7/29/2019 OWN000204 BSC6800 System Commissioning ISSUE3.0
1/40
BSC6800 System Commissioning
7/29/2019 OWN000204 BSC6800 System Commissioning ISSUE3.0
2/40
Review
BSC6800 system commissioning includes loading
commissioning, License commissioning, and
interface and service commissioning that
ultimately bring the system into normal operation
after the hardware installation and software
installation .
7/29/2019 OWN000204 BSC6800 System Commissioning ISSUE3.0
3/40
Objectives
Master the loading commissioning,
License commissioning, and interfaceand service commissioning .
Upon completion of this course,you will be able to:
7/29/2019 OWN000204 BSC6800 System Commissioning ISSUE3.0
4/40
References
31041209-BSC6800 Installation Manual - System
Commissioning (V1.20)
7/29/2019 OWN000204 BSC6800 System Commissioning ISSUE3.0
5/40
Course Contents
Overview
Loading Commissioning
Feature Commissioning
Interface and Service Commissioning
7/29/2019 OWN000204 BSC6800 System Commissioning ISSUE3.0
6/40
Prerequisite
Preparing Delivery-Attached Manuals
Checking Hardware
Checking Software
Checking Network
Checking Configuration Data
Checking Peer Equipment
7/29/2019 OWN000204 BSC6800 System Commissioning ISSUE3.0
7/40
Prerequisite
Hardware Installation check
Hardware installation check
DIP switch and jumper check
7/29/2019 OWN000204 BSC6800 System Commissioning ISSUE3.0
8/40
Prerequisite
Software Installation check
Object No. Item Result Remark
Operating
system
1 Windows 2000
Server?
Y [ ] N [ ] If no, install the operating system according to Appendix
A in Huawei BSC6800 WCDMA Radio Network
Controller Installation ManualSoftware Installation.
2 SP4 patch installed? Y [ ] N [ ] If no, install/upgrade the patch according to Appendix A
in Huawei BSC6800 WCDMA Radio Network Controller
Installation Manual
Software Installation.
SQL Server 3 SQL Server 2000
Standard Version?
Y [ ] N [ ] If no, install the SQL Server according to Appendix A in
Huawei BSC6800 WCDMA Radio Network Controller
Installation ManualSoftware Installation.
4 SP3 patch installed? Y [ ] N [ ] If no, install/upgrading the patch according to Appendix A
in Huawei BSC6800 WCDMA Radio Network Controller
Installation ManualSoftware Installation.
5 SQL Server started? Y [ ] N [ ]
BAM software 6 BAM version right? Y [ ] N [ ]
7 BAM Server started? Y [ ] N [ ]
8 Files to be loaded in
specified directory?
Y [ ] N [ ]
LMT software 9 LMT version right? Y [ ] N [ ]
7/29/2019 OWN000204 BSC6800 System Commissioning ISSUE3.0
9/40
Prerequisite
Network Communication check
Object No. Item Result Remark
Network
configuration
of BAM
Server
1 Network adapters
teamed?
Y [ ] N [ ] If no, team the network adapters according to Appendix A
in Huawei BSC6800 WCDMA Radio Network Controller
Installation ManualSoftware Installation.
2 IP setting right? Y [ ] N [ ]
Networkconfiguration
of LMT
computer
3 IP setting right? Y [ ] N [ ]
Internal
network
4 BAM and WMPU in
normal
communication?
Y [ ] N [ ]
External
network
5 LMT and BAM in
normal
communication?
Y [ ] N [ ]
7/29/2019 OWN000204 BSC6800 System Commissioning ISSUE3.0
10/40
Procedure
system commissioning procedure
Start
Loading
commissioning
Feature
commissioning
Interface and service
verifying
End
7/29/2019 OWN000204 BSC6800 System Commissioning ISSUE3.0
11/40
Course Contents
Overview
Loading Commissioning
Feature Commissioning
Interface and Service Commissioning
7/29/2019 OWN000204 BSC6800 System Commissioning ISSUE3.0
12/40
Introduction
loading commissioning procedure
Start
Generatedata
f iles
LoadFAM
sof tware
End
Setloadingchannel
Checkloading
7/29/2019 OWN000204 BSC6800 System Commissioning ISSUE3.0
13/40
Introduction
FAM software loading channel
Program files
Data files
WMPU
Boards in WRBS
WMUX/WSPU
BAM
WRSS
WRBS
Other boards in WRSS
7/29/2019 OWN000204 BSC6800 System Commissioning ISSUE3.0
14/40
Setting Loading Channel
The loading channel is a LMT-BAM-WRSS-WRBS channel
Setting BAM-WRSS Channel
Carry out SET WMPUIP to set the external IP address of the
WMPU
Setting Routes for BAM (default)
Route No. Network address Netmask Gateway address Interface Metric
1 80.0.0.0 255.0.0.0 10.121.A.C 10.121.A.B 1
2 192.1.0.0 255.255.0.0 10.121.A.C 10.121.A.B 1
7/29/2019 OWN000204 BSC6800 System Commissioning ISSUE3.0
15/40
Generating Data Files
The program files have come into being in the BAM Server
since BAM software installation. You need generate the data
files for loading
You may prepare a Man Machine Language (MML) script of
the configuration data (data script) and then generate datafiles from the script for loading in offline mode
checking Data script
Data Script Execution
Carry out FMT DATA to generate the data files for loading
7/29/2019 OWN000204 BSC6800 System Commissioning ISSUE3.0
16/40
Generating Data Files
Host software of the WRSS
BoardHost software
WMPU MPUB.VFS
WNET NETB.VFS, CLKC_LOG.VFS
WLPU LPUBGFI.VFS
WHPU WHPU750.VFS, WHPU1200.VFS, WHPULOGC.VFS, WHPUWC.VFS
7/29/2019 OWN000204 BSC6800 System Commissioning ISSUE3.0
17/40
Generating Data Files
Data file of the WRSS
The data file to be loaded to the WRSS is BNET.dat. When you
prepare a load data file, BNET.dat will be created and saved in
the new folder Config under the directory LoadDATA
To load a data file to the WRSS is right to load BNET.dat to the
WMPU
7/29/2019 OWN000204 BSC6800 System Commissioning ISSUE3.0
18/40
Generating Data Files
Host software of the WRBS
BoardHost software
WMUX B00MUX0.bin
WSPU B00SPU0.bin
WSPUb B00EPU0.bin
WFMR B00FMR0.bin, B00FMR0.dsp
WXIE B00XIE0.bin
WOSE/WOME B00OIE0.bin
WBIE/WTIE B00BIE0.bin
7/29/2019 OWN000204 BSC6800 System Commissioning ISSUE3.0
19/40
Generating Data Files
Data file of the WRBS
The data file of the BSC6800 system is stored as ".dat" file in
the BAM server, When receiving a data load request from a
board subsystem, the server will load the corresponding data file
to the subsystem
Such data files include the configuration data that will be stored
on the WMUX or on the WSPU
The file name of the data file is in the format of HXYABCN.dat
7/29/2019 OWN000204 BSC6800 System Commissioning ISSUE3.0
20/40
Loading FAM Software
Setting Loading Mode of Program File
Carry out SET LODPARA . Select "WRSS or "WRBS" for
[Subrack Type] and "FLWF (FORCEDLY LOAD AND WRITE
FLASH)" for [Host code load control]
The program files will be loaded from the BAM Server and
written to the Flash Memory of the corresponding boards when
the boards start or reset.
7/29/2019 OWN000204 BSC6800 System Commissioning ISSUE3.0
21/40
Checking Loading
Checking Board State
On the equipment panel
Through an MML command: DSP BRD
The BSC6800 contains two sets of configuration parameters
that respectively exist in FAM and BAM. They are both intables
Carry out ACT CRC to check the data consistency on table level
Carry out CMP TBLDATA to check the data consistency on
record level
Check that the cell setup procedure, common channel setup
procedure and measurement messages are all normal
through the message tracing on a LMT
7/29/2019 OWN000204 BSC6800 System Commissioning ISSUE3.0
22/40
Course Contents
Overview
Loading Commissioning
Feature Commissioning
Interface and Service Commissioning
7/29/2019 OWN000204 BSC6800 System Commissioning ISSUE3.0
23/40
Introduction
Function of License file
No. Feature Description
1 Max. number of users Max. number of users allowed in the BSC6800
2 Inter-RAT handover out-going switch Inter-RAT handover between GSM and WCDMA (from UMTS to GSM)
3 Inter-RAT handover in-coming switch Inter-RAT handover between GSM and WCDMA (from GSM to UMTS)
4 PDCP header compression functionThe BSC6800 can perform PDCP header compression to increase the
connection rate.
5 Cell ID LCS Location services based on Cell ID
6 OTDOA LCS Location services based on OTDOA
7 A_GPS LCS Location services based on A_GPS
8 Load optimizationThe following optimization means are provided, that is, cell breathing,
load handover and potential user control.
9 AMR controlThe BSC6800 can control the AMR encoding rate to provide the best
speech quality, increase inverse cell coverage and reduce system load.
7/29/2019 OWN000204 BSC6800 System Commissioning ISSUE3.0
24/40
Introduction
Function of License file
10 TFO/TrFO
TFO: Speech information is not coded using code converter if UEs in
a mobile-to-mobile call support the same code type as the network.
TrFO: The BSC6800 involved in a mobile-to-mobile call supports
speeches or multimedia services in TrFO mode.
11Dynamic channel configuration
control
Bandwidth resources can be allocated flexibly to satisfy the
requirements of burst PS services. The services can be handed over
between dedicated and common channels so that the resources can
be fully utilized.
12 Direct retry
On setup of an Radio Resource Control(RRC) connection, the
BSC6800 can specify a cell for the User Equipment(UE) to access
according to the resource status to increase the access success rate.
13 Call traceMessage trace and interpretation on standard Iub, Iur, Iu and Uu
interfaces, single subscriber trace and cell trace
14 Cell Broadcast Service(CBS) Cell broadcast service
7/29/2019 OWN000204 BSC6800 System Commissioning ISSUE3.0
25/40
Introduction
Commissioning Procedure
Start
Import License file
Activate License
file
Set algorithm
switch of feature
End
Feature controlled
by algorithm switch?
N
Y
7/29/2019 OWN000204 BSC6800 System Commissioning ISSUE3.0
26/40
Importing License File
Import a correct License file as prompted during BAM installation
Otherwise, copy the License file to the following directory:
BAM installation directory\LICENSE
BAM installation directory\FTP\LICENSE
7/29/2019 OWN000204 BSC6800 System Commissioning ISSUE3.0
27/40
Activating License File
Activating License File with Reconfiguration of RNC ID and PLMN
ID Carry out SET OFFLINE to switch to the offline mode, and then
reconfigure the RNC ID and PLMN ID accordingly
If the BSC6800 has no basic information, carry out ADD RNCBASIC to
add the RNC ID and PLMN ID
If the basic information of the BSC6800 is not authorized in the License file,
carry out MOD RNCBASIC to modify the RNC ID and PLMN ID as those
presented in the License file
Carry out ACT LICENSE to activate license file. BAM will check
validity of the file. If valid, the file will be written into the memory of
BAM
To activate the License function in the FAM, carry out RST SYS to
reset the BSC6800 system
7/29/2019 OWN000204 BSC6800 System Commissioning ISSUE3.0
28/40
Activating License File
Activating License File without Reconfiguration of RNC ID and
PLMN ID
Carry out SET ONLINE to switch to the online mode
Carry out ACT LICENSE to activate license file. BAM will check
validity of the file. If valid, the file will be written into the memory ofBAM
7/29/2019 OWN000204 BSC6800 System Commissioning ISSUE3.0
29/40
Setting Algorithm Switch of Feature
Carry out SET CORRMALGOSWITCH to set an algorithm switch
You may set the following classes of algorithm switches using the
command:
Channel class algorithm switch
Handover algorithm switch
Power control algorithm switch
Traffic combination switch
7/29/2019 OWN000204 BSC6800 System Commissioning ISSUE3.0
30/40
Course Contents
Overview
Loading Commissioning
Feature Commissioning
Interface and Service Commissioning
7/29/2019 OWN000204 BSC6800 System Commissioning ISSUE3.0
31/40
Introduction
You need also perform commissioning for interface data and dial-tests for system services before you put the BSC6800 into normal
service
7/29/2019 OWN000204 BSC6800 System Commissioning ISSUE3.0
32/40
Iub Interface Commissioning
Physical Link Commissioning
Local loop
Set the loopback type of a test E1/T1 link as LOCAL on a LMT using:
SET E1T1LOP if the E1/T1 link is on an E1/T1 trunk
SET SDHLOP if the E1/T1 link is on an SDH
Carry out LOP E1T1 on the LMT to initiate a local loopback test for theE1/T1 link
Set the loopback type of the test E1/T1 link as NOLOOP on the LMT
When performing a loopback test for an E1/T1 link in an IMA group, be
sure to carry out RST IMAGRP to reset the IMA group after the loopback
test
7/29/2019 OWN000204 BSC6800 System Commissioning ISSUE3.0
33/40
Iub Interface Commissioning
Physical Link Commissioning
Combined loop
Set the loopback type of a test E1/T1 link as REMOTE in the operation and
maintenance system at the peer end
Carry out LOP E1T1 on a LMT to initiate a combined loopback test for the
E1/T1 link.
7/29/2019 OWN000204 BSC6800 System Commissioning ISSUE3.0
34/40
Iub Interface Commissioning
Control Plane Commissioning
Carry out DSP SAALLNK to check that all Signaling ATM Adaptation
Layer (SAAL) links are available
Carry out DSP IUBP to check that the NCP link and all CCP links are
available
Carry out DSP AAL2ADJNODE to check that the adjacent node of
NodeB is available
7/29/2019 OWN000204 BSC6800 System Commissioning ISSUE3.0
35/40
Iub Interface Commissioning
User Plane Commissioning
Carry out DSP AAL2PATH to check that the AAL2 path(s) to a
specified adjacent node is/are functional
7/29/2019 OWN000204 BSC6800 System Commissioning ISSUE3.0
36/40
Iu Interface Commissioning
Physical Link Commissioning Control Plane Commissioning
Carry out DSP SAALLNK to check that all SAAL links are available.
Carry out DSP MTP3BLNK to check that all MTP3b links are available.
Carry out DSP SSN to check that all SCCP subsystems are available.
Carry out DSP AAL2ADJNODE to check that the adjacent node of
MSC is available.
User Plane Commissioning
7/29/2019 OWN000204 BSC6800 System Commissioning ISSUE3.0
37/40
Iur Interface Commissioning
The commissioning of an Iur interface is similar to that of an Iuinterface.
You need also check that the IP routes of the BSC6800 to other
Radio Network Controllers (RNCs) are available for supporting
lossless relocation. Carry out PNG IPADDR on a LMT to check theconnectivity of an IPoA to another RNC
7/29/2019 OWN000204 BSC6800 System Commissioning ISSUE3.0
38/40
Service Commissioning
Dial-tests for basic services
Basic service Dial-test method Expected results
Voice service
Make fifty calls from a UE to a fixed
network phone. Make fifty calls from the
network phone to the UE.
The connection success rate is above 90%. The
calls sound clear. There is no loud noise in the
calls.
Make fifty calls from a UE to another UE.
The connection success rate is above 90%. The
calls sound clear. There is no loud noise in the
calls.
CS streaming
service
Send a fax from a UE to the PSTN. Send a
fax from the Public Switched Telephone
Network(PSTN) to the UE.
The UE sends and receives the faxes normally.
Send a video service from a UE to another
UE
The audio part sounds clear. The visual part is
continuous. The two parts are synchronous.
PS service
Activate 384-kbit/s and 144-kbit/s services,
visit World Wide Web(WWW) Server and
browse pages on a UE fifty times.
The activation success is above 90%. The
browsing is successful.
Activate 384-kbit/s and 144-kbit/s servicesand perform download some data using
FLASHGET on a UE for half an hour.
The download is not intermittent. The average
download rate reaches 300 kbit/s or above.
Mobility
management
Perform CS voice service handover fifty
times.The handover success rate is above 95%.
Perform PS service handover fifty times. The handover success rate is above 95%.
Operation and
maintenancemanagement
Perform switchover for the WMPUs,
WMUXs and WSPU/WSPUbs fifty timesduring service
The switchover success rate is above 90%. There
is no service interruption in the switchoverprocedures.
7/29/2019 OWN000204 BSC6800 System Commissioning ISSUE3.0
39/40
Service Commissioning
Dial-tests for features
Feature Dial-test method Expected results
Inter-RAT
handover
Hand over a dual-mode UE from UMTS to
GSM and back fifty times.
The connection success rate is above 90%. The
calls sound clear. There is no loud noise in the
calls.
7/29/2019 OWN000204 BSC6800 System Commissioning ISSUE3.0
40/40