Quality Assured Contracting Pty. Ltd. ACN 071 696 743 ABN 41 071 696 743 Delivering on Integrity Safety Value Quality Reliability 36 Harries Way PINJARRA WA 6208 08 9530 4016 [email protected] Company Experience Experience Quality Assured Contracting Pty. Ltd. ( QAContracting ) was established in Mandurah in 1995 by David Cameron, primarily to provide contract services to the Water Corporation in the Mandurah - Murray, South West and Greater Southern regions of Western Australia. Due to health reasons, David retired from QAContracting in April 2013 and the company was taken over by Wayne Elliott and Roy Nella. Although David was a significant factor in the success of QAContracting and the works the company delivered, both Wayne and Roy brought a broad range of experiences to the company which enabled the company to continue operating as it always has, providing a quality multi discipline services to its clients. Some of the works that QAContracting has successfully progressed over the previous years are shown following.

Our ref: ltr 1892 - Quality Assured Engineeringqacontracting.com.au/wp-content/uploads/2017/10/... · Quality Assured Contracting Pty. Ltd. ACN 071 696 743 ABN 41 071 696 743 Pump

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Our ref: ltr 1892 - Quality Assured Engineeringqacontracting.com.au/wp-content/uploads/2017/10/... · Quality Assured Contracting Pty. Ltd. ACN 071 696 743 ABN 41 071 696 743 Pump

Quality Assured Contracting Pty. Ltd. ACN 071 696 743 ABN 41 071 696 743

Delivering on

Integrity

Safety

Value

Quality

Reliability

36 Harries Way

PINJARRA WA 6208

08 9530 4016

[email protected]

Company Experience

Experience

Quality Assured Contracting Pty. Ltd. ( QAContracting ) was established in Mandurah in 1995 by David Cameron,

primarily to provide contract services to the Water Corporation in the Mandurah - Murray, South West and Greater

Southern regions of Western Australia. Due to health reasons, David retired from QAContracting in April 2013

and the company was taken over by Wayne Elliott and Roy Nella. Although David was a significant factor in the

success of QAContracting and the works the company delivered, both Wayne and Roy brought a broad range of

experiences to the company which enabled the company to continue operating as it always has, providing a quality

multi discipline services to its clients.

Some of the works that QAContracting has successfully progressed over the previous years are shown following.

Page 2: Our ref: ltr 1892 - Quality Assured Engineeringqacontracting.com.au/wp-content/uploads/2017/10/... · Quality Assured Contracting Pty. Ltd. ACN 071 696 743 ABN 41 071 696 743 Pump

Quality Assured Contracting Pty. Ltd. ACN 071 696 743 ABN 41 071 696 743

Discharge Pipe Repairs Brownell Crescent Kwinana Waste Water Pumping Station

Client Water Corporation

Client Representative Henry McKinlay

M&E Technical Services

Phone 08 9424 8587

Mobile 0403 584 112

Email [email protected]

Start 14th March 2016

Finish ( Scheduled ) 24th May 2016

QAContracting has been engaged to replace the corroded rising pipework flanges and discharge elbows at the

Brownell Crescent Kwinana waste water pumping station. QAContracting have developed a work methodology

whereby the pumping station can remain online whilst the pipework is replaced removing the need for station

downtime and costly bypass pumping systems.

Brownell Crescent Kwinana WWPS. Flange Replacement. Replacement Elbow.

Installation of an OdaTech Odour Control System to the Bibra Drive Bibra Lake Waste Water Pumping

Station

Client OdaTech Pty. Ltd.

Client Representative Ivan de Souza

Director

Phone 08 93495940

Mobile 0418947 971

Email [email protected]

Start 9th May 2016

Finish ( Scheduled ) 30th June 2016

QAContracting has been engaged to install a new OdaTech odour control system ( OCS ) to the Bibra Drive Bibra

Lake waste water pumping station. The system is an 11 tank assembly and is the largest OCS installed by OdaTech

to date with works scheduled for completion by the end of June 2016.

Bibra Drive Bibra Lake OCS Plan Bibra Drive Bibra Lake OCS Elevation

Page 3: Our ref: ltr 1892 - Quality Assured Engineeringqacontracting.com.au/wp-content/uploads/2017/10/... · Quality Assured Contracting Pty. Ltd. ACN 071 696 743 ABN 41 071 696 743 Pump

Quality Assured Contracting Pty. Ltd. ACN 071 696 743 ABN 41 071 696 743

Pump Upgrades Byford Waste Water Pumping Stations 1 and 2

Client DMCivil

Client Representative Martin Fisher

Contract Manager

Phone 08 9492 1800

Mobile 0419 000 458

Email [email protected]

Start 21st January 2015

Finish 29th July 2015

QAContracting was engaged to upgrade the pumps in the Byford waste water pumping stations numbers 1 and 2

as part of DMCivil's upgrade works to the local pressure main for the Water Corporation. QAContracting procured

and installed the pumps as well as fabricating and installing a new concrete cover to the number 2 pumping station

meeting the required schedule.

Concrete Cover Formwork. Byford WWPS Number 2. Newly Installed Concrete Cover.

Pump Upgrade Forrest Street Palmyra Waste Water Pumping Station

Client Water Corporation

Client Representative Sajan Samuel

Project Engineer Perth Regional Alliance

Phone 08 9424 8130

Mobile 0417 457 021

Email [email protected]

Start 16th July 2015

Finish 28th August 2015

QAContracting was engaged to upgrade the pumps at the Forrest Street Palmyra waste water pumping station. The

current pumps were overdue for replacement and could not meet the current required output. QAContracting laser

scanned the existing installation to ensure the premanufactured spools would match with the existing flange

orientation errors.

Forrest Street Pumps. Flange Alignment Laser Scanned Image. New Pumps Installed.

Page 4: Our ref: ltr 1892 - Quality Assured Engineeringqacontracting.com.au/wp-content/uploads/2017/10/... · Quality Assured Contracting Pty. Ltd. ACN 071 696 743 ABN 41 071 696 743 Pump

Quality Assured Contracting Pty. Ltd. ACN 071 696 743 ABN 41 071 696 743

Pump Upgrade Mary Street Mandurah Waste Water Vacuum Pumping Station

Client Water Corporation

Client Representative Martin Cornelius

Trades Team Leader Mandurah Murray

Phone 08 9550 3428

Mobile 0407 478 470

Email [email protected]

Start 7th July 2014

Finish 7th September 2014

QAContracting was engaged to install new pumps to the Mary Street Mandurah waste water vacuum pumping

station as the old were badly eroded and not sized correctly for the current duty. The Water Corporation required

the new pumps to be Hidrostals which necessitated a total change to the existing pipework and because the well

could not be readily bypassed without significant risk, the installation was required to be performed as quickly as

possible. QAContracting premanufactured all of the pipework and installed the pumps simultaneously over a

period of three days, well within the five day schedule and with no installation or safety issues.

Previous Installation. Workshop Preassembly.

New Installation

New Installation. New Installation

Page 5: Our ref: ltr 1892 - Quality Assured Engineeringqacontracting.com.au/wp-content/uploads/2017/10/... · Quality Assured Contracting Pty. Ltd. ACN 071 696 743 ABN 41 071 696 743 Pump

Quality Assured Contracting Pty. Ltd. ACN 071 696 743 ABN 41 071 696 743

Pump Upgrade Swanbourne Street Fremantle Water Booster Station

Client Water Corporation

Client Representative Mark Hadfield

Area Coordinator Mechanical Electrical Perth Regional Alliance

Phone 08 9423 7852

Mobile 0419 362 504

Email [email protected]

Start 21st January 2015

Finish 9th March 2015

QAContracting were given the works to install new pumps to the Swanbourne Street Fremantle water booster

station as the old pumps were not sized correctly for the current duty and were transferring vibration and noise

through the piping system resulting in customer complaints. The installation needed to be done as quickly as

possible with no interruption to fresh water supply services. To ensure there was no risk to the local water supply,

QAContracting premanufactured all of the pipework utilising jigs to remove problems due to flange misalignment

and installed the pumps on two separate days over a two week period with no installation or safety issues.

Previous Installation. Workshop Preassembly.

New Installation. New Installation.

Page 6: Our ref: ltr 1892 - Quality Assured Engineeringqacontracting.com.au/wp-content/uploads/2017/10/... · Quality Assured Contracting Pty. Ltd. ACN 071 696 743 ABN 41 071 696 743 Pump

Quality Assured Contracting Pty. Ltd. ACN 071 696 743 ABN 41 071 696 743

Tank Floating Roof Demolition Kwinana Waste Water Treatment Plant

Client Water Corporation

Client Representative Ray Trinder

Plant Manager Kwinana Mandurah Operations

Phone 08 6330 6385

Mobile 0437510441

Email [email protected]

Start 10th May 2013

Finish 6th June 2013

QAContracting were awarded the works to demolish and dispose of the steel tank floating roof which was located

at the Kwinana Waste Water Treatment Plant ( WWTP ). The roof was systematically cut up using oxy acetylene

into manageable sizes and all steel delivered to the local scrap merchant for recycling. The roof was part of the

redundant equipment located at the treatment plant which QAContracting has proposed to demolish over a period

of three years, providing the Water Corporation with a milestone schedule and budget breakdown to assist with

their planning.

Redundant Tank Floating Roof. Wall Demolition.

Roof Demolition. Roof And Concrete Ring Demolition And Removal.

Page 7: Our ref: ltr 1892 - Quality Assured Engineeringqacontracting.com.au/wp-content/uploads/2017/10/... · Quality Assured Contracting Pty. Ltd. ACN 071 696 743 ABN 41 071 696 743 Pump

Quality Assured Contracting Pty. Ltd. ACN 071 696 743 ABN 41 071 696 743

Installation of the OdaTech Odour Control System to the Busselton Waste Water Treatment Plant

Client OdaTech Pty. Ltd.

Client Representative Ivan de Souza

Director

Phone 08 93495940

Mobile 0418947 971

Email [email protected]

Start 28th May 2013

Finish 25th September 2013

QAContracting provided design, fabrication and installation services to OdaTech Pty. Ltd. who are a preferred

supplier of odour control systems to the Water Corporation. Liaising directly with Tenix and on behalf of OdaTech,

QAContracting installed an eight tank biomedia odour control system to the Busselton WWTP as part of the plant

upgrade. QAContracting were responsible for all installation activities ranging from the transport of components,

erection, installation of biomedia to the vessels and commissioning. QAContracting also designed and supplied

the pipe supports and the 8 meter self standing fibreglass reinforced plastic ( FRP ) stack.

Pipe Supports Specification Drawing. Fibre Reinforced Polymer Stack Construction.

Installation Of Centre Piping. Operational OdaTech Odour Control System.

Page 8: Our ref: ltr 1892 - Quality Assured Engineeringqacontracting.com.au/wp-content/uploads/2017/10/... · Quality Assured Contracting Pty. Ltd. ACN 071 696 743 ABN 41 071 696 743 Pump

Quality Assured Contracting Pty. Ltd. ACN 071 696 743 ABN 41 071 696 743

Installation of Concrete Steps to the Caddadup Waste Water Treatment Plant

Client Water Corporation.

Client Representative George Kemshall

Operations Supervisor Waste Water Treatment Branch

Phone 08 9550 3426

Mobile 0417185585

Email [email protected]

Start 8th May 2013

Finish 8th August 2013

QAContracting were engaged to construct a set of concrete steps and associated pathways to the Caddadup WWTP.

QAContracting developed a specification and drawings based on Water Corporation standards which enable the

works to progress seamlessly with no issues.

Caddadup Stairs Location. Stairs And Handrail Specification Drawing.

Reinforcement Specification Drawing. Completed Stairs And Concrete.

Page 9: Our ref: ltr 1892 - Quality Assured Engineeringqacontracting.com.au/wp-content/uploads/2017/10/... · Quality Assured Contracting Pty. Ltd. ACN 071 696 743 ABN 41 071 696 743 Pump

Quality Assured Contracting Pty. Ltd. ACN 071 696 743 ABN 41 071 696 743

Installation of the OdaTech Odour Control System to the Coodanup Waste Water Pumping Station

Client OdaTech Pty. Ltd.

Client Representative Ivan de Souza

Director

Phone 08 9349 5940

Mobile 0418947 971

Email [email protected]

Start 28th May 2013

Finish 25th September 2013

OdaTech Pty. Ltd. was engaged directly by the Water Corporation to install their proprietary odour control system

to the Wanjeep WWPS located in Coodanup. As OdaTechs' installer, QAContracting managed the complete works

liaising directly with local Water Corporation personnel to ensure all parties were aware of the works progress and

all approvals were in place. QAContracting installed the complete system whilst also supplying the concrete pad,

fencing, exhaust stack, sprays, drainage, ventilation, electrical components and connection plus coring of the well.

QAContracting further assisted with commissioning and training to ensure the system operated as designed and

the handover to the Water Corporation progressed with no problems.

Coodanup Waste Water Pumping Station. Concrete Pad Directly Prior To Pour.

Biomedia Tanks Charged And In Place. Operational OdaTech Odour Control System.

Page 10: Our ref: ltr 1892 - Quality Assured Engineeringqacontracting.com.au/wp-content/uploads/2017/10/... · Quality Assured Contracting Pty. Ltd. ACN 071 696 743 ABN 41 071 696 743 Pump

Quality Assured Contracting Pty. Ltd. ACN 071 696 743 ABN 41 071 696 743

Modifications to the Mandurah Garden Estate Pressure Reducing Valve Station

Client Water Corporation.

Client Representative David Podmore

Operations Coordinator Mandurah Murray

Phone 08 9550 3404

Mobile 0408 400 633

Email [email protected]

Start 7th June 2013

Finish 12th July 2013

During the winter months, the Mandurah Garden Estate pressure reducing valve ( PRV ) would become flooded

with ground water causing access issues for Water Corporation operations personnel. QAContracting elevate the

valve arrangement and relocated the existing walkway to make the installation accessible all year round. The

manifolds required to elevate the PRV were measured, drawn, then remeasured to confirm accuracy and to ensure

the PRV could be quickly elevated with minimal installation time and loss of water supplies to the local consumers.

The installation was progressed with no problems for a total isolation time of 45 minutes.

Mandurah Gardens Pressure Reducing Valve. New Pipe Risers Drawing.

Pipe Risers Installed. Pressure Reducing Valve Modifications Completed.

Page 11: Our ref: ltr 1892 - Quality Assured Engineeringqacontracting.com.au/wp-content/uploads/2017/10/... · Quality Assured Contracting Pty. Ltd. ACN 071 696 743 ABN 41 071 696 743 Pump

Quality Assured Contracting Pty. Ltd. ACN 071 696 743 ABN 41 071 696 743

Installation of Falls Protection System to Rockford Street Waste Water Pumping Station

Client Water Corporation.

Client Representative Tony Addicoat

Project Manager Great Southern and Southwest Region

Phone 08 9791 0478

Mobile 0429 116 442

Email [email protected]

Start 1st March 2013

Finish 15th May 2013

QAContracting is a Water Corporation contract panel member for the Fabricate and Install of Prevention of Fall

Equipment. As a panel member, QAContracting has successfully installed prevention of falls equipment to over

20 pumping stations of which Rockford street is the most recent. Works included the supply and installation of

stainless steel grates, installation of receptacles to existing concrete plus installation of a davit base and new

concrete mass. QAContracting also replaced the existing galvanized pump rails with stainless steel whilst installing

the falls protection system.

Rochford Street Waste Water Pumping Station. Unguarded Pump Pit.

Prevention Of Falls Grates And Mounts Installed. Completed Waste Water Pumping Station.

Page 12: Our ref: ltr 1892 - Quality Assured Engineeringqacontracting.com.au/wp-content/uploads/2017/10/... · Quality Assured Contracting Pty. Ltd. ACN 071 696 743 ABN 41 071 696 743 Pump

Quality Assured Contracting Pty. Ltd. ACN 071 696 743 ABN 41 071 696 743

Replace MSCL Piping at Bridgewater Waste Water Pumping Station

Client Water Corporation.

Client Representative Martin Cornelius

District Fitter Mandurah Murray

Phone 08 9550 3428

Mobile 0407 478 470

Email [email protected]

Start 23rd May 2012

Finish 28th June 2012

QAContracting was tasked with removing and replacing the badly corroded pumping system at the Bridgewater

WWPS. Works involved installing a bypass system to maintain flow then removing the existing pump set, valves

and discharge piping to be replaced with new. All works were progressed to Water Corporation standards and finish

to ensure the system operates trouble free and in excess of its intended life.

Corroded Valve. New Pressure Main.

Refurbished valve pit. Remediated Work Area.

Page 13: Our ref: ltr 1892 - Quality Assured Engineeringqacontracting.com.au/wp-content/uploads/2017/10/... · Quality Assured Contracting Pty. Ltd. ACN 071 696 743 ABN 41 071 696 743 Pump

Quality Assured Contracting Pty. Ltd. ACN 071 696 743 ABN 41 071 696 743

Repair Water Tanks at Yarloop Water Treatment Plant

Client Water Corporation.

Client Representative Mick Adams

Project Manager South West Region

Phone 08 9791 0411

Mobile 0409080154

Email [email protected]

Start 30th August 2012

Finish 8th November 2012

During inspections of the water storage tanks at the Yarloop Water Treatment Plant ( WTP ) it was discovered that

a number of roof columns were corroded and in danger of collapsing. QAContracting was engaged to replace the

corroded columns and any damaged roof beams that were found plus clean the vessels. During the repairs,

additional problems were found which included corroded overflow pipes and corroded access ladders.

QAContracting subsequently replaced the overflow pipes with PVC pipe and replaced the existing steel ladders

for FRP units. Swing gates were also added to the roof access ladder to improve safety during access and egress.

Yarloop Water Treatment Plant Tank. Corroded Roof Support.

New Roof Support Columns. New Overflow Pipe.

Page 14: Our ref: ltr 1892 - Quality Assured Engineeringqacontracting.com.au/wp-content/uploads/2017/10/... · Quality Assured Contracting Pty. Ltd. ACN 071 696 743 ABN 41 071 696 743 Pump

Quality Assured Contracting Pty. Ltd. ACN 071 696 743 ABN 41 071 696 743

Key Personnel

Wayne Elliott B.Eng. B.Com. MIEAust.

Wayne Elliott is a professional Mechanical Engineer who also holds a

further degree in Commerce ( Finance ) and a trade qualification as a

Mechanical Fitter. He has extensive experience across a broad range of

fields including asset management and maintenance, engineering design

and drafting, contract services, project engineering and project

management. Wayne is a Director and the General Manager of

QAContracting whilst also providing project and engineering management

support to QAContracting's operations. A member of the Institute of

Engineers Australia ( IEAust. ), Wayne is equally at home applying

engineer theory to design a piece of equipment or operating a skid steer

loader assisting the execution team to deliver their works to budget and

schedule.

Wayne Elliott

Director / General Manager

Some of the works Wayne has managed prior to taking over QAContracting include the following.

2012Transfield Alcoa Pinjarra – Project Engineer

Number 7 Secondary Thickener Tank Repairs.

Replace Corroded Roof Truss.

2011 Transfield Alcoa Pinjarra – Project Engineer

30A3 Spent Liquor Tank Reconstruction.

Tank Demolition and Reconstruction.

2011 Fluor Alcoa Pinjarra – Project Engineer

125L Diesel Tank Flat Bottom Tank Inspection.

Design And Install 1 Kilometre Diesel Transfer

Piping.

2009 Terex – Reliability Engineer

MT6300 Reliability Issues.

Investigate Recurring Component Failures.

Page 15: Our ref: ltr 1892 - Quality Assured Engineeringqacontracting.com.au/wp-content/uploads/2017/10/... · Quality Assured Contracting Pty. Ltd. ACN 071 696 743 ABN 41 071 696 743 Pump

Quality Assured Contracting Pty. Ltd. ACN 071 696 743 ABN 41 071 696 743

Matthew Bee MPE. GradIEAust.

Matthew Bee

Project Engineer / Mechanical Engineer

Matthew Bee is a graduate Mechanical Engineer with a Master’s

Degrees from the University of Western Australia. He is a member of

the Institute of Engineers Australia (IEAust) and has experience in

several fields from Mining Operations and Alumina Refining to

domestic construction work. Matthew has a thorough understanding

of mechanical engineering principles and good administrative practices,

along with significant hands-on labouring experience.

Some of the works Matthew has been involved with prior to taking on his position with QAContracting include

the following:

2016 Alcoa WAO – Engineering Vacation Student.

Calciner Alliance Team for all WA refineries.

ESP Inspection and troubleshooting.

2016 UWA Final Year Thesis project.

Finite Element Modelling of Chopped Aramid fibre

adhesive joint toughening in Carbon Fibre composites.

2015 Alcoa Huntley – Engineering Vacation Student.

Payload Management System/Lifting Jig design.

Improve payload data & system utilisation.

2011-2016 Port Form Construction – Labourer.

Commercial & Industrial Construction around Perth.

Formwork, Concreting & Tilt-Up Panel Construction.

Page 16: Our ref: ltr 1892 - Quality Assured Engineeringqacontracting.com.au/wp-content/uploads/2017/10/... · Quality Assured Contracting Pty. Ltd. ACN 071 696 743 ABN 41 071 696 743 Pump

Quality Assured Contracting Pty. Ltd. ACN 071 696 743 ABN 41 071 696 743

Frank Wheel B.Eng. CPEng. MIEAust.

Frank Wheel is a qualified Mechanical Engineer who has attained the

title of Chartered Professional Engineer ( CPEng. ) as recognized by the

Institute of Engineers Australia ( IEAust. ). Frank has many years'

experience in the field of Mechanical Engineering with a particular

emphasis on project management and concrete structures. Frank is

QAContracting's Office Manager, overseeing all aspects of the companies'

administration including company processes and procedures. In addition to

his Office Managers role, Frank is also the primary lead for

QAContracting's quality assurance system and ISO 9001 accreditation.

Frank Wheel

Office Manager

Some of the works Frank has managed prior to taking on his position with QAContracting include the following.

2011 Fluor Alcoa Pinjarra – Project Manager.

35C Condensate Storage Tank.

Flat Bottom Tank Inspection and Repairs.

2011 Fluor Alcoa Pinjarra – Project Manager.

6C2 Caustic Storage Tank.

Flat Bottom Tank Inspection and Repairs.

2010 Fluor Alcoa Pinjarra – Project Manager

Ball Mill Cooling System.

Replace Cooling Towers.

2009 Rapley Wilkinson – Concrete Manager.

Seashells Resort Mandurah.

Apartment Building Construction.

Page 17: Our ref: ltr 1892 - Quality Assured Engineeringqacontracting.com.au/wp-content/uploads/2017/10/... · Quality Assured Contracting Pty. Ltd. ACN 071 696 743 ABN 41 071 696 743 Pump

Quality Assured Contracting Pty. Ltd. ACN 071 696 743 ABN 41 071 696 743

Referees

Ivan de Souza Ray Trinder

Director Plant Manager

OdaTech Pty. Ltd. Water Corporation Kwinana Mandurah Operations

Phone 08 9349 5940 Phone 08 6330 6385

Mobile 0409 841 510 Mobile 0437510441

Email [email protected] Email [email protected]

Gary Adlam

Operations Manager

Water Corporation Mandurah Murray

Phone 08 9550 3408

Mobile 0417 944 309

Email [email protected]