P. O. Box 24176, United Tower, Building No 55, Al Sadd Street, Doha – Qatar
Tel: +974 40203500 Fax: +974 40203600
Web: www.howunited.com Email: [email protected]
2 | P a g e
Content
Heading Page No. Company Introduction
3
Our Services
4
1 Previous Project Experiences And Project Lists
7
2 Senior Management Team
16
3 Staff & Operatives List 17
4 Design Capability (In-House And External)
18
5 Fabrication, Manufacturing Facilities And Location
18
6 Schedule Of Plant & Equipment Holding, Whether Owned, Leased Or Hired
18
7 O&M Capability
19
8 Accreditations: ISO 9001, ISO 14001, ISO 18001, QSAS, QGBC
20
9 Licenses: Commercial Registration, Commercial Licence, TAX Certification, Kahramaa, QCDD
29
10 Pi Insurance
41
11 Our Clients, Suppliers, Testimonials And Approval Letters
43
12 Brands Represent By How United Services W.L.L.
53
13 Evidence Of Employment Of Local Companies/Firms In Existing Contracts
53
14 Evidence Of Compliance With Mandatory Standards For Migrant Workers Welfare
53
15 After Sales Services & Sla 55
3 | P a g e
Company Introduction
How United Services was established in the State of Qatar in 2000 by Interserve UK and Al Darwish
United. Its purpose was to deliver industry-leading Mechanical, Electrical, Power and Maintenance services to a wide range of clients. Throughout the last decade Qatar has witnessed development at an astounding pace and How United Services are proud to be a part of this growth, through the delivery of numerous projects across all spheres of construction ranging from commercial and office buildings, airports, housing and since 2006, also the gas and oil industry. We have worked for blue chip clients such as RasGas, Exxon Mobile and Qatar Airways. We have also supported the construction of Ras Laffan the hub of petrochemical activities in Qatar. We have worked hard to gain the reputation as one of the major MEP companies operating within the Qatari market. Today the company maintains a core of experienced staff and directly employed site operatives numbering over 1200 people. Our work is supported by strategically located staff and operative bases with logistical support provided via central stores, dedicated plant and duct / fabrication facilities. How United Services are totally committed to providing quality assured services to the highest possible health and safety standards. We do this by an uncompromising set of standards and targets. We support and train our workforce in the achievement of these standards and targets and positively reinforce their importance regularly through transparent accountability and discipline. We recognise that our organisation is only as good as the people that represent us and to that end our continued investment in the best qualified, trained and motivated people in their field is the biggest contribution we make to being the best at what we do. Our management team is backed by a well-trained, motivated and committed workforce operating to fully substantive management systems and procedures. As well as formalised business management systems HUS also employ innovation and ingenuity when working closely with our clients to develop, enhance and proactively advance our service capabilities. We are justifiably proud of our track record as the frontrunner in our industry and we are continually working in the best interests of our clients to provide a service that is delivered right, first time, safely and within budget.
4 | P a g e
Our services
Mechanical Services Efficient, well installed & maintained mechanical services are the backbone of any modern building. As such, HUS recognise the importance of delivering the best systems, on time & right first time that meet our clients requirements and provide the best working environment available within the market. HUS has developed a market leading mechanical services capability that provides our client’s with the best mechanical systems suited to their needs within the whole spectrum of the built environment. HUS is fully committed to remaining at the forefront of this progressive industry by following a programme of continuous improvement & investing in the latest technology & working practises. We seek to develop our people to deliver the best possible services to our clients.
Electrical Services
HUS are proud to be Kahramma Grade A licensed contractors a grading that we have held for 12 years. HUS has achieved this by investing in & developing a strong team of highly skilled, qualified & experienced engineers & technicians. Utilising these skills HUS to streamline the installation process & value engineer services can provide our clients with a competitive advantage whilst not compromising quality or performance. By staying at the forefront of new technology, design standards & product development HUS are able to offer cost effective & compliant solutions to
any electrical engineering scenario.
Fire Protection Services By utilising engineers & technicians that are certified by Qatar Civil Defence Department, HUS has a capability to design, install & maintain high quality, compliant fire detection & fire protection systems. HUS’s capability has developed to such an extent that we can deliver a comprehensive range of systems from the most basic fire alarm through to VESDA, gas extinguishing systems & beyond. Senior staff are certified members of NFPA.
Fit-Outs How United services has established itself as a key player in the delivery of high quality, fast track MEP fit out projects throughout all sectors of the industry. We strive to be at the forefront of our industry with a reputation as reliable, top quality performers who lead by example and put words into action. This desire to be the best and to perform at peak output ensures that we continue to gain repeat business with a number of key clients as well as
continually developing new customers. This methodology ensures consistently high standards in workmanship and in achieving the client budget and time constraints.
5 | P a g e
Duct Fabrication Facilities Ongoing investment in the latest technology enables HUS to produce ductwork to a very high standard in a short space of time. HUS have the capability to fabricate GI, Aluminium, Mild Steel, Stainless Steel & Phenolic ductwork & cladding to relevant industry standards. HUS employs a highly skilled, motivated workforce who is continuously trained in latest working practises & standards. The manufacturing environment & modern machinery ensures that customer’s requirements are met in the shortest time frame. HUS enjoys long term successful client relationships with a high
level of repeat business. This provides a strong platform from which to continue to supply a high quality product.
HVAC (Heating, Ventilation and Air Conditioning) The design, installation and maintenance of effective and efficient HVAC systems and controls are a mandatory requirement of modern day building design and function.
Qatar is proving itself to be at the forefront of innovation and expertise in the design and construction of new buildings, HUS is more than able to keep pace with the needs of the construction industry involved in the expanding skyline of our growing nation. Our attention to detail, expertise and experience combined with robust health and safety standards and unrivalled quality systems and initiatives makes HUS one of the best and most sought after HVAC subcontractors in Qatar today.
We are able to both install and design systems that meet current global standards and are proud to have provided these services to a number of iconic projects for blue chip customers and independent traders alike. No job is too big or too little for HUS to handle; we will employ exactly the same methods and standards regardless of the size of the project.
Infrastructure Division HUS Infrastructure is typically engaged in turnkey projects in District Cooling Systems, viz. Energy Transfer Stations (ETS), Pipe Distribution Network (PDN). We offer a complete, accurate and efficient technical solution to our clients with the highest degree of quality. Repeat business from the client for the past 8-9 years continuously proves that our clients are “delighted” with our services and quality of work. We are committed to continuous improvement through new technologies and innovative ways of working. We also enact developments from the “lessons learnt”. The ultimate goal is to help our clients gain, commercially and technically, from the efficient methods we have developed. Our Services Include: • Chilled Water Piping Systems (Pre-insulated & Post insulated) • Energy Transfer Stations including Instrumentation and PLC Control Systems • Hot Tapping • Line Plugging • Flushing & Chemical Treatment of Chilled Water Networks • Fiber Optic Network and Communication Systems
6 | P a g e
Trading Division (How United Trading)
We are an experienced trading company serving the Qatar construction and sports markets. Our capabilities include sourcing and procurement of product that meets the needs of projects involving interior fit-outs, MEP works and sports related products for schools and sports arenas alike. We operate within all areas of the Qatar construction industry.
7 | P a g e
1) Previous project experiences and project list.
Aviation
Project New Doha International Air Port -Air line
Engineering and Office Facilities
Client / Main Con. NDIA / Overseas Bechtel
Duration August 2006 - November 2007
Scope of work NDIA Airline engineering Office 3 levels with
approximate area of 6000M2, Airline
operation facility 2 levels with approximately
area of 6200M2
Value ( approx ) QR 58 million
Education
Project Three Schools Projects In Wakra
Client / Main Con. Three Schools Projects In Wakra
Duration January 2011 - May 2012
Scope of work Construction works at Wakra Elementary
Girls School, Wakra Preparatory Girls School,
Wakra Model School.
Value ( approx ) QR 38 million
Residential
Project Viva Bahriya Tower on the Pearl - Bilal Suite (
VB-10) in the Pearl Qatar
Client / Main Con. AHB / GHD
Duration January 2008 - November 2011
Scope of work Viva Bahriya Tower on the Pearl Island with
2B+G+22 in liaise with Gulf Contracting and
consultant GHD
Value ( approx ) QR 85 million
Specialist Division
Project Qatar Transmission System Expansion, Phase
IX Substations
Client / Main Con. SIEMENS / Energo Project
Duration May 2010 - July 2014
Scope of work MEP
Value ( approx ) QR 240 million
8 | P a g e
Industrial
Project Nakilat
Client / Main Con. Royal Haskoning / Erhama Bin Jaber Al
Jalahma Shiptard Port
Duration February 2012 - January 2013
Scope of work The Construction of Erhama Bun Haber Al
Jalahma Shipyart Port of Ras Laffan
Value ( approx ) QR 13.9 million
Oil & Gas
Project Barzan Onshore Project
Client / Main Con. Ras Gas / JGC
Duration Aug 2012 - Feb 2014
Scope of work Operation building (BXK -02) and BSS 203/
BSIH 203 at Barzan Onshore project for Ras
Gas/ JGC
Value ( approx ) 26.5 million
Health and Fitness
Project Aspire Logistic – Construction of Fitness Center
Client / Main Con. THE SPORT CITY / GCC
Duration 07 months
Scope of work Installation and completion of MEP associated works.
Value ( approx ) QR 18.5 million
Leisure
Project Doha Beach Villa
Client PEO
Duration Aug 2012 - Mar 2014
Scope of work Supply, Delivery, Installation and completion
of MEP associated works.
Value ( approx ) QR 36 million
Project 5 Stars Hotel Project
Client / Main Con. Sh/ Khalid Al Thani / Redco ( Main Con.)
Duration 58 weeks (2016)
Scope of work MEP Services associated with the
construction.
Value ( approx ) QR 67.5 million
9 | P a g e
Various Banks projects
Bank Name HSBC
Projects in Numbers 11 projects
Overall Value (Approx) QR 15 millions
General Scope of Works MEP works & Fit Out works, building services, fire protection suppression systems
Major Projects Approx. Value (in QR)
HSBC at Airport road 10 million
HSBC at Salwa road 2.5 million
Bank Name QIB
Projects in Numbers 5 projects
Overall Value (Approx) QR 4.7 millions
General Scope of Works MEP works & Fit Out works, building services, fire protection suppression systems
Major Projects Approx. Value (in QR)
QIB Muaither Branch 1.9 million
QIB Umm Salal Branch 1 million
Apart from these projects HUS also have work with Doha Bank, Ahli Bank and Standard Chartered Bank
on similar projects.
Bank Name QNB (Qatar National Bank)
Projects in Numbers 108 projects
Overall Value (Approx) QR 56 millions
General Scope of Works Full MEP works & Fit Out works for several newly established branches, fire protection works, building services.
Major Projects Approx. Value (in QR)
QNB HQ 5th
floor 5.5 million
QNB HQ 4th
floor 1.4 million
QNB HQ 3rd
floor 1.3 million
QNB HQ 2nd
floor 1.2 million
QNB at Al Mathaf 4.1 million
QNB at ‘C’ Ring road (Credit Card, Conventional, Islamic Branch)
1.4 million
QNB Al Khor Branch 1.7 million
QNB HQ groud floor 1.5 million
Bank Name CBQ (Commercial Bank of Qatar)
Projects in Numbers 29 projects
Overall Value (Approx) QR 41 millions
General Scope of Works MEP works including electrical modification, add power requirements. Fit Out works, fire protection works, fire suppression systems, building services.
Major Projects Approx. Value (in QR)
CBQ Data Center –Al Safa Rayan branch 2nd
floor 11.9 million
CBQ Shell and Core works at Umm Lokhba 9.1 million
CBQ at D’ Ring road 4.5 million
CBQ all branches & ATMs 2.2 million
CBQ Umm Lokhba Fit Outs 2.5 million
10 | P a g e
Qatar Cool/ Infrastructure Projects District Cooling/ Energy Transfer Stations (ETS)
Qatar Cool / Infrastructure Projects Scope
Energy Transfer Station (ETS) & Associated works
Projects Approx. Value
1 VB towers at the Pearl Qatar 8.1 million
2 Jasmiya Tower - West Bay 1.8 million
3 Sahara Tower, Al Baker Tower, Twin Palm Tower, Navigation Tower & Saeed Al Misnad Tower.
13 million
4 Al Fardan Tower, Al Alayan Tower, Al Nour Tower, Gate Tower, Salam Plaza, Dubai Tower, Al Majed Tower, Yohan Tower.
18 million
5 the Qanat Quartier Within the Pearl Qatar & 1 No Customer Building at Viva Bahriya VB10 within the Pearl Qatar.
11.5 million
6 2 Nos Customer Building at Woqod Tower & Rames Tower at West Bay.
3.4 million
7 Viva Bahriya development at The Pearl Qatar VB11,VB17 and VB29.
3.8 million
8 Energy Transfer Stations works at The Pearl Qatar Marsa Malaz
2.4 million
9 Energy Transfer Stations works at The Pearl Qatar PA 11B 1.2 million
10 Energy Transfer Stations works at The Pearl Qatar PA 13 A , PA 13 B
1.4 million
11 Energy Transfer Stations works at The Pearl Qatar AQ-01 & AQ -02
5.4 million
12 Energy Transfer Stations works at West Bay Bin Samikh tower
1.8 million
13 Energy Transfer Stations works at West Bay Bin Samikh tower
4.0 million
14 District cooling Modification works to TSE Supply at P1 & P2 9.2 million
15 The Pearl Qatar PDN Cleaning works 6.3 million
16 AL ERKYAH DEVELOPMENT Project – Construction of Infrastructure District Cooling at Lusail Development
1.9 million
Palm Tower
Dubai Tower
Al Fardan Tower The Pearl Qatar – VB towers
Salam Plaza
11 | P a g e
Hot Tapping Projects
Project Client/Consultant Year Description Al Baker Tower ETS Installation
Qatar Cool
2008
Supply and installation of pre –
insulated pipe within excavated trenches, supply and installation of post insulated pipe above ground, c/w all pipe accessories, welding by our in-house certified welders, X-ray testing of pipe welds, flushing and cleansing of pipe. Supply and installation of plate heat exchanger, associated PLC controls, final Testing & Commissioning.
Navigation Tower ETS Installation
Al Noor Tower West Bay pipe distribution network for chilled water
Palm Twin Tower ETS Installation
Al Misnad Tower ETS Installation
Sahara Tower ETS Installation
Al AAyan Tower ETS Installation
AL Nour Tower ETS Installation
Gate Tower ETS Installation
Salam Tower ETS Installation
Dubai Tower ETS Installation
Yohan Tower ETS Installation
Al Majeed ETS Installation
10 No. ETS Installation at The Pearl Qatar Quant Quarter QQ1 2,3,5A,5B,6A,6B,7,8,9B
10 No. ETS Installation at The Pearl Qatar VB2,5,20,21,22,23
Ras Laffan Industrial City Air Liquide (France)
Air Liquide (France)
2008
Supply and Installation of coated pipe within excavated trench and installation of pipe above ground c/w all pipe accessories. Welding carried out by our in-house certified welders. Ultrasonic testing of welds, flushing & cleansing of pipe. Final connection to process equipment carried out by client, Air Liquide (France).
Shk Mhd Tower west Bay pipe distribution network for chilled water
Qatar Cool
2008
Liaison with Ashghal to obtain road opening permit, detailed location identification of existing services, road excavation to locate existing chilled water pipe, cut into existing chilled water pipe with Hot Tapping machine, provide new Hot Tapp valve, supply and installation of pre-insulated pipe within excavated trench, terminate pipe within new valve chamber within side walk. Welding by in house certified welders, X-ray testing of pipe welds, flushing & cleansing of pipe with final Testing & Commissioning.
Dubai Tower West Bay pipe distribution network for chilled water
Hot Tapping work for Rames Tower 2013
Rabban Tower West Bay pipe distribution network for chilled water
Commercial Twin Towers pipe distribution network for chilled water
2013
Al Jassmiya Tower pipe distribution network for chilled water
2011
Abraj Quartier AQ1 & AQ2 tower at The Pearl Qatar 2015
Al Asmakh tower at West Bay 2015
Rabban Tower at West Bay 2015
Qatar Cool P1 & P2 TSE Modifications 2015
Lusail Express Way Hyundai 2014 Pipe distribution works.
Al Erkiya Development Bin Omran 2015 Pipe distribution works.
12 | P a g e
Project Completed in last 5 years (> 2 million QAR)
Project No
Project Title Client Project Value >2million in '000' QAR
M08010 Bilal Tower Gulf Contracting Co. W.L.L 87,447
M10061 Phase IX Substations Gulf Contracting Co. W.L.L 59,886
M11093 Aspire Zone new offices Gulf Contracting Co. W.L.L 46,452
138-2005
NDIA Airline Engineering Office Gulf Contracting Co. W.L.L 42,500
M10142 Wakra Schools Gulf Contracting Co. W.L.L 33,829
M13081 American School of Doha expansion Rabban Stefanutti Stocks LLC 31,422
M12072 Barzan building works Gulf Contracting Co. W.L.L 28,710
M11079 Nakilat Phase 5 Gulf Contracting Co. W.L.L 25,786
M12019 Hisong substations Gulf Contracting Co. W.L.L 18,700
M11027 Fox Hill residential apartment Gulf Contracting Co. W.L.L 15,018
M14057 Grand Hamad Avenue Substation & Multi Storey Car Park Building
Gulf Contracting Co. W.L.L 12,728
M12066 Qatar Steel MEP works Gulf Contracting Co. W.L.L 11,524
M12092 Lusail expressway CHW works Hyundai Engineering & Construction Company
10,044
M13066 Barzan - Package 2 Gulf Contracting Co. W.L.L 9,255
M14030 Al Jazeera Centralised TX Refurb Works Amar Construction W.L.L. 8,573
M12020 NDIA Mockup warehouse works Gulf Contracting Co. W.L.L 8,514
M13078 Doha Festival City - GCC Gulf Contracting Co. W.L.L 8,079
M14031 Ras Umm Leigi Beach Villa Bluu Qatar L.L.C. 7,600
M15002 SPA Project at Dafna Redco Construction-Almana 7,415
M13021 QMA New office building Tower 2 Al Mana Maples W.L.L 5,598
M15001 Two ETS AQ-01 & AQ-02 in the Pearl-Qatar Qatar Cool (Qatar District Cooling Co.)
5,469
M15038 MEC Lusail Project Bluu Qatar L.L.C. 4,698
M12064 Doha College FM 2012-14 Doha College 4,535
M12081 QSTEC Substation Gulf Contracting Co. W.L.L 4,442
M14086 Qatar Cool TSE Plant 1 & 2 Qatar Cool (Qatar District Cooling Co.)
4,287
M12112 Al Maha new office bldg Al Maha Group Holding 4,201
M12106 Qatalam substation Gulf Contracting Co. W.L.L 4,090
M13067 Al Jazeera Network Cafe Salam Industries W.L.L 3,853
M12078 ACS School FM ACS International School 3,527
M13077 Palm tower fit out works Bluu Qatar L.L.C 3,375
M16001 Hassad Foods Bluu Qatar L.L.C. 3,277
M12115 QP Petrochem Lab - QSTP Kinnarps Project Solutions 2,872
M12082 Naeeja substation Gulf Contracting Co. W.L.L 2,721
M14089 QFB Private Banking Club Interspace 2,679
M08080 Al Majed Tower Qatar Cool (Qatar District Cooling Co.)
2,670
M11096 Al Baker tower ETS Qatar Cool (Qatar District Cooling Co.)
2,560
M13085 Tornodo Tower SCB Kinnarps Project Solutions 2,541
13 | P a g e
M14010 Marsa Malaz - TPQ Qatar Cool 2,519
M13027 CBQ Plaza AKC AKC Contracting & Supply 2,490
M15070 Qatar Airways School Gulf Contracting Co. W.L.L 2,366
M15040 QIB Salwa Road Interspace 2,346
M13079 Ooreedo fitout 23 and 25 floors Bluu Qatar L.L.C 2,297
M13047 OOREDOO Levels 20-22 MEP Fitout works Bluu Qatar L.L.C. 2,102
14 | P a g e
Project on going (> 2 million QAR)
Project Number
Project Title Client Contract Value ('000' QAR)
M12008 Beach Villa DARA Engineering Consultants W.L.L.
34,153
M14019 Thermal Energy Storage Tanks Qatar Cool (Qatar District Cooling Co.)
1,539
M14032 Al Jazeera 360 Studio Gulf Contracting Co. W.L.L 19,531
M14059 Madina New Substation Madina Group W.L.L 719
M14069 Al Erkyah District Cooling Network Bin Omran Trading & Contracting W.L.L.
8,887
M14073 CBQ -GHS Fire & Safety Improvements MEP Works
AKC Contracting & Supply 4,481
M14080 ETS at Porto Arabia (PA 13A & PA 13B) - The Pearl Qatar
Qatar Cool (Qatar District Cooling Co.)
2,853
M14083 PDN Pearl Qatar - Cleaning Works Qatar Cool (Qatar District Cooling Co.)
8,570
M14087 QNB MOF Building Interspace 15,870
M15015 Marine Restaurent at Katara Redco Construction-Almana 11,307
M15025 CBQ @ Al Ruwais AKC Contracting & Supply 4,535
M15028 Modification works at QNB capital Interspace 138
M15035 Foxhills CDD Works Gulf Contracting Co. W.L.L 1,407
M15036 Rabban Suites ETS Qatar Cool (Qatar District Cooling Co.)
1,613
M15048 QIB Fanar Interspace 3,229
M15050 QIB Rayyan Interspace 2,069
M15051 Qatar Executive FBO Terminal Refurbishment Works
Interspace 4,121
M15056 QIB Q-Mall Interspace 1,188
M15061 Sewage Treatment Plant Works extension no.05
Gulf Contracting Co. W.L.L 7,032
M15071 5 Stars Hotel Redco Construction-Almana 67,616
M16005 QNB North Gate Mall Interspace 1,351
M16007 Bluu-Moon Island Villa at Pearl Qatar Bluu Qatar L.L.C. 17,837
M16008 Phase 12 NCC Substation Gulf Contracting Co. W.L.L 37,000
M16017 NDIA Cargo Cold Store Gulf Contracting Co. W.L.L 6,431
M16018 Salam Studio & Store @ Mall Of Qatar Salam Industries W.L.L. 10,492
M16020 Residential Building at Al Sadd (B+G+4+R) Gulf Design Architects 4,725
M16021 CW Pipeworks @ HIA Hamad International Airport 849
M16023 CBQ-Grand Hammad Avanue Branch Interspace 261
M16024 BVLGARI shop at Mall of Qatar Permasteelisa Gartner Qatar LLC
1,354
M16025 QIB DFC Branch Interspace 498
M16027 Oredoo outlets at North Gate Mall- DFC- Mall of Qatar and Barwa City
Interspace 1,247
M16028 QIB HIA Branch Gulf Contracting Company W.L.L.
50
M16029 Hawar Group: Commercial Development and Villa at Legtaifiya
Gulf Design Architects 14,783
15 | P a g e
M16031 QNB at DFC Interspace 644
M16032 HIA - Temporary Handling Facility Six Construct Qatar Limited W.L.L 7,700
M16033 ETSs for 4 Nos. Doha Metro Stations and PA10A & 12A Towers
Qatar Cool (Qatar District Cooling Co.)
7,792
M16034 DFC Fire Detection Installation to Vacant Tenancies
GCC-ALEC JV 3,035
M16035 Delsey and Kipling Shops at DFC Salam Enterprises 264
M16036 CBQ Le Boulevard Branch AKC Contracting & Supply 2,078
17 | P a g e
3) Staff and Operatives List.
Title Nos
General Manager 1
Deputy General Manager 1
Commercial Manager 1
Estimation Manager 1
Contracts Manager 1
Maintenance & FM Manager 1
Finance & Administration Manager 1
Business Contacts Manager 1
Senior Projects Managers 2
Projects Managers 7
Accounts 7
Administration 3
Human Resources 2
Site Administrators 7
PRO's 4
Health & Safety 22
QA/QC 10
Planning Engineer 3
I.T 5
Estimation 11
Purchasing 6
Quantity Surveyor 6
CAD Draughtsmans 9
Transport 2
Facilities Management 51
ELECTRICAL
A Senior Electrical Engineers
B Electrical Engineers 6
MECHANICAL/HVAC 2
A Senior Mechanical Engineers
B HVAC Engineers 4
PLUMBING & DRAINAGE 9
A Senior Plumbing Engineers
B Plumbing Engineers 3
SYSTEM ENGINEER FOR ELV & FIRE FIGHTING SYSTEM 8
A Senior Fire Systems Engineer
B Fire Alarm Engineers 1
C Fire Fighting Engineers 4
D ELV Manager 4
E Senior ELV Engineer 1
F ELV Engineer 1
Total 209 1
Numbers of Operatives 943
18 | P a g e
4) Design capability (in-house and external).
In House capability utilising HEVACOMP / BENTLEY design software.
Experienced engineers working to British & American Standards.
Full output of 3D Modelling / Calculations / Tentative Equipment layouts.
Ease of site changes (WCR’s) between Client & Provider.
Full control of value engineering, providing cost effective alternatives, in compliance with Client preferred
suppliers / life cycle cost calculations.
5) Fabrication, manufacturing facilities and location. Duct shop fabrication facilities and assembly yard.
6) Schedule of Plant & Equipment holding, whether owned, leased or hired. 80 % of the equipment’s are owned by the company, and in perfect condition. Date of manufacture details are various from item to item.
(xiii) List of Equipment and Resources (if applicable). Quantity
Hydraulic crimping tools
Manual crimping tools
Cable winch manual electrical and diesel powered
Acetylene cylinders 40ltr
Oxygen cylinders 40ltr + Gauges with hose full
Oxygen & acetylene small cylinder (portable) +set
Argon cylinders +LPG gas cylinder
Duct shop tools
Bench drills big bench wise & drainage cameras
Air flow meter & testing equipment
Cable stands
Welding plants
Electric powered hand tools
Threading grooving cutters stands & hole saw cutters
Lifting & pulling equipment
Ladders & Scaffoldings
Conduit pipe benders
Containers
High pressure cleaners vacuum cleaners & vacuum pumps (HVAC)
Special testing equipment with eng. marlou
Nitrogen cylinders
Trucks
Pickups ( Facilities Managements )
18
06
06
18
41
09
03
29
06
76
10
56
792
41
24
340
47
16
18
04
10
12
22
19 | P a g e
7) O&M capability.
How United Services are fully appreciative of the importance of providing O&M documentation and record drawings to coincide with the handover of the project.
Depending on the size and how complicated the project is we would either prepare them in-house or subcontract to a specialist organisation. The process of accumulating information and wiring diagrams specific to the plant and equipment to be installed on the project is initiated at the time of order. At the same time the draft manual can be prepared based on the specification and drawings and amended ongoing during the project to reflect variations to the installation, omissions and additions.
A parallel exercise is carried out with preparing record drawings, a set of working drawings are retained in isolation to the drawings used for installation, these drawings reflect variations to the installation and as areas of the building are completed the relevant drawings are amended and recorded as installed drawings.
The process is continual throughout the life of the project with key dates identified on the programme identifying latest information to be available from suppliers/manufacturers, access to completed areas to record serial numbers and information from plant and equipment, issue of draft manual for comments and/or approval. The only section that cannot be incorporated until completion of the project are the commissioning data sheets, we would lease closely with our commissioning of the project and preparation of the results for incorporation into the manuals.
44 | P a g e
How United Services Top 20 Suppliers
Elsewedy Cables Qatar
Laffan Trading & Contracting W.L.L.
Electro Trade Company W.L.L.
Arabian Link Trading
Petra Air Conditioning Equipment Company
Khalid Manufacturing Company
Qatar Insulation Company W.L.L.
Jersey Engineering & Trading Company
Rodha Khalid Co.
KBE Gulf L.L.C. (Qatar)
Aljabor Trading Company
Nabina Ceramic
Chubb Fire Qatar
NAFFCO
Gulf Lights Electrical Engineering W.L.L.
Jaidah Motors And Trading Company
Mannai Trading Company W.L.L.
Fire Link W.L.L.
Cube Light W.L.L.
Trade House Qatar Co. W.L.L.
54 | P a g e
12) Brands represent by How United Services W.L.L.
HUS trading division represent CLICK brand by Scolmore Group U.K. Scolmore is a company based in UK
which is provide high quality electrical accessories.
13) Evidence of employment of local companies/firms in existing contracts.
HUS currently self-delivers the majority of its operations in the Country. Where specialist contractors are required we appoint through a rigorous approval process inclusive of HSE, Quality and capability deliverables.
14) Evidence of compliance with mandatory standards for migrant workers welfare.
HUS is currently in the process of upgrading their camps to comply with migrant worker welfare standards and have undertaken a number of inspections by the ministry of labour where our camps where found to be satisfactory.