3
Over 1,000,000 S.F., bulk storage opportunities at Tradepoint Atlantic 1ST PHASE - DELIVERING 4TH QUARTER 2017 Tradepoint Atlantic is a 3,100 acre logistics and maritime development located on the Chesapeake Bay in Southeastern Baltimore County, MD. Featuring a unique combination of deep water berths, rail infrastructure and highway proximity, Tradepoint Atlantic is the largest and most strategically important multi-modal industrial tract on the eastern seaboard. tradepointatlantic.com

Over 1,000,000 S.F., bulk storage · Sparrows Point, MD Sparrows Point Aerial View 3 SJ1735 03.24.2017 Over 1,000,000 S.F., bulk storage . opportunities at Tradepoint Atlantic. 1ST

  • Upload
    others

  • View
    15

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Over 1,000,000 S.F., bulk storage · Sparrows Point, MD Sparrows Point Aerial View 3 SJ1735 03.24.2017 Over 1,000,000 S.F., bulk storage . opportunities at Tradepoint Atlantic. 1ST

A1.3 Sparrows Point, MD

Sparrows Point Aerial View 3 SJ1735 03.24.2017

Over 1,000,000 S.F., bulk storage opportunities at Tradepoint Atlantic1ST PHASE - DELIVERING 4TH QUARTER 2017Tradepoint Atlantic is a 3,100 acre logistics and maritime development located on the Chesapeake Bay in Southeastern Baltimore County, MD. Featuring a unique combination of deep water berths, rail infrastructure and highway proximity, Tradepoint Atlantic is the largest and most strategically important multi-modal industrial tract on the eastern seaboard.

tradepointatlantic.com

Page 2: Over 1,000,000 S.F., bulk storage · Sparrows Point, MD Sparrows Point Aerial View 3 SJ1735 03.24.2017 Over 1,000,000 S.F., bulk storage . opportunities at Tradepoint Atlantic. 1ST

A1.1 Sparrows Point, MD

Sparrows Point Aerial View 1 SJ1735 03.24.2017

UNDER ARMOUR

FUTURE AUTO / RORO 200 +/− ACRES

1/2 MILE LONG DEEP WATER BERTH

EXISTING RAIL

1A 1.1 SCALE: 1" = 150'-0"

88

'2

00

'9

9'

20

0'

24

4'

20

0'

132

'

149' 750' 128' 1000' 125'

FUTURE PROPOSED 150,000 SFSTORAGE BLDG

TERMINAL 2PROPOSED 150,000 SFONE-STORY 35' CLEAR

STORAGE BLDG

TERMINAL 1PROPOSED 200,000 SFONE-STORY 35' CLEAR

STORAGE BLDG

FUTURE PROPOSED 200,000 SFSTORAGE BLDG

FUTURE PROPOSED 150,000 SFSTORAGE BLDG

FUTURE PROPOSED 200,000 SFSTORAGE BLDG

BAY

TRUENORTH

PROJECTNORTH (2) A1.1

SITE PLAN

SHEET NUMBER

JOB NO : SJ1740

PA : GWA / LLWDATE : XX-XX-XX

REVISIONS

ARC

HIT

ECT

CO

NTR

ACTO

RC

ON

SULT

ING

EN

GIN

EER

S

900

NO

RTH

RO

CK

HIL

L R

OAD

ST. L

OU

IS, M

ISSO

UR

I 631

19(P

) 314

-822

-519

1 (F

) 314

-963

-071

4W

WW

.GM

A-AR

CH

ITEC

TS.C

OM

THIS DESIGN AND THESE DRAWINGS ARE THE PROPERTY OFGMA ARCHITECTS, INC. NO PART OF THIS WORK MAY BEREPRODUCED WITHOUT PRIOR WRITTEN PERMISSION FROMGMA ARCHITECTS, INC.

50%

-04.

07.1

7-N

OT

FOR

CO

NST

.

CAN

AL R

OAD

, SPA

RR

OW

'S P

OIN

T, M

ARYL

AND

212

19

TPA

MAR

INE

BULK

STO

RAG

E , T

ERM

INAL

2C

IVIL

:

STR

UC

TUR

AL:

ELEC

TRIC

AL:

PLU

MBI

NG

:

FIR

E PR

OTE

CTI

ON

:M

ECH

ANIC

AL:

AED

IFIC

A C

ASE

ENG

INEE

RIN

G79

6 M

ERU

S C

OU

RT

FEN

TON

, MO

632

06JO

E BU

SHM

AN (

P) 6

36-3

49-1

600

x352

AED

IFIC

A C

ASE

ENG

INEE

RIN

G79

6 M

ERU

S C

OU

RT

FEN

TON

, MO

632

06D

ANA

TEN

NIL

L (P

) 636

-349

-160

0 x3

57

MO

RR

IS &

RIT

CH

IE A

SSO

CIA

TES,

INC

1220

-C E

JO

PPA

RD

, SU

ITE

505

TOW

NSO

N, M

D 2

1286

AMY

DIP

IETR

O (P

)410

-515

-900

0

ICO

N M

ECH

ANIC

AL16

16 C

LEVE

LAN

D B

LVD

GR

ANIT

E C

ITY,

IL 6

2040

-440

1TI

M S

CH

AEFF

ER (P

) 618

-452

-003

5

S A

CO

MU

NAL

E C

O. I

NC

.29

00 N

EWPA

RK

DR

BAR

BER

TON

, OH

IO 4

4203

DAV

E BR

OW

N (P

) 303

-706

-304

2

3110

WO

OD

CR

EEK

DR

IVE

DO

WN

ERS

GR

OVE

, IL

6051

5(P

) 331

-251

-272

6 (F

) 331

-251

-270

1W

WW

.AR

CO

MU

RR

AY.C

OM

RIC

HAR

D A

DAM

S, P

.E.

5507

E B

USC

H B

LVD

TAM

PA, F

L 33

617

RIC

H A

DAM

S (P

) 813

-985

-460

0

DEEP WATER BERTH

PHASE 1 - TERMINAL 2PROPOSED 150,000 SFONE-STORY 35’ CLEAR

STORAGE BLDG

PHASE 1 - TERMINAL 1PROPOSED 200,000 SFONE-STORY 35’ CLEAR

STORAGE BLDG

TRADEPOINT AVENUE

FUTURE WAREHOUSE DEVELOPMENT 200 +/− ACRES

A1.3 Sparrows Point, MD

Sparrows Point Aerial View 3 SJ1735 03.24.2017

Master Plan

Tradepoint Atlantic is a modern intermodal logistics center with an active deep water port, 100 miles of short line rail with service from CSX and NS, direct access to major interstates and the ideal industrial center for distribution, manufacturing and logistics.

PHASE I

• One – 150,000 SF building

• One – 200,000 SF building

PHASE II

• 700,000 SF + and Build-to-Suit opportunities

INFORMATION ON BUILDING SPECS• Clear span capability

• Metal prefabricated construction

• 10’x10’ Docks

• 24’ w x 20’ h at grade Drive-ins

• 35’ clear height

• Exhaust fans providing 1 air change per hour

• T5 lighting• Heavy floor slab capability

• Direct access to deep water berth

• Heavy electric & gas capability

• MH-IM Zoning

• Wet or dry sprinkler capability

• Rail service available (CSX/NS)

INCENTIVES• Sales & use tax exemption on construction materials and equipment

• Chesapeake Enterprise Zone (10 yr property tax credit, employment & job tax credits)

• Foreign Trade Zone #74

• BGE SEED Program

• Custom tailored incentive packages available

Page 3: Over 1,000,000 S.F., bulk storage · Sparrows Point, MD Sparrows Point Aerial View 3 SJ1735 03.24.2017 Over 1,000,000 S.F., bulk storage . opportunities at Tradepoint Atlantic. 1ST

VIRGINIA

PENNSYLVANIA

W VIRGINIA DELAWARE

MARYLAND

NEW JERSEY

RHODE ISLAND

Raleigh Winston- Salem

Richmond Newport News

Norfolk

Charleston

Bridgeport Erie

Newark

Virginia Beach

Pittsburgh

Baltimore

Washington DCAnnapolis

Dover

New YorkNew York

PhiladelphiaPhiladelphia

Reading TrentonHarrisburg

495

476

276

270

95

95

95

95

40

40

85

64

64

84

78

81

80

80

90

81

81

64

77

79

79

79

66

83

76

7676

PENN A

TURN -PIKE

PENN A

TURN -PIKE

309

422

1

40

2

89595

95

97

295

295 BWIAIRPORT

INNER HARBORINNER HARBOR

MPAFACILITIES

MPAFACILITIES

PORT OFBALTIMORE

PATAPSCO RIVER

695

695

BWIAIRPORT

BALTIMORE CBDBALTIMORE CBD

WASHINGTON D.C.

PHILADELPHIA

LOCATION

• Located within the Tradepoint Atlantic project, with direct connectivity to a 100 mile short-line rail system served by both CSX and NS

• Immediate access to I-695 and highly proximate to I-95, I-895/Harbor Tunnel Thruway, I-295/(Baltimore-Washington Parkway), as well as Interstates 70 and 83

• 16 miles to Baltimore CBD and 50 miles to Washington, DC

• Located within the Port of Baltimore and 17 miles to Baltimore-Washington Thurgood Marshall International Airport

© COPYRIGHT 2016 JONES LANG LASALLE. All rights reserved. No part of this publication may be reproduced or transmitted in any form or by any means without prior written consent of Jones Lang LaSalle.It is based on material that we believe to be reliable. Whilst every effort has been made to ensure its accuracy, we cannot offer any warranty that it contains no factual errors. No liability for negligence or otherwise is assumed by Jones Lang LaSalle for any loss or damage suffered by any party resulting from their use of this publication.

MARK LEVYManaging Director +1 443 452 1509 [email protected]

BEN MEISELSSenior Vice President +1 443 451 2614 [email protected]

RYAN BURROWSVice President +1 443 452 1514 [email protected]

GREG FERRAROSenior Associate +1 443 451 2618 [email protected]

FOR INFORMATION, CONTACT THE JLL MID-ATLANTIC INDUSTRIAL PRACTICE GROUP: