Upload
angelo
View
40
Download
0
Embed Size (px)
DESCRIPTION
Overview of Multiservice Switching Forum (MSF) Technical Activities and Direction. Dave McDysan, WorldCom Technical Committee Chair. MSF Organization. Board of Directors 11 People. Technical Committee Dave McDysan WorldCom. Marketing Awareness Committee Carol Waller Marconi. - PowerPoint PPT Presentation
Citation preview
1
Overview of Multiservice Switching Forum (MSF)
Technical Activities and Direction
Overview of Multiservice Switching Forum (MSF)
Technical Activities and Direction
Dave McDysan, WorldComTechnical Committee ChairDave McDysan, WorldComTechnical Committee Chair
2Comnet 2001 Tutorial
Switch Control WGSimon Crosby
Cplane
MSF OrganizationMSF Organization
MEGACOBrian Rosen
Marconi
Board of Directors11 People
Technical CommitteeDave McDysan
WorldCom
Marketing Awareness CommitteeCarol Waller
Marconi
Liaison CommitteeLarry Gabuzda
Lucent
Media Control WGPetros Mouchtaris
Telcordia
Architecture WGMark Klerer
Nortel
Interoperability WGOpen
Management Framework WGAvri Doria
Nortel
GSMPOpen
3Comnet 2001 Tutorial
MSF Technical Committee CharterMSF Technical Committee Charter
• Overall system and life-cycle view– Requirements, architecture, protocol specification, implementation details, facilitate interoperation
• Leverage other standards bodies and activities wherever possible
• Liaison with other standards bodies to communicate requirements, define protocols, co-sponsor events
4Comnet 2001 Tutorial
1999 Accomplishments1999 Accomplishments
• Media Gateway control requirements input to IETF/ITU-T MEGACO/H.248
• Based switch control on IETF GSMP• Adopted concept of switch partitioning• Completed Straw Ballot of Release 1
Architecture Document• Established Interoperability Working
Group
5Comnet 2001 Tutorial
2000 Accomplishments2000 Accomplishments
• Completed Final Ballot of Release 1 Architecture Document
• Final Ballot for Switch Control (GSMP)• Co-hosted First MEGACO/H.248
Interoperability Event in August at UNH• Established Management Framework
Working Group• Drafted Implementation Agreements for
MEGACO/H.248
6Comnet 2001 Tutorial
Overall 2001 ObjectivesOverall 2001 Objectives
• Release 2 Incremental Architecture Documents
– Application/ Management Plane– Extensions in support of Mobility– Extensions to support IP, MPLS
• Media Control Implementation Agreements– MEGACO Profiles (Access, Trunking, Residential)– MEGACO Package (CAS)– MGC-MGC Protocols (BICC, SIP-T)
7Comnet 2001 Tutorial
Overall 2001 ObjectivesOverall 2001 Objectives
• At least two Media Control Interoperability Events
• Switch Partitioning Documents– MIB, Requirements
• Technical Reports • Vendor White Papers• Liaisons to IETF, ITU, ISC, Others
8Comnet 2001 Tutorial
Architecture CharterArchitecture Charter
• Define overall terminology and framework for the MSF, building upon Release 1 architecture document
• Release 2– IP Support– MPLS Support– Mobility Support– Application Plane Architecture– Statistical Switch Partitioning (if possible)
9Comnet 2001 Tutorial
...AdaptationPlane
SwitchingPlane
ExternalInterfaces/Protocols
Man
ag
emen
t P
lan
e
Standard Physical and Logical Interfaces
TCP/IP Video ATM
Multiservice
...Control
Plane
Voice
ApplicationPlane
Standard IN/Signaling APIs, Interfaces, and Protocols
IP/MPLSController
Voice/SS7Controller
ATM/SVCController
TDM FR
Switching Fabric (any switching principle)
Logical MSF ArchitectureLogical MSF Architecture
10Comnet 2001 Tutorial
Release 2 Document StructureRelease 2 Document Structure
• Architectural Framework– Definitions, objectives, document structure,
• Functional Architectural Framework– Separate document for IP, MPLS, Mobility, Application plane, etc.
• Physical Architectural Mapping • Network Mapping w/ reference
protocols • Service Example Call Flows
11Comnet 2001 Tutorial
Architecture WG ScheduleArchitecture WG Schedule
• Application Plane Functional Framework
– Straw Ballot 9/01– Final Ballot 12/01
• Mobility Functional Framework– Straw Ballot 9/01– Final Ballot 12/01
• IP/MPLS Functional Framework– Straw Ballot 9/01– Final Ballot 12/01
12Comnet 2001 Tutorial
Media Control Working Group CharterMedia Control Working Group Charter
• MG-MG Interface– Media Gateway Control (MEGACO)/ H.248 Jointly developed by IETF & ITU-T
• MGC-MGC Interface– Session Initiation Protocol (SIP) or Bearer Independent Call Control (BICC)
• MGC-Telephony Interfaces– SS7, ISDN, Channel Associated Signaling (CAS), etc.
13Comnet 2001 Tutorial
Media Control Functions and InterfacesMedia Control Functions and Interfaces
IP or ATMNetwork
ResidentialGateway
AccessGateway
TrunkingGateway
TrunkingGateway
Media GatewayController (MGC)
Media GatewayController (MGC)
PBX
PSTN
SIP-T, BICC, H.225
PSTN
Media (VoIP, VoATM, TDM)
Signaling
MEGACO/H.248
SS7, ISUP
SS7, ISUP
POTS, BRA,SIP, H.323
ISDN,CAS
MEGACO/H.248
14Comnet 2001 Tutorial• 14
• MEGACO/H.248– MEGACO/H.248 Profile for Access Gateway/MGC – MEGACO/H.248 Profile for Trunking Gateway/MGC– MEGACO/H.248 Profile for Residential Gateway/MGC– CAS package (new work item)
• ia reference point– SIP-T– BICC
• Legal Intercept (new work item)• Management Interface for MGC and MG (inviting
contributions) – To be done in conjunction with management framework working group
Detailed Media Control Charter
15Comnet 2001 Tutorial• 15
• MEGACO/H.248 Work Items• CAS Package (Added as a new work item)
– Draft 2/01– Straw ballot 5/01– Final ballot 8/01
• Two implementation agreements currently under development for MEGACO/H.248– MEGACO/H.248 Profile for Access Gateway/MGC – MEGACO/H.248 Profile for Trunking Gateway/MGC
• Draft implementation Agreements available now– Straw ballot 5/01– Final ballot 8/01
• MEGACO/H.248 Profile for Residential Gateway/MGC– TBD
Media Control Schedule
16Comnet 2001 Tutorial• 16
• ia reference point • BICC
–BICC outline for implementation agreement (8/00)–Draft BICC Implementation Agreement (2/01)–Straw ballot BICC Implementation Agreement (5/01)–Final ballot BICC Implementation Agreement (8/01)
• SIP-T–Draft SIP-T Implementation Agreement (11/00)–Straw ballot SIP-T Implementation Agreement (5/01)–Final ballot SIP-T Implementation Agreement (8/01)
Media Control Schedule (cont.)
17Comnet 2001 Tutorial• 17
• Legal Intercept–New work item. –Invite contributions–Dates TBD until next meeting
• Management Interface for MGC and MG (inviting contributions)
–No progress to date.–Can the management group take it over?
Media Control Schedule (cont.)
18Comnet 2001 Tutorial
Switch Control CharterSwitch Control Charter
• General Switch Management Protocol (GSMP)– Specified jointly by MSF and IETF– Supports ATM, FR, MPLS connection establishment, termination, and status checking– Also provides means to configure interworking, where applicable–Circuit Emulation a planned future work item
• Future scope/charter TBD– Optical switching?– Distributed router?
19Comnet 2001 Tutorial
Switch Control Protocols and InterfacesSwitch Control Protocols and Interfaces
SwitchController
Physical Switch
LogicalPartitions
FR, ATM,MPLS,CES
Switch PartitionManagement
Interface
SwitchController
SwitchController
SwitchController
Multiservice Switch
FR, ATM,MPLS,CES
General SwitchManagement Protocol
(GSMP)
20Comnet 2001 Tutorial
Switch Control ScheduleSwitch Control Schedule
• Straw Ballot GSMP (without CES)– Approved 1/01
• Final Ballot GSMP (with CES)– February, 2001
• CES additions to GSMP – TBD?Issue: No MSF contributions or member support for this effort. No effort in IETF either.
21Comnet 2001 Tutorial
Management Framework CharterManagement Framework Charter
• Management for Media and Switch Control Components
• Initial Focus on MIB for Partition Management of GSMP-Controlled Switch
• Next Major Efforts – Partition Management of a MEGACO Controlled Media Gateway– Partitioning of Virtual Routers
22Comnet 2001 Tutorial
Switch Partition ManagementSwitch Partition Management
Switch Partitioning Function
Switch PartitioningManagement
Interface
Logical Switch Partitions
Multiservice Switch
Switch Control Interface (SCI)
23Comnet 2001 Tutorial
Management Framework ScheduleManagement Framework Schedule
• Partitioning MIB– Straw Ballot – 6/01– Final Ballot – 9/01
• General Partitioning Framework– Straw Ballot –9/01– Final Ballot – 12/01
• MIB/PIB for MG & MGC management– TBD
• MIB/PIB for partitioned MG (w/ Media Control)– TBD
• MIB/PIB for partitioning Router– TBD
24Comnet 2001 Tutorial
InteroperabilityInteroperability
• Three stage of interoperability testing– 1. Non-published Early Development Testing
Objective is clarifying interpretations of protocol specifications as related to overall MSS requirements
– 2. Public Bake Off against MSF IAs Overall system integration configuration
– 3. Conformance/Compliance TestingMSF “Stamp of Approval” To Be
Determined
25Comnet 2001 Tutorial
2001 Interoperability Plans2001 Interoperability Plans
• MEGACO/H.248 Interoperability Event co-sponsored with ISC 8/2000 at UNH
• Next MEGACO/H.248 Interoperability Event targeted for Jan/Feb 2001
• Plan to Sponsor MGC-MGC Interoperability Events
• Plan to Sponsor GSMP Interoperability Events