Valid as of: 101201 Checklist prior to Entering Page
1 of 2 Version: 090101.1
OMV Refining & Petrochemicals all rights reserved
Short Name:
P RefStd_1081_T01_D_v090101.1
OMV Petrom
Refining Standard Sub-Document
Description:
Checklist prior to Entering for equipment Tag
No: ..
Reference to chapter Y N
RefStd_1081_Safe Entry
Outside status for Vessels/Columns
Handlebars provided on manway-flanges? 2.2.1-1/[SU01]
Dedicated/extended platform areas/bays gratings in proper condition
provided/ marked for bulky equipment? 2.2.1-3& 2.2.2.-2&4
Safety lugs (2) provided close to manways/
access doors? 2.2.1-4/[SU03]
All ladders provided with back strips (5) down
to landing? 2.2.2-3
Cross bars available to be placed in locked position at all to be
opened manholes? 2.2.1-7/[SU10]
Inside status for Vessels/Columns
Handlebars & steps provided for egress? 2.2.3-1&2/[SU02]
Resting platform provided at 50% level,
if H 6 mtr.? 2.2.3-3
All safety lugs inspected and NDT checked
prior to use? 2.2.3-5
Distance between Safety lugs 5 mtr.? 2.2.3-6
Water boots/large floor openings protected
with grids or baffles? 2.2.3-7&8/[SU04]
When tray manways have to be opened, are
safety grids In-place on 1st tray below each
egress? 2.2.3-11/[SU07]
Inside status for Combustion Air/Fluegas Ducting
Vertical ducting is secured with reeling or
turning vanes? 2.2.3-9&10/[SU06]
Note. Hardcopies of this document may not represent the current applicable standard. Check for latest document on the Refining
Regulation Platform.
P RefStd_1081_T01_D_v090101.1_EN_Checklist-prior-to-Entering .doc
Valid as of: 101201 Checklist prior to Entering Page
2 of 2 Version: 090101.1
OMV Refining & Petrochemicals all rights reserved
Authors P-R-P-M-I P-R-A-M-PM Department
Nita Ion Tatu Adrian Name
Responsible
for Contents
Sorin Coltan
Department
P-R-P-M
Name Reference to chapter Y N RefStd_1081_Safe Entry
Status of Underground Systems
When sewer covers have to be opened, are
safety grids in place? 2.2.5/[SU08]
Status of Reactor-Vessels, when empty
Is the hoisting equipment/harness/lifting hose/
Tripod etc. approved, valid and suitable
for Personnel use? 2.2.6-2
Is a radio communication/separate channel
between hoisted person and Tripod/Crane
operator established & workable ? 2.2.6-3