) INTERSECTION AT CANNONSBURG CONSISTING OF 4 DRIVINGLANES WITH WIDE, DGA SHOULDERS. (08CCN) (10CCR)(12CCR)

2.020

BOYD

BOYD

BOYD

BOYD

BOYD

BOYD

BOYD

BOYD

-

-

-

-

-

-

-

US-60

$2,400,000

$1,200,000

$1,200,000

$1,200,000

$1,200,000

$1,200,000

$1,200,000

$32,790,000

Total

Total

Total

Total

Total

Total

Total

Total

C

C

C

C

C

C

C

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2014

2015

2016

2017

2018

2019

2020

2014

2015

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SAH

SAH

SAH

SAH

SAH

SAH

SAH

SB2

SB2

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$2,400,000

$1,200,000

$1,200,000

$1,200,000

$1,200,000

$1,200,000

$1,200,000

$2,500,000

$30,290,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

09

09

09

09

09

09

09

09

208.00

208.01

208.02

208.03

208.04

208.05

208.06

8400.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

GREENUP

GREENUP

GREENUP

GREENUP

GREENUP

GREENUP

GREENUP

09

09

09

09

09

09

09

09

208.00

208.01

208.02

208.03

208.04

208.05

208.06

8400.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2014

2014

2014

2014

2014

2014

2014

2008

2014

2014

2014

2014

2014

2014

2014

2008.2 4.02

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / CONGESTION MITIGTN(O)

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

Page 12: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 12

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

REPLACE U.S. 68 AND U.S. 150 BRIDGE OVER CHAPLIN RIVER, PERRYVILLE.(2005HPP-KY134)(EARMARK DOES NOT COVER TOTAL CONSTRUCTION COST OF$1,300,000).

REPLACE BRIDGE ON CURTIS RD (CR 1226) OVER N ROLLING FORK AT JCT WITHKY 37(SR 19.2) 011C00042N

OPERATION OF AUGUSTA FERRY FOR FY 2015.(12CCR)

OPERATION OF AUGUSTA FERRY FOR FY 2016.(12CCR)

OPERATION OF AUGUSTA FERRY FOR FY 2017. (12CCR)

OPERATION OF AUGUSTA FERRY FOR FY 2018. (12CCR)

OPERATION OF AUGUSTA FERRY FOR FY 2019.(12CCR)

OPERATION OF AUGUSTA FERRY FOR FY 2020.(12CCR)

LONG STRETCH ROAD; REPLACE BRIDGE AND APPROACHES OVER TURTLECREEK 400 FEET NORTH OF KY-8 (C03). (SR=17.7): (012C00003N)(10CCR)

.100

BOYLE

BOYLE

BRACKEN

BRACKEN

BRACKEN

BRACKEN

BRACKEN

BRACKEN

BRACKEN

US-68

CR-1226

KY-8

KY-8

KY-8

KY-8

KY-8

KY-8

CR-1023

$364,940

$590,000

$180,000

$180,000

$180,000

$180,000

$180,000

$180,000

$205,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

C

R

U

C

C

C

C

C

C

C

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2014

2014

2014

2015

2015

2016

2017

2018

2019

2020

2014

2014

2015

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

HPP

BRZ

BRZ

BRZ

SPP

SPP

SPP

SPP

SPP

SPP

BRZ

BRZ

BRZ

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$364,940

$50,000

$50,000

$490,000

$180,000

$180,000

$180,000

$180,000

$180,000

$180,000

$25,000

$5,000

$175,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

07

07

06

06

06

06

06

06

06

242.01

1133.00

355.17

355.18

355.19

355.20

355.21

355.22

1068.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

07

07

06

06

06

06

06

06

06

242.01

1133.00

355.17

355.18

355.19

355.20

355.21

355.22

1068.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2010

2012

2010

2010

2012

2012

2014

2014

2008

2010

2012

2010

2010

2012

2012

2014

2014

2008

6.4

.004

13.1

13.1

13.1

13.1

13.1

13.1

.46

6.418

.044

13.2

13.2

13.2

13.2

13.2

13.2

.51

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

Page 13: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 13

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

REPLACE BRIDGE ON KY-8 (MP 4.221) OVER SNAG CREEK; 1 MI W OF JCT KY 1109;(STRUCTURALLY DEFICIENT, SR=48.3) 012B00005N

SPOT IMPROVEMENTS FROM THE CITY OF BROOKSVILLE SOUTH TOPOWERSVILLE. (06CCN) (10CCR)

RECONSTRUCT KY-1159 FROM BROOKSVILLE TO KY-9/AA HIGHWAY. (06CCN)(10CCR)(12CCR)

REPLACE BRIDGE ON KY-3193 (MP 4.034) OVER NORTH FORK OF KENTUCKYRIVER; ON CR 5318 .4 MILE SOUTHWEST OF KY 15 (STRUCTURALLY DEFICIENT,SR=35.3) 013B00044N

REPLACE BRIDGE ON KY 30 OVER THE MIDDLE FORK OF KENTUCKY RIVER(013B00017N).

REPLACE BRIDGE ON KY 476 OVER CANEY CREEK BETWEEN HARDSHELLCANEY CREEK ROAD (CR 1117) AND NIX BRANCH ROAD (CR 1115)(SR 40.3)013B00014N

REPLACE BRIDGE ON MARIE ROBERTS ROAD (CR 1165) OVER TROUBLESOMECREEK 0.1 MILE SW OF KY 15(SR 27.1) 013C00011N

REPLACE BRIDGE OVER FROZEN CREEK ON KY 378 0.7 MI N OF KY 1812.(013B00050N)(SR=41)

.100

3.579

2.650

.100

.153

.040

.028

BRACKEN

BRACKEN

BRACKEN

BREATHITT

BREATHITT

BREATHITT

BREATHITT

BREATHITT

KY-8

KY-10

KY-1159

KY-3193

KY-30

KY-476

CR-1165

KY-378

$4,535,000

$7,890,000

$26,410,000

$2,110,000

$3,270,000

$670,000

$2,000,000

$250,000

Total

Total

Total

Total

Total

Total

Total

Total

R

U

C

D

R

U

R

C

R

U

C

U

C

R

U

C

D

R

U

C

D

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2014

2014

2017

2014

2015

2015

2014

2016

2014

2014

2016

2014

2014

2015

2015

2016

2014

2016

2016

2018

2019

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BRO

BRO

BRO

SP

SP

SP

SPP

SPP

BRX

BRX

BRX

BRO

BRO

BRO

BRO

BRO

BRZ

BRZ

BRZ

BRZ

BRX

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$150,000

$75,000

$4,310,000

$1,820,000

$4,870,000

$1,200,000

$4,410,000

$22,000,000

$60,000

$50,000

$2,000,000

$150,000

$3,120,000

$50,000

$100,000

$520,000

$200,000

$190,000

$100,000

$1,510,000

$250,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

06

06

06

10

10

10

10

10

1074.00

8309.00

8311.00

1089.00

1096.00

1100.00

1105.00

1110.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

06

06

06

10

10

10

10

10

1074.00

8309.00

8311.00

1089.00

1096.00

1100.00

1105.00

1110.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2010

2006

2006

2010

2012

2012

2012

2014

2010

2006

2006

2010

2012

2012

2012

2014

4.171

10.38

.85

3.984

4.853

4.255

.092

.672

4.271

13.959

3.5

4.084

5.006

4.295

.14

.7

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

Page 14: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 14

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

ADD CENTER TURN LANE ALONG US 60 IN IRVINGTON (PHASE 1) FROM WEST OFIRVINGTON TO KY 2202. (12CCR)

REPLACE BRIDGE OVER SINKING CREEK ON DENTS BRIDGE ROAD (CR 1021) 1.4MI W OF KY 333 (014C00003N)(SR=26)

RECONSTRUCT KY 79 FROM KY 477 TO KY 428.(12CCN)

KY-61 BEGINS SOUTH OF KY-44 AND ENDS NORTH OF THE NEWLY CONSTRUCTEDCONESTOGA PARKWAY. (CSX RAILROAD)(CONSTRUCTION SEQUENCE 3)(10CCR)(12CCR)(LET W/ 117.20)

KY-61 BEGINS NORTH OF CONESTOGA PARKWAY AND ENDS AT EXISTING KY-61SOUTH OF BROOKS RUN CREEK. (CONSTRUCTION SEQUENCE 2)(10CCR)(12CCR)(LET W/ 117.10)

KY-61 BEGINS AT EXISTING KY-61 SOUTH OF BROOKS RUN CREEK AND ENDSSOUTH OF JOHN HARPER HIGHWAY (BROOKS ROAD) (2006BOPC)(12CCR)

RECONSTRUCT KY-44 AT BELLS MILL ROAD. (06CCN) (10CCR)(12CCR)

RECONSTRUCT KY-44 AT BOGARD/LLOYD LANE. (06CCN) (10CCR)(12CCR)

.500

.020

2.143

2.200

1.300

1.500

.600

.500

BRECKINRIDGE

BRECKINRIDGE

BRECKINRIDGE

BULLITT

BULLITT

BULLITT

BULLITT

BULLITT

US-60

CR-1021

KY-79

KY-61

KY-61

KY-61

KY-44

KY-44

$4,830,000

$680,000

$4,790,000

$20,130,000

$13,590,000

$15,890,000

$1,900,000

$2,560,000

Total

Total

Total

Total

Total

Total

Total

Total

R

U

C

D

R

U

C

P

D

R

C

C

C

U

C

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2014

2014

2015

2017

2019

2019

2020

2014

2015

2015

2015

2015

2014

2014

2015

2014

2015

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SPP

SPP

BRZ

BRZ

BRZ

BRZ

SP

SP

SP

SPP

SPP

SPP

SPP

SPP

SPP

SPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$1,190,000

$710,000

$2,930,000

$100,000

$30,000

$50,000

$500,000

$10,000

$1,250,000

$3,530,000

$20,130,000

$13,590,000

$15,890,000

$880,000

$1,020,000

$1,280,000

$1,280,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

04

04

04

05

05

05

05

05

394.00

1090.00

8703.00

117.10

117.20

117.31

150.10

150.20

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

MEADE

04

04

04

05

05

05

05

05

394.00

1090.00

8703.00

117.00

117.00

117.30

150.00

150.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2012

2014

2012

2000

2000

2006

2004

2004

2012

2014

2012

1996

1996

2000

2000

2000

29.069

1.42

16.032

14.43

16.667

17.88

17.72

18.38

29.559

1.44

16.912

16.667

17.88

19.33

17.9

18.8

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / MINOR WIDENING(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / MAJOR WIDENING(O)

SAFETY / SAFETY(P)

SAFETY / SAFETY(P)

0 1.263Milepoints: To:From:

Page 15: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 15

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

RECONSTRUCT KY-44 AT ARMSTRONG/FISHER LANE. (06CCN)(10CCR)

MT. WASHINGTON-TAYLORSVILLE RD; RECONSTRUCT KY 44 FROM MT.WASHINGTON BYPASS EAST 2.0 MILES (04CCN)

WIDEN CEDAR GROVE ROAD (KY 480) FROM CEDAR GROVE ELEMENTARYSCHOOL TO VALLEY VIEW DRIVE AND CONSTRUCT ADDITIONAL RAMPENHANCEMENTS/TURNING LANES ON KY 480 AND AT THE I-65/KY 480INTERCHANGE.(12CCR)

VARIOUS SAFETY PROJECTS IN THE LOUISVILLE URBANIZED AREA.

VARIOUS SAFETY PROJECTS IN THE LOUISVILLE URBANIZED AREA.

CONSTRUCTION OF A SIDEWALK ON THE NORTH SIDE OF KY 44 FROM MT.WASHINGTON ELEMENTARY SCHOOL TO FISHER LANE IN MT.WASHINGTON.(2012BOP)

REPLACE BRIDGE ON KY-61 (MP 7.609) OVER BARLEY CREEK; .10 MI NORTH OFJCT KY 251; (STRUCTURALLY DEFICIENT, SR=49) 015B00013N

WIDEN KY-245 FROM BERNHEIM FOREST TO THE COMMUNITY COLLEGE.(08CCN)(10CCR)

.500

2.300

.830

.380

.100

1.990

BULLITT

BULLITT

BULLITT

BULLITT

BULLITT

BULLITT

BULLITT

BULLITT

KY-44

KY-44

KY-480

-

-

KY-44

KY-61

KY-245

$1,260,000

$1,980,000

$8,250,000

$1,000,000

$1,000,000

$450,000

$450,000

$10,510,000

Total

Total

Total

Total

Total

Total

Total

Total

C

R

U

R

U

C

C

C

R

U

C

R

U

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2014

2014

2014

2014

2014

2015

2014

2015

2014

2014

2014

2014

2014

2016

2015

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SP

SP

SPP

SPP

SPP

SLO

SLO

SLO

SLO

SLO

BRO

BRO

BRO

STP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$1,260,000

$890,000

$1,090,000

$250,000

$1,000,000

$7,000,000

$1,000,000

$1,000,000

$80,000

$80,000

$290,000

$130,000

$90,000

$230,000

$10,510,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

05

05

05

05

05

05

05

05

150.30

347.50

391.20

516.00

516.01

755.00

1056.00

8509.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

JEFFERSONOLDHAM

JEFFERSONOLDHAM

05

05

05

05

05

05

05

05

150.00

347.50

391.00

965.12

516.00

755.00

1056.00

8509.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2004

1998

2006

2014

2014

2012

2010

2008

2000

1998

2006

2004

2014

2012

2010

2008

20.85

23.14

2.01

21.07

7.559

4.425

21.15

25.44

2.84

21.45

7.659

6.415

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

SAFETY / SAFETY(P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

SAFETY / SAFETY(P)

SAFETY / SAFETY(P)

SAFETY / BIKE/PED FACIL(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / MINOR WIDENING(O)

Milepoints:Milepoints:

Milepoints:Milepoints:

To:To:

To:To:

From:From:

From:From:

Page 16: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 16

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

OPERATION OF REED'S FERRY AT LOGANSPORT FOR FY 2015.(12CCR)

OPERATION OF REED'S FERRY AT LOGANSPORT FOR FY 2016.(12CCR)

OPERATION OF REED'S FERRY AT LOGANSPORT FOR FY 2017.(12CCR)

OPERATION OF REED'S FERRY AT LOGANSPORT FOR FY 2018.(12CCR)

OPERATION OF REED'S FERRY AT LOGANSPORT FOR FY 2019.(12CCR)

OPERATION OF REED'S FERRY AT LOGANSPORT FOR FY 2020.(12CCR)

REPLACE BRIDGE ON KY-340 (MP 7.120) OVER BR OF E PRONG INDIAN CAMPCREEK; 1.0 MI NORTH OF JCT KY 79; (STRUCTURALLY DEFICIENT, SR=44.3)016B00041N

REPLACE BRIDGE ON KY 403 OVER UNNAMED STREAM SE OF COOL SPRINGSROAD (CR 1142)(SR 4.1) 016B00067N

CONSTRUCT TURN LANES IN BOTH DIRECTIONS AT THE INTERSECTION OF US-231/KY-70 ON TO BOAT FACTORY ROAD. (08CCN)(10CCR)

.100

.184

BUTLER

BUTLER

BUTLER

BUTLER

BUTLER

BUTLER

BUTLER

BUTLER

BUTLER

KY-269

KY-269

KY-269

KY-269

KY-269

KY-269

KY-340

KY-403

US-231

$157,200

$157,200

$157,200

$157,200

$157,200

$157,200

$260,000

$440,000

$1,200,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

C

C

C

C

C

C

C

R

U

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2015

2016

2017

2018

2019

2020

2017

2014

2014

2015

2014

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SPP

SPP

SPP

SPP

SPP

BRX

BRO

BRO

BRO

STP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$157,200

$157,200

$157,200

$157,200

$157,200

$157,200

$260,000

$40,000

$75,000

$325,000

$1,200,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

03

03

03

03

03

03

03

03

03

125.10

125.11

125.12

125.13

125.14

125.15

1072.00

1076.00

8503.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

03

03

03

03

03

03

03

03

03

125.10

125.11

125.12

125.13

125.14

125.15

1072.00

1076.00

8503.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2010

2010

2012

2012

2014

2014

2010

2012

2008

2010

2010

2012

2012

2014

2014

2010

2012

2008

1.544

1.544

1.544

1.544

1.544

1.544

7.07

6.094

11.336

1.644

1.644

1.644

1.644

1.644

1.644

7.17

6.134

11.52

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

SAFETY / SAFETY-HAZARD ELIM(P)

Page 17: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 17

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

OPERATION OF THE ROCHESTER FERRY BY THE BUTLER AND OHIO COUNTYFERRY AUTHORITY FOR FY 2015.(12CCR)

OPERATION OF THE ROCHESTER FERRY BY THE BUTLER AND OHIO COUNTYFERRY AUTHORITY FOR FY 2016.(12CCR)

OPERATION OF THE ROCHESTER FERRY BY THE BUTLER AND OHIO COUNTYFERRY AUTHORITY FOR FY 2017.(12CCR)

OPERATION OF THE ROCHESTER FERRY BY THE BUTLER AND OHIO COUNTYFERRY AUTHORITY FOR FY 2018.(12CCR)

OPERATION OF THE ROCHESTER FERRY BY THE BUTLER AND OHIO COUNTYFERRY AUTHORITY FOR FY 2019.(12CCR)

OPERATION OF THE ROCHESTER FERRY BY THE BUTLER AND OHIO COUNTYFERRY AUTHORITY FOR FY 2020.(12CCR)

RECONSTRUCT SUBSTANDARD CURVES AT ROCK SPRINGS HILL(10CCR)

NEW CONNECTOR FROM HOPKINSVILLE ROAD (KY-91) TO WILSON WAREHOUSEROAD (KY-293) NORTHEAST OF PRINCETON. (06CCR)(10CCR)(12CCR)

.600

2.400

BUTLER

BUTLER

BUTLER

BUTLER

BUTLER

BUTLER

CALDWELL

CALDWELL

KY-369

KY-369

KY-369

KY-369

KY-369

KY-369

KY-139

-

$157,200

$157,200

$157,200

$157,200

$157,200

$157,200

$4,040,000

$18,490,000

Total

Total

Total

Total

Total

Total

Total

Total

C

C

C

C

C

C

D

R

U

C

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2015

2016

2017

2018

2019

2020

2014

2015

2015

2017

2015

2015

2017

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SPP

SPP

SPP

SPP

SPP

SP

SP

SP

SP

SPP

SPP

SPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$157,200

$157,200

$157,200

$157,200

$157,200

$157,200

$520,000

$610,000

$470,000

$2,440,000

$2,960,000

$2,060,000

$13,470,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

03

03

03

03

03

03

02

02

8504.05

8504.06

8504.07

8504.08

8504.09

8504.10

141.00

153.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

OHIO

OHIO

OHIO

OHIO

OHIO

OHIO

03

03

03

03

03

03

02

02

8504.05

8504.06

8504.07

8504.08

8504.09

8504.10

141.00

153.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2010

2010

2012

2012

2014

2014

2000

2002

2010

2010

2012

2012

2014

2014

2000

2002

.526

.526

.526

.526

.526

.526

7.573

.626

.626

.626

.626

.626

.626

8.173

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

SAFETY / SAFETY(P)

RELIABILITY / NEW ROUTE(O)

0

0

0

0

0

0

.067

.067

.067

.067

.067

.067

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

Page 18: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 18

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

SOUTHERN CONNECTOR FROM KY 139 TO KY 91, CALDWELL COUNTY. (2005HPP-KY162)

MURRAY FIVE-POINTS INTERSECTION ROUNDABOUT. (12CCR)

5-LANE KY-121 FROM US-641 TO COLDWATER ROAD INMURRAY.(2008BOPP)(08CCR)(10CCN)(SEE ITEM NUMBER 1-271.10 AND 1-271.20 FOR2012 HIGHWAY PLAN SCHEDULED CONSTRUCTION FUNDING)

MAJOR WIDENING FROM TENN. STATE LINE TO MURRAY PRIORITY SECTION 1;FROM CLARKS RIVER BRIDGE, NORTH 1.0 MILE TO EXISTING 4-LANE.(12CCR)

CONSTRUCT TURN LANE ON KY 1327 AT CALLOWAY COUNTY SCHOOLS ANDMSU AG EXPO CENTER.(12CCR)(AR/W)

REPLACE BRIDGE AND APPROACHES ON KY 1536 OVER EAST FORK CLAYTONCREEK (B108) 0.3 MILE SOUTH OF KY 280. (SR=27.7)(08CCR): (018B00108N)

REPLACE BRIDGE ON KY-893 (MP 22.915) OVER MCCULLOUGH FORK; 4.0 MI EASTOF JCT US 641; (STRUCTURALLY DEFICIENT, SR=11.9) 018B00080N (AR/W)

REPLACE BRIDGE ON CR-1464 (MP 0.138) OVER BRANCH- CANEY CREEK; .15 MI NOF JCT CR 5412; (STRUCTURALLY DEFICIENT, SR=37.9) 018C00107N (AR/W)

1.000

.100

1.050

1.000

.400

.100

.100

.100

CALDWELL

CALLOWAY

CALLOWAY

CALLOWAY

CALLOWAY

CALLOWAY

CALLOWAY

CALLOWAY

-

KY-1327

KY-121

US-641

KY-1327

KY-1536

KY-893

CR-1464

$9,900

$4,550,000

$4,480,000

$9,660,000

$900,000

$800,000

$940,000

$510,000

Total

Total

Total

Total

Total

Total

Total

Total

D

R

U

C

C

U

C

C

C

R

U

C

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2014

2014

2015

2016

2014

2016

2017

2014

2015

2014

2014

2016

2014

2016

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

HPP

STP

STP

STP

SPP

SPP

SPP

STP

BRX

BRX

BRX

BRX

BRZ

BRZ

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$9,900

$1,160,000

$1,760,000

$1,630,000

$4,480,000

$2,080,000

$7,580,000

$900,000

$800,000

$200,000

$220,000

$520,000

$60,000

$450,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

02

01

01

01

01

01

01

01

193.00

121.00

271.01

314.10

900.00

1061.00

1132.00

1136.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

02

01

01

01

01

01

01

01

193.00

121.00

271.01

314.00

900.00

1061.00

1132.00

1136.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2004

2006

2000

2000

2010

2008

2010

2010

2004

2006

2000

1996

2010

2008

2010

2010

1.49

14.075

5.666

.4

.269

22.865

.088

1.51

15.133

6.666

.8

.339

22.965

.188

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / NEW ROUTE(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / MAJOR WIDENING(O)

SAFETY / SAFETY(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

Page 19: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 19

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

REPLACE BRIDGE ON CARLTON RD (CR 1411) OVER W FORK ROCKHOUSE CREEK0.1 MILE W OF COLLINS RD (CR 1505)(SR 37.3)018C00110N

CITY OF MURRAY BUSINESS LOOP FROM GLENDALE TO INDUSTRIAL ROAD. (SEE1-120 FOR D, R, & U FUNDING)(08CCN)(10CCR)

STUDY AND REHABILITATE THE I-471 CORRIDOR, CAMPBELL COUNTY,KENTUCKY. (SEE ALSO 6-8104.00)(2005HPP-KY120)

EXTEND PROPOSED POND CREEK ROAD FROM US-27 TO AA HIGHWAY VIAPORTION OF KY 10/KY 1997 CORRIDOR (NEW KY-536)(04CCN)(12CCR)

KY 9 EXTENSION, CAMPBELL COUNTY. (2006KYD). (KYD FUNDING MOVED FROM6-8101.02)

CONSTRUCT A SIDEWALK ON THE SOUTH SIDE OF KY 1120 (MEMORIALPARKWAY) FROM PAVILION PARKWAY TO WILSON ROAD OVER I-471 INNEWPORT. (2012BOP)

ROADWAY REHABILITATION ON CAROTHERS ROAD FROM MONMOUTH STREET(US 27) TO RIGHT TURN LANE INTO NEWPORT SHOPPING CENTER.

REPLACE BRIDGE ON KY-1996 (MP 0.259) OVER STEVENS BRANCH; .75 MI WESTOF JCT KY 10; (STRUCTURALLY DEFICIENT, SR=19.9) 019B00013N

.040

5.016

3.500

.150

.292

.173

.100

CALLOWAY

CALLOWAY

CAMPBELL

CAMPBELL

CAMPBELL

CAMPBELL

CAMPBELL

CAMPBELL

CR-1411

-

I-471

KY-536

KY-9

KY-1120

KY-1892

KY-1996

$550,000

$3,800,000

$1,439,839

$40,130,000

$2,900,000

$622,000

$1,109,926

$450,000

Total

Total

Total

Total

Total

Total

Total

Total

R

U

C

C

C

R

U

C

R

U

C

D

U

C

D

C

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2015

2015

2017

2016

2014

2016

2017

2018

2014

2014

2015

2014

2015

2016

2016

2017

2014

2014

2016

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BRZ

BRZ

BRZ

SPP

HPP

SPP

SP

SP

STP

STP

STP

SNK

SNK

SNK

SNK

SNK

BRX

BRX

BRX

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$150,000

$100,000

$300,000

$3,800,000

$1,439,839

$8,940,000

$5,430,000

$25,760,000

$100,000

$630,000

$2,170,000

$70,000

$25,000

$527,000

$104,874

$1,005,052

$100,000

$50,000

$300,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

01

01

06

06

06

06

06

06

1149.00

8502.00

183.00

352.00

407.00

425.00

427.00

1072.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

01

01

06

06

06

06

06

06

1149.00

8502.00

183.00

352.00

407.00

966.02

427.00

1072.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2012

2008

2004

1996

2010

2012

2014

2010

2012

2008

2004

1996

2010

2004

2014

2010

1.027

0

21.82

1.375

2.395

.209

1.067

5.016

21.97

1.667

2.568

.309

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / NEW ROUTE(O)

SAFETY / SAFETY(P)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

Page 20: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 20

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

REPLACE BRIDGE ON CS-1193 (MP 0.783) OVER TAYLOR CREEK; 1.0 MI N. JCT KY1120; (STRUCTURALLY DEFICIENT, SR=31.7) 019C00063N

REPLACE BRIDGE ON KY 10 OVER TWELVE MILE CREEK SE OF KY 1997 (SR 15.1)019B00006N

REPLACE BRIDGE ON KY 2921 OVER BR OF TWELVE MILE CREEK 0.2 MILE NW OFWASHINGTON TRACE ROAD (CR 1006)(SR 24.3) 019B00061N

REPLACE BRIDGE OVER TWELVEMILE CREEK ON KY 8 0.1 MI N OF NEISES ROAD(CR 1009). (019B00003N)(SR=46.1)

INSTALLATION OF SIDEWALKS AND TRAFFIC CONTROL MEASURES ALONG: 4THAND MONMOUTH, FROM SARATOGA TO MONMOUTH AND 3RD STREET AND 8THSTREET/COLUMBIA TO PUTMAN AND 9TH IN THE CITY OF NEWPORT. (2012BOP)

CONSTRUCT SIDEWALKS & INSTALL CROSSWALKS & ROADWAY MARKERSALONG DAYTON PIKE FROM 7TH ST TO CHATEAU DR & ALONG BELMONT RD TOERVIN TERRACE IN CITY OF DAYTON. (2012BOPC)

KY-9 RECONSTRUCTION ALONG A NEW ROUTE FROM MP 21.643 TO KY-8 NEARTHE 4TH STREET BRIDGE. (02CCN)(2004BOPC)(08CCR)(10CCR)(12CCR)(C-PHASESEE 8101.10 & 8101.20)

RECONSTRUCT KY 9 ALONG A NEW ROUTE FROM MP 21.643 TO NORTH OF 10THSTREET. (2012BOP)

.100

.054

.447

CAMPBELL

CAMPBELL

CAMPBELL

CAMPBELL

CAMPBELL

CAMPBELL

CAMPBELL

CAMPBELL

CS-1193

KY-10

KY-2921

KY-8

-

CS-3085

KY-9

KY-9

$1,480,000

$1,830,000

$625,000

$1,350,000

$250,000

$161,200

$2,660,000

$4,500,000

Total

Total

Total

Total

Total

Total

Total

Total

R

U

C

R

U

C

R

U

C

D

R

U

C

D

C

D

C

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2014

2015

2017

2015

2015

2017

2014

2014

2015

2017

2019

2019

2020

2014

2014

2014

2014

2014

2015

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BRZ

BRZ

BRZ

BRO

BRO

BRO

BRO

BRO

BRO

BRX

BRX

BRX

BRX

SAF

SAF

SAF

SAF

SPP

SPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$230,000

$120,000

$1,130,000

$150,000

$50,000

$1,630,000

$75,000

$50,000

$500,000

$150,000

$200,000

$100,000

$900,000

$25,000

$225,000

$25,000

$136,200

$2,660,000

$4,500,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

06

06

06

06

06

06

06

06

1076.00

1077.00

1078.00

1085.00

3504.00

3505.00

8101.01

8101.10

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

06

06

06

06

06

99

06

06

1076.00

1077.00

1078.00

1085.00

3504.00

908.02

8101.00

8101.01

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2010

2012

2012

2014

2012

2012

2004

2014

2010

2012

2012

2014

2012

2008

2002

2004

.733

4.567

.4

18.017

.269

.833

4.607

.54

18.071

.716

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

SAFETY / SAFETY-HAZARD ELIM(P)

SAFETY / SAFETY-HAZARD ELIM(P)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / NEW ROUTE(O)

Page 21: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 21

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

RECONSTRUCT KY 9 ALONG A NEW ROUTE FROM NORTH OF 10TH STREET TO US27 (YORK STREET). (2012BOP)

CONSTRUCT NEW I-471 SOUTHBOUND OFF-RAMP AT KY-8 (SEE ALSO 6-183.00).(02CCN)(06CCN)

TRANSPORTATION IMPROVEMENTS TO AA-I-275 CONNECTOR, CAMPBELLCOUNTY. (2005HPP-KY155)(SEE 6-8105.00 FOR "KYD" COMPONENT)(06CCR)(10CCR)

TRANSPORTATION IMPROVEMENTS TO AA-I-275 CONNECTOR, CAMPBELLCOUNTY. (2005HPP-KY166)(SEE 6-8105.00 FOR "KYD" COMPONENT)

CONSTRUCT NEW TECHNOLOGY TRIANGLE ACCESS ROAD, CAMPBELL COUNTY,KENTUCKY. (2005HPP-KY126)(2006BOPC).(10CCR)

CULVERT EXTENSION CARRYING TAYLOR CREEK UNDER KY 8 AND RIVERBOATROW.(12CCN)

CORRECT GEOMETRIC DEFICIENCIES AT INTERSECTION OF US-51/US-62/FRONTST/ELM ST IN BARDWELL TO ADDRESS FLOW, SAFETY, AND ACCESSISSUES.(12CCR)

WIDEN FOUR MILE ROAD TO WEST GHENT CITY LIMIT.(SECTION4)(2006BOPC)(00CCN)(10CCR)

KY-7 (CAROL MALONE BLVD.) WIDENING FROM LITTLE SANDY RIVER BRIDGETO ACADEMIC PARKWAY. (08CCR)(12CCR)

.100

.100

3.300

.980

CAMPBELL

CAMPBELL

CAMPBELL

CAMPBELL

CAMPBELL

CAMPBELL

CARLISLE

CARROLL

CARTER

KY-9

I-471

I-275

I-275

-

-

US-51

US-42

KY-7

$8,500,000

$2,700,000

$5,399,401

$7,249,112

$1,439,839

$3,600,000

$750,000

$7,100,000

$3,640,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

C

R

C

C

C

C

U

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2016

2014

2014

2014

2014

2014

2014

2015

2015

2014

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SP

HPP

HPP

HPP

SPP

SPP

SPP

SPP

SP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$8,500,000

$2,700,000

$5,399,401

$7,249,112

$1,439,839

$3,600,000

$250,000

$500,000

$7,100,000

$3,640,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

06

06

06

06

06

06

01

06

09

8101.20

8104.00

8105.01

8105.02

8105.03

8703.00

333.00

8002.10

144.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

06

06

06

06

06

06

01

06

09

8101.01

8104.00

8105.01

8105.02

191.00

8703.00

333.00

8002.00

144.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2014

2002

2004

2004

2004

2012

2012

2006

1998

2004

2002

2004

2004

2004

2012

2012

2000

1998

4.722

7.8

9.9

10.318

4.822

7.9

13.2

10.865

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / NEW ROUTE(O)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / DRAINAGE IMPROVE(P)

SAFETY / SAFETY(P)

RELIABILITY / MINOR WIDENING(O)

RELIABILITY / MAJOR WIDENING(O)

Page 22: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 22

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

REPLACE BRIDGE ON US-60 (MP 26.312) OVER UPPER STINSON CREEK; 1.5 MI E OFE-JCT KY 1; (STRUCTURALLY DEFICIENT, SR=29.6) 022B00064N

REPLACE BRIDGE ON US-60 (MP 4.111) OVER TYGARTS CREEK; .75 MI E OF JCT KY1662; (STRUCTURALLY DEFICIENT, SR=47) 022B00037N

REPLACE BRIDGE ON US 60 OVER REEVES BRANCH 0.05 MILE W OF REEVESBRANCH ROAD(CR 1352)(SR 39.4) 022B00038

REPLACE BRIDGE ON KY 474 OVER SMITH CREEK IN CARTER AT INTERSECTIONOF KY 474 AND NUNN ROAD(CR 1507)(SR 40.1) 022B00123N

REPLACE BRIDGE ON KY 2 OVER JORDA FORK AT INTERSECTION OF KY 2 &JORDAN FORK ROAD(CR 1445)(SR40.2) 022B00072N

SAFETY IMPROVEMENTS AT THE EAST CARTER HIGH SCHOOL.(06CCN)(08CCR)(12CCR)

SAFETY IMPROVEMENTS TO KY-773 AT KY-7: ADD LEFT-TURN LANE ANDIMPROVE SIGHT DISTANCE ON KY-7. (06CCN)(2006BOPC)(08CCR)(10CCR)(12CCR)

.100

.100

.040

.100

.100

CARTER

CARTER

CARTER

CARTER

CARTER

CARTER

CARTER

US-60

US-60

US-60

KY-474

KY-2

KY-1

KY-773

$1,430,000

$710,000

$825,000

$725,000

$900,000

$3,520,000

$730,000

Total

Total

Total

Total

Total

Total

Total

R

U

C

R

U

C

R

U

C

R

U

C

R

U

C

R

U

C

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2014

2014

2015

2014

2014

2016

2014

2014

2015

2015

2015

2016

2014

2014

2015

2014

2014

2015

2014

2014

2015

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BRO

BRO

BRO

BRO

BRO

BRO

BRO

BRO

BRO

BRO

BRO

BRO

BRO

BRO

BRO

SP

SP

SP

SP

SP

SP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$230,000

$100,000

$1,100,000

$110,000

$100,000

$500,000

$75,000

$250,000

$500,000

$75,000

$150,000

$500,000

$250,000

$250,000

$400,000

$870,000

$570,000

$2,080,000

$120,000

$110,000

$500,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

09

09

09

09

09

09

09

1072.00

1075.00

1080.00

1081.00

1083.00

8311.00

8312.10

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

09

09

09

09

09

09

09

1072.00

1075.00

1080.00

1081.00

1083.00

8311.00

8312.00

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2010

2010

2012

2012

2012

2006

2006

2010

2010

2012

2012

2012

2006

2006

26.072

4.061

3.659

5.062

8.734

10.08

0

26.172

4.161

3.699

5.102

8.774

10.18

.1

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

SAFETY / SAFETY(P)

SAFETY / SAFETY(P)

Page 23: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 23

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

DESIGN BRIDGES IN CONJUNCTION WITH PROJECT 8-8312. (08CCN)

REPLACE BRIDGE OVER BRUSH CREEK ON UPPER BRUSH CREEK ROAD (CR 1006)1.3 MI NE OF KY 1552 (023C00002N)(SR=20.3) (EBRP)

NEW ALIGNMENT FROM MP 16.8 TO MP 17.4 (12CCN)

CORRECT VERTICAL ALIGNMENT ON US 127 AND KY 1552 NEARINTERSECTION.(12CCN)

RECONSTRUCT BELL HILL FROM MP 10.4 TO MP 11.9.(12CCN)

RECONSTRUCT BRUSHY CREEK HILL FROM MP 1.8 TO MP 2.8.(12CCN)

REALIGN KY 501 TO INTERSECT KY 70 EAST OF EXISTING LOCATION ANDCORRECT VERTICAL ALIGNMENT OF KY 70 NEAR EXISTINGINTERSECTION.(12CCN)

.050

.060

.300

1.500

1.000

.180

CARTER

CASEY

CASEY

CASEY

CASEY

CASEY

CASEY

KY-773

CR-1006

KY-70

US-127

KY-70

KY-49

KY-501

$7,170,000

$770,000

$1,760,000

$1,570,000

$5,870,000

$3,610,000

$1,750,000

Total

Total

Total

Total

Total

Total

Total

R

U

C

D

R

U

C

D

R

U

D

R

U

D

R

U

D

R

U

D

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2017

2017

2018

2015

2016

2016

2016

2014

2015

2015

2014

2015

2015

2014

2015

2015

2014

2015

2015

2014

2015

2015

2016

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SPP

SPP

BRZ

BRZ

BRZ

BRZ

SP

SP

SP

SP

SP

SP

SP

SP

SP

SP

SP

SP

SP

SP

SP

SP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$560,000

$370,000

$6,240,000

$250,000

$75,000

$25,000

$420,000

$780,000

$480,000

$500,000

$780,000

$530,000

$260,000

$1,560,000

$3,420,000

$890,000

$1,250,000

$1,320,000

$1,040,000

$520,000

$80,000

$250,000

$900,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

09

08

08

08

08

08

08

8506.00

1064.00

8701.00

8702.00

8703.00

8704.00

8705.00

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

09

08

08

08

08

08

08

8506.00

1064.00

8701.00

8702.00

8703.00

8704.00

8705.00

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2008

2014

2012

2012

2012

2012

2012

2008

2014

2012

2012

2012

2012

2012

1

1.3

16.8

18.746

10.4

1.8

11

1.3

1.35

17.4

19.046

11.9

2.8

11.18

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / DESIGN ENGINEERING(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

Page 24: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 24

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

CONSTRUCT A NEW STORM DRAINING SYSTEM, CURB AND GUTTER FROMBELDON AVENUE EASTWARD AND CONSTRUCT A NEW LEFT TURN ONTOCOLLEGE STREET.(12CCN)

CHRISTIAN COUNTY, E.T. BREATHITT (PENNYRILE) PARKWAYEXTENSION.(KY182)(07KYD)(2006BOPC)

E.T. BREATHITT (PENNYRILE) PARKWAY EXTENSION SECTION 1A;RECONSTRUCT US-41A FROM CLINIC DRIVE (INCLUDING CLINIC DRRECONSTRUCTION) TO NORTH ENTRANCE OF THE MALL.(2004BOPC)(CONSTRUCT SEQUENCE 3)(12CCR)

EXTEND KY-1682 FROM THE E.T. BREATHITT PARKWAY TO US-68/KY-80 EAST OFHOPKINSVILLE (HOPKINSVILLE NORTHEAST BYPASS).

RECONSTRUCT THE KY 115/KY 911 INTERSECTION IN OAKGROVE.(03KYDN)(04KYD-KY074)(05KYD) (10CCR)

WIDEN KY-911 FROM US-41A TO OAK GROVE.(12CCR)

INTERSECTION IMPROVEMENT AT KY-107 AND KOFFMAN DRIVE JUST SOUTH OFCOUNTRY CLUB LANE IN HOPKINSVILLE. (2006BOPC)

RECONSTRUCT KY 1007 FROM US 68 TO SANDERSON ROAD INHOPKINSVILLE.(12CCR)

.368

.700

4.000

.100

1.800

.475

1.724

CASEY

CHRISTIAN

CHRISTIAN

CHRISTIAN

CHRISTIAN

CHRISTIAN

CHRISTIAN

CHRISTIAN

KY-70X

EB-9004

US-41A

KY-1682

KY-115

KY-911

KY-107

KY-1007

$3,530,000

$2,280,000

$8,660,000

$2,710,000

$2,820,000

$13,910,000

$1,440,000

$20,020,000

Total

Total

Total

Total

Total

Total

Total

Total

D

R

U

C

C

D

C

R

U

C

R

U

C

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2014

2015

2015

2014

2014

2017

2014

2014

2014

2016

2014

2014

2015

2015

2016

2018

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SP

SP

SP

KYD

NH

STP

STP

STP

STP

STP

CM

CM

CM

SPP

SPP

SPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$780,000

$1,660,000

$1,090,000

$2,280,000

$8,660,000

$2,710,000

$2,820,000

$2,800,000

$2,310,000

$8,800,000

$240,000

$550,000

$650,000

$5,520,000

$3,250,000

$11,250,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

08

02

02

02

02

02

02

02

8706.00

100.07

100.20

136.00

156.00

180.00

203.00

227.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

08

02

02

02

02

02

99

02

8706.00

100.50

100.10

136.00

156.00

180.00

219.05

227.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2012

2006

2004

2000

2002

2006

2006

2012

2012

2000

2000

2000

2002

2006

2000

2012

2.407

13.19

1.1

0

16.7

.785

2.775

13.668

1.35

1.835

17.175

2.509

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

SAFETY / SAFETY(P)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / NEW ROUTE(O)

SAFETY / SAFETY(P)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / CONGESTION MITIGTN(O)

RELIABILITY / RECONSTRUCTION(O)

Page 25: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 25

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

DESIGN STUDY TO DETERMINE THE FEASIBILITY OF A NEW INTERCHANGE ATKY 107 SOUTH OF HOPKINSVILLE.

REPLACE BRIDGE ON SUB STATION RD (CR 1116) OVER CSX RR 0.04 MILE E OF US41 (SR 34.4) 024C00034N

REPLACE BRIDGE OVER CSX RR ON WALNUT STREET (US 41A) IN HOPKINSVILLE475 FT NE OF EAST 21ST STREET (CS 1016) (024B00112N) (SR=47.4)

REPLACE BRIDGE OVER N FORK LITTLE RIVER ON MILBROOKE DRIVE (CS 1262)500 FT SW OF KAREN DRIVE (CS 1268) 024C00081NSR 21.4

NORTH DRIVE/GLASS AVENUE TRAFFIC CONGESTION IMPROVEMENT PROJECT:CONSTRUCTION OF LEFT-HAND TURNING LANES AT THE INTERSECTION OFNORTH DRIVE AND GLASS AVENUE. (2010BOPC)

EXTEND LOVERS LANE AND MAKE SAFETY IMPROVEMENTS.(08CCN)(10CCR)(12CCR)

WIDEN KY 107 TO THREE LANES FROM GREENWAY LANE TO KY 380.(12CCN)

REPLACE BRIDGE ON KY-974 (MP 10.924) OVER DRY FORK; .05 MI E-CR 1124@ALLNSVL; (STRUCTURALLY DEFICIENT, SR=23.1) 025B00090N

.132

.032

.038

.100

.346

.100

CHRISTIAN

CHRISTIAN

CHRISTIAN

CHRISTIAN

CHRISTIAN

CHRISTIAN

CHRISTIAN

CLARK

I-24

CR-1116

US-41A

CS-1262

KY-1007

-

KY-107

KY-974

$500,000

$770,000

$950,000

$225,000

$1,464,000

$2,710,000

$4,720,000

$570,000

Total

Total

Total

Total

Total

Total

Total

Total

D

R

U

C

D

R

U

D

R

C

C

R

U

C

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2016

2015

2015

2017

2018

2020

2020

2019

2014

2014

2014

2014

2014

2015

2014

2014

2016

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

BRZ

BRZ

BRZ

BRX

BRX

BRX

BRZ

CM

CM

STP

SPP

SPP

SPP

BRX

BRX

BRX

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$500,000

$150,000

$120,000

$500,000

$500,000

$100,000

$350,000

$225,000

$51,000

$1,413,000

$2,710,000

$1,110,000

$1,360,000

$2,250,000

$100,000

$90,000

$380,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

02

02

02

02

02

02

02

07

805.00

1085.00

1089.00

1094.00

3700.00

8505.00

8703.00

1121.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

02

02

02

02

99

02

02

07

805.00

1085.00

1089.00

1094.00

219.09

8505.00

8703.00

1121.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2014

2012

2014

2014

2010

2008

2012

2010

2014

2012

2014

2014

2004

2008

2012

2010

79.9

.019

15.386

.372

1.3

16.823

10.874

80.032

.059

15.418

.41

1.4

17.169

10.974

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

ECONOMIC DEVELOPMENT / SCOPING STUDY DD (O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / CONGESTION MITIGTN(O)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / MINOR WIDENING(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

Page 26: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 26

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

WIDEN KY-89 WINCHESTER-IRVINE ROAD: SECTION EIGHT FROM MILEPOST12.45 TO MILEPOST 14.32. (06CCN)(12CCR)

WIDEN KY-89 WINCHESTER-IRVINE ROAD: SECTION SEVEN FROM MILEPOST10.09 TO MILEPOST 10.88. (06CCN)(12CCR)

WIDEN KY-89 WINCHESTER-IRVINE ROAD: SECTION SIX FROM MILEPOST 9.30 TOMILEPOST 9.69. (06CCN)(12CCR)

WIDEN KY-89 WINCHESTER-IRVINE ROAD: SECTION FIVE FROM MILEPOST 7.02TO MILEPOST 7.51. (06CCN)(12CCR)

WIDEN KY-89 WINCHESTER-IRVINE ROAD: SECTION THREE FROM MILEPOST 3.06TO MILEPOST 4.28. (06CCN)(12CCR)

WIDEN KY-89 WINCHESTER-IRVINE ROAD: SECTION TWO FROM MILEPOST 1.96TO MILEPOST 2.93. (06CCN)(12CCR)

WIDEN KY-89 WINCHESTER-IRVINE ROAD: SECTION ONE FROM MILEPOST 0.96TO MILEPOST 1.96. (06CCN)(12CCR)

EXTEND THE WINCHESTER EAST BYPASS (KY 1958) FROM IRVINE ROAD (KY 89)TO KY 627 SOUTH OF WINCHESTER. (08CCN)(10CCR)

ERECT A FOUR-WAY TRAFFIC CONTROL SIGNAL AT THE INTERSECTION OF US-60 AND BREEZE HILL DRIVE. (08CCN)

1.870

.790

.400

.500

1.200

1.000

1.000

.030

CLARK

CLARK

CLARK

CLARK

CLARK

CLARK

CLARK

CLARK

CLARK

KY-89

KY-89

KY-89

KY-89

KY-89

KY-89

KY-89

KY-1958

US-60

$6,420,000

$440,000

$220,000

$220,000

$550,000

$400,000

$570,000

$42,390,000

$50,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

R

U

C

D

D

P

D

D

D

R

U

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2014

2014

2015

2014

2014

2014

2014

2014

2014

2014

2015

2016

2014

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SP

SP

SP

SP

SP

SP

SP

SP

SP

SPP

SPP

SPP

SP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$1,260,000

$1,560,000

$3,600,000

$440,000

$220,000

$220,000

$550,000

$400,000

$570,000

$6,830,000

$10,920,000

$24,640,000

$50,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

07

07

07

07

07

07

07

07

07

8302.00

8307.00

8308.00

8309.00

8310.00

8311.00

8312.00

8401.00

8410.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

07

07

07

07

07

07

07

07

07

8302.00

8307.00

8308.00

8309.00

8310.00

8311.00

8312.00

8401.00

8410.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2006

2006

2006

2006

2006

2006

2006

2008

2008

2006

2006

2006

2006

2006

2006

2006

2008

2008

12.45

10.09

9.3

7.02

3.06

1.96

.96

4.94

14.32

10.88

9.69

7.51

4.28

2.93

1.96

4.97

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / NEW ROUTE(O)

SAFETY / SAFETY-HAZARD ELIM(P)

Page 27: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 27

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

RECONSTRUCT I-64/MOUNTAIN PARKWAY INTERCHANGE TO ADD NEW RAMPSTO AND FROM THE EAST.(12CCR)

INSTALL MAST ARM POLES FOR TRAFFIC SIGNALS DOWNTOWN. (10CCN)

EXTEND FULTON ROAD. (BY COUNTY)(10CCN)

WEST BYPASS OF MANCHESTER (GRADE, DRAIN & INCIDENTAL SURFACING).(RU-04DEOB)(10CCR)

REPLACE BRIDGE AND APPROACHES ON CR-1113A OVER BIG CREEK (C63).(SR=4.0)(PROJECT FUNDING CONTINGENT UPON BRIDGE POSTING COMPLIANCE):(026C00063N)(10CCR)

REPLACE BRIDGE ON US 421 OVER ISLAND CREEK AT INTERSECTION OF US 421 &BOWLING BRANCH RD (CR 1346)(SR 27.8) 026B00001N

REPLACE BRIDGE ON BEECH CREEK RD (CR 1004) OVER GOOSE CREEK ATINTERSECTION WITH CHANDLER BRANCH RD (CR 1003)(SR 30.8) C00001N

REPLACE BRIDGE ON MILL CREEK ROAD (CR 1154) OVER GOOSE CREEK AT JCTWITH KY 1524 (SR 47) 026C00025N

2.575

3.600

CLARK

CLARK

CLARK

CLAY

CLAY

CLAY

CLAY

CLAY

I-64

-

-

US-421

CR-1113A

US-421

CR-1004

CR-1154

$14,220,000

$160,000

$1,410,000

$63,270,000

$1,360,000

$2,425,000

$2,125,000

$880,000

Total

Total

Total

Total

Total

Total

Total

Total

R

U

C

C

C

R

U

C

C

R

U

C

R

U

C

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2016

2017

2018

2014

2014

2014

2014

2016

2014

2014

2014

2015

2015

2015

2018

2017

2017

2018

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SPP

SPP

SB2

SB2

SP

SP

SP

BRZ

BRO

BRO

BRO

BRZ

BRZ

BRZ

BRZ

BRZ

BRZ

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$1,700,000

$900,000

$11,620,000

$160,000

$1,410,000

$6,180,000

$2,930,000

$54,160,000

$1,360,000

$200,000

$125,000

$2,100,000

$75,000

$50,000

$2,000,000

$80,000

$50,000

$750,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

07

07

07

11

11

11

11

11

8506.01

8633.00

8639.00

273.01

1069.00

1088.00

1091.00

1092.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

07

07

07

11

11

11

11

11

8506.00

8633.00

8639.00

273.01

1069.00

1088.00

1091.00

1092.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2012

2010

2010

1996

2004

2012

2012

2012

2008

2010

2010

1996

2004

2012

2012

2012

95.1

0

20.462

.144

0

97.675

.042

20.502

.184

.035

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / SIGNAL SYS IMPROVE(P)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / BYPASS(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

Page 28: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 28

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

REPLACE BRIDGE OVER OTTER CREEK ON OTTER CREEK ROAD (CR 1160) ATJUNCTION WITH MAY FORK ROAD (CR 1158)(026C00031N)(SR=2)

CORRECT ROCKFALL HAZARD @ MP 23.5 TO 24.1(10CCR)

RECONSTRUCT KY-2432 FROM SECOND STREET IN EAST MANCHESTER NORTHTO THE LEFT FORK OF COAL HOLLOW ROAD (MP 1.58)(00CCN)(06CCR)(08CCR)(10CCR)

WIDEN US-421/KY-80 TO THREE LANES FROM KY 80 SOUTH TO KY-149(LOCKARTS CREEK ROAD). (00CCN)(10CCR)(12CCR)

CONSTRUCT A NEW ENTRANCE TO THE GREEN PARK FROM US-421 TO END NEARCEMETERY. (10CCN)(12CCR)

REPLACE BRIDGE OVER CURRY BRANCH ROAD IN CLAY COUNTY.(12CCN)

REPLACE BRIDGE OVER CLEAR FORK CREEK ON KY 738 0.2 MI S OF US 127X.(027B00011N)(SR=31.5)

RECONSTRUCTION OF US 127 FROM APPROX 1.14 MI N OF INTERSECTION OF KY3063 & OLD US 127, EXTENDING N TO KY 1730, LOCATED APPROX 0.36 MI E OF THEINTERSECTION OF KY 1730 & MANNTOWN RD.(SEE 8-108 & 8-115 FORPE&ENV)(12CCR)(G&D)(SEE 8-8601.27 FOR SURFACING)

.016

.600

1.230

2.060

.040

.010

21.300

CLAY

CLAY

CLAY

CLAY

CLAY

CLAY

CLINTON

CLINTON

CR-1160

KY-66

KY-2432

US-421

US-421

CR-1263

KY-738

US-127

$230,000

$4,160,000

$15,890,000

$25,700,000

$3,150,000

$490,000

$250,000

$13,960,000

Total

Total

Total

Total

Total

Total

Total

Total

D

R

U

R

U

C

R

U

C

C

C

R

C

D

D

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2019

2020

2020

2014

2014

2015

2014

2014

2015

2015

2014

2014

2015

2019

2014

2016

2016

2017

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BRZ

BRZ

BRZ

SP

SP

SP

SPB

SPB

SB2

SPP

SP

SPP

SPP

BRX

SPP

SPP

SPP

NH

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$150,000

$30,000

$50,000

$130,000

$40,000

$3,990,000

$2,320,000

$570,000

$13,000,000

$25,700,000

$3,150,000

$80,000

$410,000

$250,000

$2,300,000

$1,110,000

$550,000

$10,000,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

11

11

11

11

11

11

08

08

1099.00

5005.00

8001.00

8003.00

8632.00

8711.00

1062.00

8601.26

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

RUSSELL

11

11

11

11

11

11

08

08

1099.00

5005.00

8001.00

8003.00

8632.00

8711.00

1062.00

8601.26

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2014

1998

2000

2000

2010

2012

2014

2012

2014

1998

2000

2000

2010

2012

2014

2012

2.01

23.5

.351

13.692

.281

6.478

11.017

2.026

24.1

1.58

16.915

.321

6.488

20.967

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / BRIDGE REPLACEMENT(P)

SAFETY / ROCKFALL MITIGTN(P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / MINOR WIDENING(O)

SAFETY / SAFETY(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / RECONSTRUCTION(O)0 11.4Milepoints: To:From:

Page 29: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 29

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

RECONSTRUCTION OF US 127 FROM APPROX 1.14 MI N OF INTERSECTION OF KY3063 & OLD US 127, EXTENDING N TO KY 1730, LOCATED APPROX 0.36 MI E OF THEINTERSECTION OF KY 1730 & MANNTOWN RD.(SEE 8-108 & 8-115 FORPE&ENV)(12CCR)(SURFACING)(SEE 8-8601.26 FOR G&D)

RECONSTRUCTION OF US 127 FROM APPROX 1.14 MI N OF INTERSECTION OF KY3063 & OLD US 127, EXTENDING N TO KY 1730, LOCATED APPROX 0.36 MI E OF THEINTERSECTION OF KY 1730 & MANNTOWN RD.(SEE 8-108 & 8-115 FORPE&ENV)(12CCR)(SURFACING)(SEE 8-8601.26 FOR G&D)

RECONSTRUCTION OF US 127 FROM APPROX 0.18 MI E OF THE INTERSECTION OFAARON RIDGE RD AND OLD US 127, EXTENDING N TO APPROX 1.14 MI N OF THEINTERSECTION OF KY 3063 AND OLD US 127. (SEE 8-108 AND 8-115 FORPE&ENV)(12CCR)(G&D)(SEE 8-8601.31 FOR SURFACING)

RECONSTRUCTION OF US 127 FROM APPROX 0.18 MI E OF THE INTERSECTION OFAARON RIDGE RD AND OLD US 127, EXTENDING N TO APPROX 1.14 MI N OF THEINTERSECTION OF KY 3063 AND OLD US 127. (SEE 8-108 AND 8-115 FORPE&ENV)(12CCR)(SURFACING)(SEE 8-8601.30 FOR G&D)

MARION TO FREDONIA; SURFACING AND INCIDENTAL GRADE ANDDRAIN.(12CCR)

OPERATION OF CAVE-IN-ROCK FERRY AT OHIO RIVER FOR FY 2015.(12CCR)

OPERATION OF CAVE-IN-ROCK FERRY AT OHIO RIVER FOR FY 2016.(12CCR)

OPERATION OF CAVE-IN-ROCK FERRY AT OHIO RIVER FOR FY 2017.(12CCR)

21.300

21.300

2.370

5.200

CLINTON

CLINTON

CLINTON

CLINTON

CRITTENDEN

CRITTENDEN

CRITTENDEN

CRITTENDEN

US-127

US-127

US-127

US-127

US-641

KY-91

KY-91

KY-91

$16,000,000

$20,500,000

$23,860,000

$4,000,000

$12,000,000

$402,000

$402,000

$402,000

Total

Total

Total

Total

Total

Total

Total

Total

C

C

D

R

U

C

C

C

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2018

2019

2014

2016

2016

2019

2020

2014

2015

2016

2017

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

NH

NH

SP

SP

SP

SP

SP

SPP

SPP

SPP

SPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$16,000,000

$20,500,000

$1,600,000

$1,680,000

$580,000

$20,000,000

$4,000,000

$12,000,000

$402,000

$402,000

$402,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

08

08

08

08

01

01

01

01

8601.27

8601.28

8601.30

8601.31

187.23

326.12

326.13

326.14

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

RUSSELL

RUSSELL

CALDWELL

08

08

08

08

01

01

01

01

8601.27

8601.28

8601.30

8601.31

187.20

326.12

326.13

326.14

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2014

2014

2012

2014

2006

2010

2010

2012

2014

2014

2012

2014

2000

2010

2010

2012

11.017

11.017

11.162

11.162

11.162

20.967

20.967

11.262

11.262

11.262

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / PREFINANCD CONVRSN(P)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RELOCATION(O)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

0

0

11.4

11.4

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

From:

From:

From:

Page 30: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 30

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

OPERATION OF CAVE-IN-ROCK FERRY AT OHIO RIVER FOR FY 2018.(12CCR)

OPERATION OF CAVE-IN-ROCK FERRY AT OHIO RIVER FOR FY 2019.(12CCR)

OPERATION OF CAVE-IN-ROCK FERRY AT OHIO RIVER FOR FY 2020.(12CCR)

REPLACE BRIDGE OVER CUMBERLAND RIVER ON KY 61 0.1 MI N OF COLDSPRINGS ROAD (CR 1204).(029B00012N)(SR=32)

RECONSTRUCT KY-144 IN THE VICINITY OF PLEASANT VALLEY ROAD. DESIGNPHASE MONEY WAS MOVED FROM 2-8631.00(10CCR)(12CCR)

RECONSTRUCT INTERSECTION AT FAIRVIEW DRIVE (KY 3143) AND KY 298.(12CCR)

RECONSTRUCT ON US 60 BETWEEN OAKFORD RD LOOP (CR 1370) TO ADDRESSFLOODING PROBLEM IN THE VICINITY OF THE KIMBERLY-CLARK PLANT

TRANSPORTATION IMPROVEMENTS TO US 60 OWENSBORO, DAVIESS COUNTY.(2005HPP-KY158)(2005HPP-KY167)(SEE 2-287.20 FOR "STP" COMPONENT)

.140

1.100

.100

.592

2.200

CRITTENDEN

CRITTENDEN

CRITTENDEN

CUMBERLAND

DAVIESS

DAVIESS

DAVIESS

DAVIESS

KY-91

KY-91

KY-91

KY-61

KY-144

KY-298

US-60

US-60

$402,000

$402,000

$402,000

$600,000

$1,520,000

$5,100,000

$3,250,000

$3,404,040

Total

Total

Total

Total

Total

Total

Total

Total

C

C

C

D

R

U

C

R

U

C

D

R

U

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2018

2019

2020

2018

2020

2020

2014

2015

2015

2017

2014

2015

2015

2016

2014

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SPP

SPP

BRX

BRX

BRX

SPP

SPP

SPP

SPP

SPP

SPP

SPP

SPP

HPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$402,000

$402,000

$402,000

$500,000

$50,000

$50,000

$1,520,000

$600,000

$1,000,000

$3,500,000

$250,000

$500,000

$500,000

$2,000,000

$3,404,040

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

01

01

01

08

02

02

02

02

326.15

326.16

326.17

1060.00

194.00

229.00

237.00

287.52

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

01

01

01

08

02

02

02

02

326.15

326.16

326.17

1060.00

194.00

229.00

237.00

287.52

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2012

2014

2014

2014

2006

2012

2014

2004

2012

2014

2014

2014

2006

2012

2014

2004

11.162

11.162

11.162

9.945

6.3

7.7

5.69

11.262

11.262

11.262

10.085

7.4

7.8

6.282

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / RECONSTRUCTION(O)

SAFETY / SAFETY(P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RELOCATION(O)

Page 31: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 31

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

REPLACE BRIDGE ON PR-1212 (MP 0.725) OVER TRIB-PANTHER CK; .4 MI E KY 279;(STRUCTURALLY DEFICIENT, SR=16.8) 030C00168N

REPLACE BRIDGE OVER BURNETT FORK ON FIELDS RD (CR 1014) 0.75 MI W OF KY142 030C00001N SR 39 (EBRP)

WIDENING KY-54 FROM THE US-60 BYPASS TO WHITESVILLE FROM MILEPOST4.51 TO MILEPOST 8.0. (06CCN)(10CCR)(12CCR)

WIDEN KY 1456 - ADD SHOULDERS AND CORRECT GEOMETRIC DEFICIENCIES(12CCN)

INSTALL GUARDRAIL ON KY 2326 (OTTER GAP ROAD) BEGINNING 4100 FT EASTOF BLEDSOE ROAD (MP 2.040) EXTENDING EAST TO 1200 FT WEST OF KY 743 (MP2.361). (2012BOP)

RECONSTRUCT KY-70/KY-259 FROM 0.36 MILE NORTH GREEN RIVER BRIDGE ATBROWNSVILLE TO 0.42 MILE NORTH OF THE KY-70/KY-259INTERSECTION.(06CCR)(2004BOPC)(12CCR)

RECONSTRUCT KY-259 FROM 0.42 MILE NORTH OF THE KY-70 INTERSECTION TONORTH OF THE KYROCK ELEMENTARY SCHOOL (PRIORITY SECTION).(2004BOPC)

RECONSTRUCT KY-743 FROM KY-2326 TO KY-101 TO IMPROVE HORIZONTAL ANDVERTICAL ALIGNMENT AND PROVIDE A SUFFICIENT SHOULDER WIDTH.(10CCN)(12CCR)

.100

.014

3.500

.321

.900

3.400

1.323

DAVIESS

DAVIESS

DAVIESS

DAVIESS

EDMONSON

EDMONSON

EDMONSON

EDMONSON

PR-1212

CR-1014

KY-54

KY-1456

KY-2326

KY-259

KY-259

KY-743

$640,000

$715,000

$60,240,000

$500,000

$46,290

$8,490,000

$25,610,000

$2,270,000

Total

Total

Total

Total

Total

Total

Total

Total

R

U

C

D

R

U

C

R

U

C

D

C

R

U

C

R

U

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2014

2014

2016

2019

2020

2020

2020

2015

2016

2018

2015

2014

2016

2016

2018

2015

2015

2017

2014

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BRZ

BRZ

BRZ

BRZ

BRZ

BRZ

BRZ

SPP

SPP

SP

SP

SAF

SPP

SPP

SP

SP

SP

SP

SPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$120,000

$150,000

$370,000

$215,000

$75,000

$75,000

$350,000

$7,660,000

$17,040,000

$35,540,000

$500,000

$46,290

$1,540,000

$1,470,000

$5,480,000

$3,480,000

$1,690,000

$20,440,000

$2,270,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

02

02

02

02

03

03

03

03

1075.00

1093.00

8300.00

8709.00

920.00

7030.10

7030.50

8602.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

02

02

02

02

99

03

03

03

1075.00

1093.00

8300.00

8709.00

911.03

7030.00

7030.00

8602.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2010

2014

2006

2012

2012

2004

2004

2010

2010

2014

2006

2012

2008

1998

1998

2010

.675

1.326

4.505

2.04

11.676

12.096

3.737

.775

1.34

8.003

2.361

12.096

16.204

5.06

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / MINOR WIDENING(O)

SAFETY / SAFETY-HAZARD ELIM(P)

RELIABILITY / SPOT IMPROVEMENTS(O)

RELIABILITY / SPOT IMPROVEMENTS(O)

RELIABILITY / RECONSTRUCTION(O)

Page 32: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 32

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

RECONSTRUCT KY-32 FROM 0.408 MILES WEST OF STEGALL COLD SPRING ROADTO KY-7 NEAR NEWFOUNDLAND. (PRIORITY SECTION I)(06CCR) (08CCR)(10CCR)(12CCR)

RECONSTRUCT KY-32 FROM 0.408 MILES WEST OF STEGALL COLD SPRING ROADTO KY-7 NEAR NEWFOUNDLAND. (PRIORITY SECTION I)(06CCR) (08CCR)(10CCR)(12CCR)(ADDITIONAL FUNDING FOR C PHASE)

RECONSTRUCT KY 7 FROM SOUTH CITY LIMITS OF SANDY HOOK TOWARDWRIGLEY. (12CCR)

RECONSTRUCT KY-89 FROM 260' SOUTH OF RICE ST. IN IRVINE TO THE IRVINEBY-PASS.(10CCR)

REPLACE BRIDGE OVER HENDERSON BRANCH ON KY 594 0.1 MI W OF ECKHOLLOW ROAD (CR 1259).(033B00031N)(SR=7.8)(EBRP)

SPOT IMPROVEMENTS ON KY-89/KY-82 FROM IRVINE TO THE MOUNTAINPARKWAY. (06CCN)(10CCR)

SPOT IMPROVEMENT ON KY 89: CORRECT SIGHT DISTANCE PROBLEM AT THEKY 89/DRY RIDGE ROAD INTERSECTION. (2006BOPC)(10CCR)(TO BE LET W/ 8306.2)

SPOT IMPROVEMENT ON KY 89: CORRECT SIGHT DISTANCE PROBLEM ON KY 89AT A COMMERCIAL ENTRANCE 0.495 MILE SOUTH JCT. KY 794.(2006BOPC)(10CCR)(TO BE LET W/ 8306.1)

NEW CIRCLE ROAD REHAB AND WIDENING FROM VERSAILLES ROAD TOLEESTOWN ROAD. (12CCR) (LET W/ 7-279)

6.656

6.656

6.956

.900

.014

10.412

.100

.100

2.400

ELLIOTT

ELLIOTT

ELLIOTT

ESTILL

ESTILL

ESTILL

ESTILL

ESTILL

FAYETTE

KY-32

KY-32

KY-7

KY-89

KY-594

KY-89

KY-89

KY-89

KY-4

$39,520,000

$20,000,000

$3,380,000

$5,850,000

$850,000

$1,770,000

$1,060,000

$600,000

$19,430,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

D

R

U

C

C

D

C

D

R

U

C

C

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2014

2015

2015

2016

2017

2014

2015

2015

2016

2016

2016

2014

2014

2014

2015

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

STP

STP

STP

STP

STP

STP

SPP

BRX

BRX

BRX

BRX

SPP

SPP

SPP

SB2

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$3,800,000

$7,720,000

$5,000,000

$23,000,000

$20,000,000

$3,380,000

$5,850,000

$250,000

$50,000

$50,000

$500,000

$1,770,000

$1,060,000

$600,000

$19,430,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

09

09

09

10

10

10

10

10

07

192.01

192.07

228.00

363.10

1109.00

8306.00

8306.10

8306.20

113.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

MORGAN

POWELL

09

09

09

10

10

10

10

10

07

192.00

192.01

228.00

363.00

1109.00

8306.00

8306.00

8306.00

113.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2006

2014

2012

2000

2014

2006

2006

2006

2006

2006

2006

2012

1996

2014

2006

2006

2006

2006

2

2

0

11.851

7.523

14.578

15.49

15.95

4.86

8.656

8.656

6.956

12.811

7.537

17.903

15.59

16.05

7.26

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / SPOT IMPROVEMENTS(O)

SAFETY / SPOT IMPROVEMENTS(O)

SAFETY / SPOT IMPROVEMENTS(O)

RELIABILITY / MAJOR WIDENING(O)

7.887

0

11.121

2.058

Milepoints:

Milepoints:

To:

To:

From:

From:

Page 33: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 33

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

NEW CIRCLE ROAD REHAB AND WIDENING FROM VERSAILLES ROAD TOLEESTOWN ROAD. (12CCR) (LET W/ 7-279)(ADDITIONAL FUNDING FOR C PHASE)

NEW CIRCLE ROAD REHAB AND WIDENING FROM LEESTOWN ROAD TO NEARGEORGETOWN ROAD. (12CCR)

RECONSTRUCT/WIDEN US-25 FROM SPURR ROAD SOUTH OF I-75 TO 1400 FEETSOUTH OF IRONWORKS ROAD. (06CCN)(08CCR)(10CCR)(12CCR)

RICHMOND ROAD MULTIUSE PATH IN LEXINGTON BETWEEN EAGLE CREEKDRIVE AND JACOBSON PARK. (LOCAL MATCH) (ALL WORK BY LFUCG)(FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP).

LEESTOWN ROAD; WIDEN TO 4 LANES FROM EXISTING 4-LANE NEAR NEWCIRCLE ROAD TO MASTERSON PARK. (ADDITIONAL "SLX" FUNDING FOR CPHASE)(SEE 7-223.00 FOR "STP" COMPONENT) (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP).

CLAYS MILL ROAD; WIDEN FROM HARRODSBURG ROAD TO NEW CIRCLE ROAD(SECTION 1) (LFUCG T.I.P.) (LOCAL MATCH) (ALL WORK BY LFUCG)(CONSTRUCTION SEQU. 2) (SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP).

CLAYS MILL ROAD (SECTION 2C); WIDEN FROM NEW CIRCLE ROAD TOKEITHSHIRE WAY. (LOCAL MATCH) (ALL WORK BY LFUCG)(FUNDING SUBJECTTO FISCAL CONSTRAINT PENDING MPO TIP).

LIBERTY ROAD/TODDS ROAD; WIDEN FROM 0.2 MI S OF ANDOVER FORESTDRIVE/FOREST HILL DRIVE TO I-75 (SECTION 2) (ALL WORK BY LFUCG)(SEE 7-590.00 FOR SECTION 1) (FUNDING SUBJECT TO FISCAL CONSTRAINT PENDINGMPO TIP).

LIBERTY ROAD/TODDS ROAD; WIDEN FROM 0.2 MI S OF ANDOVER FORESTDRIVE/FOREST HILL DRIVE TO I-75 (SECTION 2).(ALL WORK BY LFUCG)(ADDITIONAL FUNDING FOR C PHASE) (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP).

2.400

3.400

3.200

1.000

1.500

1.900

.674

1.000

1.000

FAYETTE

FAYETTE

FAYETTE

FAYETTE

FAYETTE

FAYETTE

FAYETTE

FAYETTE

FAYETTE

KY-4

KY-4

US-25

US-25

US-421

CS-4174

CS-4174

KY-1927

KY-1927

$15,180,000

$18,000,000

$34,970,000

$690,000

$4,856,384

$13,415,000

$4,559,000

$5,900,000

$4,000,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

C

C

R

U

C

C

C

R

U

C

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2015

2018

2014

2014

2016

2017

2014

2016

2016

2017

2015

2014

2015

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SPP

SP

SP

SP

SLX

SLX

SLX

SLX

SLX

SLX

SLX

SLX

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$15,180,000

$18,000,000

$12,170,000

$3,520,000

$19,280,000

$690,000

$4,856,384

$1,400,000

$280,000

$11,735,000

$4,559,000

$5,900,000

$4,000,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

07

07

07

07

07

07

07

07

07

113.01

113.02

122.10

220.00

223.02

224.10

224.55

225.00

225.01

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

07

07

07

07

07

07

07

07

07

113.00

113.00

122.10

996.04

223.00

224.00

224.50

225.00

225.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2006

2014

2006

2000

2004

2000

2004

2000

2004

2006

2006

2006

1996

2000

2000

2000

2000

2000

4.86

7.26

18.264

8.4

2.296

0

2.01

2.7

2.7

7.26

8.26

21.415

9.55

3.842

2.01

2.684

3.95

3.95

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / MAJOR WIDENING(O)

SAFETY / BIKE/PED FACIL(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / MINOR WIDENING(O)

RELIABILITY / MINOR WIDENING(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / PREFINANCD CONVRSN(O)

Page 34: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 34

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

VARIOUS 'SLX' CONTINUING PROGRAM PROJECTS (RIDESHARE/MOBILITY, AIRQUALITY PLANNING, TRAFFIC SIGNAL) (LOCAL MATCH) (ALL WORK BY LFUCG)(FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP).

DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR LEXINGTONURBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2018. (FUNDINGSUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)

DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR LEXINGTONURBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2019. (FUNDINGSUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)

DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR LEXINGTONURBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2020. (FUNDINGSUBJECT TO FISCAL CONTRAINT PENDING MPO TIP)

SOUTH ELKHORN TRAIL IN LEXINGTON (PRIORITY SECTION 2); FROM JOSEPHBRYAN WAY THROUGH NS RAILROAD TUNNEL TO WAVELAND HISTORIC SITE(ALL WORK BY LFUCG). (FUNDING SUBJECT TO FISCAL CONSTRAINT PENDINGMPO TIP).

SOUTH ELKHORN TRAIL(PRIORITY SECTION 3); FROM LOCHDALE TERRACE,EXTENDING NORTHERLY UNDER MAN O' WAR BOULEVARD TO SHILLITOPARK.(LOCAL MATCH)(DESIGN BY LFUCG)(ALL WORK BYLFUCG)(2004BOPC)(FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPOTIP).

ADD BIKE LANE ON ROSE STREET FROM ROSE LANE TO EUCLID. (LFUCG T.I.P.)(LOCAL MATCH)(ALL WORK BY LFUCG) (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP).

SIX-LANE NEWTOWN PIKE FROM KY-4 TOI-75.

RECONSTRUCTION OF KY-4/US-60 (VERSAILLES ROAD) INTERCHANGE.(12CCN)(LET W/ 7-113)

.300

.300

.087

1.837

.616

FAYETTE

FAYETTE

FAYETTE

FAYETTE

FAYETTE

FAYETTE

FAYETTE

FAYETTE

FAYETTE

-

-

-

-

-

-

CS-3817

KY-922

KY-4

$845,000

$3,700,000

$6,300,000

$6,300,000

$400,000

$625,000

$304,000

$500,000

$13,050,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

C

C

C

C

C

C

R

C

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2014

2018

2019

2020

2017

2017

2014

2014

2015

2014

2015

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SLX

SLX

SLX

SLX

SLX

SLX

SLX

SLX

STP

STP

STP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$845,000

$3,700,000

$6,300,000

$6,300,000

$400,000

$625,000

$37,000

$267,000

$500,000

$2,080,000

$10,970,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

07

07

07

07

07

07

07

07

07

227.09

227.12

227.13

227.14

229.20

229.30

231.00

252.00

279.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

JESSAMINE 07

07

07

07

07

07

07

07

07

227.09

227.12

227.13

227.14

229.00

229.00

231.00

252.00

279.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2004

2014

2014

2014

2002

2004

2000

2000

2006

2004

2014

2014

2014

2000

2000

2000

2000

2006

.504

1.023

4.335

.591

2.86

4.951

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

SAFETY / BIKE/PED FACIL(O)

SAFETY / BIKE/PED FACIL(O)

SAFETY / BIKE/PED FACIL(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / I-CHANGE RECONST(O)

Milepoints: To:From:

Page 35: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 35

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

OPERATION OF VALLEY VIEW FERRY AT KY RIVER FOR FY 2015.(12CCR)

OPERATION OF VALLEY VIEW FERRY AT KY RIVER FOR FY 2016.(12CCR)

OPERATION OF VALLEY VIEW FERRY AT KY RIVER FOR FY 2017.(12CCR)

OPERATION OF VALLEY VIEW FERRY AT KY RIVER FOR FY 2018.(12CCR)

OPERATION OF VALLEY VIEW FERRY AT KY RIVER FOR FY 2019.(12CCR)

OPERATION OF VALLEY VIEW FERRY AT KY RIVER FOR FY 2020.(12CCR)

WIDEN NEW CIRCLE ROAD IN LEXINGTON FROM GEORGETOWN ROAD TOBOARDWALK AVENUE INCLUDING INTERCHANGE RECONSTRUCTION ATNEWTOWN PIKE.(2002BOPC)(2004BOPP)(10CCR)(12CCR)

STREAM RESTORATION ALONG CANE RUN AT THE KENTUCKY HORSE PARK FORGENERATION OF STREAM "CREDITS" DUE TO HIGHWAY PROJECT IMPACTS INTHE LOWER KENTUCKY RIVER WATERSHED. (2006BOPC)

SOUTHLAND DRIVE BIKE/PEDESTRIAN IMPROVEMENTS: CONSTRUCT ONE MILEOF BIKE LANES ALONG SOUTHLAND DRIVE FROM ROSEMONT GARDEN TONICHOLASVILLE ROAD. CONSTRUCT SIDEWALKS UNDER RAILROAD BRIDGETHAT CROSSES SOUTHLAND DRIVE. (2010BOPC)(LET BY CITY)

CONSTRUCT 4,000 FEET OF A 5 FOOT WIDE SIDEWALK ON THE SOUTH SIDE OFLOUDON AVENUE FROM NEWTOWN PIKE TO RUSSELL CAVE ROAD(2010BOPC)(LET BY CITY)

1.300

1.048

.879

FAYETTE

FAYETTE

FAYETTE

FAYETTE

FAYETTE

FAYETTE

FAYETTE

FAYETTE

FAYETTE

FAYETTE

KY-169

KY-169

KY-169

KY-169

KY-169

KY-169

KY-4

-

CS-4791

CS-1376

$180,000

$180,000

$180,000

$180,000

$180,000

$180,000

$19,550,000

$2,000,000

$500,000

$210,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

Total

C

C

C

C

C

C

U

C

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2015

2016

2017

2018

2019

2020

2014

2015

2014

2014

2014

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SPP

SPP

SPP

SPP

SPP

NH

SPP

SP

CM

CM

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$180,000

$180,000

$180,000

$180,000

$180,000

$180,000

$5,850,000

$13,700,000

$2,000,000

$500,000

$210,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

07

07

07

07

07

07

07

07

07

07

357.12

357.13

357.14

357.15

357.16

357.17

366.00

384.00

404.00

405.00

-

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

MADISON

MADISON

MADISON

MADISON

07

07

07

07

07

07

07

99

99

99

357.12

357.13

357.14

357.15

357.16

357.17

996.08

152.08

219.08

219.08

-

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2010

2010

2012

2012

2014

2014

2002

2006

2010

2010

2010

2010

2012

2012

2014

2014

1998

2006

2002

2002

0

0

0

0

0

0

8.731

0

.33

.1

.1

.1

.1

.1

.1

10.015

1.048

1.209

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / PE & ENVIRONMENTAL(O)

RELIABILITY / ENVIRO MITIGATION(P)

RELIABILITY / CONGESTION MITIGTN(O)

RELIABILITY / CONGESTION MITIGTN(O)

12.411

12.411

12.411

12.411

12.449

12.449

12.449

12.449

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

From:

From:

From:

From:

Page 36: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 36

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

REPLACE L&N RAILROAD BRIDGE OVERPASS (MP 8.378), IMPROVE DRAINAGEAND TYPICAL SECTION ON US 27 (NORTH BROADWAY)(12CCR)

CONSTRUCT AN ADDITIONAL LANE ON KY 922 (NEWTOWN PIKE) FROM PINTAILDR (MAIN ENTRANCE TO THE MARRIOTT GRIFFIN GATE) TO THE BEGINNING OFTHE SOUTHBOUND I-75 ENTRANCE RAMP.(12CCR)

IMPROVE ROADWAY TYPICAL SECTION AND PAVEMENT ON KY 2335 (WARE RD)FROM KY 57 (BRIAR HILL RD) TO NORTHERN ENTRANCE TO LEXINGTONBLUEGRASS ARMY DEPOT. (NOTE: DISTRICT IS ANTICIPATING EXPANSION OFLOCKHEED MARTIN FACILITY AT BLUEGRASS STATION)(12CCR)

CONSTRUCT TURN LANES AT THE INTERSECTION OF MAN O' WAR BLVD (CS-4524) AND PINK PIGEON PKWY (CS-2540).

CONSTRUCT TURN LANES AT THE INTERSECTION OF MAN O' WAR BLVD (CS4524) AND ALUMNI DRIVE (CS 3016).

CONSTRUCT TURN LANES AT THE INTERSECTION OF MAN O' WAR BLVD (CS-4524) AND RICHMOND ROAD (US-25).

UPGRADE ALUMNI DRIVE BETWEEN NICHOLASVILLE ROAD AND TATES CREEKROAD.

.126

.330

2.100

.100

.100

.100

1.191

FAYETTE

FAYETTE

FAYETTE

FAYETTE

FAYETTE

FAYETTE

FAYETTE

US-27

KY-922

KY-2335

CS-4524

CS-4524

CS-4524

CS-3016

$16,030,000

$3,000,000

$11,500,000

$516,000

$855,000

$650,000

$5,000,000

Total

Total

Total

Total

Total

Total

Total

R

U

C

D

R

U

C

D

R

U

C

D

C

D

R

C

D

R

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2018

2018

2020

2014

2016

2016

2016

2014

2016

2016

2018

2015

2015

2015

2015

2015

2015

2015

2015

2015

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

STP

STP

STP

STP

STP

STP

NH

SPP

SPP

SPP

SPP

SLX

SLX

SLX

SLX

SLX

SLX

SLX

SLX

SPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$2,440,000

$1,550,000

$12,040,000

$200,000

$1,500,000

$500,000

$800,000

$1,500,000

$4,000,000

$1,000,000

$5,000,000

$60,000

$456,000

$112,000

$18,000

$725,000

$60,000

$40,000

$550,000

$5,000,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

07

07

07

07

07

07

07

412.00

413.00

415.00

426.00

427.00

428.00

429.00

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

07

07

07

07

07

07

07

412.00

413.00

415.00

426.00

427.00

428.00

429.00

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2012

2012

2012

2014

2014

2014

2014

2012

2012

2012

2014

2014

2014

2014

8.324

2.72

0

14.722

11.773

12.736

0

8.45

3.05

2.1

14.822

11.873

12.836

1.191

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

SAFETY / SAFETY(P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

SAFETY / SAFETY(P)

Page 37: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 37

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

NEWTOWN PIKE EXTENSION - PRIORITY 2: REDEVELOPMENT OF SOUTHENDPARK NEIGHBORHOOD (MITIGATION AREA). (PHASE I SITE GRADING ANDUTILITIES FOR THE NATHANIEL MISSION) (2005HPP-KY114)(2012BOP)

NEWTOWN PIKE EXTENSION - PRIORITY 3: FROM VERSAILLES ROAD TOBROADWAY. (PHASE II)(08CCR)(10CCR)

NEWTOWN PIKE EXTENSION - PRIORITY 4: FROM EXISTING NEWTOWN PIKE &PATTERSON TO SOUTH LIMESTONE. (PHASE III - SCOTT STREET CONNECTOR)

REPLACE BRIDGE ON US 421 OVER FORK OF TOWN BRANCH AT INTERSECTIONOF US 421 AND BRACKTOWN RD (CS 4008)(SR 27.8) 034B00018N

REPLACE BRIDGE ON MALABU DRIVE (CS 3605) OVER BRANCH HICKMAN CREEKAT JCT WITH TATES CREEK ROAD (KY 1974)(SR 40) 034C00038N

REPLACE BRIDGE OVER BRANCH OF NORTH ELKHORN CREEK ON HUME ROAD(CR 1001) 0.7 MI NW OF US 60 (034C00001N)(SR=44.5)

UNIVERSITY DRIVE BIKE LANE EXTENSION: ENGINEERING AND CONSTRUCTIONOF A BIKE LANE ON UNIVERSITY DRIVE FROM COOPER DRIVE TO ALUMNIDRIVE AT THE UNIVERSITY OF KENTUCKY. (2010BOPC)

TOWN BRANCH TRAIL CROSSING-INSTALLATION OF TRAIL FROM NEW CIRCLEROAD TO MCCONNELL SPRINGS PARK CROSSING OLD FRANKFORT PIKE(2010BOPC).

.040

.040

.372

FAYETTE

FAYETTE

FAYETTE

FAYETTE

FAYETTE

FAYETTE

FAYETTE

FAYETTE

-

-

-

US-421

CS-3605

CR-1001

IC-8104W

-

$120,000

$21,499,600

$22,879,700

$1,050,000

$1,000,000

$300,000

$68,740

$416,700

Total

Total

Total

Total

Total

Total

Total

Total

C

U

C

R

U

C

R

U

C

D

R

U

C

D

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2014

2014

2015

2014

2014

2016

2014

2014

2016

2014

2016

2016

2018

2020

2014

2014

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

STP

SPP

SPP

SP

SP

SP

BRO

BRO

BRO

BRZ

BRZ

BRZ

BRZ

BRZ

CM

CM

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$120,000

$5,439,800

$16,059,800

$8,657,000

$3,467,500

$10,755,200

$125,000

$125,000

$800,000

$300,000

$100,000

$100,000

$500,000

$300,000

$68,740

$416,700

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

07

07

07

07

07

07

07

07

593.14

593.20

593.30

1129.00

1132.00

1141.00

3701.00

3702.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

07

07

07

07

07

07

99

99

593.10

593.02

593.02

1129.00

1132.00

1141.00

219.09

219.09

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2006

2006

2006

2012

2012

2014

2010

2010

2006

2004

2004

2012

2012

2014

2004

2004

4.426

1.656

1.6

0

4.466

1.696

1.64

.372

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / NEW ROUTE(O)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / CONGESTION MITIGTN(O)

RELIABILITY / CONGESTION MITIGTN(O)

Page 38: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 38

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

GAINESWAY TRAIL. CONSTRUCTION OF BIKE-PED TRAIL CONNECTING TATESCREEK SCHOOL COMPLEX, GAINESWAY PARK, AND MILLCREEKELEMENTARY.(2012BOP)

SCOPING STUDY TO RECONSTRUCT/WIDEN US-60/WINCHESTER ROAD TO FOURLANES. (06CCN)(12CCR)

SCOPING STUDY TO RECONSTRUCT/WIDEN US-60/WINCHESTER ROAD FROMMAN-O-WAR BOULEVARD TO THE CLARK COUNTY LINE. (06CCN)(12CCR)

SCOPING STUDY TO RECONSTRUCT/WIDEN KY-4/NEW CIRCLE ROAD FROMNEWTOWN PIKE TO WINCHESTER ROAD. (06CCN)(12CCR)

COMPLETE CONSTRUCTION ON POLO CLUB BOULEVARD AT DEERHAVEN LANEAND TODDS ROAD. (08CCN)(FUNDING SUBJECT TO FISCAL CONSTRAINT PENDINGMPO TIP)

EXTEND MT. TABOR ROAD TO OLD US-68 TO CREATE AN IMPOUNDMENT OF ELKCREEK. THESE FUNDS TO BE MATCHED 50/50 BY FEDERAL DOLLARS TOCOMPLETELY FUND THE CONSTRUCTION OF THE DAM. (00CCR)(D-04DEOB)(12CCR)

REPLACE BRIDGE ON KY 32 OVER MUD LICK CREEK 0.2 MILES W OFCRAINTOWN RD (CR 1302)(SR 48.9) 035B00038N

REPLACE BRIDGE OVER JOHNSON CREEK ON KY 560 0.3 MI S OFFLEMING/MASON CO LINE. (035B00085N)(SR=36.4)(EBRP)

REPLACE BRIDGE OVER ALLISON CREEK ON KY 111 1.2 MI N OF KY 156.(035B00016N)(SR=32.1)(EBRP)

.900

5.850

3.300

.040

.038

.020

FAYETTE

FAYETTE

FAYETTE

FAYETTE

FAYETTE

FLEMING

FLEMING

FLEMING

FLEMING

-

US-60

US-60

KY-4

CS-2548

-

KY-32

KY-560

KY-111

$410,000

$280,000

$280,000

$340,000

$1,812,000

$5,170,000

$800,000

$1,600,000

$500,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

C

P

P

P

R

C

D

C

R

U

C

D

R

U

C

D

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2014

2014

2014

2014

2014

2014

2015

2016

2015

2015

2016

2015

2016

2016

2016

2020

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

CM

SPP

SP

SP

SLX

SLX

SP

SP

BRO

BRO

BRO

BRX

BRX

BRX

BRX

BRX

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$410,000

$280,000

$280,000

$340,000

$262,000

$1,550,000

$840,000

$4,330,000

$150,000

$250,000

$400,000

$400,000

$100,000

$100,000

$1,000,000

$500,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

07

07

07

07

07

09

09

09

09

3706.00

8340.00

8341.00

8342.00

8507.00

177.00

1084.00

1089.00

1091.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

99

07

07

07

07

09

09

09

09

219.10

8340.00

8341.00

8342.00

8507.00

177.00

1084.00

1089.00

1091.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2012

2006

2006

2006

2008

2000

2012

2014

2014

2004

2006

2006

2006

2008

2000

2012

2014

2014

12.5

13.4

9.4

7.76

3.813

11.84

13.4

19.25

12.7

7.8

3.851

11.86

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / CONGESTION MITIGTN(O)

RELIABILITY / SCOPING STUDY(O)

RELIABILITY / SCOPING STUDY(O)

RELIABILITY / SCOPING STUDY(O)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

Page 39: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 39

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

REPLACE BRIDGE OVER FLEMING CREEK ON MCINTIRE ROAD (CR 1240) AT THEJCT WITH PIKE BLUFF (CR 1305)(035C00065N)(SR=24)

RESTORATION OF RINGO'S MILL COVERED BRIDGE LOCATED ON KY 158 ATRAWLINGS ROAD APPROX 7.274 MILES EAST OF HILLSBORO (FY2010 NHCBPROJECT) (2010 BOPC).

SURFACE INDUSTRIAL PARK ROAD ON KY-11. (06CCN)(10CCR)

ADD TURN LANES ON KY-32 AT WARD ELEMENTARY SCHOOL. (06CCN)(08CCR)

RECONSTRUCT/IMPROVE KY-57 FROM THE FLEMING COUNTY COURTHOUSE TOSLEEPY RUN CREEK. (06CCN)(10CCR)

RECONSTRUCT KY 32 FROM THE KY 165 INTERSECTION AT JABETOWN (MP 5.9)TO ELIZAVILLE (MP 6.5).(12CCN)

MOUNTAIN PARKWAY CORRIDOR: SALYERSVILLE-PRESTONSBURG; WIDEN KY114 TO 4 LANES FROM THE MAGOFFIN/FLOYD COUNTY LINE TO ADAMSCEMETERY ROAD (W JCT CR 1380). (SEE 12-1.01 FOR PE & ENV)

MOUNTAIN PARKWAY CORRIDOR: SALYERSVILLE-PRESTONSBURG; WIDEN KY114 TO 4 LANES FROM ADAMS CEMETERY ROAD (W JCT CR 1380) TO STEVEFITZPATRICK ROAD (W JCT CR 1388). (SEE 12-1.01 FOR PE & ENV)

.024

.200

.400

2.008

.600

3.500

3.900

FLEMING

FLEMING

FLEMING

FLEMING

FLEMING

FLEMING

FLOYD

FLOYD

CR-1240

KY-158

KY-11

KY-32

KY-57

KY-32

KY-114

KY-114

$1,075,000

$508,000

$520,000

$1,930,000

$300,000

$4,160,000

$63,300,000

$69,700,000

Total

Total

Total

Total

Total

Total

Total

Total

D

R

U

C

C

C

C

D

C

D

R

U

C

D

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2017

2019

2019

2020

2014

2014

2014

2014

2014

2014

2015

2015

2018

2014

2015

2015

2019

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BRZ

BRZ

BRZ

BRZ

KYD

SP

SB2

SP

SPP

NH

NH

NH

SPP

NH

NH

NH

SPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$350,000

$75,000

$50,000

$600,000

$508,000

$520,000

$1,930,000

$300,000

$4,160,000

$2,900,000

$9,200,000

$1,200,000

$50,000,000

$3,200,000

$10,200,000

$1,300,000

$55,000,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

09

09

09

09

09

09

12

12

1092.00

3021.00

8300.00

8304.00

8305.00

8702.00

1.20

1.30

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

09

09

09

09

09

09

12

12

1092.00

3021.00

8300.00

8304.00

8305.00

8702.00

1.01

1.01

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2014

2010

2006

2006

2006

2012

2014

2014

2014

2010

2006

2006

2006

2012

1996

1996

2.04

13.3

20.7

.1

5.9

0

3.48

2.064

13.5

21.1

2.108

6.5

3.48

7.354

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REHAB(P)

ECONOMIC DEVELOPMENT / ECONOMIC DEVEL(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / MAJOR WIDENING(O)

Page 40: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 40

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

MOUNTAIN PARKWAY CORRIDOR: SALYERSVILLE-PRESTONSBURG; WIDEN KY114 TO 4 LANES FROM STEVE FITZPATRICK ROAD (W JCT CR 1388) TO KY 404 ATPRESTONSBURG. (SEE 12-1.01 FOR PE & ENV)

MITIGATE SAFETY HAZARDS DUE TO SPEED, POOR ACCESS CONTROL BETWEENKY 80 AND INTERSECTION WITH KY 3384.(12CCR)

SPOT IMPROVEMENTS FROM BRANHAM'S CREEK TO JOHN M. STUMBOSCHOOL.(12CCR)

MINNIE - HAROLD CONNECTOR; FROM BOY HOLLOW OF SIMPSONS BRANCH TOLITTLE MUD CREEK (SECTION 1-B)(2012BOP)

MINNIE-HAROLD CONNECTOR;FROM LITTLE MUD CREEK RD TO MOUTH OFTACKETT CREEK(ALT.3B SEC.2)PROJ SHALL BE KYTC MODEL FORPUBLIC/PRIVATE CONST PROJ W/ELKHORN COAL ORSUCCESSOR.(08CCN)(10CCR)(12CCR)

REPLACE BRIDGE AND APPROACHES ON KY-194 OVER BRUSHY CREEK (B65) ATTHE FLOYD/PIKE COUNTY LINE. (SR=46.5): (036B00065N)

REPLACE BRIDGE AND APPROACHES ON KY-466 OVER LEFT FORK BEAVERCREEK (B30). (SR=37.5): (036B00030N)

REPLACE BRIDGE AND APPROACHES ON KY-777 OVER RIGHT FORK BEAVERCREEK (B76). (SR=3.0): (036B00076N)

1.800

1.000

1.179

2.100

2.800

.100

.100

.100

FLOYD

FLOYD

FLOYD

FLOYD

FLOYD

FLOYD

FLOYD

FLOYD

KY-114

US-23

KY-979

KY-680

KY-680

KY-194

KY-466

KY-777

$38,200,000

$2,700,000

$14,320,000

$19,110,000

$31,670,000

$840,000

$1,090,000

$600,000

Total

Total

Total

Total

Total

Total

Total

Total

D

R

U

C

R

U

C

R

U

C

C

U

C

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2014

2015

2015

2016

2014

2014

2015

2016

2016

2018

2014

2014

2015

2014

2014

2014

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

NH

NH

NH

SPP

STP

STP

NH

SPP

SPP

SPP

SB2

SPP

SPP

BRZ

BRX

BRX

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$1,800,000

$5,800,000

$600,000

$30,000,000

$400,000

$500,000

$1,800,000

$1,500,000

$1,320,000

$11,500,000

$19,110,000

$550,000

$31,120,000

$840,000

$1,090,000

$600,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

12

12

12

12

12

12

12

12

1.40

191.00

195.00

301.15

301.20

1075.00

1084.00

1085.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

PIKE

12

12

12

12

12

12

12

12

1.01

191.00

195.00

301.10

301.00

1075.00

1084.00

1085.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2014

2012

2012

2012

1998

2004

2004

2004

1996

2012

2012

1998

1996

2004

2004

2004

7.354

12.775

12.389

12.105

3.559

.175

9.092

13.775

13.95

12.155

3.599

.215

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / MAJOR WIDENING(O)

SAFETY / SAFETY(P)

RELIABILITY / SPOT IMPROVEMENTS(O)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

0 .036Milepoints: To:From:

Page 41: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 41

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

REPLACE BRIDGE ON KY 1100 OVER LITTLE PAINT CREEK NEARFLOYD/JOHNSON COUNTY LINE (SR 47.1) 036B00002N

REPLACE BRIDGE OVER LEVISA FORK ON KY 2557 AT JCT US 23 IN JUSTELL.(036B00040N)(SR=19.9)

REPLACE BRIDGE OVER BRUSH CREEK ON KY 550 AT JCT WITH KY 850.(036B00015N)(SR=41.3)(EBRP)

CURVE REVISION TO INCLUDE IMPROVED SIGHT DISTANCE AND A LEFT TURNLANE ON KY-122 AT THE KY-680 INTERSECTION IN MCDOWELL. (02CCN)(12CCR)

IMPROVE ACCESS TO KY 80 AT GARRETT EASTBOUND AND ELIMINATENECESSITY FOR CROSSING WESTBOUND LANES TO MERGE INTO EASTBOUNDLANES. MP 1.527 TO MP 1.827 (12CCN)

WIDEN US 60 FROM END OF TRUCK CLIMBING LANE JUST WEST OF SOUTHBENSON CREEK BRIDGE (B97) TO VICKY WAY.(04CCN)(10CCR)

FRANKFORT-NEWCASTLE; RECONSTRUCT US-421 FROM TOP OF BALD KNOBHILL AT END OF RECONSTRUCTED SECTION TO HARVIELAND ROAD.(10CCR)

.146

.040

.100

.300

1.400

1.500

FLOYD

FLOYD

FLOYD

FLOYD

FLOYD

FRANKLIN

FRANKLIN

KY-1100

KY-2557

KY-550

KY-122

KY-80

US-60

US-421

$1,110,000

$1,550,000

$1,800,000

$3,950,000

$3,830,000

$14,920,000

$4,470,000

Total

Total

Total

Total

Total

Total

Total

R

U

C

D

R

U

D

R

U

C

C

R

U

C

R

U

C

D

R

U

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2015

2015

2017

2018

2020

2020

2019

2020

2020

2020

2014

2014

2014

2015

2015

2016

2017

2014

2015

2015

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BRO

BRO

BRO

BRX

BRX

BRX

BRX

BRX

BRX

BRX

SPP

SPP

SPP

SPP

SPP

SPP

SP

SP

SP

SP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$75,000

$135,000

$900,000

$750,000

$300,000

$500,000

$300,000

$200,000

$300,000

$1,000,000

$3,950,000

$500,000

$330,000

$3,000,000

$4,880,000

$2,440,000

$7,600,000

$680,000

$2,440,000

$1,350,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

12

12

12

12

12

05

05

1111.00

1119.00

1121.00

8100.00

8703.00

97.50

374.00

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

12

12

12

12

12

05

05

1111.00

1119.00

1121.00

8100.00

8703.00

97.50

374.00

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2012

2014

2014

2002

2012

1998

2004

2012

2014

2014

2002

2012

1998

2004

5.231

.152

2.03

18.5

1.527

2.5

5.809

5.271

.298

2.07

18.678

1.827

3.913

7.309

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

SAFETY / SAFETY(P)

RELIABILITY / CONGESTION MITIGTN(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / RECONSTRUCTION(O)

Page 42: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 42

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

ENHANCEMENT OF US 60 (EAST MAIN STREET) FROM MARTIN LUTHER KINGBLVD TO SCHENKEL LANE IN FRANKFORT.(INCLUDES PEDESTRIAN BRIDGEBETWEEN HATHAWAY HALL AND WHITNEY YOUNG HALL) (08CCR)(12CCR)

REPLACE BRIDGE ON US-421 (MP 13.09) OVER FLAT CREEK; 2.0 MI NORTH OF JCTKY 12; (STRUCTURALLY DEFICIENT, SR=46.8) 037B00023N

REPLACE BRIDGE ON US-421 (MP 14.059) OVER HUDSON CREEK; 2.8 MI NORTH OFJCT KY 12; (STRUCTURALLY DEFICIENT, SR=48.9) 037B00024N

REPLACE BRIDGE ON US-421 (MP 15.091) OVER LITTLE FLAT CREEK; 3.8 MINORTH OF JCT KY 12; (STRUCTURALLY DEFICIENT, SR=48.7) 037B00025N

REPLACE BRIDGE ON US 460 OVER SOUTH ELKHORN CREEK AT INTERSECTIONOF US 460 AND N SCRUGGS LN(CR 1010)(SR 41.3) 037B00006N (PART-WIDTHCONSTRUCTION ON EXISTING LOCATION)

REPLACE BRIDGE OVER BENSON CREEK ON CRAB ORCHARD ROAD (CR 1230) 200FT NW OF KY 151 NEAR I-64 EXIT 48 (037C00010N)(SR=33.1) (EBRP)

PAVEMENT REHAB AND BRIDGE WIDENING ON I-64 FROM MP 47.70 TO MP 53.75.(2004BOPC)(DESIGN FUNDED UNDER 5-2035.40)

.810

.100

.100

.100

.025

5.420

FRANKLIN

FRANKLIN

FRANKLIN

FRANKLIN

FRANKLIN

FRANKLIN

FRANKLIN

US-60

US-421

US-421

US-421

US-460

CR-1230

I-64

$5,680,000

$610,000

$360,000

$570,000

$1,250,000

$1,255,000

$230,000

Total

Total

Total

Total

Total

Total

Total

C

R

U

C

R

U

C

R

U

C

D

R

U

C

D

R

U

C

R

U

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2015

2014

2014

2016

2014

2014

2016

2014

2014

2016

2015

2017

2017

2019

2019

2020

2020

2020

2014

2014

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

BRO

BRO

BRO

BRO

BRO

BRO

BRO

BRO

BRO

BRO

BRO

BRO

BRO

BRZ

BRZ

BRZ

BRZ

IM

IM

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$5,680,000

$60,000

$30,000

$520,000

$100,000

$60,000

$200,000

$50,000

$30,000

$490,000

$250,000

$100,000

$200,000

$700,000

$350,000

$10,000

$20,000

$875,000

$120,000

$110,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

05

05

05

05

05

05

05

600.00

1057.00

1058.00

1059.00

1065.00

1078.00

2035.70

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

05

05

05

05

05

05

05

600.00

1057.00

1058.00

1059.00

1065.00

1078.00

2035.00

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2008

2010

2010

2010

2012

2014

2004

2008

2010

2010

2010

2012

2014

2004

9.338

13.04

14.009

15.041

2.177

.04

47.7

10.148

13.14

14.109

15.141

2.217

.065

53.75

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

SAFETY / RECONSTRUCTION(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / PAVEMENT REHAB-INT(P)

Page 43: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 43

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

RECONSTRUCT INTERSECTION OF KY-2817 (CARDWELL LANE) AND C. MICHAELDAVENPORT DRIVE. (06CCN)(10CCR)

PEDESTRIAN BRIDGE BETWEEN HATHAWAY HALL AND WHITNEY YOUNGHALL.(12CCN)

RECONSTRUCT AND IMPROVE I-69 AT THE KENTUCKY/TENNESSEE STATE LINETO US-51 INTERCHANGE AT FULTON. (I-69 CORRIDOR IMPROVEMENT)(2012BOP)

RECONSTRUCT ELEMENTS OF THE EXISTING PURCHASE PARKWAY BETWEENMP 1 AND MP 20 INCLUDING THE RECONSTRUCTION OF THE KY339INTERCHANGE IN WINGO, KY. (I-69 CORRIDOR IMPROVEMENT) (2012BOP)

OPERATION OF HICKMAN FERRY AT MISSISSIPPI RIVER FOR FY 2015.(12CCR)

OPERATION OF HICKMAN FERRY AT MISSISSIPPI RIVER FOR FY 2016.(12CCR)

OPERATION OF HICKMAN FERRY AT MISSISSIPPI RIVER FOR FY 2017.(12CCR)

OPERATION OF HICKMAN FERRY AT MISSISSIPPI RIVER FOR FY 2018.(12CCR)

OPERATION OF HICKMAN FERRY AT MISSISSIPPI RIVER FOR FY 2019.(12CCR)

1.660

19.000

FRANKLIN

FRANKLIN

FULTON

FULTON

FULTON

FULTON

FULTON

FULTON

FULTON

KY-2817

US-60

JC-9003

JC-9003

KY-1354

KY-1354

KY-1354

KY-1354

KY-1354

$910,000

$2,000,000

$6,000,000

$16,000,000

$126,000

$126,000

$126,000

$126,000

$126,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

C

C

P

D

R

D

R

C

C

C

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2014

2014

2014

2019

2020

2014

2019

2020

2015

2016

2017

2018

2019

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SPP

KYD

NH

NH

KYD

NH

NH

SPP

SPP

SPP

SPP

SPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$910,000

$2,000,000

$500,000

$3,000,000

$2,500,000

$250,000

$750,000

$15,000,000

$126,000

$126,000

$126,000

$126,000

$126,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

05

05

01

01

01

01

01

01

01

8302.00

8714.00

25.00

26.00

320.12

320.13

320.14

320.15

320.16

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

HICKMANGRAVES

05

05

01

01

01

01

01

01

01

8302.00

8714.00

25.00

26.00

320.12

320.13

320.14

320.15

320.16

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2006

2012

2012

2008

2010

2010

2012

2012

2014

2006

2012

2012

2008

2010

2010

2012

2012

2014

2.1

0

1

0

0

0

0

0

2.2

1.66

3.434

.1

.1

.1

.1

.1

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / RECONSTRUCTION(O)

SAFETY / BIKE/PED FACIL(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

3.4348.352

8.35220

Milepoints:Milepoints:

To:To:

From:From:

Page 44: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 44

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

OPERATION OF HICKMAN FERRY AT MISSISSIPPI RIVER FOR FY 2020.(12CCR)

REPLACE BRIDGE ON KY 1909 OVER LITTLE BAYOU DE CHIEN CREEK S OFINTERSECTION WITH KY 2149 (SR 28.7) 038B00074N

REPLACE BRIDGE ON HOLLAND LN (CR 1011) OVER BRANCH OF HARRIS FORKCREEK 0.26 MILE E OF KENTUCKY AVE (KY 307)(SR 31.9)038C00001N(12CCR)

RECONSTRUCT US-42 ALONG THE OHIO RIVER TO CORRECT LANDSLIDEPROBLEMS BETWEEN MARKLAND DAM AND CRAIGS CREEK.(U-04DEOB)(10CCR)

REPLACE BRIDGE OVER LITTLE SUGAR CREEK ON LITTLE SUGAR CREEK ROAD(CR 1001) 1.1 MI S OF US 42 (039C00002N)(SR=46.7)(EBRP)

OVERLAY BRIDGE DECK AND REPLACE EXPANSION JOINTS ON THE KY 465BRIDGE OVER I-71 NORTHEAST OF SPARTA AT (MP 59.433). (039B00015N) (2012BOP)

DEVELOP DESIGN FOR A TRAFFIC CIRCLE ON US-27 IN LANCASTER.(12CCR)

REPLACE BRIDGE ON KY-1972 (MP 0.663) OVER BR OF TURKEY CREEK; .50 MIEAST OF JCT KY 39; (STRUCTURALLY DEFICIENT, SR=19.4) 040B00023N

.040

3.500

.008

.053

.100

FULTON

FULTON

FULTON

GALLATIN

GALLATIN

GALLATIN

GARRARD

GARRARD

KY-1354

KY-1909

CR-1011

US-42

CR-1001

I-71

US-27

KY-1972

$126,000

$700,000

$550,000

$13,740,000

$500,000

$250,000

$710,000

$485,000

Total

Total

Total

Total

Total

Total

Total

Total

C

R

U

C

R

U

C

C

D

R

U

C

C

R

U

C

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2020

2015

2015

2016

2014

2014

2015

2017

2015

2016

2016

2016

2014

2014

2014

2015

2014

2014

2016

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

BRO

BRO

BRO

BRZ

BRZ

BRZ

SPP

BRZ

BRZ

BRZ

BRZ

IM

SPP

SPP

SPP

BRX

BRX

BRX

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$126,000

$150,000

$150,000

$400,000

$150,000

$100,000

$300,000

$13,740,000

$100,000

$100,000

$100,000

$200,000

$250,000

$10,000

$150,000

$550,000

$75,000

$60,000

$350,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

01

01

01

06

06

06

07

07

320.17

1144.00

1148.00

202.00

1089.00

2044.00

285.00

1120.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

01

01

01

06

06

99

07

07

320.17

1144.00

1148.00

202.00

1089.00

65.10

285.00

1120.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2014

2012

2012

1996

2014

2012

2006

2010

2014

2012

2012

1996

2014

2008

2006

2010

0

.712

.247

3.325

1.13

59.433

3.009

.613

.1

.752

.287

4.636

1.138

59.433

3.062

.713

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / LANDSLIDE REPAIR(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REHAB(P)

RELIABILITY / DESIGN ENGINEERING(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

Page 45: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 45

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

REPLACE BRIDGE ON KY-563 (MP 3.89) OVER SUGAR CREEK; E-@ JCT KY 39;(STRUCTURALLY DEFICIENT, SR=21.7) 040B00034N

REPLACE BRIDGE OVER GILBERTS CREEK ON KY 1972 1.4 MI E OF CRABORCHARD ROAD (CR 1226) AT SECL OF LANCASTER. (040B00024N)(SR=19.1)(EBRP)

CONSTRUCT AN INTERCHANGE ON I-75 AT SHERMAN. (06CCN)(08CCN)(10CCN)

ROADWAY IMPROVEMENTS TO KY-36 FROM I-75 AT WILLIAMSTOWN TOAPPROXIMATELY 1 MILE WEST OF HEEKIN CLARKS ROAD.(12CCR)

INSTALL SIGNS, GUARDRAIL, FRICTION TREATMENT, SHOULDERS AND REMOVETREES AND BRUSH ON KY-22 AT CLARKS CREEK BRIDGE AND BATON ROUGEROAD INTERSECTION.(2010BOP)

REPLACE BRIDGE ON SOUTH END OF BLANCHET ROAD 0.3 MILES NORTHEASTOF US 25.(12CCN)

REPLACE BRIDGE ON NORTH END OF BLANCHET ROAD 0.2 MILES SOUTHEASTOF THE JUNCTION WITH US 25.(12CCN)

.100

.010

1.000

2.900

.100

.050

.070

GARRARD

GARRARD

GRANT

GRANT

GRANT

GRANT

GRANT

KY-563

KY-1972

I-75

KY-36

KY-22

CR-1138

CR-1138

$580,000

$300,000

$13,790,000

$10,250,000

$44,000

$1,320,000

$1,440,000

Total

Total

Total

Total

Total

Total

Total

R

U

C

D

D

R

U

C

R

U

C

C

R

U

C

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2014

2014

2016

2020

2014

2015

2015

2016

2014

2014

2015

2014

2015

2015

2017

2015

2015

2017

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BRX

BRX

BRX

BRX

SP

SP

SP

SP

SPP

SPP

SPP

SAF

BRZ

BRZ

BRZ

BRZ

BRZ

BRZ

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$80,000

$70,000

$430,000

$300,000

$1,690,000

$650,000

$450,000

$11,000,000

$400,000

$750,000

$9,100,000

$44,000

$110,000

$210,000

$1,000,000

$340,000

$100,000

$1,000,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

07

07

06

06

06

06

06

1122.00

1138.00

112.10

411.00

910.00

8714.00

8715.00

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

07

07

06

06

99

06

06

1122.00

1138.00

112.00

411.00

911.01

8714.00

8715.00

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2010

2014

2006

2012

2010

2012

2012

2010

2014

2006

2012

2006

2012

2012

3.84

1.76

161.5

11.7

6.6

.28

1.95

3.915

1.77

162.5

14.6

6.7

.33

2.02

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / NEW INTERCHANGE(O)

SAFETY / SAFETY(P)

SAFETY / SAFETY-HAZARD ELIM(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

Page 46: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 46

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

REPLACE BRIDGE ON NORTH END OF DELANEY ROAD 0.1 MILE NORTH OF THEJUNCTION WITH US 25.(12CCN)

MURRAY-MAYFIELD RD; FROM KY 303 SOUTH OF MAYFIELD, NORTHWEST TOJULIAN M. CARROLL PARKWAY (PURCHASE PARKWAY). (EXTENSION OF 1-181.30)(00CCR)(12CCR)

RECONSTRUCT JULIAN CARROLL PKWY INTERSECTION W/THE MAYFIELDBYPASS TO PROVIDE SUPERIOR THROUGH MOVEMENT TO THE PARKWAY. (I-69CORRIDOR IMPROVEMENT)(12CCR)

REPLACE BRIDGE AND APPROACHES ON KY-97 OVER LEACH CREEK (B52) 0.13MILE NORTH OF FRANKS ROAD. (SR=18.8): (042B00052N) (AR/W)

REPLACE BRIDGE ON KY-1748 (MP 3.855) OVER BRANCH OBION CREEK; .3 MI E OFJCT CR 5289; (STRUCTURALLY DEFICIENT, SR=20.2) 042B00236N (AR/W)

REPLACE BRIDGE ON CR-1194 (MP 0.67) OVER CALDWELL CREEK; .6 MI S OF JCTCR 5221; (STRUCTURALLY DEFICIENT, SR=23.5) 042C00252N (AR/W)

REPLACE BRIDGE ON KY 945 OVER BRANCH OF BRUSH CREEK S OFINTERSECTION WITH BURCHARD RD (CR 1416)(SR 16.8)042B00206N

.050

2.800

1.000

.100

.100

.100

.040

GRANT

GRAVES

GRAVES

GRAVES

GRAVES

GRAVES

GRAVES

CR-1142

KY-303

JC-9003

KY-97

KY-1748

CR-1194

KY-945

$1,280,000

$15,000,000

$23,550,000

$970,000

$850,000

$625,000

$770,000

Total

Total

Total

Total

Total

Total

Total

R

U

C

C

R

U

C

R

U

C

U

C

R

U

C

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2014

2014

2015

2017

2015

2015

2016

2014

2014

2015

2014

2016

2014

2014

2016

2014

2014

2015

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BRO

BRO

BRO

SP

NH

NH

SPP

BRX

BRX

BRX

BRX

BRX

BRZ

BRZ

BRZ

BRO

BRO

BRO

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$180,000

$100,000

$1,000,000

$15,000,000

$630,000

$420,000

$22,500,000

$160,000

$160,000

$650,000

$250,000

$600,000

$75,000

$50,000

$500,000

$150,000

$200,000

$420,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

06

01

01

01

01

01

01

8716.00

181.50

193.00

1056.00

1134.00

1137.00

1146.00

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

06

01

01

01

01

01

01

8716.00

181.30

193.00

1056.00

1134.00

1137.00

1146.00

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2012

2000

2012

2008

2010

2010

2012

2012

1998

2012

2008

2010

2010

2012

.02

20.9

8.081

3.805

.62

7.197

.07

21.9

8.149

3.905

.72

7.237

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / RECONSTRUCTION(O)

SAFETY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

Page 47: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 47

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

REPLACE BRIDGE ON RULE SHACK ROAD OVER IC RAILROAD 0.4 MILE E OF KY339(SR29.3)042C00146N

REPLACE BRIDGE OVER IC RR ON LEWIS ROAD (CR 1381) 0.6 MI SE OF KY 339042C00253N SR 32.4 (EBRP)

REPLACE BRIDGE OVER PANTHER CREEK ON MCKENDREE CHURCH RD (CR1088) 0.3 MI E OF KY 301 042C00010N SR 19.7

LEITCHFIELD-HARNED ROAD; BRIDGE DECK REPLACEMENT AT KY 737 ATROUGH RIVER.

DESIGN FOR LEITCHFIELD BYPASS PRIORITY SECTION. (06CCN)(10CCR)

REPLACE BRIDGE ON CR-1872 (MP 1.792) OVER SPRING FORK; .7 MI SW OF JCT KY54; (STRUCTURALLY DEFICIENT, SR=16.8) 043C00024N

EXTEND LEITCHFIELD BYPASS SOUTH OF US 62 TO KY 259. (12CCN)

CORRECT GEOMETRIC DEFICIENCIES AND IMPROVE SAFETY CONCERN AT THEUS-68/KY-61 INTERSECTION. (10CCN)

.100

.100

2.000

4.000

.100

.045

GRAVES

GRAVES

GRAVES

GRAYSON

GRAYSON

GRAYSON

GRAYSON

GREEN

CR-1384

CR-1381

CR-1088

KY-737

-

CR-1872

-

US-68

$1,925,000

$1,625,000

$250,000

$1,100,000

$18,470,000

$220,000

$3,600,000

$2,970,000

Total

Total

Total

Total

Total

Total

Total

Total

R

U

C

D

R

U

C

D

U

C

D

R

U

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2015

2015

2018

2015

2016

2016

2016

2020

2016

2017

2014

2016

2016

2016

2014

2014

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BRZ

BRZ

BRZ

BRZ

BRZ

BRZ

BRZ

BRZ

BRX

BRX

SP

SP

SP

BRZ

SPP

SB2

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$200,000

$225,000

$1,500,000

$250,000

$75,000

$500,000

$800,000

$250,000

$10,000

$1,090,000

$2,710,000

$14,590,000

$1,170,000

$220,000

$3,600,000

$2,970,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

01

01

01

04

04

04

04

04

1147.00

1155.00

1157.00

122.00

308.01

1071.00

8709.00

8603.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

BRECKINRIDGE

01

01

01

04

04

04

04

04

1147.00

1155.00

1157.00

122.00

308.01

1071.00

8709.00

8603.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2012

2014

2014

1998

2006

2010

2012

2010

2012

2014

2014

1998

2006

2010

2012

2010

.403

.6

.3

5.78

1.772

9.8

.443

.7

.4

6.092

1.812

12.1

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / NEW ROUTE(O)

SAFETY / SAFETY-HAZARD ELIM(P)

0 .07Milepoints: To:From:

Page 48: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 48

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

CONSTRUCT A TRUCK CLIMBING LANE, SHOULDERS, AND TURN LANE AT KY-323.(12CCN)(PROJECT MOVED FROM DISTRICT 8 UNDER ITEM NO.8-8712)

COLUMBIA TO GREENSBURG PRIORITY SECTION 1B; KY-61 FROM KY-487 ATGRESHAM, NW TO 5000' SE OF US-68 IN GREENSBURG, INCLUDING BRIDGE.(2005HPP-KY125)(2005HPP-KY161). (2006BOPC)(10CCR)(12CCR)

COLUMBIA TO GREENSBURG PRIORITY SECTION 1B: KY-61 FROM KY-487 ATGRESHAM, NW TO 5000' SE OF US-68 IN GREENSBURG. (2005HPP-KY125)(2005HPP-KY161).

SCOPING STUDY AND DESIGN FOR US-68 FROM METCALFE COUNTY TO THE US-61/US-68 INTERSECTION.(12CCN)

CONSTRUCT NEW CONNECTOR FROM VAUGHN CURVE ON US-68 BYPASS EASTOF GREENSBURG CROSSING KY-61 AND KY-417 AND CONNECTING WITH KY-3535NORTH OF GREENSBURG.(12CCN)

SPOT IMPROVEMENTS FROM LOCUST GROVE RD ON US-68 TO KY-61. (12CCN)

CLEAN AND PAINT THE CARL D. PERKINS BRIDGE CARRYING KY-8S OVER THEOHIO RIVER BETWEEN SOUTH SHORE, KENTUCKY AND PORTSMOUTH, OHIO(KY-OHIO SHARE 50/50 OF PROJECT COST) (B64): (045B00064N)(10CCR)(12CCR)

RECONSTRUCT KY-2 FROM MP 13.2 TO US-23 (MP 17.2)(08CCN)

.390

5.100

14.287

7.460

.600

4.000

GREEN

GREEN

GREEN

GREEN

GREEN

GREEN

GREENUP

GREENUP

KY-61

KY-61

KY-61

US-68

-

US-68

KY-8S

KY-2

$16,370,000

$42,700,000

$2,082,599

$2,000,000

$31,500,000

$2,000,000

$10,000,000

$9,450,000

Total

Total

Total

Total

Total

Total

Total

Total

R

U

C

R

U

C

C

D

D

R

U

C

D

C

R

U

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2015

2015

2017

2014

2014

2016

2014

2014

2014

2015

2016

2017

2015

2015

2017

2019

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SPP

SPP

SP

SP

SP

HPP

STP

SPP

SPP

SPP

SPP

SP

SPP

SPP

SPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$2,100,000

$3,120,000

$11,150,000

$4,940,000

$1,040,000

$36,720,000

$2,082,599

$2,000,000

$2,600,000

$3,000,000

$900,000

$25,000,000

$2,000,000

$10,000,000

$6,070,000

$3,380,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

04

08

08

08

08

08

09

09

8712.00

128.11

128.12

8710.00

8711.00

8715.00

109.00

132.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

08

08

08

08

08

08

09

09

8712.00

128.02

128.12

8710.00

8711.00

8715.00

109.00

132.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2012

2006

2010

2012

2012

2012

1998

1998

2012

2004

2010

2012

2012

2012

1998

1998

11.379

0

6.827

.042

13.2

14.093

14.287

14.287

.61

17.2

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / SCOPING STUDY(O)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / PAVEMENT REHAB-PRI(P)

RELIABILITY / BRIDGE PAINTING(P)

RELIABILITY / PE & ENVIRONMENTAL(O)

Page 49: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 49

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

REPLACE BRIDGE ON KY-244 (MP 0.103) OVER CSX RAILROAD; .05 MI N.E. OF JCTUS 23; (STRUCTURALLY DEFICIENT, SR=47.9) 045B00039N

REPLACE BRIDGE ON KY-244 (MP 0.103) OVER CSX RAILROAD; .05 MI N.E. OF JCTUS 23; (STRUCTURALLY DEFICIENT, SR=47.9) 045B00039N (ADDITIONAL FUNDINGFOR C PHASE)

REPLACE BRIDGE ON KY-244 (MP 0.103) OVER CSX RAILROAD; .05 MI N.E. OF JCTUS 23;(STRUCTURALLY DEFICIENT SR=47.9) 045B00039N (ADDITIONAL FUNDINGFOR C PHASE)

"DEMOLISH" BRIDGE ON CS-1023 (MP 0.121) OVER TOWN BRANCH; 100' S. JCT KY2541; (STRUCTURALLY DEFICIENT, SR=16.5) 045C00051N

REPLACE BRIDGE OVER POND RUN ON WILLIAMS AVE (CS 4041) IN RACELAND250 FT NW OF POND RUN ROAD (CS 4001) (045C00119N) (SR=27.3)

CONSTRUCT A NEW CONNECTOR ROAD CONNECTING FLATWOODS AT KY-207AND KY-693 AND THE INDUSTRIAL PARKWAY CONNECTOR BETWEEN I-64 ANDUS-60. (08CCN)

IMPROVE CONNECTION BETWEEN US-60 AND CANNELTON BRIDGE APPROACHAT HAWESVILLE. (06CCR) (08CCR) (10CCR)(12CCR)

MINOR WIDENING OF OLD TWO WESTBOUND LANES OF US 60.(12CCR)

REPLACE BRIDGE ON KY 2124 OVER SOUTH FORK OF PANTHER CREEK SW OFINTERSECTION WITH HICKORY RIDGE RD (CR 1127)(SR 33.5)046B00031N

.100

.100

.016

6.267

.040

GREENUP

GREENUP

GREENUP

GREENUP

GREENUP

GREENUP

HANCOCK

HANCOCK

HANCOCK

KY-244

KY-244

KY-244

CS-1023

CS-4041

KY-207

KY-69

US-60

KY-2124

$4,020,000

$4,000,000

$4,370,000

$1,075,000

$350,000

$5,790,000

$6,610,000

$5,200,000

$450,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

R

U

C

C

C

R

U

C

D

R

U

C

C

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2014

2015

2016

2017

2018

2014

2014

2016

2020

2019

2014

2015

2015

2014

2014

2015

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BRX

BRX

BRX

BRX

BRX

BRZ

BRZ

BRZ

BRZ

SPP

SPP

SB2

SPP

BRO

BRO

BRO

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$1,930,000

$1,090,000

$1,000,000

$4,000,000

$4,370,000

$50,000

$25,000

$1,000,000

$350,000

$5,790,000

$760,000

$5,850,000

$5,200,000

$75,000

$75,000

$300,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

09

09

09

09

09

09

02

02

02

1073.00

1073.01

1073.02

1078.00

1094.00

8509.00

197.00

226.00

1082.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

09

09

09

09

09

09

02

02

02

1073.00

1073.00

1073.00

1078.00

1094.00

8509.00

197.00

226.00

1082.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2010

2014

2014

2010

2014

2008

2006

2012

2012

2010

2010

2010

2010

2014

2008

2006

2012

2012

0

0

0

.071

.05

1.933

2.593

.207

.207

.207

.171

.066

8.2

2.633

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / MINOR WIDENING(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

Page 50: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 50

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

SCOPING STUDY ON KY-69 IN HANCOCK COUNTY.(12CCN)

HARDIN I-65; WIDEN I-65 TO 6 LANES FROM 0.6MI N OF OLD SONORA RD TO 0.7MIN OF KY 222; INCLUDES NOLIN RIVER BRIDGE. (12CCR)

HARDIN I-65; WIDEN I-65 TO 6 LANES FROM 0.6MI N OF OLD SONORA RD TO 0.7MIN OF KY 222; INCLUDES NOLIN RIVER BRIDGE. (12CCR)(ADDITIONAL FUNDINGFOR C PHASE)

HARDIN I-65; WIDEN I-65 TO 6 LANES FROM 0.6MI N OF OLD SONORA RD TO 0.7MIN OF KY 222; INCLUDES NOLIN RIVER BRIDGE. (12CCR)(ADDITIONAL FUNDINGFOR C PHASE)

HARDIN I-65; WIDEN I-65 TO 6 LANES FROM 0.7MI N OF KY 222 TO WESTERNKENTUCKY PKWY.(12CCR)

HARDIN I-65; WIDEN I-65 TO 6 LANES FROM 0.7MI N OF KY 222 TO WESTERNKENTUCKY PKWY.(ADDITIONAL FUNDING FOR C PHASE)

IMPROVE THE SAFETY AND INCREASE THE CAPACITY OF THE I-65/KY-222INTERCHANGE BASED ON EXISTING AND FUTURE NEEDS OF THE AREA.(2006BOPC)(08CCR)(10CCR)

SAFETY AND SPOT IMPROVEMENTS TO KY 251 AND KY 434 AS RECOMMENDEDBY THE 2012 PLANNING STUDY.

13.043

4.200

4.200

4.200

4.700

4.700

.751

3.600

HANCOCK

HARDIN

HARDIN

HARDIN

HARDIN

HARDIN

HARDIN

HARDIN

KY-69

I-65

I-65

I-65

I-65

I-65

I-65

KY-251

$200,000

$10,640,000

$18,100,000

$22,100,000

$20,220,000

$16,600,000

$32,450,000

$12,450,000

Total

Total

Total

Total

Total

Total

Total

Total

P

R

U

C

C

C

R

U

C

C

C

D

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2014

2015

2015

2016

2017

2018

2015

2015

2016

2017

2018

2014

2015

2015

2016

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

NH

NH

IM

IM

NH

NH

NH

STP

STP

SPP

BR2

BR2

BR2

BR2

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$200,000

$530,000

$110,000

$10,000,000

$18,100,000

$22,100,000

$110,000

$110,000

$20,000,000

$16,600,000

$32,450,000

$955,000

$1,345,000

$1,395,000

$8,755,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

02

04

04

04

04

04

04

04

8708.00

18.00

18.01

18.02

19.00

19.01

20.01

153.01

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

02

04

04

04

04

04

04

04

8708.00

18.00

18.00

18.00

19.00

19.01

20.00

153.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2012

2000

2000

2014

2000

2000

2006

2008

2012

2000

2000

2000

2000

2000

2002

2008

0

82.2

82.2

82.2

86.4

86.4

85.313

2.722

13.043

86.4

86.4

86.4

91.1

91.1

86.064

6.326

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / SCOPING STUDY(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / I-CHANGE RECONST(O)

RELIABILITY / PHASE I DESIGN(O)

Page 51: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 51

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

EXTEND RING ROAD FROM THE WESTERN KENTUCKY PARKWAY TO I-65.(12CCR)

REPLACE BRIDGE OVER P&L AND CSX RAILROADS (MP 36.4 TO 36.8 IN WESTPOINT) (047B00007N).

I-65 SOUTHBOUND PORT OF ENTRY FOR A COMMERCIAL VEHICLE MONITORINGSTATION.(10CCR)

REPLACE BRIDGE ON US 62 OVER UNNAMED STREAM 0.65 MILE SW OF KY 1375 (SLONG GROVE RD)(SR 48.5) 047B00052N

RELOCATE INTERSECTION OF WOODLAND DRIVE AT US-31W. (CITY OF E-TOWNRESPONSIBLE FOR ALL PHASES) (98CCN)(06CCR)(REMAINING FUNDS FORAGREEMENT)(12CCR)(LET BY CITY)

KINGDOM COME STATE PARK ACCESS ROAD. (08CCR)(10CCR)(12CCR)

HARLAN-VIRGINIA STATE LINE; RESCOPE US-421 FROM BARN BRANCH TOVIRGINIA STATE LINE.(08CCR)(10CCR)

SAFETY IMPROVEMENTS ON US 421 FROM THE VIRGINIA STATE LINE (MP 0.00)TO (MP 21.17) 0.1 MILE NORTH OF LITTLE SHEPHERD TRAIL (KY 1679):EXCAVATEROCK CUTS, WIDEN CURVES AND FLATTEN SLOPES AT VARIOUS LOCATIONS.(2012BOP)

REPLACE BRIDGE OVER CUMBERLAND RIVER (B89) 0.1MI N JCT. KY-840.(SR=27.3): (048B00089N)

.400

.100

.400

.200

.284

3.800

21.170

.100

HARDIN

HARDIN

HARDIN

HARDIN

HARDIN

HARLAN

HARLAN

HARLAN

HARLAN

KY-3005

US-31W

I-65

US-62

KY-1600

KY-1926

US-421

US-421

KY-413

$4,450,000

$9,460,000

$550,000

$680,000

$2,710,000

$3,640,000

$44,370,000

$60,000

$1,040,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

R

U

R

U

C

D

R

U

C

C

C

D

C

D

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2016

2016

2015

2015

2017

2015

2015

2015

2017

2014

2014

2014

2015

2014

2014

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SPP

STP

STP

STP

IM

BRO

BRO

BRO

BR2

SB2

SP

SP

SAF

BRX

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$2,760,000

$1,690,000

$120,000

$110,000

$9,230,000

$550,000

$80,000

$110,000

$490,000

$2,710,000

$3,640,000

$570,000

$43,800,000

$60,000

$1,040,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

04

04

04

04

04

11

11

11

11

198.00

199.00

286.10

1077.00

7020.00

149.00

269.10

929.00

1061.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

04

04

04

04

04

11

11

99

11

198.00

199.00

286.00

1077.00

7020.00

149.00

269.00

911.01

1061.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2012

2012

2000

2012

1998

2006

2006

2012

2002

2012

2012

1996

2012

1998

2006

1996

2006

2002

36.4

81.95

8.894

0

0

0

0

.027

36.8

82.05

8.934

.2

.284

3.832

21.17

.071

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / PE & ENVIRONMENTAL(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / WEIGH STA REHAB(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

SAFETY / SAFETY(P)

SAFETY / SAFETY(P)

RELIABILITY / MAJOR WIDENING(O)

SAFETY / SAFETY-HAZARD ELIM(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

Page 52: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 52

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

REPLACE BRIDGE AND APPROACHES ON CR-1125 OVER CLOVER FORK OFCUMBERLAND RIVER (C30). (SR=2.0)(PROJECT FUNDING CONTINGENT UPONBRIDGE POSTING COMPLIANCE): (048C00030N)

REPLACE BRIDGE ON KY 72 OVER CATRON CREEK AT INTERSECTION OF KY 72AND SMITH LANE (CR 1226L)(SR 30) 048B00030N

REPLACE BRIDGE OVER WALLINS CREEK ON KY 219 3.0 MILE SOUTH OF SCL OFWALLINS CREEK. (048B00047N)(SR=43.8)

WIDEN US 119 TO PROVIDE A RIGHT TURN LANE AT THE US 119/KY 840INTERSECTION.(12CCR)(TO BE CONSTRUCTED WITH STATE FORCES)

PROVIDE A PASSING BAY ON US 119 IN THE VICINITY OF MP 12 IN HARLANCOUNTY.(12CCN)

IMPROVE SAFETY ON DEAD MAN'S CURVE NEAR MP 10.1. (12CCN)

IMPROVE SAFETY ON KY-32 AT THE ENTRANCE TO HARRISON MEMORIALHOSPITAL IN CYNTHIANA.(12CCR)

RECONSTRUCT BRIDGE OVER MILL CREEK ON KY-36 FOUR MILES WEST OFCYNTHIANA. (08CCN): (049B00032N)(12CCR)

.100

.040

.020

.200

1.000

.200

.200

HARLAN

HARLAN

HARLAN

HARLAN

HARLAN

HARLAN

HARRISON

HARRISON

CR-1125

KY-72

KY-219

US-119

US-119

KY-38

KY-32

KY-36

$1,160,000

$1,350,000

$250,000

$20,000

$4,400,000

$1,550,000

$6,200,000

$4,100,000

Total

Total

Total

Total

Total

Total

Total

Total

R

U

C

U

C

D

U

D

R

U

C

R

U

C

R

U

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2014

2014

2015

2014

2015

2020

2014

2015

2016

2016

2017

2014

2014

2015

2014

2014

2016

2014

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BRZ

BRZ

BRZ

BRO

BRO

BRX

SPP

SPP

SPP

SPP

SPP

SPP

SPP

SPP

SPP

SPP

SPP

SPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$230,000

$120,000

$810,000

$50,000

$1,300,000

$250,000

$20,000

$400,000

$500,000

$500,000

$3,000,000

$200,000

$150,000

$1,200,000

$1,200,000

$1,000,000

$4,000,000

$4,100,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

11

11

11

11

11

11

06

06

1064.00

1087.00

1097.00

8511.10

8703.00

8704.00

908.00

8500.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

11

11

11

11

11

11

06

06

1064.00

1087.00

1097.00

8511.00

8703.00

8704.00

908.00

8500.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2004

2012

2014

2008

2012

2012

2010

2008

2004

2012

2014

2008

2012

2012

2010

2008

0

6.539

1.033

10

11.5

10

10.074

12.583

.032

6.579

1.053

10.2

12.5

10.2

10.274

12.623

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

SAFETY / SPOT IMPROVEMENTS(O)

RELIABILITY / MINOR WIDENING(O)

SAFETY / SAFETY(P)

SAFETY / SAFETY(P)

RELIABILITY / BRIDGE REHAB(P)

Page 53: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 53

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

RECONSTRUCT U2 62 FROM MP 11.9 TO MP 12.3.(12CCN)

RECONSTRUCT US 27 FROM MP 11.9 TO MP 12.4.(12CCN)

REPLACE UNION ROBINSON ROAD BRIDGE.(12CCN)

TENN. STATE LINE-ELIZABETHTOWN; WIDEN TO 6 LANES FROM 0.7 MI N OF THEUS 31W BRIDGE (B27) TO 0.7 MI N OF THE KY 728 BRIDGE (B08). (PE & ENV UNDER4-10.05)(04CCN)(08CCR)(10CCR)(12CCR)(AR/W)

TENN. STATE LINE-ELIZABETHTOWN; WIDEN TO 6 LANES FROM 0.7 MI N OF THEKY 728 BRIDGE (B08) TO 0.7 MI N OF KY 224 (B16). (PE & ENV UNDER 4-10.05)(04CCN)(12CCR)(AR/W)(U PHASE ADVANCED FROM 99-337.08)

RECONSTRUCT AND MAKE SAFETY IMPROVEMENTS BY REALIGNING ANDADDING/WIDENING SHOULDERS ON KY-88 FROM LOGSTON VALLEY ROAD TOCOUNTY BARN ROAD. (08CCN)(10CCR)

PADUCAH-HENDERSON; RECONSTRUCT US-60 FROM THE CORYDON BYPASS(CORYDON-GENEVA ROAD) TO THE HENDERSON BYPASS (KY-425).(04CCR)

.400

.500

6.200

5.500

1.273

3.200

HARRISON

HARRISON

HARRISON

HART

HART

HART

HENDERSON

US-62

US-27

CR-1062

I-65

I-65

KY-88

US-60

$350,000

$850,000

$3,580,000

$57,000,000

$48,000,000

$3,000,000

$36,400,000

Total

Total

Total

Total

Total

Total

Total

R

U

R

U

R

U

C

C

C

C

D

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2014

2014

2014

2014

2014

2014

2015

2015

2015

2014

2014

2015

2015

2017

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SPP

SPP

SPP

SPP

SPP

SPP

IM

IM

SPP

SP

SP

SP

SP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$250,000

$100,000

$500,000

$350,000

$150,000

$50,000

$3,380,000

$57,000,000

$48,000,000

$3,000,000

$1,560,000

$5,760,000

$4,880,000

$24,200,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

06

06

06

04

04

04

02

8707.00

8708.00

8710.00

15.00

16.00

8501.00

79.02

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

LARUE

06

06

06

04

04

04

02

8707.00

8708.00

8710.00

15.00

16.00

8501.00

79.00

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2012

2012

2012

2000

2000

2008

1998

2012

2012

2012

2000

2000

2008

1996

11.9

11.9

3.877

64.9

71.1

15.225

5.531

12.3

12.4

3.895

71.1

74.622

16.498

8.71

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

74.622 76.6Milepoints: To:From:

Page 54: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 54

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

PADUCAH-HENDERSON; CONSTRUCT US-60 BYPASS OF CORYDON.(04CCR)(12CCR)

WIDEN AND IMPROVE US 60 FROM WEST OF HENDERSON COMMUNITY COLLEGE(MP 7.7) EXTENDING EAST TO KY 425 (MP 8.7). (BOP2012)

FEDERAL 'STP' FUNDS DEDICATED TO HENDERSON FOR FY 2016. (FUNDINGSUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)

FEDERAL 'STP' FUNDS DEDICATED TO HENDERSON FOR FY 2017. (FUNDINGSUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)

FEDERAL 'STP' FUNDS DEDICATED TO HENDERSON FOR FY 2018. (FUNDINGSUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)

FEDERAL 'STP' FUNDS DEDICATED TO HENDERSON FOR FY 2019. (FUNDINGSUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP).

FEDERAL 'STP' FUNDS DEDICATED TO HENDERSON FOR FY 2020. (FUNDINGSUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP).

US 41/KY 812 INTERSECTION UPGRADE: ADD RIGHT TURN AND LEFT TURN LANESINCLUDING SIGNAL PHASING. KYTC PROJECT WITH KYTC PROVIDING 20%MATCH.(TOLL CREDITS)(FUNDING SUBJECT TO FISCAL CONSTRAINT PENDINGMPO TIP)

N GREEN RIVER RD UPGRADE-(OSAGE DR TO WOODSPOINT DR).PROJECT WILLINCLUDE UPGRADING EXISTING PAVEMENT TO 28 FT WIDE PAVEMENT W/ CURB& GUTTER & SIDEWALK. LPA PROJECT. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)(TOLL CREDITS FOR MATCHING FUNDS)

5.000

1.000

.140

.569

HENDERSON

HENDERSON

HENDERSON

HENDERSON

HENDERSON

HENDERSON

HENDERSON

HENDERSON

HENDERSON

US-60

US-60

-

-

-

-

-

US-41

CS-1142

$39,060,000

$7,500,000

$100,000

$600,000

$600,000

$600,000

$600,000

$700,000

$675,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

D

R

U

C

R

U

C

C

C

C

C

C

R

U

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2014

2015

2015

2017

2015

2015

2016

2016

2017

2018

2019

2020

2014

2014

2015

2014

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SP

SP

SP

SP

STP

STP

STP

SHN

SHN

SHN

SHN

SHN

SHN

SHN

SHN

SHN

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$2,600,000

$3,840,000

$1,960,000

$30,660,000

$1,000,000

$1,000,000

$5,500,000

$100,000

$600,000

$600,000

$600,000

$600,000

$50,000

$100,000

$550,000

$675,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

02

02

02

02

02

02

02

02

02

79.10

79.30

700.11

700.12

700.13

700.14

700.15

711.00

712.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

02

02

02

02

02

02

02

02

02

79.00

79.00

700.11

700.12

700.13

700.14

700.15

700.07

700.07

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

1998

2012

2010

2012

2012

2014

2014

2006

2006

1996

1996

2010

2012

2012

2014

2014

2006

2006

7.7

12.766

1.099

8.71

12.906

1.668

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / NEW ROUTE(O)

RELIABILITY / MAJOR WIDENING(O)

SAFETY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

SAFETY / SAFETY(P)

Page 55: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 55

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

WATHEN BRIDGE REPLACEMENT: REPLACE EXISTING BRIDGE WITH 6FTPRECAST CONCRETE BOX CULVERT, PAVEMENT AND GUARDRAIL. LPAPROJECT. CITY TO PROVIDE MATCH.(FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)(051C00014)

KY 2183 / KY 1539 INTERSECTION AND UPGRADE: PROJECT WILL RECONSTRUCTTHE INTERSECTION AND MAKE IMPROVEMENTS TO THE SOUTHBOUNDAPPROACH. (2012BOP)

US 41/ WOLF HILLS ROAD INTERSECTION UPGRADE: PROJECT WILL ADDDEDICATED RIGHT TURN AND LEFT TURN LANES INCLUDING SIGNAL PHASINGTO BE MODIFIED OR ADDED TO EACH LEG OF THE INTERSECTION. (2012BOP)

KY-351 NEAR ZION, HORIZONTAL & VERTICAL REALIGNMENT, SHOULDERWIDENING, AND INSTALL GUARDRAIL (B/C=2.5) (D-DISTRICT, C-CONTRACTOR)(2002BOP)

REPLACE BRIDGE ON US 60 OVER GREEN RIVER AT INTERSECTION WITH KY 1078(SR 39)051B00015N.(12CCR)

REPLACE BRIDGE ON US 60 OVER GREEN RIVER AT INTERSECTION WITH KY 1078(SR 39) 051B00015N (ADDITIONAL FUNDING FOR C PHASE)

PE AND ENVIRONMENTAL FOR US-41 BRIDGE OVER THE OHIO RIVER BETWEENHENDERSON AND EVANSVILLE (POSSIBLE INTERMEDIATE SOLUTION FORFUTURE I-69).

REPLACE BRIDGE OVER BRANCH OF CANOE CREEK ON BUSBY STATION ROAD0.4 E OF ROBARS-BUSBY STATION ROAD (CR 1154) (051C00041N)(SR=21.8) (EBRP)

.100

.100

.600

.208

.208

1.028

.015

HENDERSON

HENDERSON

HENDERSON

HENDERSON

HENDERSON

HENDERSON

HENDERSON

HENDERSON

CS-1453

KY-2183

US-41

KY-351

US-60

US-60

US-41

CR-1162

$250,000

$1,400,000

$650,000

$1,500,000

$10,500,000

$15,000,000

$2,500,000

$715,000

Total

Total

Total

Total

Total

Total

Total

Total

D

R

U

C

R

U

C

R

U

C

C

R

U

C

C

D

D

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2014

2014

2014

2015

2014

2014

2014

2014

2014

2016

2014

2014

2014

2016

2017

2018

2015

2016

2016

2016

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SHN

SHN

SHN

SHN

SHN

SHN

SHN

SHN

SHN

SHN

SHN

BRO

BRO

BRO

BRO

BRO

BRZ

BRZ

BRZ

BRZ

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$25,000

$10,000

$15,000

$200,000

$400,000

$400,000

$600,000

$50,000

$100,000

$500,000

$1,500,000

$250,000

$250,000

$10,000,000

$15,000,000

$2,500,000

$215,000

$50,000

$100,000

$350,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

02

02

02

02

02

02

02

02

713.00

714.00

715.00

968.00

1080.00

1080.01

1088.00

1092.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

02

02

02

99

02

02

02

02

700.07

700.08

700.08

353.00

1080.00

1080.00

1088.00

1092.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2006

2012

2012

2002

2012

2014

2014

2014

2006

2008

2008

1998

2012

2012

2014

2014

.72

1.693

18.488

4.7

19.236

19.236

19.243

1.445

.77

1.793

18.588

5.432

19.444

19.444

20.271

1.46

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

SAFETY / SAFETY-HAZARD ELIM(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

Page 56: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 56

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

RECONSTRUCT/COMPLETE THE HALF INTERCHANGE AT EXIT 68 (KY 416) ONTHE BREATHITT PARKWAY. (I-69 CORRIDORIMPROVEMENT)(06CCN)(08CCR)(12CCR)(AR/W)

SPOT IMPROVEMENTS ALONG KY 574 BETWEEN MP 0.1 AND MP 0.5 EAST OF US421/KY 55 (BOPC2010).(12CCR)

REPLACE BRIDGE ON KY 55 OVER DAUGHERTY CREEK 0.17 MILE N OF JONES RD(CR 1331)(SR 46.8) 052B00003N

MAJOR RECONSTRUCTION OF KY-146 BETWEEN NEW CASTLE AT US-421 ANDPENDLETON AT KY-153. SEGMENT 1: PENDLETON ROAD (KY 153) TO LOST CREEK(1/2 MILE EAST OF SAFETY KLEEN ENTRANCE). MILE POINT 2.1 TO MILE POINT6.8. (06CCN)(08CCR)(10CCR)(12CCR)

MAJOR RECONSTRUCTION OF KY-146 BETWEEN NEW CASTLE AT US-421 ANDPENDLETON AT KY-153. SEGMENT 2:LOST CREEK (1/2 MILE EAST OF SAFETYKLEEN ENTRANCE) TO MAIN STREET (US 421/KY 55). MILE POINT 6.8 TO MILEPOINT 9.8.(12CCN)

REPLACE BRIDGE AND APPROACHES ON KY-1826 OVER TOWN CREEK (B79) INCLINTON. (SR=24.4): (053B00079N)

REPLACE BRIDGE OVER IC RR ON BALTIMORE RD (CR 1011) 0.3 MI NW OFHICKMAN/GRAVES CO LINE 053C00003N SR 24.5

US 41A PHASE II DESIGN AND RIGHT-OF-WAY. (2005HPP-KY135)(SEE 2-137.01 FOR"STP" COMPONENT)

.500

.400

7.600

3.000

.100

.055

3.600

HENDERSON

HENRY

HENRY

HENRY

HENRY

HICKMAN

HICKMAN

HOPKINS

EB-9004

KY-574

KY-55

KY-146

KY-146

KY-1826

CR-1011

US-41A

$4,680,000

$1,220,000

$380,000

$12,100,000

$11,700,000

$3,610,000

$350,000

$2,879,680

Total

Total

Total

Total

Total

Total

Total

Total

C

C

R

U

C

R

U

C

R

U

C

R

U

C

D

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2014

2014

2015

2015

2016

2014

2014

2014

2014

2014

2014

2014

2015

2018

2019

2015

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

STP

SPP

BRO

BRO

BRO

SB2

SB2

SPP

SB2

SB2

SPP

BRX

BRX

BRX

BRZ

HPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$4,680,000

$1,220,000

$90,000

$60,000

$230,000

$1,000,000

$1,100,000

$10,000,000

$1,900,000

$2,400,000

$7,400,000

$270,000

$630,000

$2,710,000

$350,000

$2,879,680

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

02

05

05

05

05

01

01

02

8304.00

472.00

1066.00

8300.00

8300.10

1062.00

1156.00

137.02

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

02

05

05

05

05

01

01

02

8304.00

472.00

1066.00

8300.00

8300.10

1062.00

1156.00

137.02

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2006

2010

2012

2006

2012

2008

2014

2004

2006

2010

2012

2006

2012

2008

2014

2004

68.25

.1

6.105

2.169

6.8

4.888

.25

0

68.75

.5

6.145

6.8

9.8

4.988

.305

3.426

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / I-CHANGE RECONST(O)

RELIABILITY / SAFETY(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

SAFETY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / MAJOR WIDENING(O)

Page 57: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 57

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

WIDEN US-41A FROM INDUSTRIAL DRIVE TO YORKWOOD PLACE. (SECTION 1)(2012BOP)

WIDEN US-41A FROM YORKWOOD PLACE TO US 41 / KY 281. (SECTION 2) (2012BOP)

STUDY POSSIBILITIES FOR IMPROVING RAILROAD CROSSING ON KY-1034 AT US-41A, MP 11.336.(10CCR)

RECONSTRUCT KY-85 FROM KY-70 EAST TO AIRPORT ROAD AT ANTON.(08CCR)(10CCR)

IMPROVE RAMP CONFIGURATION AT THE EXISTING I-69/WESTERN KENTUCKYPARKWAY/PENNYRILE PARKWAY INTERCHANGE (I-69 CORRIDORIMPROVEMENT)(12CCR)

RECONSTRUCT ELEMENTS OF EXISTING EDWARD T BREATHITT PKWY(PENNYRILE PARKWAY) BETWEEN MP 37.0 AND MP 73.4 TO UPGRADEGEOMETRICS TO INTERSTATE STANDARDS (I-69 CORRIDOR IMPROVEMENT)

CENTER STREET/ISLAND FORD CONNECTOR ROAD IN MADISONVILLE: STATESHARE TO BE USED NORTH OF THE RAILROAD TRACKS TO CONNECT WITH KY281. SOUTH OF RAILROAD TO BE BUILT BY OTHERS.

REPLACE BRIDGE ON KY-260 (MP 2.14) OVER OTTER CREEK; .20 MI EAST OFPENNYRILE PARKWAY; (FUNCTIONALLY OBSOLETE, SR=49.9) 054B00022N

2.030

1.246

.300

1.700

.410

36.400

.100

HOPKINS

HOPKINS

HOPKINS

HOPKINS

HOPKINS

HOPKINS

HOPKINS

HOPKINS

US-41A

US-41A

KY-1034

KY-85

I-69

EB-9004

-

KY-260

$11,000,000

$9,000,000

$200,000

$9,410,000

$18,000,000

$16,000,000

$3,000,000

$1,140,000

Total

Total

Total

Total

Total

Total

Total

Total

C

C

D

R

U

C

D

C

C

C

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2016

2017

2014

2014

2014

2016

2014

2014

2014

2016

2014

2014

2017

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SP

SP

SP

SP

SP

SP

IM

IM

NH

SPP

BRX

BRX

BRX

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$11,000,000

$9,000,000

$200,000

$890,000

$870,000

$7,650,000

$500,000

$17,500,000

$16,000,000

$3,000,000

$160,000

$300,000

$680,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

02

02

02

02

02

02

02

02

137.10

137.20

161.00

176.00

225.00

232.00

804.00

1072.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

HENDERSONWEBSTER

02

02

02

02

02

02

02

02

137.00

137.00

161.00

176.00

225.00

232.00

804.00

1072.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2000

2000

2004

2006

2012

2012

2014

2010

2000

2000

2004

2006

2012

2012

2014

2010

1.246

0

11.186

0

106

37

2.09

3.275

1.246

11.486

1.72

106.41

55.003

2.19

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / MAJOR WIDENING(O)

SAFETY / SCOPING STUDY(O)

ECONOMIC DEVELOPMENT / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

65.30555.003

73.465.305

Milepoints:Milepoints:

To:To:

From:From:

Page 58: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 58

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

REPLACE BRIDGE ON KY 262 OVER GREASEY CREEK 0.67 MILE E OF BEANCEMETERY RD (CR 1396)(SR 25.1)054B00107N

REPLACE BRIDGE ON KY 293 AT THE CALDWELL/HOPKINS COUNTY LINE(SR37.7)054B00115N

REPLACE BRIDGE ON KY 1069 OVER OTTER CREEK AT INTERSECTION OF J DBUCHANAN RD (CR 1093)(SR 43.9)054B00157N

WIDEN NORTH MAIN STREET FROM HOSPITAL DRIVE TO KY-281. (06CCN)(12CCR)

US-62; THREE LANES FROM BOARD OF EDUCATION TO CITY PARK IN DAWSONSPRINGS. (08CCN)(10CCR)(12CCR)

CONSTRUCT A LEFT TURN LANE BY PROVIDING A THREE LANE CURVE ON KY-3052. (08CCN)(10CCR)(12CCR)

UPGRADE MORTON'S GAP INTERCHANGE AT MP 37.07 TO INTERSTATESTANDARDS (I-69 CORRIDOR IMPROVEMENT). (10CCN)(12CCR)(AR/W)

.040

.600

.521

.753

1.040

HOPKINS

HOPKINS

HOPKINS

HOPKINS

HOPKINS

HOPKINS

HOPKINS

KY-262

KY-293

KY-1069

US-41

US-62

KY-3052

EB-9004

$900,000

$2,050,000

$770,000

$13,210,000

$2,500,000

$2,760,000

$12,170,000

Total

Total

Total

Total

Total

Total

Total

R

U

C

R

U

C

R

U

C

D

R

U

C

R

U

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2014

2014

2015

2014

2014

2015

2015

2015

2016

2014

2015

2015

2017

2014

2014

2015

2014

2015

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BRO

BRO

BRO

BRO

BRO

BRO

BRO

BRO

BRO

SP

SP

SP

SP

SPP

SPP

SPP

SPP

IM

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$175,000

$225,000

$500,000

$500,000

$100,000

$1,450,000

$150,000

$170,000

$450,000

$980,000

$920,000

$1,180,000

$10,130,000

$500,000

$500,000

$1,500,000

$2,760,000

$12,170,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

02

02

02

02

02

02

02

1079.00

1081.00

1084.00

8305.00

8501.00

8507.00

8633.00

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

CALDWELL

02

02

02

02

02

02

02

1079.00

1081.00

1084.00

8305.00

8501.00

8507.00

8633.00

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2012

2012

2012

2006

2008

2008

2010

2012

2012

2012

2006

2008

2008

2010

2.734

0

2.355

16.989

.829

0

36.5

2.774

.044

2.395

17.548

1.35

.753

37.54

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / MINOR WIDENING(O)

SAFETY / SAFETY-HAZARD ELIM(P)

SAFETY / SAFETY(P)

20.442 20.486Milepoints: To:From:

Page 59: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 59

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

RECONSTRUCT KY 30 FROM US 421 TO THE OWSLEY COUNTY LINE.

REPLACE BRIDGE ON US 421 OVER PIGEON ROOST CREEK AT INTERSECTIONWITH WATER STREET E(CS 1006)(SR 43.9) 055B00157N

PHASE 2: CLEAN AND PAINT STEEL BRIDGES AND STEEL BEARINGS ON THEWATTERSON EXPRESSWAY. (PHASE 2) (2008BOPC)(12CCR)

PHASE 3: CLEAN AND PAINT STEEL BRIDGES AND STEEL BEARINGS ON THEWATTERSON EXPRESSWAY. (2008BOPC)(12CCR)

SNYDER FREEWAY; RECONSTRUCT 2 RAMPS AT I-265/I-64 INTERCHANGE EASTOF LOUISVILLE. (DESIGNED WITH 5-41.00)(2006BOPP)(12CCR)

LANDSCAPING FOR THE WESTPORT ROAD CORRIDOR FROM HUBBARDS LANETO HURSTBOURNE PARKWAY. (2004BOPC)

RECONSTRUCTION OF THE I-71/I-265 (SNYDER FREEWAY) INTERCHANGE(INTERIM IMPROVEMENTS). (2004BOPC)(08CCR)(10CCR)

TRIMARC IMPROVEMENTS ON I-71 FROM NEAR KENNEDY (MP 0.00) TO THE GENESNYDER FREEWAY (MP 9.80). (2004BOPC)

8.396

.040

.300

4.283

2.300

9.800

JACKSON

JACKSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

KY-30

US-421

I-264

I-264

I-265

KY-1447

I-71

I-71

$18,000,000

$705,000

$3,370,000

$4,360,000

$60,340,000

$1,130,000

$19,310,000

$6,730,000

Total

Total

Total

Total

Total

Total

Total

Total

D

R

U

R

U

C

C

C

R

U

C

C

R

U

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2016

2018

2019

2015

2015

2017

2015

2015

2017

2017

2019

2014

2014

2014

2016

2014

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SPP

SPP

BRO

BRO

BRO

IM

IM

IM

IM

IM

SP

NH

NH

NH

SP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$4,700,000

$8,300,000

$5,000,000

$100,000

$50,000

$555,000

$3,370,000

$4,360,000

$6,510,000

$2,080,000

$51,750,000

$1,130,000

$4,440,000

$1,370,000

$13,500,000

$6,730,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

11

11

05

05

05

05

05

05

278.30

1090.00

15.20

15.30

21.00

28.70

48.30

48.90

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

11

11

05

05

05

05

05

05

278.30

1090.00

15.00

15.00

21.00

28.00

48.02

48.02

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2014

2012

2010

2010

2000

2004

2004

2004

2014

2012

2008

2008

2000

2000

2000

2000

9.913

13.919

25.3

.926

7.5

0

18.309

13.959

25.6

5.245

9.8

9.8

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE PAINTING(P)

RELIABILITY / BRIDGE PAINTING(P)

ECONOMIC DEVELOPMENT / I-CHANGE RECONST(O)

RELIABILITY / TRANSP ENHANCEMENT(P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / ITS(P)

Page 60: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 60

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

I-64 BRIDGE (SHERMAN MINTON) OVER OHIO RIVER @ LOUISVILLE (B279); JOINTPROJECT WITH INDIANA TO PERFORM IN-DEPTH INSPECTION. (056B00279N)

WIDEN FROM 2 TO 4 LANES FROM BEARGRASS CREEK TO ZORN AVENUE. (LOUT.I.P.) (KYTC MATCH) (SEE 5-91.07 FOR ADDITIONAL 'KYD' FUNDING FOR RPHASE.) (FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP).

CLEAN AND PAINT THE GEORGE ROGERS CLARK MEMORIAL BRIDGECARRYING US-31 OVER THE OHIO RIVER BETWEEN LOUISVILLE, KENTUCKYAND JEFFERSONTOWN, INDIANA (THIS STRUCTURE IS 100% OWNED ANDMAINTAINED BY KENTUCKY) (B118): (056B00118N)(12CCR)

MAJOR REVISION OF THE INTERSECTION LOCATED AT THE OUTER LOOP,FEGENBUSH LANE, AND BEULAH CHURCH ROAD. TURN LANE TO BE COMPLETEDBY TRANSPORTATION CABINET PER AGREEMENT.(04CCN)(08CCR)(10CCR)(12CCR)

CLEAN AND PAINT ALL STEEL BRIDGES AND STEEL BEARINGS ON THE GENESNYDER FREEWAY(10CCR)

WIDEN I-64 WESTBOUND RAMP TO I-264 WESTBOUND FROM ONE TO TWO LANESFOR ENTIRE LENGTH AND OTHER NEEDED IMPROVEMENTS TO ADDRESSWEAVE ISSUES AT MERGE ON I-264. (2006BOPP)(12CCR)

WIDEN I-64 WESTBOUND RAMP TO I-264 WESTBOUND FROM ONE TO TWO LANESFOR ENTIRE LENGTH AND OTHER NEEDED IMPROVEMENTS TO ADDRESSWEAVE ISSUES AT MERGE ON I-264. (ADDITIONAL FUNDING FOR C PHASE)

SIGNAL SYSTEM IMPROVEMENTS IN JEFFERSON COUNTY.

RECONSTRUCT SECOND CURVE ONLY ON I-65 SOUTHBOUND RAMP AT KY-1065(OUTER LOOP).(SEE 5-205.01 FOR BREAKOUT IMPROVEMENTS)

.300

1.500

1.100

.200

.500

.400

.621

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

I-64

CS-1001B

US-31

KY-1065

I-265

I-64

I-64

-

I-65

$160,000

$11,500,000

$18,000,000

$4,950,000

$3,790,000

$23,820,000

$15,000,000

$910,000

$1,820,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

C

C

C

C

C

R

U

C

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2014

2014

2014

2014

2014

2014

2015

2017

2018

2014

2014

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

IM

SLO

SP

SPP

SP

NH

NH

NH

NH

SP

IM

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$160,000

$11,500,000

$18,000,000

$4,950,000

$3,790,000

$7,400,000

$2,170,000

$14,250,000

$15,000,000

$910,000

$1,820,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

05

05

05

05

05

05

05

05

05

63.00

91.02

110.00

122.00

136.00

159.00

159.01

183.01

205.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

05

05

05

05

05

05

05

05

05

63.00

91.02

110.00

122.00

136.00

159.00

159.00

183.01

205.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2000

2000

2000

2000

2000

2000

2014

2006

2006

2000

2000

2000

2000

2000

2000

2000

2006

2006

0

1.6

0

9.944

.232

.232

0

.316

2.925

1.089

10.009

.779

.779

.621

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

SAFETY / BRIDGE INSPECTION(P)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / BRIDGE PAINTING(P)

SAFETY / SAFETY(P)

RELIABILITY / BRIDGE PAINTING(P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / SIGNAL SYS IMPROVE(P)

SAFETY / SAFETY(P)

Page 61: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 61

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

WIDEN BLUE LICK ROAD FROM SNYDER FREEWAY NORTH TO KY-61 (LOU T.I.P.)(SECTION 2) (RU-04DEOB)(08CCR)(12CCR)

EXTEND DUAL LEFT TURN LANES ON KY-1747 (HURSTBOURNE LN) AT BUNSENPKWY.

IMPROVE I-265/KY-61 (PRESTON HWY) INTERCHANGE AS RECOMMENDED BYKIPDA'S INTERCHANGE STUDY.

IMPROVE KY-841/STONESTREET ROAD INTERCHANGE AS RECOMMENDED BYKIPDA'S INTERCHANGE STUDY.

WIDEN GREENWOOD ROAD FROM GREENBELT HWY TO DIXIE HWY (US-31W) (3-LANE IMPROVEMENT) FROM MP 0.54 TO MP 3.148. (98CCR)(R-04DEOB)(04CCR)(BOP2006P)(10CCR)(12CCR)

WIDEN SOUTHBOUND HURSTBOURNE LANE TO 3 LANES FROM US-60 TO I-64.(06CCR)(03KYD)(2006BOPP)(SEE 5-344.02 FOR KYD C PHASE)

ENGLISH STATION ROAD IN LOUISVILLE; WIDEN TO 3 LANES FROM AVOCAROAD TO AIKEN ROAD. (FUNDING SUBJECT TO FISCAL CONSTRAINT PENDINGMPO TIP).

INTERSECTION SAFETY IMPROVEMENTS ON KY-22 AT TEN BROECK WAYINCLUDING PROVIDING LEFT TURN LANES. (2004BOPC) (DESIGN SHOWN UNDER371.01).

1.600

.100

.700

.800

2.600

1.600

.850

.400

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

KY-1450

KY-1747

I-265

KY-841

KY-1931

KY-1747

CR-1006C

KY-22

$10,130,000

$210,000

$3,700,000

$390,000

$20,950,000

$10,310,000

$3,690,000

$2,520,000

Total

Total

Total

Total

Total

Total

Total

Total

C

C

C

C

R

U

C

R

U

C

C

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2014

2014

2014

2014

2014

2014

2016

2016

2016

2018

2014

2014

2014

2015

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SPP

IM

STP

SPP

SPP

SPP

SPP

SPP

SPP

SLO

SP

SP

SP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$10,130,000

$210,000

$3,700,000

$390,000

$3,550,000

$8,770,000

$8,630,000

$2,320,000

$2,580,000

$5,410,000

$3,690,000

$610,000

$620,000

$1,290,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

05

05

05

05

05

05

05

05

247.10

254.00

263.00

284.00

323.01

344.01

353.00

371.11

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

05

05

05

05

05

05

05

05

247.00

254.00

263.00

284.00

323.01

344.00

965.08

371.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2000

2006

2006

2006

2000

2000

2000

2004

1996

2006

2006

2006

2000

2000

1998

1998

1.873

11.409

11.3

2.7

.54

11.89

.773

3.257

3.542

11.509

12

3.5

3.148

13.503

1.232

3.357

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / MAJOR WIDENING(O)

SAFETY / SAFETY(P)

SAFETY / SAFETY(P)

SAFETY / SAFETY(P)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / MINOR WIDENING(O)

SAFETY / SAFETY(P)

Page 62: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 62

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

RECONSTRUCT KY-22 AT SPRINGCREST DRIVE. (06CCN) (2004BOPC)

RECONSTRUCT KY-22 AT GOOSE CREEK ROAD. (06CCN) (2004BOPC)

RECONSTRUCT KY-22 AT BARBOUR LANE. (06CCN) (2004BOPC)

RECONSTRUCT KY-22 AT AVENUE OF THE WOODS AND CHATSWORTH. (06CCN)(2004BOPC)

INTERSECTION IMPROVEMENT ON OLD KY-22 AT HERR LANE AND THEENTRANCE TO BALLARD HIGH SCHOOL. (06CCR)(2004BOPC)(12CCR)

EXTEND/RECONSTRUCT I-65 SB RAMP TO BROOK STREET (FUNDING SUBJECT TOFISCAL CONSTRAINT PENDING MPO TIP)

EXTEND COOPER CHAPEL ROAD FROM BEULAH CHURCH ROAD TO BARDSTOWNROAD (LOU T.I.P.) (ALL WORK BY LOUISVILLE METRO)(LOCALMATCH)(2004BOPC) (FUNDING SUBJECT TO FISCAL CONSTRAINTPENDING MPO TIP).

ALIGN INTERSECTION OF BROADWAY AND 18TH STREET BY MOVING THESOUTH LEG OF 18TH STREET TO THE EAST (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)

.400

.400

.500

.400

.200

.100

2.700

.100

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

KY-22

KY-22

KY-22

KY-22

KY-22

I-65

-

US-150

$2,190,000

$2,850,000

$880,000

$6,620,000

$3,200,000

$4,330,000

$4,750,000

$870,000

Total

Total

Total

Total

Total

Total

Total

Total

R

U

C

R

U

C

R

C

R

U

C

R

C

C

D

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2014

2014

2015

2014

2014

2015

2014

2015

2014

2014

2015

2014

2015

2014

2014

2014

2014

2014

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SP

SP

SP

SP

SP

SP

SP

SP

SP

SP

SP

SP

SP

SLO

SLO

SLO

SLO

SLO

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$400,000

$600,000

$1,190,000

$560,000

$970,000

$1,320,000

$310,000

$570,000

$1,290,000

$1,790,000

$3,540,000

$1,370,000

$1,830,000

$4,330,000

$1,000,000

$3,750,000

$90,000

$780,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

05

05

05

05

05

05

05

05

371.12

371.13

371.14

371.15

371.16

378.10

404.01

413.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

05

05

05

05

05

05

05

05

371.00

371.00

371.00

371.00

371.00

378.00

404.00

413.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2004

2004

2004

2004

2004

2000

2004

2004

1998

1998

1998

1998

1998

1998

2000

2004

1.389

2.537

1.919

1.03

.438

0

1.07

1.789

2.937

2.419

1.43

.87

.155

1.12

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

SAFETY / SAFETY(P)

SAFETY / SAFETY(P)

SAFETY / SAFETY(P)

SAFETY / SAFETY(P)

SAFETY / SAFETY(P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / NEW ROUTE(O)

SAFETY / SAFETY(P)

Page 63: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 63

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

WIDEN SOUTHSIDE DRIVE (KY-907) TO 5 LANES FROM NEW CUT ROAD TONATIONAL TURNPIKE. (2004BOPC) (FUNDING SUBJECT TO FISCAL CONSTRAINTPENDING MPO TIP).

REHABILITATION AND CONSTRUCTION OF VARIOUS SIDEWALK PROJECTS INLOUISVILLE METRO. (2006BOPC) (FUNDING SUBJECT TO FISCAL CONSTRAINTPENDING MPO TIP).

REHABILITATION AND CONSTRUCTION OF VARIOUS SIDEWALK PROJECTS INLOUISVILLE METRO. (2006BOPC) (FUNDING SUBJECT TO FISCAL CONSTRAINTPENDING MPO TIP).

REHABILITATION AND CONSTRUCTION OF VARIOUS SIDEWALK PROJECTS INLOUISVILLE METRO. (2006BOPC) (FUNDING SUBJECT TO FISCAL CONSTRAINTPENDING MPO TIP).

INSTALLATION OF SIDEWALKS TO FIX GAPS IN PEDESTRIAN NETWORK ONVARIOUS STATE MAINTAINED ROADS IN THE LOUISVILLE URBANIZED AREA.(FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP).

INSTALLATION OF SIDEWALKS TO FIX GAPS IN PEDESTRIAN NETWORK ONVARIOUS STATE MAINTAINED ROADS IN THE LOUISVILLE URBANIZED AREA.(FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP).

SENECA PARK LOOP EXTENSIONS (EAST AND WEST). (LOCAL MATCH)(ALLWORK BY LOUISVILLE METRO)(2004BOPC) (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP).

.700JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

KY-907

-

-

-

-

-

-

$7,000,000

$100,000

$100,000

$100,000

$40,000

$40,000

$320,000

Total

Total

Total

Total

Total

Total

Total

D

R

U

C

C

C

C

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2014

2015

2015

2016

2015

2016

2017

2014

2014

2014

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SLO

SLO

SLO

SLO

SLO

SLO

SLO

SLO

SLO

SLO

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$1,000,000

$1,000,000

$1,000,000

$4,000,000

$100,000

$100,000

$100,000

$40,000

$40,000

$320,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

05

05

05

05

05

05

05

437.01

439.03

439.04

439.05

440.01

440.02

442.00

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

OLDHAMBULLITT

OLDHAMBULLITT

OLDHAMBULLITT

OLDHAMBULLITT

OLDHAMBULLITT

05

05

05

05

05

05

05

437.00

439.02

439.03

439.03

440.01

440.02

965.09

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2004

2006

2014

2014

2004

2004

2004

2004

2004

2006

2006

2004

2004

2000

6.31 7.036Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / MAJOR WIDENING(O)

SAFETY / BIKE/PED FACIL(O)

SAFETY / BIKE/PED FACIL(O)

SAFETY / BIKE/PED FACIL(O)

SAFETY / BIKE/PED FACIL(O)

SAFETY / BIKE/PED FACIL(O)

SAFETY / BIKE/PED FACIL(O)

Milepoints:Milepoints:

Milepoints:Milepoints:

Milepoints:Milepoints:

Milepoints:Milepoints:

Milepoints:Milepoints:

To:To:

To:To:

To:To:

To:To:

To:To:

From:From:

From:From:

From:From:

From:From:

From:From:

Page 64: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 64

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

SENECA PARK LOOP EXTENSIONS (EAST AND WEST). (LOCAL MATCH)(ALLWORK BY LOUISVILLE METRO)(2004BOPC) (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP).

MT. WASHINGTON ROAD (KY-2053) SECTION 1; FROM PRESTON TO MAPLE WAY.(KYTC MATCH)(2004BOPC)(FUNDING SUBJECT TO FISCAL CONSTRAINT PENDINGMPO TIP)

MT. WASHINGTON ROAD (KY-2053) SECTION 2; FROM MAPLE WAY TO CEDARCREEK RD. (KYTC MATCH)(2004BOPC)(FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP)

RECONSTRUCT INTERSECTION OF KY-155 AND KY-148. (FUNDING SUBJECT TOFISCAL CONSTRAINT PENDING MPO TIP).

NORTHEAST LOUISVILLE LOOP MULTI-USE PATH: CONSTRUCT A PAVED MULTI-USE TRAIL, DRAINAGE IMPROVEMENTS AND PROVIDE SIGNAGE. WORK WILLOCCUR ON SHELBYVILLE RD. BETWEEN OLD SHELBYVILLE RD AND N. BECKLEYSTATION. (2010BOPC)

CONVERSION OF ONE-WAY STREETS IN DOWNTOWN LOUISVILLE TO TWO-WAYTRAFFIC (MAIN,JEFFERSON,LIBERTY, MUHAMMAD ALI, CHESTNUT,3RDSTREETS). PHASE 1

CONVERSION OF ONE-WAY STREETS IN DOWNTOWN LOUISVILLE TO TWO-WAYTRAFFIC (8TH, 7TH, SHELBY, CAMPBELL STREETS). PHASE 2

REDUCE CONGESTION AND IMPROVE SAFETY AT THE KY 3084 (OLD HENRYROAD) INTERCHANGE. (12CCR)

IMPROVE DIXIE HIGHWAY BETWEEN CRUMS LANE (KY 2049) AND ROCKFORDLANE (KY 2051)(12CCR)

.300

2.460

.756

1.802

.820

1.503

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

-

KY-2053

KY-2053

KY-155

US-60

-

CS-1049F

I-265

US-31W

$650,000

$930,000

$290,000

$2,400,000

$678,500

$2,381,500

$748,000

$6,090,000

$4,330,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

C

D

R

U

D

C

C

C

C

R

U

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2014

2014

2015

2015

2014

2014

2014

2014

2014

2016

2016

2017

2014

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SLO

SLO

SLO

SLO

SLO

SLO

CM

SLO

SLO

NH

NH

IM

SPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$650,000

$320,000

$490,000

$120,000

$290,000

$2,400,000

$678,500

$2,381,500

$748,000

$300,000

$700,000

$5,090,000

$4,330,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

05

05

05

05

05

05

05

05

05

442.02

443.10

443.20

446.00

469.00

470.00

470.10

474.00

478.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

05

05

05

05

99

05

05

05

05

442.00

443.00

443.00

965.09

219.08

965.12

965.12

474.00

478.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2004

2004

2004

2000

2010

2011

2014

2012

2012

2004

2004

2004

2000

2002

2004

2004

2012

2012

0

.343

3.947

11.093

28.28

13.837

.343

2.804

4.703

12.895

29.1

15.34

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

SAFETY / BIKE/PED FACIL(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / SAFETY(P)

RELIABILITY / CONGESTION MITIGTN(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

SAFETY / SAFETY(P)

SAFETY / SAFETY(P)

Page 65: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 65

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

IMPROVE DIXIE HIGHWAY BETWEEN ROCKFORD LANE (KY 2051) ANDGREENWOOD ROAD (KY 1931)

WIDEN HUBBARDS LANE FROM US 60 (SHELBYVILLE ROAD) TO KY 1447(WESTPORT ROAD) AND ADD BIKE LANES FROM KRESGE WAY TO KY 1447(WESTPORT ROAD) IN LOUISVILLE. (BOPC2010)

RECONSTRUCT GRADE LANE (CR-1001G) IN LOUISVILLE BETWEEN I-65 SB RAMPSAND GRADE LANE CONNECTOR (MP 0.2 TO MP 0.6)(AS PER MOA KY NATIONALGUARD WILL REIMBURSE KYTC FOR PROJECT COSTS)(2012BOP)

WIDEN PRIORITY SECTION OF I-71 BETWEEN I-265 AND CRESTWOOD.

CONSTRUCT A 2800' LONG, 10' WIDE MULTIUSE PATH THROUGH A.B. SAWYERPARK AND CONNECTING TO SURROUNDING NEIGHBORHOODS INCLUDES ANUNDERPASS, BRIDGE, AND SITE AMENITIES.

RE-CURB US 60A (EASTERN PARKWAY) FROM KY 1631 (CRITTENDEN DRIVE) TOUS 31E (BARDSTOWN ROAD).

GOOD SAMARITAN BICYCLE/PEDESTRIAN TRAIL CONNECTOR:CONSTRUCT AMULTI-USE BICYCLE & PEDESTRIAN TRAIL ALONG OLD TAYLORSVILLE ROAD &JEFFERSON ST IN DOWNTOWN JEFFERSONTOWN CONNECTING THEDOWNTOWN ST NETWORK TO THE GOOD SAMARITAN CENTER & BICYCLE/PEDTRAIL.

PRELIMINARY DESIGN & SCOPING STUDY TO DETERMINE LOCATION OF AMULTI-USE BICYCLE & PEDESTRIAN TRAIL PROJECT ALONG TAYLORSVILLEROAD FROM DOWNTOWN JEFFERSONTOWN TO 21ST CENTURY PARK.

2.200

.614

.400

5.000

2.793

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

US-31W

CR-1005B

CR-1001G

I-71

-

US-60A

-

-

$7,200,000

$2,500,000

$2,415,000

$49,000,000

$870,000

$4,400,000

$162,000

$189,000

Total

Total

Total

Total

Total

Total

Total

Total

C

U

C

U

C

D

R

U

C

D

C

P

D

C

C

P

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2016

2015

2016

2014

2014

2014

2016

2016

2018

2014

2015

2015

2016

2017

2014

2017

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SLO

SLO

DAR

DAR

NH

NH

NH

SPP

SLO

SLO

SLO

SLO

SLO

SLO

SLO

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$7,200,000

$500,000

$2,000,000

$215,000

$2,200,000

$2,500,000

$1,000,000

$500,000

$45,000,000

$170,000

$700,000

$200,000

$400,000

$3,800,000

$162,000

$189,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

05

05

05

05

05

05

05

05

478.20

479.00

482.00

483.00

484.00

485.00

486.00

487.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

OLDHAM

05

05

05

05

05

05

05

05

478.20

965.12

482.00

483.00

965.12

965.12

965.12

965.12

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2014

2010

2012

2014

2014

2014

2014

2014

2014

2004

2012

2014

2004

2004

2004

2004

11.65

0

.2

9.1

4.038

13.837

.614

.6

11.315

6.831

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

SAFETY / SAFETY(P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / MAJOR WIDENING(O)

SAFETY / BIKE/PED FACIL(O)

RELIABILITY / PAVEMENT REHAB-PRI(P)

SAFETY / BIKE/PED FACIL(O)

RELIABILITY / SCOPING STUDY(O)

11.315 14.1Milepoints: To:From:

Page 66: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 66

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

DESIGN & CONSTRUCT SHARED USE PATH & LOUISVILLE LOOP TRAILHEADFACILITIES THRU JEFFERSON MEMORIAL FOREST FROM NORTH END OF SANDQUARRY TUNNEL AT GENE SNYDER FWY TO WEST TERMINUS OF EXISTING MSDTRAIL APPROX. 2.7 MI WHICH WILL INCLUDE BRIDGE OVER POND CR.

DESIGN & CONSTRUCT SHARED USE PATH & LOUISVILLE LOOP TRAILHEADFACILITIES THRU JEFFERSON MEMORIAL FOREST FROM BLEVINS GAP ROAD TONORTH END OF SAND QUARRY TUNNEL AT GENE SNYDER FWY(THE TUNNELWILL BE PART OF THIS SEGMENT) APPROX. 2.5 MILES.

DESIGN AND CONSTRUCT SHARED USE PATH AND LOUISVILLE LOOPTRAILHEAD FACILITIES THROUGH JEFFERSON MEMORIAL FOREST FROMPENDLETON RD AT MEDORA RD TO THE BEGINNING OF JEFFERSON MEMORIALFOREST PROPERTY ON BLEVINS GAP RD APPROX. 1.3 MILES.

MIDDLETOWN STREETSCAPE PHASE VI. ROADWAY AND STREETSCAPEIMPROVEMENTS ON OLD SHELBYVILLE RD FROM EVERGREEN RD TO US 60(SHELBYVILLE RD).

MISCELLANEOUS SIDEWALKS AND HANDICAP RAMPS: CONSTRUCT ANDREPLACE VARIOUS SIDEWALKS AND HANDICAP RAMPS THROUGHOUT THE CITYON A REOCCURRING ANNUAL BASIS.

OLMSTED PARKWAYS MULTI-USE PATH SYSTEM-SOUTHERN PKWY:CONSTRUCTION OF A 2.5 MILE SHARED USE PATH SYSTEM ALONG SOUTHERNPARKWAY BETWEEN SOUTH 3RD AND NEW CUT ROAD.

CONSTRUCTION OF A 0.5 MILE SHARED USE PATH SYSTEM ALONG ALGONQUINPARKWAY BETWEEN WILSON AVENUE AND CYPRESS STREET.

CONSTRUCTION OF A 0.45 MILE SHARED USE PATH SYSTEM ALONG ALGONQUINPARKWAY BETWEEN CYPRESS STREET AND DIXIE HWY.

CONSTRUCTION OF A 1.2 MILE SHARED USE PATH SYSTEM ALONG ALGONQUINPARKWAY BETWEEN DIXIE HIGHWAY AND SHARP AVE.

2.500

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

-

-

-

CS-3596

-

KY-1020

KY-2054

KY-2054

KY-2054

$333,600

$210,500

$144,240

$254,000

$37,800

$1,000,000

$1,000,000

$1,000,000

$1,000,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

D

D

D

C

C

C

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2014

2014

2014

2014

2017

2015

2014

2014

2014

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SLO

SLO

SLO

SLO

SLO

SLO

SLO

SLO

SLO

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$333,600

$210,500

$144,240

$254,000

$37,800

$1,000,000

$1,000,000

$1,000,000

$1,000,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

05

05

05

05

05

05

05

05

05

489.00

490.00

491.00

492.00

493.00

495.00

496.00

497.00

498.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

05

05

05

05

05

05

05

05

05

965.12

965.12

965.12

965.12

965.12

965.12

965.12

965.12

965.12

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2014

2014

2014

2014

2014

2014

2014

2014

2014

2004

2004

2004

2004

2004

2004

2004

2004

2004

.494

7.837

.72

1.22

1.64

1.005

9.15

1.22

1.64

2.717

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

SAFETY / BIKE/PED FACIL(O)

SAFETY / BIKE/PED FACIL(O)

SAFETY / BIKE/PED FACIL(O)

RELIABILITY / RECONSTRUCTION(O)

SAFETY / BIKE/PED FACIL(O)

SAFETY / BIKE/PED FACIL(O)

SAFETY / BIKE/PED FACIL(O)

SAFETY / BIKE/PED FACIL(O)

SAFETY / BIKE/PED FACIL(O)

Page 67: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 67

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

RIVER ROAD BICYCLE AND PEDESTRIAN IMPROVEMENTS FROM DOWNTOWNLOUISVILLE TO THE CITY OF PROSPECT (US 42), 8.5 MILES. (SEE 5-3036.00)

CONSTRUCT SHARED USE PATH FROM NEIGHBORHOOD SIDEWALK TO REAR OFSCHOOL PROPERTY, AND PROVIDE OUTDOOR CLASSROOM AMENITIES ALONGSHARED USE PATH. PROJECT WILL INCLUDE WETLAND RESTORATION ONSCHOOL SITE.(FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)

OHIO RIVER LEVEE TRAIL EXTENSION PROJECT- CONSTRUCT A SHARED USEPATH OF APPROXIMATELY 13,000 LINEAR FT BETWEEN RIVERSIDE HISTORICSITE AND MILL CREEK GENERATING STATION (2012BOP).

VARIOUS SAFETY PROJECTS IN THE LOUISVILLE URBANIZED AREA.

VARIOUS SAFETY PROJECTS IN THE LOUISVILLE URBANIZED AREA.

WIDEN WATTERSON TRAIL FROM 2 TO 3 LANES FROM RUCKRIEGEL PARKWAY(CS-2056H) TO MAPLE ROAD (CS-1132H) AND FROM OLD TAYLORSVILLE ROAD(CS-1119H) TO RUCKRIEGEL PARKWAY (KY 1819). PROJECT TO INCLUDESTREETSCAPE ENHANCEMENTS.

CONSTRUCT A MULTI-USE BICYCLE AND PEDESTRIAN TRAIL ALONGWATTERSON TRAIL FROM MULBERRY ROW WAY TO MANSFIELD ESTATESDRIVE.

RECONSTRUCT/WIDEN WATTERSON EXPRESSWAY FROM WESTPORT ROAD (KY1447) TO I-71.(12CCR)

.151

.831

1.700

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

CR-1001B

-

-

-

-

CR-1004H

CR-1004H

I-264

$2,243,030

$82,500

$701,444

$1,000,000

$1,000,000

$821,437

$656,640

$36,200,000

Total

Total

Total

Total

Total

Total

Total

Total

D

C

D

C

C

C

C

D

U

C

C

D

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2014

2015

2014

2014

2014

2016

2017

2014

2015

2016

2017

2014

2016

2016

2019

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SLO

SLO

SLO

SLO

SLO

SLO

SLO

SLO

SLO

SLO

SLO

IM

IM

IM

SPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$200,000

$2,043,030

$12,500

$70,000

$701,444

$1,000,000

$1,000,000

$117,480

$194,169

$509,788

$656,640

$3,000,000

$2,000,000

$1,200,000

$30,000,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

05

05

05

05

05

05

05

05

499.00

513.00

515.00

516.02

516.03

518.00

519.00

594.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

OLDHAMBULLITT

OLDHAMBULLITT

05

05

05

05

05

05

05

05

965.12

965.12

515.00

516.00

516.00

965.12

965.12

594.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2014

2004

2012

2014

2014

2014

2014

2012

2004

2004

2012

2014

2014

2004

2004

2012

0

3.179

1.857

20.9

6.761

3.33

2.688

22.6

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

SAFETY / BIKE/PED FACIL(O)

SAFETY / MATCHED FED FUNDS(O)

SAFETY / BIKE/PED FACIL(O)

SAFETY / SAFETY(P)

SAFETY / SAFETY(P)

RELIABILITY / MINOR WIDENING(O)

SAFETY / BIKE/PED FACIL(O)

RELIABILITY / RECONSTRUCTION(O)

Milepoints:Milepoints:

Milepoints:Milepoints:

To:To:

To:To:

From:From:

From:From:

Page 68: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 68

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

LOUISVILLE BRIDGES; ENVIRONMENTAL & HISTORIC MITIGATION ANDENHANCEMENTS.

LOUISVILLE BRIDGES; KENTUCKY STATE SPP FUNDING REQUIRED FOR FY 2014IN ORDER TO INCREASE TIFIA LOAN AMOUNT. THIS ITEM MUST NOT BE MOVEDFROM SPP IN 2014.

LOUISVILLE BRIDGES; KENTUCKY TRADITIONAL IM FUNDING FOR FY 2015PLEDGED TO SUPPORT THE FINANCING OF THE LSIORB (CANNOT BE MOVED)

LOUISVILLE BRIDGES; KENTUCKY TRADITIONAL NH FUNDING FOR FY 2015PLEDGED TO SUPPORT THE FINANCING OF THE LSIORB (CANNOT BE MOVED)

LOUISVILLE BRIDGES; KENTUCKY TRADITIONAL IM FUNDING FOR FY 2016PLEDGED TO SUPPORT THE FINANCING OF THE LSIORB (CANNOT BE MOVED)

LOUISVILLE BRIDGES; KENTUCKY TRADITIONAL NH FUNDING FOR FY 2016PLEDGED TO SUPPORT THE FINANCING OF THE LSIORB (CANNOT BE MOVED)

LOUISVILLE BRIDGES; KENTUCKY TRADITIONAL IM FUNDING FOR FY 2017PLEDGED TO SUPPORT THE FINANCING OF THE LSIORB (CANNOT BE MOVED)

LOUISVILLE BRIDGES; KENTUCKY TRADITIONAL NH FUNDING FOR FY 2017PLEDGED TO SUPPORT THE FINANCING OF THE LSIORB (CANNOT BE MOVED)

LOUISVILLE BRIDGES; KENTUCKY TRADITIONAL IM FUNDING FOR FY 2018PLEDGED TO SUPPORT THE FINANCING OF THE LSIORB (CANNOT BE MOVED)

RECONSTRUCT I-264 (WATTERSON EXPRESSWAY)/ US-42 INTERCHANGE AS ASPUI.(12CCR)

.100

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

-

-

-

-

-

-

-

-

-

I-264

$1,100,000

$50,000,000

$20,000,000

$30,000,000

$20,000,000

$30,000,000

$20,000,000

$30,000,000

$50,000,000

$22,300,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

Total

C

C

C

C

C

C

C

C

C

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2014

2014

2015

2015

2016

2016

2017

2017

2018

2016

2019

2020

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

NH

SPP

IM

NH

IM

NH

IM

NH

IM

STP

STP

STP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$1,100,000

$50,000,000

$20,000,000

$30,000,000

$20,000,000

$30,000,000

$20,000,000

$30,000,000

$50,000,000

$1,990,000

$2,710,000

$17,600,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

05

05

05

05

05

05

05

05

05

05

710.08

713.20

715.20

715.21

715.30

715.31

715.40

715.41

715.50

804.00

-

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

05

05

05

05

05

05

05

05

05

05

710.08

713.20

715.20

715.21

715.30

715.31

715.40

715.41

715.50

390.00

-

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2008

2008

2006

2006

2006

2006

2014

2008

2008

2010

2008

2008

2006

2006

2006

2006

2014

2008

2008

200621.8 22.3

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / ENVIRO MITIGATION(P)

RELIABILITY / I-CHANGE RECONST(O)

RELIABILITY / I-CHANGE RECONST(O)

RELIABILITY / I-CHANGE RECONST(O)

RELIABILITY / I-CHANGE RECONST(O)

RELIABILITY / I-CHANGE RECONST(O)

RELIABILITY / I-CHANGE RECONST(O)

RELIABILITY / I-CHANGE RECONST(O)

RELIABILITY / I-CHANGE RECONST(O)

ECONOMIC DEVELOPMENT / I-CHANGE RECONST(O)

Page 69: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 69

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

DEDICATED FEDERAL AID STP FUNDS EARMARKED FOR LOUISVILLEURBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2014 (FUNDINGSUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP).

DEDICATED FEDERAL AID STP FUNDS EARMARKED FOR LOUISVILLEURBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2015 (FUNDINGSUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP).

DEDICATED FEDERAL AID STP FUNDS EARMARKED FOR LOUISVILLEURBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2016 (FUNDINGSUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP).

DEDICATED FEDERAL AID STP FUNDS EARMARKED FOR LOUISVILLEURBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2017 (FUNDINGSUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)

DEDICATED FEDERAL AID STP FUNDS EARMARKED FOR LOUISVILLEURBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2018 (FUNDINGSUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)

DEDICATED FEDERAL AID STP FUNDS EARMARKED FOR LOUISVILLEURBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2019. (FUNDINGSUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP).

DEDICATED FEDERAL AID STP FUNDS EARMARKED FOR LOUISVILLEURBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2020. (FUNDINGSUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP).

US 42 SAFETY IMPROVEMENTS FROM HARRODS CREEK BRIDGE TO RIVERROAD.(10CCR)

LOUISVILLE INCIDENT MANAGEMENT PROGRAM (TRIMARC) CONSTRUCTION.(KYTC SHARE)

1.000

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

-

-

-

-

-

-

-

US-42

-

$15,100,000

$7,900,000

$3,800,000

$12,100,000

$18,000,000

$18,000,000

$18,000,000

$3,280,000

$1,410,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

C

C

C

C

C

C

C

R

U

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2014

2015

2016

2017

2018

2019

2020

2014

2014

2016

2014

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SLO

SLO

SLO

SLO

SLO

SLO

SLO

SP

SP

SP

CM

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$15,100,000

$7,900,000

$3,800,000

$12,100,000

$18,000,000

$18,000,000

$18,000,000

$780,000

$870,000

$1,630,000

$1,410,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

05

05

05

05

05

05

05

05

05

965.12

965.13

965.14

965.15

965.16

965.17

965.18

972.00

1012.12

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

05

05

05

05

05

05

05

99

05

965.12

965.13

965.14

965.15

965.16

965.17

965.18

134.00

1012.01

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2004

2006

2006

2008

2008

2014

2014

1998

1996

2004

2006

2006

2008

2008

2014

2014

1996

1996

9.628 10.548

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

SAFETY / SAFETY-HAZARD ELIM(P)

RELIABILITY / CONGESTION MITIGTN(O)

Page 70: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 70

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

REPLACE BRIDGE AND APPROACHES OVER BEARGRASS CREEK ON EAST MAINSTREET 0.25 MILE EAST OF US 31E (BAXTER AVE.) (B347) (SR=25.3). (056B00347N)

REPLACE BRIDGE ON CR-1019 (MP 0.179) OVER BEE LICK CREEK; .4 MI NE-MANSLICK RD-KY 2055; (STRUCTURALLY DEFICIENT, SR=4) 056C00104N

OLMSTED PARKS HISTORIC BRIDGES: REHABILITATE 11 BRIDGES THROUGHOLMSTED PARK: (056C00032N, 056C00031N, 056C00026N, 056C00027N, 056C00028N,056C00030N, 056C00029N, 056C00034N, 056C00033N, 056C00139N, 056C00138N)

REPLACE BRIDGE ON EASTERN PARKWAY (US 60A) OVER SOUTH FORKBEARGRASS CREEK 0.2 MILE NE OF POPLAR LEVEL RD (KY 864)(SR 43.6)056B00139N

REPLACE BRIDGE ON E BROADWAY (US 150) OVER SOUTH FORK BEARGRASSCREEK AT INTERSECTION WITH BRENT STREET (CS 1312G)(SR 38) 056B00348N

REPLACE BRIDGE ON FAIRMOUNT RD (CR 1004N) OVER CEDAR CREEK 0.2 MILEW OF FARMERS WAY (PR 1021N)(SR 16.8) 056C00054N

REPLACE BRIDGE ON E KENTUCKY ST (CS 1017G) OVER SOUTH FORKBEARGRASS CREEK 0.01 MILE E OF SCHILLER AVE (CS 1138G)(SR 48.8) 056C00083N

.100

.100

.040

.040

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

US-42

CR-1019L

-

US-60A

US-150

CR-1004N

CS-1017G

$500,000

$340,000

$800,000

$1,400,000

$1,440,000

$650,000

$910,000

Total

Total

Total

Total

Total

Total

Total

U

C

R

U

C

D

C

R

U

C

D

R

U

C

R

U

C

D

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2014

2014

2014

2014

2016

2014

2014

2015

2015

2017

2014

2015

2015

2017

2014

2014

2015

2015

2017

2017

2019

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BRO

BRO

BRZ

BRZ

BRZ

BRZ

BRZ

BRO

BRO

BRO

BRO

BRO

BRO

BRO

BRZ

BRZ

BRZ

BRZ

BRZ

BRZ

BRZ

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$50,000

$450,000

$40,000

$50,000

$250,000

$200,000

$600,000

$100,000

$500,000

$800,000

$250,000

$120,000

$220,000

$850,000

$100,000

$50,000

$500,000

$200,000

$10,000

$100,000

$600,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

05

05

05

05

05

05

05

1052.00

1061.00

1062.00

1064.00

1067.00

1068.00

1070.00

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

05

05

05

05

05

05

05

1052.00

1061.00

1062.00

1064.00

1067.00

1068.00

1070.00

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2008

2010

2010

2012

2012

2012

2012

2008

2010

2010

2012

2012

2012

2012

.23

.129

5.698

3.6

.737

1.293

.29

.229

5.738

3.64

.777

1.333

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

SAFETY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REHAB(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

Page 71: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 71

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

REPLACE I-264 EB BRIDGE OVER NORTHWESTERN PARKWAY (KY-3064) (SR=48.0)

REPLACE BRIDGE OVER NORTHWESTERN PKWY (KY 3064) ON I-264 INLOUISVILLE.(056B00226R) (SR=48.0)

REPLACE BRIDGE OVER NORTHERN DITCH ON GRADE LANE (CR 1001G) 0.34 MI SOF KY 1747 (FERN VALLEY ROAD) (056C00064N)(SR=25.4)

REPLACE BRIDGE OVER GOOSE CREEK ON RIVER ROAD (CR 1001B) 0.2 MI N OFLIME KILN ROAD (CR 1002B) (056C00130N)(SR=26.5)

SHAWNEE EXPRESSWAY LANDSCAPING; I-264 FENCING PROJECT.(2002BOPC)(10CCR)

WATTERSON TRAIL PHASE I- IMPROVE STREETSCAPE, RECONSTRUCTSIDEWALKS AND ENHANCE LANDSCAPING FROM MAPLE ROAD TO OLDTAYLORSVILLE ROAD IN JEFFERSONTOWN. (BOPC2012)

LOUISVILLE LOOP-OHIO RIVER VALLEY NORTHEAST PROJECT.BICYCLE/PEDESTRIAN FACILITIES ALONG A PATH THAT WOULD START AT THEEAST END BRIDGE AND END AT THE CITY OF PROSPECT. (2012BOPC)(SEE 5-499.OO)

REHABILITATION OF SIDEWALKS ALONG HILL STREET BETWEEN 6TH STREETAND 7TH STREET. (2012 BOP)

CONSTRUCTION OF A NEW BICYCLE PARKING & INTERMODAL TRANSITSTATION AT THE NW CORNER OF W. JEFFERSON STREET AND S. 4TH STREET(2010BOPC).

.044

.020

.070

7.800

.352

6.761

.207

.027

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

I-264

I-264

CR-1001G

CR-1001B

I-264

CS-1073H

CR-1001B

CS-1016F

CS-1002A

$2,500,000

$2,050,000

$720,000

$450,000

$110,000

$416,000

$1,635,000

$306,000

$1,353,920

Total

Total

Total

Total

Total

Total

Total

Total

Total

D

C

D

C

D

R

U

C

D

C

C

D

C

D

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2014

2016

2017

2019

2017

2019

2019

2020

2020

2014

2014

2014

2015

2014

2015

2014

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BRO

BRO

BRX

BRX

BRZ

BRZ

BRZ

BRZ

BRZ

IM

SLO

CM

CM

SLO

SLO

CM

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$500,000

$2,000,000

$450,000

$1,600,000

$350,000

$20,000

$50,000

$300,000

$450,000

$110,000

$416,000

$228,000

$1,407,000

$66,000

$240,000

$1,353,920

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

05

05

05

05

05

05

05

05

05

1073.00

1074.00

1077.00

1079.00

2000.77

3031.00

3036.00

3037.00

3703.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

05

05

05

05

05

05

99

05

99

1073.00

1074.00

1077.00

1079.00

2000.70

3031.00

219.16

440.02

219.09

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2014

2014

2014

2014

2004

2012

2012

2012

2010

2014

2014

2014

2014

2002

2012

2012

2004

2004

.15

.147

2.48

3.8

.46

0

0

.455

.273

.19

.191

2.5

3.87

8.22

.352

6.761

.662

.3

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / TRANSP ENHANCEMENT(P)

RELIABILITY / TRANSP ENHANCEMENT(P)

RELIABILITY / CONGESTION MITIGTN(O)

SAFETY / BIKE/PED FACIL(O)

RELIABILITY / CONGESTION MITIGTN(O)

Page 72: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 72

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

LOU METRO BICYCLE FACILITY IMPROVEMENTS - STRIPING, SIGNAGE &SIGNALIZATION 2010 (2010BOPC)

PILOT SYSTEM FOR THE INSTALLATION OF FOUR BIKE KIOSKS TO BE LOCATEDAT: LIBERTY & 8TH; W JEFFERSON & 6TH; W MUHAMMAD ALI BLVD & S 5TH; &E GRAY & S PRESTON ST (2010BOPC)

TARC 3 @15 HIGH CAPACITY CORRIDORS-INCREASE BUS SERVICE ON THE 4THSTREET BUS ROUTE IN LOUISVILLE. (BOPC2012)

WIDEN BUECHEL BANK ROAD TO 3 LANES FROM GE APPLIANCE PARK TOBUECHEL BY-PASS (00CCN) (FUNDING MOVED FROM 5-8105 IN 2010 ENACTEDHIGHWAY PLAN FOR R, U, AND C PHASES.)(12CCR)

RECONSTRUCT BILLTOWN ROAD. (04CCN)(06CCN)(08CCR)(10CCR)(12CCR)

DESIGN & CONSTRUCT (PH 3) A NEW NORTH/SOUTH PARK RD, INCLUDINGSHARED USE PATH, ON EAST SIDE OF LAKE TRAVERSING QUAIL CHASE GOLFCOURSE TO CONNECT TO SOUTHERN PORTION OF MCNEELEY LAKE, MT.WASHINGTON RD, AND CEDAR CREEK RD. (08CCN)(12CCR)(SEE 5-3034)

INSTALL SOUND BARRIER ON BOTH SIDES OF KY-841 AT WATSONVILLE ROAD.(08CCN)(12CCR)

INTERCHANGE AT MANSLICK ROAD (KY-1931) AND I-264. (08CCN)(10CCR)(12CCR)

CONSTRUCT A RAILROAD SAFETY CROSSING, IMPROVE LIGHTING, ERECTSIGNALS, AND ROADWAY CROSSINGS BETWEEN CARDINAL AND HILL STREETS.(08CCN)(12CCR)

.100

.900

2.500

.300

.100

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

-

-

-

CR-1007G

KY-1819

KY-2053

KY-841

I-264

-

$154,000

$184,000

$999,960

$6,850,000

$2,400,000

$4,120,000

$2,170,000

$8,900,000

$200,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

C

C

C

R

U

C

C

U

C

C

D

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2014

2014

2014

2014

2014

2015

2014

2014

2014

2014

2014

2016

2016

2014

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

CM

CM

CM

SPP

SPP

SPP

SPP

SPP

SPP

SPB

SP

SP

SP

SAF

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$154,000

$184,000

$999,960

$1,770,000

$750,000

$4,330,000

$2,400,000

$170,000

$3,950,000

$2,170,000

$3,100,000

$4,000,000

$1,800,000

$200,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

05

05

05

05

05

05

05

05

05

3704.00

3706.00

3707.00

8001.00

8203.00

8402.00

8403.00

8405.00

8412.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

99

99

05

05

05

05

05

05

05

219.09

219.09

3707.00

8001.00

8203.00

8402.00

8403.00

8405.00

8412.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2010

2010

2012

2000

2004

2008

2008

2008

2008

2004

2004

2012

2000

2004

2008

2008

2008

2008

.235

.114

5.125

3.55

8.08

.245

1.004

7.669

3.85

8.18

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / CONGESTION MITIGTN(O)

RELIABILITY / CONGESTION MITIGTN(O)

RELIABILITY / CONGESTION MITIGTN(O)

RELIABILITY / MINOR WIDENING(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / ENVIRO MITIGATION(P)

RELIABILITY / NEW INTERCHANGE(O)

SAFETY / SAFETY-RR PROTECTN(P)

Page 73: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 73

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

CONSTRUCT ROUNDABOUT AT WEST MANSLICK ROAD AND MT. HOLLY ROADAT THE INTERSECTIONS OF FAIRDALE AND MITCHELL ROAD AS WELL ASPAVEMENT REHABILITATION (06CCN). (10CCR)

WIDEN KY-1020, NATIONAL TURNPIKE, FROM FAIRDALE ROAD TO SOUTH PARKROAD. MP .615 TO MP 2.669. (08CCN)

WIDEN KY-2055 (MT. HOLLY ROAD) FROM NATIONAL TURNPIKE TO FAIRDALEROAD. (08CCN)

MAKE BEAUTIFICATION AND IMPROVEMENTS ON DIXIE HIGHWAY AT THEWATTERSON EXPRESSWAY EXCHANGE. (08CCN)(12CCR)

EXTEND THE EXISTING SOUND BARRIER WALL ON THE WEST SIDE OF THEWESTPORT ROAD INTERCHANGE. THE WALL SHALL EXTEND APPROXIMATELY2900' AND BE 16' HIGH. (10CCN)(10CCR)

IMPROVE AND WIDEN MT. WASHINGTON ROAD FROM PRESTON HIGHWAY TOPENN RUN CREEK BRIDGE. (10CCN)(12CCR)

IMPROVE AND WIDEN MT. WASHINGTON ROAD FROM PENN RUN CREEK BRIDGETO CEDAR CREEK ROAD. (10CCN)(12CCR)

REPLACE OLD WOODEN BARRIER ON SOUTHSIDE OF WATTERSON EXPRESSWAYBETWEEN TAYLOR BOULEVARD AND SOUTHERN PARKWAY. (10CCN)(TO BE LETW/ 5-8634)

.060

2.054

1.360

.400

1.501

1.187

.907

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

KY-2055

KY-1020

KY-2055

US-31W

KY-1447

KY-2053

KY-2053

I-264

$5,550,000

$1,350,000

$1,050,000

$102,000

$1,392,000

$20,800,000

$12,380,000

$1,000,000

Total

Total

Total

Total

Total

Total

Total

Total

R

U

C

D

D

C

C

D

R

U

C

D

R

U

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2014

2014

2015

2014

2014

2014

2014

2014

2014

2014

2016

2014

2015

2015

2016

2014

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

STP

STP

STP

SP

SP

SPP

SP

STP

SP

SP

SP

SP

SP

SP

SP

SB2

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$1,720,000

$2,680,000

$1,150,000

$1,350,000

$1,050,000

$102,000

$1,392,000

$600,000

$3,040,000

$6,910,000

$10,250,000

$800,000

$2,020,000

$1,650,000

$7,910,000

$1,000,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

05

05

05

05

05

05

05

05

8501.00

8502.00

8503.00

8507.00

8601.00

8611.00

8612.00

8633.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

05

05

05

05

05

05

05

05

8501.00

8502.00

8503.00

8507.00

8601.00

8611.00

8612.00

8633.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2008

2008

2008

2008

2010

2010

2010

2010

2008

2008

2008

2008

2010

2010

2010

2010

1.36

.615

0

14.5

0

1.501

9.146

1.42

2.669

1.36

14.9

1.501

2.688

10.053

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / TRANSP ENHANCEMENT(P)

RELIABILITY / ENVIRO MITIGATION(P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / ENVIRO MITIGATION(P)

Page 74: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 74

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

REBUILD THE ENTRANCE TO THE PEDESTRIAN OVERPASS ON TAYLORBOULEVARD OVER THE WATTERSON EXPRESSWAY. (10CCN)( TO BE LET W/ 5-8633)

UPGRADE A 1-MILE SECTION OF SIDEWALKS, CURBING AND BEAUTIFICATIONTO BARDSTOWN ROAD IN BUECHEL.(12CCN)

RESURFACE, STREETSCAPE, PEDESTRIAN BUMP-OUTS AND OTHER TRAFFICIMPROVEMENTS ON EAST MARKET STREET FROM BAXTER TO BROOK STREET,BETWEEN NUCLEUS UL URBAN RESEARCH PARK AND HOME OF THEINNOCENTS.(12CCN)

DESIGN AND CONSTRUCT A SOUND BARRIER WALL APPROX. 100 FEET EAST OFHOGARTH DRIVE HEADING WEST TO APPROX. 100 FEET PAST LINN STATIONROAD.(12CCN)

CONSTRUCT A NEW EXTENSION ROAD FROM SOUTH FOURTH STREET TOWARNOCK AS PER AGREEMENT WITH THE UNIVERSITY OF LOUISVILLEFOUNDATION AND KYTC.(12CCN)

SOUND BARRIER ON I-264 FROM RAMP TO US 42 SOUTH TO EXISTINGBARRIERS.(12CCN)

SOUND BARRIER ON I-64 FROM WATTERSON RAMP TO EXISTING SOUNDBARRIER. (12CCN)

EAST NICHOLASVILLE BYPASS SECTION IA FROM 50 FEET SOUTH OF KY 39 TO125 FEET NORTH OF KY 169.

EAST NICHOLASVILLE BYPASS SECTION IB FROM 125 FEET NORTH OF KY 169 TOEND OF PROJECT AT TIE-IN TO WEST BYPASS. THIS INCLUDES THEINTERCHANGE AT US 27 NORTH OF NICHOLASVILLE.

1.192

.932

.550

9.760

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JEFFERSON

JESSAMINE

JESSAMINE

-

KY-2251

US-31E

I-64

-

I-264

I-64

-

-

$300,000

$350,000

$8,500,000

$1,280,000

$20,000,000

$1,200,000

$1,200,000

$15,000,000

$38,000,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

C

D

C

C

C

C

C

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2014

2014

2014

2014

2014

2015

2015

2015

2015

2015

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SB2

SPP

SPP

SPP

SPP

SPP

SP

SP

SP

SP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$300,000

$50,000

$300,000

$8,500,000

$1,280,000

$20,000,000

$1,200,000

$1,200,000

$15,000,000

$38,000,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

05

05

05

05

05

05

05

07

07

8634.00

8702.00

8703.00

8706.00

8707.00

8716.00

8717.00

87.20

87.30

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

05

05

05

05

05

05

05

07

07

8634.00

8702.00

8703.00

8706.00

8707.00

8716.00

8717.00

87.10

87.10

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2010

2012

2012

2012

2012

2012

2012

2014

2014

2010

2012

2012

2012

2012

2012

2012

2000

2000

0

16.635

13.95

12.05

1.192

17.567

14.5

21.81

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / TRANSP ENHANCEMENT(P)

SAFETY / BIKE/PED FACIL(O)

SAFETY / BIKE/PED FACIL(O)

RELIABILITY / ENVIRO MITIGATION(P)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / TRANSP ENHANCEMENT(P)

RELIABILITY / TRANSP ENHANCEMENT(P)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / NEW ROUTE(O)

Page 75: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 75

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

EAST NICHOLASVILLE BYPASS SECTION II; FROM KY-39, EXTENDINGSOUTHEASTERLY TO US-27 SOUTH OF NICHOLASVILLE. (SEE 7-8305.00 FOR DPHASE.)(2000BOP)(12CCR)

EXTEND EAST BRANNON ROAD FROM END OF EXISTING ROAD FROM EAST OFLAUDERDALE DRIVE (CS 1501) TO TATES CREEK ROAD (KY 1974) (2-LANEIMPROVEMENT)(12CCR)

WILMORE DOWNTOWN DRAINAGE AND STREET IMPROVEMENTS.(2008BOPC)(FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)

TURN LANES AT W. JESSAMINE HIGH SCHOOL AND E. JESSAMINE MIDDLESCHOOL. (2008BOPC)(FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPOTIP)

NEW CONNECTOR BETWEEN US 27 NORTH OF NICHOLASVILLE AND I-75 AT THEKY 627 INTERCHANGE.(12CCR)

IMPROVE ROADWAY GEOMETRICS, TYPICAL SECTION, AND ROADWAYHAZARDS ON KY 1980 (BRANNON RD) FROM US 68 (HARRODSBURG RD) TO US 27(NICHOLASVILLE RD)(12CCR)

ACCESS MANAGEMENT ON NICHOLASVILLE ROAD BETWEEN NICHOLASVILLEAND MAN-O-WAR BLVD.

RECONSTRUCT INTERSECTION OF KY 29 NORTH OF WILMORE.

2.660

.122

.160

3.205

5.356

.700

JESSAMINE

JESSAMINE

JESSAMINE

JESSAMINE

JESSAMINE

JESSAMINE

JESSAMINE

JESSAMINE

-

CS-1486A

KY-1268

KY-29

-

KY-1980

US-27

US-68

$13,240,000

$22,380,000

$465,000

$20,000

$2,500,000

$24,500,000

$8,500,000

$5,100,000

Total

Total

Total

Total

Total

Total

Total

Total

C

R

U

C

R

U

C

C

D

R

U

C

D

C

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2015

2015

2015

2016

2014

2014

2014

2014

2015

2016

2016

2019

2015

2016

2014

2015

2016

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

STP

SPP

SPP

SPP

SLX

SLX

SLX

SLX

SPP

STP

STP

STP

SPP

SPP

STP

STP

STP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$13,240,000

$3,000,000

$4,980,000

$14,400,000

$50,000

$125,000

$290,000

$20,000

$2,500,000

$7,500,000

$5,000,000

$12,000,000

$600,000

$7,900,000

$1,500,000

$600,000

$3,000,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

07

07

07

07

07

07

07

07

87.50

376.00

396.00

397.00

410.00

414.00

430.00

915.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

MADISON

FAYETTE

07

07

07

07

07

07

07

07

87.02

376.00

396.00

397.00

410.00

414.00

430.00

915.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2000

2012

2008

2008

2012

2012

2014

2010

1998

2012

2008

2008

2012

2012

2014

2010

12.49

8.15

0

10.867

4.1

12.612

8.31

3.205

15.278

4.8

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / NEW ROUTE(O)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / MATCHED FED FUNDS(O)

SAFETY / SAFETY(P)

NEW ROUTES / NEW ROUTE(O)

SAFETY / SAFETY(P)

SAFETY / SAFETY(P)

SAFETY / SAFETY(P)

0 .945

Milepoints:

Milepoints:

To:

To:

From:

From:

Page 76: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 76

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

REPLACE BRIDGE OVER HICKMAN CREEK AT BLACK BRIDGE ON KY 39 1.3 MI NOF KY 1268. (057B00002N)(SR=49.5)(EBRP)

CONSTRUCT A NEW 4 LANE CONNECTOR BETWEEN US-27 AND I-75.(08CCN)(12CCR)

ADDRESS GEOMETRIC AND SAFETY ISSUES AND FUTURE CONGESTIONMITIGATION ON KY 40 FROM 0.10 MILE WEST OF TEAYS BR. ROAD TO 0.10 MILEEAST OF TEAYS BR. ROAD.(12CCR)

REPLACE BRIDGE ON KY 40 OVER BRANCH OF LITTLE PAINT CREEK 0.38 MILENE OF JOHNSON/MAGOFFIN COUNTY LINE (SR 12.5) 058B00012N

CORRECT ROCKFALL HAZARD @ MP 1.80 TO 3.05. (04CCR)(10CCR)(12CCR)

TRANSPORTATION IMPROVEMENTS TO BRENT SPENCE BRIDGE. (2005HPP-KY154AND KY 143): (059B00046N) (THESE FUNDS WILL BE USED BY KYTC FORCONTINUED PROJECT DEVELOPMENT)

BRENT SPENCE BRIDGE RELOCATION PROJECT (ADDITIONAL PROJECTFUNDS)(10CCR)

BRENT SPENCE BRIDGE RELOCATION PROJECT.

.036

.300

1.250

JESSAMINE

JESSAMINE

JOHNSON

JOHNSON

JOHNSON

KENTON

KENTON

KENTON

KY-39

US-27

KY-40

KY-40

KY-321

I-75

I-75

I-75

$2,300,000

$13,000,000

$1,506,000

$1,575,000

$14,170,000

$22,260,437

$6,520,000

$12,480,000

Total

Total

Total

Total

Total

Total

Total

Total

D

R

U

C

R

U

D

R

U

R

U

C

R

U

C

C

C

R

U

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2019

2020

2020

2020

2017

2018

2015

2017

2017

2014

2014

2015

2014

2014

2015

2014

2014

2015

2015

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BRX

BRX

BRX

BRX

STP

STP

SPP

SPP

SPP

BRO

BRO

BRO

SPP

SPP

SPP

HPP

SB2

IM

IM

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$350,000

$100,000

$200,000

$1,650,000

$10,000,000

$3,000,000

$500,000

$496,000

$510,000

$400,000

$225,000

$950,000

$790,000

$780,000

$12,600,000

$22,260,437

$6,520,000

$7,400,000

$5,080,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

07

07

12

12

12

06

06

06

1136.00

8404.00

194.00

1114.00

5008.00

17.04

17.09

17.10

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

MADISON

07

07

12

12

12

06

06

06

1136.00

8404.00

194.00

1114.00

5008.00

17.04

17.09

17.10

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2014

2008

2012

2012

1998

2004

2010

2010

2014

2008

2012

2012

1998

2004

2010

2010

3.74

9.375

.372

1.8

191.277

191.277

191.277

3.776

9.575

.412

3.05

191.777

191.777

191.777

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / NEW ROUTE(O)

SAFETY / SAFETY(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

SAFETY / ROCKFALL MITIGTN(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / RELOCATION(O)

RELIABILITY / RELOCATION(O)

Milepoints: To:From:

Page 77: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 77

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

BRENT SPENCE BRIDGE RELOCATION PROJECT. (JOINT TOLLING PROJECT WITHODOT)

BRENT SPENCE BRIDGE RELOCATION PROJECT. (JOINT TOLLING PROJECT WITHODOT)

BRENT SPENCE BRIDGE RELOCATION PROJECT. (JOINT TOLLING PROJECT WITHODOT)

BRENT SPENCE BRIDGE RELOCATION PROJECT. (JOINT TOLLING PROJECT WITHODOT)

BRENT SPENCE BRIDGE RELOCATION PROJECT. (JOINT TOLLING PROJECT WITHODOT)

BRENT SPENCE BRIDGE RELOCATION PROJECT.

BRENT SPENCE BRIDGE RELOCATION PROJECT. (JOINT TOLLING PROJECT WITHODOT)

BRENT SPENCE BRIDGE RELOCATION PROJECT. (JOINT TOLLING PROJECT WITHODOT)

BRENT SPENCE BRIDGE RELOCATION PROJECT. (JOINT TOLLING PROJECT WITHODOT)

BRENT SPENCE BRIDGE RELOCATION PROJECT. (JOINT TOLLING PROJECT WITHODOT)

KENTON

KENTON

KENTON

KENTON

KENTON

KENTON

KENTON

KENTON

KENTON

KENTON

I-75

I-75

I-75

I-75

I-75

I-75

I-75

I-75

I-75

I-75

$99,999,999

$99,999,999

$99,999,999

$99,999,999

$78,200,000

$18,720,000

$99,999,999

$99,999,999

$99,999,999

$7,700,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

Total

C

C

C

C

C

R

U

C

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2016

2016

2016

2016

2016

2015

2015

2017

2017

2017

2017

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

IF

IF

IF

IF

IF

NH

NH

IF

IF

IF

IF

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$99,999,999

$99,999,999

$99,999,999

$99,999,999

$78,200,000

$11,130,000

$7,590,000

$99,999,999

$99,999,999

$99,999,999

$7,700,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

06

06

06

06

06

06

06

06

06

06

17.15

17.16

17.17

17.18

17.19

17.22

17.23

17.24

17.25

17.26

-

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

06

06

06

06

06

06

06

06

06

06

17.15

17.16

17.17

17.18

17.19

17.22

17.23

17.24

17.25

17.26

-

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2010

2010

2010

2012

2012

2014

2014

2014

2014

2014

2010

2010

2010

2012

2012

2014

2014

2014

2014

2014

191.277

191.277

191.277

191.277

191.277

191.277

191.277

191.277

191.277

191.277

191.777

191.777

191.777

191.777

191.777

191.777

191.777

191.777

191.777

191.777

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / RELOCATION(O)

RELIABILITY / RELOCATION(O)

RELIABILITY / RELOCATION(O)

RELIABILITY / RELOCATION(O)

RELIABILITY / RELOCATION(O)

RELIABILITY / RELOCATION(O)

RELIABILITY / RELOCATION(O)

RELIABILITY / RELOCATION(O)

RELIABILITY / RELOCATION(O)

RELIABILITY / RELOCATION(O)

Page 78: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 78

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

BRENT SPENCE BRIDGE RELOCATION PROJECT. (JOINT TOLLING PROJECT WITHODOT)

BRENT SPENCE BRIDGE RELOCATION PROJECT. (JOINT TOLLING PROJECT WITHODOT)

BRENT SPENCE BRIDGE RELOCATION PROJECT. (JOINT TOLLING PROJECT WITHODOT)

BRENT SPENCE BRIDGE RELOCATION PROJECT. (JOINT TOLLING PROJECT WITHODOT)

BRENT SPENCE BRIDGE RELOCATION PROJECT. (JOINT TOLLING PROJECT WITHODOT)

BRENT SPENCE BRIDGE RELOCATION PROJECT. (JOINT TOLLING PROJECT WITHODOT)

BRENT SPENCE BRIDGE RELOCATION PROJECT. (JOINT TOLLING PROJECT WITHODOT)

BRENT SPENCE BRIDGE RELOCATION PROJECT. (JOINT TOLLING PROJECT WITHODOT)

BRENT SPENCE BRIDGE RELOCATION PROJECT. (JOINT TOLLING PROJECT WITHODOT)

BRENT SPENCE BRIDGE RELOCATION PROJECT. (JOINT TOLLING PROJECT WITHODOT)

.500

.500

.500

.500

KENTON

KENTON

KENTON

KENTON

KENTON

KENTON

KENTON

KENTON

KENTON

KENTON

I-75

I-75

I-75

I-75

I-75

I-75

I-75

I-75

I-75

I-75

$99,999,999

$99,999,999

$99,999,999

$47,600,000

$99,999,999

$99,999,999

$99,999,999

$25,700,000

$99,999,999

$99,999,999

Total

Total

Total

Total

Total

Total

Total

Total

Total

Total

C

C

C

C

C

C

C

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2018

2018

2018

2018

2019

2019

2019

2019

2020

2020

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

IF

IF

IF

IF

IF

IF

IF

IF

IF

IF

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$99,999,999

$99,999,999

$99,999,999

$47,600,000

$99,999,999

$99,999,999

$99,999,999

$25,700,000

$99,999,999

$99,999,999

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

06

06

06

06

06

06

06

06

06

06

17.27

17.28

17.29

17.30

17.31

17.32

17.33

17.34

17.35

17.36

-

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

06

06

06

06

06

06

06

06

06

06

17.27

17.28

17.29

17.30

17.31

17.32

17.33

17.34

17.35

17.36

-

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2014

2014

2014

2014

2014

2014

2014

2014

2014

2014

2014

2014

2014

2014

2014

2014

2014

2014

2014

2014

191.277

191.277

191.277

191.277

191.277

191.277

191.277

191.277

191.277

191.277

191.777

191.777

191.777

191.777

191.777

191.777

191.777

191.777

191.777

191.777

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / RELOCATION(O)

RELIABILITY / RELOCATION(O)

RELIABILITY / RELOCATION(O)

RELIABILITY / RELOCATION(O)

RELIABILITY / RELOCATION(O)

RELIABILITY / RELOCATION(O)

RELIABILITY / RELOCATION(O)

RELIABILITY / RELOCATION(O)

RELIABILITY / RELOCATION(O)

RELIABILITY / RELOCATION(O)

Page 79: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 79

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

BRENT SPENCE BRIDGE RELOCATION PROJECT. (JOINT TOLLING PROJECT WITHODOT)

BRENT SPENCE BRIDGE RELOCATION PROJECT. (JOINT TOLLING PROJECT WITHODOT)

RECONSTRUCT KY-536 TO A 4 LANE URBAN SECTION FROM THE BOONE COUNTYLINE TO KY-17 (MP 0.0 TO MP 4.5). (00CCR)(04CCN)(06CCR)(2006BOPC)(PHASE IDESIGN SHOWN UNDER 6-162.00)(12CCR)

EXTEND THE SECOND EASTBOUND LANE OF THOMAS MORE PKWY FROMTURKEYFOOT RD TO CENTERVIEW BLVD. (2012BOP)

PAVEMENT AND SIDEWALK RESTORATION ALONG 6TH STREET FROM SCOTTSTREET TO RUSSELL STREET (1,400 FEET). ALSO SIDEWALK IMPROVEMENTS ONSCOTT STREET FROM 4TH STREET TO 6TH STREET (900 FEET). (2012BOP)

PHASE I MULTI-USE PATH ALONG BROMLEY CRESCENT SPRINGS RD FROMANDERSON ROAD TO AMSTERDAM ROAD. (2012BOP)

RESURFACING OF RUSSELL STREET FROM 6TH STREET TO 18TH STREET (5,600FEET).(2012BOP)

PEDESTRIAN/BICYCLE TRAIL THROUGH THE CITIES OF LUDLOW, COVINGTON,NEWPORT & BELLEVUE ALONG THE OHIO RIVER. (2012BOP)

INSTALLATION OF NEW TRAFFIC SIGNAL AT THOMAS MORE PKWY AND SOUTHLOOP ROAD, INCLUDING PEDESTRIAN SIGNALS. (2012BOP)

.500

.500

4.500

.510

.170

.275

.993

3.462

.010

KENTON

KENTON

KENTON

KENTON

KENTON

KENTON

KENTON

KENTON

KENTON

I-75

I-75

KY-536

CS-5555

CS-2215

CR-1316

CS-2093

KY-8

CS-4061

$99,999,999

$20,800,000

$26,210,000

$685,400

$1,382,948

$4,280,000

$142,890

$481,600

$113,640

Total

Total

Total

Total

Total

Total

Total

Total

Total

C

C

R

U

R

U

C

D

C

R

U

C

C

C

D

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2020

2020

2019

2020

2015

2015

2016

2014

2014

2016

2016

2017

2014

2015

2014

2016

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

IF

IF

STP

STP

SNK

SNK

SNK

SNK

SNK

SNK

SNK

SNK

SNK

SNK

SNK

SNK

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$99,999,999

$20,800,000

$22,050,000

$4,160,000

$117,400

$40,000

$528,000

$102,440

$1,280,508

$400,000

$800,000

$3,080,000

$142,890

$481,600

$11,240

$102,400

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

06

06

06

06

06

06

06

06

06

17.37

17.38

162.01

416.00

418.00

419.00

420.00

421.00

424.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

CAMPBELL

06

06

06

06

06

06

06

06

06

17.37

17.38

162.00

966.02

966.02

966.02

966.02

966.02

966.02

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2014

2014

2000

2012

2012

2012

2012

2012

2012

2014

2014

2000

2004

2004

2004

2004

2004

2004

191.277

191.277

0

0

0

0

.336

4.2

.35

191.777

191.777

4.476

.51

.17

.275

1.329

7.662

.36

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / RELOCATION(O)

RELIABILITY / RELOCATION(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

0 2.1Milepoints: To:From:

Page 80: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 80

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

RESURFACING AND STABILIZATION OF DUDLEY ROAD, BUS SHELTER FROMDIXIE HIGHWAY TO WINDING TRAILS DRIVE.

EDGEWOOD LED SIGNALS. INTERSECTIONS ALONG DUDLEY ROAD AND THOMASMORE PARKWAY. LPA PROJECT (2012BOP)

INSTALL GUARDRAIL ON KY 8 BEGINNING 1.22 MILES EAST OF KY 371 (MP 1.240)EXTENDING EAST TO 1.53 MILES EAST OF KY 371 (MP 1.550). (2012BOP)

WEST 15TH STREET; REPLACE BRIDGE AND APPROACHES OVER CSX RR INCOVINGTON (C29). (SR=3.9): (059C00029N)(12CCR)

EVALUATE BRIDGE ON KY-1120 (MP 0.621) OVER CSX RAILROAD; 11TH ST E OFRUSSELL ST; (STRUCTURALLY DEFICIENT, SR=3) 059B00083N

REPLACE BRIDGE ON PRUETT RD (KY 2045) OVER DECOURSEY CREEK AT JCTWITH MARSHALL RD (CS 1007)(SR 18.2) 059B00030N

INSTALL AN ADDITIONAL LANE WITHIN ROW ON KY-8 (4TH ST) INTERSECTINGWITH PHILADELPHIA ST IN COVINGTON. WORK WILL OCCUR ON 4TH ST WESTOF PHILADELPHIA ST TO CRESCENT ST. (2010BOPC)

ELIMINATION OF A TRAFFIC SIGNAL BY REALIGNING AN INTERSECTION ON US-25 (MAIN ST AT PIKE ST) ALLOWING FREE FLOW TRAFFIC IN COVINGTON(2010BOPC).

3.114

.310

.079

.100

.216

.200

KENTON

KENTON

KENTON

KENTON

KENTON

KENTON

KENTON

KENTON

CS-4128

-

KY-8

CS-2097

KY-1120

KY-2045

KY-8

US-25

$1,207,100

$50,960

$42,105

$1,890,000

$2,610,000

$600,000

$1,260,000

$760,000

Total

Total

Total

Total

Total

Total

Total

Total

C

C

C

R

U

C

R

U

C

R

U

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2014

2014

2014

2014

2014

2015

2014

2014

2015

2014

2014

2015

2014

2014

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SNK

SNK

SAF

BRZ

BRZ

BRZ

BRO

BRO

BRO

BRO

BRO

BRO

CM

CM

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$1,207,100

$50,960

$42,105

$210,000

$210,000

$1,470,000

$560,000

$550,000

$1,500,000

$50,000

$50,000

$500,000

$1,260,000

$760,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

06

06

06

06

06

06

06

06

426.00

701.00

922.00

1070.00

1075.00

1080.00

3703.00

3704.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

06

06

99

06

06

06

99

99

426.00

966.01

911.03

1070.00

1075.00

1080.00

219.09

219.09

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2014

2012

2012

2008

2010

2012

2010

2010

2014

2002

2008

2008

2010

2012

2004

2004

0

1.24

.144

.59

3.711

6.434

12.8

3.114

1.55

.223

.65

3.76

6.65

13

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / MATCHED FED FUNDS(O)

RELIABILITY / MATCHED FED FUNDS(O)

SAFETY / SAFETY-HAZARD ELIM(P)

SAFETY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / CONGESTION MITIGTN(O)

RELIABILITY / CONGESTION MITIGTN(O)

Page 81: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 81

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

RECONSTRUCT HANDS PIKE (KY 1501) FROM KY 17 TO CRYSTAL LAKEDRIVE.(12CCR)

GRIND AND RESURFACE MADISON AVENUE FROM 12TH STREET TO 16TH STREETIN COVINGTON. (08CCN)

RESURFACE MAIN STREET AND HIGHWATER ROAD IN BROMLEY.(08CCN)(12CCR)

IMPROVE INTERSECTION OF KY 1486 (MP 2.590) AND KY 2047, APPLICATION OFHIGH FRICTION SURFACE, SIGHT DISTANCE, DRAINAGE STRUCTUREIMPROVEMENT, DITCHING, SIGNING AND PAVEMENT MARKINGS. (2012BOP)

IMPROVEMENTS TO KY-550 IN HINDMAN; CONSTRUCT NEW BRIDGE OVERTROUBLESOME CREEK AT THE NEW ARTS AND CRAFTS COLLEGE @ KY 160.

REPLACE BRIDGE ON ROCKLICK BRANCH (CR 1008) OVER RIGHT FORK BEAVERCREEK AT JCT WITH SOUTH HIGHWAY 7 (KY 7)(SR 43.9) 060C00006N

REPLACE BRIDGE OVER RIGHT FORK TROUBLESOME CREEK ON FIELDWOODDRIVE (CS1016) IN HINDMAN (060C00060N)(SR=21.9)

HEMP PATCH BRANCH ROAD BRIDGE AND APPROACHES OVER CANEY CREEK(C1) (OFF NHS) (FD04) (2000BOP)(08CCR): (060C00001N)(12CCR)

1.032

.437

.232

.100

.061

.012

.016

KENTON

KENTON

KENTON

KENTON

KNOTT

KNOTT

KNOTT

KNOTT

KY-1501

CS-2103

CS-6504

KY-1486

CS-1012

CR-1008

CS-1016

CR-1002

$11,310,000

$175,000

$500,000

$260,000

$2,160,000

$1,000,000

$300,000

$590,000

Total

Total

Total

Total

Total

Total

Total

Total

R

U

C

C

C

R

U

C

R

C

R

U

C

D

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2014

2014

2015

2014

2014

2014

2014

2014

2014

2015

2015

2015

2017

2020

2014

2014

2015

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SPP

SPP

SP

SPP

SAF

SAF

SAF

SP

SP

BRZ

BRZ

BRZ

BRZ

SPP

SPP

SPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$2,760,000

$2,490,000

$6,060,000

$175,000

$500,000

$45,000

$15,000

$200,000

$530,000

$1,630,000

$75,000

$325,000

$600,000

$300,000

$30,000

$30,000

$530,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

06

06

06

06

12

12

12

12

8307.10

8402.00

8410.00

9005.00

283.40

1116.00

1124.00

4092.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

06

06

06

99

12

12

12

99

8307.00

8402.00

8410.00

911.01

283.00

1116.00

1124.00

335.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2006

2008

2008

2012

2000

2012

2014

2000

2006

2008

2008

2006

1998

2012

2014

1998

0

.338

0

2.5

0

0

.018

.043

1.032

.775

.232

2.6

.061

.04

.03

.059

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RESURFACING(P)

RELIABILITY / RESURFACING(P)

SAFETY / SAFETY-HAZARD ELIM(P)

SAFETY / SAFETY(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

Page 82: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 82

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

NEW CONSTRUCTION OF ONE MILE STRETCH OF KY-1231 BEGINNING AT BRIDGEAFTER LEAVING KY-550. (04CCN)(06CCR)(08CCR)(10CCR)(12CCR)

SPOT IMPROVEMENTS ON KY-1393 FROM KY-582 TO KY-899. (06CCN) (10CCR)

WIDENING OF KY-11 RAILROAD BRIDGE AT US-25E.(08CCR): (061B00068N)(12CCR)

MAJOR WIDENING - ADDRESS SAFETY AND CAPACITY ON US 25E FROM CORBINBYPASS TO KNOX/LAUREL COUNTY LINE. IMPROVE SAFETY ALONG CORRIDORBY PROVIDING IMPROVED ACCESS MANAGEMENT.(12CCR)

REPLACE BRIDGE AND APPROACHES ON KY-2418 OVER LITTLE RICHLANDCREEK(B01) 0.6 MILE SE OF US-25E. (SR=25.6): (061B00001N)(AR/W)

REPLACE BRIDGE ON KY-3437 (MP 1.639) OVER EAST FORK BIG INDIAN CREEK;.100 MILE WEST OF KY 1232 AT GRAY; (STRUCTURALLY DEFICIENT, SR=19.3)061B00086N(12CCR)

CONSTRUCT TURN LANES, SIDEWALKS, CURVE IMPROVEMENTS AND STORMDRAINAGE SYSTEM IMPROVEMENTS ALONG KY 1487(MANCHESTER STREET) ATTHE UNION COLLEGE CAMPUS IN BARBOURVILLE.(12CCR)

REPLACE STINKING CREEK ROAD BROWNS BRANCH BRIDGE.(12CCN)

RAISE KY-459 ABOVE FLOOD PLAIN FROM MP 4 TO MP 5, INCLUDING RAISINGTHE BULL RUN CREEK BRIDGE.(12CCN)

1.000

2.800

.100

1.976

.100

.100

.410

.044

1.000

KNOTT

KNOTT

KNOX

KNOX

KNOX

KNOX

KNOX

KNOX

KNOX

KY-1231

KY-1393

KY-11

US-25E

KY-2418

KY-3437

KY-1487

KY-223

KY-459

$4,660,000

$6,000,000

$2,110,000

$12,400,000

$760,000

$700,000

$2,610,000

$1,240,000

$1,500,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

C

C

C

R

U

C

U

C

C

R

U

C

R

U

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2014

2014

2014

2015

2015

2017

2014

2014

2014

2014

2014

2015

2014

2014

2015

2014

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SB2

SP

SPP

NH

NH

NH

BRX

BRX

BRX

SPP

SPP

SPP

BRX

BRX

BRX

SPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$4,660,000

$6,000,000

$2,110,000

$3,480,000

$1,920,000

$7,000,000

$70,000

$690,000

$700,000

$790,000

$340,000

$1,480,000

$300,000

$90,000

$850,000

$1,500,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

12

12

11

11

11

11

11

11

11

8200.00

8301.00

150.00

188.00

1077.00

1082.00

3004.00

8705.00

8712.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

12

12

11

11

11

11

11

11

11

8200.00

8301.00

150.00

188.00

1077.00

1082.00

3004.00

8705.00

8712.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2004

2006

2006

2012

2008

2010

2000

2012

2012

2004

2006

2006

2012

2008

2010

2000

2012

2012

6.982

0

9.94

24.221

.054

1.589

0

15.26

4

7.982

2.757

10.1

26.197

.094

1.689

.41

15.304

5

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / RESURFACING(P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / MAJOR WIDENING(O)

SAFETY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

SAFETY / SAFETY(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

SAFETY / SAFETY(P)

Page 83: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 83

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

RAISE KY-459 ABOVE FLOOD PLAIN FROM MP 3 TO MP 4.(12CCN)

INSTALL RAILROAD CROSSING GATES AT THE SCHOOL STREET CROSSING INARTEMUS.(12CCN)

TENN. STATE LINE-ELIZABETHTOWN; WIDEN TO 6 LANES FROM 0.7MI N OF KY224 TO 0.6MI N OF OLD SONORA ROAD. (NH SHARE)(AR/W)(U PHASE ADVANCEFROM 99-337.08)

TENN. STATE LINE-ELIZABETHTOWN; WIDEN TO 6 LANES FROM 0.7MI N OF KY224 TO 0.6MI N OF OLD SONORA ROAD. (NH SHARE)(AR/W)(U PHASE ADVANCEFROM 99-337.08) (ADDITIONAL FUNDING FOR C PHASE).(12CCR)

TENN. STATE LINE-ELIZABETHTOWN; WIDEN TO 6 LANES FROM 0.7MI N OF KY224 TO 0.6MI N OF OLD SONORA ROAD. (NH SHARE)(AR/W)(U PHASE ADVANCEFROM 99-337.08) (ADDITIONAL FUNDING FOR C PHASE). (12CCR)

REPLACE BRIDGE OVER SOUTH FORK BRANCH ON KY 61 0.5 MILE NORTH OF KY1906 (062B00010N) (SR=49.8)

SCOPING STUDY FOR REHABILITATION AND IMPROVEMENTS PLANNING FOR KY222. (08CCN)

US-25 CONGESTION RELIEF; WIDEN US-25 TO 5 LANES FROM KY-1006 TO KY-2069,CONSTRUCT A CONNECTOR FROM US-25 TO KY-229, IMPROVE KY-229 UP TO KY-192 AND CONSTRUCT A BACK ENTRANCE TO THE SCHOOL FROM KY-192BYPASS.(06CCR)(10CCR)(12CCR)

1.000

.050

5.600

5.600

5.600

.008

.500

KNOX

KNOX

LARUE

LARUE

LARUE

LARUE

LARUE

LAUREL

KY-459

CR-1168L

I-65

I-65

I-65

KY-61

KY-222

US-25

$700,000

$175,000

$23,200,000

$34,800,000

$20,000,000

$485,000

$200,000

$35,140,000

Total

Total

Total

Total

Total

Total

Total

Total

C

D

C

C

C

D

R

U

C

P

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2014

2014

2015

2016

2017

2017

2019

2019

2020

2014

2014

2014

2016

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SAF

IM

NH

NH

BRX

BRX

BRX

BRX

SP

SPP

SPP

SPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$700,000

$175,000

$23,200,000

$34,800,000

$20,000,000

$100,000

$50,000

$100,000

$235,000

$200,000

$12,180,000

$1,880,000

$21,080,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

11

11

04

04

04

04

04

11

8713.00

8714.00

17.00

17.01

17.02

1087.00

8505.00

147.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

HARDIN

HARDIN

HARDIN

11

11

04

04

04

04

04

11

8713.00

8714.00

17.00

17.00

17.00

1087.00

8505.00

147.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2012

2012

2012

2012

2014

2014

2008

2006

2012

2012

2012

2012

2012

2014

2008

2006

3

0

76.6

76.6

76.6

1.504

9.028

4

.05

78.661

78.661

78.661

1.512

9.53

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

SAFETY / SAFETY(P)

SAFETY / SAFETY-RR PROTECTN(P)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / SCOPING STUDY(O)

RELIABILITY / MAJOR WIDENING(O)

78.661

78.661

78.661

82.2

82.2

82.2

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

From:

From:

From:

Page 84: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 84

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

CONSTRUCT A BACK ENTRANCE TO SOUTH LAUREL HIGH SCHOOL WITHCONNECTIONS TO KY 192 AND KY 363. (06CCR)(2006BOPC).(10CCR)

MAJOR WIDENING - ADDRESS SAFETY, CAPACITY, AND ACCESS MANAGEMENTON US 25E FROM KNOX/LAUREL COUNTY LINE TO KY 770(12CCR)

MAJOR WIDENING FROM KY 1006 TO US 25 IN LONDON. THE PROPOSEDWIDENING WILL INCREASE CAPACITY, IMPROVE FREIGHT MOVEMENT, SAFETYAND PROVIDE ACCESS MANAGEMENT. (12CCR)

CONSTRUCT A ROUNDABOUT ON KY-363 AT KY-1006. (06CCR)

REPLACE BRIDGE ON KY-578 (MP 5.154) OVER RACCOON CREEK; .10 MI W OF W-JCT KY 638; (STRUCTURALLY DEFICIENT, SR=24.9) 063B00069N

REPLACE NORTHBOUND BRIDGE ON I-75 OVER LAUREL RIVER 1.8 MILES N OF US25E EXIT (SR 43.2) 063B00043R

REPLACE BRIDGE ON DOG BRANCH MAIL RD (CR 1862) OVER SINKING CREEK0.56 MILE NW OF SINKING CREEK RD (FD 781)(SR 13.8) 063C00025N

.500

2.024

1.565

.200

.100

LAUREL

LAUREL

LAUREL

LAUREL

LAUREL

LAUREL

LAUREL

US-25

US-25E

KY-192

KY-363

KY-578

I-75

CR-1862

$6,310,000

$14,730,000

$19,100,000

$1,460,000

$1,515,000

$5,025,000

$1,350,000

Total

Total

Total

Total

Total

Total

Total

R

U

C

R

U

C

R

U

C

C

R

U

C

D

U

C

D

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2014

2014

2015

2014

2015

2017

2014

2015

2016

2014

2014

2015

2016

2015

2016

2018

2014

2015

2015

2017

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SPP

SPP

NH

NH

NH

SPP

SPP

SPP

SAF

BRX

BRX

BRX

BRO

BRO

BRO

BRZ

BRZ

BRZ

BRZ

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$1,510,000

$150,000

$4,650,000

$3,000,000

$2,480,000

$9,250,000

$2,100,000

$2,000,000

$15,000,000

$1,460,000

$175,000

$200,000

$1,140,000

$600,000

$175,000

$4,250,000

$250,000

$50,000

$50,000

$1,000,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

11

11

11

11

11

11

11

147.10

185.00

187.00

904.01

1080.00

1086.00

1094.00

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

11

11

11

11

11

11

11

147.00

185.00

187.00

904.00

1080.00

1086.00

1094.00

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2006

2012

2012

2004

2010

2012

2012

2006

2012

2012

2000

2010

2012

2012

0

18.505

9.1

5.269

30.553

1.071

2.024

20.07

9.3

5.309

30.643

1.111

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / NEW ROUTE(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / MAJOR WIDENING(O)

SAFETY / SAFETY-HAZARD ELIM(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

Page 85: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 85

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

REPLACE BRIDGE OVER CRAIG CREEK ON KY 312 1.8 MILE SE OF KY 192.(063B00053N)(SR=49.4)

INCREASE CAPACITY OF THE ROBINSON CREEK BRIDGE ON US-25 AT MILEPOST3.28. (06CCN): (063B00024N)(10CCR)

CONSTRUCTION OF A FRONTAGE ROAD ALONG I-75 BETWEEN EXITS 38 AND 41AT LONDON (FUNDS TO SUPPLEMENT PROJECT NUMBER 11-139) (PRIORITYSECTION: FROM KY 80 TO KY 3432) (SEE 8-8514.10 AND 8-8514.20 FOR ADDITIONALSECTIONS) (08CCN)

CONSTRUCTION OF I-75 FRONTAGE ROAD FROM KY 3432 TO 5TH STREET (SEE 8-8514.10 AND 8-8514.00 FOR ADDITIONAL SECTIONS) (08CCN)

CONSTRUCT A NEW ROADWAY TO CONNECT BETWEEN KY 3215 TO KY 1185 ATYATESVILLE LAKE. (12CCR)

IMPROVE SIGHT DISTANCE ON KY 2565 AND ELIMINATE DEAD MAN'S CURVE.(12CCR)

RECONSTRUCT THE KY 2565/KY 2563/CR 1519 INTERSECTION NEAR LOUISA.(12CCR)

REPLACE BRIDGE ON PR-1116 (MP 0.015) OVER ROCKCASTLE CREEK; .034 MI WJCT KY 3; (STRUCTURALLY DEFICIENT, SR=18.4) 064C00073N (AR/W)

.020

.100

.150

.200

.100

LAUREL

LAUREL

LAUREL

LAUREL

LAWRENCE

LAWRENCE

LAWRENCE

LAWRENCE

KY-312

US-25

KY-80

KY-80

KY-3215

KY-2565

KY-2565

PR-1116

$325,000

$7,250,000

$10,875,000

$3,130,000

$23,470,000

$1,845,000

$2,830,000

$640,000

Total

Total

Total

Total

Total

Total

Total

Total

D

R

U

C

R

U

C

R

R

U

C

R

U

C

R

U

C

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2019

2014

2014

2015

2014

2014

2015

2014

2014

2014

2015

2014

2014

2015

2014

2014

2015

2014

2016

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BRX

SP

SP

SP

SB2

SB2

SB2

SB2

SPP

SPP

SP

SPP

SPP

SPP

SPP

SPP

SPP

BRZ

BRZ

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$325,000

$1,650,000

$170,000

$5,430,000

$4,500,000

$975,000

$5,400,000

$3,130,000

$250,000

$500,000

$22,720,000

$160,000

$420,000

$1,265,000

$380,000

$570,000

$1,880,000

$90,000

$550,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

11

11

11

11

12

12

12

12

1096.00

8305.00

8514.00

8514.20

3.00

193.00

196.00

1106.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

11

11

11

11

12

12

12

12

1096.00

8305.00

8514.00

8514.00

3.00

193.00

196.00

1106.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2014

2006

2008

2008

1996

2012

2012

2010

2014

2006

2008

2008

1996

2012

2012

2010

1.737

3.299

3.2

2.033

0

1.757

3.326

3.35

2.233

.1

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REHAB(P)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

Page 86: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 86

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

REPLACE BRIDGE ON MATTIE RD (CR 1202) OVER RIGHT FORK OF LITTLE BLAIN0.38 MILE W OF ASH BRANCH RD (CR 1161)(SR 47) 064C00011N

SIGHT DISTANCE IMPROVEMENTS ON KY-581 FROM KY-645, EXTENDING SOUTH2000' TOWARDS PAINTSVILLE. (02CCNFD04)

REPLACE THE GEORGES CREEK BRIDGE.(12CCN)

I-75 TO MOUNTAIN PARKWAY; RECONSTRUCT KY-11 FROM KY-30 AT LEVI INOWSLEY COUNTY TO 0.5 MILE SOUTH OF KY-587 IN LEE COUNTY. (06CCR)(10CCR)

REPLACE BRIDGE ON CR-1224 (MP 0.102) OVER ELK LICK BR-ELK CK; .1 MI-W JCTCR 5212; (FUNCTIONALLY OBSOLETE, SR=21.9) 065C00023N

REPLACE BRIDGE ON SILVER CREEK RD (CS 1005) OVER SILVER CREEK 0.06 MILEN OF WADE RD (CS 1011)(SR 20.5) 065C00025N

CONSTRUCT HYDEN BYPASS FROM LESLIE COUNTY HIGH SCHOOL TO HYDENSPUR (KY-118).(00CCR) (04CCN)(10CCR)

REPLACE BRIDGE AND APPROACHES ON CR-1214 OVER BEECH FORK (C24).(SR=6.0)(PROJECT FUNDING CONTINGENT UPON BRIDGE POSTING COMPLIANCE):(066C00024N)

.400

4.200

.100

.040

2.100

.100

LAWRENCE

LAWRENCE

LAWRENCE

LEE

LEE

LEE

LESLIE

LESLIE

CR-1202

KY-581

KY-581

KY-11

CR-1224

CS-1005

US-421

CR-1214

$800,000

$640,000

$840,000

$22,620,000

$240,000

$620,000

$4,230,000

$820,000

Total

Total

Total

Total

Total

Total

Total

Total

D

R

U

C

R

U

C

R

C

C

U

C

R

U

C

R

U

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2015

2016

2016

2018

2014

2014

2015

2014

2014

2016

2014

2016

2014

2014

2015

2014

2014

2014

2014

2015

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BRZ

BRZ

BRZ

BRZ

SP

SP

SP

SPP

SPP

SP

BRZ

BRZ

BRZ

BRZ

BRZ

SP

SP

BRZ

BRZ

BRZ

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$300,000

$75,000

$75,000

$350,000

$110,000

$60,000

$470,000

$40,000

$800,000

$22,620,000

$20,000

$220,000

$50,000

$50,000

$520,000

$3,630,000

$600,000

$230,000

$120,000

$470,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

12

12

12

10

10

10

11

11

1118.00

8117.00

8701.00

292.10

1091.00

1106.00

12.00

1067.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

OWSLEY

12

12

12

10

10

10

11

11

1118.00

8117.00

8701.00

292.00

1091.00

1106.00

12.00

1067.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2012

2002

2012

2004

2010

2012

1996

2004

2012

2002

2012

1996

2010

2012

1996

2004

.844

4.815

9.45

0

.052

.167

.024

.884

5.194

9.55

1.082

.152

.207

.064

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / BRIDGE REPLACEMENT(P)

SAFETY / SAFETY(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

14.343 17.444Milepoints: To:From:

Page 87: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 87

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

REPLACE BRIDGE AND APPROACHES ON US-421 OVER STINNET CREEK (B08) 0.028MILE SOUTH OF KY-406 NEAR STINNETT.(SR=26.0) (10CCR)

REPLACE BRIDGE ON KY 80 OVER CUTSHIN CREEK AT INTERSECTION WITHBUSY HOLLOW DR (CR 1063)(SR 30) 066B00002N

REPLACE BRIDGE OVER MUNCY CREEK ON US 421 0.5 MILE SOUTH OF TAYLORMORGAN ROAD (CR 1090).(066B00006N)(SR=31.5)

REPLACE BRIDGE OVER GREASY CREEK ON ELK ROAD (CR 1138) AT JCT WITHKY 2009 (066C00019N)(SR=2) (EBRP)

REPLACE BRIDGE OVER WOLF CREEK ON COON CREEK ROAD (CR 1528) AT JCTWITH KY 3427 (066C00039N) (SR=30.1) (EBRP)

LANDSLIDE REPAIR ON US-421 FROM 0.2 MILE SOUTH JCT. KY-406 AT STINNETTNORTH 1.0 MILE. (2002BOPC) (10CCR)(ADDITIONAL FUNDS FROM ITEM NO. 11-8707R,U,C)

CONSTRUCT A NEW APPROACH FROM KY-1482 ONTO THE HAL ROGERSPARKWAY AT MP 39. (08CCN)(10CCR)(2011BOPP)

.100

.014

.020

.012

1.000

LESLIE

LESLIE

LESLIE

LESLIE

LESLIE

LESLIE

LESLIE

US-421

KY-80

US-421

CR-1138

CR-1528

US-421

KY-1482

$4,000,000

$2,106,000

$1,225,000

$930,000

$175,000

$11,400,000

$3,340,000

Total

Total

Total

Total

Total

Total

Total

R

U

C

R

U

C

D

R

U

C

D

R

U

C

D

R

U

C

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2016

2018

2019

2014

2014

2015

2017

2019

2019

2020

2015

2016

2016

2016

2020

2014

2014

2015

2015

2015

2016

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BRO

BRO

BRO

BRO

BRO

BRO

BRX

BRX

BRX

BRX

BRZ

BRZ

BRZ

BRZ

BRZ

SPP

SPP

SPP

SB2

SB2

SB2

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$890,000

$180,000

$2,930,000

$250,000

$175,000

$1,681,000

$350,000

$100,000

$75,000

$700,000

$250,000

$30,000

$50,000

$600,000

$175,000

$2,970,000

$630,000

$7,800,000

$920,000

$420,000

$2,000,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

11

11

11

11

11

11

11

1078.00

1089.00

1095.00

1098.00

1100.00

5010.00

8516.00

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

11

11

11

11

11

99

11

1078.00

1089.00

1095.00

1098.00

1100.00

5006.00

8516.00

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2008

2012

2014

2014

2014

2002

2008

2008

2012

2014

2014

2014

1998

2008

15.137

5.142

18.423

0

0

15

.09

15.177

5.182

18.437

.02

.012

16

.19

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / LANDSLIDE REPAIR(P)

RELIABILITY / NEW ROUTE(O)

Page 88: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 88

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

CONSTRUCT A NEW APPROACH FROM KY-6272 ONTO THE HAL ROGERSPARKWAY AT MP 42.7. (08CCN)(10CCR)

WIDEN KY 118 TO PROVIDE LEFT AND RIGHT TURN LANES ONTO DENTONROAD.(12CCN)

PERFORM DESIGN STUDY TO DETERMINE LOGICAL APPROACH TO IMPROVINGUS 119 BETWEEN WHITESBURG AND US 23.

HARLAN-WHITESBURG; PINE MOUNTAIN; PARTRIDGE TO OVEN FORK(SURFACING FOR SECTIONS 2 AND 3); US-119 RELOCATION FROM 1000 FEET WESTJCT. KY-3404 TO 0.1 MILE WEST OF BROWN BRANCH. (F16)(2004BOPC)(CONSTRUCTION SEQUENCE 5)

HARLAN-WHITESBURG; PINE MOUNTAIN; PARTRIDGE TO OVEN FORK SECTION4; US-119 RELOCATION FROM 0.1 MI WEST OF BROWN BRANCH TO 0.15 MI WESTOF KY-806 AT OVEN FORK INCLUDING APPROACH TO EXISTING US-119. (F16)(2004BOPC)(CONST. SEQUENCE 4)(GRADE, DRAIN AND SURF)

RECONSTRUCTION OF US-119 FROM 0.15 MILE WEST OF KY-806 TO KY-932.2012BOP

PACIES BRANCH ROAD; REPLACE BRIDGE AND APPROACHES OVER KINGSCREEK (C27) 0.05 MILE NW OF KY-160. (SR=2.0): (067C00027N)

REPLACE BRIDGE AND APPROACHES ON KY-343 OVER WRIGHT FORK (B79) 50FEET NE OF HAYMOND HILL ROAD. (SR=3.0): (067B00079N)

ISOM RACE TRACK ROAD; REPLACE BRIDGE OVER ROCKHOUSE CREEK (C35)0.05 MILE SE OF KY-7. (SR=5.0): (067C00035N)

.200

10.917

4.250

1.550

1.600

.100

.100

.100

LESLIE

LESLIE

LETCHER

LETCHER

LETCHER

LETCHER

LETCHER

LETCHER

LETCHER

KY-6272

KY-118

US-119

US-119

US-119

US-119

CR-1245

KY-343

CR-1391

$638,300

$1,525,000

$1,000,000

$11,250,000

$35,700,000

$38,300,000

$550,000

$670,000

$900,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

C

R

U

C

D

C

C

D

R

U

C

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2014

2014

2014

2015

2015

2020

2018

2016

2018

2019

2020

2014

2014

2014

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPB

SPP

SPP

SPP

SPP

APD

APD

APD

APD

APD

APD

BRZ

BRX

BRZ

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$638,300

$15,000

$150,000

$1,360,000

$1,000,000

$11,250,000

$35,700,000

$1,500,000

$2,500,000

$300,000

$34,000,000

$550,000

$670,000

$900,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

11

11

12

12

12

12

12

12

12

8518.00

8708.00

199.00

311.39

311.77

311.80

1091.00

1094.00

1096.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

11

11

12

12

12

12

12

12

12

8518.00

8708.00

199.00

311.30

311.30

311.77

1091.00

1094.00

1096.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2008

2012

2014

2004

2004

2014

2008

2008

2008

2008

2012

2014

2000

2000

2004

2008

2008

2008

0

2

17.005

8.6

.034

.622

.041

.1

2.2

27.922

10.2

.074

.662

.081

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / NEW ROUTE(O)

RELIABILITY / MINOR WIDENING(O)

RELIABILITY / SCOPING STUDY(O)

RELIABILITY / RELOCATION(O)

RELIABILITY / RELOCATION(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

Page 89: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 89

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

REPLACE BRIDGE AND APPROACHES ON KY-343 OVER WRIGHT FORK (B15) 30FEET EAST OF MASTERS DRIVE. (SR=7.0): (067B00015N)

REPLACE BRIDGE ON CS-2026 OVER (MP 0.032) ELKHORN CREEK; AT EASTJENKINS; (STRUCTURALLY DEFICIENT, SR=13) 067C00058N

REPLACE BRIDGE ON CR-1841 (MP 0.015) OVER NORTH FORK KY RIVER; 1 MI NJCT KY 1862; (STRUCTURALLY DEFICIENT, SR=15.7) 067C00063N (AR/W)

REPLACE BRIDGE ON KY 2034C OVER N FORK KY RIVER 0.02 E OF US 119(SR 42.7)067B00121N

REPLACE BRIDGE ON STEEL BRIDGE RD (CR 1359Q4) OVER NORTH FORK OFKENTUCKY RIVER AT JCT WITH HIGHWAY 7 (KY 7)(SR 24) C00080N

REPLACE BRIDGE OVER POOR FORK OF CUMBERLAND RIVER ON KY 3404 100 FTSOUTH OF US 119. (067B00114N)(SR=11.7)

IMPROVE THE EXISTING ROADWAY TO MEET CURRENT STANDARDS ANDIMPROVE CONGESTION INTO AND OUT OF JENKINS BETWEEN MP 8.741 AND MP9.247.(12CCN)

PERFORM DESIGN STUDY TO DETERMINE LOGICAL SEQUENCE OF PRACTICALIMPROVEMENTS TO UPGRADE KY 59/KY 344/KY 377 CONNECTION BETWEENVANCEBURG AND MOREHEAD.

.100

.100

.100

.040

.012

.506

LETCHER

LETCHER

LETCHER

LETCHER

LETCHER

LETCHER

LETCHER

LEWIS

KY-343

CS-2026

CR-1841

KY-2034C

CR-1359Q4

KY-3404

KY-805

KY-59

$680,000

$520,000

$505,000

$1,895,000

$1,175,000

$875,000

$8,160,000

$1,000,000

Total

Total

Total

Total

Total

Total

Total

Total

C

R

U

C

U

C

R

U

C

R

U

C

D

R

U

C

R

U

C

D

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2014

2014

2014

2016

2014

2016

2015

2015

2017

2014

2014

2015

2017

2019

2019

2020

2014

2014

2015

2015

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BRX

BRZ

BRZ

BRZ

BRZ

BRZ

BRO

BRO

BRO

BRZ

BRZ

BRZ

BRX

BRX

BRX

BRX

SPP

SPP

SPP

SPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$680,000

$100,000

$120,000

$300,000

$75,000

$430,000

$420,000

$125,000

$1,350,000

$250,000

$50,000

$875,000

$275,000

$75,000

$75,000

$450,000

$1,580,000

$520,000

$6,060,000

$1,000,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

12

12

12

12

12

12

12

09

1097.00

1107.00

1108.00

1113.00

1117.00

1120.00

8702.00

231.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

ROWAN

12

12

12

12

12

12

12

09

1097.00

1107.00

1108.00

1113.00

1117.00

1120.00

8702.00

231.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2008

2010

2010

2012

2012

2014

2012

2014

2008

2010

2010

2012

2012

2014

2012

2014

1.604

0

0

.006

.002

.782

8.741

1.644

.1

.1

.046

.042

.794

9.247

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / CONGESTION MITIGTN(O)

Milepoints: To:From:

Page 90: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 90

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

RECONSTRUCT THE INTERSECTION OF KY 10 AND KY 1306.

REPLACE BRIDGE ON KY 8 OVER KINNICONNICK CREEK 0.094 MILE W OFDUDLEY AVE (CR-1031A) (SR 26.5) 068B00003N

REPLACE BRIDGE ON BROWNS RUN RD (CR 1338) OVER CABIN CREEK 0.03 MILESW OF CABIN CREEK RD (CR 1333)(SR 2) 068C00036N

REPLACE BRIDGE OVER LAUREL FORK ON KY 1068 30 FT S OF DEEP HOLEBRANCH ROAD (CR 1125).(068B00057N)(SR=60.1)

CONSTRUCT A NEW BRIDGE CROSSING THE NORTH FORK OF THE LICKINGRIVER AT THE LEWIS-FLEMING COUNTY LINE. (08CCN): (068B00027N)

CONTINUE ONGOING IMPROVEMENTS TO US-27 CORRIDOR FROM SOMERSET TOLEXINGTON. IMPROVE LEVEL OF SERVICE AND SAFETY ON US-27 FROM KY-1247TO EDUCATION WAY.

WIDEN US-27 FROM KY-590 TO BELL STREET IN STANFORD (MP 18.2 TO MP 18.9).(INCLUDES NEW GOSHEN CUT-OFF ROAD)(2005HPP-KY115)

RELOCATE A SHORT SECTION OF GOSHEN ROAD FROM ITS EXISTINGINTERSECTION WITH US 27 TO A NEW LOCATION OPPOSITE THE EXISTING WAL-MART SIGNAL.

.160

.074

.040

.020

4.712

.700

LEWIS

LEWIS

LEWIS

LEWIS

LEWIS

LINCOLN

LINCOLN

LINCOLN

KY-10

KY-8

CR-1338

KY-1068

KY-57

US-27

US-27

CR-1071

$500,000

$3,300,000

$470,000

$500,000

$6,200,000

$2,100,000

$10,439,839

$850,000

Total

Total

Total

Total

Total

Total

Total

Total

C

R

U

C

R

U

C

D

D

C

D

D

R

U

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2015

2015

2015

2018

2014

2014

2015

2019

2014

2015

2016

2014

2018

2019

2020

2014

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

BRO

BRO

BRO

BRZ

BRZ

BRZ

BRX

SPP

SPP

NH

HPP

NH

NH

NH

SP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$500,000

$150,000

$150,000

$3,000,000

$60,000

$10,000

$400,000

$500,000

$1,000,000

$5,200,000

$2,100,000

$1,439,839

$1,400,000

$1,100,000

$6,500,000

$850,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

09

09

09

09

09

08

08

08

232.00

1082.00

1085.00

1090.00

8507.00

167.00

196.00

395.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

FLEMING

09

09

09

09

09

08

08

08

232.00

1082.00

1085.00

1090.00

8507.00

167.00

196.00

395.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2014

2012

2012

2014

2008

2012

2014

2012

2014

2012

2012

2014

2008

2012

2014

2012

12

22.563

.025

1.74

0

11.169

18.2

12.16

22.637

.065

1.76

.031

15.881

18.9

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

SAFETY / SAFETY(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / NEW ROUTE(O)

8.952 9.012Milepoints: To:From:

Page 91: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 91

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

REPLACE BRIDGE ON KY-78 (MP 11.216) OVER PEVYHOUSE BRANCH; .30 MI WESTOF JCT KY 300; (STRUCTURALLY DEFICIENT, SR=43.3) 069B00027N (AR/W)

REPLACE BRIDGE ON KY 1247 OVER ST. ASAPH CREEK 0.044 S OF KY 78(SR 45.4)069B00055N

PADUCAH-HENDERSON; RELOCATION OF US-60 FROM APPROX. 0.8 MILE EAST OFTENN. RIVER BRIDGE TO 0.5 MILE EAST OF RUDD-SPEES ROAD (00CCR)(12CCR)

REPLACE BRIDGE AND APPROACHES ON KY-453 OVER ECHO SPRING BRANCH(B29) 0.177 MILE NW OF COON CHAPEL ROAD. (SR=12.5)(08CCR): (070B00029N)

REPLACE BRIDGE ON US 60 OVER THE CUMBERLAND RIVER 0.27 MILE N OF KY 70(SR 32.7) 070B00017N.

REPLACE BRIDGE ON US 60 OVER THE CUMBERLAND RIVER 0.27 MILE N OF KY 70(SR 32.7) 070B00017N (ADDITIONAL FUNDING FOR C PHASE)

REPLACE BRIDGE ON KY 866 OVER FORK OF GUM CREEK 0.02 MILE N OF KY1664(SR 28.1)070B00050N

RUSSELLVILLE SOUTHERN BYPASS. (12CCR)

.040

3.300

.100

.344

.344

.040

4.000

LINCOLN

LINCOLN

LIVINGSTON

LIVINGSTON

LIVINGSTON

LIVINGSTON

LIVINGSTON

LOGAN

KY-78

KY-1247

US-60

KY-453

US-60

US-60

KY-866

-

$410,000

$1,280,000

$25,740,000

$1,880,000

$24,250,000

$23,000,000

$600,000

$19,300,000

Total

Total

Total

Total

Total

Total

Total

Total

U

C

R

U

C

C

C

D

R

U

C

C

R

U

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2014

2014

2015

2015

2016

2016

2014

2014

2016

2016

2019

2020

2014

2014

2015

2016

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BRO

BRO

BRO

BRO

BRO

SPP

BRX

BRO

BRO

BRO

BRO

BRO

BRO

BRO

BRO

SPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$60,000

$350,000

$120,000

$350,000

$810,000

$25,740,000

$1,880,000

$1,600,000

$300,000

$350,000

$22,000,000

$23,000,000

$100,000

$100,000

$400,000

$19,300,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

08

08

01

01

01

01

01

03

1049.00

1055.00

330.00

1059.00

1142.00

1142.01

1145.00

311.10

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

08

08

01

01

01

01

01

03

1049.00

1055.00

330.00

1059.00

1142.00

1142.00

1145.00

311.01

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2010

2012

1998

2008

2012

2012

2012

2002

2010

2012

1998

2008

2012

2012

2012

1998

11.166

17.67

14.133

12.524

12.524

.022

11.266

17.71

14.197

12.868

12.868

.062

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / RELOCATION(O)

SAFETY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / NEW ROUTE(O)

Page 92: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 92

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

RECONSTRUCT KY-79 AT MOTTS LICK CREEK (DAVENPORT HILL) NORTHEASTOF RUSSELLVILLE INCLUDING BRIDGE REPLACEMENT (B09). (2004BOPC):(071B00009N)(10CCR)(12CCR)

REPLACE BRIDGE ON KY-664 (MP 3.298) OVER PLEASANT RUN CREEK; 2.3 MI N.W.OF JCT KY 663; (STRUCTURALLY DEFICIENT, SR=29.8) 071B00040N

REPLACE BRIDGE ON KY 2146 OVER TOWN BRANCH 0.1 MILE W OF KY 3519(SR49.3) 071B00067N

REPLACE BRIDGE ON KY 663 OVER PLEASANT RUN CREEK 2.099 MILES S OF KY100(SR 49.1) 071B00057N

REPLACE BRIDGE ON LOGAN MILL RD (CR 1249) OVER RED RIVER 0.78 MILE SEOF ORNDORFF MILL RD (KY 96)(SR 25.3)071C00023N

RECONSTRUCT/RELOCATE AND CONTINUE FOUR-LANING OF US-431 FROMAPPROXIMATELY 1.5 MILES NORTH OF KY-106 EAST (NORTH OF LEWISBURG) TOWK-9001/WENDELL FORD WESTERN KENTUCKY PARKWAY. (06CCN)

RELOCATION OF PRIORITY SECTION OF US 641 BETWEEN US 62 AND US 641NORTH OF FREDONIA.(06CCN)

.670

.100

.040

.040

22.529

2.000

LOGAN

LOGAN

LOGAN

LOGAN

LOGAN

LOGAN

LYON

KY-79

KY-664

KY-2146

KY-663

CR-1249

US-431

US-641

$3,550,000

$595,000

$500,000

$325,000

$810,000

$2,600,000

$29,000,000

Total

Total

Total

Total

Total

Total

Total

C

R

U

C

R

U

C

R

U

C

R

U

C

D

D

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2014

2014

2014

2016

2015

2015

2016

2015

2015

2016

2014

2014

2016

2014

2016

2018

2019

2020

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

BRX

BRX

BRX

BRO

BRO

BRO

BRO

BRO

BRO

BRZ

BRZ

BRZ

SP

SPP

SPP

SPP

SPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$3,550,000

$65,000

$70,000

$460,000

$80,000

$70,000

$350,000

$50,000

$75,000

$200,000

$70,000

$190,000

$550,000

$2,600,000

$1,500,000

$5,000,000

$2,500,000

$20,000,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

03

03

03

03

03

03

01

1068.00

1073.00

1078.00

1079.00

1083.00

8309.00

187.50

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

MUHLENBERG

CALDWELL

99

03

03

03

03

03

01

86.09

1073.00

1078.00

1079.00

1083.00

8309.00

187.50

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2004

2010

2012

2012

2012

2006

2006

2000

2010

2012

2012

2012

2006

2006

6.3

3.248

.609

8.52

.786

26.871

6.97

3.348

.649

8.56

.826

32.15

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REHAB(P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RELOCATION(O)

0 17.25Milepoints:

Milepoints:

To:

To:

From:

From:

Page 93: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 93

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

UPGRADE KY 93/RIVERPORT ROAD INTERSECTION.

CONSTRUCT 4-LANE BEREA BYPASS SECTION 2; FROM 150' EAST OF US-25, SE TOKY-21. (2004BOPC)(08CCR)(12CCR)

RELOCATE AND/OR REALIGN KY-52 FROM WALLACE MILL ROAD TOINTERSTATE 75 AT THE DUNCANNON ROAD INTERCHANGE. (02CCR)(12CCN)

COMPREHENSIVE TRAFFIC STUDY FOR INTERSECTION OF MAIN STREET ANDBEREA COLLEGE CAMPUS, BEREA. (2005HPP-KY112)(MOA WITH BEREA).

IMPROVE PROSPECT STREET PEDESTRIAN ACCESS, BEREA. (SEE 7-8503.00 FOR"STP" FUNDS)(2005HPP-KY128)(MOA WITH BEREA)

WIDEN US-25 FROM US-421 NORTH TO KY-876. STATE TO PROVIDE DESIGN ANDPLANS, AND FUNDS FOR THIS PROJECT ARE REQUESTED TO BE PAID TO THEMADISON COUNTY FISCAL COURT, WHICH SHALL COORDINATE THE PROJECT.(2005HPP-KY110)(06CCR)

PRIORITY SECTION II: WIDEN US-25 TO 3 LANES FROM US 421 TO PUMPKIN RUN.(2006BOPC)(08CCR)(10CCR)(12CCR)

REPLACE BRIDGE ON KY 3376 OVER HAYS FORK 0.048 SOUTH OF US 421 (SR 23.1)076B00086N.

.200

3.600

3.020

.074

3.500

2.980

.040

LYON

MADISON

MADISON

MADISON

MADISON

MADISON

MADISON

MADISON

KY-93

-

KY-52

KY-595

KY-21

US-25

US-25

KY-3376

$2,225,000

$17,530,000

$27,480,000

$431,951

$215,463

$719,920

$19,690,000

$950,000

Total

Total

Total

Total

Total

Total

Total

Total

D

R

U

C

C

R

U

C

C

C

R

U

C

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2015

2016

2016

2017

2014

2014

2015

2014

2014

2014

2014

2014

2016

2014

2014

2015

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SPP

SPP

SPP

SPP

SPP

SP

HPP

HPP

HPP

NH

NH

SPP

BRO

BRO

BRO

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$250,000

$125,000

$350,000

$1,500,000

$17,530,000

$11,640,000

$15,840,000

$431,951

$215,463

$719,920

$4,250,000

$5,310,000

$10,130,000

$90,000

$100,000

$760,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

01

07

07

07

07

07

07

07

801.00

192.20

235.00

236.00

239.01

251.01

251.40

1126.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

01

07

07

07

07

07

07

07

801.00

192.00

235.00

236.00

239.01

251.01

251.50

1126.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2014

2004

2002

2004

2010

2004

2006

2012

2014

2000

2002

2004

2010

2004

2004

2012

14.3

1.17

2.565

9.115

11.903

11.903

4.586

14.5

4.19

2.665

9.189

15.442

14.883

4.626

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

SAFETY / SAFETY(P)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / SCOPING STUDY(O)

RELIABILITY / BIKE/PED FACIL(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

Page 94: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 94

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

REPLACE BRIDGE ON BATTLEFIELD MEMORIAL HWY (US 421) OVER COWBELLCREEK AT JCT WITH HIGHWAY 21 E (KY 21)(SR 45.5) 076B00021

REPLACE BRIDGE ON OLD HAYS FORK LN (CR 1158) OVER BRANCH OF HAYSFORK 0.2 MILE SE OF BATTLEFIELD MEMORIAL HWY (US 421)(SR 16.9) 076C00023N

REPLACE BRIDGE OVER TERRILL BRANCH ROAD ON KY 3376 IN BEREA 200 FT NOF PEACHTREE DRIVE (CS 2072).(076B00085N)(SR=46.5)

RECONSTRUCT AND WIDEN THE KY-627 BRIDGE OVER I-75 TO FIVE LANES TOIMPROVE TRAFFIC CONGESTION AND IMPROVE SAFETY. (INCLUDES 7-8400) (B40)(08CCN)(10CCR)

IMPROVE ROADWAY, SIDEWALKS, AND BIKE PATHS ON US-25 BETWEEN ELLIPSESTREET TO GLADES ROAD AND THEN CONTINUES ON TO THE BEREA BYPASS.(08CCN)(10CCR)(12CCR)

SUPPLEMENTAL FUNDING NEEDED TO COMPLETE PROJECT ID#07-8103. (10CCN)

MOUNTAIN PARKWAY CORRIDOR: WIDEN THE MOUNTAIN PARKWAY TO 4LANES FROM APPROXIMATELY 0.4 MILES EAST OF KY 3050 OVERPASS (MP 71.0)TO 1.1 MI W OF BRIDGE OVER LICKING RIVER (MP 73.4). (2012BOP)

MOUNTAIN PARKWAY CORRIDOR: WIDEN THE MOUNTAIN PARKWAY TO 4LANES FROM APPROXIMATELY 0.4 MILES EAST OF KY 3050 OVERPASS (MP 71.0)TO 1.1 MI W OF BRIDGE OVER LICKING RIVER (MP 73.4). (2012BOP)(ADDITIONALFUNDING FOR C PHASE)

.040

.020

.100

1.212

1.847

2.400

2.400

MADISON

MADISON

MADISON

MADISON

MADISON

MADISON

MAGOFFIN

MAGOFFIN

US-421

CR-1158

KY-3376

KY-627

US-25

KY-1983

KY-9009

KY-9009

$1,105,000

$480,000

$300,000

$30,380,000

$6,850,000

$1,050,000

$19,782,000

$30,000,000

Total

Total

Total

Total

Total

Total

Total

Total

D

R

U

C

R

U

C

D

R

U

C

R

U

C

C

D

R

U

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2014

2015

2015

2016

2014

2014

2015

2019

2014

2015

2017

2014

2014

2015

2014

2014

2014

2014

2015

2016

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BRO

BRO

BRO

BRO

BRZ

BRZ

BRZ

BRX

STP

STP

STP

SPP

SPP

SPP

SB2

STP

STP

STP

NH

NH

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$300,000

$90,000

$90,000

$625,000

$40,000

$40,000

$400,000

$300,000

$3,000,000

$8,660,000

$18,720,000

$110,000

$520,000

$6,220,000

$1,050,000

$182,000

$1,200,000

$400,000

$18,000,000

$30,000,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

07

07

07

07

07

07

10

10

1130.00

1131.00

1137.00

8403.00

8505.00

8635.00

126.12

126.13

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

07

07

07

07

07

07

10

10

1130.00

1131.00

1137.00

8403.00

8505.00

8635.00

126.03

126.12

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2012

2012

2014

2008

2008

2010

1996

2014

2012

2012

2014

2008

2008

2010

1996

1996

2.443

.252

.279

.073

4.644

0

71

71

2.483

.292

.299

.193

5.856

1.847

73.4

73.4

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / MAJOR WIDENING(O)

SAFETY / SAFETY(P)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / MAJOR WIDENING(O)

Page 95: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 95

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

MOUNTAIN PARKWAY CORRIDOR: WIDEN THE MOUNTAIN PARKWAY TO 4LANES FROM 0.3MI W OF KY 3047 (65.0) TO 0.7 MI W OF MIDDLE FORK LICKINGRIVER BRIDGE (69.6). (2012BOP)

MOUNTAIN PARKWAY CORRIDOR: WIDEN THE MOUNTAIN PARKWAY TO 4LANES FROM 0.3MI W OF KY 3047 (65.0) TO 0.7 MI W OF MIDDLE FORK LICKINGRIVER BRIDGE (69.6). (2012BOP)(ADDITIONAL FUNDING FOR C PHASE)

MOUNTAIN PARKWAY CORRIDOR: WIDEN THE MOUNTAIN PARKWAY TO 4LANES FROM 0.3MI W OF KY 3047 (65.0) TO 0.7 MI W OF MIDDLE FORK LICKINGRIVER BRIDGE (69.6). (2012BOP)(ADDITIONAL FUNDING FOR C PHASE)

MOUNTAIN PARKWAY CORRIDOR: WIDEN THE MOUNTAIN PARKWAY TO 4LANES FROM 0.4 MI E OF THE KY-134 JOHNSON CREEK BR TO 0.3 MI W OF KY3047 - SECTION 5.

MOUNTAIN PARKWAY CORRIDOR: WIDEN THE MOUNTAIN PARKWAY TO 4LANES FROM 0.4 MI E OF THE KY-134 JOHNSON CREEK BR TO 0.3 MI W OF KY3047 - SECTION 5.(ADDITIONAL FUNDING FOR C PHASE)

MOUNTAIN PARKWAY CORRIDOR: WIDEN THE MOUNTAIN PARKWAY TO 4LANES FROM 0.4 MI E OF THE KY-134 JOHNSON CREEK BR TO 0.3 MI W OF KY3047 - SECTION 5.(ADDITIONAL FUNDING FOR C PHASE)

MOUNTAIN PARKWAY CORRIDOR: MOUNTAIN PARKWAY WIDENING ANDSAFETY IMPROVEMENTS FROM MP 73.4, 1.1 MI W OF LICKING RIVER BRIDGE, TOMP 75.3 BURNING FORK BRIDGE. (08CCR)(10CCR)(12CCR)

MOUNTAIN PARKWAY CORRIDOR: WIDEN THE MOUNTAIN PARKWAYEXTENSION (KY 114/US 460) THROUGH THE CONGESTED AREA AT SALYERSVILLEFROM BURNING FORK BRIDGE TO KY 114

4.600

4.600

4.600

2.400

2.400

2.400

1.900

2.400

MAGOFFIN

MAGOFFIN

MAGOFFIN

MAGOFFIN

MAGOFFIN

MAGOFFIN

MAGOFFIN

MAGOFFIN

KY-9009

KY-9009

KY-9009

KY-9009

KY-9009

KY-9009

KY-9009

US-460

$27,070,000

$25,000,000

$12,600,000

$12,020,000

$10,000,000

$10,000,000

$22,400,000

$33,100,000

Total

Total

Total

Total

Total

Total

Total

Total

D

R

U

C

C

C

D

R

U

C

C

C

D

R

C

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2014

2016

2016

2018

2019

2020

2014

2014

2014

2015

2016

2017

2014

2014

2015

2014

2015

2016

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

STP

STP

STP

STP

STP

STP

NH

NH

NH

NH

NH

NH

SPP

SPP

SPP

NH

NH

NH

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$1,520,000

$2,400,000

$750,000

$22,400,000

$25,000,000

$12,600,000

$245,000

$1,200,000

$575,000

$10,000,000

$10,000,000

$10,000,000

$350,000

$550,000

$21,500,000

$10,500,000

$1,500,000

$21,100,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

10

10

10

10

10

10

10

10

126.40

126.41

126.42

126.50

126.51

126.52

140.00

166.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

MORGAN

MORGAN

MORGAN

10

10

10

10

10

10

10

10

126.03

126.40

126.40

126.01

126.50

126.50

140.00

166.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

1998

2014

2014

1998

2014

2014

2006

2012

1996

1998

1998

1998

1998

1998

2006

2012

65

65

65

63.123

63.123

63.123

73.4

12.486

69.6

69.6

69.6

65

65

65

75.331

14.566

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / MAJOR WIDENING(O)

62.588

62.588

62.588

63.123

63.123

63.123

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

From:

From:

From:

Page 96: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 96

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

MOUNTAIN PARKWAY CORRIDOR: NEW INTERCHANGE AT GIFFORD ROADFROM 0.7 MI W OF MIDDLE FORK LICKING RIVER BRIDGE (MP 69.6) TOAPPROXIMATELY 0.4 MI EAST OF KY 3050 OVERPASS(MP 71.0).(12CCR)

MOUNTAIN PARKWAY CORRIDOR: SALYERSVILLE-PRESTONSBURG; WIDEN KY114 TO 4 LANES FROM US 460 TO THE MAGOFFIN/FLOYD COUNTY LINE. (SEE 12-1.01 FOR PE & ENV)

MOUNTAIN PARKWAY CORRIDOR: SALYERSVILLE-PRESTONSBURG; WIDEN KY114 TO 4 LANES FROM US 460 TO THE MAGOFFIN/FLOYD COUNTY LINE. (SEE 12-1.01 FOR PE & ENV)

MOUNTAIN PARKWAY CORRIDOR: SALYERSVILLE-PRESTONSBURG; WIDEN KY114 TO 4 LANES FROM US 460 TO THE MAGOFFIN/FLOYD COUNTY LINE. (SEE 12-1.01 FOR PE & ENV)

MOUNTAIN PARKWAY CORRIDOR: SALYERSVILLE-PRESTONSBURG; WIDEN KY114 TO 4 LANES FROM US 460 TO THE MAGOFFIN/FLOYD COUNTY LINE. (SEE 12-1.01 FOR PE & ENV)

REPLACE BRIDGE ON CR-1756 (MP 0.031) OVER TRACE FORK; .08 MI-N JCT KY542; (STRUCTURALLY DEFICIENT, SR=17.3) 077C00048N(AR/W)

REPLACE BRIDGE ON KY 2019 OVER LICK CREEK 0.055 MILE S OF KY 3334 (SR31.9) 077B00062N

REPLACE BRIDGE ON KY 2019 OVER RACCOON CREEK 0.039 S OF KY 1081(SR 33.2)077B00063N

1.400

5.000

5.000

5.000

5.000

.100

.040

.040

MAGOFFIN

MAGOFFIN

MAGOFFIN

MAGOFFIN

MAGOFFIN

MAGOFFIN

MAGOFFIN

MAGOFFIN

KY-9009

KY-114

KY-114

KY-114

KY-114

CR-1756

KY-2019

KY-2019

$31,643,000

$23,700,000

$15,000,000

$19,000,000

$19,000,000

$320,000

$1,580,000

$1,010,000

Total

Total

Total

Total

Total

Total

Total

Total

D

R

C

D

R

U

C

C

C

C

C

R

U

C

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2014

2014

2015

2014

2015

2015

2017

2018

2019

2020

2016

2014

2014

2015

2014

2014

2015

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SPP

SPP

NH

NH

NH

NH

NH

NH

NH

BRZ

BRO

BRO

BRO

BRO

BRO

BRO

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$443,000

$2,200,000

$29,000,000

$4,000,000

$5,200,000

$2,500,000

$12,000,000

$15,000,000

$19,000,000

$19,000,000

$320,000

$700,000

$100,000

$780,000

$230,000

$100,000

$680,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

10

10

10

10

10

10

10

10

167.00

169.00

169.01

169.02

169.03

1092.00

1098.00

1099.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

10

12

10

10

10

10

10

10

167.00

1.01

169.00

169.00

169.00

1092.00

1098.00

1099.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2012

2014

2014

2014

2014

2010

2012

2012

2012

1996

2014

2014

2014

2010

2012

2012

69.6

0

0

0

0

0

2.898

5.497

71

5.026

5.026

5.026

5.026

.1

2.938

5.537

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / NEW INTERCHANGE(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

Page 97: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 97

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

RECONSTRUCT KY-30 AT THE BREATHITT/MAGOFFIN COUNTY LINE BEGINNINGAT MILEPOST 37 IN BREATHITT COUNTY TO MILEPOST 0.75 IN MAGOFFINCOUNTY. (06CCN)(10CCR)

WIDEN OR REPLACE BRIDGE ON KY 30 AND IMPROVE CURVE 500 FEET NORTHOF MCFARLAND ROAD TO 1000 FEET SOUTH OF KY 3337.(12CCN)

CONSTRUCT INTERSECTION OF KY 52 WITH NEW ACCESS ROAD TO MAKERSMARK MUSEUM.

REPLACE BRIDGE ON KY-1195 (MP 0.884) OVER CARTWRIGHTS CREEK; .80 MINORTH OF JCT US 68; (STRUCTURALLY DEFICIENT, SR=43.3) 078B00051N. (AR/W)

REPLACE BRIDGE ON KY 49 OVER HAMILTON BRANCH 0.33 MILE E OF COWHERDLN (CR-1301) (SR 41.4) 078B00031N.

REPLACE BRIDGE OVER GALLOWAY CREEK ON BEECH FORK LOOP (CR 1060) 0.6MI E OF US 68 (078C00109N)(SR=33.5) (EBRP)

RECONSTRUCT KY-49 FROM LEBANON TO THE CANEY CREEK BRIDGE.(06CCN)(12CCR)

SPOT IMPROVEMENTS ON TOAD MATTINGLY ROAD AND COWHERDLANE.(12CCN)

1.270

.179

.100

.100

.040

.010

2.500

4.198

MAGOFFIN

MAGOFFIN

MARION

MARION

MARION

MARION

MARION

MARION

KY-30

KY-30

KY-52

KY-1195

KY-49

CR-1060

KY-49

KY-429

$9,620,000

$2,900,000

$1,000,000

$390,000

$660,000

$408,500

$7,800,000

$510,000

Total

Total

Total

Total

Total

Total

Total

Total

R

U

C

R

U

C

C

C

R

U

C

D

R

U

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2014

2014

2015

2014

2014

2015

2015

2016

2014

2014

2015

2019

2020

2020

2020

2015

2015

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SP

SP

SP

SPP

SPP

SPP

SPP

BRX

BRO

BRO

BRO

BRZ

BRZ

BRZ

BRZ

SPP

SPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$310,000

$180,000

$9,130,000

$200,000

$250,000

$2,450,000

$1,000,000

$390,000

$90,000

$90,000

$480,000

$100,000

$30,000

$50,000

$228,500

$7,800,000

$510,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

10

10

04

04

04

04

04

04

8308.00

8702.00

395.00

1066.00

1076.00

1091.00

8304.00

8706.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

BREATHITT 10

10

04

04

04

04

04

04

8308.00

8702.00

395.00

1066.00

1076.00

1091.00

8304.00

8706.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2006

2012

2014

2010

2012

2014

2006

2012

2006

2012

2014

2010

2012

2014

2006

2012

0

7.5

7.3

.834

20.553

.595

13

2.1

.75

7.679

7.4

.934

20.593

.605

15.5

3

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / SPOT IMPROVEMENTS(O)

37 37.522Milepoints: To:From:

Page 98: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 98

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

ROADWAY IMPROVEMENTS TO KY 49 FROM JUST SOUTH OF KY 84 EXTENDINGNORTH THROUGH LORETTO TO KY 52 (MP 18.63 TO MP 27.54). (2012BOP)

CONNECTOR FROM HENDRICKSON DRIVE TO CORPORATE DRIVE (12CCN)

KY 49 FROM RIVERSIDE BRIDGE (B76) TO KY 337 IN BRADFORDSVILLE (12CCN)

IMPROVEMENTS TO US-68 TO PROVIDE LEFT TURN LANES FOR MARSHALL CO.HIGH SCHOOL AND CHRISTIAN FELLOWSHIP HIGH SCHOOL.(08CCR)(12CCR)

RECONSTRUCT ELEMENTS OF EXISTING PURCHASE PARKWAY FROM EXIT 22(KY80/US 45) AT MP 22 TO US 62 AT MP 52 AT CALVERT CITY (I-69 CORRIDORIMPROVEMENT)

RECONSTRUCT I-24/PURCHASE PARKWAY INTERCHANGE (I-69 CORRIDORIMPROVEMENT) (12CCR)

WIDEN KY-348 TO 4 LANES BETWEEN PURCHASE PARKWAY AND US-641.(00CCN)(06CCR)(INCLUDES DESIGN FOR 1-8101.00)(RU-04DEOB)(12CCR)

JULIAN M. CARROLL PKWY: RECONSTRUCT INTERCHANGE AT KY-348 INBENTON. (02CCN)(06CCR)(DESIGN INCLUDED UNDER 1-8002.00)(08CCR)(I-69CORRIDOR IMPROVEMENT)(10CCR)(12CCR)

8.910

2.513

1.200

30.000

.879

1.750

1.000

MARION

MARION

MARION

MARSHALL

MARSHALL

MARSHALL

MARSHALL

MARSHALL

KY-49

-

KY-49

US-68

JC-9003

I-24

KY-348

JC-9003

$40,350,000

$8,200,000

$17,110,000

$2,930,000

$9,070,000

$39,040,000

$4,270,000

$7,800,000

Total

Total

Total

Total

Total

Total

Total

Total

D

R

U

C

D

R

U

C

D

R

U

C

C

D

C

R

U

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2014

2016

2016

2018

2015

2016

2017

2018

2015

2016

2017

2018

2014

2014

2015

2015

2015

2016

2014

2014

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SP

SP

SP

SP

SP

SP

SP

SP

SP

SP

SP

SP

SPP

NH

NH

NH

NH

SPP

SPP

SPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$3,000,000

$2,500,000

$3,000,000

$31,850,000

$700,000

$2,000,000

$500,000

$5,000,000

$1,770,000

$2,210,000

$1,130,000

$12,000,000

$2,930,000

$750,000

$8,320,000

$2,100,000

$2,340,000

$34,600,000

$4,270,000

$7,800,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

04

04

04

01

01

01

01

01

8707.01

8714.00

8715.00

117.00

234.00

800.00

8002.00

8101.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

GRAVES

04

04

04

01

01

01

01

01

8707.00

8714.00

8715.00

117.00

234.00

800.00

8002.00

8101.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2012

2012

2012

2000

2012

2010

2000

2002

2012

2012

2012

2000

2012

2010

2000

2002

18.63

7.987

10.635

34.487

24.5

7.62

42.1

27.54

10.5

10.701

52

25.379

8.783

43.1

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / NEW ROUTE(O)

SAFETY / SAFETY(P)

SAFETY / SAFETY(P)

ECONOMIC DEVELOPMENT / I-CHANGE RECONST(O)

RELIABILITY / MAJOR WIDENING(O)

ECONOMIC DEVELOPMENT / I-CHANGE RECONST(O)

22 34.487Milepoints: To:From:

Page 99: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 99

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

INEZ TO WARFIELD (SECTION 2-1): FROM LITTLE BLACKLOG TO BOOTH FORK.[STA. 190+00 TO STA. 298+00 (ENGLISH)] (2002BOP)(12CCR)(AR/W)

INEZ TO WARFIELD (SECTION 2-2): FROM BOOTH FORK TO KY-2031 [STA. 298+00TO STA. 382+00 (ENGLISH)] (2002BOP)

INEZ TO WARFIELD (SECTION 2-3): FROM KY-2031 TO KY-292 [STA. 382+00 TO STA.427+00 (ENGLISH)] (2002BOP)

INEZ TO WARFIELD; BRIDGE OVER TUG FORK (SECTION III) (R & U IDENTIFIEDIN SECTION II-ITEM NO. 154.10)

IMPROVE ALIGNMENT AND GEOMETRICS OF THE CURVE LOCATED JUSTBEFORE THE JUNCTION OF KY 2031 AND KY 40 TO .1 MILES BEFORE GORDONHOLLOW ROAD, AND IMPROVE THE CULVERT/SAFETY DESIGN TO INCREASEMOTORIST AND PEDESTRIAN SAFETY. (12CCR)

REPLACE BRIDGE AND APPROACHES ON PR-1015 OVER ROCKCASTLE CREEK(C26) 275 FEET WEST JCT. KY-3 JUST SOUTH OF CROOKED RUN ROAD. (SR=2.0):(080C00026N)

REPLACE BRIDGE ON KY 40 OVER BUCK CREEK AT THE KY 2031 INTERSECTION(SR 49.8) 080B00002N.

NEW FULLY CONTROLLED ACCESS ROUTE FROM US 68 NEAR WASHINGTONEAST TO KY 11 INCLUDING A NEW I-CHNG AT KY 11. (PRIORITYSECTION)(2004BOPC)(06CCR)

2.000

1.600

.900

.100

.200

.070

2.700

MARTIN

MARTIN

MARTIN

MARTIN

MARTIN

MARTIN

MARTIN

MASON

KY-40

KY-40

KY-40

KY-40

KY-40

CR-1324

KY-40

US-68

$41,000,000

$44,500,000

$16,000,000

$17,080,000

$1,470,000

$490,000

$815,000

$36,630,000

Total

Total

Total

Total

Total

Total

Total

Total

U

C

C

C

C

R

U

C

R

U

C

R

U

C

D

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2014

2014

2016

2018

2019

2016

2016

2017

2014

2014

2015

2015

2015

2016

2014

2015

2015

2017

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

STP

STP

SP

SP

SP

SPP

SPP

SPP

BRZ

BRZ

BRZ

BRO

BRO

BRO

SP

SP

SP

SP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$2,000,000

$39,000,000

$44,500,000

$16,000,000

$17,080,000

$100,000

$220,000

$1,150,000

$50,000

$100,000

$340,000

$140,000

$175,000

$500,000

$780,000

$1,580,000

$1,820,000

$32,450,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

12

12

12

12

12

12

12

09

154.11

154.16

154.21

154.30

192.00

1092.00

1112.00

147.20

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

12

12

12

12

12

12

12

09

154.10

154.10

154.10

154.10

192.00

1092.00

1112.00

147.11

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2002

2002

2002

1998

2012

2008

2012

2004

1998

1998

1998

1998

2012

2008

2012

1998

18.2

0

19.63

18.4

.028

19.7

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / RELOCATION(O)

RELIABILITY / RELOCATION(O)

RELIABILITY / RELOCATION(O)

RELIABILITY / RELOCATION(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / NEW ROUTE(O)

Page 100: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 100

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

NEW FULLY CONTROLLED ACCESS ROUTE FROM KY 11 NORTHEAST TO KY 9 (AAHWY) INCLUDING NEW I-CHNG AT KY 9. (2004BOPC)(06CCR)

WIDEN THE AA HWY TO 4-LANES FROM THE NEW MAYSVILLE BRIDGEAPPROACH INTERSECTION WEST TO KY-10 (FERNLEAF-GERMANTOWN RD).(00CCR) (04CCN)(06CCR)(08CCR)(10CCR)

REPLACE BRIDGE ON FLAT FORK RD (CR 1206) OVER FLAT FORK 0.24 MILE S OFFLEMINGSBURG MAYSLICK RD (KY 161)(SR 30) 081C00025N

RECONSTRUCT/IMPROVE KY-1448/MAPLELEAF ROAD FROM KY-9 TO US-68.(06CCN)(08CCR)(10CCR)(12CCR)

I-24 BRIDGE OVER THE OHIO RIVER @ PADUCAH (B100); JOINT PROJECT WITHILLINOIS TO MITIGATE SCOUR (073B00100N)

PADUCAH-WICKLIFFE; 4-LANE US-60 FROM BETHEL CHURCH ROAD TO KY-1154(MARTIN MARIETTA) (04CCR) (TO BE LET WITH 1-115.00).(10CCR)(12CCR)

PADUCAH WATERFRONT DEVELOPMENT PROJECT. (2008KYD- KY180) (2010BOPC)

OLIVET CHURCH ROAD (KY-998) FROM FIVE-LANE SECTION TO US-60.(06CCR)(08CCR)(12CCR)(LET BY CITY OF PADUCAH)

2.900

3.500

1.600

1.000

1.600

MASON

MASON

MASON

MASON

MCCRACKEN

MCCRACKEN

MCCRACKEN

MCCRACKEN

US-68

KY-9

CR-1206

KY-1448

I-24

US-60

-

KY-998

$37,930,000

$29,210,000

$410,000

$8,440,000

$260,000

$4,920,000

$3,920,000

$4,680,000

Total

Total

Total

Total

Total

Total

Total

Total

D

R

U

C

C

R

U

C

C

C

R

U

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2014

2015

2015

2018

2014

2015

2015

2017

2014

2014

2017

2018

2014

2014

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SP

SP

SP

SP

SPP

BRZ

BRZ

BRZ

SPP

IM

SPP

SPP

KYD

SPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$780,000

$1,580,000

$1,820,000

$33,750,000

$29,210,000

$25,000

$10,000

$375,000

$8,440,000

$260,000

$2,210,000

$2,710,000

$3,920,000

$4,680,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

09

09

09

09

01

01

01

01

147.60

169.00

1088.00

8303.00

2.00

115.10

122.02

123.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

09

09

09

09

01

01

01

01

147.11

169.00

1088.00

8303.00

2.00

115.10

122.00

123.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2004

2000

2012

2006

2000

1998

2010

2006

1998

2000

2012

2006

2000

1998

2004

2006

10.256

.238

5.423

0

.4

13.987

.278

7.003

1.067

1.968

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / NEW ROUTE(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / RECONSTRUCTION(O)

SAFETY / BRIDGE INSPECTION(P)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / TRANSP ENHANCEMENT(P)

ECONOMIC DEVELOPMENT / RECONSTRUCTION(O)

Page 101: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 101

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

MAJOR WIDENING OF US 62 FROM KY 998 TO PADUCAH INFORMATION AGEPARK. (12CCR)

UPGRADE KY 1286 (FRIENDSHIP ROAD) FROM US 45 TO NEW HOLT ROAD INPADUCAH. (PRELIMINARY ENGINEERING) (12CCR)

CONSTRUCT A DOUBLE-CROSSOVER DIAMOND INTERCHANGE ON US 60 AT THEI-24 INTERCHANGE NEAR KENTUCKY OAKS MALL.

PADUCAH OUTER LOOP (PRIORITY SECTION 1); FROM KY-1322 (LOVELACEVILLEROAD) TO US-62 (BLANDVILLE ROAD). (GRADE & DRAIN AND INC. SURFACE)(2002BOPC)

PADUCAH OUTER LOOP (PRIORITY SECTION 2); FROM US-45 (PADUCAH-MAYFIELD ROAD) TO KY-1322 (LOVELACEVILLE ROAD). (GRADE & DRAIN ANDINC. SURFACE) (2002BOPC)

PADUCAH OUTER LOOP (PRIORITY SECTION 3); FROM US-62 (BLANDVILLE ROAD)TO US-60 (PADUCAH-WICKLIFFE ROAD). (GRADE & DRAIN AND INC. SURFACE)(2002BOPC)

REPLACE BRIDGE AND APPROACHES ON US-62 OVER SUGG CREEK (B24) 0.2 MILENORTH OF WOBLE ROAD. (SR=29.5): (073B00024N)

RELOCATION AND MINOR WIDENING OF US-60 FROM CLARKS RIVER TO US-62JCT.(10CCR)

.957

1.423

1.500

2.000

2.500

.100

1.000

MCCRACKEN

MCCRACKEN

MCCRACKEN

MCCRACKEN

MCCRACKEN

MCCRACKEN

MCCRACKEN

MCCRACKEN

US-62

KY-1286

US-60

-

-

-

US-62

US-60

$13,440,000

$1,000,000

$4,750,000

$4,180,000

$6,280,000

$7,840,000

$1,300,000

$22,090,000

Total

Total

Total

Total

Total

Total

Total

Total

R

U

C

D

D

R

U

C

R

U

R

U

R

U

C

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2014

2014

2016

2017

2015

2016

2016

2017

2015

2016

2015

2016

2015

2016

2014

2015

2016

2018

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SPP

SPP

SPP

NH

NH

NH

NH

SP

SP

SP

SP

SP

SP

BRO

STP

STP

STP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$2,500,000

$2,500,000

$8,440,000

$1,000,000

$750,000

$200,000

$300,000

$3,500,000

$2,100,000

$2,080,000

$4,200,000

$2,080,000

$4,200,000

$3,640,000

$1,300,000

$4,640,000

$3,380,000

$14,070,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

01

01

01

01

01

01

01

01

152.00

153.00

154.00

310.10

310.30

310.50

1055.00

1115.10

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

01

01

01

01

01

01

01

01

152.00

153.00

154.00

310.01

310.01

310.01

1055.00

1115.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2012

2012

2014

2002

2002

2002

2008

2000

2012

2012

2014

1996

1996

1996

2008

1996

7.851

5

10.484

.852

18.65

8.808

6.423

10.891

.92

19.673

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / RECONSTRUCTION(O)

ECONOMIC DEVELOPMENT / I-CHANGE RECONST(O)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / NEW ROUTE(O)

SAFETY / BRIDGE REPLACEMENT(P)

RELIABILITY / RELOCATION(O)

Page 102: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 102

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

RELOCATION OF US-62 FROM US-60 DEPARTURE TO KY-1887 (PARKROAD).(10CCR)(12CCR)

TO REMOVE EXISTING TENNESSEE RIVER BRIDGE UPON COMPLETION OF NEWUS 60 TENNESSEE RIVER BRIDGE(073B00004N)

REPLACE BRIDGE ON KY-348 (MP 6.061) OVER CAMP CREEK; .02 MI NORTH OFJCT KY 168; (STRUCTURALLY DEFICIENT, SR=4). 073B00099N (AR/W)

REPLACE BRIDGE ON KY-305 OVER MASSAC CREEK 0.023 E OF KY 1565(SR20.7)073B00098N.

REPLACE BRIDGE OVER BOTTOM DITCH ON KY 1954 0.7 MILE NORTH OF KY 348(073B00096N) (SR=8.3).

REPLACE BRIDGE OVER BLIZZARD PONDS DRAINAGE CANEL 0.45 MI EAST OF KY1014 (073B00142N)(SR=18.2) (EBRP)

REPLACE BRIDGE OVER BRANCH OF BOTTOM DITCH ON KY 994 0.8 MI NW OF KY348 (070B00010N)(SR=35.3)(EBRP)

1.500

.100

.040

.022

.022

.038

MCCRACKEN

MCCRACKEN

MCCRACKEN

MCCRACKEN

MCCRACKEN

MCCRACKEN

MCCRACKEN

US-62

US-60

KY-348

KY-305

KY-1954

KY-1288

KY-994

$23,370,000

$5,080,000

$720,000

$1,405,000

$975,000

$705,000

$190,000

Total

Total

Total

Total

Total

Total

Total

D

R

U

C

C

U

C

R

U

C

D

R

U

C

D

R

U

C

D

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2014

2016

2017

2020

2014

2014

2016

2014

2014

2015

2017

2019

2019

2020

2015

2016

2016

2016

2020

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

STP

STP

STP

STP

BRO

BRO

BRO

BRO

BRO

BRO

BRX

BRX

BRX

BRX

BRX

BRX

BRX

BRX

BRX

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$520,000

$7,300,000

$3,380,000

$12,170,000

$5,080,000

$410,000

$310,000

$125,000

$500,000

$780,000

$250,000

$125,000

$125,000

$475,000

$180,000

$75,000

$150,000

$300,000

$190,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

01

01

01

01

01

01

01

1115.20

1115.70

1135.00

1141.00

1152.00

1153.00

1154.00

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

LIVINGSTON

01

01

01

01

01

01

01

1115.00

1115.70

1135.00

1141.00

1152.00

1153.00

1154.00

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2000

2012

2010

2012

2014

2014

2014

1996

2012

2010

2012

2014

2014

2014

12.881

19.513

6.011

6.045

.768

2.735

2.27

14.358

19.886

6.111

6.085

.79

2.757

2.308

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / RELOCATION(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

0 .4Milepoints: To:From:

Page 103: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 103

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

NEW ACCESS ROAD FROM KY-305 NEAR KY-998, EXTENDING WEST TO THE OHIORIVER MEGAPARK. (2-LANE INITIAL, 4-LANE ULTIMATE)(12CCN)

PROVIDE LEFT TURN LANE INTO SOMERSET COMMUNITY COLLEGE CAMPUS.(12CCR)

BRIDGE OVER ROCK CREEK ON OLD FIDELITY-BELL FARM ROAD (CR 1239) 0.25MI W OF ROCK CREEK ROAD (CR 1236) (074C00008N)(SR=22)

RECONSTRUCT KY-92 FROM 1450 FT WEST OF KY 592 TO 350 FT EAST OF THEWHITLEY/MCCREARY COUNTY LINE (SECTION 2)

REPLACE OVERFLOW STRUCTURE ON US-431 AT THE MUHLENBERG-MCLEAN COLINE (SR 39) B00056N.

REPLACE BRIDGE OVER BRANCH OF POND DRAIN CREEK ON KY 2385 0.9 MI SWOF KY 81 (075B00066N)(SR=26.3)

SPOT IMPROVEMENTS AT THE INTERSECTION OF US-431 AND KY-250.(08CCN)(12CCR)

RECONSTRUCT AND WIDEN FROM MCLEAN/MUHLENBURG COUNTY LINE) TOLIVERMORE. (08CCN)(10CCR)

.300

.040

4.566

.142

.080

.100

5.500

MCCRACKEN

MCCREARY

MCCREARY

MCCREARY

MCLEAN

MCLEAN

MCLEAN

MCLEAN

KY-305

US-27

CR-1239

KY-92

US-431

KY-2385

US-431

US-431

$25,000,000

$1,190,000

$350,000

$30,225,000

$2,700,000

$225,000

$880,000

$6,750,000

Total

Total

Total

Total

Total

Total

Total

Total

D

R

U

C

C

D

R

U

U

C

R

U

C

D

R

U

C

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2014

2015

2015

2016

2014

2019

2020

2020

2015

2017

2014

2014

2015

2019

2014

2014

2014

2014

2014

2016

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SPP

SPP

SPP

SP

BRZ

BRZ

BRZ

SPP

SPP

BRO

BRO

BRO

BRX

SPP

SPP

SB2

SB2

SB2

SP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$3,000,000

$4,000,000

$3,000,000

$15,000,000

$1,190,000

$280,000

$50,000

$20,000

$1,225,000

$29,000,000

$200,000

$100,000

$2,400,000

$225,000

$200,000

$180,000

$500,000

$1,500,000

$1,250,000

$4,000,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

01

08

08

11

02

02

02

02

8702.00

171.00

1065.00

184.20

1078.00

1090.00

8400.00

8401.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

WHITLEY

MUHLENBERG

01

08

08

11

02

02

02

02

8702.00

171.00

1065.00

184.00

1078.00

1090.00

8400.00

8401.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2012

2012

2014

2014

2012

2014

2008

2008

2012

2012

2014

2010

2012

2014

2008

2008

8.25

.25

20.335

0

3.5

9.8

0

8.55

.29

24.835

.071

3.58

9.9

5.5

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / NEW ROUTE(O)

RELIABILITY / SAFETY(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / RELOCATION(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

SAFETY / SPOT IMPROVEMENTS(O)

RELIABILITY / RECONSTRUCTION(O)

0

28.273

.066

28.344

Milepoints:

Milepoints:

To:

To:

From:

From:

Page 104: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 104

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

EXTENSION OF BUTTERMILK FALLS ROAD TO PROVIDE ACCESS TO THE MEADECOUNTY RIVERPORT. DEMO KY058. (03KYDN)

KY-313 EXTENSION FROM THE NORTHERN KY-448 BUCK GROVE CONNECTOR TOKY-1638. (SECTION II) (FORMERLY 98 SYP ITEM NO. 4-53.00)(12CCR)

REPLACE BRIDGE OVER UNNAMED STREAM ON KY 823 0.5 MILE WEST OF KY2734.(082B00008N) (SR=45.2)

RECONSTRUCT KY 79 FROM KY 428 TO KY 144.(12CCN)

CONSTRUCT A NEW ROUTE BETWEEN BERRYMAN ROAD AND KY-933.(12CCN)

RECONSTRUCT KY 79 FROM KY 144 TO KY 1051.(12CCN)

REPLACE BRIDGE ON KY-36 (MP 6.081) OVER BEAVER CREEK IN FRENCHBURG;.05 MI NORTH OF JCT US-460; (STRUCTURALLY DEFICIENT, SR=39.7) 083B00001N(AR/W)

SPOT IMPROVEMENTS KY 36: (SECT A) FROM .20 MI N OF THE JCT W/STONEQUARRY RD (MP 2.08) TO 0.16 MI S OF THE JCT W/ STONEQUARRY RD (MP2.44). (SECT G) FROM .05 MI N OF THE JCT W/ SUITER BRCH RD (MP 3.90) TO .10 MIS OF THE JCT W/ SUITER BRCH RD (MP 4.05).

1.000

2.300

.010

3.148

3.826

.100

.360

MEADE

MEADE

MEADE

MEADE

MEADE

MEADE

MENIFEE

MENIFEE

CR-1031

KY-313

KY-823

KY-79

-

KY-79

KY-36

KY-36

$441,690

$9,740,000

$125,000

$4,140,000

$400,000

$17,650,000

$980,000

$2,800,000

Total

Total

Total

Total

Total

Total

Total

Total

C

C

D

P

D

R

C

R

U

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2014

2014

2019

2014

2015

2015

2014

2014

2014

2016

2016

2014

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

KYD

SPP

BRX

SP

SP

SP

SPP

SPP

SPP

SPP

BRO

SP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$441,690

$9,740,000

$125,000

$10,000

$1,040,000

$3,090,000

$400,000

$3,530,000

$2,000,000

$12,120,000

$980,000

$2,800,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

04

04

04

04

04

04

10

10

134.10

297.65

1088.00

8702.00

8704.00

8705.00

1090.00

8001.10

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

04

04

04

04

04

04

10

10

134.00

297.60

1088.00

8702.00

8704.00

8705.00

1090.00

8001.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2012

2000

2014

2012

2012

2012

2010

2000

2002

2000

2014

2012

2012

2012

2010

2000

.54

1.263

4.411

6.031

2.08

.55

4.411

8.237

6.131

2.44

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / NEW ROUTE(O)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / RECONSTRUCTION(O)

Page 105: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 105

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

SPOT IMPROVEMENTS ON KY 36: (PRIORITY SECTION B-F) FROM 0.18 MILESSOUTH OF JUNCTION WITH STONEQUARRY RD (MP 2.463) TO 0.6 MILES NORTHOF JUNCTION WITH SUITER BRANCH RD (MP 3.90). (SEE 8001.10 FOR SECTION A &G)

IMPROVE SAFETY ON US 68 AT KY 152 INTERSECTION IN HARRODSBURG. (12CCR)

IMPROVE SYSTEM MOBILITY ALONG MOBERLY ROAD FROM KY 390 TO KY 1989IN NORTHWEST HARRODSBURG. (12CCR)

RECONSTRUCT 1.5 MILES OF US 68, LEXINGTON ROAD FROM TOP OF PALISADESTO CHINN'S CURVE. (12CCR)

REPLACE BRIDGE AND APPROACHES ON KY-152 OVER HERRINGTON LAKE ATTHE MERCER/GARRARD COUNTY LINE (B05). (SR=3.0); (084B00005N)

REPLACE BRIDGE AND APPROACHES ON KY-152 OVER HERRINGTON LAKE ATTHE MERCER/GARRARD COUNTY LINE (B05). (SR=3.0)(084B00005N) (ADDITIONALFUNDING FOR C PHASE)

DEEP CREEK ROAD; REPLACE BRIDGE AND APPROACHES OVER CHAPLIN RIVER0.38 MILE SOUTH OF KY-152 (C13). (SR=0.0): (084C00013N)

1.440

.300

.341

1.500

.100

.100

MENIFEE

MERCER

MERCER

MERCER

MERCER

MERCER

MERCER

KY-36

US-68

CS-1237

US-68

KY-152

KY-152

CR-1225

$2,700,000

$3,500,000

$990,000

$1,200,000

$6,480,000

$7,500,000

$925,000

Total

Total

Total

Total

Total

Total

Total

D

R

U

C

D

R

U

C

U

C

R

U

C

R

U

C

C

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2014

2015

2015

2016

2014

2015

2015

2016

2014

2015

2014

2014

2015

2014

2014

2016

2017

2014

2014

2015

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SP

SP

SP

SP

SPP

SPP

SPP

SPP

SPP

SPP

SPP

SPP

SPP

BRO

BRO

BRO

BRO

BRZ

BRZ

BRZ

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$200,000

$250,000

$250,000

$2,000,000

$500,000

$1,000,000

$1,000,000

$1,000,000

$210,000

$780,000

$100,000

$100,000

$1,000,000

$960,000

$520,000

$5,000,000

$7,500,000

$100,000

$75,000

$750,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

10

07

07

07

07

07

07

8001.20

416.00

417.00

420.00

1116.00

1116.01

1117.00

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

GARRARD

GARRARD

10

07

07

07

07

07

07

8001.00

416.00

417.00

420.00

1116.00

1116.00

1117.00

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2000

2012

2012

2012

2008

2014

2008

2000

2012

2012

2012

2008

2008

2008

2.463

7.3

0

18.57

18.818

18.818

2.217

3.9

7.6

.341

20

18.894

18.894

2.261

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / RECONSTRUCTION(O)

SAFETY / SAFETY(P)

RELIABILITY / SPOT IMPROVEMENTS(O)

SAFETY / SAFETY(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / PREFINANCD CONVRSN(O)

SAFETY / BRIDGE REPLACEMENT(P)

0

0

.076

.076

Milepoints:

Milepoints:

To:

To:

From:

From:

Page 106: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 106

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

REPLACE BRIDGE ON US 68 OVER SHAKER CREEK 0.019 W OF CHATHAM RD(CR-1113)(SR 36.2) 084B00001N

SCOPING STUDY ON US-68 FROM HARRODSBURG TO WILMORE.(12CCN)

SUMMER SHADE BYPASS. (06CCR)(2006BOPC)(08CCR)(12CCR)

CONSTRUCT TWO-WAY LEFT TURN LANE AND INSTALL RAISED PAVEMENTMARKER ON US-68 FROM BRIDGE OVER ROGERS CREEK TO JCT. KY-861 INEDMONTON. (2004BOPC) (10CCR)

REPLACE BRIDGE ON CS-1053 (MP 0.327) OVER CLAY LICK CREEK; 0.4 MI SOUTHOF JCT US 68; (STRUCTURALLY DEFICIENT, SR=33.1) 085C00007N

REPLACE BRIDGE OVER OIL WELL BRANCH ON KY 496 0.5 MILE SE OF KY533.(085B00025N) (SR=48.2)(EBRP)

NEW INTERCHANGE FROM US-68 SOUTH ONTO THE CUMBERLAND PARKWAY.(08CCN)(10CCN)(12CCR)

IMPROVE KY 163 CORRIDOR FROM INTERSECTION WITH KY 90 TO US 68 EASTINCLUDING NEW ROUTE OF WEST EDMONTON BYPASS. (12CCR)

.400

13.837

.263

.100

.020

.400

8.300

MERCER

MERCER

METCALFE

METCALFE

METCALFE

METCALFE

METCALFE

METCALFE

US-68

US-68

KY-90

US-68

CS-1053

KY-496

US-68

KY-163

$860,000

$500,000

$17,130,000

$1,600,000

$850,000

$660,000

$10,740,000

$4,750,000

Total

Total

Total

Total

Total

Total

Total

Total

R

U

C

P

D

R

U

C

R

U

C

C

D

R

U

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2014

2014

2015

2014

2015

2017

2018

2020

2014

2014

2016

2017

2019

2020

2020

2020

2014

2015

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BRO

BRO

BRO

SPP

STP

STP

STP

STP

SP

SP

SP

BRZ

BRX

BRX

BRX

BRX

SPP

SP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$70,000

$80,000

$710,000

$500,000

$1,630,000

$2,000,000

$1,500,000

$12,000,000

$190,000

$370,000

$1,040,000

$850,000

$250,000

$75,000

$100,000

$235,000

$10,740,000

$4,750,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

07

07

03

03

03

03

03

03

1128.00

8708.00

112.10

900.00

1075.00

1087.00

8505.00

8506.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

JESSAMINE

07

07

08

99

03

03

03

03

1128.00

8708.00

136.00

354.07

1075.00

1087.00

8505.00

8500.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2012

2012

2006

2004

2010

2014

2008

2008

2012

2012

2000

2004

2010

2014

2008

2008

12.5

8.391

0

7

.277

11.201

9.9

12.9

20.058

11.719

7.263

.377

11.221

10.3

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / SCOPING STUDY(O)

RELIABILITY / SPOT IMPROVEMENTS(O)

SAFETY / SAFETY(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / DESIGN ENGINEERING(O)

RELIABILITY / DESIGN ENGINEERING(O)

0 2.17Milepoints: To:From:

Page 107: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 107

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

SCOPING STUDY AND DESIGN ON US-68 FROM THE CUMBERLAND PARKWAY TOTHE GREEN/METCALFE COUNTY LINE.(12CCN)

OPERATION OF TURKEY NECK BEND FERRY FOR FY 2015. (12CCR)

OPERATION OF TURKEY NECK BEND FERRY FOR FY 2016. (12CCR)

OPERATION OF TURKEY NECK BEND FERRY FOR FY 2017. (12CCR)

OPERATION OF TURKEY NECK BEND FERRY FOR FY 2018. (12CCR)

OPERATION OF TURKEY NECK BEND FERRY FOR FY 2019.(12CCR)

OPERATION OF TURKEY NECK BEND FERRY FOR FY 2020.(12CCR)

REPLACE BRIDGE ON NEW SALEM RD (CR 1354) OVER PETER CREEK 0.2 MILE EOF BETHLEHAM CHURCH RD (CR 1335)(SR 35.4) 086C00015N

CONSTRUCT NEW ROUTE FOR THE EAST TOMPKINSVILLE BYPASS "GRADE &DRAIN ONLY". (98CCN)(02CCR) (2002BOPC)(DESIGN "STP" FUNDING SHALL BESUPPLEMENTAL TO THE AUTHORIZED AMOUNT ALREADY EXPENDED ON THISPROJECT). (08CCR)(10CCR)

9.826

.040

METCALFE

MONROE

MONROE

MONROE

MONROE

MONROE

MONROE

MONROE

MONROE

US-68

KY-214

KY-214

KY-214

KY-214

KY-214

KY-214

CR-1354

-

$2,500,000

$444,000

$444,000

$444,000

$444,000

$444,000

$444,000

$335,000

$6,200,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

D

C

C

C

C

C

C

R

U

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2015

2015

2016

2017

2018

2019

2020

2015

2015

2017

2016

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

STP

SPP

SPP

SPP

SPP

SPP

SPP

BRZ

BRZ

BRZ

STP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$2,500,000

$444,000

$444,000

$444,000

$444,000

$444,000

$444,000

$85,000

$50,000

$200,000

$6,200,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

03

03

03

03

03

03

03

03

03

8706.00

128.06

128.07

128.08

128.09

128.10

128.11

1084.00

7020.01

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

03

03

03

03

03

03

03

03

03

8706.00

128.06

128.07

128.08

128.09

128.10

128.11

1084.00

7020.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2012

2010

2010

2012

2012

2014

2014

2012

2002

2012

2010

2010

2012

2012

2014

2014

2012

1998

10.2

1.737

1.737

1.737

1.737

1.737

1.737

1.954

20.026

1.837

1.837

1.837

1.837

1.837

1.837

1.994

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / SCOPING STUDY(O)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / FERRY OPERATION(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / NEW ROUTE(O)

Page 108: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 108

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

CONSTRUCT NEW ROUTE FOR THE EAST TOMPKINSVILLE BYPASS "SURFACINGONLY". (98CCN)(02CCR) (2002BOPC)(DESIGN "STP" FUNDING SHALL BESUPPLEMENTAL TO THE AUTHORIZED AMOUNT ALREADY EXPENDED ON THISPROJECT). (08CCR)(10CCR)

WIDEN KY 1991 FROM MAYSVILLE ROAD TO MIDLAND TRAIL INDUSTRIAL PARK,MONTGOMERY COUNTY (SEE 7-8501.00 FOR "SPB" FUNDS)(2005HPP-KY129)

RECONSTRUCT US 460 AT LUCKY STOP HILL. (12CCR)

RECONSTRUCT KY 11 FROM FAIRFIELD DRIVE TO 1.0 MILE SOUTH OF THE BATHCOUNTY LINE. (2008BOPC)(2010BOPC)

UPGRADE HINKSTON PIKE IN MT. STERLING FROM NEW MIDLAND TRAIL TOTHE NEW INDUSTRIAL PARK ENTRANCE (INCLUDES EXTENSION OF INDUSTRIALACCESS ROAD TO HINKSTON PIKE). (12CCR)

WIDEN KY-1991 FROM MAYSVILLE ROAD TO MIDLAND TRAIL INDUSTRIAL PARK.(2005HPP-KY129) TO BE DONE IN CONJUNCTION WITH 7-240.00. (08CCN)(12CCR)

MOUNTAIN PARKWAY CORRIDOR: WIDEN THE MOUNTAIN PARKWAY TO 4LANES FROM CR 1226 PARKWAY ROAD TUNNEL (MP 59.3) TO 0.4 MI EAST OF THEKY-134 JOHNSON CREEK BRIDGE - SECTION 6.(12CCR)

MOUNTAIN PARKWAY CORRIDOR: WIDEN THE MOUNTAIN PARKWAY TO 4LANES FROM CR 1226 PARKWAY ROAD TUNNEL (MP 59.3) TO 0.4 MI EAST OF THEKY-134 JOHNSON CREEK BRIDGE - SECTION 6.(12CCR)(ADDITIONAL FUNDINGFOR C PHASE)

MOUNTAIN PARKWAY CORRIDOR: WIDEN THE MOUNTAIN PARKWAY TO 4LANES FROM CR 1226 PARKWAY ROAD TUNNEL (MP 59.3) TO 0.4 MI EAST OF THEKY-134 JOHNSON CREEK BRIDGE - SECTION 6.(12CCR)(ADDITIONAL FUNDINGFOR C PHASE)

1.768

1.480

2.910

1.032

1.768

3.300

3.300

3.300

MONROE

MONTGOMERY

MONTGOMERY

MONTGOMERY

MONTGOMERY

MONTGOMERY

MORGAN

MORGAN

MORGAN

-

KY-1991

US-460

KY-11

KY-1991

KY-1991

KY-9009

KY-9009

KY-9009

$6,700,000

$749,899

$17,700,000

$10,820,000

$6,000,000

$1,600,000

$15,920,000

$15,000,000

$15,000,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

C

C

R

U

C

C

C

C

D

R

U

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2017

2014

2014

2014

2016

2014

2014

2014

2014

2015

2015

2017

2018

2019

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

STP

HPP

STP

STP

STP

SB2

SPP

SPP

NH

NH

NH

NH

NH

NH

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$6,700,000

$749,899

$3,680,000

$1,040,000

$12,980,000

$10,820,000

$6,000,000

$1,600,000

$540,000

$3,480,000

$900,000

$11,000,000

$15,000,000

$15,000,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

03

07

07

07

07

07

10

10

10

7020.17

240.01

250.10

317.30

411.00

8501.00

126.60

126.61

126.62

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

03

07

07

07

07

07

10

10

10

7020.01

240.01

250.10

317.00

411.00

8501.00

126.01

126.60

126.60

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2002

2010

2010

1998

2012

2008

2000

2014

2014

2002

2010

2010

1998

2012

2008

1998

2000

2000

0

18.125

11.448

1.768

0

59.3

59.3

59.3

1.768

19.6

14.355

2.8

1.768

62.588

62.588

62.588

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / NEW ROUTE(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / MINOR WIDENING(O)

RELIABILITY / MINOR WIDENING(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / PREFINANCD CONVRSN(O)

Page 109: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 109

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

IMPROVE SAFETY AND REDUCE ACCIDENTS ON KY-7 BY ELIMINATING ROCKOVERHANG AND ADDING SHOULDERS 1000 FEET SOUTH OF KY 1161 TO 1000 FEETNORTH OF KY 1161. (12CCR)

RECONSTRUCT/WIDENING OF MAIN ST(US 460) & PRESTONSBURG ST(US 460/KY 7)IN W LIBERTY BEGINNING ON US 460 AT BLAIR ST(CS1066) EXTENDING NE TOSALYER CEMETERY RD(CS1034) BEGINNING AT INTERSECTION OF US 460/KY 7EXTENDING N TO RIVERSIDE DR(CS1058) (2012BOP).

REPLACE BRIDGE OVER WHITE OAK CREEK ON US 460 0.5 MILE NW OF KY 1000.(088B00021N)(SR=35)

IMPROVE ALIGNMENT ON KY-172 FROM MP 5 TO MP 8.(02CCN)(06CCR)(08CCR)(10CCR)(12CCR)

RECONSTRUCT KY-172 FROM MILEPOST 2 TO MILEPOST 5.(06CCN)(08CCR)(12CCR)

RECONSTRUCT KY-172 FROM MILEPOST 8.0 TO MILEPOST 10.4.(06CCN)(08CCR)(10CCR)(12CCR)

RECONSTRUCT AND STRAIGHTEN CURVE IN US-460 FROM MILEPOST 1.6 TOMILEPOST 2.1. (06CCN)(12CCR)

RECONSTRUCT KY-7 FROM MILE POST 2.7 TO MILE POST 5.6 (JUNCTION 519 TOSOUTH SIDE OF WRIGLEY HILL). (08CCN)(12CCR)

.400

.480

.050

3.000

3.000

2.400

.500

2.950

MORGAN

MORGAN

MORGAN

MORGAN

MORGAN

MORGAN

MORGAN

MORGAN

KY-7

US-460

US-460

KY-172

KY-172

KY-172

US-460

KY-7

$5,380,000

$7,050,000

$300,000

$7,100,000

$6,470,000

$6,500,000

$6,260,000

$13,110,000

Total

Total

Total

Total

Total

Total

Total

Total

R

U

C

D

R

U

C

D

C

C

C

R

U

C

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2015

2015

2016

2014

2015

2015

2016

2020

2014

2014

2014

2014

2014

2015

2014

2014

2015

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SPP

SPP

SPP

SPP

SPP

SPP

BRX

SPP

SB2

SPP

SPP

SPP

SPP

SP

SP

SP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$630,000

$310,000

$4,440,000

$350,000

$1,000,000

$500,000

$5,200,000

$300,000

$7,100,000

$6,470,000

$6,500,000

$470,000

$380,000

$5,410,000

$2,320,000

$1,560,000

$9,230,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

10

10

10

10

10

10

10

10

160.00

293.00

1111.00

8100.00

8300.00

8301.00

8302.00

8402.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

10

99

10

10

10

10

10

10

160.00

86.12

1111.00

8100.00

8300.00

8301.00

8302.00

8402.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2012

2012

2014

2002

2006

2006

2006

2008

2012

2002

2014

2002

2006

2006

2006

2008

3.45

17.424

25.74

5

2

8

1.6

2.667

3.85

17.904

25.79

8

5

10.4

2.1

5.592

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

SAFETY / SAFETY(P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / SPOT IMPROVEMENTS(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

Page 110: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 110

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

IMPROVE RAILROAD CROSSING AT MP 15.674 BETWEEN CENTRAL CITY ANDDRAKESBORO. (04CCR)

REPLACE BRIDGE ON JARRELS CREEK RD (CR 1296) OVER JARRELS CREEK 0.56MILE N OF KY 189 (SR 19.8)089C00013N

CONSTRUCT A TURNING LANE AT MADISONVILLE COMMUNITY COLLEGE,MUHLENBERG CAMPUS. (06CCN)(10CCR)

WIDEN US-62 FROM WAL-MART TO US-431. (08CCN)(10CCR)(12CCR)

BARDSTOWN-LOUISVILLE; WIDENING AND ACCESS MANAGEMENTIMPROVEMENTS ON US-31E BETWEEN NAZARETH DRIVE AND KY-509. (2004BOPC)

BARDSTOWN-LOUISVILLE; RELOCATION OF US-31E FROM JUST SOUTH OFWHITESIDES DRIVE IN NELSON COUNTY TO THE SALT RIVER BRIDGE INSPENCER COUNTY. (2004BOPC)(10CCR)(12CCR)

REPLACE BRIDGE ON US-62 OVER EAST FRK OF SIMPSON CREEK 0.01 MILES S OFKY-55 IN BLOOMFIELD (SR 49.5) 090B00023N.(12CCR)

REPLACE BRIDGES ON US 62 (HINKLE CREEK) AND KY 48 IN BLOOMFIELD090B00096N (12CCR)

.300

.250

1.500

3.700

6.400

.040

.040

MUHLENBERG

MUHLENBERG

MUHLENBERG

MUHLENBERG

NELSON

NELSON

NELSON

NELSON

US-431

CR-1296

US-62

US-62

US-31E

US-31E

US-62

US-62

$4,120,000

$575,000

$520,000

$9,740,000

$37,880,000

$32,240,000

$430,000

$2,150,000

Total

Total

Total

Total

Total

Total

Total

Total

D

R

U

C

R

U

C

C

C

R

U

C

C

C

D

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2014

2015

2015

2016

2014

2014

2015

2014

2014

2014

2014

2017

2015

2014

2014

2014

2014

2015

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SP

SP

SP

SP

BRZ

BRZ

BRZ

SP

SPP

SP

SP

SP

SPP

BRO

BRO

BRO

BRO

BRO

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$630,000

$450,000

$330,000

$2,710,000

$150,000

$75,000

$350,000

$520,000

$9,740,000

$9,930,000

$2,440,000

$25,510,000

$32,240,000

$430,000

$300,000

$150,000

$400,000

$1,300,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

02

02

02

02

04

04

04

04

160.00

1087.00

8301.00

8506.00

287.10

287.50

1075.00

1078.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

BULLITTSPENCER

02

02

02

02

04

04

04

04

160.00

1087.00

8301.00

8506.00

287.30

287.05

1075.00

1078.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2004

2012

2006

2008

2004

2004

2012

2012

2004

2012

2006

2008

2004

2000

2012

2012

15.524

.567

17.55

16.471

16.835

23.607

24.917

27.278

15.824

.607

17.7

17.93

20.536

27.31

24.957

27.318

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

SAFETY / SAFETY(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / MINOR WIDENING(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / RELOCATION(O)

RELIABILITY / RELOCATION(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

0 2.703Milepoints:Milepoints:

To:To:

From:From:

Page 111: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 111

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

REPLACE BRIDGE ON MOBLEY MILL RD (CR 1327) OVER FROMAN CREEK 0.72MILE W OF LENORE RD (KY 2739)(SR 24.5) 090C00039N (12CCR)

REPLACE BRIDGE OVER DAVIS RUN ON HIGDON LOOP (CR 1215) 0.1 MI S OF US31E NEAR SCL OF NEW HAVEN (090C00030N)(SR=27) (EBRP)

WIDEN KY-245 FROM US-150 TO US-62. (2006BOPC)(06CCN)(12CCR)

WIDEN US-150 FROM KY-49 TO NEAR KY-245/WAL-MART WIDENING. (06CCN)

WIDEN US-150 FROM NEAR KY-245 THROUGH THE BLUEGRASS PARKWAYINTERCHANGE TO JUST PAST LESLIE BALLARD ROAD.(06CCN)(2006BOPC)(12CCR)

PARIS-MAYSVILLE ROAD; RECONSTRUCT FROM MILLERSBURG TO KY-32 ATCARLISLE (SECTION 3).(08CCR)(12CCR)

RECONSTRUCT KY 36-KY 32 NEAR THE NICHOLAS COUNTY SCHOOLS PROPERTY.MP 3.10 TO MP 3.283. (12CCR)

REPLACE BRIDGE ON KY-32 (MP 13.896) OVER TTI RR & SCRUBGRASS CREEK; 4.2MILE NORTHEAST OF JCT KY 1455; (FUNCTIONALLY OBSOLETE, SR=49.2)091B00008N

.020

2.334

1.300

.600

4.400

.183

.100

NELSON

NELSON

NELSON

NELSON

NELSON

NICHOLAS

NICHOLAS

NICHOLAS

CR-1327

CR-1215

KY-245

US-150

US-150

US-68

KY-36

KY-32

$400,000

$100,000

$11,250,000

$16,540,000

$30,670,000

$24,450,000

$7,010,000

$3,360,000

Total

Total

Total

Total

Total

Total

Total

Total

C

D

C

D

R

U

C

D

R

U

C

U

C

R

U

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2014

2020

2014

2014

2015

2015

2017

2014

2015

2015

2017

2014

2016

2014

2014

2015

2014

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BRZ

BRZ

SPP

SP

SP

SP

SP

SP

SP

SP

SP

NH

SPP

STP

STP

STP

BRO

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$400,000

$100,000

$11,250,000

$520,000

$2,210,000

$650,000

$13,160,000

$50,000

$2,630,000

$940,000

$27,050,000

$7,580,000

$16,870,000

$1,660,000

$850,000

$4,500,000

$3,360,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

04

04

04

04

04

07

09

09

1083.00

1092.00

8307.10

8308.10

8309.10

310.30

205.00

1074.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

04

04

04

04

04

07

09

09

1083.00

1092.00

8307.00

8308.00

8309.00

310.01

205.00

1074.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2012

2014

2006

2006

2006

2000

2012

2010

2012

2014

2006

2006

2006

1996

2012

2010

3.411

.12

0

.44

1.697

.4

3.1

13.846

3.451

.14

2.334

1.697

2.285

4.827

3.283

13.946

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / MAJOR WIDENING(O)

SAFETY / SAFETY(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

Page 112: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 112

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

RECONSTRUCT INTERSECTION AT KY 54 AND KY 2671. (12CCR)

REPLACE BRIDGE ON US-62 (MP 12.264) OVER MUDDY CK.; .4 MI W OF JCT KY1543; (STRUCTURALLY DEFICIENT, SR=49.3) 092B00034N

REPLACE BRIDGE ON CR-1194 (MP 0.079) OVER THREELICK CREEK; .15 MI W JCTCR 5172; (STRUCTURALLY DEFICIENT, SR=2) 092C00128N

REPLACE BRIDGE ON US 62 OVER BRANCH OF THREE LICK FORK 0.23 MILE E OFGREEN MEADOWS DR (CS 6068)(SR 49.2)092B00032

REPLACE BRIDGE OVER THREELICK FORK ON US 62 0.4 MILE E OF GREENMEADOWS DRIVE (CS 6068) IN BEAVER DAM. (092B00033N)(SR=48)

ADDRESS LEFT TURN LANE ISSUES ON US-231 AT SOUTHERN ELEMENTARYSCHOOL, MP 5.15 TO 5.25.(12CCN)

KY-393 RECONSTRUCT FROM NORTHERN RAMP OF I-71 TO NORTH OF KY-146(CSX RAILROAD) (STATIONS 10+100 TO 12+100)(DESIGN UNDER 5-230.00)

RECONSTRUCT KY-22 FROM KY-329 TO ABBOTT LANE.(2004BOPC)(08CCR)(10CCR)(12CCR)

.100

.100

.100

.040

.074

.100

1.243

2.100

OHIO

OHIO

OHIO

OHIO

OHIO

OHIO

OLDHAM

OLDHAM

KY-54

US-62

CR-1194

US-62

US-62

US-231

KY-393

KY-22

$1,500,000

$1,360,000

$590,000

$970,000

$225,000

$1,800,000

$16,820,000

$17,440,000

Total

Total

Total

Total

Total

Total

Total

Total

R

U

C

C

R

U

C

R

U

C

D

R

U

C

C

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2015

2015

2016

2014

2014

2014

2016

2015

2015

2016

2020

2014

2014

2015

2015

2017

2017

2019

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SPP

SPP

BRO

BRZ

BRZ

BRZ

BRO

BRO

BRO

BRX

SPP

SPP

SPP

STP

SP

SP

SP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$200,000

$300,000

$1,000,000

$1,360,000

$100,000

$150,000

$340,000

$230,000

$90,000

$650,000

$225,000

$400,000

$500,000

$900,000

$16,820,000

$2,560,000

$2,540,000

$12,340,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

02

02

02

02

02

02

05

05

231.00

1071.00

1077.00

1083.00

1091.00

8705.00

234.00

304.10

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

02

02

02

02

02

02

05

05

231.00

1071.00

1077.00

1083.00

1091.00

8705.00

230.00

304.01

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2012

2010

2010

2012

2014

2012

2000

2004

2012

2010

2010

2012

2014

2012

1996

1996

3.939

12.264

.029

11.892

12

5.15

4.672

3.25

4.039

12.364

.129

11.932

12.074

5.25

5.868

5.32

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

SAFETY / SAFETY(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

SAFETY / SAFETY(P)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / MAJOR WIDENING(O)

Page 113: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 113

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

RECONSTRUCT KY-22 FROM KY-329B TO ABBOTT LANE INCLUDING THETERMINI INTERSECTIONS OF KY 22 @ KY 329B AND KY 22 @ ABBOTTLANE.("BRIDGE HILL")(12CCR)

RECONSTRUCT KY-22 TO 5-LANES FROM ABBOTT LANE TO PROPOSED KY-393INTERSECTION AND CONTINUING WITH 3-LANES TO EXISTING KY-393.(2004BOPC)

CONSTRUCT NEW ROUTE FROM OLD HENRY INTERCHANGE AT I-265 TOCRESTWOOD BYPASS. (98CCR)(2004BOPP)(10CCN)

EXTENSION OF OLD HENRY ROAD EAST TO ASH AVENUE (KY362). (12CCR)

INTER-URBAN GREENWAY: CONSTRUCT A NON-MOTORIZED CORRIDOR FROMLAGRANGE TO JEFFERSON COUNTY LINE. (FUNDING SUBJECT TO FISCALCONSTRAINT PENDING MPO TIP).

CONSTRUCT AN UNINTERRUPTED RAIL UNDERPASS WEST OF LAGRANGE.(LOCAL MATCH)(ALL WORK BY OLDHAM COUNTY) (FUNDING SUBJECT TOFISCAL CONSTRAINT PENDING MPO TIP).

CONSTRUCT SIDEWALKS ON KY 1793 FROM RIDGEVIEW DRIVE TO SETTLERSPOINT TRAIL, AND A SIDEWALK CONNECTION FROM TIMOTHY WAY TO PEGGYBAKER PARK.(FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)

RECONSTRUCT US-42 FROM THE JEFFERSON/OLDHAM COUNTY LINE TORIDGEMOOR DRIVE. (2004BOPC) (FUNDING SUBJECT TO FISCAL CONSTRAINTPENDING MPO TIP).

1.400

2.200

5.000

2.200

.750

.286

.900

OLDHAM

OLDHAM

OLDHAM

OLDHAM

OLDHAM

OLDHAM

OLDHAM

OLDHAM

KY-22

KY-22

-

-

-

CR-1002

KY-1793

US-42

$10,200,000

$18,240,000

$16,000,000

$20,840,000

$2,080,000

$10,140,000

$80,000

$4,010,000

Total

Total

Total

Total

Total

Total

Total

Total

C

D

R

U

C

R

U

C

R

U

C

C

R

U

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2015

2014

2016

2016

2017

2014

2014

2016

2014

2014

2016

2014

2014

2014

2016

2014

2014

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SP

SP

SP

SP

SB2

SB2

SP

SB2

SB2

SB2

SLO

SLO

SLO

SLO

SLO

SLO

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$10,200,000

$910,000

$3,840,000

$2,540,000

$10,950,000

$500,000

$500,000

$15,000,000

$2,400,000

$3,440,000

$15,000,000

$2,080,000

$3,190,000

$1,350,000

$5,600,000

$80,000

$4,010,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

05

05

05

05

05

05

05

05

304.15

304.20

367.00

367.20

410.01

434.00

440.10

441.01

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

SHELBYJEFFERSON

JEFFERSON

05

05

05

05

05

05

05

05

304.10

304.01

367.00

367.00

410.00

434.00

440.01

441.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2004

2004

1996

2010

2004

2004

2004

2004

2004

1996

1996

1996

2002

2004

2004

2004

3.929

5.32

0

1.542

0

5.32

7.5

.747

1.828

.942

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / NEW ROUTE(O)

SAFETY / BIKE/PED FACIL(O)

SAFETY / SAFETY(P)

SAFETY / SAFETY(P)

RELIABILITY / RECONSTRUCTION(O)

Milepoints:Milepoints:

Milepoints:

To:To:

To:

From:From:

From:

Page 114: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 114

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

ACCESS MANAGEMENT AND INTERSECTION/SIGNAL IMPROVEMENTS TOPROVIDE CONGESTION RELIEF ON KY-53 FROM DOWNTOWN LAGRANGE TO I-71.(2004BOPC)

INTERSECTION IMPROVEMENT AT KY 22 AND KY 329 IN CRESTWOOD. (ALLWORK BY KYTC)(2006BOPC)(FUNDING SUBJECT TO FISCAL CONSTRAINTPENDING MPO TIP)

CONSTRUCTION OF A PARK AND RIDE FACILITY INCLUDING A PARKING LOT,SHELTER, PLAYGROUND, BIKE LOCKERS, WALKWAYS, AND A 1000' ACCESSROAD LOCATED ON APPLE PATCH WAY OFF OF KY-329 NEAR I-71 EXIT 14 INCRESTWOOD.(2010BOPC)

CONSTRUCT AN ADA COMPLIANT SIDEWALK AND MINOR DRAINAGEIMPROVEMENTS ON THE SOUTHSIDE OF KY 146 FROM THE OLDHAM/JEFFERSONCOUNTY LINE EAST TO FOLEY AVENUE.

OLD FLOYDSBURG ROAD SAFETY IMPROVEMENTS: REPLACE NARROW ONE-LANE CULVERT CROSSING; CLEAR TREES AND VEGETATION OUT OF RIGHT-OF-WAY; ADD SHOULDER TO THE ROAD, AND ADD SIGNAGE FOR SAFETY.

CONSTRUCT VARIOUS SIDEWALKS IN OLDHAM COUNTY.

CONSTRUCT VARIOUS SIDEWALKS IN OLDHAM COUNTY.

CONSTRUCT VARIOUS SIDEWALKS IN OLDHAM COUNTY.

CONSTRUCT VARIOUS SIDEWALKS IN OLDHAM COUNTY.

.649

.200

.183

OLDHAM

OLDHAM

OLDHAM

OLDHAM

OLDHAM

OLDHAM

OLDHAM

OLDHAM

OLDHAM

KY-53

KY-22

CS-7000

KY-146

CR-1209

-

-

-

-

$1,200,000

$870,000

$702,551

$166,000

$1,056,700

$386,123

$100,000

$100,000

$100,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

C

C

C

D

U

C

D

R

C

D

C

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2014

2014

2014

2014

2014

2014

2014

2015

2016

2014

2014

2015

2016

2017

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

CM

SLO

CM

SLO

SLO

SLO

SLO

SLO

SLO

SLO

SLO

SLO

SLO

SLO

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$1,200,000

$870,000

$702,551

$36,000

$10,000

$120,000

$304,700

$230,000

$522,000

$52,222

$333,901

$100,000

$100,000

$100,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

05

05

05

05

05

05

05

05

05

444.00

449.00

468.00

488.00

494.00

517.00

517.01

517.02

517.03

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

99

05

99

05

05

05

05

05

05

219.05

965.12

219.08

965.12

965.12

965.12

517.00

517.00

517.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2004

2004

2010

2014

2014

2014

2014

2014

2014

2000

2004

2002

2004

2004

2004

2014

2014

2014

6.488

3.15

0

0

7.137

3.35

.041

.183

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / CONGESTION MITIGTN(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / CONGESTION MITIGTN(O)

SAFETY / BIKE/PED FACIL(O)

SAFETY / SAFETY-HAZARD ELIM(P)

SAFETY / BIKE/PED FACIL(O)

SAFETY / BIKE/PED FACIL(O)

SAFETY / BIKE/PED FACIL(O)

SAFETY / BIKE/PED FACIL(O)

Page 115: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 115

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

CONSTRUCTION OF A NEW CONNECTION FROM OLD LAGRANGE ROAD TO KY393 AT BUCKNER. LPA CONTRACT. (BOP2012)

CONSTRUCT NEW I-71 OVERPASS WITH APPROACHES FROM COMMERCEPARKWAY TO PEAK ROAD. (06CCR)(12CCR)

PROVIDE A NEW FOUR LANE CONNECTOR BETWEEN THE NEW I-71 OVERPASSAND US 53. [RING ROAD](12CCN)

RECONSTRUCT KY-22 AT KY-227 AT END OF NEW CONSTRUCTION TO 0.4 MILEEAST OF KY 845 SOUTH. (06CCR)(08CCN)(12CCR)

REPLACE BRIDGE AND APPROACHES ON KY-355 OVER LITTLE TWIN CREEK 380FEET SOUTHEAST OF KY-355/KY-325 INTERSECTION (B09). (SR=30.3): (094B00009N)

REPLACE BRIDGE OVER CEDAR CREEK ON SAWDRIDGE CREEK W ROAD (CR1214) 0.2 MI N OF US 127 (094C00011N)(SR=20.3)

WIDEN KY 22 FROM INTERSECTION WITH KY 845 TO THE OWEN/GRANT COUNTYLINE.(12CCN)

KY 30 (PRIORITY SECTION); FROM NORTH OF JCT. KY 847 AT TRAVELLERS RESTAT END OF NEW CONSTRUCTION TO KY 11 AT LEVI. (08CCN)(10CCR)(12CCR)

4.700

.100

.040

2.500

6.200

OLDHAM

OLDHAM

OLDHAM

OWEN

OWEN

OWEN

OWEN

OWSLEY

-

-

-

KY-22

KY-355

CR-1214

KY-22

KY-30

$1,131,040

$10,740,000

$13,100,000

$26,490,000

$2,030,500

$850,000

$35,000,000

$29,970,000

Total

Total

Total

Total

Total

Total

Total

Total

D

R

C

C

C

R

U

C

R

C

D

R

U

C

R

U

C

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2015

2015

2015

2014

2014

2015

2015

2016

2014

2014

2017

2019

2019

2020

2014

2014

2016

2014

2016

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SLO

SLO

SLO

SPP

SPP

SPP

SPP

SP

BRX

BRX

BRZ

BRZ

BRZ

BRZ

SPP

SPP

SPP

SPP

SPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$95,104

$115,104

$920,832

$10,740,000

$13,100,000

$1,840,000

$1,250,000

$23,400,000

$40,500

$1,990,000

$150,000

$100,000

$100,000

$500,000

$3,000,000

$1,000,000

$31,000,000

$1,890,000

$28,080,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

05

05

05

06

06

06

06

10

754.00

8201.01

8708.00

198.00

1066.00

1088.00

8702.00

279.51

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

05

05

05

06

06

06

06

10

754.00

8201.00

8708.00

198.00

1066.00

1088.00

8702.00

279.50

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2012

2006

2012

2006

2008

2014

2012

1996

2012

2004

2012

2006

2008

2014

2012

1996

11.315

13.307

.22

16.057

16.057

13.457

.26

18.56

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / NEW ROUTE(O)

RELIABILITY / NEW INTERCHANGE(O)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / RECONSTRUCTION(O)

SAFETY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / RELOCATION(O)

Page 116: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 116

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

RECONSTRUCT KY 30 FROM KY 846 TO THE JACKSON COUNTY LINE.

REPLACE BRIDGE AND APPROACHES ON KY-30 OVER LITTLE STURGEON CREEK(B13) 40 FEET EAST OF LITTLE STURGEON CREEK ROAD. (SR=8.7): (095B00013N)

REPLACE BRIDGE ON CR-1136 (MP 0.437) OVER S. FORK KY. RIVER; .4 MI E OF JCTKY 11; (STRUCTURALLY DEFICIENT, SR=15.8) 095C00007N

REPLACE BRIDGE ON UPPER WOLFE CREEK ROAD (CR-1134) (MP 0.176) OVERUPPER WOLFE CREEK 0.2 MILES EAST OF JCT. KY-11.(095C00018N)(SR=25)(2012BOP)(AR/W)

REPLACE BRIDGE ON KY-3185 (MP 1.535) OVER LICK CREEK; 1.6 MI NE - JCT KY17; (STRUCTURALLY DEFICIENT, SR=13.7) 096B00038N

REPLACE BRIDGE ON KY-159 (MP 3.639) OVER KINCAID CREEK; .2 MI. SOUTH OFJCT.KY 609; (STRUCTURALLY DEFICIENT, SR=24.4) 096B00004N

REPLACE BRIDGE ON KY 330 OVER SHORT CREEK 0.35 MILE N OF J H GODMANRD (CR 1238)(SR 47.3) 096B00012N

SCOPING STUDY FROM BUTLER TO KY-9/AA HIGHWAY. (08CCN)(10CCR)(12CCR)

3.378

.100

.100

.100

.100

.040

OWSLEY

OWSLEY

OWSLEY

OWSLEY

PENDLETON

PENDLETON

PENDLETON

PENDLETON

KY-30

KY-30

CR-1136

CR-1134

KY-3185

KY-159

KY-330

KY-9

$32,000,000

$5,200,000

$550,000

$860,000

$525,000

$2,525,000

$575,000

$200,000

Total

Total

Total

Total

Total

Total

Total

Total

D

R

U

C

C

C

D

U

C

R

U

C

R

U

C

R

U

C

P

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2015

2017

2017

2019

2014

2016

2014

2015

2017

2014

2014

2016

2014

2015

2017

2015

2015

2016

2014

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SPP

SPP

SPP

BRO

BRZ

BRZ

BRZ

BRZ

BRX

BRX

BRX

BRX

BRX

BRX

BRO

BRO

BRO

SPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$1,500,000

$5,000,000

$500,000

$25,000,000

$5,200,000

$550,000

$300,000

$30,000

$530,000

$75,000

$50,000

$400,000

$100,000

$75,000

$2,350,000

$50,000

$25,000

$500,000

$200,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

10

10

10

10

06

06

06

06

279.60

1084.00

1093.00

1108.00

1071.00

1073.00

1081.00

8509.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

10

10

10

99

06

06

06

06

279.60

1084.00

1093.00

1074.04

1071.00

1073.00

1081.00

8509.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2014

2008

2010

2012

2010

2010

2012

2008

2014

2008

2010

2004

2010

2010

2012

2008

0

5.066

.387

.14

1.485

3.589

8.638

3.378

5.13

.487

.213

1.585

3.689

8.678

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / RECONSTRUCTION(O)

SAFETY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / DESIGN ENGINEERING(O)

Page 117: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 117

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

RECONSTRUCT US-27 FROM BUTLER IN PENDLETON COUNTY TO SOUTH OF KY-154 IN CAMPBELL COUNTY (MP 17.9 PENDLETON COUNTY TO MP 1.9 CAMPBELLCOUNTY).(12CCN)

IMPROVE SAFETY, UPGRADE GEOMETRICS, AND ADDRESS CAPACITY ISSUESFOR KY 15 IN PERRY COUNTY FROM MORTON BOULEVARD TO KY 15 BYPASS

IMPROVE SAFETY, UPGRADE GEOMETRICS, AND ADDRESS CAPACITY ISSUESFOR KY 15 IN PERRY COUNTY FROM MORTON BOULEVARD TO KY 15BYPASS.(ADDITIONAL FUNDING FOR C PHASE)

IMPROVE SAFETY, UPGRADE GEOMETRICS, AND ADDRESS CAPACITY ISSUESFOR KY 15 IN PERRY COUNTY FROM MORTON BOULEVARD TO KY 15 BYPASS.(ADDITIONAL FUNDING FOR C PHASE)

IMPROVE SAFETY, UPGRADE GEOMETRICS, AND ADDRESS CAPACITY ISSUESFOR KY 15 FROM MORTON BOULEVARD TO BONNYMAN. (12CCR)(PROJECTMOVED FROM 10-159)(D-PHASE UNDER 10-269.0)

RECONSTRUCTION OF THREE (3) AT-GRADE RAILROAD CROSSING ON KY15 INPERRY COUNTY LOCATED BETWEEN MP 2.1 TO MP 3.7. (2012BOP)

REPLACE BRIDGE AND APPROACHES ON KY-80 AT THE CSX RAILROAD ANDKENTUCKY RIVER (B29). (SR=6.5): (097B00029N)(10CCR)

REPLACE BRIDGE ON KY-451 (MP 0.054) OVER CSX RAILROAD AND NORTH FORKKENTUCKY RIVER; .100 MILE NORTH OF JCT KY-15; (STRUCTURALLY DEFICIENT,SR=37.4) 097B00016N (AR/W)

3.340

1.243

1.243

1.243

2.314

1.600

.100

.100

PENDLETON

PERRY

PERRY

PERRY

PERRY

PERRY

PERRY

PERRY

US-27

KY-15

KY-15

KY-15

KY-15

KY-15

KY-80

KY-451

$67,790,000

$27,250,000

$20,000,000

$20,000,000

$35,460,000

$1,995,000

$3,800,000

$3,100,000

Total

Total

Total

Total

Total

Total

Total

Total

R

U

C

R

U

C

C

C

D

C

D

R

U

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2014

2015

2016

2016

2016

2018

2019

2020

2014

2018

2014

2014

2014

2014

2014

2014

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SPP

SPP

NH

NH

NH

NH

NH

NH

SPP

RRP

RRP

RRP

RRP

BRO

BRO

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$20,000,000

$4,500,000

$43,290,000

$10,370,000

$630,000

$16,250,000

$20,000,000

$20,000,000

$300,000

$35,160,000

$100,000

$50,000

$145,000

$1,700,000

$3,800,000

$3,100,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

06

10

10

10

10

10

10

10

8706.00

158.00

158.01

158.02

269.10

294.00

1082.00

1088.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

CAMPBELL 06

10

10

10

10

99

10

10

8706.00

158.00

158.00

158.00

159.00

352.10

1082.00

1088.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2012

2012

2014

2014

2012

2008

2008

2010

2012

2012

2012

2012

2012

2008

2008

2010

17.9

13.269

13.269

13.269

14.486

2.1

6.92

.004

19.34

14.512

14.512

14.512

16.8

3.7

7.32

.104

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / SAFETY-RR PROTECTN(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

0 1.9Milepoints: To:From:

Page 118: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 118

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

KY 1096 OVER BIG CREEK BRIDGE PROJECT (FY2010 IBRD PROJECT) (2010BOPC)(AR/W)

REPLACE BRIDGE ON RIGHT FORK MACES CREEK RD (KY 1166) OVER RIGHTFORK MACES CREEK AT INTERSECTION WITH HUNTER RIDGE LN (CR 1226Q3)(SR36.3) 097B00101N

REPLACE BRIDGE ON BULAN HINER RD (KY 1146) OVER TRACE FORK AT JCTWITH KENTUCKY HIGHWAY 476 (KY 476)(SR 25.5) 097B00103N

REPLACE BRIDGE ON BIG WILLARD RD (KY 2021) OVER WILLARD CREEK ATINTERSECTION WITH BEECH NUT LN (CR 1213)(SR 44.6) 097B00027N

REPLACE BRIDGE ON OLD BEECH FORK RD (CR 1539) OVER LEATHERWOODCREEK AT JCT WITH KENTUCKY HIGHWAY 699 (KY 699)(SR 7.3) 097C00045N

REPLACE BRIDGE ON BLACK HAWK RD (CR 1107) OVER CARR FORK AT JCTWITH RAPTOR LN (CR 1179)(SR 4.3) 097C00006N

REPLACE BRIDGE OVER CLOVER FORK ON ROAD TO LEATHERWOOD SCHOOL50 FT N OF KY 699 (097C00052N) (SR= 14.6)

.040

.033

.040

.010

PERRY

PERRY

PERRY

PERRY

PERRY

PERRY

PERRY

KY-1096

KY-1166

KY-1146

KY-2021

CR-1539

CR-1107

PR-1056

$670,000

$1,090,000

$1,100,000

$600,000

$920,000

$880,000

$850,000

Total

Total

Total

Total

Total

Total

Total

R

U

C

R

U

C

R

U

C

R

U

C

R

U

C

R

U

C

D

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2014

2015

2016

2014

2014

2015

2015

2015

2017

2015

2015

2017

2014

2014

2015

2014

2014

2015

2017

2019

2019

2020

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BRX

BRX

BRX

BRO

BRO

BRO

BRO

BRO

BRO

BRO

BRO

BRO

BRZ

BRZ

BRZ

BRZ

BRZ

BRZ

BRZ

BRZ

BRZ

BRZ

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$100,000

$100,000

$470,000

$150,000

$50,000

$890,000

$400,000

$150,000

$550,000

$100,000

$50,000

$450,000

$400,000

$50,000

$470,000

$180,000

$50,000

$650,000

$250,000

$50,000

$50,000

$500,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

10

10

10

10

10

10

10

1095.00

1101.00

1102.00

1103.00

1104.00

1107.00

1112.00

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

10

10

10

10

10

10

10

1095.00

1101.00

1102.00

1103.00

1104.00

1107.00

1112.00

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2010

2012

2012

2012

2012

2012

2014

2010

2012

2012

2012

2012

2012

2014

3.539

2.137

2.679

1.075

0

.062

.02

3.547

2.177

2.712

1.115

.03

.102

.03

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

Page 119: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 119

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

REPLACE BRIDGE OVER NORTH FORK KENTUCKY RIVER ON KENMONT ROAD(CR 1114) 380 FT SE OF KY 7 (097C00005N)(SR=48.6)

REPLACE BRIDGE OVER STRAIGHT FORK ON LITTLE LEATHERWOOD CREEKROAD (CR 1140) AT JCT WITH KY 3348 (097C00013N)(SR=38)

IMPROVE KY 194 FROM US 119 RAMP NEAR SMITH FARMS BOTTOM (CR 1458) TONEAR DESKINS BRANCH CULVERT

PIKEVILLE TO VA. STATE LINE; US460/KY80 FROM KY-195 TO EAST OF PONDCREEK - SECTION 6A-2 BRIDGE AT POND CREEK.

PIKEVILLE TO VA. STATE LINE; US 460/KY 80 AT BEAVER CREEK NEAR BEAVERBOTTOM (SECTION 7A-2), RAMP 2, GRADE, DRAIN AND SURFACING.

PIKEVILLE TO VA. STATE LINE; US 460/KY 80 FROM BEAVER CREEK NEAR FLATFORK TO BEAVER CREEK STATION 885+00 NEAR KY 1373 (SECTION 8A).

PIKEVILLE TO VA. STATE LINE; US-460/KY-80 FROM KY-80 AT BEAVER CREEK TOVIRGINIA STATE LINE (SURFACING FOR SECTIONS 7A, 7B, 8 & 9V) (2000BOP)

PIKEVILLE TO VA. STATE LINE; US-460/KY-80 FROM KY-80 AT BEAVER CREEK TOVIRGINIA STATE LINE (SURFACING FOR SECTIONS 7A, 7B, 8 & 9V)(2000BOP)(ADDITIONAL FUNDING FOR C PHASE)

CONSTRUCT BRIDGE AT POTTER FLATS NEAR ELKHORN CITY.(10CCR)

.047

.009

2.049

1.700

.600

2.700

4.500

4.500

PERRY

PERRY

PIKE

PIKE

PIKE

PIKE

PIKE

PIKE

PIKE

CR-1114

CR-1140

KY-194

US-460

US-460

US-460

US-460

US-460

-

$300,000

$375,000

$18,000,000

$20,000,000

$28,910,000

$25,100,000

$15,000,000

$14,130,000

$2,990,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

D

D

R

U

D

R

U

C

C

C

C

C

C

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2020

2019

2020

2020

2015

2017

2017

2019

2020

2014

2014

2018

2019

2014

2014

2015

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BRZ

BRZ

BRZ

BRZ

SPP

SPP

SPP

SPP

APD

APD

APD

APD

APD

SP

SP

SP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$300,000

$250,000

$50,000

$75,000

$2,000,000

$2,000,000

$1,500,000

$12,500,000

$20,000,000

$28,910,000

$25,100,000

$15,000,000

$14,130,000

$120,000

$60,000

$2,810,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

10

10

12

12

12

12

12

12

12

1113.00

1114.00

198.00

263.63

263.74

263.80

263.89

263.95

276.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

10

10

12

12

12

12

12

12

12

1113.00

1114.00

198.00

263.61

263.72

263.24

263.80

263.89

276.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2014

2014

2014

2006

2002

2000

2000

2014

2000

2014

2014

2014

2000

2000

1998

2000

2000

2000

.07

0

17.951

.117

.009

20

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RELOCATION(O)

RELIABILITY / RELOCATION(O)

RELIABILITY / RELOCATION(O)

RELIABILITY / SURFACE(O)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / NEW ROUTE(O)

Page 120: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 120

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

CURVE REVISION AND PASSING LANES ON KY-194 NEAR DESKINS BRANCH(08CCR)(12CCR)

KY-199 SPOT IMPROVEMENT (PRIORITY 2); IMPROVE INTERSECTION WITH KY-1056 AND RELOCATE PORTIONS OF KY-199 ALONG OLD NORFOLK SOUTHERNRAILROAD BED @ MCANDREWS. (2002BOPC) (08CCR)(10CCR)

KY-199 SPOT IMPROVEMENT; RELOCATE PORTIONS OF KY-199 ALONG OLDNORFOLK SOUTHERN RAILROAD BED @ STONE. (2002BOPC)(08CCR)

REPLACE BRIDGE ON KY-1426 (MP 17.294) OVER BENT BRANCH; 0.4 MILES EASTOF NORTHEAST JCT KY 194; (STRUCTURALLY DEFICIENT, SR=4) 098B00014N(AR/W)(LET W/12-1102)

REPLACE BRIDGE ON KY-1426 (MP 17.957) OVER BENT BRANCH; 1.1 MILE EAST OFNORTHEAST JCT KY 194; (STRUCTURALLY DEFICIENT, SR=4) 098B00015N(AR/W)(LET W/12-1101)

REPLACE BRIDGE ON KY-610 (MP 8.146) OVER LONG FORK; .1 MI S OF JCT KY-1469; (STRUCTURALLY DEFICIENT, SR=32) 098B00069N

REPLACE BRIDGE ON KY-1469 (MP 5.243) OVER MARSHALL'S BRANCH; .72 MI E.JCT KY-3414; (STRUCTURALLY DEFICIENT, SR=7.5) 098B00242N

REPLACE BRIDGE ON FISHTRAP RD (KY 1441) OVER RACCOON CREEK ATINTERSECTION WITH COON CREEK (CR 1371)(SR 37.9) 098B00093N

.700

1.400

1.000

.100

.100

.100

.100

.040

PIKE

PIKE

PIKE

PIKE

PIKE

PIKE

PIKE

PIKE

KY-194

KY-199

KY-199

KY-1426

KY-1426

KY-610

KY-1469

KY-1441

$8,300,000

$4,500,000

$5,300,000

$320,000

$360,000

$1,770,000

$560,000

$1,445,000

Total

Total

Total

Total

Total

Total

Total

Total

C

C

C

C

C

R

U

C

R

U

C

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2014

2014

2014

2016

2016

2014

2014

2016

2014

2014

2016

2014

2014

2016

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SP

SP

BRX

BRX

BRO

BRO

BRO

BRO

BRO

BRO

BRO

BRO

BRO

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$8,300,000

$4,500,000

$5,300,000

$320,000

$360,000

$200,000

$470,000

$1,100,000

$90,000

$100,000

$370,000

$270,000

$225,000

$950,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

12

12

12

12

12

12

12

12

281.00

298.30

298.40

1101.00

1102.00

1104.00

1105.00

1115.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

12

12

12

12

12

12

12

12

281.00

298.00

298.00

1101.00

1102.00

1104.00

1105.00

1115.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

1998

2002

2002

2010

2010

2010

2010

2012

1998

1996

1996

2010

2010

2010

2010

2012

21.3

7.9

9.5

17.244

17.907

8.096

5.193

10.279

22

9.3

10.5

17.344

18.007

8.196

5.293

10.319

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

SAFETY / SAFETY(P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

Page 121: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 121

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

REPLACE BRIDGE OVER LEVISA FORK ON SOUTH RIVER ROAD CONNECTOR (CR1181-70) AT JCT WITH US 460 NEAR VIRGINIA STATE LN (098C00088N)(SR=49)

REPLACE BRIDGE OVER BLACKBERRY CREEK ON BIG BLUE SPRINGS ROAD (CR1801) AT JCT WITH KY 1056 (098C00028N)(SR=15.2)

CORRECT EMBANKMENT FAILURE ON US-460 FROM 1.4 MILES WEST OF KY-195(MP 8.00) TO BLAIR ADKINS ROAD (MP 10.00). (2002BOP)

ROCKFALL MITIGATION AND ROADWAY IMPROVEMENTS IN VICINITY OF THEEXPO CENTER IN PIKEVILLE. (12CCR)

RECONSTRUCT CURVE ON US-460 AT MILLARD MIDDLE SCHOOL. (10CCN)

RECONSTRUCT THOMPSON ROAD FROM THE END OF THE COMPLETED SECTIONTO THE LIMITS OF ITEM 12-8705.(12CCN)

PROVIDE NEW CONNECTIVITY FROM THOMPSON ROAD TO KY 3495 INPIKEVILLE NEAR THE SUSPENSION BRIDGE.(12CCN)

IMPROVE SAFETY, UPGRADE GEOMETRICS, AND ADDRESS CAPACITY ISSUESFOR KY 213 FROM KY 11 TO BOTTOM OF MOUNTAIN. (12CCR)

.038

.265

2.000

.200

1.029

.055

3.671

PIKE

PIKE

PIKE

PIKE

PIKE

PIKE

PIKE

POWELL

CR-1181

CR-1801

US-460

KY-1426

US-460

CS-1192

CS-1192

KY-213

$1,800,000

$300,000

$2,400,000

$4,900,000

$5,410,000

$7,535,000

$6,100,000

$12,270,000

Total

Total

Total

Total

Total

Total

Total

Total

D

R

U

C

D

C

R

U

C

C

R

U

C

R

U

C

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2017

2019

2019

2020

2019

2014

2014

2014

2015

2014

2014

2014

2015

2014

2014

2015

2016

2016

2018

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BRZ

BRZ

BRZ

BRZ

BRZ

SP

SPP

SPP

SPP

SPP

SPP

SPP

SPP

SPP

SPP

SPP

SPP

SPP

SPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$400,000

$100,000

$100,000

$1,200,000

$300,000

$2,400,000

$1,000,000

$400,000

$3,500,000

$5,410,000

$1,233,000

$1,233,000

$5,069,000

$800,000

$600,000

$4,700,000

$1,050,000

$1,090,000

$10,130,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

12

12

12

12

12

12

12

10

1122.00

1123.00

5011.00

5016.00

8631.00

8704.00

8705.00

163.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

12

12

99

12

12

12

12

10

1122.00

1123.00

5006.00

5016.00

8631.00

8704.00

8705.00

163.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2014

2014

2002

2010

2010

2012

2012

2012

2014

2014

1998

2010

2010

2012

2012

2012

.04

.005

8

6.35

6.657

1.37

7.595

.078

.027

10

6.55

7.686

1.425

11.271

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / LANDSLIDE REPAIR(P)

SAFETY / ROCKFALL MITIGTN(P)

SAFETY / SAFETY-HAZARD ELIM(P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / NEW ROUTE(O)

SAFETY / SAFETY(P)

Page 122: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 122

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

REPLACE BRIDGE AND APPROACHES ON KY-11 OVER MIDDLE FORK OF REDRIVER (B39) SE OF BERT T COMBS MOUNTAIN PARKWAY UNDERPASS. (SR=15.7):(099B00039N)

REPLACE BRIDGE ON KY-1057 OVER FRAMES BRANCH 0.01 N OF WILLOUGHBYRD (CR-1237) (SR 38.3) 099B00079N.

I-66 SOMERSET TO LONDON. (2006KYD)(10CCR)

I-66 NORTHERN BYPASS AROUND SOMERSET. (2006KYD)

SOMERSET SOUTHEAST BYPASS; DESIGN-BUILD FOR MAJOR WIDENING TO 4LANES FROM APPROXIMATELY 0.4 MI WEST OF KY 769 TO KY 80.(12CCR)(2012BOP)

HORIZONTAL AND VERTICAL REALIGNMENT OF KY-196 AT WHITE OAK CREEKFROM 1.0 MILE E OF WARNER ROAD TO 0.3 MILE W OF SIEVERS ROAD.(10CCR)

MEDIAN SAFETY IMPROVEMENTS WITH LEFT-TURN LANES ON US-27 FROM 0.05MILE NORTH OF LOST LODGE ROAD TO BOAT DOCK ROAD. (2006BOPC)(10CCR)

REPLACE BRIDGE ON KY 196 OVER SPUTTER CREEK 0.757 MILE W OF KY 1664(SR30.5) 100B00026N

REPLACE BRIDGE ON KY 1674 OVER BIG CLIFTY CREEK AT BETHLEHEM RIDGERD (CR 1672)(SR 44.7) 100B00056N

.100

.040

25.000

10.000

3.200

.500

.900

.040

.040

POWELL

POWELL

PULASKI

PULASKI

PULASKI

PULASKI

PULASKI

PULASKI

PULASKI

KY-11

KY-1057

I-66

I-66

KY-914

KY-196

US-27

KY-196

KY-1674

$980,000

$170,000

$3,219,838

$1,470,000

$10,000,000

$1,660,000

$510,000

$780,000

$450,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

C

U

C

C

C

C

R

U

C

C

U

C

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2014

2014

2015

2014

2014

2014

2015

2015

2016

2014

2014

2015

2015

2015

2016

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BRO

BRO

BRO

KYD

KYD

SPP

SPP

SPP

SPP

SP

BRO

BRO

BRO

BRO

BRO

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$980,000

$20,000

$150,000

$3,219,838

$1,470,000

$10,000,000

$70,000

$180,000

$1,410,000

$510,000

$170,000

$610,000

$30,000

$30,000

$390,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

10

10

08

08

08

08

08

08

08

1085.00

1097.00

59.11

59.21

119.01

121.00

147.00

1054.00

1056.00

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

LAUREL

10

10

08

08

08

08

99

08

08

1085.00

1097.00

59.11

59.21

119.00

121.00

376.01

1054.00

1056.00

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2008

2012

2004

2004

2012

2006

2006

2012

2012

2008

2012

2004

2004

2000

2006

2006

2012

2012

4

3.138

10.1

7.7

10.38

5.568

2.421

4.19

3.178

13.301

8.2

11.374

5.608

2.461

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

SAFETY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / PE & ENVIRONMENTAL(O)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / MAJOR WIDENING(O)

SAFETY / SAFETY(P)

SAFETY / SAFETY-HAZARD ELIM(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

Milepoints: To:From:

Page 123: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 123

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

REPLACE BRIDGE ON GLADE FORK RD (CR 1086) OVER GLADE FORK CREEK 0.06MILE S OF JIM WEAVER RD (CR 1087)(SR 18.6) 100C00010N

SOMERSET-LONDON ROAD (KY-80) WESTBOUND LANES ONLY, FROM KY-80BBYPASS (MP 21.579) TO KY- 461(MP 28.119). (2006BOPC)

CORRECT ROCKFALL HAZARD @ MP 4.7 TO 5.05 (BOTH SIDES OFROADWAY)(10CCR)(12CCR)

CORRECT ROCKFALL HAZARD @ MP 84.6 TO 84.8 (BOTH SIDES OFROADWAY)(10CCR)(12CCR)

RECONSTRUCT US 62/KY 616 INTERSECTION AT NEW ROBERTSON COUNTYSCHOOL TO ADD TURN LANES AND IMPROVE SIGHT DISTANCE. (12CCR)

IMPROVE CURVE ON KY 616 AND IMPROVE ROADWAY FROM THE NEWROBERTSON COUNTY SCHOOL TO MT OLIVET. (12CCN)

I-75 IN ROCKCASTLE COUNTY, KENTUCKY (MILEPOINT 64.5 TO MILEPOINT 69.0),4.5 MILES. (04KYD-KY070)

REPLACE BRIDGE ON KY 1505 OVER DIX RIVER 0.037 EAST OF KY 2250 (OLD US-150) (SR 25.2) 102B00046N.

6.540

.400

.200

.203

4.500

.040

PULASKI

PULASKI

PULASKI

PULASKI

ROBERTSON

ROBERTSON

ROCKCASTLE

ROCKCASTLE

CR-1086

KY-80

US-27

LN-9008

US-62

KY-616

I-75

KY-1505

$790,000

$1,050,000

$4,160,000

$4,160,000

$1,100,000

$5,350,000

$855,000

$610,000

Total

Total

Total

Total

Total

Total

Total

Total

R

U

C

C

C

C

C

R

U

C

C

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2014

2014

2015

2014

2014

2014

2014

2014

2014

2015

2014

2014

2014

2015

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BRZ

BRZ

BRZ

SP

SP

SP

SPP

SPP

SPP

SPP

KYD

BRO

BRO

BRO

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$60,000

$130,000

$600,000

$1,050,000

$4,160,000

$4,160,000

$1,100,000

$250,000

$100,000

$5,000,000

$855,000

$40,000

$50,000

$520,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

08

08

08

08

06

06

08

08

1059.00

2007.00

5003.00

5004.00

8507.01

8711.00

6.02

1052.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

08

99

08

08

06

06

08

08

1059.00

278.14

5003.00

5004.00

8507.01

8711.00

6.02

1052.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2012

2006

1998

1998

2012

2012

2004

2012

2012

2006

1998

1998

2012

2012

2004

2012

1.013

21.579

4.7

84.6

12.1

6.3

64.5

.046

1.053

28.119

5.05

84.8

12.193

6.503

69

.086

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / PAVEMENT REHAB-PRI(P)

SAFETY / ROCKFALL MITIGTN(P)

SAFETY / ROCKFALL MITIGTN(P)

SAFETY / SAFETY(P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

Page 124: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 124

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

REPLACE BRIDGE ON KY 1787 OVER DAVIS BRANCH 0.07 S OF SALT SPRINGSHOLLOW RD(CR-1048)(SR 37.5) 102B00038N

REPLACE BRIDGE ON WILDIE RD (CR 1071) OVER CLEAR CREEK 0.67 MILE S OFDISPUTANTA RD (KY 1787)(SR 17.6) 102C00008N

REPLACE BRIDGE ON WILDIE RD (CR 1071) OVER CLEAR CREEK 0.2 MILE S OFDISPUTANTA RD (KY 1787)(SR 17.6) 102C00009N

REPLACE BRIDGE OVER MULLINS SPRING ON MULLINS STATION ROAD (CR 1140)0.4 MI N OF US 25 (102C00012N)(SR=11.9) (EBRP)

LANDSLIDE REPAIR ON KY-1329 FROM LUNER ROAD AT THE LAUREL COUNTYLINE, NORTHEAST TO JCT. US-25. (2002BOPC)

MAKE I-75 THREE LANES IN EACH DIRECTION FROM EXIT 55 TO EXIT 69. (SEE 8-8718.01 FOR ADDITIONAL FUNDING FOR THIS PROJECT). (12CCN)

MAKE I-75 THREE LANES IN EACH DIRECTION FROM EXIT 55 TO EXIT 69.(ADDITIONAL FUNDING FOR C PHASE) (12CCN)

.040

.010

6.000

14.000

14.000

ROCKCASTLE

ROCKCASTLE

ROCKCASTLE

ROCKCASTLE

ROCKCASTLE

ROCKCASTLE

ROCKCASTLE

KY-1787

CR-1071

CR-1071

CR-1140

KY-1329

I-75

I-75

$920,000

$780,000

$790,000

$765,000

$990,000

$99,000,000

$39,000,000

Total

Total

Total

Total

Total

Total

Total

R

U

C

R

U

C

R

U

C

D

R

U

C

R

U

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2014

2014

2015

2014

2014

2015

2014

2014

2015

2015

2016

2016

2016

2014

2014

2015

2015

2015

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BRO

BRO

BRO

BRZ

BRZ

BRZ

BRZ

BRZ

BRZ

BRZ

BRZ

BRZ

BRZ

SP

SP

SP

SP

SP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$50,000

$120,000

$750,000

$60,000

$110,000

$610,000

$60,000

$110,000

$620,000

$250,000

$75,000

$20,000

$420,000

$60,000

$60,000

$870,000

$99,000,000

$39,000,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

08

08

08

08

08

08

08

1053.00

1057.00

1058.00

1063.00

5009.00

8718.00

8718.01

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

08

08

08

08

99

08

08

1053.00

1057.00

1058.00

1063.00

5006.00

8718.00

8718.00

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2012

2012

2012

2014

2002

2012

2012

2012

2012

2012

2014

1998

2012

2012

3.614

1.713

2.181

.39

0

55

55

3.654

1.753

2.221

.4

5.599

69

69

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / LANDSLIDE REPAIR(P)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / PREFINANCD CONVRSN(O)

Page 125: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 125

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

FROM PARK HILLS DRIVE TO VIKING DRIVE NORTH. (12CCR)

CONSTRUCT TURN LANES INTO LAKESIDE CHRISTIAN ACADEMY TO IMPROVESAFETY.(12CCR)

NEW ROUTE FROM US-60/KY-32 EAST OF MOREHEAD TO I-64 INCLUDING A NEWINTERCHANGE. (98CCN)(08CCR)

INSTALLATION OF GUARDRAIL ALONG KY 519 FROM 1130 FEET NORTH OFLOWER LICK FORK ROAD EXTENDING NORTH TO 998 FEET SOUTH OF JUDYLANE. (2012BOP)

REPLACE BRIDGE AND APPROACHES ON US-60 OVER HAYS BRANCH (B06).(SR=13.3): (103B00006N)

REPLACE BRIDGE ON KY-32 (MP 13.289) OVER SEAYS BRANCH; 3.5 MI W OF JCTKY 504; (STRUCTURALLY DEFICIENT, SR=40) 103B00013N

REPLACE BRIDGE ON HAMILTON RD (CR 1070) OVER TRIPLETT CREEK 0.02 MILEN OF US 60 (SR 26.1) 103C00056N

REPLACE BRIDGE OVER BULL FORK ON HORSEMAN CEMETERY ROAD (CR 1140)AT JCT WITH BULLFORK ROAD (CR 1222) (103C00108N)(SR=32.5)(EBRP)

2.000

.300

3.200

.542

.100

.100

.010

ROWAN

ROWAN

ROWAN

ROWAN

ROWAN

ROWAN

ROWAN

ROWAN

KY-32

US-60

-

KY-519

US-60

KY-32

CR-1070

CR-1140

$26,924,000

$250,000

$14,000,000

$90,000

$1,500,000

$820,000

$460,000

$850,000

Total

Total

Total

Total

Total

Total

Total

Total

R

U

C

C

D

R

U

C

C

C

R

U

C

D

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2016

2016

2018

2014

2014

2015

2015

2014

2014

2016

2014

2014

2015

2019

2020

2020

2020

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SPP

SPP

SPP

SP

SP

SP

SAF

BRO

BRO

BRZ

BRZ

BRZ

BRZ

BRZ

BRZ

BRZ

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$5,000,000

$3,888,000

$18,036,000

$250,000

$3,000,000

$8,000,000

$3,000,000

$90,000

$1,500,000

$820,000

$50,000

$10,000

$400,000

$350,000

$50,000

$50,000

$400,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

09

09

09

09

09

09

09

09

204.00

227.00

301.10

920.00

1061.00

1076.00

1086.00

1093.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

09

09

09

99

09

09

09

09

204.00

227.00

301.00

911.03

1061.00

1076.00

1086.00

1093.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2012

2012

2000

2012

2004

2010

2012

2014

2012

2012

1996

2008

2004

2010

2012

2014

2.235

5.25

3.37

14.855

13.239

.01

.01

4.157

5.55

3.912

14.955

13.339

.05

.02

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / RECONSTRUCTION(O)

SAFETY / SAFETY(P)

RELIABILITY / NEW ROUTE(O)

SAFETY / SAFETY-HAZARD ELIM(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

Page 126: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 126

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

LANDSLIDE REPAIR ON KY-211 FROM THE NORTH BANK OF LICKING RIVER,NORTHWEST TO THE FLEMING COUNTY LINE. (2002BOPC)(12CCR)

WIDEN KY-519 FROM THE INTERSECTION OF KY-801 AND EXTENDING 2.0 MILESNORTH. (98CCN) (08CCR)(12CCR)

RECONSTRUCT US-60 FROM WEST OF GLENWOOD HOLLOW ROAD TO EAST OFKY-3296. THE PROJECT SHALL INCLUDE 12' LANES, WIDE PAVED SHOULDERS,UNOBSTRUCTED CLEAR ZONES, FLATTER VERTICAL GRADES, AND GENTLYHORIZONTAL CURVES. (08CCN)(12CCR)

RECONSTRUCT KY-377 FROM KY-32 TO THE LEWIS COUNTY LINE TO IMPROVESAFETY, CAPACITY, EFFICIENCY, AND HIGHWAY SYSTEMS CONNECTIVITY INPREPARATION OF A NEW INTERCHANGE ON I-64 AT MP 3.1. (08CCN)(10CCR)

US-127 FROM NORTH BANK OF THE CUMBERLAND RIVER TO THE JAMESTOWNBYPASS. (00CCR) (08CCR)(10CCR)(12CCR)(G&D)(SEE 8-108.10 FOR SURFACING)

US-127 FROM NORTH BANK OF THE CUMBERLAND RIVER TO THE JAMESTOWNBYPASS. (00CCR) (08CCR)(10CCR)(12CCR)(SURFACING)(SEE 8-108.00 FOR G&D)

CONSTRUCT A NEW INTERCHANGE AT THE CUMBERLAND PARKWAYINTERSECTION WITH KY-910 AT WINDSOR. (08CCN)(10CCR)

RECONSTRUCT INTERCHANGE RAMPS FROM US-127 ON THE CUMBERLANDPARKWAY. (08CCN) (10CCR)(12CCR)

.500

2.000

1.500

15.300

3.444

3.444

ROWAN

ROWAN

ROWAN

ROWAN

RUSSELL

RUSSELL

RUSSELL

RUSSELL

KY-211

KY-519

US-60

KY-377

US-127

US-127

LN-9008

US-127

$2,340,000

$13,520,000

$6,950,000

$7,131,800

$27,100,000

$2,800,000

$9,340,000

$7,020,000

Total

Total

Total

Total

Total

Total

Total

Total

R

U

C

C

R

U

C

R

U

C

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2014

2014

2015

2014

2014

2014

2015

2014

2016

2015

2016

2014

2014

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SPP

SPP

SB2

SPP

SPP

SPP

SB2

SB2

SB2

SB2

SB2

SPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$60,000

$30,000

$2,250,000

$13,520,000

$750,000

$700,000

$5,500,000

$4,500,000

$2,631,800

$27,100,000

$2,800,000

$9,340,000

$7,020,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

09

09

09

09

08

08

08

08

5012.00

7030.00

8401.00

8406.00

108.00

108.10

8502.00

8504.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

CARTER

99

09

09

09

08

08

08

08

5006.00

7030.00

8401.00

8406.00

108.00

108.10

8502.00

8504.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2002

1998

2008

2008

2000

2014

2008

2008

1998

1998

2008

2008

2000

2014

2008

2008

0

2.464

16

0

8.129

8.129

70.5

17.7

.5

4.464

17.112

15.339

11.573

11.573

70.9

18.1

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / LANDSLIDE REPAIR(P)

RELIABILITY / MINOR WIDENING(O)

SAFETY / SAFETY(P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

ECONOMIC DEVELOPMENT / NEW INTERCHANGE(O)

RELIABILITY / I-CHANGE RECONST(O)

0 .4Milepoints: To:From:

Page 127: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 127

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

RECONSTRUCT US 127 FR APPROX .36 MI E OF INTERSECTION KY 1730 &MANNTOWN RD EXTENDING N TO N BANK OF CUMBERLAND RIVER INCLUDINGNEW BRIDGE OVER LAKE CUMBERLAND FR CLINTON CO TO RUSSELL CO(SEE 8-108&8-115 FOR PE&ENV)(12CCR)(G&D)(SEE 8-8601.22-SURFACING)

RECONSTRUCT US 127 FR APPROX .36 MI E OF INTERSECTION KY 1730 &MANNTOWN RD EXTENDING N TO N BANK OF CUMBERLAND RIVER INCLUDINGNEW BRIDGE OVER LAKE CUMBERLAND FR CLINTON CO TO RUSSELL CO(SEE 8-108&8-115 FOR PE&ENV)(12CCR)(SURFACING)(SEE 8-8601.21-G&D)

GEORGETOWN NORTHWEST BYPASS; FROM KY-32, EAST TO I-75.(04CCR)(2004BOPC)(SEE 7-102.01 FOR "HPP" COMPONENT)(10CCR)(12CCR)

RECONSTRUCT US-460 FROM KY-227 AT GREAT CROSSING TO APPROX. 0.3 MILEEAST OF GEORGETOWN BYPASS (US 460B). (04CCR)(10CCR)

CONSTRUCT NEW I-75 INTERCHANGE AND APPROACH ROADWAY FROMCHAMPION WAY TO CHERRY BLOSSOM WAY IN GEORGETOWN.

REPLACE BRIDGE ON KY 1689 OVER LECOMPTES RUN 0.46 MILE W OF KY 227(SR37.5) 105B00038N

REPLACE BRIDGE OVER NS (CNO&TP)RR ON FIELDS ROAD (CR 1022) ATSCOTT/HARRISON CO LINE (105R00607N)(SR=28.8) (EBRP)

WIDEN/IMPROVE SHOULDERS ON KY-620. (06CCN) (08CCR)

2.520

2.520

4.700

1.600

3.000

.040

.020

1.370

RUSSELL

RUSSELL

SCOTT

SCOTT

SCOTT

SCOTT

SCOTT

SCOTT

US-127

US-127

-

US-460

I-75

KY-1689

CR-1022

KY-620

$23,310,000

$4,500,000

$22,980,000

$3,450,000

$35,500,000

$720,000

$1,900,000

$1,560,000

Total

Total

Total

Total

Total

Total

Total

Total

D

R

U

C

C

R

U

C

C

D

C

R

U

C

D

R

U

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2014

2016

2016

2018

2020

2015

2015

2017

2014

2014

2015

2014

2014

2015

2018

2019

2019

2019

2014

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SPP

SPP

SPP

SP

STP

STP

STP

STP

SPP

SPP

BRO

BRO

BRO

BRZ

BRZ

BRZ

BRZ

SPB

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$1,900,000

$2,100,000

$810,000

$18,500,000

$4,500,000

$4,730,000

$3,540,000

$14,710,000

$3,450,000

$500,000

$35,000,000

$60,000

$60,000

$600,000

$300,000

$100,000

$250,000

$1,250,000

$1,560,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

08

08

07

07

07

07

07

07

8601.21

8601.22

102.50

212.00

425.00

1127.00

1139.00

8306.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

08

08

07

07

07

07

07

07

8601.21

8601.22

102.01

212.00

425.00

1127.00

1139.00

8306.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2012

2014

2004

1996

2012

2012

2014

2006

2012

2014

1996

1996

2012

2012

2014

2006

7.055

126

1.801

1.19

11.26

8.583

129

1.841

1.21

12.63

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / BYPASS(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / SCOPING STUDY DD (O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / MAJOR WIDENING(O)

Page 128: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 128

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

5-LANE KY-1848 FROM THE I-64 INTERCHANGE TO US-60 AT SIMPSONVILLE.(02KYD)(NCPD)(2004BOPC) (08CCR)(10CCR)(12CCR)

REPLACE BRIDGE ON KY-53 (MP 11.366) OVER FOX RUN CREEK; 3.0 MI NORTH OFJCT US-60W; (STRUCTURALLY DEFICIENT, SR=38.9) 106B00031N

REPLACE BRIDGE ON KY-55 OVER BULL SKIN CREEK 0.18 MILE N OF HERITAGELN (PR-1212)(SR 35.9) 106B00020N.

REPLACE BRIDGE ON SCRABBLE RD (CR 1036) OVER BACKBONE CREEK 0.47MILE E OF CEDARMORE RD (KY 1922)(SR 44.2) 106C00055N

PAVEMENT REHAB AND BRIDGE WIDENING ON I-64 FROM MP 43.33 TO MP 47.70.(2004BOPC)(DESIGN FUNDING COVERS 5-2035.70 SECTION ALSO)

WIDEN KY-53 TO FOUR LANES FROM I-64 TO US-60. (08CCN)(10CCN)(12CCR)

CONSTRUCT A THIRD LANE ON US-60 FROM THE MASONIC HOME TO ROCKETLANE. (12CCN)

US-31W SECTION 3B: THREE LANE WIDENING FROM NORTH OF I-65INTERCHANGE TO WAL-MART/LOWES AT FRANKLIN.(04CCR)(08CCR)(10CCR)(2012BOP)

1.000

.100

.040

4.370

1.900

1.378

1.668

SHELBY

SHELBY

SHELBY

SHELBY

SHELBY

SHELBY

SHELBY

SIMPSON

KY-1848

KY-53

KY-55

CR-1036

I-64

KY-53

US-60

US-31W

$7,920,000

$1,670,000

$2,400,000

$440,000

$220,000

$19,050,000

$3,520,000

$4,790,000

Total

Total

Total

Total

Total

Total

Total

Total

C

R

U

C

R

U

C

R

U

C

R

U

R

U

C

R

U

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2016

2014

2014

2016

2014

2014

2015

2016

2016

2018

2014

2014

2014

2014

2015

2014

2014

2015

2014

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

STP

BRO

BRO

BRO

BRO

BRO

BRO

BRZ

BRZ

BRZ

IM

IM

STP

STP

SPP

SPP

SPP

SPP

STP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$7,920,000

$100,000

$70,000

$1,500,000

$100,000

$100,000

$2,200,000

$60,000

$30,000

$350,000

$110,000

$110,000

$1,850,000

$1,400,000

$15,800,000

$350,000

$1,000,000

$2,170,000

$4,790,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

05

05

05

05

05

05

05

03

348.01

1060.00

1063.00

1069.00

2035.40

8511.00

8713.00

8.32

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

FRANKLIN

05

05

05

05

05

08

05

03

348.00

1060.00

1063.00

1069.00

2035.02

8511.00

8713.00

8.30

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2000

2010

2012

2012

2004

2008

2012

2004

2000

2010

2012

2012

2004

2012

2004

5.054

11.316

3.839

.462

43.33

6.064

11.5

2.732

6.025

11.416

3.879

.502

46.303

8.006

12.878

4.4

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / PAVEMENT REHAB-INT(P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / MAJOR WIDENING(O)

46.303 47.7Milepoints: To:From:

Page 129: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 129

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

WIDENING OF I-65 AND CONSTRUCTION OF RAMPS NEAR THE STATE LINE FORNEW INTERCHANGE WITH SR-109 IN TENNESSEE. (CONSTRUCTION AND UTILITYCOSTS BEING HANDLED BY TDOT AS PER MOA). (2012BOP)

FRANKLIN NORTHWEST BYPASS; EXTEND KY-1008 FROM US-31W TO KY-100WEST. (2002BOPP)(10CCR)(12CCR)

IMPROVEMENTS TO KY 100: RECONSTRUCT KY 100 FROM KY 622 TO EAST OFSULPHUR FORK CREEK. (12CCR)

REPLACE BRIDGE OVER JOHNSON CREEK ON KY 664 100 FT E OF KY 1885(107B00019N)(SR=43.7)(EBRP)

REPLACE BRIDGE OVER SPRING CREEK ON ROBEY-BETHEL GROVE ROAD (CR1300) 0.9 MI N OF KY 100 (107C00004N)(SR=42.3) (EBRP)

RECONSTRUCTION AND WIDENING KY-100 FROM I-65 TO KY-622. (06CCN)(10CCR).(12CCR)

KY-44 WIDENING FROM OAK TREE WAY TO KY-1633. (08CCR)(12CCR)

.439

2.800

2.875

.014

.020

2.806

1.000

SIMPSON

SIMPSON

SIMPSON

SIMPSON

SIMPSON

SIMPSON

SPENCER

I-65

KY-1008

KY-100

KY-664

CR-1300

KY-100

KY-44

$100,000

$17,000,000

$11,740,000

$700,000

$560,000

$13,110,000

$4,850,000

Total

Total

Total

Total

Total

Total

Total

R

R

U

C

R

U

C

D

R

U

C

D

R

U

C

R

U

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2014

2014

2014

2016

2016

2016

2018

2015

2016

2016

2016

2015

2016

2016

2016

2014

2014

2015

2014

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

NH

SPP

SPP

SP

SPP

SPP

SPP

BRX

BRX

BRX

BRX

BRZ

BRZ

BRZ

BRZ

STP

STP

SPP

SB2

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$100,000

$3,000,000

$2,500,000

$11,500,000

$640,000

$1,500,000

$9,600,000

$250,000

$75,000

$75,000

$300,000

$250,000

$50,000

$60,000

$200,000

$1,800,000

$2,640,000

$8,670,000

$4,850,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

03

03

03

03

03

03

05

19.00

106.00

319.00

1086.00

1089.00

8306.00

395.00

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

ALLEN

03

03

03

03

03

03

05

19.00

106.00

319.00

1086.00

1089.00

8306.00

395.00

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2012

2000

2012

2014

2014

2006

2006

2012

2000

2012

2014

2014

2006

2006

0

16.34

4.55

6.14

13.534

7.45

.439

19.115

4.564

6.16

16.34

8.45

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / PAVEMENT REHAB-INT(P)

RELIABILITY / PHASE I DESIGN(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

0 .1Milepoints: To:From:

Page 130: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 130

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

IMPROVE SAFETY AT THE INTERSECTION OF KY 55 AND KY 1169 AND PROVIDEFOR TURN LANES. (12CCR)

REPLACE SALT RIVER BRIDGE IN TAYLORSVILLE (B04). (SR=41.2) (08CCR):(108B00004N)(10CCR)(12CCR)

REPLACE BRIDGE ON KY-3192 (MP 0.058) OVER ELK CREEK; .1 MI WEST OF JCTKY-1633; (STRUCTURALLY DEFICIENT, SR=49.3) 108B00013N

REPLACE BRIDGE OVER BUCK CREEK ON KY 1169 75 FT EAST OF YODER TIPTONROAD (CR 1142). (108B00022N)(SR=45.6)(EBRP)

REPLACE BRIDGE OVER SIMPSON CREEK ON KY 2885 (WEST RIVER ROAD) ATJCT WITH NETHERTON LANE (CR 1082) 3-TON WEIGHT LIMIT (SR=2)(108B00041N)

CONSTRUCTION SECTION 1 - CAMPBELLSVILLE BYPASS FROM KY-55 TO KY-70.(2010BOP)

CONSTRUCTION SECTION 2 - CAMPBELLSVILLE BYPASS FROM KY-70 TO US-68.(2010BOP)

REPLACE BRIDGE OVER GREEN RIVER (C15) 0.75MI SW OF N-JCT. KY-55. (SR=25.2):(109C00015N)(AR/W)

.100

.200

.100

.100

SPENCER

SPENCER

SPENCER

SPENCER

SPENCER

TAYLOR

TAYLOR

TAYLOR

KY-55

KY-55

KY-3192

KY-1169

KY-2885

KY-555

KY-555

CR-1236

$2,050,000

$4,620,000

$500,000

$350,000

$1,050,000

$23,600,000

$18,700,000

$1,500,000

Total

Total

Total

Total

Total

Total

Total

Total

R

U

C

C

R

U

C

D

D

R

U

C

R

U

C

R

U

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2014

2014

2015

2014

2014

2014

2016

2020

2014

2015

2015

2015

2016

2017

2018

2018

2019

2020

2014

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SPP

SPP

BRO

BRX

BRX

BRX

BRX

BRX

BRX

BRX

BRX

SPP

SPP

SPP

SPP

SPP

SPP

BRZ

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$150,000

$150,000

$1,750,000

$4,620,000

$90,000

$60,000

$350,000

$350,000

$400,000

$100,000

$50,000

$500,000

$9,200,000

$1,000,000

$13,400,000

$8,000,000

$200,000

$10,500,000

$1,500,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

05

05

05

05

05

04

04

04

476.00

1033.00

1055.00

1076.00

1080.00

142.20

142.30

1058.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

05

05

05

05

05

04

04

04

476.00

1033.00

1055.00

1076.00

1080.00

142.10

142.10

1058.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2012

2000

2010

2014

2014

2010

2010

2002

2012

2000

2010

2014

2014

2006

2006

2002

10.46

5.93

.008

8.53

2.629

2.317

10.66

6.4

.108

8.552

2.635

2.349

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

SAFETY / SAFETY(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

Page 131: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 131

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

REPLACE BRIDGE ON WISE RD (CR 1001) OVER LONG BRANCH .08 MILE W OFLONG BRANCH RD (CR 1002)(SR 23.7) 109C00001N

REPLACE KY 70 BRIDGE OVER STONER CREEK IN TAYLOR COUNTY KENTUCKYBY USING HYBRID COMPOSITE BEAMS (HCB) AS PER FEDERALLY APPROVED"HIGHWAYS FOR LIFE" DISCRETIONARY FUNDEDPROJECT.(KYD2013)(SR=67.6)(2012BOP)(REMAINING CONSTRUCTION COSTFUNDED W/ STP FUNDS)

RECONSTRUCT AND WIDEN FROM ELKTON COURTHOUSE NORTH TO US-68/KY80. (08CCN) (10CCR)(12CCR)

CONSTRUCTION OF FINAL TWO LANES OF CADIZ BYPASS. (12CCR)

CADIZ-AURORA; FROM 200 METERS WEST OF KY-1489 TO 200 METERS WEST OFPETE LIGHT SPRING ROAD.(10CCR)(12CCR)

CADIZ-AURORA; FROM 200 METERS WEST OF PETE LIGHT SPRING ROAD TOCADIZ BYPASS (GRADE, DRAIN & SURFACE)(10CCR)

CADIZ-AURORA; FROM EAST END OF LAKE BARKLEY BRIDGE TO 200 METERSWEST OF KY-1489 (08CCR)(10CCR)

CADIZ-AURORA; BRIDGE OVER LAKE BARKLEY (TOTAL CONSTRUCTION COST IS$165 MILLION)(2006BOPP): (111B00020N)(10CCR)

CADIZ-AURORA; BRIDGE OVER LAKE BARKLEY (ADDITIONAL FUNDING FOR CPHASE)(10CCR)

.014

1.000

4.066

1.358

3.110

3.100

.600

.600

TAYLOR

TAYLOR

TODD

TRIGG

TRIGG

TRIGG

TRIGG

TRIGG

TRIGG

CR-1001

KY-70

KY-181

US-68

US-68

US-68

US-68

US-68

US-68

$150,000

$170,000

$3,760,000

$6,800,000

$22,500,000

$16,880,000

$9,740,000

$90,000,000

$75,000,000

Total

Total

Total

Total

Total

Total

Total

Total

Total

R

C

D

U

C

R

U

C

D

C

C

C

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2014

2016

2014

2014

2014

2014

2014

2015

2014

2014

2014

2016

2014

2015

2016

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BRZ

BRZ

STP

STP

KYD

SPP

SPP

SPP

SPP

SPP

NH

STP

NH

JM5

JM5

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$30,000

$120,000

$25,000

$25,000

$120,000

$740,000

$910,000

$2,110,000

$300,000

$6,500,000

$22,500,000

$16,880,000

$9,740,000

$90,000,000

$75,000,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

04

04

03

01

01

01

01

01

01

1082.00

1086.00

8401.00

151.00

180.10

180.11

180.51

180.60

180.61

-

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

04

04

03

01

01

01

01

01

01

1082.00

1086.00

8401.00

151.00

180.10

180.11

180.51

180.60

180.60

-

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2012

2012

2008

2012

1996

1996

1996

1996

1996

2012

2012

2008

2012

1996

1996

1996

1996

1996

1.58

13.161

12.021

16.365

11.382

12.74

8.872

8.284

8.284

1.62

13.175

13.042

20.431

12.74

16.35

11.382

8.872

8.872

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / CONGESTION MITIGTN(O)

NEW ROUTES / NEW ROUTE(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / PREFINANCD CONVRSN(O)

Page 132: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 132

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

REPLACE BRIDGE ON KY-1585 (MP 4.87) OVER SINKING FORK; .3 MI. NORTH OFHWY. 272 JCT.; (STRUCTURALLY DEFICIENT, SR=19.7) 111B00054N (AR/W)

OVERLAY BRIDGE DECK AND REPLACE EXPANSION JOINTS ON EASTBOUND I-24BRIDGE OVER TRW RAILROAD EAST OF US 68 AT (MP 66.515). (111B00027R)(2012BOP)

NEW MILTON-MADISON BRIDGE APPROACHES TO REALIGN US 421 AT BOTTOMOF HILL AT NEW BRIDGE LOCATION.

ADDRESS SAFETY ISSUES AND ACCESS AT THE INTERSECTION OF US-421/KY-1226AT MP 11.5. (12CCR)

REPLACE BRIDGE OVER LITTLE KENTUCKY RIVER ON KY 2871 150 FT NW OF KY1335. (112B00029N) (SR=46.2)

CONSTRUCT TURN LANES INTO TRIMBLE COUNTY HIGH SCHOOL. (12CCN)

PADUCAH-HENDERSON; RECONSTRUCT US-60 FROM WAVERLY BYPASS TOCORYDON BYPASS. (PRIORITY SECTION)(08CCR)(12CCR)

PADUCAH-HENDERSON; MORGANFIELD BYPASS TO WAVERLY (08CCR)(12CCR)

.100

.600

.040

.040

.100

3.637

3.900

TRIGG

TRIGG

TRIMBLE

TRIMBLE

TRIMBLE

TRIMBLE

UNION

UNION

KY-1585

I-24

US-421

US-421

KY-2871

US-421

US-60

US-60

$1,220,000

$250,000

$5,750,000

$1,410,000

$375,000

$2,250,000

$9,730,000

$31,550,000

Total

Total

Total

Total

Total

Total

Total

Total

U

C

C

D

C

R

U

C

D

D

C

D

R

U

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2014

2016

2014

2014

2016

2014

2014

2015

2019

2014

2016

2014

2015

2015

2014

2014

2016

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

BRX

BRX

IM

SPP

BRO

STP

STP

STP

BRX

SPP

SPP

SPP

SP

SP

SPP

SPP

SPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$220,000

$1,000,000

$250,000

$750,000

$5,000,000

$320,000

$260,000

$830,000

$375,000

$250,000

$2,000,000

$1,800,000

$5,680,000

$2,250,000

$3,860,000

$2,710,000

$24,980,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

01

01

05

05

05

05

02

02

1133.00

2039.00

135.81

905.00

1075.00

8712.00

79.20

122.01

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

HENDERSON

01

99

05

05

05

05

02

02

1133.00

65.10

135.80

905.00

1075.00

8712.00

79.00

122.01

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2010

2012

2004

2010

2014

2012

1998

1996

2010

2008

2000

2010

2014

2012

1996

1996

4.82

66.5

18.776

11.278

.228

7.6

23.86

17.6

4.92

66.53

19.198

11.678

.268

7.7

26.069

21.5

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REHAB(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

SAFETY / SAFETY(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

SAFETY / SAFETY(P)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / MAJOR WIDENING(O)

0 1.428Milepoints: To:From:

Page 133: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 133

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

PADUCAH-HENDERSON; WAVERLY BYPASS. (12CCR)

CONSTRUCT NEW US-60 BYPASS AT SULLIVAN. (04CCN)

KY-56 FROM JUST WEST OF KY-360 TO THE MORGANFIELD BYPASS; WIDENING,ADDING SHOULDERS AND ELIMINATING HORIZONTAL & VERTICALDEFICIENCIES.(10CCR)(12CCR)

ADDRESS SAFETY, CONDITION AND SERVICE CONCERN FROM KY 109 TO WESTOF KY 360 TO ESTABLISH TRUCK NETWORK CONNECTION TO SHAWNEETOWNBRIDGE.

REPLACE BRIDGE ON KY-359 (MP 0.971) OVER LOST CREEK; .95 MI N.E. OF JCT US-60; (FUNCTIONALLY OBSOLETE, SR=48.6) 113B00006N

REPLACE BRIDGE ON KY-359 (MP 1.193) OVER SINKING CREEK; 1.1 MI N.E. OF JCTUS-60; (FUNCTIONALLY OBSOLETE, SR=48.6) 113B00007N

CONSTRUCT CENTER TURN LANE AT UNION COUNTY HOSPITAL AND NEW UNIONCOUNTY TECHNOLOGY CENTER. (10CCN)

CONSTRUCT NEW INTERCHANGE ON I-65 TO ACCOMODATE MAJORDEVELOPMENT POSSIBILITIES NORTH OF BOWLING GREEN. (06CCR)(SEE 3-16.03;3-16.04; FOR ADDITIONAL "HPP" AND "IM" FUNDS) (12CCR)

2.600

.300

4.318

4.460

.100

.100

.230

UNION

UNION

UNION

UNION

UNION

UNION

UNION

WARREN

US-60

US-60

KY-56

KY-56

KY-359

KY-359

US-60

I-65

$21,350,000

$1,000,000

$11,700,000

$20,000,000

$770,000

$770,000

$470,000

$7,500,000

Total

Total

Total

Total

Total

Total

Total

Total

R

U

C

D

C

D

R

U

C

R

U

C

R

U

C

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2015

2015

2018

2014

2014

2014

2016

2016

2017

2014

2014

2016

2014

2014

2016

2014

2015

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SPP

SPP

SP

SPP

SPP

SPP

SPP

SPP

BRO

BRO

BRO

BRO

BRO

BRO

SB2

IM

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$1,730,000

$1,360,000

$18,260,000

$1,000,000

$11,700,000

$1,500,000

$2,000,000

$2,000,000

$14,500,000

$75,000

$125,000

$570,000

$75,000

$125,000

$570,000

$470,000

$7,500,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

02

02

02

02

02

02

02

03

123.01

139.00

310.10

310.20

1073.00

1074.00

8636.00

16.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

02

02

02

02

02

02

02

03

123.01

139.00

310.01

310.01

1073.00

1074.00

8636.00

16.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

1996

2000

2006

2006

2010

2010

2010

2002

1996

2000

2000

2000

2010

2010

2010

2002

1.398

7.182

2.723

.921

1.143

11.7

1.6

11.5

7.182

1.021

1.243

11.93

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / BYPASS(O)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / MINOR WIDENING(O)

RELIABILITY / MINOR WIDENING(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

SAFETY / SAFETY(P)

RELIABILITY / NEW INTERCHANGE(O)

Page 134: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 134

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

CONSTRUCTION OF NEW I-65 INTERCHANGE IN WARREN COUNTY.(GRADE &DRAIN ONLY, SEE 16.04 FOR C PHASE SURFACING) (2005HPP-KY137; KY150;KY167)(SEE 3-16.00 AND 3-16.04 FOR "IM" C PHASE FUNDING)

CONSTRUCTION OF NEW I-65 INTERCHANGE IN WARREN COUNTY.(SURFACINGONLY, SEE 16.03 FOR G&D) (SEE 3-16.00 FOR STP COMPONENT)

CONSTRUCTION OF PEDESTRIAN ACCESSIBILITY IMPROVEMENTS AT US 231-KENBALE BLVD AND US 231-CUMBERLAND TRACE (KY 2158) INTERSECTIONS WITHINTHE I-65/US 231 (SCOTTSVILLE ROAD) INTERCHANGE AT BOWLING GREEN,KENTUCKY.(2012BOP)

WIDEN THREE SPRINGS ROAD TO REDUCE CONGESTION FROM FLEALAND TO0.30 MILE WEST OF SCOTTSVILLE ROAD.

RECONSTRUCT KY-101 FROM SMITHS GROVE NORTH TO US-31W.(00CCR)(04CCR)(06CCR)(FUNDING SWAP WITH 11-20.00) (12CCR)

RECONSTRUCT KY-185 FROM NORTH OF THE JUNCTION WITH KY-263 NEARRICHARDSVILLE (MP 6.29) TO THE BUTLER COUNTY LINE (MP 11.913).(02CCR)(04CCR)(06CCR)(10CCR)

CONSTRUCT ROUNDABOUT AT US-31W BYPASS AND CHESTNUTSTREET/UNIVERSITY BLVD/LOVING WAY.(06CCR) (08CCR) (10CCR)(12CCR)

WIDEN TO 5 LANES FROM 1.0 MILE SOUTH OF KY 242 (MP 4.1) TO DILLARD ROAD(MP 6.7).(12CCR)

.600

.709

2.700

5.600

.350

2.600

WARREN

WARREN

WARREN

WARREN

WARREN

WARREN

WARREN

WARREN

I-65

I-65

I-65

KY-884

KY-101

KY-185

US-31W

US-31W

$18,671,207

$13,000,000

$420,000

$5,640,000

$17,390,000

$33,360,000

$2,300,000

$18,640,000

Total

Total

Total

Total

Total

Total

Total

Total

C

C

C

C

R

U

C

D

R

U

C

C

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2014

2016

2014

2014

2014

2014

2016

2014

2016

2016

2018

2014

2015

2015

2017

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

HPP

IM

NH

SPP

SP

SP

SP

SPP

SPP

SPP

SP

SB2

SPP

SPP

SPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$18,671,207

$13,000,000

$420,000

$5,640,000

$3,310,000

$1,410,000

$12,670,000

$700,000

$3,310,000

$2,540,000

$26,810,000

$2,300,000

$3,570,000

$3,820,000

$11,250,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

03

03

03

03

03

03

03

03

16.03

16.04

17.10

102.20

109.00

110.00

131.00

199.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

03

03

03

03

03

03

03

03

16.03

16.04

17.00

102.10

109.00

110.00

131.00

199.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2004

2004

2012

2006

2000

2000

2006

2012

2004

2004

2002

2006

2000

2000

2006

2012

22.088

8.622

6.29

11.55

4.1

22.624

9.331

11.913

11.9

6.7

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / NEW INTERCHANGE(O)

RELIABILITY / NEW INTERCHANGE(O)

ECONOMIC DEVELOPMENT / I-CHANGE RECONST(O)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / RECONSTRUCTION(O)

SAFETY / SAFETY(P)

RELIABILITY / MAJOR WIDENING(O)

Page 135: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 135

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

REALIGN INTERSECTION OF US 31W AND MOORMAN LANE AND US 31W ANDBRISTOW ROAD. (12CCR)

RECONSTRUCT THE EXISTING NATCHER PARKWAY/US 231 INTERCHANGE ONWEST SIDE OF BOWLING GREEN. (12CCR)

WEST BOGLE ROAD; REPLACE BRIDGE AND APPROACHES OVER RJC RAILROAD0.20 MILE SOUTHEAST OF US-68 (C7). (SR=16.5): (114C00007N)

REPLACE BRIDGE ON KY-234 OVER DRAKES CREEK 0.097 E OF SHAKER MILL RD(CR-1131) (SR 42.8) 114B00012N.

REPLACE BRIDGE ON KY-234 OVER DRAKES CREEK 0.097 E OF SHAKER MILL RD(CR-1131)(SR 42.8) 114B00012N. (ADDITIONAL FUNDING FOR C PHASE)

REPLACE BRIDGE OVER BRANCH OF INDIAN CREEK ON LODGE HALL ROAD (CR1425) 1.4 MI W OF KY 185 (114C00021N)(SR=49.4) (EBRP)

REALIGN HENNESEY WAY AT CORVETTE DRIVE. (10CCN)

WIDEN AND EXPAND US 231 FROM LOVER'S LANE TO THREE SPRINGS ROAD.(12CCN)

.100

.200

.245

.060

.060

.015

.100

.998

WARREN

WARREN

WARREN

WARREN

WARREN

WARREN

WARREN

WARREN

US-31W

WN-9007

CR-1301

KY-234

KY-234

CR-1425

CS-1691

US-231

$700,000

$8,200,000

$1,140,000

$3,310,000

$3,850,000

$635,000

$100,000

$8,600,000

Total

Total

Total

Total

Total

Total

Total

Total

C

D

R

U

C

C

R

U

C

C

D

R

U

C

D

R

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2015

2017

2018

2019

2020

2014

2015

2015

2018

2019

2015

2016

2016

2016

2014

2014

2015

2016

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

NH

NH

NH

NH

BRZ

BRO

BRO

BRO

BRO

BRZ

BRZ

BRZ

BRZ

SB2

SPP

SPP

SPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$700,000

$1,000,000

$700,000

$1,500,000

$5,000,000

$1,140,000

$160,000

$1,150,000

$2,000,000

$3,850,000

$250,000

$50,000

$75,000

$260,000

$100,000

$1,600,000

$2,000,000

$5,000,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

03

03

03

03

03

03

03

03

200.00

202.00

1070.00

1077.00

1077.01

1090.00

8632.00

8702.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

03

03

03

03

03

03

03

03

200.00

202.00

1070.00

1077.00

1077.00

1090.00

8632.00

8702.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2012

2012

2008

2012

2014

2014

2010

2012

2012

2012

2008

2012

2012

2014

2010

2012

18.8

9.4

.1

9.746

9.746

1.37

0

9.455

18.9

9.6

.345

9.806

9.806

1.385

.1

10.453

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / SAFETY(P)

SAFETY / SAFETY(P)

SAFETY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / MAJOR WIDENING(O)

Page 136: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 136

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

CONSTRUCT A NEW INTERCHANGE ON THE NATCHER PARKWAY AT ELRODROAD IN BOWLING GREEN (MP 3.4 TO MP 4.0).(12CCN)

DESIGN STUDY TO DETERMINE IMPROVEMENTS NEEDED FOR US 150 BETWEENSPRINGFIELD AND BARDSTOWN.

RECONSTRUCT KY-90 FROM OLD MILL SPRINGS ROAD TO BRIDGE AT MP 19.5.(12CCR)

WIDEN WASHAM LANE FROM COLUMBIA AVENUE (KY 92) TO PREVIOUSLYWIDENED SECTION 0.1 MILE SW OF COLUMBIA AVE THE BYPASS INMONTICELLO. (08CCR)(10CCR)

RAISE GRADE TO PREVENT FLOODING FROM 0.5 MI W OF VALLEY VIEW DRIVETO 0.7 MI W OF KY 1258. (12CCR)

INSTALL TURN LANES ON KY 90 IN THE VICINITY OF WALMART.

REPLACE BRIDGE ON CR-1136 (MP 0.225) OVER LITTLE SOUTH FORK RIVER; 0.25MI SE OF JCT CR-5137; (STRUCTURALLY DEFICIENT, SR=16.6) 116C00007N

REPLACE BRIDGE ON CR-1700 (MP 0.008) OVER DRY HOLLOW CREEK; 15' E. JCTCR-5213; (STRUCTURALLY DEFICIENT, SR=5.6) 116C00040N (AR/W)

.600

12.178

1.800

.100

2.061

.100

.100

.100

WARREN

WASHINGTON

WAYNE

WAYNE

WAYNE

WAYNE

WAYNE

WAYNE

WN-9007

US-150

KY-90

CS-1125

KY-92

KY-90

CR-1136

CR-1700

$9,950,000

$500,000

$10,020,000

$120,000

$12,830,000

$4,000,000

$740,000

$475,000

Total

Total

Total

Total

Total

Total

Total

Total

D

R

U

C

D

R

C

C

R

U

C

C

R

U

C

U

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2015

2017

2017

2019

2015

2014

2016

2014

2014

2014

2015

2015

2014

2014

2016

2014

2016

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

NH

NH

NH

NH

SPP

SB2

SP

SPB

SP

SP

SP

SPP

BRZ

BRZ

BRZ

BRZ

BRZ

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$700,000

$2,000,000

$950,000

$6,300,000

$500,000

$1,580,000

$8,440,000

$120,000

$1,660,000

$2,170,000

$9,000,000

$4,000,000

$90,000

$80,000

$570,000

$65,000

$410,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

03

04

08

08

08

08

08

08

8707.00

396.00

109.10

110.00

394.00

397.00

1050.00

1051.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

NELSON

03

04

08

08

08

08

08

08

8707.00

396.00

109.00

110.00

394.00

397.00

1050.00

1051.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2012

2014

2004

2000

2012

2014

2010

2010

2012

2014

2000

2000

2012

2014

2010

2010

3.4

0

17.691

.763

9.624

12.39

.175

0

4

6.557

19.5

.863

11.685

12.49

.275

.1

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / NEW INTERCHANGE(O)

SAFETY / SCOPING STUDY DD (O)

SAFETY / SAFETY(P)

RELIABILITY / MINOR WIDENING(O)

RELIABILITY / RECONSTRUCTION(O)

SAFETY / SAFETY(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

2.032 7.653Milepoints: To:From:

Page 137: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 137

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

RECONSTRUCT US-41A BETWEEN PROVIDENCE AND DIXON(04CCN)(08CCR)(10CCR)(12CCR)

RECONSTRUCT BETWEEN KY 120 AND RR BRIDGE AT SLAUGHTERS TOALLEVIATE FLOODING. (12CCR)

RECONSTRUCT EDWARD T BREATHITT (PENNYRILE) PARKWAY / KY 56INTERCHANGE NEAR SEBREE. (I-69 CORRIDOR IMPROVEMENT). (10CCN)(AR/W)

RECONSTRUCT KY-92 FROM 500 FT WEST OF THE WHITLEY/MCCREARY COUNTYLINE TO 1200 FT EAST OF OLD JELLICO CREEK ROAD. (SECTION 1)

MAJOR WIDENING, ADDRESSES CONGESTION, FREIGHT MOVEMENT, ANDACCESS ALONG 25W FROM KY 727 TO KY 3041. (12CCR)

INSTALL GUARDRAIL ALONG KY 204 FROM 1.67 MILES FROM KY 296 TO 0.67MILES SOUTH OF US 25. (2012BOP)

REPLACE BRIDGE ON CR-1184 (MP 0.139) OVER PATTERSON CREEK; .2 MI EAST OFJCT KY 904; (STRUCTURALLY DEFICIENT, SR=16.5) 118C00012N. (12CCR)(AR/W)

RECONSTRUCT KY-2386 SOUTH OF BAILEY'S CURVE TO THE INTERSECTION OFSOUTH 2ND STREET BY STRAIGHTENING AND RAISING ABOVE THE FLOODPLAIN. (06CCN)(10CCR)

9.000

.281

.450

4.172

2.225

9.576

.400

WEBSTER

WEBSTER

WEBSTER

WHITLEY

WHITLEY

WHITLEY

WHITLEY

WHITLEY

US-41A

KY-138

EB-9004

KY-92

US-25W

KY-204

CR-1184

KY-2386

$43,590,000

$1,550,000

$10,400,000

$23,800,000

$13,475,000

$140,000

$1,150,000

$2,980,000

Total

Total

Total

Total

Total

Total

Total

Total

D

R

U

C

R

U

C

C

U

C

R

U

C

C

U

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2014

2015

2015

2017

2014

2014

2015

2015

2015

2016

2015

2016

2017

2014

2014

2014

2014

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SP

SP

SP

SPP

SPP

SPP

NH

SPP

SPP

STP

STP

STP

SAF

BRZ

SB2

SPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$1,760,000

$5,370,000

$4,430,000

$32,030,000

$100,000

$250,000

$1,200,000

$10,400,000

$1,800,000

$22,000,000

$1,935,000

$2,540,000

$9,000,000

$140,000

$200,000

$950,000

$2,980,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

02

02

02

11

11

11

11

11

143.00

228.00

8637.00

184.10

186.00

931.00

1085.00

8306.00

-

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

02

02

02

11

11

99

11

11

143.00

228.00

8637.00

184.00

186.00

911.03

1085.00

8306.00

-

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2000

2012

2010

2014

2012

2012

2010

2006

2000

2012

2010

2010

2012

2008

2010

2006

1.324

10.449

62.4

0

28.2

1.672

.089

.05

10.01

10.73

62.85

4.172

30.425

11.248

.189

.459

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / NEW ROUTE(O)

RELIABILITY / RECONSTRUCTION(O)

RELIABILITY / DESIGN ENGINEERING(O)

RELIABILITY / RELOCATION(O)

RELIABILITY / MAJOR WIDENING(O)

SAFETY / SAFETY-HAZARD ELIM(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / RECONSTRUCTION(O)

Page 138: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 138

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

MOUNTAIN PARKWAY CORRIDOR: WIDEN THE MOUNTAIN PARKWAY TO 4LANES FROM 0.45 MI W OF KY 205 (MP 56.8) TO CR 1226 PARKWAY ROAD TUNNEL(MP 59.30). (2012BOP)

MOUNTAIN PARKWAY CORRIDOR: WIDEN THE MOUNTAIN PARKWAY TO 4LANES FROM 0.45 MI W OF KY 205 (MP 56.8) TO CR 1226 PARKWAY ROAD TUNNEL(MP 59.30). (2012BOP)(ADDITIONAL FUNDING FOR C PHASE)

RECONSTRUCT TO CURRENT STANDARDS THE CURVE FROM THE KY 15OVERPASS TO 2700 EAST OF KY 15 OVERPASS. (12CCR)

ADDRESS SAFTEY ISSUES AT INTERSECTION OF KY 3356. (12CCR)

MOUNTAIN PARKWAY CORRIDOR: WIDEN THE MTN PKY TO 4 LANES FROM 0.6MI W OF KY 191 OVERPASS TO 0.45 MI W OF KY 205 INTERCHANGE. (SEE 10-126.03FOR PE & ENVIR FUNDS)(2012BOP)MTN PKY WILL BE TOLL FACILITY FROMWINCHESTER TO PRESTONBURG TO GENERATE THESE FUNDS.

MOUNTAIN PARKWAY CORRIDOR: WIDEN THE MTN PKY TO 4 LANES FROMEAST OF CAMPTON TO KY 205. TO BE CONSTRUCTED WITH TOLLREVENUES.(ADDITIONAL FUNDING FOR C PHASE). MTN PKY WILL BE TOLLFACILITY FROM WINCHESTER TO PRESTONBURG TO GENERATE THESE FUNDS.

MOUNTAIN PARKWAY CORRIDOR: DEVELOP TOLLING PLAN FOR THEMOUNTAIN PARKWAY.

2.500

2.500

.600

.200

11.000

11.000

WOLFE

WOLFE

WOLFE

WOLFE

WOLFE

WOLFE

WOLFE

KY-9009

KY-9009

KY-9000

KY-1010

KY-9009

KY-9009

KY-9009

$23,730,000

$21,000,000

$3,090,000

$500,000

$122,250,000

$59,000,000

$2,000,000

Total

Total

Total

Total

Total

Total

Total

D

R

U

C

C

R

U

C

C

D

R

U

C

C

D

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2014

2015

2015

2017

2018

2016

2016

2017

2014

2015

2017

2017

2019

2019

2016

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

STP

STP

STP

STP

STP

SPP

SPP

SPP

SPP

SPP

SPP

SPP

IF

IF

SPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$980,000

$2,000,000

$750,000

$20,000,000

$21,000,000

$50,000

$50,000

$2,990,000

$500,000

$10,000,000

$11,000,000

$2,250,000

$99,000,000

$59,000,000

$2,000,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

10

10

10

10

10

10

10

126.70

126.71

162.00

165.00

168.00

168.01

170.00

-

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

MORGAN

MORGAN

MORGANMAGOFFINFLOYD

10

10

10

10

10

10

10

126.03

126.70

162.00

165.00

168.00

168.00

170.00

-

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

1996

2014

2012

2012

1996

2014

2014

1996

1996

2012

2012

1996

1996

2014

56.8

56.8

38

10.595

45.8

45.8

57.72

57.72

38.6

10.795

56.8

56.8

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

From:

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / RECONSTRUCTION(O)

SAFETY / SAFETY(P)

RELIABILITY / MAJOR WIDENING(O)

RELIABILITY / PREFINANCD CONVRSN(O)

RELIABILITY / MAJOR WIDENING(O)

57.72

57.72

59.3

59.3

Milepoints:

Milepoints:

Milepoints:Milepoints:Milepoints:

To:

To:

To:To:To:

From:

From:

From:From:From:

Page 139: Page: 1 FY - FY - 2014 2020 THRU SPP - Kentucky ...transportation.ky.gov/program-management/highway plan...KENTUCKY TRANSPORTATION CABINET SIX YEAR HIGHWAY PLAN Page: 1 FY - FY - 2014

KENTUCKY TRANSPORTATION CABINETSIX YEAR HIGHWAY PLAN

Page: 139

FY - FY - THRU2014 2020

COUNTY ITEM NO. & PARENT NO. ROUTE LENGTH DESCRIPTION FUND-SCHEDULING INFORMATION

17 JAN 2014

RECONSTRUCT KY-205 FROM THE WOLFE/BREATHITT CO. LINE TO THEMOUNTAIN PARKWAY (PHASE 1). (02CCN)(06CCR)(08CCR)(10CCR)(12CCR)

HILL AND CURVE CORRECTION ON KY-191 BETWEEN HAZEL GREEN AND KY-205.(02CCN)(08CCR)(10CCR)

NORTHWEST VERSAILLES MOBILITY CORRIDOR. (06CCR)(10CCN)(12CCN)

REPLACE BRIDGE OVER GRIER CREEK ON GRIER CREEK ROAD (CR 1217) 0.8 MIW OF SCOTTS FERRY ROAD (CR 1215) (120C00017N)(SR=31.5)

REPLACE THE WEISENBURG MILL ROAD BRIDGE AT THE WOODFORD/SCOTTCOUNTY LINE. (10CCN)

IMPROVE SAFETY ON KY 169 NEAR BOYD'S ORCHARD ENTRANCE MP 2.9-3.08(12CCN)

6.390

4.000

.030

.023

.180

WOLFE

WOLFE

WOODFORD

WOODFORD

WOODFORD

WOODFORD

KY-205

KY-191

-

CR-1217

CR-1015

KY-169

$11,590,000

$2,470,000

$39,000,000

$475,000

$500,000

$1,800,000

Total

Total

Total

Total

Total

Total

C

R

U

C

D

R

U

C

D

R

U

C

C

PHASE

PHASE

PHASE

PHASE

PHASE

PHASE

2015

2014

2014

2015

2014

2016

2016

2017

2019

2020

2020

2014

2014

YEAR

YEAR

YEAR

YEAR

YEAR

YEAR

SPP

SP

SP

SP

SPP

SPP

SPP

SP

BRZ

BRZ

BRZ

SB2

SPP

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

FUNDING

$11,590,000

$250,000

$670,000

$1,550,000

$2,000,000

$5,000,000

$2,000,000

$30,000,000

$325,000

$50,000

$100,000

$500,000

$1,800,000

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

AMOUNT

10

10

07

07

07

07

8101.00

8102.00

345.00

1140.00

8642.00

8701.00

-

-

-

-

-

-

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

Purpose and Need:

SCOTT

10

10

99

07

07

07

8101.00

8102.00

357.09

1140.00

8642.00

8701.00

-

-

-

-

-

-

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

Parent No.:

2002

2002

2006

2014

2010

2012

2002

2002

2006

2014

2010

2012

0

10.256

1.15

2.499

2.9

6.394

14.298

1.18

2.522

3.08

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

Milepoints:

To:

To:

To:

To:

To:

To:

From:

From:

From:

From:

From:

From:

RELIABILITY / RECONSTRUCTION(O)

SAFETY / SAFETY(P)

RELIABILITY / NEW ROUTE(O)

RELIABILITY / BRIDGE REPLACEMENT(P)

RELIABILITY / BRIDGE REPLACEMENT(P)

SAFETY / SAFETY(P)

.536 .559Milepoints: To:From: