Page 1 9/4/01
SMS Test Phase 2 & 3
WFC3 FSW and STScI Development Flow through SMGT
4/1/02-6/30/02
FSW 2.1 C&UT
7/8/01-8/15/01
FSW 2.2 C&UT
- WFC3 Software Bench- SITS
- WFC3 TBD Bench
- SITS
- Database (CCL, Cmd, TLM, Tables)
- Macros
- FSW 3.0
- WFC3 Software Bench- SITS
8/16/01-11/17/01
FSW 2.1 C&UT
4/2/01-7/30/01
- COS Bench- SITS
FSW 3.0 C&UT
- WFC3 TBD Bench- SITS
12/15/01-4/4/02
SMS Test Phase 4 &
IR Subarrays
9/1/02-12/31/02
FinalQualification
Test
6/3/02-7/31/02
- WFC3 TBD Bench
- SITS
Continued on the Next Page
SMS Test Phase 5
2/1/03-4/30/03
FSW 3.0 Component
Test
- WFC3 TBD Bench- SITS
3/1/02-5/31/02
Pre-SMGTBench Testing
11/15/02-4/30/02
- WFC3 TBD Bench
- SITS
- Database (CCL, Cmd, TLM, Tables)
- Macros
- FSW 3.0
- WFC3 TBD Bench
- SITS
- Database (CCL, Cmd, TLM, Tables)
- Macros
- FSW 3.0
- WFC3 TBD Bench
- SITS
- Database (CCL, Cmd, TLM)
- Macros
- FSW 3.0
Ship to GSFC
~8/15/02
FSW 2.1 Component
Test
FSW 2.2Component
Test8/16/01-10/31/01 10/31/01-2/28/02
Boot CodeTesting
- SES 1 Board (due 10/29/01)
10/1/01-11/16/01
FSW 2.3 C&UT
FSW 2.3Component
Test
11/1/01-1/17/01
Page 2 9/4/01
WFC3 FSW and STScI Development Flow through SMGT - concluded
SMGT
No earlier than 5/1/03
- WFC3 Instrument
- SMPRD Database
- Macros
- STOCC/CCS
-FSW 3.X
-VEST
-PACOR/STScI
From Pre-SMGT Bench Testing
VEST I&T
TBD
- WFC3 Instrument
- SMPRD Database
- Macros
- VOCC/CCS
-FSW 3.X
-VEST
-PACOR/STScI
VEST I&T
TBD
- S/W or Ops Bench
- SMPRD Database
- Macros
- VOCC/CCS
-FSW 3.X
-VEST
-PACOR/STScI
VEST Dry Run
TBD
- VOCC/CCS
- VEST
- Bench?
PRDOffice
TBD
- Commands
- Telemetry
- Tables
- CCL’s
- Display Pages
NSSCAP’s
TBD
Page 3 9/4/01
WFC3 FSW Development Flow (2.1 through 2.2)
FSW 2.1 C&UT
7/2/01-8/31/01
FSW 2.2 C&UT
8/16/01-11/15/01
SITS 15.4
(S/W Bench)
MEB
WFC3 S/WBench
DRD Items
Component Test2.1
DRD Items
- DM-06 (Initial)
Mechanisms(Test Software)
- SOFA/Corrector (10/17/01)- Shutter (10/17/01)-Filter Wheel (10/19/01- Mech Sim1 (10/1/01))
Hardware
CCS3.4.0.3 7/31/01
10/15/01
SITS 25.4.1
(Ops Bench)
MEB 2
WFC3 OpsBench
- S/W Bench- SITS
8/16/01-10/31/01
10/1/01
SES 1Board
Boot CodeC&UT
10/1/01-11/16/01
10/29/01
FSW 2.2 Component
Test
10/31/02- 1/28/02
- SES2 (10/19/01)- SES3 (9/14/01)- SES4 (9/7/01)
To FSW 2.3 Code & Unit Test
Boot CodeTesting
10/1/01-12/15/01
Page 4 9/4/01
FSW 3.0C&UT
11/1/01-3/15/02FSW 3.0
ComponentTest
3/1/02-9/30/02
-TBD Bench
FSWFQT
6/1/02-7/31/02
-TBD Bench
SI Deliveryto
GSFC
8/15/02
DRD Items
- Need List of Deliverables
Mechanisms
- TBD
Support
- UVIS/IR Detector Simulator (9/21/01)
- UVIS/IR Science Data Generator(12/1/01)
DRD Items
- TBD
WFC3 FSW Development Flow (2.3 through System Functional Test)
FSW 2.3C&UT
Mechanisms(Test Software)
- CSM (11/19/01)- Mech Sim2 (11/15/01)
Hardware
DRD Items
- TBD
FSW 2.3Component
Test
WFC3 System Functional
Test(MEB Install)
WFC3 System Functional
Test(Surrogate Detector Install)
- SES1 (10/29/01)- SES2 (9/14/01)
11/16/01-1/15/02
From FSW 2.2 Component Test
12/1/01-3/31/02
Procedures not fully component tested in 3.0can be run against the hardware if the procedure is dryrun on the bench first.
Page 5 9/4/01
Phase 2
- Aperture Definitions
- Basic UVIS ACCUM Mode
-UVIS Dark and Bias Calibration
DRD Items
- DM-06 (Initial)
Phase 4development
1/1/02-6/30/02
- UVIS & IR ALIGN Mode
-Timing Updates
-SAA Contour Defintions
- UVIS CTE Monitoring- IR Bright Earth Avoidance
1/1/01-6/30/01
Phase 4 & IR Subarrays
SMS Test Window
9/2/02-11/29/02Support
- Detector Simulator
- Science Data Generator
Phase 3development
- Basic IR MULTIACCUM Mode- IR Dark Calibrations
- UVIS & IR Lamp Operations
7/1/01-12/31/01
Phase 2 & 3 SMS Test
Window
4/5/02-7/4/02
IR Subarrays
(from phase 5)
1/1/02-6/30/02
WFC3 STScI Ground System Support Development Flow (Phases 2 – 4)
FSW3.0
SMGT
No earlier than 5/1/03
Remainder of phase 5 and phases 6 & 7
development(needed post Launch)
FSW2.2
FSW2.3
MacroTiming
MacroTiming
MacroTiming