Upload
others
View
25
Download
0
Embed Size (px)
Citation preview
ReferencesOur Selected Works
ʻʻActions speak louder than voice
Our philosophy is what you do is more important than what you say. So,
let’s talk to our customers.
Gizil Enerji
RefineriesOur Selected Works
Gizil Enerji
ReferencesTank Construction Project in Karbala Refinery
Challenge
Solution
• Project Planning
• Contract Management
• Project Controlling
• Site Management Activities
• QA/ QC Activities
• HSE Activities
• Project Procurement Activities
• Project Reporting
• Technical Drawings
• All Engineering Activities
• Other All Relevant Works
• The aim of the project is to provide all engineering, procurement and
construction management (EPCM) services for Construction of 42
Storage Tank Project Karbala Refinery, Iraq.
Short project information:
Customer: Arca Metal
Location: Karbala, Iraq
Start: July, 2015
Finish: Ongoing
Gizil Enerji
ReferencesTupras Izmir Demin Water Tanks and Transfer Lines
Challenge
Solution
• Basic and Detailed Engineering
• Prepare data sheets
• Develop material requisition forms
• Procurement of all electrical and instrumentation equipment
• Installation supervision
• Test and commissioning
• All relevant technical drawings
• Other all relevant works
• The aim of the project is engineering, material supply and test/
commissioning activities of electrical and automation scope of the
project.
Short project information:
Customer: Ada Endüstri
Location: Izmir, Turkey
Start: October, 2015
Finish: Ongoing
Gizil Enerji
ReferencesTupras Petrocoke Storage Conveyor Line Project
Challenge
Solution
• Procurement of all electrical and instrumentation equipment
• Design and assembly of exproof electrical panel
• Prepare data sheets
• Material requisition forms
• Cable routings and projects
• Electrical panel one line diagram
• Cable lists
• Cable section calculations
• All relevant technical drawings
• Other all relevant works
• The aim of the project is making of the petrocoke storage conveyor line
which will transport petrocoke as the output of Resid Upgrading Project
(RUP).
Short project information:
Customer: Intra Danismanlik
Location: Kocaeli, Turkey
Start: August, 2014
Finish: May, 2015
Gizil Enerji
ReferencesTupras Petrocoke Storage Dust Control System
Challenge
Solution
• Procurement of all electrical and instrumentation equipment
• Design and assembly of exproof electrical panels
• Prepare data sheets
• Material requisition forms
• Electrical panel one line diagram
• Cable lists
• Cable section calculations
• All relevant technical drawings
• Other all relevant works
• The aim of the project is designing and assembly of exproof electrical
panels in dast control system of petrocoke storage in Resid Upgrading
Project (RUP).
Short project information:
Customer: Enveks
Location: Ankara, Turkey
Start: July, 2014
Finish: March, 2015
Gizil Enerji
ReferencesTupras Izmir Refinery Resid Upgrading Storage Tanks
Challenge
Solution
• Generate electrical one-line diagram
• Preparation of electrical grounding project
• Prepare data sheets of MCC panels
• Calculations of cable sections
• Develop cable list
• Lighting projects
• Instrument data sheets
• Instrument list
• Logic diagrams
• Procurement supervision
• The aim of the project is making of the storage tanks which will feed fuel
oil to the Resid Upgrading Project (RUP).
Short project information:
Customer: Dema Makine
Location: Izmir, Turkey
Start: 2014
Finish: 2014
Gizil Enerji
ReferencesTupras Izmir RUP Charge Tanks
Challenge
Solution
• Relevant special pipe hangers are manufactured and delivered to the
customer site on time. One of the competitive advantages is best price
philosophy. This is the first order intake of NCD Group products in
Tupras Refinery as a result of being a part of listed vendor list.
• Special pipe support delivery for RUP Charge Tanks in Tupras Izmir
Refinery
Short project information:
Customer: Tüpraş
Location: İzmir
Start: December, 2014
Finish: February, 2015
Gizil Enerji
ReferencesTurkmenbashi Refinery LPG Treatment Project
Challenge
Solution
• Develop project pilot plan
• Prepare civil and steel projects
• Pressure vessels and heat exchangers calculations
• Isometrical drawings
• Stress analysis
• Generate electrical and instrumentation projects
• Develop material requisition forms
• Coordinate procurement activities
• Commissioning supervision
• Other all relevant works
• The aim of the Project is treatment of LPG gas which is output of coker
unit from H2S. Basic engineering is owned by Axens as LPG Treatment
Basic Engineering package.
Short project information:
Customer: Lotus Enerji
Location: Turkmenbashi, Turkmenistan
Start: 2014
Finish: Ongoing
Gizil Enerji
ReferencesTurkmenbashi Refinery TDSP Project
Challenge
Solution
• Controlling and approval of the documents prepared by Foster Wheeler
• All engineering activities out of Foster Wheeler scope
• Procurement activities
• Supplier relationship management
• The aim of the projects is to add a new DCU (Delayed Coker Unit), SDA
(Solvent Deasphalting Unit) and auxiliary services to the existing plant.
Short project information:
Customer: Lotus Enerji
Location: Turkmenbashi, Turkmenistan
Start: 2013
Finish: Ongoing
Gizil Enerji
Tank FarmsOur Selected Works
Gizil Enerji
ReferencesMKE Barutsan Seveso II Project - P&IDs and PFDs
Challange
Çözüm
• All P&IDs created according to BS EN ISO 10628-1:2015 and BS EN
ISO 10628-2:2012 global standards buy using Autocad Plant 3d
software.
• All lines in the context of Seveso studied in detail
• All instrumentation critical to HAZOP and SIL studies showed additionally
to mechanical equipment and piping
• Numbering standardization developed and implemented for all relevant
equipment
• Material list developed
• PFD studies prepared with relevant data on; such as temperature, etc.
• The aim of the project is drawing of P&IDs and PFDs of MKE Barutsan Elmadağ
Plant in the context of SEVESO II compliance works
Short project information:
Customer: Armada Danışmanlık
Location: Ankara, Turkey
Start: March, 2016
Finish: Ongoing
Gizil Enerji
ReferencesAkım Tek Seveso II Project - P&IDs and PFDs
Challenge
Solution
• All P&IDs created according to BS EN ISO 10628-1:2015 and BS EN
ISO 10628-2:2012 global standards buy using Autocad Plant 3d
software.
• All oil, LPG, propane, hydraulic and fire fighting lines studied in detail
• All instrumentation critical to HAZOP and SIL studies showed additionally
to mechanical equipment and piping
• Numbering standardization developed and implemented for all relevant
equipment
• Material list developed
• PFD studies prepared with relevant data on; such as temperature, etc.
• The aim of the project is drawing of P&IDs and PFDs of Akım Tek
Ankara Güvercinlik Plant in the context of SEVESO II compliance works
Short project information:
Customer: Armada Danışmanlık
Location: Ankara, Turkey
Start: February, 2016
Finish: Ongoing
Gizil Enerji
ReferencesLikit Kimya Exproof Tanks Turnkey Project
Challenge
Solution
• Inspection of as-is stituation
• Definition and classification of hazordous zone areas
• Engineering calculations and selection of suitable products
• Prepare data sheets
• Material requisition forms
• Develop cable list
• Lighting projects
• Installation on site
• Commissioning and startup activities
• The aim of the project is transforming of the tank dykes in Likit Kimya
Tekirdağ plant into exproof with the suitable mechanical, electrical and
automation products.
Short project information:
Customer: Likit Kimya
Location: Tekirdağ, Turkey
Start: February, 2016
Finish: Ongoing
Gizil Enerji
ReferencesLikit Kimya Seveso II Project - P&IDs and PFDs
Challenge
Solution
• All P&IDs created according to BS EN ISO 10628-1:2015 and BS EN
ISO 10628-2:2012 global standards buy using Autocad Plant 3d
software.
• All process, hydraulic, fire fighting and utility lines studied in detail
• All instrumentation critical to HAZOP and SIL studies showed additionally
to mechanical equipment and piping
• Numbering standardization developed and implemented for all relevant
equipment
• Material list developed
• PFD studies prepared with relevant data on; such as temperature, etc.
• The aim of the project is drawing of P&IDs and PFDs of Likit Kimya
Tekirdağ plant in the context of SEVESO II compliance works
Short project information:
Customer: Likit Kimya
Location: Tekirdağ, Turkey
Start: February, 2015
Finish: Ongoing
Gizil Enerji
ReferencesAkça Gaz Seveso II Project - P&IDs and PFDs
Challenge
Solution
• All P&IDs created according to BS EN ISO 10628-1:2015 and BS EN
ISO 10628-2:2012 global standards buy using Autocad Plant 3d
software.
• All LPG, propane, hydraulic and fire fighting lines studied in detail
• All instrumentation critical to HAZOP and SIL studies showed additionally
to mechanical equipment and piping
• Numbering standardization developed and implemented for all relevant
equipment
• Material list developed
• PFD studies prepared with relevant data on; such as temperature, etc.
• The aim of the project is drawing of P&IDs and PFDs of Akça Gaz’s
plants in the context of SEVESO II compliance works
Short project information:
Customer: Mavi Sinerji
Location: Kocaeli-Denizli, Turkey
Start: January, 2016
Finish: Ongoing
Gizil Enerji
ReferencesMir Gaz Seveso II Project - P&IDs and PFDs
Challenge
Solution
• All P&IDs created according to BS EN ISO 10628-1:2015 and BS EN
ISO 10628-2:2012 global standards buy using Autocad Plant 3d
software.
• All LPG, propane, hydraulic and fire fighting lines studied in detail
• All instrumentation critical to HAZOP and SIL studies showed additionally
to mechanical equipment and piping
• Numbering standardization developed and implemented for all relevant
equipment
• Material list developed
• PFD studies prepared with relevant data on; such as temperature, etc.
• The aim of the project is drawing of P&IDs and PFDs of Mir Gaz
Kırıkkale plant in the context of SEVESO II compliance works
Short project information:
Customer: Mavi Sinerji
Location: Kırıkkale, Turkey
Start: February, 2016
Finish: Ongoing
Gizil Enerji
Referencesİpragaz Seveso II Project - P&IDs and PFDs
Challenge
Solution
• All P&IDs created according to BS EN ISO 10628-1:2015 and BS EN
ISO 10628-2:2012 global standards buy using Autocad Plant 3d
software.
• P&ID and PFDs of 19 different sites studied in 3 months
• Steam and water lines addition to the LPG, propane, hydraulic and fire
fighting lines studied in detail
• All instrumentation critical to HAZOP and SIL studies showed additionally
to mechanical equipment and piping
• Numbering standardization developed and implemented for all relevant
equipment
• Material list developed
• PFD studies prepared with relevant data on; such as temperature, etc
• The aim of the project is drawing of P&IDs and PFDs of İpragaz’s 19
plants in the context of SEVESO II compliance works
Short project information:
Customer: Türk Loydu
Location: İstanbul, Turkey
Start: April, 2015
Finish: July, 2015
Gizil Enerji
ReferencesHabaş Seveso II Project - P&IDs and PFDs
Challenge
Solution
• All P&IDs created according to BS EN ISO 10628-1:2015 and BS EN
ISO 10628-2:2012 global standards buy using Autocad Plant 3d
software.
• P&ID and PFDs of 6 different sites studied in 2 months
• All LPG, propane, hydraulic and fire fighting lines studied in detail
• All instrumentation critical to HAZOP and SIL studies showed additionally
to mechanical equipment and piping
• Numbering standardization developed and implemented for all relevant
equipment
• Material list developed
• PFD studies prepared with relevant data on; such as temperature, etc.
• The aim of the project is drawing of P&IDs and PFDs of Habas’s 6 plants
in the context of SEVESO II compliance works
Short project information:
Customer: Habaş
Location: İstanbul, Turkey
Start: August, 2015
Finish: October, 2015
Gizil Enerji
ReferencesEr Gaz Seveso II Project - P&IDs and PFDs
Challenge
Solution
• All P&IDs created according to BS EN ISO 10628-1:2015 and BS EN
ISO 10628-2:2012 global standards buy using Autocad Plant 3d
software.
• All LPG, propane, hydraulic and fire fighting lines studied in detail
• All instrumentation critical to HAZOP and SIL studies showed additionally
to mechanical equipment and piping
• Numbering standardization developed and implemented for all relevant
equipment
• Material list developed
• PFD studies prepared with relevant data on; such as temperature, etc.
• The aim of the project is drawing of P&IDs and PFDs of ErGaz’s 8 plants
in the context of SEVESO II compliance works
Short project information:
Customer: Ergaz
Location: Istanbul, Turkey
Start: December, 2015
Finish: Ongoing
Gizil Enerji
ReferencesAnt Gaz Seveso II Project - P&IDs and PFDs
Challenge
Solution
• All P&IDs created according to BS EN ISO 10628-1:2015 and BS EN
ISO 10628-2:2012 global standards buy using Autocad Plant 3d
software.
• All LPG, propane, hydraulic and fire fighting lines studied in detail
• All instrumentation critical to HAZOP and SIL studies showed additionally
to mechanical equipment and piping
• Numbering standardization developed and implemented for all relevant
equipment
• Material list developed
• PFD studies prepared with relevant data on; such as temperature, etc.
• The aim of the project is drawing of P&IDs and PFDs of Ant Gaz’s plant
in the context of SEVESO II compliance works
Short project information:
Customer: Mavi Sinerji
Location: Antalya, Turkey
Start: December, 2015
Finish: January, 2015
Gizil Enerji
ReferencesAnadolu Gaz Seveso II Project - P&IDs and PFDs
Challenge
Solution
• All P&IDs created according to BS EN ISO 10628-1:2015 and BS EN
ISO 10628-2:2012 global standards buy using Autocad Plant 3d
software.
• P&ID and PFDs of 4 different sites studied in 1 month
• All LPG, propane, hydraulic and fire fighting lines studied in detail
• All instrumentation critical to HAZOP and SIL studies showed additionally
to mechanical equipment and piping
• Numbering standardization developed and implemented for all relevant
equipment
• Material list developed
• PFD studies prepared with relevant data on; such as temperature, etc.
• The aim of the project is drawing of P&IDs and PFDs of Anadolugaz’s 4
plants in the context of SEVESO II compliance works
Short project information:
Customer: Anadolu Gaz
Location: Ankara, Turkey
Start: June, 2015
Finish: August, 2015
Gizil Enerji
IndustryOur Selected Works
Gizil Enerji
ReferencesLafarge Conveyor Automation Project
Challenge
Solution
• Procurement of all electrical and instrumentation equipment
• Prepare data sheets
• Material requisition forms
• Cable routings and projects
• Electrical panel one line diagram
• Cable lists
• Cable section calculations
• All relevant technical drawings
• Other all relevant works
• The aim of the project is automation of cement conveyor line constructed
by Intra Danismanlik
Short project information:
Customer: Intra Danismanlik
Location: France
Start: August, 2015
Finish: Ongoing
Gizil Enerji
ReferencesKümaş Seveso II Project - P&IDs and PFDs
Challenge
Solution
• All P&IDs created according to BS EN ISO 10628-1:2015 and BS EN
ISO 10628-2:2012 global standards buy using Autocad Plant 3d
software.
• All process, hydraulic and fire fighting lines studied in detail
• All instrumentation critical to HAZOP and SIL studies showed additionally
to mechanical equipment and piping
• Numbering standardization developed and implemented for all relevant
equipment
• Material list developed
• PFD studies prepared with relevant data on; such as temperature, etc.
• The aim of the project is drawing of P&IDs and PFDs of Kümaş Manyezit
Sanayi plant in the context of SEVESO II compliance works
Short project information:
Customer: TMGD A.Ş.
Location: Kütahya, Turkey
Start: March, 2016
Finish: Ongoing
Gizil Enerji
ReferencesAksa Akrilik Piping and Instrumentation Diagrams
Challenge
Solution
• All P&IDs are created according to BS EN ISO 10628-1:2015 and BS EN
ISO 10628-2:2012 global standards buy using Autocad Plant 3d
software.
• The aim of the project is revision of some P&IDs in the context of
SEVESO II compliance works
Short project information:
Customer: Proje Dizayn
Location: Yalova, Turkey
Start: 2015
Finish: Finished
Gizil Enerji
ReferencesClariant Isometric Drawings
Challenge
Solution
• Site analysis
• Measurement
• Drawing of isometrics using Autocad software
• The aim of the project is drawing of some isometrics
Short project information:
Customer: Aveskon
Location: Kocaeli, Turkey
Start: 2015
Finish: Finished
Gizil Enerji
Power PlantsOur Selected Works
Gizil Enerji
ReferencesGSD AS CCPP in Georgia
Challenge
Solution
• Relevant pipe hangers are manufactured and delivered in very short time
schedule which is only 4 week days.
• The customer is asking for the relevant pipe hangers in very short
delivery time which is critical to the rest of the process
Short project information:
Customer: GSD A.Ş.
Location: Georgia
Start: April, 2015
Finish: May, 2015
Gizil Enerji
ReferencesActions speak louder than voice
ʻʻOur philosophy is what you do is more important than
what you say. So, let’s talk to our customers.
Gizil Enerji
ContactKeep in Touch
ʻʻWe remain at your disposal
Do not hesitate to contact us whenever you need…
Gizil Enerji
ContactWe remain at your disposal
Address: Esentepe Mah. Milangaz Cad. No:77 A2 Blok
D: 217 34860 Dumankaya Vizyon Plaza, Kartal-İstanbul
Phone: +90 (216) 511 59 43
E-mail: [email protected]
www.gizilenerji.com.tr
Direct Contact:
Esma Gulten Can
E-mail: [email protected]
ʻʻIf you have any support, please feel free to
contact us:
Gizil Enerji
facebook.com/pages/Gizi
l-Enerji-Sanayi-ve-
Ticaret-Ltd
https://twitter.com/gizilen
erji
https://plus.google.com/
11672741188569387772
3/about
https://tr.linkedin.com/c
ompany/gizil-enerji-
sanayi-ve-ticaret-ltd-ti
www.gizilenerji.com.tr GO
Follow Us!We are on the line!
Gizil Enerji