Upload
elizabeth-may
View
213
Download
1
Embed Size (px)
Citation preview
At Promise/At Risk Report College Community School Board
July 20, 2015
Overview
Current State*Focus has been on programs of support*Increased needs for the following at risk indicators: transiency, mental health, and disconnected youth*Maximizing services to support many students who are struggling—beyond those who meet the at risk indicators defined by DE
Overview
Desired State—Process Focus not Program Focus*Focus on processes of the MTSS (RTI) Model
Tier I—Supporting all kids with academic and social emotional needs (PLC’s are crucial)—will meet 80% or more kids’ needs
Tier II—use data to align services to needs for those who need supplemental support (10-15%)
Tier III—use data to align most intense services to students
Focus #1
Success will be measured by…
1a. By May 2015, we will have baseline data collected for all power standards in literacy and math for all students.
1b. In the fall of 2014, 60% of students will respond favorably to the Iowa Youth Survey in targeted growth areas (staff relationships and bullying) in grades 6, 8, and 11.
1c. By May 2015, we will district wide baseline data collected for office referrals based on the same criteria.
Looking at Data…in a nutshell
1a. Baseline is telling us that if our goal is to have 90% of our students meeting proficiency targets aligned to 90% of the power standards on our DCA’s, we have some growth opportunities. Right now, about 50% of our students (K-12) are meeting proficiency on the power standards with our DCA’s at the first assessment point.
Looking at Data…in a nutshell
1a. Iowa Youth Survey is taken every two years and is only measuring responses from 6th, 8th , and 11th grades. It is not cohort data. We will be using an annual measurement with the Gallup Poll Survey in grades 5-12 in the future.
Goal 1 Data: SCHOOL STAFF/STUDENT SUPPORT
2012 Left/Green is favorable 2014 Left/Blue is favorable
Goal 2 Data: Bullying2012 Left/Green is favorable 2014 Left/Blue is favorable
Looking at Data…in a nutshell
1c. Our baseline data has been collected through Infinite Campus for office referrals based on the same criteria defining “major” and “minor” discipline incidents. Our PBIS schools office referral data declined significantly, while the HS data increased.
At-Risk/At-PromiseStructures and Programming to Assist Students
2012-2015
ELEMENTARY (K-6): Mostly Integrated or Supports provided by Classroom TeachersIntervention Teams through PLC workReading and Math Interventions and Supplementary InstructionWIN time at Prairie CreekSmall Learning Communities—Personal Connections
SECONDARY: Mostly supplemental programmingLearning Resource Center—Point and Success Center (HS)Learning Strategies—integrates reading--PointHS 540 and HS 360Credit Recovery (HS and Point)Supported Math in HS and PointAlternative HSKirkwood HS Completion
At-Risk/At-PromiseProcesses to Assist Students
2015-16 Plan
• New at-risk data pull that can be done daily through Infinite Campus—the indicators align will the new component of our student information system. PROCESS to support data driven decision making
• Integrated supports for students—designing differently:• Group Supports at elementary level, MTSS (WIN time, intervention
time, classroom structures with Literacy Norms)• Seminar Supports in grades 7-9: targeted social-emotional and
executive functioning curriculum in small groups and in LRC aligned with academic supports
• Check and Connect Philosophy in grades 10-12—a system of support for the most at-risk students—designing processes for individualized supports
At-Risk/At-PromiseStructures and Programming to Assist Students
2015-16 Plan
• All programs will continue; we will continue data collection and measure effectiveness aligned with Focus 1 on the Strategic Plan
• Mental Health Training and Awareness through Professional Learning: Point and HS are training all staff in Mandt Chapters 1-3—including understanding Trauma, Adverse Childhood Experiences, and how to respond to behavior
• Targeting services for specific supports: SRO, LRC, Success Center, and AHS
Focus #1…New Annual Goals
Focus #1…New Annual Goals
Future State
Constant Collaboration and PLC workFocus on social emotional learning and core
instruction—TIER I is the most important part of MTSS—WE BELIEVE ALL CHILDREN CAN LEARN AT HIGH LEVELS
Questions—Reflections?