Overview of Make Whole PaymentsModifications Committee Meeting 59

12 February 2015

Page 2: Overview of Make Whole Payments Modifications Committee Meeting 59 12 February 2015

• Definition of Make Whole Payments (MWP);

• Why do MWP occur?;

• MWP through the years;

• Sample cases of Interconnector (IC) Users;

• SEMO’s comments on the four proposed Modifications;

• Further considerations.

Content

Page 3: Overview of Make Whole Payments Modifications Committee Meeting 59 12 February 2015

4.139 The purpose of Make Whole Payments is to make up any difference between the total Energy Payments to a Generator Unit in a Billing Period, and the Schedule Production Cost within that Billing Period (where the difference is arithmetically positive calculated over the Billing Period)…

• This is to guarantee recovery of all submitted costs (Incremental Cost, No Load costs, Start Up costs);

• SEM is designed to normally recover costs through Energy Payments, due to Uplift;

• The intent of the T&SC was for MWPs to be occasional and only limited to exceptional circumstances;

MWPs – what are they?

Page 4: Overview of Make Whole Payments Modifications Committee Meeting 59 12 February 2015

• Is the Unit’s revenue (SMP*MSQ)* sufficient to cover the Production Cost (MSQ*MOP+NLC+SUC)* of the unit in each TP?

• YES = MWP will be a negative value

• NO = MWP will be a positive value

• MWPs paid on the total at the end of the Energy Market Billing Period (week) only if the total aggregation is positive for each unit;

• Equivalent of Generator Units are IC Users (PT_XXXXX) not IC Gate Units (PT_XXXXX_EA/EA2/WD1).

*TPD applied as appropriate

MWPs – what are they? cont.

Page 5: Overview of Make Whole Payments Modifications Committee Meeting 59 12 February 2015

MWPs – what are they? cont.

€0

€5,000

€10,000

€15,000

€20,000

€25,000

00:0

0:00

00:3

0:00

01:0

0:00

01:3

0:00

02:0

0:00

02:3

0:00

03:0

0:00

03:3

0:00

04:0

0:00

04:3

0:00

05:0

0:00

05:3

0:00

06:0

0:00

06:3

0:00

07:0

0:00

07:3

0:00

08:0

0:00

08:3

0:00

09:0

0:00

09:3

0:00

10:0

0:00

10:3

0:00

11:0

0:00

11:3

0:00

12:0

0:00

12:3

0:00

13:0

0:00

13:3

0:00

14:0

0:00

14:3

0:00

15:0

0:00

15:3

0:00

16:0

0:00

16:3

0:00

17:0

0:00

17:3

0:00

18:0

0:00

18:3

0:00

19:0

0:00

19:3

0:00

20:0

0:00

20:3

0:00

21:0

0:00

21:3

0:00

22:0

0:00

22:3

0:00

23:0

0:00

23:3

0:00

Sum of Prod cost Sum of ENP

Over recovery

Under recovery

Page 6: Overview of Make Whole Payments Modifications Committee Meeting 59 12 February 2015

MWPs – what are they? cont.

If at the end of the week the unit is over recovering, no MWPs applies;

If at the end of the week the unit is under recovering, MWPs applies for the under recovered amount.

Page 7: Overview of Make Whole Payments Modifications Committee Meeting 59 12 February 2015

The main reasons behind MWPs are:

• Costs are determined on a Trading Day basis while MWPs are calculated on a Settlement Day basis; if unit is scheduled at the end of a Billing Period MWPs could occur;

• Recovery of SUC is spread over the Optimization Horizon – schedule might change when TD+1 is run leading to under-recovery;

• Re-price runs changing the schedule of a unit recovering costs over two Trading Days;

• SMP is zero or negative for a number of periods;

• Technical characteristics when baseload are not marginal;

MWPs – Why?

Page 8: Overview of Make Whole Payments Modifications Committee Meeting 59 12 February 2015

• When negative schedules are exposed to Uplift;

• Uplift represent a benefit for Generators with positive schedules; however it is a cost for those with prominent negative schedules;

• This could happen for units pumping or exporting*;

• Pumping is limited in capacity and will generally balance out with generation across the Billing Period;

• IC Users can export an unlimited amount due to superpositioning exposing them to Uplift;

• This exposure has always been a feature of the SEM;

• IC Gate Units created to respond to the design challenges of scheduling firm amounts.

*DSU not affected as their schedule is set as positive;

MWPs – Why? cont.

Page 9: Overview of Make Whole Payments Modifications Committee Meeting 59 12 February 2015

MWPs through the years – Standard Units

€0

€50,000

€100,000

€150,000

€200,000

€250,000

€300,000

1 6 111621263136414651 3 8 131823283338434853 5 101520253035404550 2 7 121722273237424752 4 9 1419242934394449 1 6 111621263136414651 3 8 131823283338434853

2008 2009 2010 2011 2012 2013 2014

DSU1 DSU2 DSU3 DSU4 DSU5 DSU6 DSU7 DSU8 DSU9_NI G100 G101 G102 G103 G104 G105 G106G107 G108 G109 G110 G111 G112 G113 G114 G115 G116 G117 G118 G119 G120 G121 G122G123 G124 G125 G126 G127 G128 G129 G130 G131 G132 G133 G134 G135 G136 G137 G138G139 G140 G141 G142 G143 G144 G145 G146 G147 G148 G149 G150 G151 G152 G153 G154G155 G156 G157 G158 G159 G160 G161 G162 G163 G164 G165 G166 G167 G168_NI G169_NI G170_NIG171_NI G172_NI G173_NI G174_NI G175_NI G176_NI G177_NI G178_NI G179_NI G180_NI G181_NI G182_NI G183_NI G184_NI G185_NI G186_NIG187_NI G188_NI G189_NI G190_NI G191_NI G192_NI G193_NI G194_NI G195_NI G196_NI G197_NI G198_NI G199_NI G200_NI

Page 10: Overview of Make Whole Payments Modifications Committee Meeting 59 12 February 2015

MWPs through the years – IC Units

€0

€50,000

€100,000

€150,000

€200,000

€250,000

€300,000

1 6 11 16 21 26 31 36 41 46 51 3 8 13 18 23 28 33 38 43 48 53 5 10 15 20 25 30 35 40 45 50 2 7 12 17 22 27 32 37 42 47 52 4 9 14 19 24 29 34 39 44 49 1 6 11 16 21 26 31 36 41 46 51 3 8 13 18 23 28 33 38 43 48 53

2008 2009 2010 2011 2012 2013 2014

IC100_EA IC100_EA2 IC100_WD1 IC101_EA IC101_EA2 IC101_WD1 IC102_EA IC102_EA2 IC102_WD1 IC103_EA IC104_EA IC105_EA

IC105_EA2 IC105_WD1 IC106_EA IC106_EA2 IC106_WD1 IC107_EA IC107_EA2 IC108_EA IC109_EA IC110_EA IC110_EA2 IC110_WD1

IC111_EA_NI IC111_EA2_NI IC111_WD1_NI IC112_EA_NI IC112_EA2_NI IC112_WD1_NI IC113_EA_NI IC114_EA_NI IC114_EA2_NI IC114_WD1_NI IC115_EA_NI IC115_EA2_NI

IC116_EA_NI IC117_EA_NI IC118_EA_NI IC118_EA2_NI IC118_WD1_NI IC119_EA_NI IC119_EA2_NI IC120_EA_NI IC120_EA2_NI IC120_WD1_NI IC121_EA_NI IC121_EA2_NI

IC121_WD1_NI IC122_EA_NI IC122_EA2_NI IC122_WD1_NI IC123_EA_NI IC123_EA2_NI IC123_WD1_NI IC124_EA_NI IC124_EA2_NI IC124_WD1_NI

IDT

Page 11: Overview of Make Whole Payments Modifications Committee Meeting 59 12 February 2015

-10000

-5000

0

5000

10000

15000

20000

25000

1 14291225 8 21 4 183116291226 8 22 5 18 3 16301326 9 22 5 18 3 17301326 9 23 5 20 3 16301226 9 22 7 20 3 17301326 9 22 7 21 4 17301327

1 2 3 4 5 6 7 8 91011121 2 3 4 5 6 7 8 91011121 2 3 4 5 6 7 8 91011121 2 3 4 5 6 7 8 91011121 2 3 4 5 6 7 8 91011121 2 3 4 5 6 7 8 91011121 2 3 4 5 6 7 8 9101112

2008 2009 2010 2011 2012 2013 2014

I_NIMOYLE I_ROIEWIC

Interconnector Flow* through the years IDT MWP

*Interconnector Users only – no SO-SO trades

Page 12: Overview of Make Whole Payments Modifications Committee Meeting 59 12 February 2015

Imp/Exp 2013/2014 – MSQs IC123

-6000

-4000

-2000

0

2000

4000

12/0

5/20

1321

/05/

2013

30/0

5/20

1308

/06/

2013

17/0

6/20

1326

/06/

2013

05/0

7/20

1314

/07/

2013

23/0

7/20

1301

/08/

2013

10/0

8/20

1326

/09/

2013

05/1

0/20

1314

/10/

2013

23/1

0/20

1301

/11/

2013

10/1

1/20

1319

/11/

2013

28/1

1/20

1307

/12/

2013

16/1

2/20

1325

/12/

2013

03/0

1/20

1412

/01/

2014

21/0

1/20

1430

/01/

2014

08/0

2/20

1417

/02/

2014

26/0

2/20

1407

/03/

2014

16/0

3/20

1425

/03/

2014

09/0

4/20

1418

/04/

2014

27/0

4/20

1406

/05/

2014

15/0

5/20

1424

/05/

2014

02/0

6/20

1411

/06/

2014

20/0

6/20

1429

/06/

2014

30/0

8/20

1408

/09/

2014

17/0

9/20

1426

/09/

2014

05/1

0/20

1414

/10/

2014

23/1

0/20

1401

/11/

2014

10/1

1/20

1419

/11/

2014

28/1

1/20

1407

/12/

2014

16/1

2/20

1425

/12/

2014

EA EA2 WD1

Page 13: Overview of Make Whole Payments Modifications Committee Meeting 59 12 February 2015

Imp/Exp 2013/2014 – Net MSQs IC123

-6000

-4000

-2000

0

2000

4000

12/0

5/20

1321

/05/

2013

30/0

5/20

1308

/06/

2013

17/0

6/20

1326

/06/

2013

05/0

7/20

1314

/07/

2013

23/0

7/20

1301

/08/

2013

10/0

8/20

1326

/09/

2013

05/1

0/20

1314

/10/

2013

23/1

0/20

1301

/11/

2013

10/1

1/20

1319

/11/

2013

28/1

1/20

1307

/12/

2013

16/1

2/20

1325

/12/

2013

03/0

1/20

1412

/01/

2014

21/0

1/20

1430

/01/

2014

08/0

2/20

1417

/02/

2014

26/0

2/20

1407

/03/

2014

16/0

3/20

1425

/03/

2014

09/0

4/20

1418

/04/

2014

27/0

4/20

1406

/05/

2014

15/0

5/20

1424

/05/

2014

02/0

6/20

1411

/06/

2014

20/0

6/20

1429

/06/

2014

30/0

8/20

1408

/09/

2014

17/0

9/20

1426

/09/

2014

05/1

0/20

1414

/10/

2014

23/1

0/20

1401

/11/

2014

10/1

1/20

1419

/11/

2014

28/1

1/20

1407

/12/

2014

16/1

2/20

1425

/12/

2014

EA EA2 WD1 Net

Page 14: Overview of Make Whole Payments Modifications Committee Meeting 59 12 February 2015

Paid MWPs by Gate – IC123

€0Grand Total

Grand Total

Grand Total

Page 15: Overview of Make Whole Payments Modifications Committee Meeting 59 12 February 2015

Imp/Exp 2013/2014 – MSQ for IC102

-6000

-4000

-2000

0

2000

4000

30/0

9/20

1226

/12/

2012

07/0

1/20

1319

/01/

2013

31/0

1/20

1312

/02/

2013

24/0

2/20

1303

/05/

2013

15/0

5/20

1327

/05/

2013

08/0

6/20

1320

/06/

2013

02/0

7/20

1314

/07/

2013

26/0

7/20

1307

/08/

2013

19/0

8/20

1331

/08/

2013

12/0

9/20

1324

/09/

2013

06/1

0/20

1318

/10/

2013

30/1

0/20

1311

/11/

2013

25/1

1/20

1313

/12/

2013

25/1

2/20

1306

/01/

2014

18/0

1/20

1430

/01/

2014

11/0

2/20

1423

/02/

2014

07/0

3/20

1419

/03/

2014

31/0

3/20

1412

/04/

2014

24/0

4/20

1406

/05/

2014

18/0

5/20

1430

/05/

2014

11/0

6/20

1423

/06/

2014

05/0

7/20

1417

/07/

2014

29/0

7/20

1410

/08/

2014

22/0

8/20

1403

/09/

2014

17/0

9/20

1429

/09/

2014

11/1

0/20

1423

/10/

2014

04/1

1/20

1416

/11/

2014

28/1

1/20

1410

/12/

2014

22/1

2/20

14

EA EA2 WD1

Page 16: Overview of Make Whole Payments Modifications Committee Meeting 59 12 February 2015

Imp/Exp 2013/2014 – Net MSQs IC102

-6000

-4000

-2000

0

2000

4000

30/0

9/20

1226

/12/

2012

07/0

1/20

1319

/01/

2013

31/0

1/20

1312

/02/

2013

24/0

2/20

1303

/05/

2013

15/0

5/20

1327

/05/

2013

08/0

6/20

1320

/06/

2013

02/0

7/20

1314

/07/

2013

26/0

7/20

1307

/08/

2013

19/0

8/20

1331

/08/

2013

12/0

9/20

1324

/09/

2013

06/1

0/20

1318

/10/

2013

30/1

0/20

1311

/11/

2013

25/1

1/20

1313

/12/

2013

25/1

2/20

1306

/01/

2014

18/0

1/20

1430

/01/

2014

11/0

2/20

1423

/02/

2014

07/0

3/20

1419

/03/

2014

31/0

3/20

1412

/04/

2014

24/0

4/20

1406

/05/

2014

18/0

5/20

1430

/05/

2014

11/0

6/20

1423

/06/

2014

05/0

7/20

1417

/07/

2014

29/0

7/20

1410

/08/

2014

22/0

8/20

1403

/09/

2014

17/0

9/20

1429

/09/

2014

11/1

0/20

1423

/10/

2014

04/1

1/20

1416

/11/

2014

28/1

1/20

1410

/12/

2014

22/1

2/20

14

EA EA2 WD1 Net

Page 17: Overview of Make Whole Payments Modifications Committee Meeting 59 12 February 2015

Paid MWPs by Gate – IC102

€0

€50,000

€100,000

€150,000

€200,000

€250,000

€300,000

40 51 53 2 4 6 8 10 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 49 51 53 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52

2012 2013 2014

IC102_EA IC102_EA2 IC102_WD1

Page 18: Overview of Make Whole Payments Modifications Committee Meeting 59 12 February 2015

All MWPs calculated by Gate – IC102

-€700,000

-€600,000

-€500,000

-€400,000

-€300,000

-€200,000

-€100,000

€0

€100,000

€200,000

€300,000

40 51 53 2 4 6 8 10 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 49 51 53 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52

2012 2013 2014

IC102_EA IC102_EA2 IC102_WD1

Page 19: Overview of Make Whole Payments Modifications Committee Meeting 59 12 February 2015

All MWPs by Gate – IC102

-€700,000

-€600,000

-€500,000

-€400,000

-€300,000

-€200,000

-€100,000

€0

€100,000

€200,000

€300,000

40 51 53 2 4 6 8 10 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 49 51 53 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52

2012 2013 2014

IC102_EA IC102_EA2 IC102_WD1 IC102_Net

Page 20: Overview of Make Whole Payments Modifications Committee Meeting 59 12 February 2015

Imp/Exp by TP 20130715 – MSQs IC102

-80

-60

-40

-20

0

20

40

60

80

100

1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

EA EA2 WD1

Page 21: Overview of Make Whole Payments Modifications Committee Meeting 59 12 February 2015

Imp/Exp by TP – MSQs IC102

-150

-100

-50

0

50

100

150

1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

5th Aug 2013

EA EA2 WD1 -120

-100

-80

-60

-40

-20

0

20

40

60

80

1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

10th Aug 2013

EA EA2 WD1

-150

-100

-50

0

50

100

150

1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

05th Sep 2013

EA EA2 WD1 -120

-100

-80

-60

-40

-20

0

20

40

60

80

100

1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

09th Oct 2013

EA EA2 WD1

-150

-100

-50

0

50

100

150

1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

25th Nov 2013

EA EA2 WD1

-100

-80

-60

-40

-20

0

20

40

60

80

100

1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

15th Dec 2013

EA EA2 WD1-150

-100

-50

0

50

100

150

1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

2nd Jan 2014

EA EA2 WD1

-150

-100

-50

0

50

100

150

1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

22nd Feb 2014

EA EA2 WD1 -150

-100

-50

0

50

100

150

1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

22nd Mar 2014

EA EA2 WD1

-60

-40

-20

0

20

40

60

1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

21st May 2014

EA EA2 WD1 -200

-150

-100

-50

0

50

100

1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

21st Jul 2014

EA EA2 WD1-150

-100

-50

0

50

100

150

1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

21st Oct 2014

EA EA2 WD1

-100

-80

-60

-40

-20

0

20

40

60

80

100

120

1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

21st Dec 2014

EA EA2 WD1

Page 22: Overview of Make Whole Payments Modifications Committee Meeting 59 12 February 2015

Pumped Storage – MSQs 2013/2014

-4000

-3000

-2000

-1000

0

1000

2000

3000

01/0

1/20

1316

/01/

2013

31/0

1/20

1315

/02/

2013

02/0

3/20

1317

/03/

2013

01/0

4/20

1316

/04/

2013

01/0

5/20

1316

/05/

2013

31/0

5/20

1315

/06/

2013

30/0

6/20

1315

/07/

2013

30/0

7/20

1314

/08/

2013

29/0

8/20

1313

/09/

2013

28/0

9/20

1313

/10/

2013

28/1

0/20

1312

/11/

2013

27/1

1/20

1312

/12/

2013

27/1

2/20

1311

/01/

2014

26/0

1/20

1410

/02/

2014

25/0

2/20

1412

/03/

2014

27/0

3/20

1411

/04/

2014

26/0

4/20

1411

/05/

2014

26/0

5/20

1410

/06/

2014

25/0

6/20

1410

/07/

2014

25/0

7/20

1409

/08/

2014

24/0

8/20

1408

/09/

2014

23/0

9/20

1408

/10/

2014

23/1

0/20

1407

/11/

2014

22/1

1/20

1407

/12/

2014

22/1

2/20

14

Total

Page 23: Overview of Make Whole Payments Modifications Committee Meeting 59 12 February 2015

Pumped Storage – MWP 2013/2014

€0

€50,000

€100,000

€150,000

€200,000

€250,000

€300,000

05/0

1/20

13

19/0

1/20

13

02/0

2/20

13

16/0

2/20

13

02/0

3/20

13

16/0

3/20

13

30/0

3/20

13

13/0

4/20

13

27/0

4/20

13

11/0

5/20

13

25/0

5/20

13

08/0

6/20

13

22/0

6/20

13

06/0

7/20

13

20/0

7/20

13

03/0

8/20

13

17/0

8/20

13

31/0

8/20

13

14/0

9/20

13

28/0

9/20

13

12/1

0/20

13

26/1

0/20

13

09/1

1/20

13

23/1

1/20

13

07/1

2/20

13

21/1

2/20

13

04/0

1/20

14

18/0

1/20

14

01/0

2/20

14

15/0

2/20

14

01/0

3/20

14

15/0

3/20

14

29/0

3/20

14

12/0

4/20

14

26/0

4/20

14

10/0

5/20

14

24/0

5/20

14

07/0

6/20

14

21/0

6/20

14

05/0

7/20

14

19/0

7/20

14

02/0

8/20

14

16/0

8/20

14

30/0

8/20

14

13/0

9/20

14

27/0

9/20

14

11/1

0/20

14

25/1

0/20

14

08/1

1/20

14

22/1

1/20

14

06/1

2/20

14

20/1

2/20

14

(blank)

(blank)

Page 24: Overview of Make Whole Payments Modifications Committee Meeting 59 12 February 2015

• Mod_09_14: ‘Amendment to Make Whole Payments for Interconnector Units’:• Remove ability to isolate losses/gains between Gates for MWP;• Eliminates unintended consequences of IDT;• Traders exposure still mitigated for their net position;• Exports are not impacted and still viable;• MWPs could still happen for cross Interconnector trading;

• Mod_10_14 ‘Remove Make Whole Payments for Interconnector Units’:• Traders exposure not mitigated in the Market;• This is the only Mod that eliminates both risks on MWPs due to

cross trading between Gates and/or between Interconnectors;• Exports are not incentivised but are not impaired either;• Radical solution to the observed issue;

Comments on the four Modifications

Page 25: Overview of Make Whole Payments Modifications Committee Meeting 59 12 February 2015

• Mod_11_14 ‘Pay-As-Bid / Paid-As-Bid for Interconnector Units’:• Inconsistent with current Energy Balancing mechanism;• SEMO does not consider this as a viable option for this Market;

• Mod_12_14 ‘Amendment to Make Whole Mechanism to remove Settlement Periods of simultaneous import and export flows’:• Partially remove ability to isolate losses/gains between Gates for

MWP;• Inadequate balancing of MWP for IC Users where:

• Trading exposure unmitigated if large exports happens at times of small imports;

• MWP overstated if over recovery, due to large imports, is negated by small exports;

• MWP could still happen via cross Interconnector trading;• Principles of IDT compromised;• Exports could either increase or decrease substantially;

Comments on the four Modifications – Cont.

Page 26: Overview of Make Whole Payments Modifications Committee Meeting 59 12 February 2015

• SEMO wishes to propose the following points for further discussion:

• Curtailment affected by net Interconnector flow; individual Gates or

individual Users trades are irrelevant;

• Curtailment or Constraints in each jurisdiction might be badly

affected if cross trading between Interconnectors will push large

imports on one Interconnector while large export on the other;

• Principles of Cross Border Trades and price signals for exports

have been in place since the start of the SEM; should they change

now?

• Dispatch down of wind efficiently managed notwithstanding

‘increased wind factor, increased Imports, 300MW new installed

wind capacity and stable demand’*;

* Eirgrid ‘Annual Wind Constraint and Curtailment Report 2013’ – dispatch down 3.2% in 2013 vs 2.1% in 2012

Further Considerations

Page 27: Overview of Make Whole Payments Modifications Committee Meeting 59 12 February 2015

• Exports effects on SMP;

• Consumer interests impacted by current behaviours;

• Exposure to Uplift when Exporting, is common to units with

comparable behaviour: Pumped Storage and Suppliers;

• Interconnector Users not subject to BCoP and to date have

been able to represent their exposure adequately;

• Discrimination? APTG, VPTG and PPTG don’t receive MWP;

• The nature of costs to be recovered;

• EA prices currently over-estimated due to large Imports

countertraded by Exports at the EA2;

• To calculate exposure, EA prices good estimate of EP2 SMP in

many TPs as per following graphs:

Further Considerations – cont.

Page 28: Overview of Make Whole Payments Modifications Committee Meeting 59 12 February 2015

SMP comparison: EA vs EP2

-€8

-€6

-€4

-€2

€0

€2

€4

€6

€8

€10

€12

121212121212121212121212121212121212121212121212121212121212121212121212121212121212121212121212

1 2 3 4 5 6 7 8 9 101112131415161718192021222324 1 2 3 4 5 6 7 8 9 101112131415161718192021222324

2013 2014

SMP variation 2013/2014: EP2 - EA

€0

€20

€40

€60

€80

€100

€120

€140

121212121212121212121212121212121212121212121212121212121212121212121212121212121212121212121212

1 2 3 4 5 6 7 8 9 101112131415161718192021222324 1 2 3 4 5 6 7 8 9 101112131415161718192021222324

2013 2014

EA and EP2 SMP Average by TP - 2013/2014

EA EP2

Page 29: Overview of Make Whole Payments Modifications Committee Meeting 59 12 February 2015