Presented by Ze Nunes of MACH Acoustics 25 Bishop Road, Bishopston, Bristol, BS7 8LS [email protected] mobile 07730590904
MACH ACOUSTICS
Working with the Construction team
Design by TestingMary Newman Case Study
Student AccommodationPod wallsImpact isolationCorridor wallsSoft treatments in corridorsDoors
Contents – Value Engineering
Presented by Ze Nunes of MACH Acoustics 25 Bishop Road, Bishopston, Bristol, BS7 8LS [email protected] mobile 07730590904
MACH ACOUSTICS
Not limiting meetings
Using the correct specification
Working with the Construction Team
Presented by Ze Nunes of MACH Acoustics 25 Bishop Road, Bishopston, Bristol, BS7 8LS [email protected] mobile 07730590904
MACH ACOUSTICS
Presenting clear and understandable information with options
Being proactive in finding cost savings
Working with the Construction Team
Presented by Ze Nunes of MACH Acoustics 25 Bishop Road, Bishopston, Bristol, BS7 8LS [email protected] mobile 07730590904
MACH ACOUSTICS
Design by testing works by having several design options
Design Options A, B and C
Where:
Option A is based upon standard construction details and is therefore known to work. Option A provides zero cost benefits since it contains typical construction tolerances
Option B is based upon reducing tolerance levels, and hence providing some cost savings
Option C is mathematically proven to work but has zero or little level of tolerance, this option provides good cost savings
Design by Testing
Presented by Ze Nunes of MACH Acoustics 25 Bishop Road, Bishopston, Bristol, BS7 8LS [email protected] mobile 07730590904
MACH ACOUSTICS
The construction team must fully buy into the Design by Testing Concept.
All three options must be build able.
Procurement times must be considered for all three options.
Early on site testing must be carried out to ensure which design option is to be taken forwards.
To Succeed with Design by Testing
Presented by Ze Nunes of MACH Acoustics 25 Bishop Road, Bishopston, Bristol, BS7 8LS [email protected] mobile 07730590904
MACH ACOUSTICS
Case Study – Mary Newman Building
Presented by Ze Nunes of MACH Acoustics 25 Bishop Road, Bishopston, Bristol, BS7 8LS [email protected] mobile 07730590904
MACH ACOUSTICS
New Walls
Presented by Ze Nunes of MACH Acoustics 25 Bishop Road, Bishopston, Bristol, BS7 8LS [email protected] mobile 07730590904
MACH ACOUSTICS
Upgrading Existing Walls
Presented by Ze Nunes of MACH Acoustics 25 Bishop Road, Bishopston, Bristol, BS7 8LS [email protected] mobile 07730590904
MACH ACOUSTICS
Upgrading Existing Walls – Design Options
Path 2Path 1
Illustration Not to scale
Path 3
Over Clad Bean
Sound Insulating CeilingTwo Layers of plaster board
Presented by Ze Nunes of MACH Acoustics 25 Bishop Road, Bishopston, Bristol, BS7 8LS [email protected] mobile 07730590904
MACH ACOUSTICS
LL School Abergavenny - Complex Roof Details
Presented by Ze Nunes of MACH Acoustics 25 Bishop Road, Bishopston, Bristol, BS7 8LS [email protected] mobile 07730590904
MACH ACOUSTICS
Case Study – UEL Student Accommodation
Presented by Ze Nunes of MACH Acoustics 25 Bishop Road, Bishopston, Bristol, BS7 8LS [email protected] mobile 07730590904
MACH ACOUSTICS
Pod Walls
Presented by Ze Nunes of MACH Acoustics 25 Bishop Road, Bishopston, Bristol, BS7 8LS [email protected] mobile 07730590904
MACH ACOUSTICS
One Layer of Plasterboard to Pod Walls
Presented by Ze Nunes of MACH Acoustics 25 Bishop Road, Bishopston, Bristol, BS7 8LS [email protected] mobile 07730590904
MACH ACOUSTICS
Regulation E1 – Impact Isolation – MACH Acoustics proposed to use carpets as the resilient floor finish.
Regulation E1 - Party walls to corridor spaces - MACH Acoustics proposed to remove the need for high spec walls to corridors.
Regulation E1 – Doors – MACH Acoustics proposed to reduce the performance of doors from 29 dB acoustic doors to 28 dB.
Regulation E3 – MACH Acoustics used the performance standards given in BB93 ‘Acoustic Design for Schools’ to reduce the levels of treatment in circulation spaces.
Cost Saving – Part E - Student Accommodation
Presented by Ze Nunes of MACH Acoustics 25 Bishop Road, Bishopston, Bristol, BS7 8LS [email protected] mobile 07730590904
MACH ACOUSTICS
B2.13 Impact sound insulation tests should be conducted on a floor without a soft covering (e.g. carpet, foam backed vinyl etc) except in the case of (a) separating floor type 1, as described in this Approved Document, or (b) a concrete structural floor base which has a soft covering as an integral part of the floor.
Regulation E1 – Impact Isolation
Presented by Ze Nunes of MACH Acoustics 25 Bishop Road, Bishopston, Bristol, BS7 8LS [email protected] mobile 07730590904
MACH ACOUSTICS
ADE states that separating walls and corridors wall must achieve equal performance.
Regulation E1 - Corridor Walls
Presented by Ze Nunes of MACH Acoustics 25 Bishop Road, Bishopston, Bristol, BS7 8LS [email protected] mobile 07730590904
MACH ACOUSTICS
In the case of student accommodation, all corridor walls are compromised by a door.
Regulation E1 - Corridor Walls
Presented by Ze Nunes of MACH Acoustics 25 Bishop Road, Bishopston, Bristol, BS7 8LS [email protected] mobile 07730590904
MACH ACOUSTICS
Composite Sound Reduction with a 42 dB Rw Wall
Calculated Sound Reduction Levels - Corridor Walls
Separating Element Area of element
RW
Door 1.8 28 Sound Insulation of Pod wall + Corridor Wall Calculated/Estimated 3.8 62 Wood stud, 2*15mm Soundlock, Mineral wool, Res Bar one side Sound reduction index derived from Gypsum – White Book 1 58 Composite sound insulation 34
Separating element Area of element
RW
Door 1.8 28 Sound Insulation of Pod wall + 40 dB RW Partition Calculated/Estimated 5.1 55
Standard 40 dB RW partition 5.1 42 Composite sound insulation 34
Composite Sound Reduction with a Part E compliant wall
Presented by Ze Nunes of MACH Acoustics 25 Bishop Road, Bishopston, Bristol, BS7 8LS [email protected] mobile 07730590904
MACH ACOUSTICS
Construction of - Corridor Walls
Sound Reduction Partition Constrution Details
56 dB
Two layers of 12.5mm SoundBloc each side of a 146mm Gypframe ‘C’ Studs at 600mm centres with Gypframe RB1 Resilient Bar to one side. 50mm Isowool Acoustic Partition Roll (1200) in the cavity. Lined each side with 2*12.5mm Soundbloc
42 dB RW
One layer of 12.5 mm FireLine on each side of timber studs at 600mm centres, with 50mm Isowool.
42 dB RW
Two layer of 12.5 mm Wall board on each side of timber studs at 600mm centres, with 50mm Isowool.
43 dB RW
One layer of 15 mm SoundBloc on each side of timber studs at 600mm centres, with 50mm Isowool.
Presented by Ze Nunes of MACH Acoustics 25 Bishop Road, Bishopston, Bristol, BS7 8LS [email protected] mobile 07730590904
MACH ACOUSTICS
Regulation E3 – states that soft treatments are required within common circulation spaces.
Approved Document E does not provide specific performance standards, it is therefore seen appropriate to use performance standards given within BB93.
Regulation E3 - Student Accommodation
Presented by Ze Nunes of MACH Acoustics 25 Bishop Road, Bishopston, Bristol, BS7 8LS [email protected] mobile 07730590904
MACH ACOUSTICS
Regulation E3 - Student Accommodation
Presented by Ze Nunes of MACH Acoustics 25 Bishop Road, Bishopston, Bristol, BS7 8LS [email protected] mobile 07730590904
MACH ACOUSTICS
It can be shown that plasterboard and carpet meets BB93 requirements
Calculated Rt within Corridor and Stair Cores
Reverberation Time Calculation Tmf= 1.47 = Kent Uni - Student Accommodation
L 4.2 Volume Reverberation Time: 125Hz 250Hz 500Hz 1KHz 2KHz 4KHzW 3.4 33 m³ 1.16 1.19 1.41 1.56 1.44 1.28H 2.3 Noise Absorption Coeficient Reverberation Values
Surface Materials W L/H surface area 125Hz 250Hz 500Hz 1KHz 2KHz 4KHz 125Hz 250Hz 500Hz 1KHz 2KHz 4KHz Ceiling Plaster board 14 m² 0.15 0.15 0.10 0.05 0.04 0.05 2.1 2.1 1.4 0.7 0.6 0.7doors Door 0.9 2 2 m² 0.10 0.08 0.08 0.08 0.08 0.08 0.2 0.1 0.1 0.1 0.1 0.1Wall Plaster board 3.4 2.3 8 m² 0.20 0.15 0.10 0.05 0.04 0.05 1.6 1.2 0.8 0.4 0.3 0.4Wall Plaster 3.4 2.3 10 m² 0.02 0.03 0.04 0.05 0.04 0.03 0.2 0.3 0.4 0.5 0.4 0.3Wall Plaster 4.2 2.3 8 m² 0.02 0.03 0.04 0.05 0.04 0.03 0.2 0.2 0.3 0.4 0.3 0.2Wall Plaster 4.2 2.3 8 m² 0.02 0.03 0.04 0.05 0.04 0.03 0.2 0.2 0.3 0.4 0.3 0.2floor 6 mm needlefelt carpet stuck to concrete 35% 5 m² 0.01 0.02 0.05 0.15 0.30 0.40 0.0 0.1 0.2 0.7 1.5 2.0
- - - - - - - - - - - - - -- - - - - - - - - - - - - -- - - - - - - - - - - - - -
Total Surfaces 4 4 4 3 4 4
Air 33 m³ 0.003 0.003 0.003 0.003 0.003 0.003 0.099 0.099 0.099 0.099 0.099 0.099
Objects Quantity 125Hz 250Hz 500Hz 1KHz 2KHz 4KHz 125Hz 250Hz 500Hz 1KHz 2KHz 4KHz- 0 - - - - - - - - - - - -- 0 - - - - - - - - - - - -- 0 - - - - - - - - - - - -- 0 - - - - - - - - - - - -- 0 - - - - - - - - - - - -- 0 - - - - - - - - - - - -- 0 - - - - - - - - - - - -- 0 - - - - - - - - - - - -
Total Object 0.0 0.0 0.0 0.0 0.0 0.0
Total 5 4 4 3 4 4
Presented by Ze Nunes of MACH Acoustics 25 Bishop Road, Bishopston, Bristol, BS7 8LS [email protected] mobile 07730590904
MACH ACOUSTICS
ADE requires a reasonable level of sound insulation between living spaces and circulation spaces,
ADE advises that the sound insulation of the door achieves 29 dB Rw. MACH Acoustics propose to use 28 dB Rw doors.
Acoustic Performance of Doors
Leader Flush
Presented by Ze Nunes of MACH Acoustics 25 Bishop Road, Bishopston, Bristol, BS7 8LS [email protected] mobile 07730590904
MACH ACOUSTICS
Acoustic Requirements From the Door
Presented by Ze Nunes of MACH Acoustics 25 Bishop Road, Bishopston, Bristol, BS7 8LS [email protected] mobile 07730590904
MACH ACOUSTICS
Increased Levels of Soft Treatments in Corridors
Presented by Ze Nunes of MACH Acoustics 25 Bishop Road, Bishopston, Bristol, BS7 8LS [email protected] mobile 07730590904
MACH ACOUSTICS
Increased Levels of Soft Treatments in Corridors
Presented by Ze Nunes of MACH Acoustics 25 Bishop Road, Bishopston, Bristol, BS7 8LS [email protected] mobile 07730590904
MACH ACOUSTICS
Noise Reduction in Corridors Due to Ceiling Tiles