27
www.nek.si Naslovnica ÚJV Řež – May, 2019 Overview of the NEK Equipment Qualification Programs 30’

Overview of the NEK Equipment Qualification Programs2019/05/03  · • Operating Licence:40 ‐60 years • Gross Plant Output:727 MW ABOUT NEK NEK EQ programs, UJV Rež, 2019 Slide

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Overview of the NEK Equipment Qualification Programs2019/05/03  · • Operating Licence:40 ‐60 years • Gross Plant Output:727 MW ABOUT NEK NEK EQ programs, UJV Rež, 2019 Slide

www.nek.si

Naslovnica

ÚJV Řež – May, 2019

Overview of theNEK Equipment QualificationPrograms

30’

Page 2: Overview of the NEK Equipment Qualification Programs2019/05/03  · • Operating Licence:40 ‐60 years • Gross Plant Output:727 MW ABOUT NEK NEK EQ programs, UJV Rež, 2019 Slide

ABOUTNEK

NEKEQprograms,UJVRež,2019

Slide02/27

• Owners: GENEnergija 50%HEP50%• Operator: NEK• NSSSSupplier: Westinghouse• ReactorType: PWR• ConstructionPermit: 1975• CommercialOperation: 1983• OperatingLicence: 40‐60years• GrossPlantOutput: 727MW

Page 3: Overview of the NEK Equipment Qualification Programs2019/05/03  · • Operating Licence:40 ‐60 years • Gross Plant Output:727 MW ABOUT NEK NEK EQ programs, UJV Rež, 2019 Slide

ABOUTNEK

NEKEQprograms,UJVRež,2019

Slide03/27

HE(HydroPower)=4.293GWh

TE(FossilPower)=4.400GWh

NEK=5.423GWh*

Total =14116GWh

NEK shareinSlovenia inproductionofelectricalenergy

Source:ELES,MonthlyReportonthePowerSystemforDecemberandyear2016,January2017

NEK38,4 %

TE 31,2 %

HE 30,4 %

Page 4: Overview of the NEK Equipment Qualification Programs2019/05/03  · • Operating Licence:40 ‐60 years • Gross Plant Output:727 MW ABOUT NEK NEK EQ programs, UJV Rež, 2019 Slide

NEKEQPROGRAMSHISTORICALBACKGROUNDANDDEVELOPMENT

NEKEQprograms,UJVRež,2019

Slide04/27

Construction designrequirements:

• EnvironmentalQualificationofElectricalandI&C(EQ)ReactorBuildingDBAequipmentshallbequalifiedtoIEEE323‐1971andIEEE323‐1974–NOFORMALPROGRAM

• SeismicDesign– SeismicCategoryImechanicalandelectricalequipmentfortheKRSKONuclearPowerPlantshallmeetseismicperformancerequirementsduringandfollowingtheOPERATINGBASIS EARTHQUAKE(OBE),SAFESHUTDOWNEARTHQUAKE(SSE)

ReactorBuilding(RB) Intermediate

and TurbineBuilding(IB,TB)

AuxiliaryBuilding(AB) EQ

Page 5: Overview of the NEK Equipment Qualification Programs2019/05/03  · • Operating Licence:40 ‐60 years • Gross Plant Output:727 MW ABOUT NEK NEK EQ programs, UJV Rež, 2019 Slide

NEKEQPROGRAMSHISTORICALBACKGROUNDANDDEVELOPMENT

NEKEQprograms,UJVRež,2019

Slide05/27

NEKEnvironmental Qualification programfor Electrical and I&Cequipment:

‐ FirstPeriodic Safety Review (PSR1)– 2005actionplan

‐ Slovenian Nuclear Regualtory Body ruleJV5 „Rulesonradiationandnuclearsafetyfactors“

Page 6: Overview of the NEK Equipment Qualification Programs2019/05/03  · • Operating Licence:40 ‐60 years • Gross Plant Output:727 MW ABOUT NEK NEK EQ programs, UJV Rež, 2019 Slide

NEKCURRENTQUALIFICATIONPROGRAMSOVERVIEW

NEKEQprograms,UJVRež,2019

Slide06/27

EQPROGRAMFORELECTRICALANDI&C EQUIPMENT

NEKEQProgramdocument:

1. ED‐12consistentwith10CFR50.49

2. ED‐12definesmethodologyandcriteriaforEQconditionsdetermination(EQzones)

3. ED‐12methodologyandcriteriaforEQMELinEQSELlists

4. Programdefinesqualificationprocess:• Methodsforqualificationand

documentation• Processcontrol(designchanges,

maintenance,purchasing)

Page 7: Overview of the NEK Equipment Qualification Programs2019/05/03  · • Operating Licence:40 ‐60 years • Gross Plant Output:727 MW ABOUT NEK NEK EQ programs, UJV Rež, 2019 Slide

NEKCURRENTQUALIFICATIONPROGRAMSOVERVIEW

NEKEQprograms,UJVRež,2019

Slide07/27

NEKEQPROGRAMFORELECTRICALANDI&C EQUIPMENT

EnvironmentalconditionsduringandafterDBA:• LOCA• MSLB(MainSteamLineBreak)• HELB(HighEnergyLineBreaks):T>93.30Corp>2.0MPa

(forexampleCVCSletdown,SGBD)

Analyses:• T/H:RB,IB,AB:T,pandRH• DoseratesandTIDs:RB,AB(forexampleRHsump

recirculation),IB

Harshconditionssignificantlymoreseverethannormaloperatingconditions:

• Temperature:8,30C(150F)abovenormal/designT

• Pressure:10%abovenormal/design(10kPa– 1,47psi)

• RH:100%RHwithcondensation

• ChemicalSpray‐ exposure

• Submergence– exposure

• RadiationTID>100Gy;>10Gyforelectronics

NEKDBAEQconditions:

Page 8: Overview of the NEK Equipment Qualification Programs2019/05/03  · • Operating Licence:40 ‐60 years • Gross Plant Output:727 MW ABOUT NEK NEK EQ programs, UJV Rež, 2019 Slide

NEKCURRENTQUALIFICATIONPROGRAMSOVERVIEW

NEKEQprograms,UJVRež,2019

Slide8/27

EQPROGRAMFORELECTRICALANDI&C EQUIPMENT

EQZoneMapsdocument

• EQconditionsdefinedforeveryevaluatedroom:

• DefinedHarsh/MildlocationsendcorrespondingenvelopingEQzone:

Page 9: Overview of the NEK Equipment Qualification Programs2019/05/03  · • Operating Licence:40 ‐60 years • Gross Plant Output:727 MW ABOUT NEK NEK EQ programs, UJV Rež, 2019 Slide

NEKCURRENTQUALIFICATIONPROGRAMSOVERVIEW

NEKEQprograms,UJVRež,2019

Slide9/27

EQPROGRAMFORELECTRICALANDI&C EQUIPMENT

EQequipmentlist

EQMasterEquipmentList(EQMEL)components:• ElectricalandI&Cequipment:

• Safety‐related;• Non‐safety‐relatedthataffectssafety‐

related;• Certainpost‐accidentmonitoring(RG1.97

Category1in2)• LocatedinHarshenvironmentandperformDBA

safetyfunction

Page 10: Overview of the NEK Equipment Qualification Programs2019/05/03  · • Operating Licence:40 ‐60 years • Gross Plant Output:727 MW ABOUT NEK NEK EQ programs, UJV Rež, 2019 Slide

NEKCURRENTQUALIFICATIONPROGRAMSOVERVIEW

NEKEQprograms,UJVRež,2019

Slide10/27

EQPROGRAMFORELECTRICALANDI&C EQUIPMENT

EQMELequipmentlist(typical):

‐Pumpselectricmotors,‐VAfancoolerselectricmotors‐MOVs‐Limitswitches‐Electricalpenetrations‐Pressuretransmitters(LT,PT,FT)‐RTDs,TCs‐Pressureswitches‐RMdetectors/monitors‐Solenoidvalves‐MCCDs‐H2recombiners (replacedwithPARs)‐Transformers,‐Selectorswitches

Page 11: Overview of the NEK Equipment Qualification Programs2019/05/03  · • Operating Licence:40 ‐60 years • Gross Plant Output:727 MW ABOUT NEK NEK EQ programs, UJV Rež, 2019 Slide

NEKCURRENTQUALIFICATIONPROGRAMSOVERVIEW

NEKEQprograms,UJVRež,2019

Slide11/27

EQPROGRAMFORELECTRICALANDI&C EQUIPMENT

EQSupportingEquipmentList(EQSEL)– entirefunctionalloopshallbequalified

Typicalsupportingequipment:

• Cables– BIW,Rockbestos,Okonite,GeneralCable

• Wires– FWIIISIS,FLAMETROL• Heat‐shrinkin‐linecablesplices‐

TYCO/RAYCHEM• Terminalblocks– MARATHON• SealingTapes– Graphoil,Locktite• Connectors– EGSQualtech,Conax• SealingCompounds– DOW

CORNING,NAMCO

QualTech QDCconnector

Page 12: Overview of the NEK Equipment Qualification Programs2019/05/03  · • Operating Licence:40 ‐60 years • Gross Plant Output:727 MW ABOUT NEK NEK EQ programs, UJV Rež, 2019 Slide

NEKCURRENTQUALIFICATIONPROGRAMSOVERVIEW

NEKEQprograms,UJVRež,2019

Slide12/27

EQPROGRAMFORELECTRICALANDI&C EQUIPMENT

Qualificationdocumentation– EQMS

• Testreports(EnvironmentalQualificationReport)

• NEKQualificationevaluations ‐ EPRIEQ managementSoftware (EQMS):

EQEnviroments

EQMEL

GQEPQE+SCEW

Page 13: Overview of the NEK Equipment Qualification Programs2019/05/03  · • Operating Licence:40 ‐60 years • Gross Plant Output:727 MW ABOUT NEK NEK EQ programs, UJV Rež, 2019 Slide

NEKCURRENTQUALIFICATIONPROGRAMSOVERVIEW

NEKEQprograms,UJVRež,2019

Slide13/27

Qualificationdocumentation– EQMSPlantQualificationEvaluation Module(PQE):

ThermalAging– qualifiedlifecalculation:

PAOTprofilesareacomparison– margincalculation:

EQPROGRAMFORELECTRICALANDI&C EQUIPMENT

Page 14: Overview of the NEK Equipment Qualification Programs2019/05/03  · • Operating Licence:40 ‐60 years • Gross Plant Output:727 MW ABOUT NEK NEK EQ programs, UJV Rež, 2019 Slide

NEKCURRENTQUALIFICATIONPROGRAMSOVERVIEW

NEKEQprograms,UJVRež,2019

Slide14/27

EQPROGRAMFORELECTRICALANDI&C EQUIPMENT

Otherqualificationdocuments:

EQblockdiagrams:

Page 15: Overview of the NEK Equipment Qualification Programs2019/05/03  · • Operating Licence:40 ‐60 years • Gross Plant Output:727 MW ABOUT NEK NEK EQ programs, UJV Rež, 2019 Slide

NEKCURRENTQUALIFICATIONPROGRAMSOVERVIEW

NEKEQprograms,UJVRež,2019

Slide15/27

EQPROGRAMFORELECTRICALANDI&C EQUIPMENT

Otherqualificationdocuments:

EQWorkmanshipstandard (EQWS):

EQFieldConfigurationDrawings

EQFieldConfigurationPartsList

Page 16: Overview of the NEK Equipment Qualification Programs2019/05/03  · • Operating Licence:40 ‐60 years • Gross Plant Output:727 MW ABOUT NEK NEK EQ programs, UJV Rež, 2019 Slide

NEKCURRENTQUALIFICATIONPROGRAMSOVERVIEW

NEKEQprograms,UJVRež,2019

Slide16/27

EQPROGRAMFORELECTRICALANDI&C EQUIPMENT

EQactivities: EQlabeling:Hotspots determination:• Temperature• Gammaandneutron

radiation

Controloverplantprocesses:‐ Designchanges‐ Preventive

Maintenance‐ Procurement

Page 17: Overview of the NEK Equipment Qualification Programs2019/05/03  · • Operating Licence:40 ‐60 years • Gross Plant Output:727 MW ABOUT NEK NEK EQ programs, UJV Rež, 2019 Slide

NEKCURRENTQUALIFICATIONPROGRAMSOVERVIEW

NEKEQprograms,UJVRež,2019

Slide17/27

EQPROGRAMFORELECTRICALANDI&C EQUIPMENT

EQoverallprocess

QualificationInputs:

Qualification test report(Manufacturer/Model)

Equipment:‐ Location (Normal and 

DBA environment)‐ Safety function‐ PAOT

Manufacturer/Model

EQMS qualification (PQE):

‐ Qualified Life‐ EQ configuration‐ EQ maintenance‐ Procurement 

requirements

EQ Block Diagram 

EQ Workmanship Standard‐ Configuration requirements 

(orientation, sealing, etc.)‐ Maintenance requirements 

(periodic replacement equipment or part, periodic inspections, etc.)

EQ Label,Plant Information system equipment EQ designation

(EQ=YES)

QualificationEvaluation:

QualificationOutputs:

EQgroupisinvolvedwheneverEQequipmentisaffected:1) Replaced,2) Modified,3) De‐installed4) NewEQequipmentinstalled5) Environmentalconditionsaffected

‐ EQ Master Equipment ‐ EQ Supporting Equipment

Page 18: Overview of the NEK Equipment Qualification Programs2019/05/03  · • Operating Licence:40 ‐60 years • Gross Plant Output:727 MW ABOUT NEK NEK EQ programs, UJV Rež, 2019 Slide

NEWQUALIFICATIONREQUIREMENTSUNDERDEVELOPMENT

NEKEQprograms,UJVRež,2019

Slide18/27

SecondPeriodicSafetyReview(PSR2):

1. QualificationtoSevereAccidents– EquipmentSurvivabilityProgram

2. ActiveMechanicalEquipmentEnvironmentalQualification–MechanicalQualificationProgram

3. ElectromagneticCompatibilityQualification– EMCProgram

Page 19: Overview of the NEK Equipment Qualification Programs2019/05/03  · • Operating Licence:40 ‐60 years • Gross Plant Output:727 MW ABOUT NEK NEK EQ programs, UJV Rež, 2019 Slide

NEWQUALIFICATIONREQUIREMENTSUNDERDEVELOPMENT

NEKEQprograms,UJVRež,2019

Slide19/27EQUIPMENTSURVIVABILITY(DEC)

REGULATIONS:

Slovenianlegislation:„Rulesonradiationandnuclearsafetyfactors“requiresEquipmentSurvivability(ES)assessmenttoshowthatthereisreasonableassurancethattheequipmentandinstrumentationusedtomitigateandmonitorDesignExtendedAccidentConditions(DEC).ActisinaccordancewithIAEA,WENRArequirements.

IAEASafetyStandardSSR‐2/1„SpecificSafetyRequirements“Requirement20‐ Designextensionconditions:„Thesedesignextensionconditionsshallbeusedtoidentifytheadditionalaccidentscenariostobeaddressedinthedesignandtoplanpracticableprovisionsforthepreventionofsuchaccidentsormitigationoftheirconsequences“.

WENRASafetyReferenceLevelsforExistingReactors(2014)IssueF‐ DesignExtensionofExistingReactors:„TherearetwocategoriesofDEC:• DECAforwhichpreventionofseverefueldamageinthecoreorinthespentfuel

storagecanbeachieved;• DECBwithpostulatedseverefueldamage“.„…DEChavethecapacityandcapabilityandareadequatelyqualifiedtoper‐formtheirrelevantfunctionsfortheappropriateperiodoftime …“

Page 20: Overview of the NEK Equipment Qualification Programs2019/05/03  · • Operating Licence:40 ‐60 years • Gross Plant Output:727 MW ABOUT NEK NEK EQ programs, UJV Rež, 2019 Slide

NEWQUALIFICATIONREQUIREMENTSUNDERDEVELOPMENT

NEKEQprograms,UJVRež,2019

Slide20/27EQUIPMENTSURVIVABILITY(DEC)

NEKWENRAapproach:

IAEAandWENRAplantstatesdefinesenvironmentalqualificationandequipmentsurvivability→NEKSafetyUpgradeProjects(SUP) requirements:

without 

significant fuel 

degradation

with core 

melt

Operational States 

Design extension conditions

Normal operation (NO)

Anticipated operational occurrences 

(AOO)

Design basisaccidents (DBA)

Accident conditions

Page 21: Overview of the NEK Equipment Qualification Programs2019/05/03  · • Operating Licence:40 ‐60 years • Gross Plant Output:727 MW ABOUT NEK NEK EQ programs, UJV Rež, 2019 Slide

NEWQUALIFICATIONREQUIREMENTSUNDERDEVELOPMENT

NEKEQprograms,UJVRež,2019

Slide21/27EQUIPMENTSURVIVABILITY(DEC)

DESIGNEXTENSIONCONDITIONSDECB

1) ThelimitingscenarioisSBOsequencewithPCFV,PAR actuation,mitigationactionsat24h:reactorcoredamage,Ex‐Vesselcorerelocation;AccidentmitigationscenariousingAHXinsevereaccident(spray,recirculationfromcontainmentsumpduringex‐vesselevent):conditionsinAB,IBbuildingatARHRequipment/pipinglocations

2) SGTR:radioactivereleasetoenvironment‐ conditionsinBB1,BB2,Yard3) SFPaccident:scenarioperIndustryGuidanceNEI12‐02‐ conditionsinFHB

Page 22: Overview of the NEK Equipment Qualification Programs2019/05/03  · • Operating Licence:40 ‐60 years • Gross Plant Output:727 MW ABOUT NEK NEK EQ programs, UJV Rež, 2019 Slide

NEWQUALIFICATIONREQUIREMENTSUNDERDEVELOPMENT

NEKEQprograms,UJVRež,2019

Slide22/27EQUIPMENTSURVIVABILITY(DEC)

EquipmentSurvivabilityElements

EquipmentSafetyFunctionandLocationAssessmentDECclassification:

• Detailedsafetyfunctiondescription‐ inwhichspecificplantstateequipmentwillbeused(normaloperation,abnormaloperation,DBA,DEC)– IfDECthancandidateforDECclassification

• Locationofequipment– isequipmentlocatedinHarshenvironment– IfYesthancandidateforDECclassification

• Temperature:8,30C(150F) abovenormal/designT• Pressure:10%abovenormal/design(10kPa– 1,47psi)• RH:100%RHwithcondensation• ChemicalSpray ‐ exposure• Submergence – exposure• Radiation TID>100Gy;>10Gyforelectronics

DECPAOTtimingisdetermined:1hour,1day,1month,1year

DECQualificationstandards:‐ ElectricalandI&C:IEEE323‐1974orlateredition,IEEEEQdaughterstandards(317,334,382,383,…)

‐ Mechanical:ASMEQME‐1,orqualificationofnon‐metallicmaterials

DEC A or DEC B

&

Page 23: Overview of the NEK Equipment Qualification Programs2019/05/03  · • Operating Licence:40 ‐60 years • Gross Plant Output:727 MW ABOUT NEK NEK EQ programs, UJV Rež, 2019 Slide

NEWQUALIFICATIONREQUIREMENTSUNDERDEVELOPMENT

NEKEQprograms,UJVRež,2019

Slide23/27EQUIPMENTSURVIVABILITY(DEC)

DECsystemsandqualification

Variouspost‐FukushimaSafetyUpgradeProjectsunderdevelopment:

• IndependentthirdDECDieselGeneratoradditionaltotwo100%redundantDBADGs– DECBequipment

• Floodprotectionupgrade• NewEmergencyControlRoominDECBunkeredBuilding• PassiveContainmentFiltering&Ventilationsystem(PCFV)– DECBequipment

• PassiveAutocatalyticSystem(PAR)– DECBequipment• Containmentaccidentinstrumentation‐ DECA&B• Variousinstrumentslocatedinsystemsincontainmentbuilding(includingnewneutronfluxinstrumentationchannels)– DECA&B

• IndependentsystemfortheRCSpressurerelief(alternatePORV)‐DECAsystem

• ReactorCoolantandContainmentalternatecooling(ARH‐ACI)systemDECA&B

• AlternateSIandAF(ASI,AAF)systemsDECA&B• AlternatecoolingoftheSFP(HeatExchangers,SpraySystem)– DECAsystems

EquipmentSurvivability(underdevelopment)performedtorequiredlevelofconditions(DECAorDECBconditions).

Page 24: Overview of the NEK Equipment Qualification Programs2019/05/03  · • Operating Licence:40 ‐60 years • Gross Plant Output:727 MW ABOUT NEK NEK EQ programs, UJV Rež, 2019 Slide

NEWQUALIFICATIONREQUIREMENTSUNDERDEVELOPMENT

NEKEQprograms,UJVRež,2019

Slide24/27OTHER NEW QUALIFICATION PROGRAMS

ActiveMechanicalEquipmentQualification

• Newqualificationprogrambasedon:• EPRIEQReferenceManual• EPRINP‐3877QualificationofActiveMechanicalEquipmentforNuclearPlants

• NUREG0800StandardReviewPlanCh.3.11• RG1.100Rev.3(SEISMICQUALIFICATIONOFELECTRICALANDACTIVEMECHANICALEQUIPMENTANDFUNCTIONALQUALIFICATIONOFACTIVEMECHANICALEQUIPMENTFORNUCLEARPOWERPLANTS)endorsingASMEQME‐1(QualificationofActiveMechanicalEquipmentUsedinNuclearPowerPlants)

• MEQMELdevelopment:DBAandDECequipment;Safetyfunction;PAOT;Location(NormalandHarshenvironmentconditions)

• Qualificationassessment: Based onavailablequalificationtestreportsorbasedonevaluationofnon‐metallicmaterials(EPRIreportsandCurtissWrightPowerSuiteEQapplications)

• Documentationpackages(similarapproachasEQ);correctiveactions• Preservingqualifiedstatus:controlofmaintenance,modificationsandprocurementprocesses

Page 25: Overview of the NEK Equipment Qualification Programs2019/05/03  · • Operating Licence:40 ‐60 years • Gross Plant Output:727 MW ABOUT NEK NEK EQ programs, UJV Rež, 2019 Slide

NEWQUALIFICATIONREQUIREMENTSUNDERDEVELOPMENT

NEKEQprograms,UJVRež,2019

Slide25/27OTHER NEW QUALIFICATION PROGRAMS

EMCQualificationProgram

• Newqualificationprogrambasedon:• USNRCRegulatoryGuide1.180

• Guidanceapplicabletoallnewsafetyrelatedsystemsormodificationstoexistingsafetyrelatedsystemscontaininganalog,digitalorhybrid(combined)electronicsequipment

• EPRITR‐102323• DetailedtechnicalreportprovidingdetailsfromhistoricalbackgroundtorecommendedgenericEMIsusceptibilityandemissionstestlevelstobeusedinestablishingequipmentelectromagneticcompatibilityfornuclearpowerplantapplications

• ProvidesdefinitionofequipmentunderEMCscope:• EMCzones:highemissions(E);sensitiveequipment(S)includingexclusionzones

• SRI&CequipmentlocatedinEMCzones• ProvidesguidelinesandpracticalexamplesforEMC‐relateddocumentation

• Zonemapping hasbeenperformedtocaptureanemissionprofileoftheselectedarea.

• Administrativemeasures– definesexclusionsareaforwelding,useofportabletransceivers

• Implementationofpracticalnoisereductiondesignconsiderations• Qualificationsprocessrequiredandstartedfornewequipment/systems(includingSUP)

Page 26: Overview of the NEK Equipment Qualification Programs2019/05/03  · • Operating Licence:40 ‐60 years • Gross Plant Output:727 MW ABOUT NEK NEK EQ programs, UJV Rež, 2019 Slide

NEARFUTURETASKS

NEKEQprograms,UJVRež,2019

Slide26/27

• EQprogram/PlantLifeExtensionfrom40to60years(2023to2043)

• ElectricalPenetrationAssemblies,Cables,CableSplicesandothercommoditiesqualifiedlifeextension(ReanalysisperNUREG‐1801,qualificationtestingforlifeextension)

• Obsoleteequipment– newqualifications

• TocompleteEquipmentSurvivability• TocompleteMEQprogram• TocompleteEMCprogram

• PSR3???

Page 27: Overview of the NEK Equipment Qualification Programs2019/05/03  · • Operating Licence:40 ‐60 years • Gross Plant Output:727 MW ABOUT NEK NEK EQ programs, UJV Rež, 2019 Slide

Naslovnica

Thankyou!

[email protected]

www.nek.si

NEK EQ presentation

40’

NEKEQprograms,UJVRež,2019

Slide27/27