• Overview of FCGO's IT Systems• Technical Aspects of FCGO's IT Systems
• Data Flow of the Systems• Functional Flow of the Systems• Challenges and Way Forward• Interaction
Management Information System (MIS):{Provides management with reports / on-line access organization’s overall current and historical performance}
FCGO - Financial Management Information System (FMIS)
Bespoke (Customized) Type of Software
DECS/FMIS
Exp
en
dit
ure
Rev
enu
e
Ret
enti
on
Descriptions FMIS/DECS (New Version)
Technology Web baseWeb base
Front-endFront-end DeveloperDeveloper(Forms/ Report 10g)(Forms/ Report 10g)
Back-endBack-end Oracle 11g databaseOracle 11g database
Operating SystemOperating System Client Client in DTCOs (Windows in DTCOs (Windows XP or above) XP or above) Server in FCGO (AIX 6.1)Server in FCGO (AIX 6.1)
FontFont Nepali UnicodeNepali Unicode
Descriptions Technical Requirements
Client Computer Client Computer Core i3 or higherCore i3 or higher
At least 2 GB RAM and 320 GB Hard At least 2 GB RAM and 320 GB Hard DiskDisk
Server Processor : RISC Power 7 with 4 CoresRAM/ Main Memory : 128GB DDR3- 1333 MHzStorage : 4 TBTape Library : 16 GB * 20
Backup System for Data Cluster, Mirroring
Backup system for Electricity power
Undisrupted Electricity Line of Singhdurbar15 KVA UPS - 2, 10 KVA UPS -1, 6 KVA UPS - 1, 60 KVA Generator
Security Firewall, Intrusion Prevention SystemKaspersky Anti Virus, Bid Defender
Data Flow Management – Under Web based System using Intranet Lease Line and Optical Fiber
Firewall IPS
Server1
Server2
Storage
20 Districts
(Including Kathmandu's 5 Paying Centers)
40 Districts DECS (TSA)7 Districts DECS (Non-TSA)
Optical Fiber
Service Provider: Subisu Cable Net
ADSL
Service Provider: Nepal Telecom
(Data Center)
Data Flow Management – Under Non-Web Based System
`
DECS
`
DECS MoF Data Sharing PC
FCGOData ProcessingData AnalysisData Finalization
Data Retrieve PC
FCGO
Through
E-MailPC Anywhere (Telephone Line)External Devices
Through
External Devices
Summary File
Backup File
`
DECS
Backup Server
Transfer Summary File
Main Database
Server (FMIS)
Upload Data
Back up
Statistics Analysis Section FCGO
(8 Districts)
DECS (TSA) web base 60 Districts
DECS (Non-TSA) web base 7 Districts
DECS (Non-TSA) stand alone 8 Districts
Contd.Contd.Functional Flow Overview Functional Flow Overview
Non-Cash Payment: Direct Payment (Loan & Grant) Commodity Grant
Line Ministries (LMBS)
Data
Reconciliation
FMIS
Data Reconciliation
Auditor General Office
Export data via FMIS to BMIS Budget Release & Expenditure Revenue Export Master Data via BMIS to FMIS
BMIS
(MoF)
Budget Execution Section (FCGO)
Virement
Virement
Paying Office (CGAS & RAS)
DECS
Export Summary Data Budget Release and Expenditure Revenue Retention Money
Payment Request
Non-Cash Payment
IsIs Issue
Cheques
Initial Authorisation
Additional Authorisatio
n
Virement
Department / Regional Directorial
Initial Authorisation
Additional Authorisation
Virement
Ministry/DepartmentAuthorization, Virement Allocation, Program
Spending Units•Request for release•Cash Flow Statement•Procurement Management•Expenditure and accounting
Payment Order14, 14 ka
TSA-DECS Functional Flow
Local Bank:• Cheque payment
•Preparation of statement of paid cheque and send to DTCO
Nepal Rastra Bank
Nepal Rastra Bank
FCGOTreasury Admin Section
FCGOTreasury Admin Section
DTCO Internal Work Flow
Initial Require-nment
Help Desk
Release and payment Section
Record Section
•Registration of Spending Units•Uploading the specimen of signature•Entry of Authorization/ Virement
• Payment Order reg. (Up to 12 noon)
• Cheque
Release (Up to 2
PM)
• Release Set• Signature
verification• Budget,
Program and source verification
• Cheque prepare and sign
• Cheque handover to Help Desk (within 2 hours)
• Preparation of statement of issued cheque and send to Record Section
• Reconciliation of Bank Statement (up to 4 PM)
• Settlement and preparation of report (up to 5 PM)
• These Systems capture:Released Amount & Budget Expenditure for Recurrent, Capital and Financing
Tax and Non-tax RevenueTotal Retention Money deposited with the Government and with others
Direct Payments & Commodity GrantsDebt Service
ChallengesChallenges
Large fiscal activities remain outside the scope of these Systems
Determination of Treasury Position of the Govt
Reliable & Strong Communication Facilities
Power Irregularities
Continuation of Financial Resources
Need to establish well IT Infrastructure in FCGO and DTCOs
Confusion between Business Process & Technical Aspect
Resist with IT Initiatives
Lack of Sufficient IT Manpower
Lack of Training for Managerial & Technical Manpower
No Electronic Linkage between the System and Bank
Interface among the system, spending units and the Bank
Way Forward
• IT Policy and IT Strategic Planning• Integrated FMIS (Phase wise)• Integration/Interface of the TSA-DECS with the Bank and CGAS & RAS
• IT Infrastructure with Complete Solutions (Power Back-up, Connectivity, IT Set-up, Networking – LAN & WAN etc)
• Capacity Building