IMPORTANT NOTICE: The information provided in the brief is intended for technical briefing only. Page 1 of 1 Abstract Petronas Carigali is currently finding a way to increase its income by increasing its production due to loss in profit. One of the way to increase its production is by reactivating idle wells. However, not all idle wells are economic to reactivate. Therefore, several analysis was done to determine which well is suitable to be reactivated. The idle well that I found was in Dulang X named XXX well. It needs additional perforation to continue as a producing oil well. Several assessment was done: - To prove the reservoir potential is conducive for additional perforation - To determine exactly the location of perforation - To prove that by reactivating the well will promise huge profit Brief Description of the Project XXX Well history will be studied together with the interpretation of openhole log to show that there is a profitable reservoir in the well. Then, based on the production performance of offset well, reservoir capability after reperforation will be assessed and its future production rate will be predicted beside its recoverable reserves using Decline Curve Analysis. Then perforation strategy and design is devised. Lastly, from rate of production, revenue will be calculated together with cost to know its Net Present Value of this project. Based on the NPV, it will show that this project will promise huge income. Issued by Syed Dzafeer Bin Syed Idrus 22 May 2016 Date 2 December 2015 Matric ID 18773 UTP SV Miss Nur Asyraf Binti Md Akhir Programme Petroleum Engineering HC SV Mr Abd Aziz Bin Omar - Syed Dzafeer Bin Syed Idrus - Additional Perforation Potential for Well Dulang- XXXX and Its Life Cycle Cost DULG-B014:0-SS:N3-E1 Dulang Unit Performance DULG-B014:0-SS:N3-E1 Dulang Unit Performance DULG-B014:0-SS:N3-E1 Dulang Unit Performance Figure 1: Well Performance

Overview of Project

Embed Size (px)

Citation preview

IMPORTANT NOTICE: The information provided in the brief is intended for technical briefing only.

Page 1 of 1

Abstract

Petronas Carigali is currently finding a way to increase its income by increasing its production due to loss in

profit. One of the way to increase its production is by reactivating idle wells. However, not all idle wells are

economic to reactivate. Therefore, several analysis was done to determine which well is suitable to be

reactivated. The idle well that I found was in Dulang X named XXX well. It needs additional perforation to

continue as a producing oil well. Several assessment was done:

- To prove the reservoir potential is conducive for additional perforation

- To determine exactly the location of perforation

- To prove that by reactivating the well will promise huge profit

Brief Description of the Project

XXX Well history will be studied together with the interpretation of openhole log to

show that there is a profitable reservoir in the well. Then, based on the production

performance of offset well, reservoir capability after reperforation will be assessed and

its future production rate will be predicted beside its recoverable reserves using

Decline Curve Analysis. Then perforation strategy and design is devised. Lastly, from

rate of production, revenue will be calculated together with cost to know its Net

Present Value of this project. Based on the NPV, it will show that this project will

promise huge income.

Issued by Syed Dzafeer Bin Syed Idrus

22 May 2016

Date 2 December 2015 Matric ID 18773

UTP SV Miss Nur Asyraf Binti Md Akhir Programme Petroleum Engineering

HC SV Mr Abd Aziz Bin Omar

- Syed Dzafeer Bin Syed Idrus -

Additional Perforation Potential for Well Dulang-XXXX and Its Life Cycle Cost

1990 91 92 93 94 95 96 97 98 99 2000 01 02 03 04 05 06 07 08 09 10 11 12

0

500

1000

1500

2000

2500

CD_Liquid ( bbl ) CD_Oil ( bbl/d )

DULG-B014:0-SS:N3-E1

Dulang Unit Performance

1990 91 92 93 94 95 96 97 98 99 2000 01 02 03 04 05 06 07 08 09 10 11 12

0

20

40

60

80

100

0

15

30

45

60

WC ( % ) GOR ( Mcf/bbl )

DULG-B014:0-SS:N3-E1

Dulang Unit Performance

1990 91 92 93 94 95 96 97 98 99 2000 01 02 03 04 05 06 07 08 09 10 11 12

0

60000

120000

180000

240000

300000

Cum

_O

il (

bbl )

Cum_Oil ( bbl ) DULG-B014:0-SS:N3-E1

DULG-B014:0-SS:N3-E1

Dulang Unit Performance

Figure 1: Well Performance