28
www.ieagreen.org.uk Overview of CO Overview of CO 2 2 Capture and Capture and Storage Demonstrations Storage Demonstrations Dr John Topper IEA Clean Coal Centre and IEA Greenhouse Gas R&D Programme India – UK Workshop on CCS 22-23 January 2008, Delhi [email protected]

Overview of CO Capture and Storage Demonstrations - IRADE

  • Upload
    others

  • View
    6

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Overview of CO Capture and Storage Demonstrations - IRADE

www.ieagreen.org.uk

Overview of COOverview of CO 22 Capture and Capture and Storage DemonstrationsStorage Demonstrations

Dr John Topper

IEA Clean Coal Centre and

IEA Greenhouse Gas R&D ProgrammeIndia – UK Workshop on CCS

22-23 January 2008, Delhi

[email protected]

Page 2: Overview of CO Capture and Storage Demonstrations - IRADE

www.ieagreen.org.uk

Carbon Capture and StorageCarbon Capture and Storage

CaptureTransport

Storage

Three Options;• Post Combustion• Pre Combustion• Oxy fuel

Two Options;• Pipelines• Ships

Three Options;• Coal seams, 40 Gt CO2

• Oil and gas fields, 1,000 Gt CO2

• Deep saline aquifers – up to 10,000 Gt CO2

Page 3: Overview of CO Capture and Storage Demonstrations - IRADE

www.ieagreen.org.uk

530

540

550

560

570

580

590

600

610

1980 1985 1990 1995 2000 2005 2010

Year

Max

SH

Ste

am T

empe

ratu

re, °

C

Studstrup (DK) 540/540

Maatsura 1 (J) 538/566

Esbjerg (DK) 560/560

Schwarze Pumpe (D) 547/565

Maatsura 2 (J) 593/593

Haramachi 2 (J) 600/600

Nordjylland (DK) 580/580/580

Boxberg (D) 545/581

Tachibanawan 1 (J) 600/610

Avedore (DK) 580/600

Niederaussem (D) 580/600

Hekinan (J) 568/593

Isogo (J) 600/610

Torrevaldaliga (I) 600/610⊗⊗⊗⊗

⊗⊗⊗⊗

Hitachinaka (J) 600/600

Huyan (China)

Recent Plant State-of-the-Art Conditions

Genesee 3 580/570Yunghung 566/576

Ultrasupercritical

Supercritical

Page 4: Overview of CO Capture and Storage Demonstrations - IRADE

www.ieagreen.org.uk

E On 50% efficient plant… 50plus by using new materials

Location

Efficiency

Capacity

Investment

Start of operation

Wilhelmshaven

50 %

500 MWel

1 billion €

2014

Size of plant Search for location

2007

Material developmentRequest for proposal

2010

ConstructionStart of operation

2014

Page 5: Overview of CO Capture and Storage Demonstrations - IRADE

www.ieagreen.org.uk

160 T/D CO2 Capture Plant(Supplied by MHI of Japan and using their KS 1

Solvent)

Client: Petronas Fertilizer (Keda) Sdn. Bhd.

Location: Kedah Darul Aman, Malaysia

Feed Gas: Steam Reformer Flue Gas

Capacity: Flue Gas 47,000 Nm3/H(Max. Capacity = 210 T/D)

Use of CO2: Urea Production

Start Up: October 1999

CO2 Capture: in Malaysia

Page 6: Overview of CO Capture and Storage Demonstrations - IRADE

www.ieagreen.org.uk

Esbjerg power plant

Capacity: 1 t CO2 / h

5000 Nm3/h flue gas (coal

combustion)

In operation since early 2006

CASTOR Post-Combustion Pilot Plant

Page 7: Overview of CO Capture and Storage Demonstrations - IRADE

www.ieagreen.org.uk

UK CCS competition� Terms of Reference published 19 November 2007� Minimum 300MWe; � Must demonstrate full CCS� Post Combustion** pre-selected because

(** oxy fuel also eligible as a retrofit option)� Need to do something to support potential retrofits world

wide - eyes on China and India� Hence exportability looks promising� There are several demonstrations of other carbon capture

routes under development� Good fit with potential UK based suppliers� Provides one technology block of EU 10-12

demonstrators?

Page 8: Overview of CO Capture and Storage Demonstrations - IRADE

www.ieagreen.org.uk

CO2 Capture Ready Plant

� Avoids the risk of stranded assets and ‘carbon lock-in’

� Developers must eliminate factors which would prevent installation and operation of CO2 capture

� This might include

• A study of options for capture retrofit

• Include sufficient space and access for

additional facilities

• Identify reasonable route(s) to storage of

CO2

Page 9: Overview of CO Capture and Storage Demonstrations - IRADE

www.ieagreen.org.uk

IEA GHG International Post Combustion Capture Network

• A network of international experts from North America, Europe, Japan, Australia

• Has met 10 times since 2000

• 11th Meeting in Beijing 20-21 May 2008

• Supported by UK nZEC and MoU with China

• INDIAN PARTICIPATION WELCOME

Page 10: Overview of CO Capture and Storage Demonstrations - IRADE

www.ieagreen.org.uk

Oxyfuel process(Courtesy of Vatenfall)

economiser

steam

condensate

gypsum

carbon dioxidecompressor

Page 11: Overview of CO Capture and Storage Demonstrations - IRADE

www.ieagreen.org.uk

Vatenfall 30MW Demonstration

Page 12: Overview of CO Capture and Storage Demonstrations - IRADE

www.ieagreen.org.uk

Callide A – Queensland, Australia

Courtesy of CS Energy

Page 13: Overview of CO Capture and Storage Demonstrations - IRADE

www.ieagreen.org.uk

Pilot-scale testing by IHI at Aioi (Japan)• Test facility:

• Capacity 1.2 MWt (~ 150 kg coal/h)

• Furnace size – 1.3m dia x 7.5 m

• Objectives:

• Compare air- vs oxy-firing combustion and emissions

• Additional validation of Callide A boiler model

• Investor confidence

• Ash samples for other CCSD Projects

• Status:

• Callide & Acland coals tested in Sep. 05

• Rolleston coal to be tested in Dec. 05

• Measurements:

• Burnout and temperature profiles

• Ash deposition tares

• Emissions including Hg

• Turn-down effects

• Fly ash for characterization

Page 14: Overview of CO Capture and Storage Demonstrations - IRADE

www.ieagreen.org.uk

SaskPower’s 300MWe oxyfuel plant

Page 15: Overview of CO Capture and Storage Demonstrations - IRADE

www.ieagreen.org.uk

IGCC Plant

The Tampa 250MW IGCC plant in Florida

Page 16: Overview of CO Capture and Storage Demonstrations - IRADE

www.ieagreen.org.uk

Gasification with Cleanup Separation System

Integration

CarbonSequestration

Optimized Turbines

Fuel Cells

H2 Production

Page 17: Overview of CO Capture and Storage Demonstrations - IRADE

www.ieagreen.org.uk

RWE is pushing forward the IGCC technology

per pipeline toCO2 storage facility

can also be used as H 2, or to produce SNG, methanol, fuel

IGCC*Gas and steam

turbinePower

Hydrogen

CO2

450 MWgross

Oxygen

CoalGasification

Page 18: Overview of CO Capture and Storage Demonstrations - IRADE

www.ieagreen.org.uk

IGCC in Japan (courtesy of J Coal)

IGCC (Integrated Coal Gasification Combined Cycle)

IGFC (Integrated Coal Gasification Fuel Cell Combined Cycle)

●EAGLE Project●Oxygen blown, entrained-flow gasifier●150t/d pilot test, 2001-2009●High efficiency (30% CO2 reduction)●CO2 capture test, 2007-

●Clean Coal Power R&D Co., Ltd.●Air blown, entrained-flow gasifier●250MW demonstration, 2007-2009●High efficiency (20% CO2 reduction)

Bird eye's view of the demonstration plant Pilot plant at Wakamatsu Res. Inst., JPower

Page 19: Overview of CO Capture and Storage Demonstrations - IRADE

www.ieagreen.org.uk

CO2 storage effectiveness increases with depth Courtesy of CO2CRC

Page 20: Overview of CO Capture and Storage Demonstrations - IRADE

www.ieagreen.org.ukCourtesy of CO2CRC

Page 21: Overview of CO Capture and Storage Demonstrations - IRADE

www.ieagreen.org.uk

CO2Injection

site

Weyburn EOR – CO 2 Storage Project

Productionwell

Page 22: Overview of CO Capture and Storage Demonstrations - IRADE

www.ieagreen.org.uk

Saline Formations

Page 23: Overview of CO Capture and Storage Demonstrations - IRADE

www.ieagreen.org.uk

CO2 Capture Facilities

Mitsubishi Plant, Nagasaki

Sumitomo Chemicals

Indo Gulf Fertilizer Co .

Luzhou Natural Gas

Vattenfall

CASTOR

Snohvit

Sleipner

In Salah

Shady Point

Bellingham CogenDakota Gasification PlantBoundary Dam

IMC Global Inc.

Key

Warrior Run

Gasification synfuels plant

Major Pilot Plants

CO2 Separation from Natural Gas for CCS

Food-grade CO2/carbonation of brine/Urea (Post Combustion)

Kedah

www.co2captureandstorage.info

Page 24: Overview of CO Capture and Storage Demonstrations - IRADE

www.ieagreen.org.uk

COCO22 Injection and Storage ActivitiesInjection and Storage Activities

NagaokaHokkaido

Qinshui Basin

Snohvit

Sleipner

In Salah

Key

ECBM projects

EOR projects

Gas production Fields

Saline aquifier

SibillaRECOPOLCO2 SINK

K-12B

Cerro Fortunoso

Frio

West Pearl Queen

MountaineerWeyburn

Penn WestAlberta ECBM

Teapot DomeRangely

Burlington

4 New CO2-EOR Pilots in Canada

50 Acid Gas injection sites in North America

70 CO2-EOR projects in U.S.A.

GorgonDepleted Oil Field

Otway Basin

Page 25: Overview of CO Capture and Storage Demonstrations - IRADE

www.ieagreen.org.uk

Page 26: Overview of CO Capture and Storage Demonstrations - IRADE

www.ieagreen.org.uk

Information DisseminationInformation Dissemination

Quarterly newsletter

Topical Reports

GHGT-916th – 19th

November 2009Washington D.C.

www.mit.edu/ghgt9

Page 27: Overview of CO Capture and Storage Demonstrations - IRADE

www.ieagreen.org.uk

International Summer School• New Initiative launched in 2007• Annual summer school for up to 60 invited students

• Post grad/post doc students targeted• Encouraging developing country participation

• International Steering Committee established• IEAGHG, Germany, France, Australia, Japan, Canada, Netherlands and USA

• First summer school was held in Germany in August 2007• 54 students from 22 countries attended• Next planned for Canada in 2008

• Details available at www.ieagreen.org.uk/summerschool/

Page 28: Overview of CO Capture and Storage Demonstrations - IRADE

www.ieagreen.org.uk

Thank You Thank You

Reference material on IEA GHG can be found at:www.ieagreen.org.uk

Reference material on CCS can be found at:

www.co2captureandstorage.info