Upload
whitneybrooks
View
706
Download
0
Embed Size (px)
Citation preview
Whitney Brooks Overstreet 3344 South Holly StreetDenver, CO 80222(303) [email protected]
multi-use downtown revitalizationPark Lane Development 2Whyard remodel/addition 3
commercialCraft & Design Center 4Xanterra Employee Dining 5
senior housingFox Run Good Samaritan Village 6
multi-family housingThe Timbers at Estes Park 7
single family residentialCheley-Klebe, Hill, Greer, McMillon 8
Park Lane Development 2Whyard remodel/addition 3
Craft & Design Center 4Xanterra Employee Dining 5
Fox Run Good Samaritan Village 6
The Timbers at Estes Park 7
collaborative projects 9Cheley-Klebe, Hill, Greer, McMillon 8
Standard Renewable Energy
photovoltaic installs 1Basis Architecture
photovoltaic installs 1
Whitney Brooks Overstreet 3344 South Holly StreetDenver, CO 80222(303) [email protected]
multi-use downtown revitalizationPark Lane Development 2Whyard remodel/addition 3
commercialCraft & Design Center 4Xanterra Employee Dining 5
senior housingFox Run Good Samaritan Village 6
multi-family housingThe Timbers at Estes Park 7
single family residentialCheley-Klebe, Hill, Greer, McMillon 8
Park Lane Development 2Whyard remodel/addition 3
Craft & Design Center 4Xanterra Employee Dining 5
Fox Run Good Samaritan Village 6
The Timbers at Estes Park 7
collaborative projects 9Cheley-Klebe, Hill, Greer, McMillon 8
Standard Renewable Energy
photovoltaic installs 1Basis Architecture
photovoltaic installs 1
1
Denver, Jefferson County, Aurora, Greenwood Village, Boulder County, City of Boulder, Broomfi eld, Louisville, Westminster, Conifer, Colorado Springs
Whitney Brooks Overstreet 3344 South Holly StreetDenver, CO 80222(303) [email protected]
multi-use downtown revitalizationPark Lane Development 2Whyard remodel/addition 3
commercialCraft & Design Center 4Xanterra Employee Dining 5
senior housingFox Run Good Samaritan Village 6
multi-family housingThe Timbers at Estes Park 7
single family residentialCheley-Klebe, Hill, Greer, McMillon 8
Park Lane Development 2Whyard remodel/addition 3
Craft & Design Center 4Xanterra Employee Dining 5
Fox Run Good Samaritan Village 6
The Timbers at Estes Park 7
collaborative projects 9Cheley-Klebe, Hill, Greer, McMillon 8
Standard Renewable Energy
photovoltaic installs 1Basis Architecture
photovoltaic installs 1
Park Lane DevelopmentWAG Corporation
Estes Park, CO
2
7 retail units/caferestaurant/banquet area
courtyards2 offi ce spaces
4 residential units
24,150 sf
basisarchitecture.com
B
Schematic
Este
s Pa
rk, C
olor
ado
8051
716
92 B
ig T
hom
pson
Ave
nue,
Sui
te 1
00
AI
SS
A7Sheet No:
fax: 970.586.9149vox: 970.586.9140
Sheet Title:Sheet Title:
Date:
A R C H I T E C T U R E P. C.
Architecture, P.C.
Issue:
BASIS
Elevations
3/22/2009
WA
G C
orpo
rati
onP
ark
Lane
Dev
elop
men
t20
5 P
ark
Lane
Est
es P
ark,
Col
orad
o 80
517
11/8" = 1'-0"
North West Elevation
21/8" = 1'-0"
North Elevation
basisarchitecture.com
B
Schematic
Este
s Pa
rk, C
olor
ado
8051
716
92 B
ig T
hom
pson
Ave
nue,
Sui
te 1
00
AI
SS
A7Sheet No:
fax: 970.586.9149vox: 970.586.9140
Sheet Title:Sheet Title:
Date:
A R C H I T E C T U R E P. C.
Architecture, P.C.
Issue:
BASIS
Elevations
3/22/2009
WA
G C
orpo
rati
onP
ark
Lane
Dev
elop
men
t20
5 P
ark
Lane
Est
es P
ark,
Col
orad
o 80
517
11/8" = 1'-0"
North West Elevation
21/8" = 1'-0"
North Elevation
basisarchitecture.com
B
Schematic
Este
s Pa
rk, C
olor
ado
8051
716
92 B
ig T
hom
pson
Ave
nue,
Sui
te 1
00
AI
SS
A6Sheet No:
fax: 970.586.9149vox: 970.586.9140
Sheet Title:Sheet Title:
Date:
A R C H I T E C T U R E P. C.
Architecture, P.C.
Issue:
BASIS
Elevations
3/22/2009
WA
G C
orpo
rati
onP
ark
Lane
Dev
elop
men
t20
5 P
ark
Lane
Est
es P
ark,
Col
orad
o 80
517
21/8" = 1'-0"
South West Elevation
11/8" = 1'-0"
South East Elevation
Whitney Brooks Overstreet 3344 South Holly StreetDenver, CO 80222(303) [email protected]
multi-use downtown revitalizationPark Lane Development 2Whyard remodel/addition 3
commercialCraft & Design Center 4Xanterra Employee Dining 5
senior housingFox Run Good Samaritan Village 6
multi-family housingThe Timbers at Estes Park 7
single family residentialCheley-Klebe, Hill, Greer, McMillon 8
Park Lane Development 2Whyard remodel/addition 3
Craft & Design Center 4Xanterra Employee Dining 5
Fox Run Good Samaritan Village 6
The Timbers at Estes Park 7
collaborative projects 9Cheley-Klebe, Hill, Greer, McMillon 8
Standard Renewable Energy
photovoltaic installs 1Basis Architecture
photovoltaic installs 1
Whyard Remodel/AdditionPaul & Sally Whyard
Estes Park, CO
Tiki Bar & Deck (proposed) 2 story residence (addition)
Gallery of Glass (addition)Mountain Munchies (remodel)
1 story residence (existing)
5940 sf total
3
basisarchitecture.comc
B
Final Review
East & North Elevations
Este
s Pa
rk, C
olor
ado
8051
716
92 B
ig T
hom
pson
Ave
nue,
Sui
te 1
00
AI
SS
A3.0Sheet No:
fax: 970.586.9149vox: 970.586.9140
Sheet Title:Sheet Title:
Date:
A R C H I T E C T U R E P. C.
Architecture, P.C.BASIS
Issue:
Pau
l & S
ally
Why
ard
Est
es P
ark,
Col
orad
o 80
517
Why
ard
'Tik
i Bar
'18
9 E
ast R
iver
side
Driv
e
__ of __
3/22/2009
T.O. 1st FloorEL: 100' - 0"
Max. HeightEL: 130' - 0"
T.O. 2nd FloorEL: 112' - 6 1/2" (+/-)
PROPOSED SIGN LOCATION
MECHANICAL GUARD FOR EXHAUST FAN
CORRUGATED METAL ROOF
CORRUGATED METAL SIDING, TYP
2X8 FASCIA, TYP
NEW
EXISTING
21/4" = 1'-0"
North Elevation
11/4" = 1'-0"
East Elevation
3 7
basisarchitecture.comc
B
Final Review
Site Plan & 1st FloorPlan
Este
s Pa
rk, C
olor
ado
8051
716
92 B
ig T
hom
pson
Ave
nue,
Sui
te 1
00
AI
SS
A1.0Sheet No:
fax: 970.586.9149vox: 970.586.9140
Sheet Title:Sheet Title:
Date:
A R C H I T E C T U R E P. C.
Architecture, P.C.BASIS
Issue:
Pau
l &
Sal
ly W
hyar
d
Est
es P
ark,
Col
orad
o 80
517
Why
ard
'Tik
i B
ar'
189
Eas
t Riv
ersi
de D
rive
__ of __
3/22/2009
NN
REF.
WALL TYPES (PLAN)
1
2
1 HR EXTERIOR WALL
1 HR INTERIOR WALL
3
NON-RATED INTERIOR WALL
4
2 HR WALL/INFILL
21/8" = 1'-0"
1st Floor Plan 11/8" = 1'-0"
Site/Roof Plan
SHEET INDEX
A1.0 SITE PLAN & 1ST FLOOR PLANA2.0 2ND FLOOR PLAN & CODE STUDYA3.0 EAST & NORTH ELEVATIONSA3.1 WEST & SOUTH ELEVATIONSA4.0 SECTIONS & ASSEMBLIESA4.1 SECTIONS & DETAILSS2.0 FRAMING PLANSS2.1 STRUCTURAL DETAILS
GENERAL NOTES1.) All construction shall conform to the following applicable codes; as amended by Town of Estes Park
International Building Code 2003 International Plumbing Code 2003 International Mechanical Code 2003 National Electrical Code 2008 ed. All other applicable codes.
The Contractor and its sub-contractors shall obtain all licences and permits required by the
authorities having jurisdiction.
2.) The Contractor and sub-contractors are to become familiar with the site and the drawings, and
shall report, to the Architect, any discrepancies within or between the Contract Documents and
the Work, discovered during the course of their review of the drawings and/or examination of the Work.
3.) The Contractor shall be solely responsible for safety on the jobsite and shall take all necessary
precautions to protect the public and adjacent properties from damage during construction.
4.) Construction debris shall be legally removed on a continuing basis. The site shall be maintained
in a 'neat' appearance.
5.) Dimensions are to face of stud, concrete or masonry unless other wise noted. Column dimensions
are to centerline. Vertical dimensions are to concrete slab, wood subfloor or top of wall or beam.
Dimensional discrepancies discovered shall be reported to the Architect prior to installation of Work
potentially affected.
Scaling drawings to determine exact dimensions for construction is not permitted. If dimensions are
required but not indicated, request necessary information from the Architect.
6.) Provide fire-blocking per IBC Section 717. Fire blocking is required in concealed spaces, including
but not limited to, in stud walls at the floor-ceiling level and at 10-foot intervals, in openings around
vents, ducts, etc and at all interconnections between concealed horizontal and vertical spaces.
Provide draft-stopping as indicated on drawings.
7.) Provide adequate blocking in walls and ceilings for all installations occurring later in construction,
including, but not limited to, equipment, accessories, cabinets, door tracks, finish carpentry, etc.
8.) All construction shall be adequately braced to resist construction loads and to prevent distortion
or damage due to construction activities, wind, weather, etc.
9.) All fire-resistive assemblies are to comply with the complete listings indicated, as described in the
I.B.C., Underwriters Laboratories and Gypsum Association references, most current addition.
10.) All penetrations of fire-resistive assemblies shall be protected by listed materials which conform to
approved Underwriters Laboratories listings for 'Through penetration fire-stop assemblies' and/or
as otherwise permitted by the Building code.
Each subcontractor shall be responsible for fire-stops required by penetrations by their portion of
the Work, unless otherwise directed by the General Contractor.
11.) All components, equipment and other installations shall comply with the manufacturer's written
instructions and recommendations.
12.) not used
13.) Use metal edge at all gypsum wallboard corners. Ensure factory edge or provide metal edge trim
where gypsum wallboard meets a different material.
Provide water-resistant (type 'X' where req'd) gypsum wallboard at all wet locations, u.o.n.
14.) Materials and finishes shall be as detailed on drawings or as described by clarification drawings
issued by the Architect for items not described.
15.) Insulation shall be as detailed on drawings. Batt insulation is to be
installed where blown-in insulation is impractical, for fire-safing and fire-blocking and where
otherwise required. Minimum value for roof insulation is to be R-38.
16.) not used
17.) All openings into the building envelope, including, but not limited to exterior joints at windows
and doors, openings between wall and foundation, between wall and roof construction,
penetrations of utility services, etc shall be sealed, caulked, gasketed or weatherstripped to
prevent air leakage. 18.) not used
19.) Fabrication of all manufactured installations dependent on finished dimensions of other aspects
of the Work shall be field verified.
20.) not used
21.) Do not split apart sets of construction documents. The general condition of the contract
for construction affirm that what is required by one part of the construction documents
shall be "as required by all."
1 7
Whitney Brooks Overstreet 3344 South Holly StreetDenver, CO 80222(303) [email protected]
multi-use downtown revitalizationPark Lane Development 2Whyard remodel/addition 3
commercialCraft & Design Center 4Xanterra Employee Dining 5
senior housingFox Run Good Samaritan Village 6
multi-family housingThe Timbers at Estes Park 7
single family residentialCheley-Klebe, Hill, Greer, McMillon 8
Park Lane Development 2Whyard remodel/addition 3
Craft & Design Center 4Xanterra Employee Dining 5
Fox Run Good Samaritan Village 6
The Timbers at Estes Park 7
collaborative projects 9Cheley-Klebe, Hill, Greer, McMillon 8
Standard Renewable Energy
photovoltaic installs 1Basis Architecture
photovoltaic installs 1
4
Craft & Design CenterYMCA of the Rockies
Estes Park, CO
adult/family crafts3 classrooms/future classroom
leather room/kiln room offi ce/cashier area
6180 sf total
Whitney Brooks Overstreet 3344 South Holly StreetDenver, CO 80222(303) [email protected]
multi-use downtown revitalizationPark Lane Development 2Whyard remodel/addition 3
commercialCraft & Design Center 4Xanterra Employee Dining 5
senior housingFox Run Good Samaritan Village 6
multi-family housingThe Timbers at Estes Park 7
single family residentialCheley-Klebe, Hill, Greer, McMillon 8
Park Lane Development 2Whyard remodel/addition 3
Craft & Design Center 4Xanterra Employee Dining 5
Fox Run Good Samaritan Village 6
The Timbers at Estes Park 7
collaborative projects 9Cheley-Klebe, Hill, Greer, McMillon 8
Standard Renewable Energy
photovoltaic installs 1Basis Architecture
photovoltaic installs 1
Xanterra Employee Dining FacilityXanterra Parks & Resorts
Estes Park, CO
5
dining/lounge/kitchen/offi ce/staging/storage
2000 sf
completed 2007completed 2007completed 2007
dining/lounge/kitchen/offi ce/staging/storagedining/lounge/kitchen/offi ce/staging/storage
Whitney Brooks Overstreet 3344 South Holly StreetDenver, CO 80222(303) [email protected]
multi-use downtown revitalizationPark Lane Development 2Whyard remodel/addition 3
commercialCraft & Design Center 4Xanterra Employee Dining 5
senior housingFox Run Good Samaritan Village 6
multi-family housingThe Timbers at Estes Park 7
single family residentialCheley-Klebe, Hill, Greer, McMillon 8
Park Lane Development 2Whyard remodel/addition 3
Craft & Design Center 4Xanterra Employee Dining 5
Fox Run Good Samaritan Village 6
The Timbers at Estes Park 7
collaborative projects 9Cheley-Klebe, Hill, Greer, McMillon 8
Standard Renewable Energy
photovoltaic installs 1Basis Architecture
photovoltaic installs 1
Fox Run Good Samaritan VillageGood Samaritan Society
Greeley, CO
chapel/public & private diningcommercial kitchen/breakroom
main lobby/sitting areas/2 loungesspa/exercise room/locker rooms
bank/hair care/store/offi ces50 residential units
96,000 sf
year completed phase 1 of 5: 2005
6
year completed phase 1 of 5: 2005year completed phase 1 of 5: 2005
main lobby/sitting areas/2 loungesmain lobby/sitting areas/2 loungesmain lobby/sitting areas/2 loungesmain lobby/sitting areas/2 loungesmain lobby/sitting areas/2 loungesmain lobby/sitting areas/2 loungesmain lobby/sitting areas/2 loungesspa/exercise room/locker rooms
main lobby/sitting areas/2 loungesmain lobby/sitting areas/2 loungesspa/exercise room/locker roomsspa/exercise room/locker rooms
bank/hair care/store/offi cesbank/hair care/store/offi ces50 residential units50 residential units
main lobby/sitting areas/2 loungesmain lobby/sitting areas/2 loungesspa/exercise room/locker rooms
main lobby/sitting areas/2 lounges
Good Samaritan Society
chapel/public & private diningcommercial kitchen/breakroom
main lobby/sitting areas/2 lounges
chapel/public & private diningcommercial kitchen/breakroom
main lobby/sitting areas/2 loungesspa/exercise room/locker rooms
bank/hair care/store/offi ces50 residential units
commercial kitchen/breakroom
year completed phase 1 of 5: 2005year completed phase 1 of 5: 2005year completed phase 1 of 5: 2005year completed phase 1 of 5: 2005year completed phase 1 of 5: 2005
commercial kitchen/breakroomcommercial kitchen/breakroomcommercial kitchen/breakroommain lobby/sitting areas/2 lounges
chapel/public & private diningcommercial kitchen/breakroomcommercial kitchen/breakroomcommercial kitchen/breakroom
main lobby/sitting areas/2 loungesmain lobby/sitting areas/2 loungesmain lobby/sitting areas/2 loungesmain lobby/sitting areas/2 loungesspa/exercise room/locker rooms
bank/hair care/store/offi ces50 residential units
chapel/public & private diningcommercial kitchen/breakroomchapel/public & private dining
commercial kitchen/breakroomchapel/public & private dining
commercial kitchen/breakroommain lobby/sitting areas/2 lounges
spa/exercise room/locker roomsbank/hair care/store/offi ces
50 residential units
commercial kitchen/breakroommain lobby/sitting areas/2 lounges
year completed phase 1 of 5: 2005
spa/exercise room/locker roomsbank/hair care/store/offi cesbank/hair care/store/offi ces
50 residential units50 residential units
spa/exercise room/locker roomsbank/hair care/store/offi ces
50 residential units50 residential units50 residential units
year completed phase 1 of 5: 2005year completed phase 1 of 5: 2005
Good Samaritan SocietyGood Samaritan SocietyGood Samaritan SocietyGood Samaritan SocietyGood Samaritan Society
50 residential units50 residential units50 residential units
commercial kitchen/breakroomcommercial kitchen/breakroom
year completed phase 1 of 5: 2005year completed phase 1 of 5: 2005year completed phase 1 of 5: 2005
Good Samaritan Society
chapel/public & private dining
Good Samaritan Society
50 residential units
96,000 sf
50 residential units50 residential units
96,000 sf
50 residential units
96,000 sf
50 residential units50 residential units50 residential units50 residential units
chapel/public & private diningchapel/public & private dining
year completed phase 1 of 5: 2005year completed phase 1 of 5: 2005year completed phase 1 of 5: 2005
chapel/public & private diningchapel/public & private diningcommercial kitchen/breakroom
spa/exercise room/locker roomsspa/exercise room/locker roomsbank/hair care/store/offi cesbank/hair care/store/offi ces
50 residential units
chapel/public & private diningcommercial kitchen/breakroomchapel/public & private dining
commercial kitchen/breakroom
spa/exercise room/locker roomsbank/hair care/store/offi ces
50 residential units
spa/exercise room/locker roomsbank/hair care/store/offi ces
50 residential units
year completed phase 1 of 5: 2005
Good Samaritan Society
Whitney Brooks Overstreet 3344 South Holly StreetDenver, CO 80222(303) [email protected]
multi-use downtown revitalizationPark Lane Development 2Whyard remodel/addition 3
commercialCraft & Design Center 4Xanterra Employee Dining 5
senior housingFox Run Good Samaritan Village 6
multi-family housingThe Timbers at Estes Park 7
single family residentialCheley-Klebe, Hill, Greer, McMillon 8
Park Lane Development 2Whyard remodel/addition 3
Craft & Design Center 4Xanterra Employee Dining 5
Fox Run Good Samaritan Village 6
The Timbers at Estes Park 7
collaborative projects 9Cheley-Klebe, Hill, Greer, McMillon 8
Standard Renewable Energy
photovoltaic installs 1Basis Architecture
photovoltaic installs 1
The Timbers CondominiumsThe Sanctuary, LLC
Estes Park, CO
3 units @ 2500 sf each
year completed phase 1 of 5: 2008
7
year completed phase 1 of 5: 2008
Whitney Brooks Overstreet 3344 South Holly StreetDenver, CO 80222(303) [email protected]
multi-use downtown revitalizationPark Lane Development 2Whyard remodel/addition 3
commercialCraft & Design Center 4Xanterra Employee Dining 5
senior housingFox Run Good Samaritan Village 6
multi-family housingThe Timbers at Estes Park 7
single family residentialCheley-Klebe, Hill, Greer, McMillon 8
Park Lane Development 2Whyard remodel/addition 3
Craft & Design Center 4Xanterra Employee Dining 5
Fox Run Good Samaritan Village 6
The Timbers at Estes Park 7
collaborative projects 9Cheley-Klebe, Hill, Greer, McMillon 8
Standard Renewable Energy
photovoltaic installs 1Basis Architecture
photovoltaic installs 1
Lot 1
5, E
agle
Roc
k R
anch
esE
stes
Par
k, C
olor
ado
8051
7
__ of __
Sheet No:
fax: 970.586.9149
c
vox: 970.586.9140Steve Lane, AIA
P. O
. BO
X 2
421
ES
TES
PA
RK
, CO
LOR
AD
O 8
0517
Sheet Title:Sheet Title:
Issue:
Date:
BA
IS
S
Architecture, P.C.BASIS
552
WE
ST
ELK
HO
RN
AV
EN
UE
A R
C H
I T
E C
T U
R E
P.
C
.
11/16/2004
Perspectives
McM
illio
n R
esid
ence
8
Cheley-Klebe Residence: 2500 sf; May 2009 estimated completion
Hill Spec House: 2700 sf; completed 2007
Greer Residence: 2400 sf; completed 2006
McMillon Residence: 3200 sf; completed 2005
Whitney Brooks Overstreet 3344 South Holly StreetDenver, CO 80222(303) [email protected]
multi-use downtown revitalizationPark Lane Development 2Whyard remodel/addition 3
commercialCraft & Design Center 4Xanterra Employee Dining 5
senior housingFox Run Good Samaritan Village 6
multi-family housingThe Timbers at Estes Park 7
single family residentialCheley-Klebe, Hill, Greer, McMillon 8
Park Lane Development 2Whyard remodel/addition 3
Craft & Design Center 4Xanterra Employee Dining 5
Fox Run Good Samaritan Village 6
The Timbers at Estes Park 7
collaborative projects 9Cheley-Klebe, Hill, Greer, McMillon 8
Standard Renewable Energy
photovoltaic installs 1Basis Architecture
photovoltaic installs 1
Our Lady of the Mountains Catholic Church Addition/Remodel
Shepherd of the Mountains Lutheran Church
Kirks Fly Shop
Ravencrest Dining Hall Riverspointe Downtown
Basis Architecture Offi ce Building
Estes Park Visitors CenterRocky Mountain
Evangelical Free Church
9