DOE site visit, Feb. 1, 2010 Pat Skubic, University of Oklahoma 1
Pat SkubicUniversity of Oklahoma
OUHEP Introductionand
ATLAS Overview
DOE site visit, Feb. 1, 2010 Pat Skubic, University of Oklahoma 2
OUTLINE
OUHEP Introduction ATLAS Overview
Hardware Projects Pixel Detector Construction
Flex Hybrid Pixel Detector Installation
ATLAS Upgrade Optical Link Development
OSUOU
Software Projects Tier 2 Center Physics Analysis
Conclusions
DOE site visit, Feb. 1, 2010 Pat Skubic, University of Oklahoma 3
OUHEP Introduction Experimental Task A
ATLAS New run plan: collect 1/fb at 7 TeV CM energy during 2010-11 Need COLA support for personnel at CERN (included in foreign travel) P. Skubic requesting sabbatical for Fall 2010 and Spring 2011
D0 Computing (ATLAS & D0 and contributions to OSG) OCHEP- DOE EPSCoR Implementation grant (ends Aug. 2010)
ATLAS Southwest Tier 2 computing Center established in collaboration with UT-Arlington, UNM
Started OSU experimental group – close collaboration with OUHEP on physics and hardware
Theory Task B K. Milton C. Kao H. Baer: Included in this proposal Theory Group hosted two international conferences during 2009
Interconnection between Particle Physics and Cosmology (PPC2009) Quantum Field Theory under the Influence of External Conditions (QFEXT09)
IDC rate changes
FY07 – FY09 On campus IDC rate (48%) with negotiated returned IDC
Task A (FY09): $92 K Task B (FY09): $ 4 K
FY10 – FY12 Off campus IDC rate (26%) except on travel (15%) Returned IDC (11% of travel request)
Task A (FY10): $ 15 K Task B (FY10): $ 3.3 K
DOE site visit, Feb. 1, 2010 Pat Skubic, University of Oklahoma 4
Task A Funding (FY09)(Including IDC)
Note $419 K decrease for FY10 DOE Base grant + supplement:
DOE OU match SFW: $433 K $ 46 K Travel: 78 K 31 K + 15 K M&S 7.6 K
OCHEP: DOE : including supplement:
SFW : $162 K Travel: 56 K M&S: 21 K
Regents match: SFW: $ 78 K VPR match: ($117 K will continue after end of EPSCoR grant)
SFW: $117 K Travel: 15 K
Department of Physics and Astronomy: SFW: $ 10 KDOE site visit, Feb. 1, 2010 Pat Skubic, University of Oklahoma 5
ATLAS Overview
DOE site visit, Feb. 1, 2010 Pat Skubic, University of Oklahoma 6
DOE site visit, Feb. 1, 2010 Pat Skubic, University of Oklahoma 7
ATLAS Personnel OU/LU Group members
Faculty: B. Abbott, P. Gutierrez, P. Skubic (contact), J. Snow (LU), M. Strauss Research Scientist: H. Severini OCHEP Postdoc: M. Saleem Tier 2 Postdoc: G. Huang IT Specialist: K. Arunachalam Tech. Support: G. Boyd, A. Wade Grad Students: D. Jana, M.R. Meera Lebbai, S. Norberg
Projects Pixel flex hybrid production complete; pixel detector installed ATLAS GRID testbed (PS, HS) Tier 2 Center Physics analysis Pixel detector commissioning (GB, MS, DJ, MRML are resident at CERN) Pixel monitoring Muon isolation studies Pixel optical link upgrade (OU, OSU, Ohio State)
DOE site visit, Feb. 1, 2010 Pat Skubic, University of Oklahoma 8
Pixel Module: see Episode II
Schematic Cross Section(through here)
Bumps
Flex Hybrid (green)
Sensor
Wirebonds
ASICs
Pigtail (beyond)
OU responsible for design, fabrication, assembly, and testing of Flex Hybrids (FH). FH Construction completed May, 2005
DOE site visit, Feb. 1, 2010 Pat Skubic, University of Oklahoma 9
Pixel Detector Commissioning
Electronics Engineer Rusty Boyd is resident at CERN to help in pixel and ID commissioning.
Contributions of OUHEP members at CERN: HVPP4 design, construction, installation (all) Off-detector electronics installation (complete) Pixel detector calibration (MS) ID shifts: Pixel & ID Data Quality, Pixel DAC, Cosmic Ray
and collision data taking, etc. (all) Laser Safety Officer (GB) Shift Leader in Matters of Safety (GB) Counting room M&O (all) ID cooling system operation (GB)
DOE site visit, Feb. 1, 2010 Pat Skubic, University of Oklahoma 10
ATLAS Upgrade OU and OSU joined collaboration to develop the inner
detector optical link for the ATLAS upgrade LHC Luminosity will increase by factor of 10 in 2 phases Phase 2 upgrade installation in ~2017? Three year R&D phase (completed)
Collaboration with Ohio State U. Irradiations at CERN in Aug. 2006, 2007, 2008, 2009 & IU in 2008 Total OU budget $63K
OU and OSU are collaborating on Opto-box for the Insertable B Layer (IBL) Opto-box holds, powers, and cools opto-boards used for optical
fiber data transmission from IBL G. Boyd is technical contact OSU graduate student will work on project
DOE site visit, Feb. 1, 2010 Pat Skubic, University of Oklahoma 11
Software Projects Tier 2 Center
ATLAS management selected OU, LU, UT-Arlington, UNM, as a Tier 2 Center (Southwest Tier 2 Center)
Collaboration developed grid software: PanDA OCHEP linux cluster deployed and running DOE EPSCoR funding for OU/LU NSF funding (subcontract from UTA)
Amount negotiated each year ($110K for FY10)
Physics Analysis: OCHEP collaboration begins on physics topics, building on Tevatron experience b tagging top physics Higgs/SUSY searches
US ATLAS Forum co-convenors: Top Physics: P. Skubic (OU) QCD: B. Abbott b-tagging: F. Rizatdinova (OSU)
Physics at the LHC will be driven by…
DOE site visit, Feb. 1, 2010 Pat Skubic, University of Oklahoma 12
Hardware – pixel tracking system Software – alignment of the pixel tracking system; Physics object identification – b-jet identification
Heavily relies on the pixel tracking system; Development of the calibration of the b-tagging and mis-tagging
rates in situ e/γ tagging
Physics experience from the Tevatron Top quark physics Higgs boson searches SUSY searches
OCHEP contributions to ATLAS notes
Contributed to CSC note on flavor tagging performance
Contributed to muon-isolation note Authored INT note on b-tagging fake rates Authored INT note on ttbar cross section
measurement (approved) Co-authored INT note on SO(10) SUSY search
DOE site visit, Feb. 1, 2010 Pat Skubic, University of Oklahoma 13
DOE site visit, Feb. 1, 2010 Pat Skubic, University of Oklahoma 14
Conclusions
OCHEP personnel are contributing to ATLAS pixel detector commissioning and operation
OCHEP collaboration on ATLAS upgrade and IBL optical link development started
ATLAS SW Tier 2 Center created and OCHEP linuxcluster is deployed and is currently being upgraded to allow analysis jobs in addition to production jobs
OUHEP desktop cluster is deployed as Tier 3 resource and will be upgraded with ARRA funds
OCHEP personnel collaborating on grid software development in support of ATLAS, D0, and OSG
OCHEP personnel collaborating on ATLAS physics analysis