P-8A Variable Stator Vane (VSV) HPC Corrosion – History and Mitigations ADF Propulsion Systems Symposium 17 October 2018 Jonathan Speedy P-8A P&P IPT Lead AIR-4.4.1.1 Systems Engineering Branch Distribution Statement A – Approved for public release; distribution is unlimited, as submitted under NAVAIR Public Release Authorization 18-866.

P-8A Variable Stator Vane (VSV) HPC Corrosion – History

  • Upload
    others

  • View
    15

  • Download
    1

Embed Size (px)

Citation preview

Page 1: P-8A Variable Stator Vane (VSV) HPC Corrosion – History

P-8A Variable Stator Vane (VSV) HPC Corrosion – History and Mitigations

ADF Propulsion Systems Symposium

17 October 2018 Jonathan Speedy P-8A P&P IPT Lead AIR-4.4.1.1 Systems Engineering Branch

Distribution Statement A – Approved for public release; distribution is unlimited, as submitted under NAVAIR Public Release Authorization 18-866.

Page 2: P-8A Variable Stator Vane (VSV) HPC Corrosion – History

Overview

2

US Navy P-8A program has experienced 8 engine (CFM56-7B27) removals due to VSV system

damage and binding

Failed VSV pull-check performed by field team drove removal of 2 engines (24 NOV 14) Fractured VSV lever arm (15 APR 15) Bent VSV lever arm (26 AUG 16) Multiple bent/disengaged lever arms (7 NOV 17) Distorted actuation ring and partially disengaged lever arms (8 MAR 18) 1 Broken and 10 disengaging lever arms (6 APR 18) Multiple bent/disengaged lever arms (30 AUG 18)

Lever arm disengagement and failures due to stator vane seizure in HPC case Potential for engine stall Vane seizure can progress to HPC rotor failure (Non-Recoverable In-Flight Shutdown)

Root Cause HPC VSV borehole corrosion

Unique P-8A low level marine operation results in increased salt and moisture exposure

Commercial world spends very little time at low altitude Much higher utilization rate per aircraft Not stationed along coast

Distribution Statement A – Approved for public release; distribution is unlimited, as submitted under NAVAIR Public Release Authorization 18-866.

Page 3: P-8A Variable Stator Vane (VSV) HPC Corrosion – History

Event Findings - External

3

Engineering Investigation EI conducted on 4 of the engines at CFM shop. Multiple examples of damage and disengagement observed along the VSV system

Disengaged lever arm

Fractured lever arm and missing actuation ring bushing

Bent/Distorted lever arm

Fractured 2nd Stage VSV actuation ring

Distribution Statement A – Approved for public release; distribution is unlimited, as submitted under NAVAIR Public Release Authorization 18-866.

Page 4: P-8A Variable Stator Vane (VSV) HPC Corrosion – History

Event Findings - Internal

4

Engineering Investigation Severe corrosion build up in VSV borehole of the HPC Case found on all four engines

Particularly stage 2

External View of HPC Case

Internal View of HPC Case

Distribution Statement A – Approved for public release; distribution is unlimited, as submitted under NAVAIR Public Release Authorization 18-866.

Page 5: P-8A Variable Stator Vane (VSV) HPC Corrosion – History

VSV System Operation

The Variable Stator Vane system positions the HPC stator vanes to the appropriate angle to optimize efficiency and improve stall margin.

The VSV actuators provide an output force and motion to the VSV system

This force is transferred to the vane actuation rings via the bellcrank assembly

The actuation ring halves rotate circumferentially about the horizontal axis of the compressor

Movement of the rings is transmitted to the individual vanes, through vane actuating levers.

5 Distribution Statement A – Approved for public release; distribution is unlimited, as submitted under NAVAIR Public Release Authorization 18-866.

Page 6: P-8A Variable Stator Vane (VSV) HPC Corrosion – History

VSV System Operation – Cont.

6

LEVER ARMS VANES

Distribution Statement A – Approved for public release; distribution is unlimited, as submitted under NAVAIR Public Release Authorization 18-866.

Page 7: P-8A Variable Stator Vane (VSV) HPC Corrosion – History

Failure Mode Severe corrosion build up in VSV borehole leads to interference fit of VSVs and

increased force required to actuate system. As corrosion builds, vane stem clearance is reduced

Over time, required force to open vanes increases

Can lead to damage of VSV system lever arms and actuation ring

7 Distribution Statement A – Approved for public release; distribution is unlimited, as submitted under NAVAIR Public Release Authorization 18-866.

Page 8: P-8A Variable Stator Vane (VSV) HPC Corrosion – History

Failure History Summary

8

VSV Failure Date ESN Calendar Time

to VSV Failure TSN CSN

Dec 2014 362114 2.8 2742 3149 Dec 2014 362115 2.8 2742 3149 Apr 2015 362135 2.0 1683 998 Aug 2016 362122 3.9 3091 2483 Oct 2017 362123 5.0 4011 3557 Mar 2018 362124 5.4 4258 3714 Apr 2018 362121 5.6 4181 3234 Aug 2018 362173 3.7 3129 ~2000

Distribution Statement A – Approved for public release; distribution is unlimited, as submitted under NAVAIR Public Release Authorization 18-866.

Page 9: P-8A Variable Stator Vane (VSV) HPC Corrosion – History

9

0500

10001500200025003000350040004500

362114 362115 362135 362122 362123 362124 362121 362173

TSN

(EFH

)

ESN

TSN (EFH)

0500

1000150020002500300035004000

362114 362115 362135 362122 362123 362124 362121 362173

CSN

ESN

CSN

0

1

2

3

4

5

6

362114 362115 362135 362122 362123 362124 362121 362173

Year

s

ESN

Calendar Time to VSV Failure

Failure History Summary -Metrics

Distribution Statement A – Approved for public release; distribution is unlimited, as submitted under NAVAIR Public Release Authorization 18-866.

Page 10: P-8A Variable Stator Vane (VSV) HPC Corrosion – History

Failure Distribution

10 Distribution Statement A – Approved for public release; distribution is unlimited, as submitted under NAVAIR Public Release Authorization 18-866.

Page 11: P-8A Variable Stator Vane (VSV) HPC Corrosion – History

Mitigation History Original 500 FH recurring hot water engine wash interval reduced to 100

FH with revised dry out procedure in May 2015 Core engine wash to remove salt deposits and inhibit corrosion growth

General visual inspection of VSV hardware added to maintenance

requirement at wash interval Inspect for broken, bent, or disengaged lever arms and actuation rings

Age Exploration Bulletin released Aug 2015 to evaluate effectiveness of

these updated maintenance procedures Detailed inspections on six aircraft performed pre and post-wash to determine

effectiveness of implemented changes Wash and inspection interval relaxed to every A-check (every 90 days) for AEB

aircraft in September 2016 100 FH interval relaxed to align with A-checks fleet wide based off AEB results in

July 2017

11 Distribution Statement A – Approved for public release; distribution is unlimited, as submitted under NAVAIR Public Release Authorization 18-866.

Page 12: P-8A Variable Stator Vane (VSV) HPC Corrosion – History

Current Maintenance Requirements At every A-Check:

Hot water engine wash General visual inspection of VSV hardware

Any missing actuation ring bushings can be repaired on-wing and do not

drive an engine removal 3 missing bushings: No action required 4 missing bushings: Replace bushings within 200 cycles 5 or more missing: Replace bushings immediately Evaluating further actions if >10 bushings found missing

Any broken, bent, or disengaged lever arm or actuation ring results in

engine removal 5 engines to date removed as a result of inspection findings

12 Distribution Statement A – Approved for public release; distribution is unlimited, as submitted under NAVAIR Public Release Authorization 18-866.

Page 13: P-8A Variable Stator Vane (VSV) HPC Corrosion – History

Implementation of SermeTel corrosion inhibiting coating Design solution to eliminate VSV seizure failure mode

Production cut-in and depot incorporation

Currently applying SermeTel coating to HPC forward stator cases at depot shop visit regardless of reason for removal All USN engines that have been through depot to date have received SermeTel

coating Production cut-in for all CFM56-7B27AE began Nov 2017 P-8A aircraft began delivery with SermeTel coated engines May 2018

SermeTel Incorporation

Cleaned HPC FWD stator case with

SERMETEL applied to the VSV boreholes

SERMETEL application location highlighted in red

13 Distribution Statement A – Approved for public release; distribution is unlimited, as submitted under NAVAIR Public Release Authorization 18-866.

Page 14: P-8A Variable Stator Vane (VSV) HPC Corrosion – History

Forced Retrofit during Aircraft Depot Visits Early lot engines are being forced retrofit with SermeTel

Sub-population selected due to time in fleet prior to washing being incorporated. The retrofit aligns with scheduled airframe depot schedule to avoid aircraft down

time

SermeTel – Forced Retrofit

14 Distribution Statement A – Approved for public release; distribution is unlimited, as submitted under NAVAIR Public Release Authorization 18-866.

Page 15: P-8A Variable Stator Vane (VSV) HPC Corrosion – History

SermeTel Concurrent with Aircraft Depot Inductions

A/C MRO to remove, ship engine(s) to Engine MRO, and reinstall

A/C inductEngine(s) Removal PHST To Eng Depot

Engine Acceptance

Engine Reinstall

Engine Turn FCF

Engine Acceptance Case Removal & Sermetal Case Reinstall & Engine Turn PHST to Depot

Engine MRO accept, retrofits and ships engine back to A/C MRO – ~ 60 days turn-around times per RFP

• Expect ~30 with rotatable case pool

0-3 (CONUS) ; 10-15 (OCONUS)

Duration (days)

2-10 1 1 Prep for Shipment + 0-3 (CONUS); 10-15 (OCONUS) Duration (days)

1 1 1 1 Duration (days)

25-48

2 15 Distribution Statement A – Approved for public release; distribution is unlimited, as submitted under NAVAIR Public Release Authorization 18-866.

Page 16: P-8A Variable Stator Vane (VSV) HPC Corrosion – History

SermeTel corrosion inhibiting coating Aluminum-ceramic coating that can resist the heat of operation while retaining its

ability to provide sacrificial corrosion protection positive field experience on Naval based aircraft and marine engines

Used in similar application on F414 engines

Meets Mil-Specs

Why SermeTel

16 Distribution Statement A – Approved for public release; distribution is unlimited, as submitted under NAVAIR Public Release Authorization 18-866.

Page 17: P-8A Variable Stator Vane (VSV) HPC Corrosion – History

17

Questions?