Page 1 9/4/01 SMS Test Phase 2 & 3 WFC3 FSW and STScI Development Flow through SMGT 4/1/02- 6/30/02 FSW 2.1 C&UT 7/8/01-8/15/01 FSW 2.2 C&UT - WFC3 Software Bench - SITS - WFC3 TBD Bench - SITS - Database (CCL, Cmd, TLM, Tables) - Macros - FSW 3.0 - WFC3 Software Bench - SITS 8/16/01- 11/17/01 FSW 2.1 C&UT 4/2/01-7/30/01 - COS Bench - SITS FSW 3.0 C&UT - WFC3 TBD Bench - SITS 12/15/01- 4/4/02 SMS Test Phase 4 & IR Subarrays 9/1/02- 12/31/02 Final Qualification Test 6/3/02- 7/31/02 - WFC3 TBD Bench - SITS Continued on the Next Page SMS Test Phase 5 2/1/03- 4/30/03 FSW 3.0 Component Test - WFC3 TBD Bench - SITS 3/1/02-5/31/02 Pre-SMGT Bench Testing 11/15/02- 4/30/02 - WFC3 TBD Bench - SITS - Database (CCL, Cmd, TLM, Tables) - Macros - FSW 3.0 - WFC3 TBD Bench - SITS - Database (CCL, Cmd, TLM, Tables) - Macros - FSW 3.0 - WFC3 TBD Bench - SITS - Database (CCL, Cmd, TLM) - Macros - FSW 3.0 Ship to GSFC ~8/15/02 FSW 2.1 Component Test FSW 2.2 Component Test 8/16/01- 10/31/01 10/31/01- 2/28/02 Boot Code Testing - SES 1 Board (due 10/29/01) 10/1/01- 11/16/01 FSW 2.3 C&UT FSW 2.3 Component Test 11/1/01- 1/17/01

Page 1 9/4/01 SMS Test Phase 2 & 3 WFC3 FSW and STScI Development Flow through SMGT 4/1/02-6/30/02 FSW 2.1 C&UT 7/8/01-8/15/01 FSW 2.2 C&UT - WFC3 Software

Embed Size (px)

Citation preview

Page 1: Page 1 9/4/01 SMS Test Phase 2 & 3 WFC3 FSW and STScI Development Flow through SMGT 4/1/02-6/30/02 FSW 2.1 C&UT 7/8/01-8/15/01 FSW 2.2 C&UT - WFC3 Software

Page 1 9/4/01

SMS Test Phase 2 & 3

WFC3 FSW and STScI Development Flow through SMGT

4/1/02-6/30/02

FSW 2.1 C&UT

7/8/01-8/15/01

FSW 2.2 C&UT

- WFC3 Software Bench- SITS

- WFC3 TBD Bench

- SITS

- Database (CCL, Cmd, TLM, Tables)

- Macros

- FSW 3.0

- WFC3 Software Bench- SITS

8/16/01-11/17/01

FSW 2.1 C&UT

4/2/01-7/30/01

- COS Bench- SITS

FSW 3.0 C&UT

- WFC3 TBD Bench- SITS

12/15/01-4/4/02

SMS Test Phase 4 &

IR Subarrays

9/1/02-12/31/02

FinalQualification

Test

6/3/02-7/31/02

- WFC3 TBD Bench

- SITS

Continued on the Next Page

SMS Test Phase 5

2/1/03-4/30/03

FSW 3.0 Component

Test

- WFC3 TBD Bench- SITS

3/1/02-5/31/02

Pre-SMGTBench Testing

11/15/02-4/30/02

- WFC3 TBD Bench

- SITS

- Database (CCL, Cmd, TLM, Tables)

- Macros

- FSW 3.0

- WFC3 TBD Bench

- SITS

- Database (CCL, Cmd, TLM, Tables)

- Macros

- FSW 3.0

- WFC3 TBD Bench

- SITS

- Database (CCL, Cmd, TLM)

- Macros

- FSW 3.0

Ship to GSFC

~8/15/02

FSW 2.1 Component

Test

FSW 2.2Component

Test8/16/01-10/31/01 10/31/01-2/28/02

Boot CodeTesting

- SES 1 Board (due 10/29/01)

10/1/01-11/16/01

FSW 2.3 C&UT

FSW 2.3Component

Test

11/1/01-1/17/01

Page 2: Page 1 9/4/01 SMS Test Phase 2 & 3 WFC3 FSW and STScI Development Flow through SMGT 4/1/02-6/30/02 FSW 2.1 C&UT 7/8/01-8/15/01 FSW 2.2 C&UT - WFC3 Software

Page 2 9/4/01

WFC3 FSW and STScI Development Flow through SMGT - concluded

SMGT

No earlier than 5/1/03

- WFC3 Instrument

- SMPRD Database

- Macros

- STOCC/CCS

-FSW 3.X

-VEST

-PACOR/STScI

From Pre-SMGT Bench Testing

VEST I&T

TBD

- WFC3 Instrument

- SMPRD Database

- Macros

- VOCC/CCS

-FSW 3.X

-VEST

-PACOR/STScI

VEST I&T

TBD

- S/W or Ops Bench

- SMPRD Database

- Macros

- VOCC/CCS

-FSW 3.X

-VEST

-PACOR/STScI

VEST Dry Run

TBD

- VOCC/CCS

- VEST

- Bench?

PRDOffice

TBD

- Commands

- Telemetry

- Tables

- CCL’s

- Display Pages

NSSCAP’s

TBD

Page 3: Page 1 9/4/01 SMS Test Phase 2 & 3 WFC3 FSW and STScI Development Flow through SMGT 4/1/02-6/30/02 FSW 2.1 C&UT 7/8/01-8/15/01 FSW 2.2 C&UT - WFC3 Software

Page 3 9/4/01

WFC3 FSW Development Flow (2.1 through 2.2)

FSW 2.1 C&UT

7/2/01-8/31/01

FSW 2.2 C&UT

8/16/01-11/15/01

SITS 15.4

(S/W Bench)

MEB

WFC3 S/WBench

DRD Items

Component Test2.1

DRD Items

- DM-06 (Initial)

Mechanisms(Test Software)

- SOFA/Corrector (10/17/01)- Shutter (10/17/01)-Filter Wheel (10/19/01- Mech Sim1 (10/1/01))

Hardware

CCS3.4.0.3 7/31/01

10/15/01

SITS 25.4.1

(Ops Bench)

MEB 2

WFC3 OpsBench

- S/W Bench- SITS

8/16/01-10/31/01

10/1/01

SES 1Board

Boot CodeC&UT

10/1/01-11/16/01

10/29/01

FSW 2.2 Component

Test

10/31/02- 1/28/02

- SES2 (10/19/01)- SES3 (9/14/01)- SES4 (9/7/01)

To FSW 2.3 Code & Unit Test

Boot CodeTesting

10/1/01-12/15/01

Page 4: Page 1 9/4/01 SMS Test Phase 2 & 3 WFC3 FSW and STScI Development Flow through SMGT 4/1/02-6/30/02 FSW 2.1 C&UT 7/8/01-8/15/01 FSW 2.2 C&UT - WFC3 Software

Page 4 9/4/01

FSW 3.0C&UT

11/1/01-3/15/02FSW 3.0

ComponentTest

3/1/02-9/30/02

-TBD Bench

FSWFQT

6/1/02-7/31/02

-TBD Bench

SI Deliveryto

GSFC

8/15/02

DRD Items

- Need List of Deliverables

Mechanisms

- TBD

Support

- UVIS/IR Detector Simulator (9/21/01)

- UVIS/IR Science Data Generator(12/1/01)

DRD Items

- TBD

WFC3 FSW Development Flow (2.3 through System Functional Test)

FSW 2.3C&UT

Mechanisms(Test Software)

- CSM (11/19/01)- Mech Sim2 (11/15/01)

Hardware

DRD Items

- TBD

FSW 2.3Component

Test

WFC3 System Functional

Test(MEB Install)

WFC3 System Functional

Test(Surrogate Detector Install)

- SES1 (10/29/01)- SES2 (9/14/01)

11/16/01-1/15/02

From FSW 2.2 Component Test

12/1/01-3/31/02

Procedures not fully component tested in 3.0can be run against the hardware if the procedure is dryrun on the bench first.

Page 5: Page 1 9/4/01 SMS Test Phase 2 & 3 WFC3 FSW and STScI Development Flow through SMGT 4/1/02-6/30/02 FSW 2.1 C&UT 7/8/01-8/15/01 FSW 2.2 C&UT - WFC3 Software

Page 5 9/4/01

Phase 2

- Aperture Definitions

- Basic UVIS ACCUM Mode

-UVIS Dark and Bias Calibration

DRD Items

- DM-06 (Initial)

Phase 4development

1/1/02-6/30/02

- UVIS & IR ALIGN Mode

-Timing Updates

-SAA Contour Defintions

- UVIS CTE Monitoring- IR Bright Earth Avoidance

1/1/01-6/30/01

Phase 4 & IR Subarrays

SMS Test Window

9/2/02-11/29/02Support

- Detector Simulator

- Science Data Generator

Phase 3development

- Basic IR MULTIACCUM Mode- IR Dark Calibrations

- UVIS & IR Lamp Operations

7/1/01-12/31/01

Phase 2 & 3 SMS Test

Window

4/5/02-7/4/02

IR Subarrays

(from phase 5)

1/1/02-6/30/02

WFC3 STScI Ground System Support Development Flow (Phases 2 – 4)

FSW3.0

SMGT

No earlier than 5/1/03

Remainder of phase 5 and phases 6 & 7

development(needed post Launch)

FSW2.2

FSW2.3

MacroTiming

MacroTiming