P. O. Box 24176, United Tower, Building No 55, Al Sadd Street, Doha – Qatar

Tel: +974 40203500 Fax: +974 40203600

Web: www.howunited.com Email: [email protected]

2 | P a g e

Content

Heading Page No. Company Introduction

3

Our Services

4

1 Previous Project Experiences And Project Lists

7

2 Senior Management Team

16

3 Staff & Operatives List 17

4 Design Capability (In-House And External)

18

5 Fabrication, Manufacturing Facilities And Location

18

6 Schedule Of Plant & Equipment Holding, Whether Owned, Leased Or Hired

18

7 O&M Capability

19

8 Accreditations: ISO 9001, ISO 14001, ISO 18001, QSAS, QGBC

20

9 Licenses: Commercial Registration, Commercial Licence, TAX Certification, Kahramaa, QCDD

29

10 Pi Insurance

41

11 Our Clients, Suppliers, Testimonials And Approval Letters

43

12 Brands Represent By How United Services W.L.L.

53

13 Evidence Of Employment Of Local Companies/Firms In Existing Contracts

53

14 Evidence Of Compliance With Mandatory Standards For Migrant Workers Welfare

53

15 After Sales Services & Sla 55

3 | P a g e

Company Introduction

How United Services was established in the State of Qatar in 2000 by Interserve UK and Al Darwish

United. Its purpose was to deliver industry-leading Mechanical, Electrical, Power and Maintenance services to a wide range of clients. Throughout the last decade Qatar has witnessed development at an astounding pace and How United Services are proud to be a part of this growth, through the delivery of numerous projects across all spheres of construction ranging from commercial and office buildings, airports, housing and since 2006, also the gas and oil industry. We have worked for blue chip clients such as RasGas, Exxon Mobile and Qatar Airways. We have also supported the construction of Ras Laffan the hub of petrochemical activities in Qatar. We have worked hard to gain the reputation as one of the major MEP companies operating within the Qatari market. Today the company maintains a core of experienced staff and directly employed site operatives numbering over 1200 people. Our work is supported by strategically located staff and operative bases with logistical support provided via central stores, dedicated plant and duct / fabrication facilities. How United Services are totally committed to providing quality assured services to the highest possible health and safety standards. We do this by an uncompromising set of standards and targets. We support and train our workforce in the achievement of these standards and targets and positively reinforce their importance regularly through transparent accountability and discipline. We recognise that our organisation is only as good as the people that represent us and to that end our continued investment in the best qualified, trained and motivated people in their field is the biggest contribution we make to being the best at what we do. Our management team is backed by a well-trained, motivated and committed workforce operating to fully substantive management systems and procedures. As well as formalised business management systems HUS also employ innovation and ingenuity when working closely with our clients to develop, enhance and proactively advance our service capabilities. We are justifiably proud of our track record as the frontrunner in our industry and we are continually working in the best interests of our clients to provide a service that is delivered right, first time, safely and within budget.

4 | P a g e

Our services

Mechanical Services Efficient, well installed & maintained mechanical services are the backbone of any modern building. As such, HUS recognise the importance of delivering the best systems, on time & right first time that meet our clients requirements and provide the best working environment available within the market. HUS has developed a market leading mechanical services capability that provides our client’s with the best mechanical systems suited to their needs within the whole spectrum of the built environment. HUS is fully committed to remaining at the forefront of this progressive industry by following a programme of continuous improvement & investing in the latest technology & working practises. We seek to develop our people to deliver the best possible services to our clients.

Electrical Services

HUS are proud to be Kahramma Grade A licensed contractors a grading that we have held for 12 years. HUS has achieved this by investing in & developing a strong team of highly skilled, qualified & experienced engineers & technicians. Utilising these skills HUS to streamline the installation process & value engineer services can provide our clients with a competitive advantage whilst not compromising quality or performance. By staying at the forefront of new technology, design standards & product development HUS are able to offer cost effective & compliant solutions to

any electrical engineering scenario.

Fire Protection Services By utilising engineers & technicians that are certified by Qatar Civil Defence Department, HUS has a capability to design, install & maintain high quality, compliant fire detection & fire protection systems. HUS’s capability has developed to such an extent that we can deliver a comprehensive range of systems from the most basic fire alarm through to VESDA, gas extinguishing systems & beyond. Senior staff are certified members of NFPA.

Fit-Outs How United services has established itself as a key player in the delivery of high quality, fast track MEP fit out projects throughout all sectors of the industry. We strive to be at the forefront of our industry with a reputation as reliable, top quality performers who lead by example and put words into action. This desire to be the best and to perform at peak output ensures that we continue to gain repeat business with a number of key clients as well as

continually developing new customers. This methodology ensures consistently high standards in workmanship and in achieving the client budget and time constraints.

5 | P a g e

Duct Fabrication Facilities Ongoing investment in the latest technology enables HUS to produce ductwork to a very high standard in a short space of time. HUS have the capability to fabricate GI, Aluminium, Mild Steel, Stainless Steel & Phenolic ductwork & cladding to relevant industry standards. HUS employs a highly skilled, motivated workforce who is continuously trained in latest working practises & standards. The manufacturing environment & modern machinery ensures that customer’s requirements are met in the shortest time frame. HUS enjoys long term successful client relationships with a high

level of repeat business. This provides a strong platform from which to continue to supply a high quality product.

HVAC (Heating, Ventilation and Air Conditioning) The design, installation and maintenance of effective and efficient HVAC systems and controls are a mandatory requirement of modern day building design and function.

Qatar is proving itself to be at the forefront of innovation and expertise in the design and construction of new buildings, HUS is more than able to keep pace with the needs of the construction industry involved in the expanding skyline of our growing nation. Our attention to detail, expertise and experience combined with robust health and safety standards and unrivalled quality systems and initiatives makes HUS one of the best and most sought after HVAC subcontractors in Qatar today.

We are able to both install and design systems that meet current global standards and are proud to have provided these services to a number of iconic projects for blue chip customers and independent traders alike. No job is too big or too little for HUS to handle; we will employ exactly the same methods and standards regardless of the size of the project.

Infrastructure Division HUS Infrastructure is typically engaged in turnkey projects in District Cooling Systems, viz. Energy Transfer Stations (ETS), Pipe Distribution Network (PDN). We offer a complete, accurate and efficient technical solution to our clients with the highest degree of quality. Repeat business from the client for the past 8-9 years continuously proves that our clients are “delighted” with our services and quality of work. We are committed to continuous improvement through new technologies and innovative ways of working. We also enact developments from the “lessons learnt”. The ultimate goal is to help our clients gain, commercially and technically, from the efficient methods we have developed. Our Services Include: • Chilled Water Piping Systems (Pre-insulated & Post insulated) • Energy Transfer Stations including Instrumentation and PLC Control Systems • Hot Tapping • Line Plugging • Flushing & Chemical Treatment of Chilled Water Networks • Fiber Optic Network and Communication Systems

6 | P a g e

Trading Division (How United Trading)

We are an experienced trading company serving the Qatar construction and sports markets. Our capabilities include sourcing and procurement of product that meets the needs of projects involving interior fit-outs, MEP works and sports related products for schools and sports arenas alike. We operate within all areas of the Qatar construction industry.

7 | P a g e

1) Previous project experiences and project list.

Aviation

Project New Doha International Air Port -Air line

Engineering and Office Facilities

Client / Main Con. NDIA / Overseas Bechtel

Duration August 2006 - November 2007

Scope of work NDIA Airline engineering Office 3 levels with

approximate area of 6000M2, Airline

operation facility 2 levels with approximately

area of 6200M2

Value ( approx ) QR 58 million

Education

Project Three Schools Projects In Wakra

Client / Main Con. Three Schools Projects In Wakra

Duration January 2011 - May 2012

Scope of work Construction works at Wakra Elementary

Girls School, Wakra Preparatory Girls School,

Wakra Model School.

Value ( approx ) QR 38 million

Residential

Project Viva Bahriya Tower on the Pearl - Bilal Suite (

VB-10) in the Pearl Qatar

Client / Main Con. AHB / GHD

Duration January 2008 - November 2011

Scope of work Viva Bahriya Tower on the Pearl Island with

2B+G+22 in liaise with Gulf Contracting and

consultant GHD

Value ( approx ) QR 85 million

Specialist Division

Project Qatar Transmission System Expansion, Phase

IX Substations

Client / Main Con. SIEMENS / Energo Project

Duration May 2010 - July 2014

Scope of work MEP

Value ( approx ) QR 240 million

8 | P a g e

Industrial

Project Nakilat

Client / Main Con. Royal Haskoning / Erhama Bin Jaber Al

Jalahma Shiptard Port

Duration February 2012 - January 2013

Scope of work The Construction of Erhama Bun Haber Al

Jalahma Shipyart Port of Ras Laffan

Value ( approx ) QR 13.9 million

Oil & Gas

Project Barzan Onshore Project

Client / Main Con. Ras Gas / JGC

Duration Aug 2012 - Feb 2014

Scope of work Operation building (BXK -02) and BSS 203/

BSIH 203 at Barzan Onshore project for Ras

Gas/ JGC

Value ( approx ) 26.5 million

Health and Fitness

Project Aspire Logistic – Construction of Fitness Center

Client / Main Con. THE SPORT CITY / GCC

Duration 07 months

Scope of work Installation and completion of MEP associated works.

Value ( approx ) QR 18.5 million

Leisure

Project Doha Beach Villa

Client PEO

Duration Aug 2012 - Mar 2014

Scope of work Supply, Delivery, Installation and completion

of MEP associated works.

Value ( approx ) QR 36 million

Project 5 Stars Hotel Project

Client / Main Con. Sh/ Khalid Al Thani / Redco ( Main Con.)

Duration 58 weeks (2016)

Scope of work MEP Services associated with the

construction.

Value ( approx ) QR 67.5 million

9 | P a g e

Various Banks projects

Bank Name HSBC

Projects in Numbers 11 projects

Overall Value (Approx) QR 15 millions

General Scope of Works MEP works & Fit Out works, building services, fire protection suppression systems

Major Projects Approx. Value (in QR)

HSBC at Airport road 10 million

HSBC at Salwa road 2.5 million

Bank Name QIB

Projects in Numbers 5 projects

Overall Value (Approx) QR 4.7 millions

General Scope of Works MEP works & Fit Out works, building services, fire protection suppression systems

Major Projects Approx. Value (in QR)

QIB Muaither Branch 1.9 million

QIB Umm Salal Branch 1 million

Apart from these projects HUS also have work with Doha Bank, Ahli Bank and Standard Chartered Bank

on similar projects.

Bank Name QNB (Qatar National Bank)

Projects in Numbers 108 projects

Overall Value (Approx) QR 56 millions

General Scope of Works Full MEP works & Fit Out works for several newly established branches, fire protection works, building services.

Major Projects Approx. Value (in QR)

QNB HQ 5th

floor 5.5 million

QNB HQ 4th

floor 1.4 million

QNB HQ 3rd

floor 1.3 million

QNB HQ 2nd

floor 1.2 million

QNB at Al Mathaf 4.1 million

QNB at ‘C’ Ring road (Credit Card, Conventional, Islamic Branch)

1.4 million

QNB Al Khor Branch 1.7 million

QNB HQ groud floor 1.5 million

Bank Name CBQ (Commercial Bank of Qatar)

Projects in Numbers 29 projects

Overall Value (Approx) QR 41 millions

General Scope of Works MEP works including electrical modification, add power requirements. Fit Out works, fire protection works, fire suppression systems, building services.

Major Projects Approx. Value (in QR)

CBQ Data Center –Al Safa Rayan branch 2nd

floor 11.9 million

CBQ Shell and Core works at Umm Lokhba 9.1 million

CBQ at D’ Ring road 4.5 million

CBQ all branches & ATMs 2.2 million

CBQ Umm Lokhba Fit Outs 2.5 million

10 | P a g e

Qatar Cool/ Infrastructure Projects District Cooling/ Energy Transfer Stations (ETS)

Qatar Cool / Infrastructure Projects Scope

Energy Transfer Station (ETS) & Associated works

Projects Approx. Value

1 VB towers at the Pearl Qatar 8.1 million

2 Jasmiya Tower - West Bay 1.8 million

3 Sahara Tower, Al Baker Tower, Twin Palm Tower, Navigation Tower & Saeed Al Misnad Tower.

13 million

4 Al Fardan Tower, Al Alayan Tower, Al Nour Tower, Gate Tower, Salam Plaza, Dubai Tower, Al Majed Tower, Yohan Tower.

18 million

5 the Qanat Quartier Within the Pearl Qatar & 1 No Customer Building at Viva Bahriya VB10 within the Pearl Qatar.

11.5 million

6 2 Nos Customer Building at Woqod Tower & Rames Tower at West Bay.

3.4 million

7 Viva Bahriya development at The Pearl Qatar VB11,VB17 and VB29.

3.8 million

8 Energy Transfer Stations works at The Pearl Qatar Marsa Malaz

2.4 million

9 Energy Transfer Stations works at The Pearl Qatar PA 11B 1.2 million

10 Energy Transfer Stations works at The Pearl Qatar PA 13 A , PA 13 B

1.4 million

11 Energy Transfer Stations works at The Pearl Qatar AQ-01 & AQ -02

5.4 million

12 Energy Transfer Stations works at West Bay Bin Samikh tower

1.8 million

13 Energy Transfer Stations works at West Bay Bin Samikh tower

4.0 million

14 District cooling Modification works to TSE Supply at P1 & P2 9.2 million

15 The Pearl Qatar PDN Cleaning works 6.3 million

16 AL ERKYAH DEVELOPMENT Project – Construction of Infrastructure District Cooling at Lusail Development

1.9 million

Palm Tower

Dubai Tower

Al Fardan Tower The Pearl Qatar – VB towers

Salam Plaza

11 | P a g e

Hot Tapping Projects

Project Client/Consultant Year Description Al Baker Tower ETS Installation

Qatar Cool

2008

Supply and installation of pre –

insulated pipe within excavated trenches, supply and installation of post insulated pipe above ground, c/w all pipe accessories, welding by our in-house certified welders, X-ray testing of pipe welds, flushing and cleansing of pipe. Supply and installation of plate heat exchanger, associated PLC controls, final Testing & Commissioning.

Navigation Tower ETS Installation

Al Noor Tower West Bay pipe distribution network for chilled water

Palm Twin Tower ETS Installation

Al Misnad Tower ETS Installation

Sahara Tower ETS Installation

Al AAyan Tower ETS Installation

AL Nour Tower ETS Installation

Gate Tower ETS Installation

Salam Tower ETS Installation

Dubai Tower ETS Installation

Yohan Tower ETS Installation

Al Majeed ETS Installation

10 No. ETS Installation at The Pearl Qatar Quant Quarter QQ1 2,3,5A,5B,6A,6B,7,8,9B

10 No. ETS Installation at The Pearl Qatar VB2,5,20,21,22,23

Ras Laffan Industrial City Air Liquide (France)

Air Liquide (France)

2008

Supply and Installation of coated pipe within excavated trench and installation of pipe above ground c/w all pipe accessories. Welding carried out by our in-house certified welders. Ultrasonic testing of welds, flushing & cleansing of pipe. Final connection to process equipment carried out by client, Air Liquide (France).

Shk Mhd Tower west Bay pipe distribution network for chilled water

Qatar Cool

2008

Liaison with Ashghal to obtain road opening permit, detailed location identification of existing services, road excavation to locate existing chilled water pipe, cut into existing chilled water pipe with Hot Tapping machine, provide new Hot Tapp valve, supply and installation of pre-insulated pipe within excavated trench, terminate pipe within new valve chamber within side walk. Welding by in house certified welders, X-ray testing of pipe welds, flushing & cleansing of pipe with final Testing & Commissioning.

Dubai Tower West Bay pipe distribution network for chilled water

Hot Tapping work for Rames Tower 2013

Rabban Tower West Bay pipe distribution network for chilled water

Commercial Twin Towers pipe distribution network for chilled water

2013

Al Jassmiya Tower pipe distribution network for chilled water

2011

Abraj Quartier AQ1 & AQ2 tower at The Pearl Qatar 2015

Al Asmakh tower at West Bay 2015

Rabban Tower at West Bay 2015

Qatar Cool P1 & P2 TSE Modifications 2015

Lusail Express Way Hyundai 2014 Pipe distribution works.

Al Erkiya Development Bin Omran 2015 Pipe distribution works.

12 | P a g e

Project Completed in last 5 years (> 2 million QAR)

Project No

Project Title Client Project Value >2million in '000' QAR

M08010 Bilal Tower Gulf Contracting Co. W.L.L 87,447

M10061 Phase IX Substations Gulf Contracting Co. W.L.L 59,886

M11093 Aspire Zone new offices Gulf Contracting Co. W.L.L 46,452

138-2005

NDIA Airline Engineering Office Gulf Contracting Co. W.L.L 42,500

M10142 Wakra Schools Gulf Contracting Co. W.L.L 33,829

M13081 American School of Doha expansion Rabban Stefanutti Stocks LLC 31,422

M12072 Barzan building works Gulf Contracting Co. W.L.L 28,710

M11079 Nakilat Phase 5 Gulf Contracting Co. W.L.L 25,786

M12019 Hisong substations Gulf Contracting Co. W.L.L 18,700

M11027 Fox Hill residential apartment Gulf Contracting Co. W.L.L 15,018

M14057 Grand Hamad Avenue Substation & Multi Storey Car Park Building

Gulf Contracting Co. W.L.L 12,728

M12066 Qatar Steel MEP works Gulf Contracting Co. W.L.L 11,524

M12092 Lusail expressway CHW works Hyundai Engineering & Construction Company

10,044

M13066 Barzan - Package 2 Gulf Contracting Co. W.L.L 9,255

M14030 Al Jazeera Centralised TX Refurb Works Amar Construction W.L.L. 8,573

M12020 NDIA Mockup warehouse works Gulf Contracting Co. W.L.L 8,514

M13078 Doha Festival City - GCC Gulf Contracting Co. W.L.L 8,079

M14031 Ras Umm Leigi Beach Villa Bluu Qatar L.L.C. 7,600

M15002 SPA Project at Dafna Redco Construction-Almana 7,415

M13021 QMA New office building Tower 2 Al Mana Maples W.L.L 5,598

M15001 Two ETS AQ-01 & AQ-02 in the Pearl-Qatar Qatar Cool (Qatar District Cooling Co.)

5,469

M15038 MEC Lusail Project Bluu Qatar L.L.C. 4,698

M12064 Doha College FM 2012-14 Doha College 4,535

M12081 QSTEC Substation Gulf Contracting Co. W.L.L 4,442

M14086 Qatar Cool TSE Plant 1 & 2 Qatar Cool (Qatar District Cooling Co.)

4,287

M12112 Al Maha new office bldg Al Maha Group Holding 4,201

M12106 Qatalam substation Gulf Contracting Co. W.L.L 4,090

M13067 Al Jazeera Network Cafe Salam Industries W.L.L 3,853

M12078 ACS School FM ACS International School 3,527

M13077 Palm tower fit out works Bluu Qatar L.L.C 3,375

M16001 Hassad Foods Bluu Qatar L.L.C. 3,277

M12115 QP Petrochem Lab - QSTP Kinnarps Project Solutions 2,872

M12082 Naeeja substation Gulf Contracting Co. W.L.L 2,721

M14089 QFB Private Banking Club Interspace 2,679

M08080 Al Majed Tower Qatar Cool (Qatar District Cooling Co.)

2,670

M11096 Al Baker tower ETS Qatar Cool (Qatar District Cooling Co.)

2,560

M13085 Tornodo Tower SCB Kinnarps Project Solutions 2,541

13 | P a g e

M14010 Marsa Malaz - TPQ Qatar Cool 2,519

M13027 CBQ Plaza AKC AKC Contracting & Supply 2,490

M15070 Qatar Airways School Gulf Contracting Co. W.L.L 2,366

M15040 QIB Salwa Road Interspace 2,346

M13079 Ooreedo fitout 23 and 25 floors Bluu Qatar L.L.C 2,297

M13047 OOREDOO Levels 20-22 MEP Fitout works Bluu Qatar L.L.C. 2,102

14 | P a g e

Project on going (> 2 million QAR)

Project Number

Project Title Client Contract Value ('000' QAR)

M12008 Beach Villa DARA Engineering Consultants W.L.L.

34,153

M14019 Thermal Energy Storage Tanks Qatar Cool (Qatar District Cooling Co.)

1,539

M14032 Al Jazeera 360 Studio Gulf Contracting Co. W.L.L 19,531

M14059 Madina New Substation Madina Group W.L.L 719

M14069 Al Erkyah District Cooling Network Bin Omran Trading & Contracting W.L.L.

8,887

M14073 CBQ -GHS Fire & Safety Improvements MEP Works

AKC Contracting & Supply 4,481

M14080 ETS at Porto Arabia (PA 13A & PA 13B) - The Pearl Qatar

Qatar Cool (Qatar District Cooling Co.)

2,853

M14083 PDN Pearl Qatar - Cleaning Works Qatar Cool (Qatar District Cooling Co.)

8,570

M14087 QNB MOF Building Interspace 15,870

M15015 Marine Restaurent at Katara Redco Construction-Almana 11,307

M15025 CBQ @ Al Ruwais AKC Contracting & Supply 4,535

M15028 Modification works at QNB capital Interspace 138

M15035 Foxhills CDD Works Gulf Contracting Co. W.L.L 1,407

M15036 Rabban Suites ETS Qatar Cool (Qatar District Cooling Co.)

1,613

M15048 QIB Fanar Interspace 3,229

M15050 QIB Rayyan Interspace 2,069

M15051 Qatar Executive FBO Terminal Refurbishment Works

Interspace 4,121

M15056 QIB Q-Mall Interspace 1,188

M15061 Sewage Treatment Plant Works extension no.05

Gulf Contracting Co. W.L.L 7,032

M15071 5 Stars Hotel Redco Construction-Almana 67,616

M16005 QNB North Gate Mall Interspace 1,351

M16007 Bluu-Moon Island Villa at Pearl Qatar Bluu Qatar L.L.C. 17,837

M16008 Phase 12 NCC Substation Gulf Contracting Co. W.L.L 37,000

M16017 NDIA Cargo Cold Store Gulf Contracting Co. W.L.L 6,431

M16018 Salam Studio & Store @ Mall Of Qatar Salam Industries W.L.L. 10,492

M16020 Residential Building at Al Sadd (B+G+4+R) Gulf Design Architects 4,725

M16021 CW Pipeworks @ HIA Hamad International Airport 849

M16023 CBQ-Grand Hammad Avanue Branch Interspace 261

M16024 BVLGARI shop at Mall of Qatar Permasteelisa Gartner Qatar LLC

1,354

M16025 QIB DFC Branch Interspace 498

M16027 Oredoo outlets at North Gate Mall- DFC- Mall of Qatar and Barwa City

Interspace 1,247

M16028 QIB HIA Branch Gulf Contracting Company W.L.L.

50

M16029 Hawar Group: Commercial Development and Villa at Legtaifiya

Gulf Design Architects 14,783

15 | P a g e

M16031 QNB at DFC Interspace 644

M16032 HIA - Temporary Handling Facility Six Construct Qatar Limited W.L.L 7,700

M16033 ETSs for 4 Nos. Doha Metro Stations and PA10A & 12A Towers

Qatar Cool (Qatar District Cooling Co.)

7,792

M16034 DFC Fire Detection Installation to Vacant Tenancies

GCC-ALEC JV 3,035

M16035 Delsey and Kipling Shops at DFC Salam Enterprises 264

M16036 CBQ Le Boulevard Branch AKC Contracting & Supply 2,078

16 | P a g e

2) Senior management team.

17 | P a g e

3) Staff and Operatives List.

Title Nos

General Manager 1

Deputy General Manager 1

Commercial Manager 1

Estimation Manager 1

Contracts Manager 1

Maintenance & FM Manager 1

Finance & Administration Manager 1

Business Contacts Manager 1

Senior Projects Managers 2

Projects Managers 7

Accounts 7

Administration 3

Human Resources 2

Site Administrators 7

PRO's 4

Health & Safety 22

QA/QC 10

Planning Engineer 3

I.T 5

Estimation 11

Purchasing 6

Quantity Surveyor 6

CAD Draughtsmans 9

Transport 2

Facilities Management 51

ELECTRICAL

A Senior Electrical Engineers

B Electrical Engineers 6

MECHANICAL/HVAC 2

A Senior Mechanical Engineers

B HVAC Engineers 4

PLUMBING & DRAINAGE 9

A Senior Plumbing Engineers

B Plumbing Engineers 3

SYSTEM ENGINEER FOR ELV & FIRE FIGHTING SYSTEM 8

A Senior Fire Systems Engineer

B Fire Alarm Engineers 1

C Fire Fighting Engineers 4

D ELV Manager 4

E Senior ELV Engineer 1

F ELV Engineer 1

Total 209 1

Numbers of Operatives 943

18 | P a g e

4) Design capability (in-house and external).

In House capability utilising HEVACOMP / BENTLEY design software.

Experienced engineers working to British & American Standards.

Full output of 3D Modelling / Calculations / Tentative Equipment layouts.

Ease of site changes (WCR’s) between Client & Provider.

Full control of value engineering, providing cost effective alternatives, in compliance with Client preferred

suppliers / life cycle cost calculations.

5) Fabrication, manufacturing facilities and location. Duct shop fabrication facilities and assembly yard.

6) Schedule of Plant & Equipment holding, whether owned, leased or hired. 80 % of the equipment’s are owned by the company, and in perfect condition. Date of manufacture details are various from item to item.

(xiii) List of Equipment and Resources (if applicable). Quantity

Hydraulic crimping tools

Manual crimping tools

Cable winch manual electrical and diesel powered

Acetylene cylinders 40ltr

Oxygen cylinders 40ltr + Gauges with hose full

Oxygen & acetylene small cylinder (portable) +set

Argon cylinders +LPG gas cylinder

Duct shop tools

Bench drills big bench wise & drainage cameras

Air flow meter & testing equipment

Cable stands

Welding plants

Electric powered hand tools

Threading grooving cutters stands & hole saw cutters

Lifting & pulling equipment

Ladders & Scaffoldings

Conduit pipe benders

Containers

High pressure cleaners vacuum cleaners & vacuum pumps (HVAC)

Special testing equipment with eng. marlou

Nitrogen cylinders

Trucks

Pickups ( Facilities Managements )

18

06

06

18

41

09

03

29

06

76

10

56

792

41

24

340

47

16

18

04

10

12

22

19 | P a g e

7) O&M capability.

How United Services are fully appreciative of the importance of providing O&M documentation and record drawings to coincide with the handover of the project.

Depending on the size and how complicated the project is we would either prepare them in-house or subcontract to a specialist organisation. The process of accumulating information and wiring diagrams specific to the plant and equipment to be installed on the project is initiated at the time of order. At the same time the draft manual can be prepared based on the specification and drawings and amended ongoing during the project to reflect variations to the installation, omissions and additions.

A parallel exercise is carried out with preparing record drawings, a set of working drawings are retained in isolation to the drawings used for installation, these drawings reflect variations to the installation and as areas of the building are completed the relevant drawings are amended and recorded as installed drawings.

The process is continual throughout the life of the project with key dates identified on the programme identifying latest information to be available from suppliers/manufacturers, access to completed areas to record serial numbers and information from plant and equipment, issue of draft manual for comments and/or approval. The only section that cannot be incorporated until completion of the project are the commissioning data sheets, we would lease closely with our commissioning of the project and preparation of the results for incorporation into the manuals.

20 | P a g e

8) Accreditations.

21 | P a g e

22 | P a g e

23 | P a g e

24 | P a g e

25 | P a g e

26 | P a g e

27 | P a g e

28 | P a g e

29 | P a g e

30 | P a g e

9) Licenses.

31 | P a g e

32 | P a g e

33 | P a g e

34 | P a g e

35 | P a g e

36 | P a g e

37 | P a g e

38 | P a g e

39 | P a g e

40 | P a g e

41 | P a g e

10) PI Insurance.

42 | P a g e

43 | P a g e

11) Our clients, Suppliers, testimonials and approval letters.

44 | P a g e

How United Services Top 20 Suppliers

Elsewedy Cables Qatar

Laffan Trading & Contracting W.L.L.

Electro Trade Company W.L.L.

Arabian Link Trading

Petra Air Conditioning Equipment Company

Khalid Manufacturing Company

Qatar Insulation Company W.L.L.

Jersey Engineering & Trading Company

Rodha Khalid Co.

KBE Gulf L.L.C. (Qatar)

Aljabor Trading Company

Nabina Ceramic

Chubb Fire Qatar

NAFFCO

Gulf Lights Electrical Engineering W.L.L.

Jaidah Motors And Trading Company

Mannai Trading Company W.L.L.

Fire Link W.L.L.

Cube Light W.L.L.

Trade House Qatar Co. W.L.L.

45 | P a g e

Client Testimonials

46 | P a g e

47 | P a g e

48 | P a g e

49 | P a g e

50 | P a g e

51 | P a g e

52 | P a g e

53 | P a g e

54 | P a g e

12) Brands represent by How United Services W.L.L.

HUS trading division represent CLICK brand by Scolmore Group U.K. Scolmore is a company based in UK

which is provide high quality electrical accessories.

13) Evidence of employment of local companies/firms in existing contracts.

HUS currently self-delivers the majority of its operations in the Country. Where specialist contractors are required we appoint through a rigorous approval process inclusive of HSE, Quality and capability deliverables.

14) Evidence of compliance with mandatory standards for migrant workers welfare.