Page 1: P-RBI Presentation Slide

MOHD NORHAFIZ BIN OTHMANMECHANICAL ENGINEERING

M9348

UTP Supervisor : Dr Redzuan

Host Company Supervisors: Mr Eric Ang Mr Quek Meng Kau

Page 2: P-RBI Presentation Slide

Content

Training Objective Project & Activities Project Involvement Conclusion & Acknowledgement Q & A Session

Page 3: P-RBI Presentation Slide

Training Objective

Integrate theories with practical Work side by side with industrial

practitioners Introduction to work cultures and

industrial practices. Expose student to potential

employees Develop skills in communication,

work ethics, management, etc.

Page 4: P-RBI Presentation Slide

Project & Activities

Page 5: P-RBI Presentation Slide

PMOPMO SKOSKOSBOSBO

LCOT

Project Involvement

Page 6: P-RBI Presentation Slide

LCOT Layout

Page 7: P-RBI Presentation Slide

T-1201 Layout

Page 8: P-RBI Presentation Slide

P-RBI

Page 9: P-RBI Presentation Slide

Petronas-Risk Based Inspection (P-RBI) A method that have been approved to

meet the requirements of API 580 and being used by PETRONAS

ObjectivesTo focus inspection resources on critical

equipment which will prevent failures.

Page 10: P-RBI Presentation Slide

P-RBI Benefits Reduce costs Provide well defined steps to improve plant

performance Optimize inspection ,test and maintenance work. Reduce and ultimately eliminate unplanned

equipment failures.

P-RBI Reduces Risk……How??Finding and fixing problem before lead to leaks.An item will be removed from its service if it risk

reach unacceptable level.

Page 11: P-RBI Presentation Slide

P-RBI Implementation StepsIdentify EquipmentIdentify Equipment

Criticality AnalysisCriticality Analysis

Inspection PlanningInspection Planning

Inspection ActivitiesInspection Activities

Evaluate ResultsEvaluate Results

Update CriticalityUpdate Criticality

Report ResultsReport Results

Update Inspection PlansUpdate Inspection Plans

Non-conformance

Page 12: P-RBI Presentation Slide

Identifying Equipment

Tank details:Tank Number: T-1201Tank Type: Upright Cylindrical fixed

Storage TankReference Height: 13100Tank Diameter: 11300Max Liquid Level: 12000Design Temp: 65°CDesign Press: 56 / -6 mbar

P-RBI On Storage Tank T-1201

Page 13: P-RBI Presentation Slide

Data ExampleP-RBI On Storage Tank T-1201

Page 14: P-RBI Presentation Slide

Data Collection We get data for the equipment from:

General Arrangement (GA) Ultrasound Thickness Test (UT) PFD and P&ID Manufacturer Equipment Data Sheet (U-1 Report)

Data Collection Pitfalls Incomplete data collection Inappropriate sourceCut and paste errors Incorrect “units of measure”

P-RBI On Storage Tank T-1201

Page 15: P-RBI Presentation Slide

Equipment History & Visual Inspection = Inspection History

• Help to establish the level of deterioration• Rate of deterioration• Confidence Level

Probability of leak is based on how well we know the true condition of the item

P-RBI On Storage Tank T-1201

Page 16: P-RBI Presentation Slide

Corrosion Study Corrosion study help to understand how the

equipment will fail Its also used to establish appropriate Inspection

Plans

P-RBI On Storage Tank T-1201

Page 17: P-RBI Presentation Slide

P-RBI On Storage Tank T-1201

Page 18: P-RBI Presentation Slide

Shell

Bottom

Criticality Analysis

ProbabilityProbability ConsequencesConsequences

•Internal corrosion•External corrosion•Cracking•Other damage mechanism

•Cost•Environmental•Toxic

RISK

P-RBI On Storage Tank T-1201

Page 19: P-RBI Presentation Slide

P-RBI On Storage Tank T-1201

Page 20: P-RBI Presentation Slide

Criticality

P-RBI On Storage Tank T-1201

Page 21: P-RBI Presentation Slide

Internal Corrosion

P-RBI On Storage Tank T-1201

Page 22: P-RBI Presentation Slide

External Corrosion

P-RBI On Storage Tank T-1201

Page 23: P-RBI Presentation Slide

Enviromental Cracking

P-RBI On Storage Tank T-1201

Page 24: P-RBI Presentation Slide

Consequences

P-RBI On Storage Tank T-1201

Page 25: P-RBI Presentation Slide

Production Loss

P-RBI On Storage Tank T-1201

Page 26: P-RBI Presentation Slide

Inspection Planning

Recommended Tasks

Recommended Locations

Define Task & Locations

P-RBI On Storage Tank T-1201

Page 27: P-RBI Presentation Slide

Inspection Management

Visual Inspection Ultrasonic Thickness Testing Radiography Penetrant Testing

Type of Inspections

P-RBI On Storage Tank T-1201

Page 28: P-RBI Presentation Slide

Non-Conformance

Conditions found during inspection that do not meet acceptance criteria

Non-conformance report (NCR) can be generated and tracked in P-RBI

P-RBI On Storage Tank T-1201

Page 29: P-RBI Presentation Slide

Report & QueriesP-RBI On Storage Tank T-1201

Page 30: P-RBI Presentation Slide

Conclusion

Skill enhanced Built more confidence Gained professional experience Knowledge application

Page 31: P-RBI Presentation Slide

Acknowledgment

Mr Eric Ang Mr Quek Meng Kau Engineers & Technicians Dr Ridzual

Page 32: P-RBI Presentation Slide

Q & A session