Upload
estella-stevenson
View
220
Download
0
Embed Size (px)
DESCRIPTION
Purpose Overview #Orchestrate2015
Citation preview
Overhead Deep DiveAdvanced Session
Presented by:Dylan PriceLead Implementation Consultant
November 10, 2015
1. Overview2. Deployment Methods3. Process Flow4. Prerequisites5. Demo6. Final Note – Q & A
AGENDA
#Orchestrate2015
Purpose
Overview
#Orchestrate2015
Overview
Overview• See true value of inventory and cost of production
• You can add Overhead Items (Labor, Utilities, Depreciation/Amortization, etc.) at any step in the production process
• As much detail in OBeer for overhead as you capture in the real world
#Orchestrate2015
Overview
What is OverheadAnything that is a cost of production that is not consumed as inventory• Labor• Utilities• Consumables• Taxes• Depreciation Expenses• Etc.All the costs not already consumed in production
#Orchestrate2015
Overview
Labor OverheadAll the labor that is related to the production process
• Brewhouse labor• Cellar labor• Packaging labor• Whse• Etc.
You can account for as much detail of labor as you can track via payroll system
#Orchestrate2015
Deploy
Deployment Methods
#Orchestrate2015
Deploy
Deployment Methods• Simple First• Have a single item that just accrues at the
Finished Good level• Or at the Bright Beer stage (when the TTB sees
the beer)• Start from what you know and build from there
• Complex Later• Break out overhead costs onto multiple stages
of the production process• Include utilities and other miscellaneous costs
#Orchestrate2015
Deploy
Why Not Hours?• Your staff would have to key in their hours on
each production order
• Multitasking doesn’t make this feasible• Ex: start a batch before another batch is
finished
#Orchestrate2015
Process
Process Flow
#Orchestrate2015
ProcessPurpose
Step 1 – Item Master
• Set overhead items up as standard cost, non-inventory items
#Orchestrate2015
ProcessPurpose
Step 2 – GL Determination
• Set overhead items up as standard cost, non-inventory items
• Add them to the BoMs they are associated with• standard cost for the
overhead items based on the # of BBLs
#Orchestrate2015
ProcessPurpose
Step 3 – Bill of Materials
• Add them to the BoMs they are associated with• standard cost for the
overhead items based on the # of BBLs
#Orchestrate2015
ProcessPurpose
Step 4 – Production Order
• Overhead items will be calculated based on the BoM
#Orchestrate2015
ProcessPurpose
Step 5 – Journal Entry Posting
• Processing the production order creates a JE
• Credits the overhead clearing account
• Debits the inventory asset account
• This applies the overhead cost to inventory
#Orchestrate2015
Prereq
Prerequisites
#Orchestrate2015
PrereqPurpose
Overhead Item
#Orchestrate2015
PrereqPurpose
Bill of Material
#Orchestrate2015
Demo
Demo
#Orchestrate2015
Q&A
Questions?
#Orchestrate2015
http://
forums.orchestratedbeer.com
Thank You!