Padom Holdings Ltd. Stormwater Management and Servicing Brief Type of Document Issued for Site Plan Approval Project Name 173-177 Preston Street, Ottawa, Ontario Project Number OTT-00216595-A0 Prepared By: exp Services Inc. 100-2650 Queensview Drive Ottawa, ON K2B 8H6 Canada Date Submitted March 25, 2014

Padom Holdings Ltd. - webcast.ottawa.ca

  • Upload
    others

  • View
    7

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Padom Holdings Ltd. - webcast.ottawa.ca

� Padom Holdings Ltd.

Stormwater Management and Servicing Brief

Type of Document Issued for Site Plan Approval

Project Name 173-177 Preston Street, Ottawa, Ontario

Project Number OTT-00216595-A0

Prepared By:

exp Services Inc. 100-2650 Queensview Drive Ottawa, ON K2B 8H6 Canada

Date Submitted March 25, 2014

Page 2: Padom Holdings Ltd. - webcast.ottawa.ca
Page 3: Padom Holdings Ltd. - webcast.ottawa.ca

Padom Holdings Ltd Redevelopment of 173-177 Preston Street

OTT-00216595-A0 March 25, 2014�

Legal Notification This report was prepared by exp Services Inc. for the account of Padom Holdings Ltd

Any use which a third party makes of this report, or any reliance on or decisions to be made based on it, are the responsibility of such third parties. Exp Services Inc. accepts no responsibility for damages, if any, suffered by any third party as a result of decisions made or actions based on this project.

Page 4: Padom Holdings Ltd. - webcast.ottawa.ca

Padom Holdings Ltd Redevelopment of 173-177 Preston Street

OTT-00216595-A0 March 25, 2014�

i

Table of Contents Page

1� Introduction ........................................................................................................................... 1�2� Existing Conditions ................................................................................................................ 1�3� Development Proposal .......................................................................................................... 1�4� Stormwater Management ...................................................................................................... 1�

4.1� Existing Site Drainage ................................................................................................. 1�4.2� Proposed Site Drainage .............................................................................................. 1�4.3� Stormwater Quantity Control ....................................................................................... 1�4.4� Stormwater Quality Control ......................................................................................... 2�

5� Sanitary and Water Servicing ................................................................................................ 2�6� Erosion and Sediment Control Measures ............................................................................. 3�7� Conclusion ............................................................................................................................ 3�

List of Figures �Figure 1 – Aerial / Location Plan ................................................................................... Appendix A Figure 2 - Zone Plan ..................................................................................................... Appendix A Figure 3 - Site Plan ....................................................................................................... Appendix A Figure 4 – Servicing, Grading, and Erosion Control Plan (Dwg. No. 216595-SGP) ..... Appendix A

List of Appendices Appendix A - Figures Appendix B - Stormwater Management Calculations Appendix C - City of Ottawa Servicing Report Checklist

Page 5: Padom Holdings Ltd. - webcast.ottawa.ca

Padom Holdings Ltd Redevelopment of 173-177 Preston Street

OTT-00216595-A0 March 25, 2014�

1

1 IntroductionPadom Holdings Ltd retained exp Services Inc. (exp) to prepare a Stormwater Management Report for a proposed redevelopment project located at 173-177 Preston Street in the City of Ottawa, Ontario. The proposed development will comprise of a new four-storey residential apartment building, one level basement, and asphalt parking lot. Refer to Appendix A, Figure 1 for Aerial / Location Map.

2 Existing Conditions The current site is approximately 0.051 hectares, and is occupied by a two-storey, semi-detached residential dwelling with surface parking. It is zoned as local Traditional Mainstreet (TM). Appendix A, Figure 2 shows the Zoning Plan.

3 Development ProposalThe proposed development involves the construction of a new four storey residential apartment building, with improvements to the existing parking area. The existing dwelling is to remain. Appendix A, Figure 3 shows the proposed Site Plan.

�4 Stormwater Management 4.1 Existing Site Drainage

Currently, the site is occupied by an existing 2-storey building with an asphalt surface parking lot. Storm water runoff from the area sheet flows off-site to the existing inlets located on both Preston and Poplar Street, with no on-site detention.

4.2 Proposed Site Drainage

In the proposed development the storm runoff will be detained on-site with the designed restrict flow being released to the municipal system. The proposed stormwater management system will consist of: surface storage (i.e. parking area), an on-site catch basin manhole connected to a lateral lead, that further connects to the existing 450mm diameter combined sewer located along Poplar Street. Reference Appendix A, Servicing, Grading, and Erosion Control Plan (Dwg. No. 216595-SGP) for details on the proposed storm sewer system.

4.3 Stormwater Quantity Control

Design of the storm sewer system was completed in conformance with the City of Ottawa Design Guidelines (November 2004), specifically Section 5 “Storm and Combined Sewer Design” and Technical Bulletin ISDTB-2012-4 issued June 20, 2012.

Page 6: Padom Holdings Ltd. - webcast.ottawa.ca

Padom Holdings Ltd Redevelopment of 173-177 Preston Street

OTT-00216595-A0 March 25, 2014�

2

The allowable release rate was determined using the 2-year design storm event. With a total controlled drainage area of 0.031 hectares and runoff coefficient of 0.40, the calculated rate was 2.67 L/sec. See Table 1 in Appendix B.

Quantity storage requirements were based on storms up to and including the 100-year. On-site detention will be provided via surface parking, underground structure (i.e. CBMH1), and roof-top. The proposed catch basin manhole will be equipped with an Inlet Control Device (ICD) to control the outflow rate. Also, roof drains will be equipped with adjustable controls (i.e. upper cone, closed position) to restrict flow, see Appendix B for details.

Supporting calculations are included in Appendix B, summary provided below in Table 4.3-1. The depth and extent of surface storage is illustrated on the Servicing, Grading and Erosion Control Plan Drawing No. 216595-SGP, Appendix A.

Table 4.3.1 - Stormwater Management Summary

Area No.

Description Area (ha)

5 YEAR 100 YEAR OrificeControl

Location Release Rate (L/sec)

StorageRequired

(m3)

StorageProvided

(m3)

ReleaseRate

(L/sec)

StorageRequired

(m3)

StorageProvided

(m3)

A1Parking Lot Surface & CBMH1

0.0206 2.04 1.2 4.3 2.04 5.9 4.3 CBMH1

A2 Roof Drain 0.0106 0.63 1.1 7.8 0.63 3.8 7.8 Roof Top

TOTAL 0.0312 2.67 2.2 12.1 2.67 9.7 12.1 0.03

4.4 Stormwater Quality Control

Quality control is not required as the site drains to an existing combined sewer on Poplar Street that is directed to a wastewater treatment plant.

5 Sanitary and Water Servicing The new building will be serviced with a proposed 135mm diameter sanitary and 100mm diameter water lateral each connected to the existing infrastructure located along Preston Street; 2100mm diameter sanitary sewer and 400mm diameter watermain, respectively. In addition, weeping tiles from the proposed building will connect (i.e. 100mm diam.) to the existing sanitary sewer located along Preston Street. �

Page 7: Padom Holdings Ltd. - webcast.ottawa.ca

Padom Holdings Ltd Redevelopment of 173-177 Preston Street

OTT-00216595-A0 March 25, 2014�

3

6 Erosion and Sediment Control Measures During all construction activities, erosion and sedimentation shall be controlled by the following techniques:

� Extent of exposed soils shall be limited at any given time; � Exposed areas shall be re-vegetated as soon as possible; � Filter cloth shall be installed between frame and cover on all proposed catch basin manhole; � Visual inspection shall be completed daily on sediment control barriers and any damage repaired

immediately. Care will be taken to prevent damage during construction operations; � Sediment control devices will be cleaned of accumulated silt as required. The deposits will be

disposed of as per the requirements of the contract; � During the course of construction, if the engineer believes that additional prevention methods are

required to control erosion and sedimentation, the contractor will install additional silt fences or other methods as required to the satisfaction of the engineer; and

� Construction and maintenance requirements for erosion and sediment controls are to comply with Ontario Provincial Standard Specification (OPSS) OPSS 805, and City of Ottawa specifications.

�7 ConclusionThe conclusions of this report are as follows:

� Runoff from the site is controlled to an allowable release rate of 2.67 L/sec. � Quantity storage requirements were based on storms up to and including the 100-year. � The required and provided storage volumes are 9.7 and 12.1 cubic-meters, respectively. � Quality control of stormwater is not required as the site drains to an existing combined sewer on

Poplar Street further flowing to a wastewater treatment plant. � An overland flow route is provided for the major storm event. � Erosion and sediment control measures will be implemented during construction.

Page 8: Padom Holdings Ltd. - webcast.ottawa.ca

Padom Holdings Ltd Redevelopment of 173-177 Preston Street

OTT-00216595-A0 March 25, 2014�

Appendix A – Figures

Page 9: Padom Holdings Ltd. - webcast.ottawa.ca

PLOUFFE

PARK

PROPOSED

BUILDING

& SITE

OAK STREET

ANDERSON ST

POPLAR ST

PR

ES

TO

N S

TR

EE

T

ECCLES ST

THE GOLF

ACADEMY

EXISTING

FIRE STATION

p:\projects\civil engineering services\216000\ott-00216595-a0 - 175-177 preston street - padom

holdings\d - draw

ings\sketches and figures\216595-noise study fig 1 and fig2.dw

g

2/5/2014 11:06:57 A

MLast P

lotted:

Filenam

e:

Plotted by:

duthilleulm

References: xref-keyplan.dw

g

t: +1.613.688.1899 | f: +1.613.225.7330

2650 Queensview Drive, Unit 100

Ottawa, ON K2B 8H6

Canada

www.exp.com

BUILDINGS EARTH & ENVIRONMENT ENERGY

INDUSTRIAL INFRASTRUCTURE SUSTAINABILITY

exp Services Inc.

Page 10: Padom Holdings Ltd. - webcast.ottawa.ca

\\pottfsg001\data\projects\civil engineering services\216000\ott-00216595-a0 - 175-177 preston street - padom

holdings\d - draw

ings\216595-fig1-2.dw

g

3/18/2014 2:41:17 P

MLast P

lotted:

Filenam

e:

Plotted by:

butlers

References: xref-keyplan.dw

g

t: +1.613.688.1899 | f: +1.613.225.7337

2650 Queensview Drive, Suite 100

Ottawa, ON K2B 8H6

Canada

www.exp.com

BUILDINGS EARTH & ENVIRONMENT ENERGY

INDUSTRIAL INFRASTRUCTURE SUSTAINABILITY

exp Services Inc.

Page 11: Padom Holdings Ltd. - webcast.ottawa.ca
Page 12: Padom Holdings Ltd. - webcast.ottawa.ca

SCALE

p:\p

roje

cts\

civi

l eng

inee

ring

serv

ices

\216

000\

ott-0

0216

595-

a0 -

175-

177

pres

ton

stre

et -

pado

m h

oldi

ngs\

d - d

raw

ings

\216

595-

sgp.

dwg

3/25

/201

4 11

:21:

52 A

M--

--3/25

/201

4 11

:20:

36 A

M

Pen

Tab

le::

Last

Plo

tted:

Last

Sav

ed:

File

nam

e:

Plo

tted

by:

agos

tinoe

Ref

eren

ces:

xre

f-key

plan

.dw

g

t: +1.613.688.1899 | f: +1.613.225.73302650 Queensview Drive, Unit 100Ottawa, ON K2B 8H6Canada

www.exp.com

BUILDINGS EARTH & ENVIRONMENT ENERGYINDUSTRIAL INFRASTRUCTURE SUSTAINABILITY

exp Services Inc.

DISCLAIMER OF WARRANTYWhereas no practical control of restriction on the purpose, use or alteration of supplied digitaldata can be exercised by exp Services Inc., the accompanying computer file, containing theAutoCAD drawing data, is supplied as a matter of courtesy to .The data is provided "as is" without warranty of any kind, either expressed or implied. Althoughevery care and diligence is taken to ensure the accuracy and correctness of all supplied digitaldata, any and all liabilities for damage, direct or indirect, however caused and resulting in anyway from the use of the supplied digital data, is the full and final responsibility of the user. will indemnify and hold harmless exp Services and itsemployees, affiliates, etc., from any claims made against exp Services Inc. by third parties as aresult of the unauthorized distribution of these digital drawings.

BY OPENING AND OR THAWING/TURNING ON THE FROZENLAYERS IN THIS DRAWING THE USER ACKNOWLEDGES THISDISCLAIMER.

COPYRIGHTAll rights are reserved. No part of the supplied digital data may be reproduced, stored inretrieval system or transmitted, in any form or by any means, mechanical, photocopying,recording or otherwise, without the without the prior permission of exp Services Inc.

COMPANY NAME HERE

COMPANY NAME HERE

Page 13: Padom Holdings Ltd. - webcast.ottawa.ca

Padom Holdings Ltd Redevelopment of 173-177 Preston Street

OTT-00216595-A0 March 25, 2014�

Appendix B – Stormwater Management Calculations � �

Page 14: Padom Holdings Ltd. - webcast.ottawa.ca

3/25/2014 10:50 AM

Project: 175-177 Preston StreetClient: Padom Holdings Ltd.exp No: OTT-00216595-A0DATE:

TABLE A-1: ALLOWABLE RUNOFF RELEASE RATE - 2 YEAR STORMQ pre = 2.78 A I C, where

A = 312 m2 = 0.0312 haI = 77.1 mm/hr for tc = 10 mins and 2 year storm

C = 0.40 Runoff Coefficient

Q = 2.67 L/sec

MAXIMUM ALLOWABLE RUNOFF is 2.67 L/sec

TABLE A-2: ORIFICE SIZINGORIFICE SQUARE CIRC

AREA(sq.m.)

1-side(mm)

DIAM.(mm)

2.04 1.42 0.0006 25 29

ORIFICE TO BE INSTALLED 29 mm

Orifice Control Sizing Q = 0.6 x A x (2gh)1/2

Where: Q, release rate in m3/s

A is the orifice area in m2

g is the acceleration due to gravity, 9.81m/s2

h is the head of water above the orifice centre in m

d is the diameter of the orifice in m

HEAD (m)

25-Mar-14

FlLOW(L/sec)

STRUCTURE NO.

CBMH1

216595 SWM SWM

Page 15: Padom Holdings Ltd. - webcast.ottawa.ca

3/25/2014 10:50 AM

Project: 175-177 Preston StreetClient: Padom Holdings Ltd.exp No: OTT-00216595-A0DATE: 25-Mar-14

Parking Lot Area = 0.0206 ha C = 0.90

Return Time Intensity Flow Q Q Storage

Period (min) (mm/hr) Q (L/s) allowabe store Req'd m3

5 103.57 5.34 2.04 3.30 0.9910 76.81 3.96 2.04 1.92 1.1515 61.77 3.18 2.04 1.14 1.03

20 52.03 2.68 2.04 0.64 0.77

25 45.17 2.33 2.04 0.29 0.43

Roof Top Drain Area = 0.0106 ha C = 1.00Return Time Intensity Flow Q Q StoragePeriod (min) (mm/hr) Q (L/s) allowable store Req'd m3

15 61.77 1.82 0.63 1.19 1.0820 52.03 1.54 0.63 0.91 1.0925 45.17 1.33 0.63 0.70 1.0630 40.04 1.18 0.63 0.55 1.0035 36.06 1.07 0.63 0.44 0.9140 32.86 0.97 0.63 0.34 0.82

QUANTITY STORAGE REQUIREMENTS - 5 Year is 2.2 m3

TABLE A-4: QUANTITY STORAGE REQUIREMENTS - 100 YearParking Lot Area = 0.0206 ha C = 1.00

Return Time Intensity Flow Q Q StoragePeriod (min) (mm/hr) Q (L/sec) allowable store Req'd m3

10 178.56 10.23 2.04 8.19 4.91

15 142.89 8.18 2.04 6.14 5.53

20 119.95 6.87 2.04 4.83 5.8025 103.85 5.95 2.04 3.91 5.86

30 91.87 5.26 2.04 3.22 5.80

35 82.58 4.73 2.04 2.69 5.65

40 75.15 4.30 2.04 2.26 5.43

45 69.05 3.95 2.04 1.91 5.17

50 63.95 3.66 2.04 1.62 4.87

55 59.62 3.41 2.04 1.37 4.54

60 55.89 3.20 2.04 1.16 4.18

Roof Top Drain Area = 0.01063 ha C = 1.00

Return Time Intensity Flow Q Q StoragePeriod (min) (mm/hr) Q (L/sec) allowable store Req'd m3

15 142.89 4.22 0.63 3.59 3.2320 119.95 3.54 0.63 2.91 3.5025 103.85 3.07 0.63 2.44 3.6630 91.87 2.71 0.63 2.08 3.7535 82.58 2.44 0.63 1.81 3.8040 75.15 2.22 0.63 1.59 3.8245 69.05 2.04 0.63 1.41 3.81

QUANTITY STORAGE REQUIREMENTS - 100 Year is 9.7 m3

TABLE A-3: QUANTITY STORAGE REQUIREMENTS - 5 Year

100 YR

100 YEAR

5 YEAR

5 YEAR

216595 SWM SWM

Page 16: Padom Holdings Ltd. - webcast.ottawa.ca

3/25/2014 10:50 AM

Project: 175-177 Preston StreetClient: Padom Holdings Ltd.exp No: OTT-00216595-A0DATE: 25-Mar-14

TABLE A-5: STAGE STORAGE TABLES TYPICAL ROOF TOP DRAIN

Storage Depth (m)

VOL.(cu.m.)

0.00 0.00.10 3.50.20 7.8

TABLE A-6: SURFACE STORAGE

T/G(m)

MAX W/L (m)

STORAGE DEPTH

(m)AREA

(sq.m.)VOL.

(cu.m.)

57.58 57.70 0.120 96.0 3.84

TABLE A-7: UNDERGROUND STRUCTURE STORAGE

No. SIZE(mm)

T/G(m)

INV.(m)

SUMP(m)

STORAGE DEPTH

(m)AREA

(sq.m.)VOL.

(cu.m.)

CBMH1 600 square 57.58 56.18 56.18 1.40 0.36 0.50

AMOUNT OF ON-SITE STORAGE PROVIDED IS 12.1 m3

PARKING LOT

SURFACE AREADESCRIPTION

0.0

2.0

4.0

6.0

8.0

10.0

0.00 0.05 0.10 0.15 0.20 0.25

STAGE STORAGE CURVE FOR ROOF‐TOP DRAIN

Series1

216595 SWM SWM

Page 17: Padom Holdings Ltd. - webcast.ottawa.ca

3/25/2014 10:50 AM

Project: 175-177 Preston StreetClient: Padom Holdings Ltd.exp No: OTT-00216595-A0DATE: 25-Mar-14

216595 SWM SWM

Page 18: Padom Holdings Ltd. - webcast.ottawa.ca

Padom Holdings Ltd Redevelopment of 173-177 Preston Street

OTT-00216595-A0 March 25, 2014�

Appendix C -City of Ottawa Servicing Report Checklist

Page 19: Padom Holdings Ltd. - webcast.ottawa.ca

4.1 General ContentExecutive Summary (for larger reports only).

Date and revision number of the report.

Location map and plan showing municipal address, boundary, and layout ofproposed development.

Plan showing the site and location of all existing services.

Development statistics, land use, density, adherence to zoning and official plan, andreference to applicable subwatershed and watershed plans that provide context towhich individual developments must adhere.

Summary of Pre-consultation Meetings with City and other approval agencies.

Reference and confirm conformance to higher level studies and reports (MasterServicing Studies, Environmental Assessments, Community Design Plans), or in thecase where it is not in conformance, the proponent must provide justification anddevelop a defendable design criteria.

Statement of objectives and servicing criteria.

DEVELOPMENT SERVICING STUDY CHECKLIST

1

Comments:

Comments:

Comments:

Comments:

Comments:

Comments:

Comments:

Comments:

Identification of existing and proposed infrastructure available in the immediatearea.

Comments:

N/A due to report length.

Refer to the SWM & Servicing Brief, Title Page.

Refer to the SWM & Servicing Brief, Appendix A, Figure 1.

Refer to the Servicing, Grading, and Erosion Control Plan (Dwg No. SGP) for service locations.

Land use meets zoning. Refer to the SWM & Servicing Brief, Appendix A.

Pre-consultation meeting was held with City.

No higher level studies available.

Stated throughout the SWM & Servicing Brief.

Refer to the Servicing, Grading, and Erosion Control Plan (Dwg No. SGP).

Page 20: Padom Holdings Ltd. - webcast.ottawa.ca

Identification of Environmentally Significant Areas, watercourses and MunicipalDrains potentially impacted by the proposed development (Reference can be madeto the Natural Heritage Studies, if available).

development. This is required to confirm the feasibility of proposed stormwatermanagement and drainage, soil removal and fill constraints, and potential impacts toneighbouring properties. This is also required to confirm that the proposed gradingwill not impede existing major system flow paths.

Concept level master grading plan to confirm existing and proposed grades in the

Comments:

Comments:

All preliminary and formal site plan submissions should have the followinginformation:

Metric scaleNorth arrow (including construction North)Key planName and contact information of applicant and property ownerProperty limits including bearings and dimensionsExisting and proposed structures and parking areasEasements, road widening and rights-of-wayAdjacent street names

Identification of potential impacts of proposed piped services on private services(such as wells and septic fields on adjacent lands) and mitigation required to addresspotential impacts.

Proposed phasing of the development, if applicable.

Reference to geotechnical studies and recommendations concerning servicing.

Comments:

Comments:

Comments:

Comments:

2

DEVELOPMENT SERVICING STUDY CHECKLIST

N/A

Refer to Servicing, Grading, and Erosion Control Plan (Dwg No. SGP).

N/A

N/A

Geotechnical Investigation, Final Report, prepared by exp Services Inc., Project Number OTT-00216595-A0, dated March 21, 2014.

Page 21: Padom Holdings Ltd. - webcast.ottawa.ca

DEVELOPMENT SERVICING STUDY CHECKLIST

3

4.2 Development Servicing Report: WaterConfirm consistency with Master Servicing Study, if available

Availability of public infrastructure to service proposed development

Identification of system constraints

Identify boundary conditions

Confirmation of adequate domestic supply and pressure

Confirmation of adequate fire flow protection and confirmation that fire flow iscalculated as per the Fire Underwriter's Survey. Output should show available fireflow at locations throughout the development.

Provide a check of high pressures. If pressure is found to be high, an assessment isrequired to confirm the application of pressure reducing valves.

Definition of phasing constraints. Hydraulic modeling is required to confirmservicing for all defined phases of the project including the ultimate design

Address reliability requirements such as appropriate location of shut-off valves

Check on the necessity of a pressure zone boundary modification.

Comments:

Comments:

Comments:

Comments:

Comments:

Comments:

Comments:

Comments:

Comments:

Comments:

Water as per City guidelines.

Refer to the SWM & Servicing Brief.

Refer to the SWM & Servicing Brief.

N/A.

N/A.

N/A.

N/A.

N/A.

N/A.

N/A.

Page 22: Padom Holdings Ltd. - webcast.ottawa.ca

4

Description of off-site required feedermains, booster pumping stations, and otherwater infrastructure that will be ultimately required to service proposeddevelopment, including financing, interim facilities, and timing of implementation.

Confirmation that water demands are calculated based on the City of Ottawa DesignGuidelines.

Provision of a model schematic showing the boundary conditions locations, streets,parcels, and building locations for reference.

Description of the proposed water distribution network, including locations ofproposed connections to the existing system, provisions for necessary looping, andappurtenances (valves, pressure reducing valves, valve chambers, and fire hydrants)including special metering provisions.

Reference to water supply analysis to show that major infrastructure is capable ofdelivering sufficient water for the proposed land use. This includes data that showsthat the expected demands under average day, peak hour and fire flow conditionsprovide water within the required pressure range

Comments:

Comments:

Comments:

Comments:

Comments:

DEVELOPMENT SERVICING STUDY CHECKLIST

N/A.

Refer to the SWM & Servicing Brief.

N/A.

N/A.

N/A.

Page 23: Padom Holdings Ltd. - webcast.ottawa.ca

DEVELOPMENT SERVICING STUDY CHECKLIST

5

Identification and implementation of the emergency overflow from sanitarypumping stations in relation to the hydraulic grade line to protect against basementflooding.

Special considerations such as contamination, corrosive environment etc.

4.3 Development Servicing Report: WastewaterSummary of proposed design criteria (Note: Wet-weather flow criteria should notdeviate from the City of Ottawa Sewer Design Guidelines. Monitored flow data fromrelatively new infrastructure cannot be used to justify capacity requirements forproposed infrastructure).

Confirm consistency with Master Servicing Study and/or justifications fordeviations.

Consideration of local conditions that may contribute to extraneous flows that arehigher than the recommended flows in the guidelines. This includes groundwaterand soil conditions, and age and condition of sewers.

Description of existing sanitary sewer available for discharge of wastewater fromproposed development.

Verify available capacity in downstream sanitary sewer and/or identification ofupgrades necessary to service the proposed development. (Reference can be made topreviously completed Master Servicing Study if applicable)

Comments:

Comments:

Comments:

Comments:

Comments:

Comments:

Comments:

Reference SWM & Servicing Brief.

N/A

N/A

N/A

N/A.

N/A

N/A

Page 24: Padom Holdings Ltd. - webcast.ottawa.ca

6

4.4 Development Servicing Report: StormwaterDescription of drainage outlets and downstream constraints including legality ofoutlets (i.e. municipal drain, right-of-way, watercourse, or private property)

Analysis of available capacity in existing public infrastructure.

A drawing showing the subject lands, its surroundings, the receiving watercourse,existing drainage patterns, and proposed drainage pattern.

Water quantity control objective (e.g. controlling post-development peak flows topre-development level for storm events ranging from the 2 or 5 year event(dependent on the receiving sewer design) to 100 year return period); if otherobjectives are being applied, a rationale must be included with reference tohydrologic analyses of the potentially affected subwatersheds, taking into accountlong-term cumulative effects.

Water Quality control objective (basic, normal or enhanced level of protection basedon the sensitivities of the receiving watercourse) and storage requirements.

Description of the stormwater management concept with facility locations anddescriptions with references and supporting information.

Set-back from private sewage disposal systems.

Watercourse and hazard lands setbacks.

Record of pre-consultation with the Ontario Ministry of Environment and theConservation Authority that has jurisdiction on the affected watershed.

Comments:

Comments:

Comments:

Comments:

Comments:

Comments:

Comments:

Comments:

Comments:

DEVELOPMENT SERVICING STUDY CHECKLIST

Minor system to existing combined sewer on Poplar Street. Major system flow to Preston and Poplar Street.

Flows controlled to allowable rate based on City Guidelines. Reducing flows to less than pre-development rates.

Refer to the Servicing, Grading, and Erosion Control Plan (Dwg No. SGP).

Refer to the SSWM & Servicing Brief for the quantity control objectives.

No on site quality control required. Refer to the SWM & Servicing Brief.

Refer to SWM & Servicing Brief.

N/A

N/A

N/A.

Page 25: Padom Holdings Ltd. - webcast.ottawa.ca

DEVELOPMENT SERVICING STUDY CHECKLIST

7

Identification of watercourses within the proposed development and howwatercourses will be protected, or, if necessary, altered by the proposed

Storage requirements (complete with calculations) and conveyance capacity forminor events (1:5 year return period) and major events (1:100 year return period).

development with applicable approvals.

Calculate pre and post development peak flow rates including a description ofexisting site conditions and proposed impervious areas and drainage catchments incomparison to existing conditions.

Any proposed diversion of drainage catchment areas from one outlet to another.

Proposed minor and major systems including locations and sizes of stormwatertrunk sewers, and stormwater management facilities.

If quantity control is not proposed, demonstration that downstream system hasadequate capacity for the post-development flows up to and including the 100-yearreturn period storm event.

Identification of potential impacts to receiving watercourses

Identification of municipal drains and related approval requirements.

Confirm consistency with sub-watershed and Master Servicing Study, if applicablestudy exists.

Comments:

Comments:

Comments:

Comments:

Comments:

Comments:

Comments:

Comments:

Comments:

N/A

Refer to calculations provided in the SWM & Servicing Brief, Appendix B.

N/A

Included in the SSWM & Servicing Brief, Appendix B.

N/A

N/A

Quantity control is proposed. Refer to the SWM & Servicing Brief, Section 4.0 for details.

N/A

N/A

Page 26: Padom Holdings Ltd. - webcast.ottawa.ca

Descriptions of how the conveyance and storage capacity will be achieved for thedevelopment.

100 year flood levels and major flow routing to protect proposed development fromflooding for establishing minimum building elevations (MBE) and overall grading.

Inclusion of hydraulic analysis including hydraulic grade line elevations.

Description of approach to erosion and sediment control during construction for theprotection of receiving watercourse or drainage corridors.

Identification of floodplains - proponent to obtain relevant floodplain informationfrom the appropriate Conservation Authority. The proponent may be required todelineate floodplain elevations to the satisfaction of the Conservation Authority ifsuch information is not available or if information does not match currentconditions.

Identification of fill constraints related to floodplain and geotechnical investigation.

Comments:

Comments:

Comments:

Comments:

Comments:

Comments:

8

DEVELOPMENT SERVICING STUDY CHECKLIST

Refer to the SWM & Servicing Brief, Section 4.0 and Appendix A for details on the storage methods.

Maximum ponding levels of 0.3m on local roads. Major flow routing to the existing municipal roadway.

N/A.

Refer to the SWM & Servicing Brief, and Servicing, Grading, and Erosion Control Plan (Dwg No. SGP).

N/A

N/A.

Page 27: Padom Holdings Ltd. - webcast.ottawa.ca

Conservation Authority as the designated approval agency for modification offloodplain, potential impact on fish habitat, proposed works in or adjacent to awatercourse, cut/fill permits and Approval under Lakes and Rivers ImprovementAct. The Conservation Authority is not the approval authority for the Lakes andRivers Improvement Act. Where there are Conservation Authority regulations inplace, approval under the Lakes and Rivers Improvement Act is not required, exceptin cases of dams as defined in the Act.

Application for Certificate of Approval (CofA) under the Ontario Water ResourcesAct.

Changes to Municipal Drains.

Other permits (National Capital Commission, Parks Canada, Public Works andGovernment Services Canada, Ministry of Transportation etc.)

4.6 Conclusion ChecklistClearly stated conclusions and recommendations

Comments received from review agencies including the City of Ottawa andinformation on how the comments were addressed. Final sign-off from theresponsible reviewing agency.

All draft and final reports shall be signed and stamped by a professional Engineerregistered in Ontario

4.5 Approval and Permit Requirements: ChecklistThe Servicing Study shall provide a list of applicable permits and regulatory approvalsnecessary for the proposed development as well as the relevant issues affecting eachapproval. The approval and permitting shall include but not be limited to the following:

Comments:

Comments:

Comments:

Comments:

Comments:

Comments:

Comments:

9

DEVELOPMENT SERVICING STUDY CHECKLIST

N/A

An Environmental Compliance Approval will be required for the storm and sanitary sewers. An application will be made under the Transfer of Review Program.

N/A

N/A

Refer to the Servicing & SWM Report, Section 7.

Response to the City of Ottawa comments, dated Sept. 24, 2013, are provided in this submittal. Final sign-off from the responsible reviewing agency to follow.

All reports are signed and stamped by a professional Engineer registered in Ontario.