PAC Nuclear Physics, 1-2 PAC Nuclear Physics, 1-2 April, 2004 April, 2004 Construction of the IREN source Construction of the IREN source (the theme 06-4-0993-94/2004). (the theme 06-4-0993-94/2004). Status&perspectives-proposal on the Status&perspectives-proposal on the extension extension W.I. Furman W.I. Furman Content Content 1. 1. Short review of the written report Short review of the written report 2. 2. Status of the project in current year Status of the project in current year 3. 3. Perspectives for year 2004 and up to 2006 Perspectives for year 2004 and up to 2006

PAC Nuclear Physics, 1-2 April, 2004 Construction of the IREN source (the theme 06-4-0993-94/2004). Status&perspectives-proposal on the extension W.I

Embed Size (px)

Citation preview

Page 1: PAC Nuclear Physics, 1-2 April, 2004 Construction of the IREN source (the theme 06-4-0993-94/2004). Status&perspectives-proposal on the extension W.I

PAC Nuclear Physics, 1-2 April, 200PAC Nuclear Physics, 1-2 April, 20044

Construction of the IREN source Construction of the IREN source (the theme 06-4-0993-94/2004). (the theme 06-4-0993-94/2004).

Status&perspectives-proposal on the extensionStatus&perspectives-proposal on the extension

W.I. FurmanW.I. Furman

ContentContent

1.1. Short review of the written reportShort review of the written report

2.2. Status of the project in current yearStatus of the project in current year

3.3. Perspectives for year 2004 and up to 2006Perspectives for year 2004 and up to 2006

Page 2: PAC Nuclear Physics, 1-2 April, 2004 Construction of the IREN source (the theme 06-4-0993-94/2004). Status&perspectives-proposal on the extension W.I

PAC Nuclear Physics, 1-2 April, 200PAC Nuclear Physics, 1-2 April, 20044

Construction of the IREN source Construction of the IREN source (the theme 06-4-0993-94/2004). (the theme 06-4-0993-94/2004).

Status&perspectives-proposal on the extensionStatus&perspectives-proposal on the extension

1. Short review of the written report1. Short review of the written report

Main results obtained during last 40 months are reviewed in Main results obtained during last 40 months are reviewed in

the written report provided for members of the PAC.the written report provided for members of the PAC.

During this time During this time essential progress was achieved in the project essential progress was achieved in the project

designdesign ( a new improved technical project of multiplying target and its ( a new improved technical project of multiplying target and its

technological drawings, the part for approval of general engineering technological drawings, the part for approval of general engineering

project of the IREN facility, a preliminary technical project of facility control project of the IREN facility, a preliminary technical project of facility control

system)system)

Page 3: PAC Nuclear Physics, 1-2 April, 2004 Construction of the IREN source (the theme 06-4-0993-94/2004). Status&perspectives-proposal on the extension W.I

PAC Nuclear Physics, 1-2 April, 200PAC Nuclear Physics, 1-2 April, 20044

Construction of the IREN source Construction of the IREN source (the theme 06-4-0993-94/2004). (the theme 06-4-0993-94/2004).

Status&perspectives-proposal on the extensionStatus&perspectives-proposal on the extension After forming of special LPP division aimed at creation of IREN linacAfter forming of special LPP division aimed at creation of IREN linac

LUE-200 some progress was got in a design, construction and testing theLUE-200 some progress was got in a design, construction and testing the

elements of accelerator being on responsibility of JINR. elements of accelerator being on responsibility of JINR.

Beside that practically Beside that practically all high-tech parts of the linac booked in Budker all high-tech parts of the linac booked in Budker

Institute (accelerating sections, buncher and SLED system) were Institute (accelerating sections, buncher and SLED system) were

manufactured, tested and delivered to JINRmanufactured, tested and delivered to JINR..

Most part of vacuum equipment of linac has been manufactured andMost part of vacuum equipment of linac has been manufactured and

delivered from Czech Republic and Bulgaria as its contribution to JINR.delivered from Czech Republic and Bulgaria as its contribution to JINR.

Page 4: PAC Nuclear Physics, 1-2 April, 2004 Construction of the IREN source (the theme 06-4-0993-94/2004). Status&perspectives-proposal on the extension W.I

PAC Nuclear Physics, 1-2 April, 200PAC Nuclear Physics, 1-2 April, 20044

Construction of the IREN source Construction of the IREN source (the theme 06-4-0993-94/2004). (the theme 06-4-0993-94/2004).

Status&perspectives-proposal on the extensionStatus&perspectives-proposal on the extension

During last two years During last two years most part of linac equipmentmost part of linac equipment planned to produce planned to produce

in JINR in JINR was really manufactured was really manufactured in the central workshop and inin the central workshop and in

workshops of LPP and FLNP .workshops of LPP and FLNP .

After final shutdown of previous neutron source IBR-30+LUE-40 theAfter final shutdown of previous neutron source IBR-30+LUE-40 the

old linac was dismantledold linac was dismantled, the accelerator halls in bld. 43 FLNP were, the accelerator halls in bld. 43 FLNP were

repaired and repaired and an assembling of new linac LUE-200 has been started upan assembling of new linac LUE-200 has been started up..

At the full scale RF stand was demonstrated At the full scale RF stand was demonstrated two week non-stoptwo week non-stop

operation of the LUE-200 RF systemoperation of the LUE-200 RF system at 90% of planned level of power. at 90% of planned level of power.

Page 5: PAC Nuclear Physics, 1-2 April, 2004 Construction of the IREN source (the theme 06-4-0993-94/2004). Status&perspectives-proposal on the extension W.I

PAC Nuclear Physics, 1-2 April, 200PAC Nuclear Physics, 1-2 April, 20044

Construction of the IREN source Construction of the IREN source (the theme 06-4-0993-94/2004). (the theme 06-4-0993-94/2004).

Status&perspectives-proposal on the extensionStatus&perspectives-proposal on the extension

Crucial result in creation of IREN multiplying target (MT) was achieved Crucial result in creation of IREN multiplying target (MT) was achieved by the end of 2000 when plutonium fuel elements were commissioned by the end of 2000 when plutonium fuel elements were commissioned and installed for temporary storing at “Mayak” plantand installed for temporary storing at “Mayak” plant

After final shut-down of IBR-30+LUE-40 neutron source a dismantling After final shut-down of IBR-30+LUE-40 neutron source a dismantling of auxiliary reactor equipment has been realizedof auxiliary reactor equipment has been realized

In course of preparation of In course of preparation of full decommissioning of IBR-30 a licensefull decommissioning of IBR-30 a license for for this activity was obtained, all necessary equipment was produced and this activity was obtained, all necessary equipment was produced and the storagethe storage for activated elements of the reactor , bld. 117/6 for activated elements of the reactor , bld. 117/6 was was constructedconstructed

Page 6: PAC Nuclear Physics, 1-2 April, 2004 Construction of the IREN source (the theme 06-4-0993-94/2004). Status&perspectives-proposal on the extension W.I

PAC Nuclear Physics, 1-2 April, 200PAC Nuclear Physics, 1-2 April, 20044

Construction of the IREN source Construction of the IREN source (the theme 06-4-0993-94/2004). (the theme 06-4-0993-94/2004).

Status&perspectives-proposal on the extensionStatus&perspectives-proposal on the extension2. Status of the project in current year2. Status of the project in current year

During months after the 19During months after the 19thth PAC NP session main efforts were PAC NP session main efforts weredone on preparation for IBR-30 dismantling, installation of new linac anddone on preparation for IBR-30 dismantling, installation of new linac andorganization of transportation of IREN fuel elements from “MAYAK”organization of transportation of IREN fuel elements from “MAYAK”plant and its storing at JINR. plant and its storing at JINR.

• It was delivered a shadow shielding for new storage bld. 117/6It was delivered a shadow shielding for new storage bld. 117/6

The set of documents necessary for licensing of the storage in The set of documents necessary for licensing of the storage in Russian Agency for Radiation Safety is practically completedRussian Agency for Radiation Safety is practically completed

But up to now it has not paid the dosimetric equipment necessary for But up to now it has not paid the dosimetric equipment necessary for commissioning of bld. 117/6. It can cause a derangement of full commissioning of bld. 117/6. It can cause a derangement of full IBR-30dismantling by the end of current year IBR-30dismantling by the end of current year

Page 7: PAC Nuclear Physics, 1-2 April, 2004 Construction of the IREN source (the theme 06-4-0993-94/2004). Status&perspectives-proposal on the extension W.I

PAC Nuclear Physics, 1-2 April, 200PAC Nuclear Physics, 1-2 April, 20044

Construction of the IREN source Construction of the IREN source (the theme 06-4-0993-94/2004). (the theme 06-4-0993-94/2004).

Status&perspectives-proposal on the extensionStatus&perspectives-proposal on the extension

• The progress in LUE-200 mounting could be estimated The progress in LUE-200 mounting could be estimated

from comparison of pictures shown at November PAC from comparison of pictures shown at November PAC

session and the present onessession and the present ones

Page 8: PAC Nuclear Physics, 1-2 April, 2004 Construction of the IREN source (the theme 06-4-0993-94/2004). Status&perspectives-proposal on the extension W.I

PAC Nuclear Physics, 1-2 April, 200PAC Nuclear Physics, 1-2 April, 20044

Construction of LUE-200Construction of LUE-200Supporting columnsSupporting columns

Page 9: PAC Nuclear Physics, 1-2 April, 2004 Construction of the IREN source (the theme 06-4-0993-94/2004). Status&perspectives-proposal on the extension W.I

PAC Nuclear Physics, 1-2 April, 200PAC Nuclear Physics, 1-2 April, 20044

Construction of the IREN source Construction of the IREN source (the theme 06-4-0993-94/2004). (the theme 06-4-0993-94/2004).

Status&perspectives-proposal on the extensionStatus&perspectives-proposal on the extension

Page 10: PAC Nuclear Physics, 1-2 April, 2004 Construction of the IREN source (the theme 06-4-0993-94/2004). Status&perspectives-proposal on the extension W.I

PAC Nuclear Physics, 1-2 April, 200PAC Nuclear Physics, 1-2 April, 20044

Construction of LUE-200Construction of LUE-200Installation of first section gridInstallation of first section grid

Page 11: PAC Nuclear Physics, 1-2 April, 2004 Construction of the IREN source (the theme 06-4-0993-94/2004). Status&perspectives-proposal on the extension W.I

PAC Nuclear Physics, 1-2 April, 200PAC Nuclear Physics, 1-2 April, 20044

Construction of the IREN source Construction of the IREN source (the theme 06-4-0993-94/2004). (the theme 06-4-0993-94/2004).

Status&perspectives-proposal on the extensionStatus&perspectives-proposal on the extension

Page 12: PAC Nuclear Physics, 1-2 April, 2004 Construction of the IREN source (the theme 06-4-0993-94/2004). Status&perspectives-proposal on the extension W.I

PAC Nuclear Physics, 1-2 April, 200PAC Nuclear Physics, 1-2 April, 20044

Construction of the IREN source Construction of the IREN source (the theme 06-4-0993-94/2004). (the theme 06-4-0993-94/2004).

Status&perspectives-proposal on the extensionStatus&perspectives-proposal on the extension

Very recently, on 11-12 March it was achieved Very recently, on 11-12 March it was achieved practically planned parameters of the pulsed linac practically planned parameters of the pulsed linac electron gun:electron gun:

Repetition rateRepetition rate - - 5050 HzHz Electron energyElectron energy - - 175 175 keVkeV Beam currentBeam current - - 5 А5 А Beam diameter at exit diaphragmBeam diameter at exit diaphragm - 10 - 10 mmmm Electron pulse durationElectron pulse duration ~ ~ 550-600 550-600 nsns Continuous operation timeContinuous operation time  -  - 32 hours 32 hours

Page 13: PAC Nuclear Physics, 1-2 April, 2004 Construction of the IREN source (the theme 06-4-0993-94/2004). Status&perspectives-proposal on the extension W.I

PAC Nuclear Physics, 1-2 April, 200PAC Nuclear Physics, 1-2 April, 20044

Construction of the IREN source Construction of the IREN source (the theme 06-4-0993-94/2004). (the theme 06-4-0993-94/2004).

Status&perspectives-proposal on the extensionStatus&perspectives-proposal on the extension

Page 14: PAC Nuclear Physics, 1-2 April, 2004 Construction of the IREN source (the theme 06-4-0993-94/2004). Status&perspectives-proposal on the extension W.I

PAC Nuclear Physics, 1-2 April, 200PAC Nuclear Physics, 1-2 April, 20044

Construction of the IREN source Construction of the IREN source (the theme 06-4-0993-94/2004). (the theme 06-4-0993-94/2004).

Status&perspectives-proposal on the extensionStatus&perspectives-proposal on the extension

New fuel transportationNew fuel transportation

The negotiations with “MAYAK” plant on conditions of transportation of The negotiations with “MAYAK” plant on conditions of transportation of

IREN fuel elements are carried outIREN fuel elements are carried out

A design of technical reconstruction of special room into JINR A design of technical reconstruction of special room into JINR department for storing of fissile materials (DSFM) is completeddepartment for storing of fissile materials (DSFM) is completed

An approval of nuclear safety for storing into DSFM is obtainedAn approval of nuclear safety for storing into DSFM is obtained

But start-up of real works for equiping of the storage room and signing But start-up of real works for equiping of the storage room and signing a contract with “Mayak” plant is blocked due absence of financinga contract with “Mayak” plant is blocked due absence of financing

Page 15: PAC Nuclear Physics, 1-2 April, 2004 Construction of the IREN source (the theme 06-4-0993-94/2004). Status&perspectives-proposal on the extension W.I

PAC Nuclear Physics, 1-2 April, 200PAC Nuclear Physics, 1-2 April, 20044

Construction of the IREN source Construction of the IREN source (the theme 06-4-0993-94/2004). (the theme 06-4-0993-94/2004).

Status&perspectives-proposal on the extensionStatus&perspectives-proposal on the extension extensionextension

As very promising fact for future development of the project As very promising fact for future development of the project one could consider a successful implementation of one could consider a successful implementation of agreement for reimbursement of JINR’s debt from the agreement for reimbursement of JINR’s debt from the contract with NIKIET, Moscow signed (and implemented) contract with NIKIET, Moscow signed (and implemented) for working out of technological drawings for multiplying for working out of technological drawings for multiplying target (MT) manufacture target (MT) manufacture

Now JINRNow JINR could obtained these drawings necessary for could obtained these drawings necessary for choice of MT producerschoice of MT producers

Page 16: PAC Nuclear Physics, 1-2 April, 2004 Construction of the IREN source (the theme 06-4-0993-94/2004). Status&perspectives-proposal on the extension W.I

PAC Nuclear Physics, 1-2 April, 200PAC Nuclear Physics, 1-2 April, 20044

Construction of the IREN source Construction of the IREN source (the theme 06-4-0993-94/2004). (the theme 06-4-0993-94/2004).

Status&perspectives-proposal on the extensionStatus&perspectives-proposal on the extension

3.3. Perspectives for year 2004 and up to 2006Perspectives for year 2004 and up to 2006

Main task of current year is to complete full dismantlingof reactor IBR-30. It allows to start the licensing of the IREN facility construction

Third task is to complete an assembling of main equipment of LUE-200 in bld. 43

Second task is to deliver the IREN fuel to JINR from “Mayak” plant

Fourth task is a choice of the multiplying target producer

Page 17: PAC Nuclear Physics, 1-2 April, 2004 Construction of the IREN source (the theme 06-4-0993-94/2004). Status&perspectives-proposal on the extension W.I

PAC Nuclear Physics, 1-2 April, 200PAC Nuclear Physics, 1-2 April, 20044

Construction of the IREN source Construction of the IREN source (the theme 06-4-0993-94/2004). (the theme 06-4-0993-94/2004).

Status&perspectives-proposal on the extensionStatus&perspectives-proposal on the extension

But it is crucial for future of whole project an approval by But it is crucial for future of whole project an approval by JINR directorate of the corrected time-table with respective JINR directorate of the corrected time-table with respective firm annual financing. firm annual financing.

The last point depends essentially from finding of new sources for support of the IREN project

• As it could be seen from tables presented below even in caseof optimal financing a start-up of IREN source may be realized not earlier than by the end of 2006

Page 18: PAC Nuclear Physics, 1-2 April, 2004 Construction of the IREN source (the theme 06-4-0993-94/2004). Status&perspectives-proposal on the extension W.I

PAC Nuclear Physics, 1-2 April, 200PAC Nuclear Physics, 1-2 April, 20044

Construction of the IREN source Construction of the IREN source (the theme 06-4-0993-94/2004). (the theme 06-4-0993-94/2004).

Status&perspectives-proposal on the extensionStatus&perspectives-proposal on the extension

Page 19: PAC Nuclear Physics, 1-2 April, 2004 Construction of the IREN source (the theme 06-4-0993-94/2004). Status&perspectives-proposal on the extension W.I

PAC Nuclear Physics, 1-2 April, 200PAC Nuclear Physics, 1-2 April, 20044

Construction of the IREN source Construction of the IREN source (the theme 06-4-0993-94/2004). (the theme 06-4-0993-94/2004).

Status&perspectives-proposal on the extensionStatus&perspectives-proposal on the extension

Page 20: PAC Nuclear Physics, 1-2 April, 2004 Construction of the IREN source (the theme 06-4-0993-94/2004). Status&perspectives-proposal on the extension W.I

PAC Nuclear Physics, 1-2 April, 200PAC Nuclear Physics, 1-2 April, 20044

Construction of the IREN source Construction of the IREN source (the theme 06-4-0993-94/2004). (the theme 06-4-0993-94/2004).

Status&perspectives-proposal on the extensionStatus&perspectives-proposal on the extension

Page 21: PAC Nuclear Physics, 1-2 April, 2004 Construction of the IREN source (the theme 06-4-0993-94/2004). Status&perspectives-proposal on the extension W.I

PAC Nuclear Physics, 1-2 April, 200PAC Nuclear Physics, 1-2 April, 20044

Construction of the IREN source Construction of the IREN source (the theme 06-4-0993-94/2004). (the theme 06-4-0993-94/2004).

Status&perspectives-proposal on the extensionStatus&perspectives-proposal on the extension

Page 22: PAC Nuclear Physics, 1-2 April, 2004 Construction of the IREN source (the theme 06-4-0993-94/2004). Status&perspectives-proposal on the extension W.I

PAC Nuclear Physics, 1-2 April, 200PAC Nuclear Physics, 1-2 April, 20044

Construction of the IREN source Construction of the IREN source (the theme 06-4-0993-94/2004). (the theme 06-4-0993-94/2004).

Status&perspectives-proposal on the extensionStatus&perspectives-proposal on the extension

Financial status of theFinancial status of the projectproject

Total budget of the project approved in 1994 was 3.7 M$Total budget of the project approved in 1994 was 3.7 M$

Up to now it has been invested ~2.1 M$ Up to now it has been invested ~2.1 M$

including ~ 0.8 M$ during 2000-2003including ~ 0.8 M$ during 2000-2003

More realistic estimation of the rest investments necessary More realistic estimation of the rest investments necessary to complete a first stage of the project could be obtained to complete a first stage of the project could be obtained after a choice of multiplying target producerafter a choice of multiplying target producer