The right way is always the fastest way
Basic installation guidelines of Pacific GRP pipes.
This installation guide is intended as a basic guide to installation and it does notreplace more comprehensive guides and installation standards. GRP is an easyand fast pipe material to install but there are some basic rules to follow and anunderstanding of the pipe material and the design is required. These rules are notunique to GRP pipes but rather rules for the installation of flexible pipes in general.Please also refer to more comprehensive manuals, this document is not intendedto replace those, and always contact Pacific Pipe Systems site service departmentbefore the commencement of the installation.
The most important to remember is that the correct way is always the fastest andeasiest way to install GRP pipes. There are no time saving short cuts as all shortcuts will be very time consuming before the installation is completed and tested.With following the correct installation procedure, GRP pipes are by far the fastest
large diameter pipe material to install.
PACIFIC
8/13/2019 Pacific Installation
http://slidepdf.com/reader/full/pacific-installation 2/9
esign considerations
n common with many other pipes materials like steel,E, PVC and even ductile iron, GRP is a flexible pipe.he soil is therefore a part of the pipeline design and for
e completed installation to perform as per design, thepes must be correctly installed.
RP is a pipe material that deflects under a line load.
When installed, the amount of deflection that takesace must be limited so that strains are not excessive.
When a GRP pipe is buried, it acts with the surroundingoil to form a composite structure.
s loads is applied from above, the pipe deflects.
s sides push into the soil surround.
assive soil pressure is mobilized to provide supportnd the pipe acts as an arch carrying carrying much ofe load in ring compression and only part in ringending.
he allowable deflections of pipes from DN300 andrger are 3% initial and 5% long term.
andling of pipes
When handling single pipe, use pliable straps, slings orope to lift. Do not use steel cables or chains to lift oransport the pipe.
ipe sections of larger diameters can be lifted withnly one support point, but two support points make thepe easier to control. Of safety reasons two supportshould always be recommended to minimize the risk
at the pipe section slides of the straps.
o not lift pipes by passing a rope through the sectionnd to end.
PACIFIC
RP pipes from Pacific Pipe Systems are highly engineered products and are
manufactured with precision using first class material and technology. The pipes
ave a long maintenance free service life with excellent flow properties.
nless the pipes are handled and installed correctly, the full benefits of the pipes
ill not be realized.
8/13/2019 Pacific Installation
http://slidepdf.com/reader/full/pacific-installation 3/9
It is important to understand the factors that influence the amount of
deflection that takes place and how to control it.
PACIFIC
Surface Loads
Burial depth
Pipe stiffness
Live loads
Native soil type
Soil density
Backfill soil
Compaction %
8/13/2019 Pacific Installation
http://slidepdf.com/reader/full/pacific-installation 4/9
Storing pipes.
Store pipe on flat timber.
When storing pipes directly on the ground, use aflat area free of rocks and other potentiallydamaging debris.
All pipes should be chocked to prevent rolling inhigh winds.
Maximum stacking height: 3 meters. Do not stackpipes larger than DN1400.
The pipeline designer considers:
Depth of burial. Traffic loading. Surface loading. Native soil type and density.
The pipeline designer specifies:
Pipe stiffness. Trench width. Bed, surround type and compaction.
The installer has the task of delivering thepipeline according to the specification.
Pipe laying and jointing.
The trench is excavated and the bed laid, leveled
and compacted.
Raking the center line of the bedding, to a depthof 25 mm will provide moire uniform support.
“Bell holes” should be provided at each couplingso the pipe is always in contact with the beddingand is not resting on the coupling.
PACIFIC
8/13/2019 Pacific Installation
http://slidepdf.com/reader/full/pacific-installation 5/9
Joint preparation.
Normally pipes are delivered with thecoupling fitted to one end.
First the socket is cleaned.
And the gasket is fitted.
The gasket and the spigot are lightlylubricated.
Each coupling has two gaskets and acenter stop register.
PACIFIC
New
pipe Coupling
Gasket Installed
pipe
8/13/2019 Pacific Installation
http://slidepdf.com/reader/full/pacific-installation 6/9
Pipes may be joined using:
Fabric slings or steel clamps with two
“come - along” jacks.
Careful use of the excavator bucketagainst a timber pad placed at the end ofthe pipe to be joined.
And it will come together like pictureshows.
It is very important to provide propersupport for the pipe and to ensure thatthere are no voids in the bedding and thatthe first lift of backfill at the “haunch” isfirmly compacted.
Use a tampering tool at the haunch toensure a good compaction.
Proper selection, placement andcompaction of pipe zone backfill areimportant for control l ing vert ical
deflection.
PACIFICFill all voids and ensure a good hunching
8/13/2019 Pacific Installation
http://slidepdf.com/reader/full/pacific-installation 7/9
Backfill.
Proper selection, placement andcompaction of pipe zone backfill areimportant for control l ing vert icaldeflection.
Pipes should be backfilled as soon asthey joined in the trench. Never leavelong stretches of pipes without backfill orunprotected in the trench.
Backfill should be placed and compactedin layers 75 - 300 mm depending uponthe type of backfill material andcompaction equipment being used.
Pipe deflection with full backfill is checkedperiodically to ensure it does not exceedthe allowed initial value. If the value iswithin the limit it indicates that the backfillprocedure is satisfactory.
Correcting over deflected pipes.
Pipes with an initial deflection between 4% and 8 % can be corrected. Pipes with adeflection exceeding 8 % should bereplaced.
For pipes deflected up to 8 % of
diameter:
Excavate to a level equal to approx.85 % of the pipe diameter.
Excavate just above and at the sidesof the pipe with hand tools to avoid impactwith heavy equipment.
Inspect pipe for damage. Damagedpipe should be repaired or replaced.
PACIFIC
8/13/2019 Pacific Installation
http://slidepdf.com/reader/full/pacific-installation 8/9
Excavate to a level equal to approx.85 % of the pipe diameter.
Excavate just above and at the sides
of the pipe with hand tools to avoid impactwith heavy equipment.
Inspect pipe for damage. Damagedpipe should be repaired or replaced.
Re-compact haunch backfill withuncontaminated material.
Re-backfill the pipe zone in lifts withthe appropriate material, compacting
each layer to the required relativecompaction density.
Backfill to grade and check the pipedeflections to verify they do not exceedspecified values.
PACIFIC
Field pressure testing
Pressure pipelines will require a field pressure test prior to acceptance.
Pressure tests should be carried out regularly as installation proceeds.
Ideally, installation should never be more than 1 km ahead of testing.
Nowhere in the line should the pressure exceed 1.5 times the systemdesign pressure.
For more details, please refer to related manuals.
8/13/2019 Pacific Installation
http://slidepdf.com/reader/full/pacific-installation 9/9
Pacific Pipe Systems Pvt Ltd
Plot 36 - 43 (P), 101 (P) Naranpura
Chandrasan, Sanand,
Ahmedabad, Gujarat 382170
Phone: +91 2717 273031
Fax: +91 2717 273032
Email: [email protected]
Pacific Website
Pacific GRP Pipe Systems
GRP pipes have a history spanning more than60 years and with well proven and tested
standards. The most commonly used areAWWA, ASTM and ISO standards and thoseare also the base for the Indian BISstandards. In the early days, due to the highercost of raw materials, GRP pipes had adisadvantage against metallic pipes but evenin this situation, GRP pipes were the fastestgrowing pipe material in the world in marketshare. It was supplied at a premium price dueto the benefits in corrosion resistance andlong term performance. Since then the raw
material cost ratio has changed to theadvantage of GRP pipes over metallic pipes.Now we supply a superior product at a morecompetitive price than traditional pipematerials.