24
1 Package Marking, Packing List and Invoice Data Requirements for EB Receiving & Invoicing Approved for Public Release

Package Marking, Packing List and Invoice Data Requirements for EB Receiving & Invoicing

  • Upload
    hamish

  • View
    43

  • Download
    0

Embed Size (px)

DESCRIPTION

Package Marking, Packing List and Invoice Data Requirements for EB Receiving & Invoicing. Approved for Public Release. Introduction. Problem EB Receiving Process Package Marking / Packing List Data Invoice Requirements Action Conclusion. Approved for Public Release. The Problem. - PowerPoint PPT Presentation

Citation preview

Page 1: Package Marking, Packing List and Invoice Data Requirements  for EB Receiving & Invoicing

1

Package Marking, Packing List and

Invoice Data Requirements for EB Receiving & Invoicing

Approved for Public Release

Page 2: Package Marking, Packing List and Invoice Data Requirements  for EB Receiving & Invoicing

Shipments to Electric Boat 2

Introduction

• Problem

• EB Receiving Process

• Package Marking / Packing List Data

• Invoice Requirements

• Action

• Conclusion

Approved for Public Release

Page 3: Package Marking, Packing List and Invoice Data Requirements  for EB Receiving & Invoicing

Shipments to Electric Boat 3

The Problem

Package marking and packing list / invoice data errors

• Delays payment to our suppliers

• Adds non-value project cost

• Slows EB invoicing to the Navy

Approved for Public Release

Page 4: Package Marking, Packing List and Invoice Data Requirements  for EB Receiving & Invoicing

Shipments to Electric Boat 4

The ProblemWhy is this a serious problem?

• EB is under pressure to reduce the cost of building submarines

• EB suppliers depend on prompt payment

• Every month millions of dollars of billing are delayed

Approved for Public Release

Page 5: Package Marking, Packing List and Invoice Data Requirements  for EB Receiving & Invoicing

Shipments to Electric Boat 5

The Problem

• The Navy does not pay EB for material until we pay you

• Non value-added project cost are incurred

EB has strong incentive to pay vendors promptly!

Approved for Public Release

Page 6: Package Marking, Packing List and Invoice Data Requirements  for EB Receiving & Invoicing

Shipments to Electric Boat 6

Topics

• Problem

• EB Receiving Process• Package Marking / Packing List Data

• Invoice Requirements

• Action

• Conclusion

Approved for Public Release

Page 7: Package Marking, Packing List and Invoice Data Requirements  for EB Receiving & Invoicing

Shipments to Electric Boat 7

EB Receiving Process

• Requirements mandate that all material be positively identified throughout the shipbuilding process.

• EB uses a structured system (MRP II) to order, track and pay for incoming material.

• The EB supplier base includes thousands of suppliers.

• EB receives hundreds of deliveries each day.

• Our customer will only pay for material that is properly received and documented.

Approved for Public Release

Page 8: Package Marking, Packing List and Invoice Data Requirements  for EB Receiving & Invoicing

Shipments to Electric Boat 8

Topics

• Problem

• EB Receiving Process

• Package Marking / Packing List Data

• Invoice Requirements

• Action

• ConclusionApproved for Public Release

Page 9: Package Marking, Packing List and Invoice Data Requirements  for EB Receiving & Invoicing

Shipments to Electric Boat 9

Package Marking / Packing List Data

Package Marking

• Required Data :– EB PO number and line item number

– EB Part Number

– Quantity and Unit of Measure• Same unit as shown within the P.O.

– Carton number

– Total number of cartons

– The packing list

Approved for Public Release

Page 10: Package Marking, Packing List and Invoice Data Requirements  for EB Receiving & Invoicing

Shipments to Electric Boat 10

Package Marking / Packing List Data

Approved for Public Release

Page 11: Package Marking, Packing List and Invoice Data Requirements  for EB Receiving & Invoicing

Shipments to Electric Boat 11

Package Marking / Packing List Data

11 Shipments to Electric BoatApproved for Public Release

Page 12: Package Marking, Packing List and Invoice Data Requirements  for EB Receiving & Invoicing

Shipments to Electric Boat 12

Package Marking / Packing List Data

Approved for Public Release

Page 13: Package Marking, Packing List and Invoice Data Requirements  for EB Receiving & Invoicing

Shipments to Electric Boat 13

Package Marking / Packing List Data

• Mark each EB PO number 1” down from the top edge of the container : Make sure the EB PO is marked

When multiple POs or PO line item (POLI) numbers are shipped in a single container:

• Record each PO / POLI starting 1” from the top• Separate multiple PO line items shipped in same

container

Approved for Public Release

Page 14: Package Marking, Packing List and Invoice Data Requirements  for EB Receiving & Invoicing

Shipments to Electric Boat 14

Package Marking / Packing List Data

Packing Lists

• Required Data :

– EB PO number and line item number

– EB part number

– EB part description

– Quantity and unit of measure• Same unit as shown within the P.O.

Approved for Public Release

Page 15: Package Marking, Packing List and Invoice Data Requirements  for EB Receiving & Invoicing

Shipments to Electric Boat 15

Package Marking / Packing List Data

Approved for Public Release

Page 16: Package Marking, Packing List and Invoice Data Requirements  for EB Receiving & Invoicing

Shipments to Electric Boat 16

Issues

• Packing slip is missing

• PO incorrect or missing– Supplier / distributor PO number used instead of

EB

• Part number incorrect or missing– Supplier / distributor part number used instead of

EB

• Material not separated / identified when shipped in one container

Approved for Public Release

Page 17: Package Marking, Packing List and Invoice Data Requirements  for EB Receiving & Invoicing

Shipments to Electric Boat 17

Issues

• Unit of measure does not match PO

– For example, we order 1000 feet of pipe but supplier delivers 150 pieces

– Cannot receive / issue payment until we call you to obtain units conversion

Approved for Public Release

Page 18: Package Marking, Packing List and Invoice Data Requirements  for EB Receiving & Invoicing

Shipments to Electric Boat 18

Consequences:

• Material can not be accepted

• Material can not be located

• Program incurs non value added cost

• EB may return the material

• Delays: ship’s construction; supplier payment

Approved for Public Release

Page 19: Package Marking, Packing List and Invoice Data Requirements  for EB Receiving & Invoicing

Shipments to Electric Boat 19

Topics

• Problem

• EB Receiving Process

• Package Marking / Packing List Data

• Invoice Requirements• Action

• Conclusion

Approved for Public Release

Page 20: Package Marking, Packing List and Invoice Data Requirements  for EB Receiving & Invoicing

Shipments to Electric Boat 20

Invoice Requirements• EB PO number• EB PO line item number• EB Part number• Quantity (unit of measure used

in the PO)

Master Pricing Agreements• Delivery Request number• Delivery Request Item Number

Units of measure must match the PO!

Clarify all pricing issues before submitting an invoice

Approved for Public Release

Page 21: Package Marking, Packing List and Invoice Data Requirements  for EB Receiving & Invoicing

Shipments to Electric Boat 21

Topics

• Problem

• EB Receiving Process

• Package Marking / Packing List Data

• Invoice Requirements

• Action• Conclusion

Approved for Public Release

Page 22: Package Marking, Packing List and Invoice Data Requirements  for EB Receiving & Invoicing

Shipments to Electric Boat 22

Action• Communicate these requirements to your shipping personnel

• Verify proper marking

• Assure that the packing slip & invoice are provided

• If necessary, use checklists to make sure EB requirements are met

• Emphasize correctly marking drop shipments

Approved for Public Release

Page 23: Package Marking, Packing List and Invoice Data Requirements  for EB Receiving & Invoicing

Shipments to Electric Boat 23

Checklist• Container Markings

– Correct EB PO and item number marked

– All POs listed– Correct EB part number– Quantity & unit of measure– Carton number– All markings legible

• Multiple POs / container– All part numbers separated– All part numbers identified

as an EB part number, quantity, unit of measure etc.

• Packing Lists– Is attached to the carton– EB PO & line item – EB part number– Quantity, unit of measure

matches PO• Invoice

– EB PO & line item – EB Part number– Quantity (unit of measure

used in the PO)• Master Pricing Agreements EB

PO & line item – Delivery Request number &

Item number

Approved for Public Release

Page 24: Package Marking, Packing List and Invoice Data Requirements  for EB Receiving & Invoicing

Shipments to Electric Boat 24

ConclusionCompliance:• Faster processing of

incoming material• Fewer phone calls and

faxes• Faster invoice turnaround• Lower cost to build

submarine

Non-compliance• Incoming material “on-

hold”• Production delays in

shipyard• Labor spent resolving

issues• Slower payment

All correct packing slip / invoices can be paid within 30 days

Approved for Public Release