16
Page 1 © 2007, UGS Corp. All rights reserved UGS PLM Software Integrating MBSE and PLM Wayne Collier Senior Functional Architect 2008.05.14

Page 1 © 2007, UGS Corp. All rights reserved UGS PLM Software Integrating MBSE and PLM Wayne Collier Senior Functional Architect 2008.05.14

Embed Size (px)

Citation preview

Page 1: Page 1 © 2007, UGS Corp. All rights reserved UGS PLM Software Integrating MBSE and PLM Wayne Collier Senior Functional Architect 2008.05.14

Page 1© 2007, UGS Corp. All rights reserved

UGS PLM Software

Integrating MBSE and PLM

Wayne CollierSenior Functional Architect2008.05.14

Page 2: Page 1 © 2007, UGS Corp. All rights reserved UGS PLM Software Integrating MBSE and PLM Wayne Collier Senior Functional Architect 2008.05.14

Page 2 Apr-08 Siemens PLM SoftwareTeamcenterFor internal use only / Copyright © 2008 Siemens PLM Software. All rights reserved.

Starting Point: Requirements and Trace Links

Page 3: Page 1 © 2007, UGS Corp. All rights reserved UGS PLM Software Integrating MBSE and PLM Wayne Collier Senior Functional Architect 2008.05.14

Page 3 Apr-08 Siemens PLM SoftwareTeamcenterFor internal use only / Copyright © 2008 Siemens PLM Software. All rights reserved.

Starting Point: Diagram AutoLayout

Page 4: Page 1 © 2007, UGS Corp. All rights reserved UGS PLM Software Integrating MBSE and PLM Wayne Collier Senior Functional Architect 2008.05.14

Page 4 Apr-08 Siemens PLM SoftwareTeamcenterFor internal use only / Copyright © 2008 Siemens PLM Software. All rights reserved.

Teamcenter for Manufacturing – Process BOM

Page 5: Page 1 © 2007, UGS Corp. All rights reserved UGS PLM Software Integrating MBSE and PLM Wayne Collier Senior Functional Architect 2008.05.14

Page 5 Apr-08 Siemens PLM SoftwareTeamcenterFor internal use only / Copyright © 2008 Siemens PLM Software. All rights reserved.

Starting Point: Integrating Objects & Documents

Page 6: Page 1 © 2007, UGS Corp. All rights reserved UGS PLM Software Integrating MBSE and PLM Wayne Collier Senior Functional Architect 2008.05.14

Page 6 Apr-08 Siemens PLM SoftwareTeamcenterFor internal use only / Copyright © 2008 Siemens PLM Software. All rights reserved.

Starting Point: WorkFlow and Change Management

Page 7: Page 1 © 2007, UGS Corp. All rights reserved UGS PLM Software Integrating MBSE and PLM Wayne Collier Senior Functional Architect 2008.05.14

Page 7© 2007, UGS Corp. All rights reserved

UGS PLM Software

The Core Product Lifecycle Management Question

Tank

Check Valve

Main ValvePump

P - 1

P - 2 P - 5

Page 8: Page 1 © 2007, UGS Corp. All rights reserved UGS PLM Software Integrating MBSE and PLM Wayne Collier Senior Functional Architect 2008.05.14

Page 8© 2007, UGS Corp. All rights reserved

UGS PLM Software

Original Logical Design

Tank

Check Valve

Main ValvePump

P - 1

P - 2 P - 5

Page 9: Page 1 © 2007, UGS Corp. All rights reserved UGS PLM Software Integrating MBSE and PLM Wayne Collier Senior Functional Architect 2008.05.14

Page 9© 2007, UGS Corp. All rights reserved

UGS PLM Software

Design Change #1

Drain Valve

P-3

P-2 P-4

Tank

Check Valve

Main ValvePump

P-1

P-5

This change involves inserting P-3, P-4, and Drain Valve

The effectivity of this change is for Tech Insertion #1 – think of it as an option.

Page 10: Page 1 © 2007, UGS Corp. All rights reserved UGS PLM Software Integrating MBSE and PLM Wayne Collier Senior Functional Architect 2008.05.14

Page 10© 2007, UGS Corp. All rights reserved

UGS PLM Software

Design Change #2

Tank

Check Valve

Globe ValvePump

P-1

P-5P-2

This change involves replacing the Main Valve with a Globe Valve.

The effectivity of this change is for Tech Insertion #2 – think of it as another option.

Page 11: Page 1 © 2007, UGS Corp. All rights reserved UGS PLM Software Integrating MBSE and PLM Wayne Collier Senior Functional Architect 2008.05.14

Page 11© 2007, UGS Corp. All rights reserved

UGS PLM Software

Design Change #3

Hi Pressure Tank

Check Valve

Main ValvePump

P-1

P-5P-2

This change involves replacing the original Tank with a high pressure tank.

The effectivity of this change is for Model #2.

Page 12: Page 1 © 2007, UGS Corp. All rights reserved UGS PLM Software Integrating MBSE and PLM Wayne Collier Senior Functional Architect 2008.05.14

Page 12© 2007, UGS Corp. All rights reserved

UGS PLM Software

Summary of Design Changes

DesignChange

Before

After

Effectivity

Insert P3,P4, Drain Valve

Tech Insertion#1

Replace Main Valvewith Globe Valve

Tech Insertion#2

Replace Tankwith Hi Pres Tank

Model #2and Up

Page 13: Page 1 © 2007, UGS Corp. All rights reserved UGS PLM Software Integrating MBSE and PLM Wayne Collier Senior Functional Architect 2008.05.14

Page 13© 2007, UGS Corp. All rights reserved

UGS PLM Software

3 Independent Design Changes – Results in 8 Possible Configurations

Product Model = 1Tech Insert #1 = NoTech Insert #2 = No

Product Model = 1Tech Insert #1 = NoTech Insert #2 = No

Product Model = 1Tech Insert #1 = YesTech Insert #2 = No

Product Model = 1Tech Insert #1 = YesTech Insert #2 = No

Product Model = 1Tech Insert #1 = NoTech Insert #2 = Yes

Product Model = 1Tech Insert #1 = NoTech Insert #2 = Yes

Product Model = 1Tech Insert #1 = YesTech Insert #2 = Yes

Product Model = 1Tech Insert #1 = YesTech Insert #2 = Yes

Product Model = 2Tech Insert #1 = NoTech Insert #2 = No

Product Model = 2Tech Insert #1 = NoTech Insert #2 = No

Product Model = 2Tech Insert #1 = YesTech Insert #2 = No

Product Model = 2Tech Insert #1 = YesTech Insert #2 = No

Product Model = 2Tech Insert #1 = NoTech Insert #2 = Yes

Product Model = 2Tech Insert #1 = NoTech Insert #2 = Yes

Product Model = 2Tech Insert #1 = YesTech Insert #2 = Yes

Product Model = 2Tech Insert #1 = YesTech Insert #2 = Yes

The goal is to store all 8 configurationsWithout storing 8 different files

The goal is to store all 8 configurationsWithout storing 8 different files

Tank

Check Valve

Pump

P-1

P-2 P-5

Globe ValveTank

Check Valve

Pump

P-1

P-2 P-5

Globe ValveTank

Check Valve

Main ValvePump

P-1

P-2 P-5

Tank

Check Valve

Main ValvePump

P-1

P-2 P-5

Drain Valve

P-3

P-2 P-4

Tank

Check Valve

Main ValvePump

P-1

P-5

Drain Valve

P-3

P-2 P-4

Tank

Check Valve

Main ValvePump

P-1

P-5

Drain Valve

P-3

P-2 P-4

Tank

Check Valve

Pump

P-1

P-5

Globe Valve

Drain Valve

P-3

P-2 P-4

Tank

Check Valve

Pump

P-1

P-5

Globe Valve

Check Valve

Main ValvePump

P-1

P-2 P-5

Hi Pressure Tank

Check Valve

Main ValvePump

P-1

P-2 P-5

Hi Pressure TankHi Pressure Tank

Drain Valve

P-3

P-2 P-4

Check Valve

Main ValvePump

P-1

P-5

Hi Pressure Tank

Drain Valve

P-3

P-2 P-4

Check Valve

Main ValvePump

P-1

P-5

Hi Pressure TankHi Pressure Tank

Check Valve

Pump

P-1

P-2 P-5

Globe ValveHi Pressure Tank

Check Valve

Pump

P-1

P-2 P-5

Globe ValveHi Pressure TankHi Pressure Tank

Drain Valve

P-3

P-2 P-4

Check Valve

Pump

P-1

P-5

Globe ValveHi Pressure Tank

Drain Valve

P-3

P-2 P-4

Check Valve

Pump

P-1

P-5

Globe ValveHi Pressure TankHi Pressure Tank

Page 14: Page 1 © 2007, UGS Corp. All rights reserved UGS PLM Software Integrating MBSE and PLM Wayne Collier Senior Functional Architect 2008.05.14

Page 14© 2007, UGS Corp. All rights reserved

UGS PLM Software

Way Forward

Enhanced modeling of Use Cases/Operational Scenarios Functions/Activities Networks Abstract Flows/Invocations/Signals Connections Item Flows/Messages Ports Port Sets (Interfaces) Behaviors Diagram Typing Allocations:

Functions to Abstract Physical models Functions & Abstract Physical models to 2D and 3D designs

Algorithms Configuration Validation and Solves Rules Solving Diagram Auto-Layouts Equivalence

Transition Tool Integrations to this new model

Page 15: Page 1 © 2007, UGS Corp. All rights reserved UGS PLM Software Integrating MBSE and PLM Wayne Collier Senior Functional Architect 2008.05.14

Page 15© 2007, UGS Corp. All rights reserved

UGS PLM Software

What Can the Industry Do?

Push current modeling techniques to their limits of scale Document where the processes and tools break down Share these stress points with PLM vendors

Page 16: Page 1 © 2007, UGS Corp. All rights reserved UGS PLM Software Integrating MBSE and PLM Wayne Collier Senior Functional Architect 2008.05.14

Page 16© 2007, UGS Corp. All rights reserved

UGS PLM Software

Summary

Siemens PLM Software has a long-term mandate to: Manage systems models of arbitrary scale and complexity

Plants Products Infrastructure

Apply engineering rules and product configuration variables to these models

Support collaboration across large models Scale from single-user, local-domain models to full-system models at

any level of detail Integrate systems models with

Portfolio management and product planning Product configuration Engineering rules modeling Manufacturing process models MCAD and ECAD Software Development CAE (Functional and Physics-based)