1
HOR PC N40.232204 W79.770922 HOR PT N40.233176 W79.770581 PA-WM1-0012.0005-SS PA-WM1-0012.0005 COLLINSBURG ROAD OHE OHE OHE OHE OHE OHE OHE PA-WM-0014.00070 PA-WM1-0011.0100 HDD ENTRY/EXIT N40.227407 W79.773242 HDD EXIT/ENTRY N40.235262 W79.770109 PA-WM1-0012.0004 PA-WM1-0009.0000 0+00 2+00 4+00 6+00 8+00 10+00 12+00 14+00 16+00 18+00 20+00 22+00 24+00 26+00 28+00 30+00 30+02 PA-WM-0014.00070 SEWICKLY TOWNSHIP SOUTH HUNTINGDON TOWNSH CSX RR N40.229299 W79.772327 GEOTECH HDD-12A GEOTECH HDD-12B PA-WM1-0012.0001-TAR2 PA-WM1-0012.0004 PA-WM1-0012.0000 PA-WM1-0009.0001 PA-WM1-0011.00000 PA-WM1-0012.00001 SEWICKLY TOWNSHIP EXISTING SUNOCO 12" PIPELINE CLEARING ONLY ROW YOUGHIOGHENY RIVER S122 500 600 800 1000 500 600 700 800 900 1000 1100 -2+00 0+00 2+00 4+00 6+00 8+00 10+00 12+00 14+00 16+00 18+00 20+00 22+00 24+00 26+00 28+00 30+00 32+00 HOR PC 18+64 HOR PT 22+31 127' 234' 1286' STA. 5+78 EL. 687' STA. 22+64 EL. 687' STA. 28+82 EL. 785' CSX RR 7+35 EDGE OF BANK S122 6+71 EDGE OF BANK S122 2+93 HDD EXIT/ENTRY 30+02 EL.824' R=2000' L=347' S=349' 10°' HDD ENTRY/EXIT 0+00 EL.758' 33' HORIZONTAL CURVE R=2000' L=367' EX. COLUMBIA GAS LINE 12+77 EX. DOMINION LINE 11+86 EX. DOMINION LINE 11+45 EX. WATER LINE 7+07 R=2000' L=618' S=628' 18°' STA. 2+30 EL. 718' EX. COLUMBIA GAS LINE 22+09 79' 43' SUTERSVILLE ROAD 7+00 GRADE GEOTECH HDD-12A 1+67, 21' RT EX. WILLIAMS PIPELINE 13+74 GEOTECH HDD-12B 13+08, 133' LT APPROXIMATE BEDROCK (SHALE, SILTSTONE, MUDSTONE) CL STREAM S222 21+90 137' YOUGHIOGHENY RIVER S122 4+53 -INCH HORIZONTAL DIRECTIONAL DRILL REF. DRAWING EROSION & SEDIMENT PLAN AERIAL SITE PLAN PLAN VIEW PROFILE VIEW NO. DESCRIPTION DATE BY CHK DATE REVISIONS DATE APP NOTES Sunoco Logistics Partners L.P. SUNOCO PIPELINE, L.P. 1. ALL COORDINATES SHOWN ARE IN LATITUDE AND LONGITUDE. ALL MSL ELEVATIONS ARE NAD83 2. STATIONING IS BASED ON HORIZONTAL DISTANCES. 3. ROONEY ENGINEERING, INC. AND SUNOCO PIPELINE, LP ARE NOT RESPONSIBLE FOR LOCATION OF FOREIGN UTILITIES SHOWN IN PLOT PLAN OR PROFILE. THE INFORMATION SHOWN HEREON IS FURNISHED WITHOUT LIABILITY ON THE PART OF ROONEY ENGINEERING, INC. AND SUNOCO PIPELINE, LP, FOR ANY DAMAGES RESULTING FROM ERRORS OR OMISSIONS THEREIN. 4. CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL UTILITIES. CONTACT ONE CALL AT 811 PRIOR TO DIGGING. 5. SUNOCO EMERGENCY HOTLINE NUMBER IS #1-800-786-7440. PENNSYLVANIA PIPELINE PROJECT DESIGN AND CONSTRUCTION: 1. CONTRACTOR SHALL FIELD VERIFY DEPTH OF ALL EXITING UTILITIES SHOWN OR NOT SHOWN ON THIS DRAWING. 2. THE MINIMUM SEPARATION DISTANCE FROM EXISTING SUBSURFACE UTILITIES SHALL NOT BE LESS THAN 10 FEET AS MEASURED FROM THE OUTSIDE EDGE OF THE UTILITY TO OUTSIDE OF PROPOSED PIPELINE. 3. DESIGNED IN ACCORDANCE WITH CFR 49 195 & ASME B31.4 4. CROSSING PIPE SPECIFICATION: HDD HORZ. LENGTH (L=): HDD PIPE LENGTH (S=): 20" x 0.456" W.T., X-65, API5L, PSL2, ERW, BFW COATING: 14-16 MILS FBE WITH 30-35 MIL ARO (POWERCRETE OR ENGINEER APPROVED EQUAL) 5. INTERNAL DESIGN PRESSURE 1480 PSIG (SEAM FACTOR 1.0, DESIGH FACTOR 0.50). 6. INSTALLATION METHOD: HORIZONTAL DIRECTIONAL DRILL (HDD). 7. PIPELINE WARNING MARKERS SHALL BE INSTALLED ON BOTH SIDES OF ALL ROAD, RAILWAY, AND STREAM CROSSINGS. 8. CARRIER PIPE NOT ENCASED. 9. PIPE / AMBIENT TEMPERATURE MUST BE NO LESS THAN 30°F DURING PULLBACK WITHOUT PRIOR WRITTEN APPROVAL FROM THE ENGINEER. 10. CONDUCT 4-HOUR PRE-INSTALLATION HYDROTEST OF HDD PIPE STRING TO MINIMUM 1850 PSIG. 11. SEE SUNOCO PENNSYLVANIA PIPELINE PROJECT ESRI WEBMAP FOR ACCESS ROAD ALIGNMENT. LEGEND PERMANENT ROW TEMPORARY CONSTRUCTION ROW TEMPORARY WORKSPACE TEMPORARY ACCESS ROAD PERMANENT ACCESS ROAD SPOIL SPACE ONLY PROPOSED HDD PROPOSED 20" PIPELINE HDD ENTRY-EXIT PEM WETLANDS PSS WETLANDS PFO WETLANDS 12. SUNOCO PIPELINE, L.P.'S HORIZONTAL DIRECTIONAL DRILL INADVERTENT RETURN CONTINGENCY PLAN WILL BE IMPLEMENTED AT ALL TIMES. 13. SUNOCO PIPELINE, L.P.'S EROSION AND SEDIMENTATION CONTROL PLAN WILL BE IMPLEMENTED AT ALL TIMES. TO TO DWG NO DWG NO DESCRIPTION 20 03/15/16 YOUGHIOGHENY RIVER 1"=300' PA-WM1-0012.0000-RR WESTMORELAND COUNTY, SOUTH HUNTINGDON/SEWICKLY TOWNSHIPS S1B-0170 EP DLM RMB AAW 03/15/16 09/30/16 03/15/16 05/06/16 ES-1.07 SHEET 7 EP2 REVISED PER PADEP COMMENTS RECEIVED 09-06-16 MRS RMB AAW 09/30/16 ES-1.09 09/30/16 EP1 REVISED PER PADEP COMMENTS DLM RMB AAW 05/06/16 SHEET 6 05/06/16 3002' 3029' 0 FEET 150 150 300 -CL/SC (0.0' - 12.0') -NG EL. 756' -SM/SC (12.0' - 28.0') -SILT STONE (28.0' - 42.0') -GROUNDWATER (16.0') -COMPLETION DEPTH EL. 714' GEOTECH HDD-12A NOTE: REFER TO TEST BORING LOG HD-12A FOR COMPLETE SOIL MATERIAL DESCRIPTION -CL (0.0' - 7.2') -NG EL. 913' -SAND STONE (7.2' - 9.0') -COMPLETION DEPTH EL. 904' GEOTECH HDD-12B NOTE: REFER TO TEST BORING LOG HD-12B FOR COMPLETE SOIL MATERIAL DESCRIPTION SUNOCO EASEMENT LIMITS - NOT LOD

PA-WM1-0012.0004 SEWICKLY TOWNSHIP N40.233176 …files.dep.state.pa.us/ProgramIntegration/PA Pipeline Portal... · drawing erosion & sediment plan aerial site plan plan view profile

Embed Size (px)

Citation preview

Page 1: PA-WM1-0012.0004 SEWICKLY TOWNSHIP N40.233176 …files.dep.state.pa.us/ProgramIntegration/PA Pipeline Portal... · drawing erosion & sediment plan aerial site plan plan view profile

HOR PC

N40.232204

W79.770922

HOR PT

N40.233176

W79.770581

PA-WM1-0012.0005-SS

PA-WM1-0012.0005

C

O

LLIN

S

B

U

R

G

R

O

A

D

OH

E

OH

E

OH

E

OH

E

O

H

E

O

H

E

O

H

E

PA-WM-0014.00070

PA-WM1-0011.0100

HDD ENTRY/EXIT

N40.227407

W79.773242

HDD EXIT/ENTRY

N40.235262

W79.770109

PA-WM1-0012.0004

PA-WM1-0009.0000

0+

00

2+

00

4+

00

6+

00

8+

00

10+

00

12+

00

14+

00

16+

00

18+

00

20+

00

22+

00

24+

00

26+

00

28+

00

30+

00

30+

02

PA-WM-0014.00070

SE

WIC

KLY

T

OW

NS

HIP

SO

UT

H H

UN

TIN

GD

ON

T

OW

NS

HIP

CSX RR

N40.229299

W79.772327

GEOTECH HDD-12A

GEOTECH HDD-12B

PA-WM1-0012.0001-TAR2

PA-WM1-0012.0004

PA-WM1-0012.0000

PA-WM1-0009.0001

PA-WM1-0011.00000

PA-WM1-0012.00001

S

E

W

IC

K

L

Y

T

O

W

N

S

H

IP

EXISTING SUNOCO 12" PIPELINE CLEARING ONLY ROW

YO

UG

HIO

GH

EN

Y R

IV

ER

S

122

500

600

800

1000

500

600

700

800

900

1000

1100

-2+00 0+00 2+00 4+00 6+00 8+00 10+00 12+00 14+00 16+00 18+00 20+00 22+00 24+00 26+00 28+00 30+00 32+00

HO

R P

C

18+

64

HO

R P

T

22+

31

127'

234'

1286'

STA. 5+78

EL. 687'

STA. 22+64

EL. 687'

STA. 28+82

EL. 785'

CS

X R

R

7+

35

ED

GE

O

F B

AN

K S

122

6+

71

ED

GE

O

F B

AN

K S

122

2+

93

HD

D E

XIT

/E

NT

RY

30+

02

EL.824'

R=2000'

L=347'

S=349'

10°'

HD

D E

NT

RY

/E

XIT

0+

00

EL.758'

33'

HORIZONTAL CURVE

R=2000'

L=367'

EX

. C

OLU

MB

IA

G

AS

LIN

E

12+

77

EX

. D

OM

IN

IO

N LIN

E

11+

86

EX

. D

OM

IN

IO

N LIN

E

11+

45

EX

. W

AT

ER

LIN

E

7+

07

R=2000'

L=618'

S=628'

18°'

STA. 2+30

EL. 718'

EX

. C

OLU

MB

IA

G

AS

LIN

E

22+

09

79'

43'

SU

TE

RS

VILLE

R

OA

D

7+

00

GRADE

GE

OT

EC

H H

DD

-12A

1+

67, 21' R

T

EX

. W

ILLIA

MS

P

IP

ELIN

E

13+

74

GE

OT

EC

H H

DD

-12B

13+

08, 133' LT

APPROXIMATE BEDROCK

(SHALE, SILTSTONE, MUDSTONE)

CL S

TR

EA

M S

222

21+

90

137'

YO

UG

HIO

GH

EN

Y R

IV

ER

S

122

4+

53

-INCH HORIZONTAL DIRECTIONAL DRILL

REF. DRAWING

EROSION & SEDIMENT PLAN

AERIAL SITE PLAN

PLAN VIEW

PROFILE VIEW

NO. DESCRIPTION DATEBY CHK DATE

REVISIONS

DATEAPP

NOTES Sunoco LogisticsPartners L.P.

SUNOCO PIPELINE, L.P.

1. ALL COORDINATES SHOWN ARE IN LATITUDE AND LONGITUDE. ALL MSL ELEVATIONS ARE NAD83

2. STATIONING IS BASED ON HORIZONTAL DISTANCES.

3. ROONEY ENGINEERING, INC. AND SUNOCO PIPELINE, LP ARE NOT RESPONSIBLE FOR LOCATION

OF FOREIGN UTILITIES SHOWN IN PLOT PLAN OR PROFILE. THE INFORMATION SHOWN HEREON IS

FURNISHED WITHOUT LIABILITY ON THE PART OF ROONEY ENGINEERING, INC. AND SUNOCO PIPELINE,

LP, FOR ANY DAMAGES RESULTING FROM ERRORS OR OMISSIONS THEREIN.

4. CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL UTILITIES. CONTACT ONE CALL AT 811 PRIOR TO

DIGGING.

5. SUNOCO EMERGENCY HOTLINE NUMBER IS #1-800-786-7440.

PENNSYLVANIA PIPELINE PROJECT

DESIGN AND CONSTRUCTION:

1. CONTRACTOR SHALL FIELD VERIFY DEPTH OF ALL EXITING UTILITIES SHOWN OR NOT SHOWN ON

THIS DRAWING.

2. THE MINIMUM SEPARATION DISTANCE FROM EXISTING SUBSURFACE UTILITIES SHALL NOT BE LESS

THAN 10 FEET AS MEASURED FROM THE OUTSIDE EDGE OF THE UTILITY TO OUTSIDE OF PROPOSED

PIPELINE.

3. DESIGNED IN ACCORDANCE WITH CFR 49 195 & ASME B31.4

4. CROSSING PIPE SPECIFICATION:

HDD HORZ. LENGTH (L=):

HDD PIPE LENGTH (S=):

20" x 0.456" W.T., X-65, API5L, PSL2, ERW, BFW

COATING: 14-16 MILS FBE WITH 30-35 MIL ARO (POWERCRETE OR ENGINEER APPROVED EQUAL)

5. INTERNAL DESIGN PRESSURE 1480 PSIG (SEAM FACTOR 1.0, DESIGH FACTOR 0.50).

6. INSTALLATION METHOD: HORIZONTAL DIRECTIONAL DRILL (HDD).

7. PIPELINE WARNING MARKERS SHALL BE INSTALLED ON BOTH SIDES OF ALL ROAD, RAILWAY, AND

STREAM CROSSINGS.

8. CARRIER PIPE NOT ENCASED.

9. PIPE / AMBIENT TEMPERATURE MUST BE NO LESS THAN 30°F DURING PULLBACK WITHOUT PRIOR

WRITTEN APPROVAL FROM THE ENGINEER.

10. CONDUCT 4-HOUR PRE-INSTALLATION HYDROTEST OF HDD PIPE STRING TO MINIMUM 1850 PSIG.

11. SEE SUNOCO PENNSYLVANIA PIPELINE PROJECT ESRI WEBMAP FOR ACCESS ROAD ALIGNMENT.

LEGEND

PERMANENT ROW

TEMPORARY CONSTRUCTION ROW

TEMPORARY WORKSPACE

TEMPORARY ACCESS ROAD

PERMANENT ACCESS ROAD

SPOIL SPACE ONLY

PROPOSED HDD

PROPOSED 20" PIPELINE

HDD ENTRY-EXIT

PEM WETLANDS

PSS WETLANDS

PFO WETLANDS

12. SUNOCO PIPELINE, L.P.'S HORIZONTAL DIRECTIONAL DRILL INADVERTENT RETURN CONTINGENCY PLAN

WILL BE IMPLEMENTED AT ALL TIMES.

13. SUNOCO PIPELINE, L.P.'S EROSION AND SEDIMENTATION CONTROL PLAN WILL BE IMPLEMENTED AT ALL

TIMES.

TO

TO

DWG NO DWG NO DESCRIPTION

20

03/15/16

YOUGHIOGHENY RIVER

1"=300'

PA-WM1-0012.0000-RR

WESTMORELAND COUNTY, SOUTH HUNTINGDON/SEWICKLY TOWNSHIPS

S1B-0170

EP DLM RMB AAW03/15/16

09/30/16

03/15/16

05/06/16

ES-1.07

SHEET 7

EP2 REVISED PER PADEP COMMENTS RECEIVED 09-06-16 MRS RMB AAW09/30/16

ES-1.09

09/30/16

EP1 REVISED PER PADEP COMMENTSDLM RMB AAW05/06/16

SHEET 6

05/06/16

3002'

3029'

0

FEET

150 150 300

-CL/SC (0.0' - 12.0')

-NG EL. 756'

-SM/SC (12.0' - 28.0')

-SILT STONE (28.0' - 42.0')

-GROUNDWATER (16.0')

-COMPLETION

DEPTH EL. 714'

GEOTECH HDD-12A

NOTE: REFER TO TEST BORING LOG HD-12A

FOR COMPLETE SOIL MATERIAL DESCRIPTION

-CL (0.0' - 7.2')

-NG EL. 913'

-SAND STONE (7.2' - 9.0')

-COMPLETION

DEPTH EL. 904'

GEOTECH HDD-12B

NOTE: REFER TO TEST BORING LOG HD-12B

FOR COMPLETE SOIL MATERIAL DESCRIPTION

SUNOCO EASEMENT LIMITS - NOT LOD

AutoCAD SHX Text
S222S222
AutoCAD SHX Text
S122S122
AutoCAD SHX Text
W65W65
AutoCAD SHX Text
W64W64
AutoCAD SHX Text
W65W65
AutoCAD SHX Text
(303) 792-5911